Decision 18/2003/qđ-Bxd: On The Regulation Of Quality Management Of Construction Works

Original Language Title: Quyết định 18/2003/QĐ-BXD: Về việc ban hành Quy định quản lý chất lượng công trình xây dựng

Subscribe to a Global-Regulation Premium Membership Today!

Key Benefits:

Subscribe Now for only USD$40 per month.
The decision on issuing the provisions on quality management of construction works _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ CONSTRUCTION MINISTER pursuant to Decree No. 36/2003/ND-CP dated 4 April 2003 of the Government functions, tasks, powers and organizational structure of the Ministry of construction;
Pursuant to Decree No. 51/1999/ND-CP dated 8 July 1999 the Government issued regulations on investment and build the evil Decree 12 v/2000/ND-CP dated 5 May 2000, Decree No. 7/2003/ND-CP dated 30 January 2003 by the Government on amendments and supplements to some articles of the regulation on investment management and building attached to the Decree No. 51/1999/ND-CP dated 8 July 1999 from the Government;
At the suggestion of Director of Department of the State inspection of the quality of construction works, the Director of the legislation;
Article 1 DECISION. Attached to this decision regulates the quality management alternative constructions quality management regulations of construction works attached to decision No 17/2000/QD-BXD dated 2 August 2000 of the Minister of construction.
Article 2. This decision was implemented uniformly throughout the country and have effect after 15 days from the date The report.
Article 3. The Ministers, heads of ministerial agencies, government agencies, the financial administration of the Central Party, the Central Agency of the political organization, the social-political organization, the Chairman of the provincial people's Committee, the central cities, businesses, investors, organizations and individuals responsible for the implementation of this decision.
 

 



Ministers (signed) Nguyen Hong Quan QUALITY MANAGEMENT REGULATIONS of CONSTRUCTION WORKS (attached to decision No 18/2003/QĐ-BXD dated 27 June 2003 the Minister of construction) Chapter 1: GENERAL PROVISIONS article 1. The object and scope of this regulations prescribe the content of quality management of institutions, individual investment advisory activities and building, construction business, project management, construction, owner and Manager of State bodies involved in the survey design, construction, testing, delivery, warranty, maintenance, construction works in new construction projects (including ancillary works, works, works serve kicked), restoration, renovation, irrespective of form of ownership, capital.
Article 2. Explanation of terms In this regulation, the terms below are interpreted as follows: 1-the quality of construction is the requirement for secure, sustainable, techniques and art of works in accordance with the construction standards and benchmarks, the provisions in the text of the relevant legal and contract delivery.
2-building survey is survey activities, drawing, exploration, collection, analysis and synthesis of the materials and data on the region's natural conditions, location, built to serve the design.
3-preliminary design is the document shown by demonstration and drawing on planning, architectural, structural, technical and system layout technology, specifically the factors stated in the content of the feasibility study report. Preliminary design approved feasibility study report together is grounds for creation, evaluation and technical design review or construction engineering design.
4-technical design (design) is the document shown by demonstration and drawings to be deployed on the basis of preliminary design approved feasibility study report together. Profile design engineering to ensure eligible to form of estimation, tender and construction drawings.
5-construction drawing design (detailed design) is the document shown by the drawing was created on the basis of technical design. Profile design drawing must show the architectural detail, texture, systems engineering (power supply, water supply, drainage, steam, air conditioners, ...) and the technology to make building business construction.
6-design verification is to check the design of the building consulting organisations comply with the requirements of the investor for the design works by a different design consulting organization.
7-the evaluation design is the work of competent person inspect the Organization's capacity in terms of counseling, individual design; check the legitimacy of the profile design, engineering or construction engineering design; check the fit between the content of technical design profile with preliminary design and content have been approved in investment decisions; reviews the logical solution designed to serve as a basis for approval of technical design.
8-author is monitoring the work test, interpret or handle the obstacles to change, resulting in the scene to ensure the continued construction in the correct design and copyright protection of the design consultancy established technical design made the scene in the process of construction.
9-supervise construction of investor activity is monitored regularly, continuously, systematically performed by the owner to manage the volume, quality, the progress of the building works by the construction business performed by contract delivery contractor, construction drawing design or construction engineering design has been approved And standards, building standards are applied.
10-quality control for construction activity is test, test weight, one or more of the nature of the products or the construction, in comparison with the provisions of the design and construction standards to be applied by the Advisory organizations.
11-quality inspection of construction works is the activity of the Agency the function of State management of the quality of construction works, on the basis of Standard Rules of construction, technical standards are applied, legal texts and the results of quality control to evaluate the quality of the conclusions, the product or construction work.
12-complete the drawing is the drawing reflects the results of construction by the construction business established on the basis of construction drawing design or construction engineering design has been approved and the results of the test construction products made at the scene was the owner confirmed.
13-warranty works is repairs the damaged works occurred in the warranty period of the business construction 14 construction-maintenance works is maintenance work, repair, duỡng small, medium, large repair repair by the owner or the management server using the work done to ensure for the use , safe operation of the process, because the people who designed and built the House rules.
Article 3. Decentralized management on the quality of construction works 1-Ministry of construction: the unification of State management of the quality of construction works within the country, is responsible for: a) issued legal documents about the quality management of survey, design, construction , testing, delivery, warranty, maintenance, construction and installation works; the agreement to have sets of specialized construction, specialized technical manager issued the regulations on quality management of specialized construction and specialized quality management techniques in the process.
b) instructions, check the implementation of legal documents on management of the quality of construction works.

c) periodically check or irregular management of construction quality of owner, organization design and implementation consultancy business for the construction works of the project group a. direct quality control organization works in both countries when needed.
d) implementation and responsible for the assessment of the quality of construction works according to the hierarchy of the Government;
e) synthesis report the Prime Minister six months, 1 year on the quality of construction works as specified.
Department of State inspection of quality of construction, survey, design and construction of relevant units of the Ministry of construction to help Minister to build on responsibilities.
2-provincial people's Committee: a) the provincial people's Committee of the unified state management on the quality of construction works at the local responsibility:-Guide and check the implementation of legal documents on management of construction quality at the local level.
-Check periodically or irregularly in quality management of construction of owner, design consultants and construction business for public works projects in the Group B, C by local management. Direct quality control organization works locally as needed.
-Handle the infringing on the quality of construction works and construction issues locally according to the hierarchy in article 25 of this regulation.
-General and periodic construction Ministry report in six months on the State of the quality of the local construction management (reporting form as Appendix 27 of this Regulation).
-Decentralized governance for quality of construction works for the project by the people's committees at district level, the investment decision.
Construction Department is the agency that helps provincial people's Committee on responsibilities.
Depending on the nature of the project, the provincial people's Committee delivered to the building Department or the Department has specialized construction engineering design and assessment of construction estimation due to local management; the Guide, check out the work of technical and design evaluation of estimation of construction works according to the rules of construction and investment manager at Allied vehicles;
b) Departments have specialized construction work has the task of managing the local industry on the quality of the construction work, is responsible for:-Guide and check the implementation of legal documents on management of construction quality of majors at the local.
-Check periodically or irregularly in quality management of specialized construction of owner, organization design and construction business for specialized work in project groups B, C by local management. Directly inspecting the quality of specialized construction work locally when needed.
-Recommendations to treat the breach of the quality of construction works; in collaboration with the Department of construction to resolve specialized construction work due to local management.
-Periodic reports on the situation/06 quality specialized construction works in the scope of industry Management Department of Department of building (report template according to the annex of this regulation 28) to report aggregate provincial people's Committee, the Ministry of construction.
3-the Department has specialized construction works include the Ministry of transport, Ministry of industry, Ministry of agriculture and rural development, the Ministry of defence, the Ministry of public security and the Ministry of post and telecommunications is responsible for: a) issued the regulations on quality management of specialized construction work after the agreement with the Ministry of construction.
b) instructions, check the implementation of the quality management regulations for the construction works by the specialized management on nationwide.
c) appraising, approving engineering designs and the total construction work by specialist assigned by the Government; instructions, check the work appraisal, design, engineering, and total construction specialization according to the regulations on investment and construction management for the professional work by the management;
d) periodically check or irregular quality management by the owner, design consultants and construction business for the professional work by the management. When necessary, direct the Organization to check the quality of the construction work in The disciplines of management. Petitions handled in violation of the quality of construction works. Particularly for the work of the project group A need of coordination with the Ministry of construction when performing the job on.
e) recurring reports 6 months of quality specialized construction works sent the Ministry of construction (sample report as Appendix 28 of this Regulation) to General Government reports.
4-The technical disciplines including ministries, ministerial-level agencies have state management functions of specialized techniques such as fire prevention, blast; environmental safety; labor safety; industrial safety; Dyke safety; traffic safety; the post office; Security; Defense is responsible for: a) issued the regulation of specialized quality management techniques in the construction work after the agreement with the Ministry of construction.
b) instructions, check the implementation of the provisions of specialized quality management techniques in the construction works on the nationwide.
c) join with state management functions for quality of construction works (according to the hierarchy in the account 1, 2 of this) to check the quality of the engineering disciplines such as fire prevention, blast; environmental safety; labor safety; industrial safety; Dyke safety; traffic safety; the post Office for each type of work required.
5-ministries, ministerial agencies, government agencies, the financial administration of the Central Party, the central organ of the Organization of politics, of the social-political organizations (defined in the State budget Law) have the projects and assigned to manage the capital construction investment project approved (called The Yes project) is responsible : a) organizations follow the quality management regulations for the construction of management through The function of the Agency, or organization managing the project has enough capacity in accordance with the law.
b) appraising, approving engineering designs and the total construction work under assignment by the Government; instructions, check the work appraisal, design, engineering, and total construction works according to the rules of construction and investment management for construction management c) in collaboration with the Ministry of construction to check the management of construction quality of investor , organization design and construction business; monitor, detect and handle petitions the breach of quality works for the Ministry of construction management at the same time inform the Department of building and facility construction majoring in locally known to coordinate.
d) periodic reports 6, about the quality of construction sent the Ministry of construction (sample report as Appendix 28 of this Regulation) to General Government reports.
Article 4. Responsible for the quality of the work of the investor, the investment consultant organization and building, construction business 1-for the owner: a) is responsible for the whole of the quality of the construction works of the project due to her management.
b) made under the provisions of article 14, paragraph 1 to article 46 of the regulation on investment management and building attached to Decree No. 51/1999/ND-CP on 08/7/1999, and the related content in this regulation.

c) Only be contracted delivery contractor with the investment advisory organization and building, construction business have qualified the capacity building activities according to regulations.
d) to hire consultancy organization overseeing construction when the owner is not eligible under the regulation.
e) recurring reports 6 months of quality work (report template according to the annex of this regulation 21) sent the Agency has the function of State management of the quality of construction works (according to the hierarchy in article 3 of this Regulation).
2-for organizations and individuals implement the survey, design: a) responsible before the law and the owner of the content has committed to in the agreement, including the amount, quality, duration, the accuracy of the product and the product quality survey, his design;
b) Must comply with the provisions of article 15, paragraph 2 Article 46 of regulation on investment management and building attached to Decree No. 51/1999/ND-CP on 08/7/1999 and Article 8 paragraph 1 of Decree No. 19/2003/ND-CP on January 30, 2003 by the Government and the relevant content in this regulation.
3-for the construction business: a) Must be responsible before the law for the quality, safety, construction construction of buildings under construction and safety of neighbouring buildings.
b) made under the provisions of article 16, paragraph 3 to article 46 of the regulation on investment management and building attached to Decree No. 51/1999/ND-CP on 08/7/1999 and paragraph 3 article 1 of Decree No. 19/2003/ND-CP on January 30, 2003 by the Government and the relevant content of this regulation.
4-the State encourages the application of quality management models based on the ISO standard ISO 9000:2000.
Chapter 2: QUALITY MANAGEMENT of CONSTRUCTION SURVEY and DESIGN of CONSTRUCTION WORKS article 5. Building survey 1-the works must be done building survey at the venue construction.
2-building survey must be done according to the specifications on the survey and survey mission led by owner approval. Technical survey to suit every design stage (preliminary design, technical design or construction engineering design), characteristics (reflected in technical requirements survey the building) and in accordance with the natural conditions of the region expected to build. Survey records must be properly identified with the location of the building, reflect the current state of the ground construction, natural terrain, geology, hydrography and meteorology condition of the environment, in accordance with the construction standards and specifications to be applied. Survey results report build to be owner reviews, trials, established thereon.
3-implementation of responsible construction survey in collaboration with the client to resolve the problems, which arise in the process of building survey to ensure the quality of building survey records, the accuracy and reliability of the figures serve design.
4-reported survey results: a) the content of construction survey report include:-base and survey methods;
-Data analysis, synthesis, evaluation survey results;
-The conclusions of the survey results and recommendations;
b) reported construction survey results must meet the requirements of the survey mission in accordance with the corresponding design steps, recommendations on the disposal of the Foundation works of construction and reasonable use of natural resources, protection of the surrounding environment to organize design consultants , construction business and investor note when designing, building, using works.
c) reported construction survey results to establish 6 and must be the owner check acceptance, under article 7 of this regulation and is the legal basis to implement the design.
5-client review, determine the additional survey by design consultants recommend.
Article 6. Construction design 1-The construction works must be designed with the prescribed drawings.
2-is designed in three steps: preliminary design, technical design and construction drawing design. For simple technical works or had design templates, non Foundation processing complex design made only two steps: preliminary design and technical design-construction.
The content design step ahead of set forth in annex 1 of this regulation.
3-products designed to fit the Standard Rules and the technical standards of construction are applied, mission design and delivery contract tender design.
4-products designed to be owner reviews, according to article 7 of this regulation.
5-design consultant organizations is not specified the place of production, the supply of material or technical supplies.
6-projects designed to only be done when the owner designed and chaired the design has enough capacity in accordance with the Ministry of construction. The Chairman of the design and the design host should bear personal responsibility for the quality of its products are made.
7-organization design must have a quality management system product designed to control the quality of product design.
8-advisory organization established technical design or construction engineering design must make the author supervision during construction according to article 17 of this regulation.
9-design consultancy specialized construction works outside of work to implement the provisions of the above paragraphs of this Article, have to comply with regulations on product content design of the specialized construction work.
10-organization design consultants are not subcontract the entire contract or the main part of the content of the contract for a different design consulting organization.
Article 7. Product test survey construction, design 1-The trials of products building survey (survey results report construction), product design (design records) on the basis of the following documents: a) the contract bidding and delivery building survey, design.
b) task of building survey, design.
c) technical standards and standards of construction are applied d) report results of design verification consultant organization design verification (if available).
2-test results to established thereon under model Appendix 2.3 of this regulation.
3-minutes of testing the product building survey, trials designed to indicate the errors (if any), fix time and additional requirements for repair, construction survey report, profile design, and conclusions about the quality of construction, survey design.
4-minutes of testing the product building survey, design is part of the record process, approved the corresponding design step.
Article 8. Design verification engineering 1-owner to hire consultancy not directly designed make design verification technique for the project in the works: oil and gas, chemicals, bridges, seaports, river ports, levees, dams, reservoirs, high-rise buildings, schools, hospitals, indoor stadium , the stands of the stadium, the cinema, the theatre and the gathering of works, what works when incidents can happen to the disaster. For works under other project types by the owner himself decided to implement verification.
2-content design verification technique is mainly about the level of safety of the works and other content owner requirements.
3-the drawings have been approved must be signed, certified by the representative organization of design verification consultant. Approval stamp design verification as specified in annex 25 of this regulation.
4-The design verification technique does not mitigate the responsibility of the contractor.

5-where design verification results does not detect the major flaws forced the organization designed to bring technical design, the owner must bear the costs of verification. The resulting case design verification to detect the major flaws forced the organization designed to bring technical design, the design organisation shall bear the cost of this undertaking.
Article 9. Profile process, approval of the design, engineering, construction engineering or design technical design profile due to the investor the appraisals, approved include: 1-Sheet process, approving engineering designs created model under annex 4.6 of this regulation;
2-a copy of the decision to approve the investment project profile attached to the preliminary design has been browsing the same project;
3-reported survey results build have enough content referred to in paragraph 2 article 5 of this regulation;
4-profile design, engineering or construction engineering design was established according to annex 1 of this regulation;
5-report design verification for the works of the project have specified in clause 1 article 8 of this regulation;
6-minutes of testing the product building survey, set design by template Appendix 2.3 of this regulation;
7-The written approval of the State administration authority on environmental safety, fire prevention, safety, safety, safety dikes, traffic safety and the relevant requirements.
Article 10. Technical design or construction engineering design 1-contents technical design or construction engineering design: a) the condition of capacity building activities of the advisory organization, individual design.
b) conformity of design engineering or design construction technique with preliminary design and feasibility reports in content has been approved on planning, architecture, building scale, technology, design capacity, level of works, technical-economic norms, standards and technical standards are applied;
c) solutions to protect the environment, the prevention of fire, explosion, labor safety, safe Dyke, traffic safety and the relevant requirements.
d) affordability of technical design solutions include:-The logical design solutions, with geological characteristics nail works, geological, hydrological hydrological municipal works; the fit of the structural solution with architecture design (for public buildings have architectural design profile) and with the power of the work;
-The rational and uniform solution of system design engineering;
2-results of the evaluation be reflected in writing according to the model in annex 5 of this regulation. The technical drawings are approved must sign certifying evaluators to design according to the model in annex 25 of this regulation.
Article 11. Competent appraisal of engineering design 1-works in the important national project, the project group A: a) for works of the project using the State budget:-Ministry of construction engineering design works in national important projects due to the prime investment decisions; the work of the project group A led by Ministers, ministerial heads, government agencies, the Chairman of the provincial people's Committee and the corporate investment decisions.
-Separate specialized construction: construction works of irrigation, agriculture, and forestry by Ministry of agriculture and rural development; transportation construction by the Ministry of transportation; mine construction, power plants, power lines and substations, by the Ministry of industry; the construction of telecommunications that specialized technology section is mainly due to The postal service-telecommunications; the process of security, defense and secret protection by the Ministry of national defense, the Ministry of public security, the host of technical design.
b) for public works projects in the use of capital by the State credit guarantees, credit capital investment and development of the State: the ministries, the local businesses have organized project engineering design appraisal.
c) for public works projects in the use of capital investment and development of State enterprises, which had mobilized themselves and by enterprises which do not trade credit by the State guarantee: order valuation organization business design techniques.
2-the work of the project groups B, C, a) for public works projects in the use of capital budget, capital credit by the State guarantee, credit capital investment and development of the State:-for works by the ministries, Central Agency management: professional body building management function of the level of investment decisions the evaluation design;
-For works by local management: Department of construction or the Department has specialized construction engineering design appraisal (depending on the nature of the project).
-For works in the project due to a people's Committee at district level, the town decided to invest according to the hierarchy of the provincial people's Committee: professional body building management function of district-level people's committees organize technical design.
b) for construction enterprises to invest in any business, capital organized the technical design.
3-the owner is responsible for the organisation of technological design for design technology works irrespective of the source of capital.
4-The competent technical design must take responsibility before the law about the content of the evaluation provided for in paragraph 1 of article 10 of this regulation.
Article 12. The authority to approve the design, engineering or construction engineering design 1-for construction works (regardless of form of ownership, capital) who has the authority to approve investment decisions or be allowed to authorize subordinates to approve the technical design but must be responsible before the law about the authority. Authorized person responsible for his decision before the law and the authorization.
2-for the construction of the project due to a people's Committee at district level, the town decided to invest according to the hierarchy of the provincial people's Committee: Chairman of the people's Committee of the district level approval of technical design.
3-content of the decision approving the technical design or construction engineering design is regulated under article 38 clause 2 of the regulation on investment management and building attached to Decree No. 51/1999/ND-CP on 08/7/1999 of the Government. The decision to approve the technical design was created by template annex 7 of this regulation.
4-for the project group A if not yet approved engineering design but need to start drawing design of categories was approved by the authority and contract logistic lawful tender. At the latest after implementation was 30% of total investment must have the technical design authority approval.
5-authority approving engineering design must take responsibility before the law about the content approval prescribed in article 38 of regulation on investment management and building attached to Decree No. 51/1999/ND-CP on 08/7/1999 of the Government.
Article 13. The authority approved the construction drawing design 1-for three-step design works, construction drawing design must be approved. The approval authority shall be as follows:

a) for works in the investment project and construction of the capital budget, capital credit by the State guarantee, credit capital investment and development of the State, the base level of technical complexity of projects and level of competence, the expertise of the owner who has the authority to approve the technical design was authorized for investor approval of construction drawing design projects consistent with the technical design has been approved.
b) for the use of other sources of capital, the investor is responsible for approval of construction drawing design.
c) The construction drawing design must have the seal of approval by the owner according to the model in annex 25 of this regulation.
2-case when set construction drawing design projects have changed compared to the technical design has been approved, the owner must have the authority to review approved.
3-in the course of construction, the owner is allowed only after the design change was authorized allowing investment decisions. Case of need for timely processing, the owner is allowed to change the design and take responsibility for his decisions. The owner must report the results of handling the design changes with authority decided to invest.
Chapter 3: QUALITY MANAGEMENT in CONSTRUCTION article 14. Supervision work in the construction process owner (project management, or consulting organization supervision was the owner hired), organization design and construction business to be eligible under the regulations and must have the departments ensure sustained monitoring activities in a systematic way the entire exam process the construction from the construction to completion and delivery of the entire works under this regulation.
Article 15. Quality control of construction of construction business (side B) 1-construction enterprise must perform the following tasks: a) Established the quality management system in accordance with the requirements of the contract and delivery of construction contractors, including the monitoring of quality parts including those who qualified under the rules.
b) full reporting processes, methods and test results, quality of materials, building products and constructions with the owner (A party) to check and monitor.
c) material testing, structural, construction products, construction equipment, production equipment before installation and construction in the works.
d) internal test and complete the drawing up of construction works, the period of construction and installation, testing equipment, projects completed and finished works.
e) prepared the record trials under the regulations and the proposal owner (party A) organizing trials of products the construction work, construction and installation phase, testing equipment, projects completed and completed after the internal test.
f) party A report on the progress, quality, mass construction.
2-when making contract of EPC, EPC is responsible for: a) to perform the work outlined in points a, b, c, d, f of paragraph 1 of this Article.
b) prepare the prescribed test profile and suggest A party organization construction and installation phase test, test equipment, projects completed and completed after the internal test.
Article 16. Quality control of construction of the investor (the A side) To ensure the quality of construction works, the owner must perform the following operations: 1-preparatory phase of construction: a) check out the commencement conditions;
b) Established the quality management system in accordance with the requirements of the project. Quality monitoring Division consists of those who qualified under the rules.
c) check the condition of the capacity building of the construction business (main contractor/general contractor, sub-contractors);
d) inspection, testing and approval of design drawing;
2. implementation stage construction: a) check the quality management system in accordance with the requirements stated in the contract of delivery contractor, processes and methods of quality control self construction business;
b) check of conformity of equipment and manpower of the construction business is selected with the record bid.
c) test materials, construction products, constructions in the scene through the quality certificate of the place of production and the results of experiments by the approved laboratories;
d) check the equipment works and equipment before installation in the works through the certified quality of production equipment and quality control results the equipment due to the organization with legal personality are State regulation;
e) check the construction measures, safety measures for workers and safety of neighbouring buildings by construction business;
f) check on quality, volume, tempo construction jobs (construction, mounting), each Department, construction phase, each of the projects and works to make trials under the provisions of article 18 of this regulation.
g) auditing organizations building products when necessary. The number of samples calibrated does not exceed 5% of the number of samples calibrated must follow the provisions of the technical standards and no less than 3 acres.
h) check and confirm the completed drawing each work, each section, each stage, each category of works and public buildings put to use.
I) collection, check and submit relevant project management functions for quality of construction works (according to the hierarchy in article 3 of this Regulation) of records, documents and test before acceptance organization construction phase, trials of equipment testing, trials completed projects or works for works stated in clause 1 article 8 of this regulation. The list of records, documents and trials are regulated according to annex 20 of this regulation;
k) reporting generally States and six months on the quality, volume and the progress of the building works;
l) coordinated with the parties concerned to resolve the problems, which arise in construction;
m) when construction equipment, manpower, materials, components, products, equipment and construction of buildings and equipment, does not match the contract bidding and delivery shall be entitled to:-request the construction business are using construction equipment, manpower according to the commitment stated in the delivery contract bidding;
-Does not allow put to use in the process of the structure, materials, construction products, the equipment does not conform to the quality standards, specifications; not consistent with technology; has not passed the test, testing;
-Stop execution and set the minutes when side B violated the conditions ensure safe, quality construction and sanitation;
-Refuse the product of the work of construction, the construction and installation phase, testing the equipment does not guarantee quality. The reason for refusal must be in writing;
n) before collecting the parts, projects or works, if the signs do not guarantee the quality, then the owner must advise organizations hire quality control reviews to base trials.
3. When making EPC contract, the owner is responsible for: a) to perform the work specified in clause 1.2 of this except for the trials of job.
b) decided to schedule the construction phase, trials of equipment testing, trials completed projects and completed projects.
4. When not qualified capacity, the owner can hire a consulting organization monitoring the implementation of all or some of the work mentioned in this article.

Article 17. Author of the monitoring organization established technical design consultant in the process of construction, consulting organization established technical design or construction engineering design (even when it is the subcontracting of EPC) must supervise the author include the following: 1-the design document explain works for the investor construction business, to manage and execute in accordance with the requirements of the design;
2-coordination to solve the obstacles to change, arise on the design during construction;
3-check the work of construction of conformity with the approved design.
4-participate in the construction and installation phase, commissioning the equipment, completed projects and the whole project when the owner asked.
5-make the occasional surveillance mode unless structural construction, parts, projects are designed according to the advanced technology and to the finishing phase.
Article 18. 1 construction company-construction company including individual work, each section, each stage, each category of works and public buildings put to use. Depending on the nature and the request object, the owner can organize the Council.
2-jobs (construction, fitting) party B must be made A party. Obscured parts of the work must be complete and drawing up the public before proceeding with the next job. The minutes of the company being formed according to the form in the Appendix 8, 9, 10 and 11 of this regulation.
3-The construction phase, the device when testing aggregate after installation must be checked before deploying the next construction phase. The minutes of trials are set up according to the model in the annex of 13.12 of this regulation.
4-The category of complete works and the complete works was put into use only when has been collecting. The minutes of trials are set up according to the model in annex 14 of this regulation.
The minutes of trials completed construction works is the legal base to do the procedure owner handed putting works into the harness use, capital investments and property registration execution in accordance with the law.
5-for the Department, projects or works with the required fire prevention or when tapping, use has adverse impact on the environment and safety, when the trials entering must have the Agency's approval of specialized technical management of the State on the above mentioned requirements.
6-When the owner or contractor is foreign people participate in building construction (design, construction, equipment supply, supervision of construction, the minutes of trials are to be expressed in 2 languages (South Vietnamese and by foreign investors choose). 7-project management function on the quality of construction works (according to the hierarchy in article 3 of this Regulation) Guide and check compliance with the provisions on quality management of construction works and the work experience of the client before testing, construction phase completed each category of works and works to put to use for the construction of the project to design verification referred to in paragraph 1 of article 8 This regulation. The test results must be established thereon are set up according to the model in annex 19 of this regulation.
8-the owner is responsible for submission of records, documents and complete the construction according to the provisions of the State records, documents (see list of records, archives in annex 30 of this Regulation).
9-the Prime Minister decided to form the Council of State trials of the construction works.
The Council of State has responsibility for collecting test considering the work experience of the client and direct the process in A group project, the national important projects when necessary and the other work required by the Prime Minister. The Council of State set up a test company form appendix 18 of this regulation.
Article 19. The grounds for testing The individual work, construction and installation phase complete, projects and complete works to put to use should be based on the following bases: 1. With respect to the work of building, insert complete: a) profile construction drawing design has been the owner and approved.
b) reported construction survey.
c), the technical standards of construction and the State of the current industry.
d) These terms regulation of the quality and volume of works in the delivery contract.
e) test results, quality of materials, laboratory equipment is made in the process of construction.
f) The regulation or technical instructions of the manufacturer of the preservation, use, building materials, equipment and technology.
g) complete drawing the building works is trials.
2. for the construction and installation phase complete, the projects and the whole complete works: a) The construction standards, technical standards and the construction of the current industry.
b) minutes of the Agency's functions to the State management of the quality of construction works check record trials construction phase, trials of equipment testing, trials completed projects and completed the work for the construction of the project to design verification referred to in paragraph 1 of article 8 of this regulation.
c) reported by the owner, the construction business, organizational consulting, design and consulting organizations monitor the quality of construction and installation phase complete, quality testing equipment, the quality of the completed work items and process established under the model in the annex 21 , 22, 23, 24.
d) full legal records and documents of quality management was created under the category referred to in the annex of this regulation.
Article 20. The completed drawing 1-construction business have to set up the complete drawing when individual jobs, each section, each stage, each category of works and public buildings put to use.
2-complete the drawing must be established on the basis of the drawing has been the owner for approval have scored below the design data of the respective figures were achieved in practice (size, shaft, high, mold process), changes in design and must be certified by the person who created the , check out a draw with the following specific provisions: a) the completed drawing the work must be signed, specify the name of the technical staff A and b. b) complete the drawing stages, each category of works and the work entered must be signed, stating the name and seal of the construction business and representatives of investor representatives.
Article 21. Manage the operations of foreign contractors to join consulting, testing, monitoring, quality 1 register-foreign contractors involved in consulting, auditing, monitoring, quality control post must comply with the content of the regulations on the management of the quality of construction works according to the regulations and the commitments in the contract bidding and delivery of quality results the work was done, at the same time be subject to the control of the State administration in the areas of technical specialization.
The results are due to the above mentioned foreign contractors provided under contract bidding and delivery is grounds for investor review, reviews of service the company under this regulation.
2-State management bodies in the areas of professional engineering is responsible for tracking, check the process consulting, implementation, monitoring, control, register the quality of foreign contractors; When necessary can inspect the results of work by foreign contractors make.
Chapter 4:

WARRANTY WORKS and MAINTENANCE WORKS Article 22. Warranty works 1-warranty works stage the owner must perform the following tasks: a) check the status using the work, discovered damage to require repairs;
b) requires construction businesses make the responsibility of warranty.
2-construction business is obliged to repair the damage done by themselves caused in the warranty period.
3-construction business is not responsible for warranty work in the following cases: a) When the damaged buildings during the warranty period is not the fault of the construction business.
b) When departments, categories or the competent State Agency forcing scrapped by owner violated the law on construction.
Article 23. Maintenance works 1-term maintenance works: a) the duration of maintenance works is calculated from the date the test put the work into use until most of early expiry date according to the rules of the level works.
The case works exceed the annual limit the use or do not ensure quality requirements for continued use, to have the text of the advisory organization to perform the audit reviews the current state of the work as a basis for competent authority consideration, decision.
b) for specialized construction works, have to comply with the regulations of the Ministry of construction has specialized on the duration of maintenance works.
2-Level maintenance works: a) the maintenance work specified under 4: maintenance, maintenance; small fixes; medium and large repair repair.
b) for maintenance, maintenance and minor repair grant: Home works use management or the owner of the work plan for the annual recurring maintenance.
c) for medium-level and fix major repairs are related to operational safety, harness, using works: based on the scale of the work, the owner of management used works or works of owner project investment or investment report in accordance with the regulations of investment and building attached to Decree No. 52/1999/ ND-CP on 08/7/1999 of the Government.
3-responsible maintenance works: a) the case of the State affairs management rights to use the work, the owner of management used must:-comply with the indications in the technical maintenance of the consulting organization designed the operating mining works, use;
-Responsibility before the law about the degraded quality, not maintaining the ability of the structure, components, categories, structures and operating unsafe due to not perform maintenance work according to the rules.
b) case through a lease contract for use of the works, the use of rental buildings to be responsible before the law about not perform maintenance work according to the rules.
Chapter 5: BUILDING CONSTRUCTION ISSUES article 24. Order to resolve the issue of construction works 1-The construction of all capital investment, the form of ownership, are in construction, have finished or are using when the problem must be resolved according to the following sequence: a) emergency rescue people in distress (if available);
b) take measures to prevent timely to avoid danger can continue to happen;
c) protect the scene of the incident except emergency remedial in point c of paragraph 3 of this Article;
d) immediately notify the competent bodies to solve.
2-within 24 hours after the crash, the owner, the management server using the work (when the work has been delivered, and are exploited, used) to report form Appendix 29 of this regulation with the State management functions for quality of construction works (according to the hierarchy in article 25 of this Regulation) and agencies organizations and individuals have the responsibility to investigate and handle the problem.
With regard to the breakdown of all works if there is damage to people, the owner, the management server using the process to report on the Ministry of construction.
3-Set the record of incidents: a) When the problem of construction works, the owner, the management server using the work (when the work has been delivered, and are exploited, used) are responsible for making trouble. Case to survey, assess the extent of the problem, if the owner, the management server using the process of with no capacity to execute, you can hire a construction consulting organization has the function to perform.
b) profile content breakdown:-report on the test scene when the problem occurred;
-The results of measuring, drawing, photographing, filming or tape the picture about the current state of the problem, the cracks, broken, the slump, sinking and other details necessary for the research; the test results of samples to determine the quality of the material, the structure of the incident to determine the cause analysis of incidents;
-Other materials for his as: changes, additional design; These discrepancies in construction compared to the approved design; loading phenomena or the use of incorrect design works; the operating process violations, used; do not perform maintenance work according to regulations;
-Description of the problem and the analysis determine the cause of the problem.
c) mop-up breakdown:-after a full-profile response to the study, analyze and identify the cause of the problem of construction works, the Agency chaired resolve allows construction business, user or owner to conduct mop-up.
-Quickly scrapped or mop-up problem when rescuing people in distress, emergency rescue, dams, bridges, bridges, roads or prevent the next incident. Before dismantling or cleaning, construction business, user or owner must proceed to photograph, film or video, collecting, recording, to the maximum extent the requirements stipulated in this article.
d) troubleshooting:-the repair or reconstruction of the incident to ensure thorough remedy the cause of the problem was identified in the minutes to resolve the issue.
-Cost for troubleshooting by the unit or the individual causing the problem.
-The case of the incident due to unforeseen causes, then the owner or insurance agency (for works have to buy insurance) the fix costs.
Article 25. Troubleshooting hierarchy construction 1-for the construction works of the project investment group A: The build host address, the involvement of the building or Facility has specialized construction works (if the construction specialization) of the locality where the works The Ministry has the project or have specialized construction works (if the construction works of majors) and the management authorities of the other State concerned.
2-for the construction works of the project investment group B, c: construction chaired resolve, the involvement of the Department has the project or the Department has specialized construction works (if the construction works of majors) and the management authorities of the other State concerned.
3-for housing of households and individuals: Agency construction management (construction) of the people's Committee of the district chaired the settlement. Where necessary, the Agency chaired resolve can invite representatives of building and Facility professionals to counsel.
The Agency stated in paragraph 2.3 of presiding over this responsibility to report the results to resolve the issue of The construction.
Chapter 6: test and HANDLE INFRINGEMENT on the QUALITY MANAGEMENT of CONSTRUCTION WORKS Article 26. Check the implementation of quality management of construction works

Inspection by the authority of State management of the quality of construction works, the direct administration of the owner to ensure the quality of construction works, promptly proposed preventive measure, remedy, exclude violations of quality of construction works. Inspection must be conducted periodically or irregularly throughout the process of construction and use of buildings.
Article 27. Handle violation on quality management of construction organizations and individuals violating the quality of construction works specified in this Regulation shall, depending on the nature and extent of the violation will be administrative sanctions, criminal prejudice, if the damage is compensated according to the provisions of the law.
Chapter 7: terms of the IMPLEMENTATION of Article 28. This provision has the effect after 15 days from the Post Gazette. The other provisions contrary to this regulation was abolished.
Article 29. The Ministers, heads of ministerial agencies, government agencies, the financial administration of the Central Party, the Central Agency of the political organization, the social-political organization, the Chairman of the provincial people's Committee, the central cities, businesses, investors, organizations and individuals responsible for the implementation of this regulation.
 
 
 
Annex 1 of the CONTENT, NUMBER of RECORDS to DESIGN i. PRELIMINARY DESIGN 1. Preliminary design requirements-must comply with the standards, the standards applicable to the work;
-To show the geometric parameters, primarily technical;
-To ensure qualified to determine the total cost of construction works;
2. preliminary design 2.1 content. Presentation: section a. General Section-brief of the preliminary designs were shown at the request of the mission design;
-Presentation of relationships for general planning and for the surrounding buildings;
-Stated the grounds for establishing design: + design was chosen over the examination (if any);
+ Directory of construction standards, technical standards are applied;
+ Planning requirements, architecture, and technology;
+ The document on natural conditions and techniques: topography, geology, hydrography, meteorology, geology, hydrogeology, environmental impact in the area of construction, the current state of the quality of the work (in case of repair, renovation), technical projects, infrastructure and other conditions.
-The ability of the works;
b. presentation design:-total ground: an area of land, building coefficient. Location of the projects, construction area, warehouse, transportation, roads, canals, drains, electricity, water, steam, heat, green trees, distance glasses...;
-Alternative technology, operation, use of production;
-Architectural approach consistent with the planning, technology, requires the use of environmental, landscape, fine art of works...;
-Building approach: background, nail-reinforced, main bearing structure, systems engineering, technical projects, infrastructure works, accessories;
-Environmental protection projects, explosions, safety;
-Preliminary volume of building works, materials, supplies, machinery and equipment (only outlined general requirements about technical features) ... mostly of the works.
-An overview of the progress, the conditions of construction, building materials mainly for works;
-Analysis of technical condition of buildings in selected locations;
For transportation, irrigation, đưường line, đưường tube, then the content of the preliminary design needs more sections:-Online works and works to build on it;
-The slope, the vertical geodetic, geodetic horizontal radius of curvature;
-Handling of special works, crossed the River, cross the mountains, swamps, obstacles, bridges, dykes and dams, embankment, wall, abutment columns line, siphons, reservoirs, tunnels, foundations etc.
2.2. the drawing:-zone plan location works;
-Drawings of the premises (locate building, occupied the land area, building area, building density, land use coefficient, just about the construction, the building elevations, score duel nôí technical infrastructure works: water supply, gas supply, power supply);
-Drawing of the cross-section of geology, hydrology, buildings, land leveling;
-Technological diagram drawing, lines operate, exploit, use, production;
-Drawing of the floor plan, cross-section, longitudinal cutting, the facade of the projects, the model (if necessary);
-Drawing the background processing solutions, nail attached to the corresponding geological cross-sections, main bearing structure and the other necessary details;
-Drawing the technical infrastructure systems and system engineering.
-The drawing expresses the environmental protection system, explosions, safety;
-Depending on the characteristics of the types of construction, transportation, irrigation, đưường, tube lines specify some other necessary drawings to present the full contents of the preliminary design.
II. content of RECORDS ENGINEERING DESIGN 1. Technical design requirements-must comply with the approved preliminary design;
-To ensure eligible to form the total design and construction drawings.
2. technical design 2.1 content. Presentation: section a. pursuant to established technical design:-investment approval decision (or the investment license);
-Preliminary design was approved;
-Building standards, standards are applied;
-Planning requirements, architecture, and technology;
-Material on the natural conditions and techniques: topography, geology, hydrography, meteorology, geology, hydrogeology, earthquakes in the construction sector, the impact of the environment, the current state of the quality of the work (in case of repair, renovation), technical infrastructure works ... b. presentation design technology :-technological solutions, technological lines, the specifications and the technical-economic targets mostly;
-The category of technological equipment;
-Technical systems comes the technology;
-Solutions to environmental protection, safety, fire prevention operation ...-operation procedures, maintenance works.
c. presentation: building design-architectural solutions consistent with the planning, technology, requires the use of environmental landscape, ...;
-Building solutions: background, nail-reinforced load-bearing structure, systems engineering, technical infrastructure works...;
-Directory of software use, interpreted the computational steps primarily;
-General volume of building works, materials, supplies, machinery, equipment, ... of each category and the whole project;
-Instruction execution measures (for complex construction case ...);
-Process operation, maintenance works.
2.2. the drawing:-using the status and location of buildings on the map;
-Deployment of the ground (locate building, occupied the land area, building area, building density, land use coefficient, just about building, built height ...);
-Solution architecture: floor, the facade and the main sections of the category and the whole works, perspective works;
-Building solutions: background, nail-reinforced load-bearing structure, systems engineering, technical projects, infrastructure ... (not required to deploy the material);
-Details of the typical link, the complex details (frame, button eyes, reinforced anchor for the reinforced concrete structural stress ahead...);
-Technical systems;
-Deployed technology, machinery, equipment, etc.;
-Environmental protection, safety, fire prevention operation...;
III. content of RECORDS of CONSTRUCTION DRAWING DESIGN 1. Required-Must match the thiét technique.

-Must be the architectural detail, texture, systems engineering to construction contractors performing construction works.
-To ensure qualified to estimate;
-Must have caption about how materials, guidelines and implementation measures, labor safety, if the foreign design documents created should translate into Vietnamese.
-Đưược Not adjust or reduce capacity, build scale and longevity of works stated in the mission design and preliminary design.
-Do not modify or redo the design when applied to typical design. If additional adjustment is needed a drawing of typical design to suit the specific circumstances of the construction area, they must consult the Agency has reviewed and issued the typical design.
2.2.1 content. Presentation: section a. pursuant to drawing: design-design engineering was approved;
-Building standards, standards are applied;
-Planning requirements, architecture, and technology;
-Material on the natural conditions and techniques: topography, geology, hydrography, meteorology, geology, hydrogeology, earthquakes in the construction sector, the impact of the environment, the current state of the quality of the work (in case of repair, renovation), technical infrastructure works ... b. presentation design technology :-technological solutions, technological lines, the specifications and the technical-economic targets mostly;
-The category of technological equipment;
-Technical systems comes the technology;
-Solutions to environmental protection, safety, fire prevention operation ...-operation procedures, maintenance works.
c. presentation: building design-architectural solutions consistent with the planning, technology, requires the use of environmental landscape, ...;
-Building solutions: background, nail-reinforced load-bearing structure, systems engineering, technical infrastructure works...;
-Directory of software use, interpreted the computational steps primarily;
-General volume of building works, materials, supplies, machinery, equipment, ... of each category and the whole project;
-Instruction execution measures (for complex construction case ...);
-Process operation, maintenance works.
2.2. the drawing:-ground details the status and location of buildings on the map;
-Details of the premises, specify a location, building area occupies of land, an area of the building, the building density, distance, land use coefficient, just about the construction, the building elevations ... for works of architecture, network đưường sá, canals, drains, electricity, yards, nưước, steam, heat, etc.;
-Architectural details: floor, the facade and the main sections of the projects and the whole works, perspective works;
-Construction details: reinforced background, nails, main bearing structure, systems engineering, technical projects, infrastructure ... (required to deploy the material);
-Details of the typical link, the complex details (frame, button eyes, reinforced anchor for the reinforced concrete structural stress before ...), other construction details;
-Technical systems;
-Detail layout technology, machinery, equipment, etc.;
-Environmental protection, safety, fire prevention operation...;
-Lists the volume of building works, materials, supplies, machinery, equipment, ... of the category and the whole project;
-Instruction execution measures (for complex construction case ...);
-Process operation, maintenance works.
IV. content of RECORDS of CONSTRUCTION ENGINEERING DESIGN 1. Technical design requirements and must comply with the preliminary design was approved. Đưược not adjust or reduce capacity, build scale and longevity of works stated in the mission design and preliminary design.
-Must be the architectural detail, texture, systems engineering to construction contractors performing construction works; Must have references about how the material, guidelines and implementation measures, labor safety, if the foreign design documents created should translate into Vietnamese.
-Do not modify or redo the design when applied to typical design. If additional adjustment is needed a drawing of typical design to suit the specific circumstances of the construction area, they must consult the Agency has reviewed and issued the typical design.
-To ensure eligible to form the total estimation and estimation;
2. content construction engineering design 2.1. Presentation: section under clause 2.1 section II of this annex;
2.2. Drawing Part: according to paragraph 2.2 of section III of this annex.
V. The NUMBER Of DESIGN PROFILE 1. For preliminary design approved by the Agency:-the investment project (5);
-Investor (2, including 1 the send key investment projects);
-Licensing Agency building (1).
2. for engineering design:-investor (4, including 1 the FIRE PROTECTION agency sent to evaluation of FIRE PROTECTION design);
-Licensing Agency building (1);
-Construction business (2 sets);
3. for construction drawing design:-investor (4 sets);
-Construction business (3 sets).
-The storage Agency in accordance with the State of the archive records document (1).
4. for the construction engineering design:-investor (5 sets, in which the 1st FIRE PROTECTION agency sent to evaluation of FIRE PROTECTION design);
-Construction business (3 sets).
-The storage Agency in accordance with the State of the archive records document (1).
Note: the cost of establishment according to the aforesaid amount is included in the price.
 
 
APPENDIX 2 of the SOCIALIST REPUBLIC of VIETNAM independence-freedom-happiness......., on ... ... ... ... ... ... ... ... ....
The MINUTES of TRIALS RESULTS REPORTED BUILDING SURVEY USED for the STEP design (preliminary, engineering, construction drawing) works.....................................
1. Đại diện Chủ đầu tư:..............................................................................
- Tên, chức vụ người đại diện:...................................................................
- Địa chỉ:...................................................................................................
2. Representative organizations make building survey.......................................-the name, the position of the representative:...................................................................-address:....................................................................................................
3. Representatives of private organizations plywood design..............................................................-the name, the position of the representative:....................................................................
4. time trials: start:....................................
Finish:....................................
Tại...............................................................................................................
5. After reviewing the record, the following documents:-the contract of building survey of the ... day ... was formed between the two sides-profile, building survey documentation;
-Technical standards apply when the survey;
the two sides confirmed the following points: 5.1. Construction survey volume 5.2. The number, form the building survey records:-number of records building survey: internal;
-Building survey records include: 5.3. The quality of the record building survey-survey mission fit due to organizational design requirements have been approved by owner-in compliance with building standards, technical standards are applied (attached catalogue technical standards are applied);
5.4. implementation time-start-finish 5.5. Recommendations:-for implementation survey: stating the existence of the report the survey results build and implementation requirements surveyed need repair, Supplement;

-For the client: should state clearly the responsibilities of the owner should follow the agreement stated in the contract of 5.6. Conclusion:-accept or not accept test results reported building survey.

Organization representative survey (sign, stating the full name, chứcvụ and stamp) represented the Organization Design (signed, stating your name, position and stamp) represent the owner (signed, stating your name, position and stamp) ANNEX 3 to the SOCIALIST REPUBLIC of VIETNAM independence-freedom-happiness ... .... , on ... ... ... ... ... ... ... ... ....
MINUTES of EXPERIENCE DESIGN DESIGN STEPS (preliminary, technical drawing or engineering construction) works.....................................
1. Đại diện Chủ đầu tư:........................................................................................
- Tên, chức vụ người đại diện:.............................................................................
- Địa chỉ:..............................................................................................................
2. Đại diện tổ chức tư vấn thiết kế........................................................................
- Tên, chức vụ người đại diện:.............................................................................
- Địa chỉ:..............................................................................................................
3. acceptance: time start:.....................................
Finish:......................................
Tại.......................................................................................................................
4. After reviewing the record, the following documents:-contract number design........, established between the two sides-profile, document design;
-Technical standards to apply when designing;
the two sides confirmed the following points: 4.1. On the form, the number of design: profile-profile design (preliminary, technical drawing, engineering construction) works were created with the content under the provisions stated in annex No. 1 of the regulation of quality management of construction works are issued together with decision No. 18/2003/QĐ-BXD dated 27/6/2003 includes : + Part + presentation-drawing record numbers of design (preliminary, technical drawing, engineering construction):;
4.2. The quality of the profile design (preliminary, technical drawing, engineering construction)-match: + The content of the feasibility study report;
+ Mission preliminary design in the feasibility study report has been approved;
+ Technical design has been approved,-compliance with building standards, technical standards are applied (attached catalogue technical standards are applied),-the level works, guarantee safety in the process of construction and use of buildings.
-The specifications in design step by step.
-Satisfies the conditions of protection of the environment, prevention of fire, explosion, labor safety, safe Dyke, traffic safety and the relevant requirements.
-Design drawings expression according to the current rules of the State.
4.3. On time make the time duration for the preliminary engineering design stage construction drawing technical start complete 4.4. Recommendations:-for organization design: stating the existence of design profile and the required design organizations need repair, Supplement;
-For the client: should state clearly the responsibilities of the owner should follow the agreement stated in the contract of 4.5. Conclusion:-accept or not accept the test design.
-Requirements and the time limit to finish repairing the deficiencies (if any) representing design Organization (signed, stating your name, position and stamp) represent the owner (signed, stating your name, position and stamp) ANNEX 4: owner of the SOCIALIST REPUBLIC of VIETNAM independence-freedom-happiness.......... , on ... ... ... ... ... ... ... ... ....


ENGINEERING DESIGN PROCESS SHEET THUẬTCÔNG the dear-pursuant to Decree No. 51/1999/ND-CP dated 8 July 1999 the Government issued regulations on investment and construction of the Decree No. 12/2000/ND-CP dated 5 May 2000, Decree No. 7/2003/ND-CP dated 30 January 2003 by the Government on amendments , the addition of some articles of the Statute and building investment management attached to Decree No. 51/1999/ND-CP dated 8 July 1999 from the Government;
-Pursuant to decision No. 18/2003/QĐ-BXD, on 27/6/2003 of the Minister regulations construction quality management of construction works;
-Circular base.....-based investment approval decision (or the investment license).. ...
The investor process engineering design works......................... in the first tư.......do project design consultant organization......................... with the following: 1. name the process. .. in investment projects. ....-total investment project has been approved.
-The construction location, an area of occupied land.
2. Profile design engineering process: 1-a copy of the decision to approve the investment project profile attached to the preliminary design has been browsing the same project;
2-reported survey results build 3-profile design engineering was established according to annex 1 of this regulation;
4-report design verification results (if any);
5-minutes of collecting survey construction, product design;
6-The written approval of the State administration authority on environmental safety, fire prevention, safety, safe Dyke, traffic safety and the relevant requirements.
The investor process..... design engineering .... in.

Where to get:-as above-the-store owner representative: (sign, stating your name, position and stamp) Annex 5 The competent evaluation (business, personal).......................

Number: the SOCIALIST REPUBLIC of VIETNAM independence-freedom-happiness.........., on ... ... ... ... ... ... ... ... ....


RESULTS EVALUATION of ENGINEERING DESIGN works...................
Kính gửi:..........................................................
Evaluation Agency......... got the sheet (attached to the profile design engineering) ... ... ... ... ... ... ... ... ... the design engineering of the project investment.................-pursuant to Decree No. 51/1999/ND-CP dated 8 July 1999 the Government issued regulations on investment and build the evil Decree 12 v/2000/ND-CP dated May 5, 2000 , Decree No. 7/2003/ND-CP dated 30 January 2003 by the Government on amendments and supplements to some articles of the Statute and building investment management attached to Decree No. 51/1999/ND-CP dated 8 July 1999 from the Government;
-Pursuant to decision No. 18/2003/QĐ-BXD, on 27/6/2003 of the Minister regulations construction quality management of construction works;
-Circular base.....-based investment approval decision (or the investment license).....-the number of sheet base.............
After the review, the agency evaluation report evaluation results of design technique works as follows:-name............................... in investment projects................................-investor:...................................................................................................-According to decision of investment approval.........................................-total investment projects have been approved:..........................................

-Construction location......................................................................................-an area of land:.....................................................................................-implementation survey building...........................................................-consulting organization established technical design..............................................................
1. The content and quality of the technical design profile:-----2. Results appraisal technical design: a) the condition of capacity building activities of the advisory organization, individual design.
b) conformity of design engineering with preliminary design and feasibility reports in content has been approved on planning, architecture, building scale, technology, design capacity, level of works, technical-economic norms, standards and technical standards are applied;
c) solutions to protect the environment, the prevention of fire, explosion, labor safety, safe Dyke, traffic safety and the relevant requirements.
d) affordability of technical design solutions under construction standards and technical standards are applied on the basis of the profile design engineering process, including:-The logical design solutions, with geological characteristics Foundation works; the fit of the structural solution with architecture design (for public buildings have architectural design profile) and with the power of the work;
-The rational and uniform solution of system design engineering;
3. Conclusion:-requirements and the time limit to finish repairing the deficiencies (if any)-liability of owner and consulting organizations improve engineering design:-evaluation of the proposal. .. to consider and decide.

Where to get:-approval authorities, TECHNICAL DESIGN-the investor-organization design-consulting organization design verification (if any)-save the authority of technical design (Signed, stating your name, position and stamp) ANNEX 6 Number owner: SOCIALIST REPUBLIC of VIETNAM independence-freedom-happiness.......... , on ... ... ... ... ... ... ... ... ....


The APPROVAL SHEET DESIGN ENGINEERING.
Dear:..............................................-pursuant to Decree No. 51/1999/ND-CP dated 8 July 1999 the Government issued regulations on investment and construction of the Decree No. 12/2000/ND-CP dated 5 May 2000, Decree No. 7/2003/ND-CP dated 30 January 2003 by the Government on amendments , the addition of some articles of the Statute and building investment management attached to Decree No. 51/1999/ND-CP dated 8 July 1999 from the Government;
-Pursuant to decision No. 18/2003/QĐ-BXD, on 27/6/2003 of the Minister regulations construction quality management of construction works;
-Circular base.....-based investment approval decision (or the investment license).. ...
Owner approval process engineering design.......... in investment projects......... design consultancy organization................. with the following: 1. name the process. .. in investment projects. ....-total investment project has been approved.
-The construction location, an area of occupied land.
2. Profile design engineering process: 1-a copy of the decision to approve the investment project profile attached to the preliminary design has been browsing the same project;
2-reported survey results build 3-profile design engineering was established according to annex 1 of this regulation;
4-report design verification results (if available) 5-minutes of collecting survey construction, product design;
6-The written approval of the State administration authority on environmental safety, fire prevention, safety, safe Dyke, traffic safety and the relevant requirements.
7. Results evaluation technical design due to ... ... ... ... ... ... ... done.
The investor process..... approval of design engineering .... in.

Where to get:-as above-the-store owner representative: (sign, stating your name, position and stamp) ANNEX 7 approval agency........................................................

Number: the SOCIALIST REPUBLIC of VIETNAM independence-freedom-happiness.........., on ... ... ... ... ... ... ... ... ....


THE DECISION OF THE..................
APPROVAL of the DESIGN ENGINEERING...................
HEADS for APPROVAL...................-pursuant to Decree No......... of government functions and organizational structure of.....-pursuant to Decree No. 51/1999/ND-CP dated 8 July 1999 the Government issued regulations on investment and build the evil Decree 12 v/2000/ND-CP dated May 5, 2000 , Decree No. 7/2003/ND-CP dated 30 January 2003 by the Government on amendments and supplements to some articles of the Statute and building investment management attached to Decree No. 51/1999/ND-CP dated 8 July 1999 from the Government;
-Pursuant to decision No. 18/2003/QĐ-BXD, on 27/6/2003 of the Minister regulations construction quality management of construction works;
-Circular base.....-based investment approval decision (or the investment license). ....-According to the results of engineering design appraisal. ....-Review the sheet numbers.............
DECIDES article 1: approved design engineering .... in investment projects.....-......................................................................................................-design consultant organization...................................................................................-construction location.........................................................................................-area of occupied land........................................................................................-The technical specifications and the technical-economic indicators:....................-scale (mostly items and whole project) capacity, level of works:...........-construction standards, technical standards are applied:...........................-the solution primarily designed (each category and the whole project): + technology;
+ Planning, architecture;
+ Reinforced background, main bearing structure foundations;
+ Systems engineering;
+ Technical infrastructure works (power supply, water supply, drainage, transport, ...);
+ Environmental protection; Prevention of fires; safety in the construction process; safe use of works; Dyke safety; traffic safety and the relevant requirements.
Article 2: responsibility of the owner and the Organization's established technical design consultant about additions, improve design engineering (if available).
Article 3: responsibilities of the agencies involved to enforce the decision.

Where:-The relevant bodies-the owner-Save heads approve (sign, stating your name, position and stamp) ANNEX 8 owner/EPC..........................................

Công trình

..........................................

The category works........



The SOCIALIST REPUBLIC of VIETNAM independence-freedom-happiness.........., on ... ... ... ... ... ... ... ... ... ... ... ....


 
THE MINUTES OF THE..............
COMPANY BUILDING (ground works, formwork, Rebar, concrete, masonry, structural parts, constructions works) 1. Name the job test.........................................................................
2. Đối tượng kiểm tra.....................................................................................
3. Participants experience;
-Technical staff of the investor or of the organization supervising construction by the owner (not technically A), EPC-technical staff of construction business (technique B)/sub-contractor (EPC contract when done)

4. technical standards apply when constructing, testing, and trials: a specific number, name of the stated standards..........................................................................................
5. check the scene STT content check drawing of test method Test Results Achieved did not meet recommendations: 6. Volume has made 7. The modifications as compared with the approved design: (if any) 8. Conclusion:-accept or not accept a deployment to the next job.
-Requirements and the time limit to finish repairing the defective new launch the next job.
Participants in the trials: (signature and specify name, position) the technical staff of the investor or of the organization supervising construction by the owner (not technically A) EPC/technical staff of construction business ((technique B)/sub-contractor (EPC contract when made) The appendix to :-The certificate of quality of production and test results.
-Complete drawing jobs trials (can print right on the back of the minutes or the private drawing attached).
 
 
APPENDIX 9 the owner/EPC..........................................

Công trình

..........................................

The category works..........................................



The SOCIALIST REPUBLIC of VIETNAM independence-freedom-happiness......., on ... ... ... ... ... ... ... ... ... ...


The MINUTES of the STATIC DEVICE INSTALLATION 1. The name of the device/equipment be checked include: STT is testing the unit number On factory-built base 2. The Council experience includes:-technical staff of the investor or of the organization supervising construction and installation of equipment by the owner (not technically A), EPC-technical staff of business equipment (technique B)/subcontracting when making EPC contract :-technical staff of construction business (technique B)/subcontracting when making EPC contract – officers of the enterprise providing the device (if available): 3. technical standards apply when constructing, testing, and trials: a specific number, name of the stated standards.............................................................
4. Kiểm tra tại hiện trường

STT



Nội dung kiểm tra



Bản vẽ thi công số



Phương pháp kiểm tra



Kết quả kiểm tra



 



 



 



 



Đạt



Không đạt



 



 



 



 



 



 



 



 



 



 



 



 


5. Khối lượng

STT



Công tác lắp đặt thiết bị



Đơn vị



Khối lượng



Thời gian thi công



 



 



 



Theo t.kế đã được duyệt



Đã thực hiện



Bắt đầu



Hoàn thành



 



 



 



 



 



 



 



 



 



 



 



 



 



 


6. The modifications as compared with the approved design: (if available) 7. Recommendations: 8. Conclusion:-accept or not accept a deployment to the next job.
-Requirements and the time limit to finish repairing the defective new launch the next job.
The participants of the Council trials: (signature and specify name, position)-technical staff of the investor or of the organization supervising construction and installation of equipment by the owner (not technically A), EPC-technical staff of construction business (technique B)/subcontracting when making EPC contracts-technical staff of the enterprise installation (technique B)/subcontracting when making EPC contract – officers of the enterprise providing the equipment (if applicable) appendices attached:-The certificate of quality of production and test results.

-Complete the drawing equipment (can print right on the back of the minutes or the private drawing attached) APPENDIX 11 Investor/EPC........................................

Công trình

........................................

The category works........................................



The SOCIALIST REPUBLIC of VIETNAM independence-freedom-happiness......., on ... ... ... ... ... ... ... ... ... ...


The MINUTES of ...
TEST EQUIPMENT For TESTING The DYNAMIC MENU NOT LOADING 1. The name of the device/equipment be checked include: STT is testing the unit number 2. The Council experience includes:-technical staff of the investor or of the organization supervising construction and installation of equipment by the owner (not technically A), EPC-technical staff of business equipment (technique B)/subcontracting when making EPC contract :-officers of the enterprise providing the device (if available): 3. technical standards apply when constructing, testing, and trials: a specific number, name of the stated standards............................................................
4. field test the equipment has installed the tracking process is completed and the test run does not load single action device: STT run-time test equipment test results began reaching completion 5. The modifications as compared with the approved design: (if available) 6. Recommendations: 7. Conclusion:-accept or not accept a deployment to the next job.
-Requirements and the time limit to finish repairing the defective new launch the next job.
The participants of the Council trials: (signature and specify name, position)-technical staff of the investor or of the organization supervising construction and installation of equipment (technically A), EPC-technical staff of business equipment (technique B)/subcontracting when making EPC contract – officers of the enterprise providing the device (if available) Lu attached:-The minutes of trials of static equipment installation work accompanied by the completed drawings;

-Reports of results of experiments testing in place.



 


 
 
APPENDIX 11 Investor/EPC........................................

Công trình

........................................

The category works........................................



The SOCIALIST REPUBLIC of VIETNAM independence-freedom-happiness......., on ... ... ... ... ... ... ... ... ... ...


THE MINUTES OF THE..............
TESTING EQUIPMENT for RUNNING an AFFILIATE DOES NOT LOAD 1. The name of the device/equipment be checked include: STT is testing the unit number 2. The Council experience includes:

-A representative of the owner or representative of the organization supervising construction and installation of equipment by the owner/rental EPC representatives-representatives of business equipment (technical B)/subcontracting when making EPC contracts:-business representatives provided the device (if available): 3. technical standards applied when executing calibration and testing: specific name of the stated, standard number......................................................
4. field test the equipment has installed the tracking process is completed and the device dynamic link test run: test run-time devices STT test run results began reaching completion 5. The modifications as compared with the approved design: (if available) 6. Recommendations: 7. Conclusion:-accept or not accept trials to test run loaded dynamic link.
-Requirements and the time limit to finish the new defect repair test run loaded dynamic link.
The participants experience: Council-a representative of the owner or representative of the organization supervising construction and installation of equipment by the owner/rental EPC representative (sign, stating your name, position and stamp)-a representative of the business equipment (technique B)/subcontracting when making EPC contract (signing , stating your full name and title)-business representatives provided the device (if available) (sign, stating the full name and position) of the appendix to:-The minutes of static installation equipment acceptance testing equipment, do not download ... accompanied by the completed drawings;

-Reported results of experiments in situ APPENDIX 12 investors........................................

Công trình

........................................

The category works........................................



The SOCIALIST REPUBLIC of VIETNAM independence-freedom-happiness......., on ... ... ... ... ... ... ... ... ... ...


The MINUTES of TRIALS TESTING DEVICE LOADED DYNAMIC LINK/Cluster device name device trials include: STT is testing the unit amount of time trials: start:......................................
Finish:......................................
In the process.
The Council experience includes:-a representative of the owner: name of the agency or unit + name, specify the position of each of the participants-representatives of construction enterprise equipment installation/EPC: building business name + name, specify the position of each of the participants-representatives of organization supervising construction organization name: advice + stating the full name, position each participant-consulting organization representative design, engineering or construction engineering design (if the owner required): the name of the design + consulting organization stating the full name, position each of the participants – representatives of business equipment supplies (if any) : company name + name, specify the position of each participant acceptance Council has undertaken: 1. Reviewing the records, the following documents:-documents, document design;
-Guide the operation of the equipment;
-Technical standards applied when installing, testing and trials (mentioned specifically name, standard number);
-The minutes of static equipment installation, test equipment, test and dynamic menu not loading.
-The laboratory reports in the process of testing and dynamic menu not loading;
2. check in the device has finished installation and monitoring the process of testing device loaded dynamic link: STT devices running time trial test run results began Reaching completion not reached 3. Put into operation: capacity-capacity according to the approved design;
-Capacity according to the fact.
4. The modifications in comparison with the approved design: (the above mentioned) 5. Recommendations: 6. Conclusion:-accept or not accept the trials to the total company.
-Requirements and the time limit to finish the new defect repair of company The Appendix:-records, document design;

-Guide the operation of the equipment;

-The minutes of static equipment installation, test equipment, test and dynamic menu not loading, ... accompanied by the completed drawings;

-Reported results of experiments in place when static installation equipment, testing equipment, test run and single contact does not download the investor representative (signature and specify your name, position and seal) The participants experience Council: (signature and specify name, position)-represents construction business equipment installation/EPC organization representative:-supervising construction:-consulting organization representative design, engineering or construction engineering design (if the owner required):-business representatives provided the device (if available): APPENDIX 13-owner of the SOCIALIST REPUBLIC of VIETNAM independence-freedom-happiness ... .... , on ... ... ... ... ... ... ... ... ... ...


The MINUTES of TRIALS COMPLETED STAGE construction:.............................................................................................
Hạng mục công trình:.............................................................................
Địa điểm xây dựng:................................................................................
Construction stage name be checked:................................................
Time trials: start:......................................
Finish:.......................................
In the process.
The Council experience includes:-a representative of the owner: name of the agency or unit + name, specify the position of each of the participants-representatives of businesses build/EPC: building business name + name, specify the position of each of the participants-representatives of organization supervising construction organization name: advice + stating the full name, position each participant-consulting organization representative design, engineering or construction engineering design (if the owner required): the name of the design + consulting organization stating the full name, position each of the participants – representatives of business equipment supplies (if any) : company name + name, specify the position of each of the participants was conducted to: 1. Review the records, the following documents:-the design documentation, records: specify the design consultancy organization;
-Technical standards apply when constructing, testing, and trials: a specific name, the number of the above mentioned standard;
-The minutes of the building works was established in the form of 8, 9, 10, 11, 12;
-Quality control materials, mass;
-The minutes of the State administration of quality of construction works (according to the hierarchy in article 3 of this Regulation) examination profile trials construction phase (for the works of the project are specified in clause 1 article 8 of this Regulation) 2. Check in: 3. Review of the volume, quality and construction period (technical and fine arts): 3.1. Execution time (start, finish);

STT construction and equipment installation unit of mass execution time



 




 



 



According to the approved design have made the start finished the record in the table is the preliminary calculation volume. The exact volume will be determined in a settlement.
3.2. quality construction compared with the approved design: 4. The modifications in comparison with the approved design: (the above mentioned) 5. Recommendations: 6. Conclusion:-accept or not accept a deployment to the next construction phase.
-Requirements and the time limit to finish repairing the defective development of new construction.

The Appendix:-The minutes of company building-minutes of static equipment installation, test equipment, test and dynamic menu not loading, single and joint-action legal records, documentation of quality management testing phase according to the categories listed in annex 20-minutes of test records test trials construction phase with regard to the work of the project referred to in paragraph 1 of article 8 of this regulation.

-Complete drawing the construction phase trials representative of the owner (and stating your name, position and seal) The participants experience Council: (signature and specify name, position)-industry representation/EPC:-organization representatives supervising construction :-the representative organization of technical consulting, design or construction engineering design (if the owner required):-business representatives provided the equipment (if applicable) ANNEX 14 the owner of the SOCIALIST REPUBLIC of VIETNAM independence-freedom-happiness......., on ... ... ... ... ... ... ... ... ... ...


The MINUTES of TRIALS COMPLETED PROJECTS or WORKS to PUT to USE:.........................................................................................
Hạng mục công trình: .......................................................................
Địa điểm xây dựng: ..........................................................................
Chủ đầu tư công trình: ......................................................................
The design Organization (main, sub)/EPC: STT consulting organizations make design number, the date of the contract work performed consultancy organization design (main) consultancy organization design (sub) EPC the agency evaluation and approval of the design, engineering, or construction engineering design : (specify the dates of writing results evaluation and approval decisions)-key:..........................................................................-approval authorities:..........................................................................
The construction business (main, sub)/EPC: STT enterprises build number, the date of the contract work performed EPC construction business (main) building (sub) the institutions supervising construction (main, sub): STT organizations supervising construction Of date of the contract work performed the organization supervising construction (main) organization supervising construction (sub) time to conduct trials: start:...........................
Finish:...........................
In the process.
The Council experience includes:-a representative of the owner: name of the agency or unit + name, specify the position of each of the participants – representatives of the main construction business (construction)/EPC: the name of the business + name, specify the position of each participant-consulting organization representative to perform construction supervision : name of consulting + specify name, position each participant-consulting organization representative design, engineering or construction engineering design (if the owner required): the name of the consulting organization + specify name, position each of the participants-representatives of units assigned responsibility to manage , use, or operation of works: the name of the unit + stating your full name, position each participant acceptance Council created this record on the following: 1. name of works: (introduction to architectural, structural, systems engineering, technology, the specifications are mainly technical infrastructure works) 2. Building works: (stated summary of the process of construction items and whole) STT projects On execution time trials start ended 3. The parties have reviewed the records, the following documents:-documents, material design: clearly the organisation consultancy design;
-Technical standards apply when constructing, testing, and trials: a specific name, the number of the above mentioned standard;
-The minutes of the building works, equipment installation, test run and single contact does not load;
-Minutes of the completion of construction and installation phase;
-Report on the trials of synthetic test equipment;
-The minutes of the governing body for the quality of construction works (according to the hierarchy in article 3 of the regulation) examination profile trials completed projects or works of the project are specified in clause 1 article 8 of this regulation.
-Legal profile and quality management documents according to the list of annexes 20 4. Field test:-stating the location of the test.
On the basis of the review of records, documents and complete the work and checking the work performed, the trials confirm the following points: 1. The time limit for construction works:-start date;
-Completion date.
2. Enter the scale of projects or project: (the scale of construction, capacity, technology, these specifications mostly) STT scale taken into use of item works or works according to the approved design Under actual construction scale 1 2 3 4 other technology specifications mostly 5.



 



 



6



…………………………………………….



 



 


3. Volume: (stated the main volume of the construction and installation of equipment mainly) projects building works unit of mass by design has been approved according to the actual



 



 



 



 



 



Record volume is the volume of the preliminary calculations. The exact volume will be determined in a settlement (if any settlement, then put on the settlement data) 4. Quality (technical and fine arts) the construction and installation of equipment items and entire works compared with the requirements of the approved design: 4.1. 4.2 the construction quality. The quality of construction and installation of equipment 5. Fire prevention measures, labour safety, safety, environmental protection, safety, traffic safety, Dyke: (stated summary) 5.1. Fire and explosion prevention measures 5.2. The safety measure 5.3. Operating safety measures 5.4. Environmental protection measures 5.5. The 5.6 Dyke safety measures. The traffic safety measure 6. The modifications during the construction and installation of the equipment compared with the approved design: (the above mentioned) 7. Recommendations: 8. Conclusion:-accept (or not acceptable) trials completed projects or works to put to use.
-Requirements and the time limit to finish the new defect repair put projects or works in use.

The Appendix:-The minutes of the building works of the investor: building works, equipment installation, test run and single contact does not load;

-Minutes of the period to complete xâylắp;

-Report on the trials of synthetic test equipment;

-The minutes of the project management agency about the quality of construction works (according to the hierarchy in article 3 of the regulation) examination profile trials completed projects or works of the project are specified in clause 1 article 8 of this regulation.

-Legal profile and quality management documents according to the list of annexes 20 represented the owner: (sign, stating your name, position and seal) The participants experience Council: (signature and specify name, position)-main construction business representatives (construction)/EPC organization representative:-supervising construction:-consulting organization representative design, engineering or construction engineering design (if the owner required):-unit representative was assigned responsibility for the management, use, or operation of works: ANNEX 16 SAMPLE LISTS the CHANGES COMPARED with the APPROVED DESIGN (included with the minutes of trials established under Subsection lục 14)
Công trình .................................................................................

Number of content changes and the number of approved design drawings (TECHNICAL DESIGN, TKKTTC and TKBVTC) causes a change authority browser change the name, number, date, text allows the change of notes represented design Organization (signed, stating your name, position and stamped)..........., day .... in 200 owner representation (the sign , stating your name, position and stamp) ANNEX 16 SAMPLE LISTS the WORK NOT YET COMPLETE (included with the minutes of trials established under annex 14) works..................................................................................

Number of work not yet completed the organization responsible for implementing the complete duration of notes represented design Organization (signed, stating your name, position and stamp) date 200 owner representative (sign, stating your name, position and stamp) ANNEX 17 LISTS the DAMAGE MODEL ERRORS (included with the minutes of trials established under annex 14)
Công trình............................................................................................

STT



Tên các hư hỏng sai sót



Giá trị công việc sửa chữa hư hỏng, sai sót



Tổ chức chịu trách nhiệm thực hiện



Thời hạn hoàn thành



Ghi chú



 



 



Hư hỏng



Sai sót



 



 



 



1



Về thiết kế



 



 



 



 



 



2



Về xây dựng



 



 



 



 



 



3



Về thiết bị



 



 



 



 



 



4



Về lắp đặt thiết bị



 



 



 



 



 



 



Tổng cộng



 



 



 



 



 


 

Đại diện tổ chức tư vấn thiết kế

(ký , stating your name, position and stamp) represents construction business (registration, stating the name, position and stamp) date. in may 200 owner representative (sign, stating your name, position and stamp) ANNEX 18 industries Council of State: SOCIALIST REPUBLIC of VIETNAM independence-freedom-happiness......., on ... ... ... ... ... ... ... ... ... ...


COMPANY THEREON...................
The Council of State test works........................ was established by decision No............. day of the Prime Minister, has conducted test, considering the work experience of the client and reviews of quality works....................
The Council of State meeting on test.........., and set thereon according to the following: 1. The progress of work of the Council: (stated summary of the work already done) 2. Reviews of the Board: on the basis of projects approved construction design, construction standards, approved technical standards use....., the record complete works by owner offer, field test results, report on the trials completion of oil and reported results to Gospel of the specialized Sub-Committee of the Council of State trials The Council reviews:-About the current state of the work completed.
-About results of the company owner.
-The quality of the work; the volume according to the approved design and, as practice has done (report by owner): + building;
+ Technology equipment Section.
-About the influence of the process (when used or operated, tapping) on the environment, the environment; the remedy.
-On measures against fire, safety, safety, safety, traffic safety, Dyke ...-About the relevant issues.
-The quality records completed by the owner.
3. The conclusions of the Council of State trials: (conclusion and the decision of the Board of the company: accept or not accept company results and proposal of investor overall rating).
4. The request of the Council of State: test (The Board's requirements for investors and institutions related to the work).
Chairman of the State test works..........
(signed, stating your name, position and seal)
The members of the Council of State trials: (signature and specify your name, title) ANNEX 19 of the SOCIALIST REPUBLIC of VIETNAM independence-freedom-happiness..........., the day of the month. ... the year 200 MINUTES of TEST EXPERIENCE PROFILE construction phase is complete, the completed projects or works to put to use the works.......................... In the projects of the group............................
Hạng mục công trình.............................................................................

Địa điểm xây dựng....................................................................................
Time check start h 00, on may end 200 h 00, dates 200 participants in the test:-investor representative works: Agency's name, unit + name, specify the position of each of the participants-representatives of organization supervising construction or engineering consulting organization that helps investors set the record (if there): name of consulting + name, specify the position of each of the participants – representatives of business building (masonry, insert): the name of the business + name, specify the position of each of the participants-representative governance function of the quality of construction works (according to the hierarchy in article 3 of this Regulation) to check the work experience : name of the Agency stating the name, + the position of each participant has conducted the following:-check the catalog profile trials construction stages............, or completion of projects or works.................... has formed between the owner and the construction business and equipment installation/EPC.
-Check the legitimacy and quality of the record trials construction phase completed........................, the category of complete works.............., or complete works............................
After the screening, review and Exchange, the parties had concluded: 1. Profile process to experience complete construction stages................, the category of complete works............, or complete works................ established enough (or not enough) according to the category mentioned in annex 20 of the regulations of quality management of construction works are issued together with decision No. 18/2003/QĐ-BXD dated 27/6/ 2003 the Minister of construction.
2. The record trials construction phase completed................ projects completed............, or complete works............. have full legitimacy under the rules.
3. The other comments-If not enough test records shall request additional investor to complete trials (mentioned specifically in terms of legal records and documents of quality management) 4. Acceptance records list attached to minutes of guarantees sufficient grounds for the investor conducted acceptance trials construction stages................, or trials completed projects................... or............................. For cases of incomplete test records shall record the following: after the addition complete profile testing according to the requirements stated in section 3, the investor conducted acceptance trials construction stages....................., or trials completed projects........................ or.............................
Note: enclose the list of records, documents and complete the construction phase, completed projects, complete works was established according to annex 20 of this regulation.

Owner representative (sign, stating your name, position and stamp) represented the organization supervising construction or engineering consulting organization to help investors gather records (signed, stating your name, position and stamp) represents construction business (built , Assembly) (signed, stating your name, position and stamp) represent the agency project management functions for quality of construction works (according to the hierarchy in article 3 of this Regulation) to check the work (signed, stating your name, position and stamp) ANNEX 20 investor CHECKLIST The DOCUMENT, COMPLETED CONSTRUCTION WORKS (accompanied by a test resumes testing under model number 19) a. LEGAL RECORDS 1. The agreement signed between the Governments of Vietnam and the Government or organization help on financial, technical, material for the project.
2. Decides to approve the investment project, each project or sub-project of the authority.
3. land use right certificates by the competent State agencies: 4. level of approval authority on: – planning, architecture;
-Technical design;
-Design and fire protection devices, explosive;
-Protection of the environment;
-Reviews of source water quality, chemical, germs: rivers, lakes, wells, surface water, groundwater, water moves out of the land..........-reviews of water reserves, mineral extraction, land mines, rock ...-results of experiment on the models for the expected water resource exploitation.
-Demining work reports (if available).
-The archaeological results report (if applicable) 5. The text approved by the specialized agency of competent jurisdiction about permits use of technical projects outside the fence:-power supply;
-Use of water resources;
-Groundwater extraction;
-Mining, mining;
-Drainage (sewer connections);
-The Ministry of roads, hydro;
-Safety of the dike (Dyke, near to underground works through levees, in the scope of protection of the dyke).
-Traffic safety (if applicable).
6. The text approving the bidding results of authority (for the bidding organization work) or the tender specified text (for the non-tender organization): consulting, equipment procurement, construction (including import equipment and domestic appliances).
7. Contract (numbers, dates of contract) between the owner with tưư advisory organization survey, design, supervision, quality control for lưượng and construction business as well as major contract between consulting/construction business and consulting/doanh consulting (construction industry , construction).
8. eligibility the capacity of/doanh consulting organization in the country (building, construction business) 9. Building contractor license in Vietnam by foreign contractors (construction design consulting, business consulting, construction supervision, quality check of sign ...).
10. Report on the test results reported building survey.
11. The minutes of the above steps.
12. Profile design, engineering or construction engineering design has been approved by the authorized (with accompanying drawings category);
13. The resulting design verification engineering consulting organization not directly designed make design verification technique for the work specified in clause 1 article 8 of this regulation.
14. construction drawing design has been approved by the owner (with accompanying drawings category);
15. The report of geological survey works, hydrological geology, hydrogeology, water resources (specify implementation and execution time);
16. (a) trials, approved technical system, qualified technology used by the competent State bodies to:-quality of product water;
-Use the waterproofing construction of water supply projects;
-Fire, explosion;
-Lightning protection;
-Protection of the environment;
-Labour safety, safety of operation;
-Implement building permit (for cases must have the building permit);
-Building land Only;
-Connect with technical infrastructure works (power supply, water supply, drainage, transport, ...);
-Secure the dykes (if any), safety (if applicable);
-Contact information (if available).
17. The minutes of the relevant project management functions on the quality of construction works (according to the hierarchy in article 3 of this Regulation) to check the compliance with the provisions on quality management of construction works and the work experience of the client before the construction phase test , complete each of the projects and works to put to use for the construction of the project to design verification referred to in paragraph 1 of article 8 of this Regulation (created according to the model in annex 19 of this Regulation).
B. QUALITY MANAGEMENT DOCUMENTS

1. complete the drawing items and the entire works of architecture, structure, equipment, systems engineering, finishing ... (have attached drawing portfolio).
2. The technical certificate issued confirmation of the quality of materials used in the process to execute the part: leveling, reinforcement, piles, piles, texture and body structure, electrical and perfect ...
3. The vote check confirms the quality of materials used in the work to execute the part: san background, background, reinforced piles, piles, texture and body structure, electrical and perfect ... by a professional organization or a scientific organization has legal personality, capacity and use of approved laboratories perform.
4. Authority types and quality of production equipment and engineering systems installation works in such as power supply, water supply, gaz ... due to the production level.
5. reporting the results of quality inspection of materials, imported equipment used in this work of consulting organizations have legal personality be State regulation.
6. The documents, minutes, testing the quality of the construction (according to the template Appendix 8) and equipment (according to the model Appendix 9). Attached to each is a complete drawing the building works are (there's a list experience building works attached).
7. The minutes of trials testing equipment and single contact does not (according to the model of annex 10, 11) test equipment test run loaded dynamic link (according to the model of annex 12), to report test results, test, calibrate, test equipment operation (no load and load) 8. Minutes of trial and testing communications equipment, protective devices.
9. Minutes of trial and testing of the fire fighting equipment, blast.
10. Report on the audit of the environment, environment (for the works of the project are reporting severe environmental impact assessment).
11. Reporting the results of experiments (reinforced background, load of Foundation pile concrete pile quality;, oil well flow, resistance of the system lightning protection for buildings and for equipment, bearing structure, try downloading reservoirs, water supply pipes to load-test liquid. ...).
12. report results check the quality of the welding line connections: piles, metal structures, pipeline pressure (steam, liquid) metal tank ...
13. The measuring material, subsidence and deformation monitoring of the projects, the whole trìnhvà of neighboring buildings in subsidence scope of influence in the process of building (weak, tilt, moved laterally, rotation ...) 14 diary to track the construction work of the owner (or the organization supervising construction was the owner of rental) , construction business (self supervision) and consulting organization established technical design (author supervision).
15. The curriculum vitae of the equipment and machinery installation in the works; Guide or operation process works; the warranty process and maintenance of equipment and facilities 16. Certificate of completion for each job (designing, construction) of the categories of works, entire works due to the Organization of quality control consultant independent construction (including foreign contractors involved in consulting, auditing, monitoring, quality register) review and level before investors held trials completed the projects and the entire works.
17. Statement of changes compared with the design (engineering, construction drawing) was approved under the form in annex 15.
18. troubleshooting profile works (if any) 19. Report of auditing advice organizations for these parts, projects or works signs do not ensure quality before the owner (if any).
20. The minutes of trials the period established under construction template annex 13 of this regulation.
21. The minutes of test projects, complete works to put to use the model established by Annex 13 of this regulation.
22. The report of the investor of the construction process and quality works created according to model annex 21 of this regulation.
23. The report of the construction business (established under Annex 23 samples of this Regulation), the Organization's design consultants (established under Annex 23 samples of this Regulation) and of the supervising organization (established under annex 24 samples of this Regulation) of the quality of construction works.
....., on ... ... ... ... ... ... ... ... ... ... ... ..... Owner representative (sign, stating your name, position and stamp) Note: based on scale and stage company to identify the material on the record list accordingly. The construction and installation phase generally subdivided as follows:-for civil and construction industry, the construction phase including: San background, background-reinforced Piles-piles-Beams so enraged the underground structure and Foundation-profile-motors and perfect.
-For water supply and drainage works, the construction phase including: digging and preparing the background-boreholes created hole wells (for water extraction wells)-Well structure-most recent tube, try downloading each piece of pipe before land-installation project with crude pipe network, management, distribution, transmission-try downloading the entire pipeline exhaust pipe cleaning, DOUCHING, wells ...-for the bridge construction, the construction phase including: nail, abut head-Stringer-perfection.
-For road works, the construction phase including: background (background layer)-nails-Austria route.
-For irrigation: the Division of the stages of construction similar to the kind of works on.
 
 
ANNEX 21 to the SOCIALIST REPUBLIC of VIETNAM independence-freedom-happiness..........., the day of the month. ... the year 200 OWNER'S REPORT ABOUT the CONSTRUCTION QUALITY..........................................................................................
(Periodic report 6 months and completion of construction phase, completed projects and completed the work put to use)
From the day.................... to date, the ... ... ... ... ....
Kính gửi:
1. Chủ đầu tư........................................................................................
2. Địa điểm xây dựng ...........................................................................
3. Scale (stated summary of the architecture, structural, systems engineering, technology, capacity, etc.).
4. list the Organization building it: survey, design, construction supervision, construction inspection (if applicable); the adoption by the institutions that perform.
5. Key technical design and total (numbers, days, months of writing evaluation results).
6. approval authority with respect to:-the investment project (numbers, dates of the approval decision or investment licenses).
-Technical design and total (numbers, dates of the approval decision).
7. list the construction business (main, sub); the adoption by enterprises that perform.
8. The modifications in the construction process as compared with the approved design (the stated reason, modify, the opinion of the authority on this).
9. Regarding the duration of the construction works:-start date;
-Completion date.
10. the main volume of the types of building works is mainly done in the period of the report (background, foundations, concrete, Rebar, steel structures, building blocks, finishing, technical system works...) of the categories and the whole works (compare the volume made with volume according to the approved design).
11. The system of inspection, monitoring and quality assurance measures of investor advisory organization, supervising construction by owner, rental construction business (self supervision), technical design consultant (monitoring of the author).

12. The work experience, participants, moment of experience: experience building works, construction phase, no load test equipment, test equipment, test completed each category and the whole works, delivery takes the work into use ...
13. The observation and field experiments were performed (reinforced background, load of Foundation pile; grounding resistor ...). Reviews of monitoring results and field experiments in comparison with the requirements of the approved design.
14. Incidents and defects in quality (if applicable): time, location, damage, cause, remedy the situation.
15. The scale of use of works (building scale, capacity, technology, these specifications mostly ...):-by design was approved;
-In fact achieved.
16. Conclusions on the quality of work done, the category and the whole works (reporting period).
17. Recommendations (if any).

Where: represents the owner (Signed, stating your name, position and stamp) Note: the content in this appendix to report only once, unless there are changes.
 
ANNEX 22 of the SOCIALIST REPUBLIC of VIETNAM independence-freedom-happiness..........., the day of the month. ... the year 200 REPORTS of CONSTRUCTION BUSINESS (CONSTRUCTION)/EPC CONSTRUCTION QUALITY..........................................................................................
(Reported when testing is complete, the construction phase completed projects and completed the work to put into use)
From the day.................... to date, the ... ... ... ... ....
Dear investor 1. Construction business...................................................................
2. Công trình ........................................................................................
3. Categories of works 4. 5. test phase Construction location.
6. The quantity and quality of the parts of the background, reinforced san, foundation piles, piles and body structure, electrical and perfecting of the projects and the whole works, 7. The process of implementation: progress, construction organizations of the san, reinforced the background, foundation piles, piles and body structure, electrical and improve the work of the projects and the whole works, 8. quality management and quality assurance measures part san , to strengthen the background, foundation piles, piles and body structure, electrical and perfecting of the projects and the whole works, 9. The conclusions and recommendations section of the san, reinforced the background, foundation piles, piles and body structure, electrical and perfecting of the projects and the whole works.

Where: represents construction business (construction)/EPC (sign, stating your name, position and stamp) ANNEX 23 to the SOCIALIST REPUBLIC of VIETNAM independence-freedom-happiness..........., the day of the month. ... the year 200 REPORTS of ORGANIZED TECHNICAL DESIGN CONSULTANTS on QUALITY BUILDING..........................................................................................
(The report as finished phase trials, completed projects and completed the work to put into use)
From the day.................... to date, the ... ... ... ... ....
Dear owner/EPC 1. The organization design consulting techniques...........................................................
2. Công trình .............................................................................................
3. Hạng mục công trình ............................................................................
4. Giai đoạn nghiệm thu ...........................................................................
5. Địa điểm xây dựng ...............................................................................
6. monitoring implementation of the construction phase, the author of the works and the whole project 7. The change of design versus design was approved in the building permit and the approved design (the reason for the change, the opinion of the licensing authority and the authority approved the design on this) 8. Comment on construction quality of the construction phase of the projects and the whole project by the construction business (building, fitting) made 9. Conclusions and recommendations the construction phase of the projects and the works received: represents the Organization Design (Signed, stating your name, position and stamp) ANNEX 24 of the SOCIALIST REPUBLIC of VIETNAM independence-freedom-happiness..........., the day of the month. ... the ORGANIZATION'S REPORT 200 year SUPERVISING CONSTRUCTION on QUALITY XÂY DỰNG CÔNG TRÌNH ..........................................................................................
(The report as finished phase trials, completed projects and completed the work to put into use)
From the day.................... to date, the ... ... ... ... ....
Dear investor 1. The organization supervising construction.............................................
2. Công trình.............................................................................................
3. Hạng mục công trình ...........................................................................
4. Giai đoạn nghiệm thu ..........................................................................
5. Địa điểm xây dựng ..............................................................................
6. The management of the quality of the construction and installation phase, the projects and the whole works, 7. The use of standards for the construction and installation phase, the projects and the whole works, 8. Comment on quality of construction the construction phase, the projects and the whole project by the construction business (building, Assembly).
9. Conclusions and recommendations the construction phase, the projects and the whole works, where to get: represented the organization supervising construction: (sign, stating your name, position and stamp) ANNEX 25 CONFIRMATION STAMP DESIGN, ENGINEERING and CONSTRUCTION DRAWINGS for APPROVAL 1. The Organization's stamp design verification consultant approved design drawings NAME of ORGANIZATION DESIGN VERIFICATION CONSULTANT HAS VERIFIED the signature, name, surname and position of the competent investigation...............

On December. year..


2. Seal of competent technical design technical design validation by the client the AGENCY NAME, personal EVALUATION of TECHNICAL DESIGN HAS been drawing APPRAISAL appraisal according to the text of.................................

First and last name, title, signature of the authorized person due diligence...............................................................................................................


3. Owner's stamp of approval of construction drawing design before delivery to construction contractors made the NAME OWNER HAS APPROVED CONSTRUCTION DRAWINGS drawings are deployed consistent with technical design has been approved.

Họ và tên, chữ ký, chức vụ đại diện chủ đầu tư ......................

.................................................................................................

.... ngày........ tháng........ năm..........


Note: the content on the right. Sign size depending on the font size.
 
 
APPENDICES 26 GUIDE to SET UP the COMPLETE DRAWING 1. The completed drawing expression building works-producing drawing drawing design part of work experience on the back of a company building (model Annex 8), installation of static equipment (according to the model Appendix 9).

Field representative-construction business owner representative, measuring and recording the actual number value in parentheses under the value of design. The details change, supplements are right on the completed drawing.
-Complete the drawing of the building and the business rep representative of the owner (signed).
2. complete the drawing expression of works-Take back the entire drawing has been approved by the owner and keep the frame name, do not change the number of the design drawings.
-Write the actual number value in parentheses under the governance of the design on the basis of the complete drawing the building works, mounting.
-Demonstrate the details change, additional details on the drawing changes, additions. If on this drawing without blank agains exhibits in other drawing with additional drawing numbers do not coincide with the number of the design drawings.
-Complete the drawing name Frame built into the right corner of the drawing on the name of the drawing drawing design or construction engineering design.
-Complete the drawing of construction business representatives and representatives of the investor (sign, stating the name and seal).
3. complete the drawing name frame Template DRAWINGS DONE on Public ....,........



COMPANY NAME BUILD UP COMPLETE the DRAWING represents construction business (registration, stating the name, position and stamped).................................................................................................................................



The NAME of the OWNER to CONFIRM investor representative (sign, stating your name, position and stamped)......................................................................................................................................................


Note: the content frame to full name. Name frame size depending on the font and size.
 
 
ANNEX 27 of the SOCIALIST REPUBLIC of VIETNAM independence-freedom-happiness..........., the day of the month. ... the year 200 REPORT of the PROVINCIAL PEOPLE'S COMMITTEE ABOUT the SITUATION of the QUALITY of CONSTRUCTION WORKS at the local (periodic report 6 months) dear: Minister of construction 1. Total number of buildings are being constructed in local construction during the period of the report, in which:-The work of the ministries (separate in groups A, B, C).
-The works of local (distributed in groups A, B, C).
By: capital-investment by the State's budget.
-Direct investment abroad.
-Investment by the other funds.
2. The number of completed works and be put to use in the report period, in which:-The work of the ministries (separate in groups A, B, C).
-The works of local (distributed in groups A, B, C).
By: capital-investment by the State's budget.
-Direct investment abroad.
-Investment by the other funds.
Evaluate the quality of the local's work has been put into use in the reporting period.
The handling of the breach of regulations to manage the quality of construction works in the period of the report.
3. The number of buildings started construction in the period of the report, in which:-The work of the ministries (separate in groups A, B, C).
-The works of local (distributed in groups A, B, C).
-By: capital + capital investment by the State's budget.
+ Direct investment abroad.
+ Investment by the other funds.
4. The implementing rules for quality management of construction works for buildings, engineering works and infrastructure (power supply, water supply, drainage, urban traffic, waste water and waste ...), industrial area.
5. The works were the Department of building and construction facility specialized design-engineering total during the period of the report, including:-in groups A, B, C.-by: capital + capital investment by the State's budget.
+ Direct investment abroad.
+ Investment by the other funds.
Reviews TECHNICAL DESIGN quality for the works by local management.
6. The works have been built and the Department has specialized construction work test trials during the period of the report.
7. The breakdown of construction works going on locally in the report period (by group and by funding): – name of the incident;
-Investor;
-The time of the incident (hour, day, month);
-The situation of damage (damage to the material, ...);
-The cause of the problem;
-Measures and the situation remedied.
8. The recommendations aimed at improving the efficiency of quality management in local construction.

Where to get:-as above-the State inspection on quality of construction works (Ministry of construction)-Save Chairman (Signed, stating your name, position and stamp) ANNEX 28 of the SOCIALIST REPUBLIC of VIETNAM independence-freedom-happiness..........., the day of the month. ... the year 200 REPORT of the (Department) HAVE SPECIALIZED CONSTRUCTION WORK or MINISTRY (Department) HAS a PROJECT on the SITUATION of the QUALITY BUILDING CONSTRUCTION (periodic report 6 months) dear: Minister of construction (Director of the Department of construction) 1. Total number of works Ministry (Department) being the construction during the period of the report, including:-in groups A, B, C.-capital investment by the State's budget.
-Direct investment abroad.
-Investment by the other funds.
2. The amount of the work of the Department (the Department) has been completed and was put into use in the reporting period, including:-in groups A, B, C.-capital investment by the State's budget.
-Direct investment abroad.
-Investment by the other funds.
Evaluate the quality of the work of the Department (the Department) has put into use during the reporting period; the implementation of the regulations on warranty and maintenance works.
The handling of the breach of regulations to manage the quality of construction works in the period of the report.
3. Amount of the work of the Department (the Department) started construction in the period of the report, including:-in groups A, B, C.-capital investment by the State's budget.
-Direct investment abroad.
-Investment by the other funds.
4. The works were The (Department) evaluation design, engineering total during the reporting period, including:-in groups A, B, C.-by: capital + capital investment by the State's budget.
+ Direct investment abroad.
+ Investment by the other funds.
Reviews technical design quality total constructions by Ministry (Department) management.
5. The construction works has been The (Department) to check the work experience in the period of the report.
6. The problems of construction occurred during the period of the report (by group and by funding): – name of the incident;
-Investor;
-The time of the incident (hour, day, month, year);
-The situation of damage (damage to the material, ...);
-The cause of the problem;
-Measures and the situation remedied.
7. The recommendations aimed at improving the efficiency of the management of the quality of construction works.

Where to get:-as above-PPC (for the report of the Department)-Save The (Department) have specialized construction work or Ministry project: (sign, stating your name, position and stamp) ANNEX 29 to the SOCIALIST REPUBLIC of VIETNAM independence-freedom-happiness..........., the day of the month. ... the year 200 the QUICK REPORT CONSTRUCTION PROBLEMS dear : ......................................................................
1. The report (Investor/EPC) or the management server using the work (when the work has been delivered, and are exploiting, using)..........

2. name the process of occured incidents........................................................................
3. Thuộc dự án (nhóm A, B, C).................................................................
4. construction locations...............................................................
5. Tổ chức tư vấn thiết kế......................................................................
6. The organization supervising construction..................................................
7. Construction business (construction)............................................................
8. The time of the incident (hour, day, month)...............................................
9. Description of the problem, the situation works when the problem..............................................................................................................................................
10. The situation of damage (damage to the material, ...) ..........
.......................................................................................................................
11. Sơ bộ về nguyên nhân sự cố (nếu có)...............................................
..................................................................................................................
12. Preliminary troubleshooting situation...................................................

Where to get:-as above-Save The report (signed, stating your name, position and stamp) ANNEX 30 REGULATIONS on STORING the COMPLETE PROFILE 1. Complete the record-setting responsibilities 1. Owner: the owner or rent construction consultancy organization (case no owner rent the organization supervising construction) complete sets, complete the profile.
2. Construction Business:-complete the profile Setting for the execution, delivery and profile and investor review to complete the entire profile.
-Coordinate subcontractors to complete the record-setting the section of the building contractor;
3. The organization supervising construction: in case the owner rented the organization supervising the construction consulting organization has the responsibility to examine the entire set of legal records and document quality management ensure the perfect profile to reflect the true reality.
2. complete the profile content complete the records include documents stated in the list of records, documents and complete construction works according to annex 20 of this regulation.
3. complete the profile specification 1. Form of records-all the documents are sorted by the order of the list in annex 20 shall be installed on the cover of iron grip hard file, install through the hole directly into the left edge of the document, or folded into the bag of cans have lids installed and then punches on the left edge of the bag of cans.
With the large-sized drawings, allowing folded drawings under A4 (207x296mm), and then install on the file cover or on the box.
On the cover of the file, or the box must be labeled, write the name of the document, enclose the list of documents contained in it.
-Don't get the complete dossier submitted to in folder 3.
-Encourage the use of videotapes, diskettes, CD-ROM, the retention of other informatics equipment to prepare and submit the attached public complete profile according to conventional forms.
2. the amount of the refund profile-The complete profile the established 5-6 sets to send: + investor (2 sets if the investor to establish dedicated project management) 01-02 the + Server Management using the 1st buildings + construction business (building, fitting) 2 sets + State Archive authority under decentralization 1 set of 4. Submit the completed record-store after the company completed put into use, the owner handed the complete public record 01 complete for server management using the work (unless the owner at the same time as the server managing the use of the work); at the same time file the archive 01 Ministry for State administration bodies are responsible for filing the refund according to the hierarchy.