ontario regulation 284/14
made under the
Environmental Assessment Act
Made: December 10, 2014
Filed: December 16, 2014
Published on e-Laws: December 16, 2014
Printed in The Ontario Gazette: January 3, 2015
Amending O. Reg. 276/06
(DESIGNATION AND EXEMPTION OF INTEGRATED POWER SYSTEM PLAN)
1. Section 1 of Ontario Regulation 276/06 is revoked and the following substituted:
Definition
1. (1) In this Regulation,
“integrated power system plan” means any integrated power system plan developed by the Independent Electricity System Operator under Part II.2 of the Electricity Act, 1998.
(2) For greater certainty, an integrated power system plan includes each version of an integrated power system plan developed by the Independent Electricity System Operator, whether or not required by the Minister of Energy, and whether or not it is approved by the Ontario Energy Board or is referred by the Ontario Energy Board back to the Independent Electricity System Operator.
(3) For greater certainty, an integrated power system plan developed by the Ontario Power Authority to which this Regulation applied immediately before January 1, 2015 continues to be an integrated power system plan for the purposes of this Regulation.
Commencement
2. This Regulation comes into force on the later of January 1, 2015 and the day it is filed.