The DECISION of the PRIME MINISTER issued the action program of the Government implementation of resolution No. 39/NQ-TW on August 16, 2004 the Politburo about the socio-economic development and ensure the defence and security of North-Central and Central Coast until 2010 the PRIME MINISTER pursuant to the law on organization of the Government of 25 December 2001;
Pursuant resolution No. 39/NQ-TW on August 16, 2004 the Politburo;
According to the recommendation of the Minister of planning and investment, the DECISION: article 1. Attached to this decision of the Government's action program to implement resolution No. 39/NQ-TW on August 16, 2004 the Politburo about the socio-economic development and ensure the defence and security of North-Central and Central Coast until 2010.
Article 2. This decision has the effect after 15 days from the date The report.
Article 3. The Ministers, heads of ministerial agencies, heads of government agencies, the Chairman of the provincial Committee, City: Thanh Hoa, Nghe An, Ha Tinh, Quang Binh, Quang Tri, Thua Thien Hue, Da Nang, Quang Nam, Quang Ngai, Binh Dinh, Phu Yen, Khanh Hoa, Ninh Thuan, Binh Thuan, was responsible for the implementation of this decision.
 
The GOVERNMENT'S ACTION PROGRAM to IMPLEMENT RESOLUTION NO. 39/NQ-TW on August 16, 2004 the POLITBURO ABOUT the DIRECTIONS of SOCIAL-economic DEVELOPMENT and ENSURE the DEFENCE and security of NORTH-CENTRAL and CENTRAL COAST until 2010 (attached to decision No 113/2005/QD-TTg dated 20 May 2005 from the Prime Minister's) implementation of resolution No. 39/NQ-TW on August 16, 2004 the Politburo about the directions of social-economic development and ensure the defence and security of North-Central and central-coast by 2010, the Prime Minister issued the Government's action program to directing and operated made the investment in development and development management as a base to the level departments, enterprises in all economic sectors to the orientation of its activities, ensure the North-Central and Central Coast soon advancing up the other regions in the country, become a major bridge in the country's top exchanges, international economic cooperation; improve the basis material, cultural life, the spirit of the people in the region; limited to the lowest level effects of natural disasters; maintaining political stability and social safety order, guarantee the security, defence, protection of the ecological environment.
A. MISSION and SPECIFIC SOLUTION i. reviewing, correcting, adding overall planning the social-economic development, industry development planning, planning with 5 year plan 2006-2010. Clearly define the issues of security, Defense need to adjust, Supplement to ensure socio-economic development of the North-Central and Central Coast until 2010.
On the basis of the master plan for socio-economic development, industry development planning and product planning, ministries, sectors, localities in the North Central Coast and Central check, additional adjustments to planning in the field of management according to their functions and the Prime Minister on the third quarter of 2005.
Your requirements, additional adjustments to planning to achieve are:-holds and materialize the contents according to the spirit of resolution No. 39/NQ-TW, updated, adding new conditions match.
-Clearly define in the planning of the development of economic infrastructure, social (traffic, electricity, irrigation, industry, schools, medical establishments, cultural works, ...) for the power industry business just outlined and defined areas of priority need to focus development investment , set out the policy to the economic development investment.
-Clearly identify the programs and projects of investment in the next 5 years, the demand for capital and capital structure for each program, projects and solutions, policy mechanism to mobilize investment capital. Selected, arranged in order of precedence made the project, important projects for inclusion in the 2006-2010 five-year plan.
1. for the ministries.
a) Ministry of planning and investment to host, in cooperation with ministries, sectors and localities to build overall planning the social-economic development of the North-Central and central-coast by 2010; The programme of action and the plan of implementation of the tasks of developing foreign economic Department in North-Central and Central Coast, the Government in the third quarter of 2005.
b) the Ministry of construction, in cooperation with the ministries and the relevant local government research and the planned construction of the North-Central and Central Coast and central key economic region; development of the network of municipalities and the residential area of North-Central and Central Coast to 2010 and vision 2020; master plan for solid waste management in the North Central Coast and Central to 2010 and vision 2020; the overall construction plan of premises for economic zones, the new municipality of Nghi son, Lam Sơn (Thanh Hoa), Huangmei, meaning Forums (Nghe An), Vung Ang (Ha Tinh), Lao Bao (Recommended), Chan (Thua Thien Hue), electric Jewels-electric (Quang Nam), the great wall to wall (Quang Ngai), American Association (District), van Phong (Khanh Hoa); planning of domestic water supply network in the towns, townships, cities and rural areas.
c) Ministry of industry, in collaboration with the ministries and local research review, adjust, additional development of the industry (especially for shipbuilding, mechanical industry, building materials, electricity production); in collaboration with the Ministry of transportation route planning supplementary fuel up the Highlands; development of the industrial products of the region; urgently complete the petroleum industry development strategy as a basis for the construction industry master plan development, including the development of the oil-filter Center.
Implementation of the programme of action of the industry such as: industrial development, promote the production; enhance industry investment development associated with economic restructuring and international economic integration; developing small and medium industries, handicraft, craft village; continue to streamline innovation, develop and improve the efficiency of State enterprises.
d) Ministry of agriculture and rural development, chairing the study in cooperation with the ministries and related reviewed local adjustments, additional development of agriculture, forestry, irrigation, which focused on consolidating and strengthening the research system, the transfer of science and technology in agricultural sector system development, agricultural and forestry processing associated with the raw materials in order to meet domestic and export markets, focusing on the products of industrial plants on short, rubber trees, trees and forest products; irrigation development plan ensuring the water supply, flood prevention and disaster mitigation to prevent, protect the ecological environment in the region.
Ministry of fisheries) in collaboration with the relevant ministries, sectors and localities in the region of your research, adjust, additional fishery development planning, planning the extraction, processing and aquaculture.

e) Ministry of transportation, in collaboration with relevant ministries, sectors and localities in the region of your research, adjust, additional strategies and planning was browsing: strategy development of transport of Vietnam by 2020, the master plan for the development of Vietnam seaports to 2010 detailed planning, the Group of ports, the development of specialization of transport by road, rail, waterways, airports system by 2010 and towards 2020, maritime transport development planning of Vietnam by 2010 and towards 2020; improve and accelerate progress to early approval of the project: planning the details of the remaining sea port group, detailed planning for the international transit port van Phong, overall planning of road networks, high-speed rail by 2020, up rail planning, development planning transportation central key economic Region development plan, the transportation corridor and border patrol the border region until 2010, the planning system of the coastal road and the other plan.
g) Ministry of defence, in coordination with ministries and the local build process on reviewing, correcting, overall planning of additional areas related to military targets, the defence sector; the construction of national defense and economic network of the frontier in the Western Department of Ho Chi Minh Street; building the infrastructure to serve the needs of Defense-Security and economic needs of the population on the Islands, island, until 2010.
h) postal and telecommunications Ministry chaired the study, construction and the Government on the construction of postal infrastructure, Telecom contact information guarantee in the North Central Coast and Central.
I) Ministry of science and technology, chaired the study, construction and the Government scheme to develop scientific research center, the key laboratory in the North Central Coast and Central.
k) Ministry of natural resources and the environment chaired research, build the Government on reviewing, adjusting land use planning of the region up to 2010; planning the exploitation, use and protection of water resources in the great river basin; Project for disaster prevention Department in North-Central and Central Coast; The programme integrated management of the coastal strip.
l) Ministry of Commerce presiding, in cooperation with the ministries and the local research, construction of the Government in the third quarter of 2005 on reviewing, correcting, planning additional service sector infrastructure development; Trade promotion programs and brand development; The project of expanding foreign trade cooperation in the region.
m) Ministry of labor, invalids and Social Affairs and the Government building of your scheme, and adjust the planning network of vocational institutions; guide the planning of local treatment facility, recovering drug addict for the province in the North Central Coast and Central.
n) the Ministry of education and training, in collaboration with the ministries and the local research, build and process of your Government on the planning and construction of the investment plan of developing education and training; network of universities, colleges, secondary; Project to promote the implementation of the program solidly turned school, classes and housing for teachers in the town especially hard, borders, islands of the North-Central and Central Coast; Investment project to upgrade infrastructure and capacity building training for the University: the University of Vinh, hue, Da Nang, Qui Nhon University and University of Nha Trang.
o) Ministry of health, in collaboration with local research, build the Government Development Planning Department of health; the Medical Center's high quality, intensive in the region; the health of the local basis; The project of improving the effective implementation of national target programs, against some infectious diseases, social disease, dangerous diseases and HIV/AIDS in the province in the North Central Coast and Central.
p) Ministry of culture-information hosted, in cooperation with relevant ministries, sectors and localities to study the construction of the investment scheme Government embellished its cultural relics, historical sites, resistance and revolution; conserve, preserve and promote the natural and cultural heritage UNESCO; The project of construction of network cultural institution-level information, Ward and township Hamlet, in the province; conservation plan-building cultural development-information the ethnic minority region of North-Central and Central Coast.
q) Of tourism, in coordination with the local research review, additional adjustment, development planning and investment plans until 2010 the system of modern tourist area of high quality; development of amusement, entertainment in the economic area and in the central key economic region; The project of developing the region associated with the travel and the Highlands region of the Mekong subregion countries; Promotion programmes promote tourism region.
r) Vietnam television research, construction, and the Ministry of culture and information, due diligence before submitting to the Government project to expand the network tv coverage to mountainous districts, the western border; planning and deployment roadmap increases the amount of time the tv broadcast in the nation for the region.
s) radio voice of Vietnam studies, construction, and the Ministry of culture and information, the appraisal before the Government scheme expanded the network coverage to mountainous districts, the western border; planning and deployment roadmap increases the duration of broadcast radio in the nation for the region.
t) Committee on population, family and children presided over the Government building and the project of strengthening reproductive health and family planning to improve the quality of the population, protection, care and education of the children of the North-Central and Central Coast.
u) ethnic Committee chaired, in cooperation with relevant ministries, sectors and localities to study the building and the project of government social-economic development of the ethnic minority areas very few people of the region; The project plan, settled for minorities; The project of training the cadres of ethnic minority people; the policy of socio-economic development for the mountainous Township border.
v) other ministries according their functions, regulate the development of the industry on the region.
2. for the local.
The local people's Committee chaired, in coordination with the ministries concerned to conduct review of the master plan for socio-economic development in the spirit of resolution No. 39/NQ-TW, while investment plans of local specific to 2010, which clearly defines the priority fields solution on the mobilization and use of funds for each programme, the Government projects. Updated forecasts, reviewed the likely reality, redefine the economic structure towards promoting the potential of local advantages; associated with the consumption of products and ensure sustainable development. Publicly the urban planning, industrial zones, including the small business parks, villages and regions producing trees, the DAC has quality and high productivity.

Review, Supplement and improve the development of the economic zone, economic zones, commercial areas, industrial zones, the system of municipalities and settlements in the province fits with the general direction of the country. Clearly, the structure of investment needs and financing solutions to implement the program, the key project was to take on projects and investment programs are in the build process of Government approval to invest in the period from now to 2010.
II. building plans implement the 2006-2010 period, and local industry in the field of investment to build economic infrastructure, social.
 
Investment completed the cutover of the projects implemented on the region from now to 2010, and conduct the activities prepared for the important infrastructure investments after 2010. In particular: 1. the economic infrastructure.
Development priority network traffic, particularly road traffic, the port, the irrigation works of meaningful clues important to the production infrastructure, tourism and other economic sectors.
a) Ministry of transportation, in cooperation with ministries and local mobilization of resources, gradually implemented major projects such as highways, Hanoi-Vinh-Ninh Binh, Quang Tri, Da Nang-Hue-Danang-Quang Ngãi-Quy Nhon Lam, HA-Qin Germany; the road branches East of the Son; the coastal line of the region; project tunnels Pass; international transit port van Phong.
-Hosted implementation, monitoring, and urge the relevant units to ensure the progress and effectiveness of investment works, construction projects using ODA, the capital budget and Government bonds: the project upgrade, restore national road 1A paragraph Dong HA-Quang Ngai (WB3), the Quang Ngai-Nha Trang (ADB3); National Highway 9 East-West corridor (Dong HA-Lao Bảo, Quảng Trị); National route 49B (paragraph km 14-km 40) (Thua Thien Hue); National Highway 47 (overpass Le Loi, Thanh Hoa and the road bridge on the National Highway 1A; National route 14 d (Quang Nam); Ho Chi Minh Street; Vung Ang line-Laos Vietnam border; the way West Western Nghe An, Thanh Hoa; National Highway 7, Highway 8, Highway 27, highway 217, and the other route; Western Province 3-Phu Yen-Dak Lak. Upgrading, expanding the port of Vung Ang, Oven Doors, First Sa, Quat, Qui Nhon, Nha Trang; Terminal airports the airport of Da Nang, Cam Ranh, Chu Lai; to upgrade, renovate the rail route from Hanoi-Ho Chi Minh City.
b) Ministry of agriculture and rural development in collaboration with the local Department of management make true progress and effective priority investment projects for the irrigation plan up to 2010, including:-The project forward by capital budget, capital credit Government bonds, such as reaching the Doors project (Thanh Hoa); irrigation system upgrade indoor Boat (Ha); outdoor AI (Quang Tri); Truồi Lake, the irrigation Net, beating A Long Workshop (Thua Thien Hue); Phu Ninh (Quang Nam); outdoor Copper; Binh Dinh (); following Xin river hydroelectric works (Phu Yen); outdoor Oil Streams; Iron River, Buffalo River Lake Lake, Hubin (Ninh Thuan) irrigation project, Phan Ri-Phan Thiet, Quao district River Channel goods shelters, outdoor River (Binh Thuan Province).
-The new construction project financing in water in the form of government bonds and capital budget: outdoor A Mồng (Nghe An); outdoor Showers (Quang Binh province); outdoor Description Trach (Thua Thien Hue); outdoor Bronze Jian (Quang Nam); the Lake In (Ad); irrigation system Style (), Lake Forest (District), American Indoor Paint Flowers, outdoor Ta Ming (Khanh Hoa), Hubin (Ninh Thuan), Ta Pao River, Lake and Lake Nail (Binh Thuan Province).
The project to build the embankment against the avalanche against sedimentation, river estuaries, and coastal erosion.
c) Fisheries Ministry to coordinate with the local Department of management make true progress and effective investment projects are undertaken and forward: the same national seafood Centre Central, the production and inspection center like fisheries in focus, the Fisheries Research Institute in North-Central the project contact information service for boats harvesting in key construction projects, monitoring center, alerted the environment for disease prevention, fisheries, fish market building projects, logistics area fishing, anchoring the room to avoid the storm stay , the marine protected areas.
d) the Ministry of construction, in cooperation with the Ministry of planning and investment and the local General, proposed directory of the program, projects on upgrading and building new water production and supply for residential living are the priority funding to implement.
DD) Ministry of industry, in collaboration with relevant ministries, sectors and localities to feasibility demonstration project to build a national power transmission system. Build the electrical system for the District of the island, the island Township.
e) postal and telecommunications Ministry chaired the urge and monitor implementation of the investment project of development of postal, telecommunication systems, InterCity transmission information assurance capacity and Internet service to the city centre, town and commune; meet the needs of communication to all communes.
g) Of tourism in collaboration with the local construction in tourist areas; manage and implement effectively the projects tourism infrastructure investment under the plan until 2010.
-Determine the order of priority of investment, urge do prepares investment activities and implementation schedule of the project to construct the zone, General travel routes such as: Sam son-Lam son; Kim Lien-Door; Phong Nha-Ke Bang; Permanent Mold-Hien Luong-Khe Sanh; Hue-Scene-Sea-Non Water; Hoi An-My Son; Style-The Vast Territory; Nha Trang; Tan function-Mui: Indigo Towers system from Quang Nam to Binh Thuan Province along with many other thematic tourist areas.
h) Ministry of Commerce in collaboration with the local Department of proposed research infrastructures projects proposed trading the State support for investment, including construction projects, improving the market in these areas, the local borders.
I) Ministry of planning and investment in cooperation with the ministries and localities in the layout which focus on building infrastructure, economic zones, border gate economic zone (including the bonded warehouse) have import and export turnover of large goods, development of financial services import-export, banking, postal, telecommunications, to increase budget revenues and the implementation of economic restructuring of the region.
k) Ministry of Defence develop Shandong School routes according to the progress and construction.
2. social infrastructures and residential layout.
a) the Ministry of education and training, in collaboration with the local implementation of project development network of colleges, professional high school of the region according to the master plan; investment to upgrade facilities at the University. Construction investment arrangement in order of priority and specific deployment plans.
In collaboration with the local Department in implementing the program solidified school, classes and housing for teachers in the town especially hard, borders, Islands; construction of the school network, as the network of kindergartens, boarding school of ethnic and vocational guidance centres in mountain districts, Islands.
b) Ministry of health, in coordination with the ministries concerned to continue investing in the construction and development of Advanced Medical Center technical regional high in hue and Da Nang; construction of the project of developing the health centre in Vinh, Nha Trang; construction of overall project to upgrade provincial hospitals, district hospitals and clinics.

c) Ministry of defence, in coordination with the Ministry of public security, the Ministry of planning and investment and the local Department in implementing the project to build the social infrastructure of the town especially hard, the commune borders, the infrastructure, the Central cluster of town along the Laos-Vietnam border to ensure stable production and needs b. work of the people associated with the task of protecting security-defense.
d) Ministry of culture-information hosted, in cooperation with relevant ministries, sectors and localities in the implementation of the project to build the cultural institution-system information base, preserve cultural development-information Department of minorities, the North-Central and Central Coast.
DD) Ministry of labor, invalids and Social Affairs the Government support research from the central budget for investment projects in the vocational training field, local teachers of vocational area; investment, upgrading technical colleges 3alya into Technical University; investment support, detoxification treatment facility to recover for the provinces in the region.
III. building plans implement the 2006-2010 period, and local industry in the field of developing the main product sectors of the region.
The 5-year investment programme (2006-2010) for the North Central Coast and Central aim of promoting rapid conversion of the structure of production, the product structure in the economic sector, focusing on hydropower products, cement, steel, oil refining and tourist services and agricultural products , forestry and fisheries.
1. The Ministry of industry in collaboration with the owner, the local planning, building capital solutions and mechanisms to coordinate implementation of the project to build metallurgical complexes in Thach Khe district, Hebei province Province. The Ministry of industry, in collaboration with the ministries and the relevant local building solutions policy mechanisms, financing, especially from the non-State capital to the works during the period 2005-2010 according to schedule deployment, of which the most important are:-implementation of the projects forward. About hydro power as hydropower and Stork Swallow A Cup, drawing (Nghe An), Quang Tri (Quang Tri), Binh Dien (Thua Thien Hue), A Picturesque River, Vương1 2 (Quang Nam), Ninh Binh, BAC (Binh Thuan Province), Kon Tum (Quang Ngai), Three Rivers (District). Other works such as the brewery of Hanoi-Quang Binh (), the brewery (Vinh Phuc), paper pulp factory in Thanh Hoa (Thanh Hoa).
-The investment project for the new construction. Nghi son thermal power such as electricity (Thanh Hoa), agricultural products (Quang Nam); Reaching the Door of hydropower (Thanh Hoa), Salt (Nghe An) Waterfall, the river Con 2 (Quang Nam), Đak Corinthians (Quang Ngai), An Khe Kanak (), Ea Krong (Phu Yen), La Contingent, Knitting books (Binh Thuan Province). Other works such as vehicle tire factory radians (Da Nang), project production of PP, PE (Ad); The No. 1 oil refinery Dung quat (Quang Ngai), petroleum refineries (The Goods); Hot-rolled steel sheet factory (Central), mine and metallurgical combines Rauch Khe (Ha); Processing plant pigment (TiO2) (Ha); Long steel rolling plant (Da Nang City); Assembly and parts manufacturing automobiles Kamaz (Quang Nam).
-Coordination with the ministries concerned to actively deploy the project to the Dung quat oil refinery, striving to put the plant into operation in late 2008, early 2009, while actively seeking joint venture partners or 100% of the capital to build the Nghi son oil filtration combined (Thanh Hoa).
2. The Ministry of agriculture and rural development in collaboration with the relevant ministries, sectors and localities in the construction of the project to produce products such as industrial development on short, rubber trees, trees, livestock, meat, beef farming development, focused investment in forestation. Planning production and reforestation policies to mobilize the economic sectors involved and protecting the forest, tied with wood processing industry.
3. The Ministry of construction, in collaboration with the owner, the local construction and speeding up the implementation of true progress and effective investment projects as planned until 2010 the project forward as the line 3 cement BIM son (), cement Gianh River () cement, Fossils (Quang Nam).
At the same time, in coordination with the ministries concerned and the local development plan to add some new cement factory as Nghi son cement 2 (Thanh Hoa), Eastern cement (Thua Thien Hue).
In cooperation with ministries, sectors and localities to build the solution, the mechanism of financing policy, especially from the sources of capital in and out of the State for planning to deploy converts the cement kiln to rotary kiln technology.
4. The ministries of construction planning and development solutions products services according to the management function of individual ministries; focus on products and services air transportation, sea transport, transport by road; telecommunications, banking, financial services, information technology application and the Internet; application services technical progress, public services, agriculture, forestry, fisheries.
IV. Improve mechanisms, policies and institutional framework on the management framework and implementation operating resolution No. 39/NQ-TW to directing and operated effective results of the activities of the programme of action, essential to successful decision is perfect the mechanisms and institutional framework, policy on the management and executive implementation of resolution No. 39-NQ/TW , mobilize enough resources and build for the political system to be clean, strong and a team of managers and executives, have flexible capacity. The Government specifically tasked as follows: 1. Ministry of planning and investment to host, in cooperation with relevant ministries, sectors and localities in the region suggest the mechanism frame, specific policies specific to both the region and for key economic region, the Government in the fourth quarter of 2005 :-calculate the balance of resources and suggestions to the Government on priority policy mechanism support on which to perform and take on the investment plan the 2006-2010 period. The mechanism, policy management and rational allocation of resources for the local budget to accomplish the goals of resolution No. 39/NQ-TW.
-Special preferential policies to attract investment capital, especially foreign investment attraction and promotion of investment in industrial production, development services, travel into the promotion and development of trade Chan Chu Lai open economic zone, General Dung quat economic zone Nhon hoi, van Phong, industrial, gate economic zones.
-Mechanisms, human resource training policy.
-Mechanisms, policy links in the region, between key economic region and outside the region economic cooperation links with other regions.
2. The Ministry of finance, in cooperation with the ministries for research construction of the Government in the fourth quarter of 2005 on the mechanism, financial incentive policies for the region by 2010.
3. State Bank of Vietnam presided, in cooperation with the ministries of research, focusing on reviewing, editing, difficulty in investing, credit for the region.
4. The Ministry of agriculture and rural development, research and proposals with the Government policies that encourage the production of seed, livestock yield high quality, adapted to the ecological conditions of the region.
5. The Ministry of transport, in coordination with the ministries and related local research proposals and the Government in the fourth quarter of the year 2005:-policy mechanisms in the development of coordinated cooperation and effective use of the sea port in the North-Central and Central Coast.
-Modes of road transport and multimodal transport in the ASEAN region.

6. Ministry of Commerce presided over construction, proposed solutions, mechanisms, policies and processes of the Government about the method of consumption of agricultural products, develop the market and perfect the operation mechanism of the commercial industry in the region.
7. The Ministry of science and technology, research building, presiding over the proposal and the Government in the third quarter of 2005 on the mechanism of special preferential policies and encourage investment in applied research, the transfer of scientific achievements, technology consulting services, science and technology in production business in the region. '
8. The Ministry of health, building research, proposals and the Government in the third quarter of 2005 on the policy of support for the Foundation examination and the poor and strengthen the combined Military-Civilian medicine in health care and protect the health of the people in the mountainous districts, Islands, the western border of the Department.
9. The Ministry of the Interior, in coordination with the Ministry of Finance of research proposals and the Government in the fourth quarter of 2005 on the policy priorities in particular in fostering, training of officials and civil servants in local establishments is uplands, the border region, the region of the town particularly hard; officers are ethnic minority people.
Hosted, in cooperation with the ministries and the province, the central city construction plan research on event organization-wide administrative levels are regulated in the law on organization of the Government in 2001, the law on organization of people's councils and people's committees in 2003 from now to the year 2010 in the spirit of public administration in the implementation of resolution No. 39-NQ/TW of the Politburo about the development of the North-Central and Central Coast.
10. The Ministry of public security, in coordination with the ministries, the local Department of construction and organization of the security, in order to serve socio-economic development of the North-Central and central-coast by 2010, the Government in the second quarter of 2005. Focus on building and deploying security work for a number of areas, in key areas such as: for economic development programs; with regard to the border province of Laos; the province contains the key project, attract more foreign investment capital; with the adjacent Highlands; with the focus on the religion and the ethnic focus Health. The mechanism of coordination between the Ministry of public security with the local branches of the search select partners, evaluators of foreign partners join economic investment in the region. Policy and management mechanisms that improve the effectiveness of the prevention and fight against the evils of illegal drugs, prostitution and trafficking in women across the border, trafficking in counterfeit money, transport and trafficking of weapons across the border. Hosted, in cooperation with the Ministry of Internal Affairs, the people's Committee of the coordination of forces and consolidating Government facilities to handle, stop the activities that affect security, social order and safety.
11. The Ministry of justice review the written law system and operating mechanism, policy development priority areas of difficulty in the areas of investment, allocate and manage the use of State capital, market orientation and support for science and technology for development , poverty alleviation and ensuring the security of Defense Department.
12. The Ministry of labour, invalids and Social Affairs the Government research on specific policy mechanisms for the development of vocational training, job creation, poverty alleviation, social security, and Detox Recovery for the region of North-Central and Central Coast.
13. The Ministry of culture-information supplement proposed host, organization of activities and enjoy the culture and information Department in North-Central and Central Coast.
14. The Fisheries Ministry chaired the proposal human resources development policy, the policy engine manages the fishing port, fish market information system, clue fishing, anchorage to avoid Typhoon for ships to stay, concentrated aquaculture areas, the same focus, the quality management policy of fisheries product processing policy, encourage the development of aquatic production stricken coasts, Islands and aquaculture policy at sea.
V. information propagated about the resolution of the Government Office for cooperation with the Board of thought-the Central culture, Central Economic Committee, ministries, sectors and localities in the region in collaboration with the radio voice of Vietnam, Vietnam television station and the radio-television, widespread organization of resolution No. 39-NQ/TW of the political and administrative programs made the resolution of the Government, planning, plans and programmes should focus on the deployment to the party organizations, unions, the middle-class people, especially for the team of entrepreneurs. ...
B. IMPLEMENTATION of the ORGANIZATION based on the action program of the Government, the industry, the local building plans to make the task of management responsibility is allocated on the basis of reviewing, correcting, adding there was planning, identify project, scheme, program priorities , the resources needed, the need to adjust policies or enact additional and investment plans, and the time taken to complete the task from now to 2010.
1. On the basis of the specific continuing implementation of the content was mainly raised in the action program of the Government, according to the function, the task has been assigned, the Ministers, heads of ministerial agencies, heads of government agencies, the Chairman of the people's committees of provinces and cities directed construction of the action program of the , local branches; implementation of the project, project, and additional policy mechanisms and apparatus as assigned by the Government.
2. Ministers, heads of ministerial agencies, heads of government agencies, the Chairman of the local people's Committee in the North Central Coast and Central focus, strengthen inspection, urging the implementation of the tasks outlined in the action programme, proposed solutions in a timely manner policy, consistent with the specific situation and the Prime report the implementation of this action programme.
3. The ministries was assigned to preside over the execution of programs, projects, proposals, build proactive policies in coordination with relevant agencies to research, build, and report the results according to the time schedule specified in the regular session of the Government.
4. on the basis of the approved area, assigned the Ministry of planning and investment, General Government reports specific solutions on the mechanism, policy, capital investment ... to implement in the 2006-2010 five-year plan.