____ ELECTRICITY LAW based on the Constitution of the Socialist Republic of Vietnam in 1992 was amended and supplemented by resolution No. 51/2001/QH10 on 25 December 2001 of the Xth Congress, session 10;
This law regulates the electricity.
Chapter I GENERAL PROVISIONS article 1. Scope this law regulates the planning and development of electricity; save electricity; electricity market; rights and obligations of the organization or individual operating the electricity and use of electricity; protection of electric equipment, power structures and electrical safety.
Article 2. The object to apply this law apply to the organization or individual operating the electricity, use electricity or have other activities related to electric power in Vietnam. The case of the international treaties to which the Socialist Republic of Vietnam signed or joined other provisions with the provisions of this law shall apply to the provisions of international treaties.
Article 3. Explanation of terms In this law, the terms below are interpreted as follows: 1. the power operation is the operation of individual organizations in the areas of planning, electricity development investment, power generation, power transmission, power distribution, moderation system, operating the electricity market transactions wholesale, retail, electrical, power specialized consulting and other related activities.
2. power unit is the Organization, individuals carrying generators, power transmission, power distribution, moderation system, operating the electricity market trading, wholesale, retail sale of electricity, electricity specialist consulting and other related activities.
3. The grid system to power lines, transformers and auxiliary equipment for power transmission. The grid, according to the purpose of use and management, are differentiated into the grid transmission and distribution grid.
4. Wholesale electricity is electricity sales this power unit for other power units for resale to third parties.
5. electric retail sale of electrical activity is the unit of electrical power for customers who use electricity.
6. Customers who use electricity is organization, personal power purchase to use, not to sell it back to the Organization, the other individual.
7. large electricity users are customers using mobile capacity and large consumption of output under the rules of the industry consistent with each period of development of the power system.
8. electric rates is lists the rates and specific power framework apply to the selling of electricity under different conditions.
9. Frame the power price range is the range of the price of electricity between the lowest price (price floor) and the highest price (ceiling price).
10. national power system is the system of power generation equipment, electrical grid and the auxiliary equipment to be linked together and be unified command within the country.
11. Regulate electrical power as the State's impact on the operations of electricity and electricity market aims to provide a safe, stable, power quality, power saving, effectively and ensure the impartiality, transparency, rules of law.
12. electrical system is an active command, process control, power transmission, power distribution in power system under national procedures, technical and operational modalities have been identified.
13. Operating the electricity market trading activity is managed and coordinated the purchases of electricity and ancillary services in electricity market.
14. cell count measurement is the measurement of capacity, power, current, voltage, frequency, power factor, including the types of counters, the power meter and the equipment, accessories.
15. power theft is the unauthorized power grab behavior not through the counters, the impact in order to falsify the measuring index of Count counters, and other electrical devices that involve counting power, intentionally or collusion wrong record index counters, and the behavior of other fraud power grab.
power engineering is the combination of facilities, equipment, machinery, building structure served directly for the generator, power transmission, power distribution, moderation system, purchase and sale of electricity; the protection system works in electric power; Corridor protection grid; the land use for the electric power and other ancillary works.
Article 4. Electricity development policy 1. Sustainable power development on the basis of optimal exploitation of all resources, to meet the needs of electric power serves the people's lives and social-economic development with stable quality, safety and economy, civilized services, contribute to ensuring defense, security and national energy security.
2. construction and electric power market development according to the principles of publicity, equality, healthy competition, the regulators of the State to improve the efficiency of electricity activity; ensuring the legitimate rights and interests of the power unit and the customer uses electricity; the attraction of all economic sectors to participate in the activity generator, electrical distribution, electrical wholesalers, retail and electric power consultants. State monopolies in the transport activity, moderation of the national power system, build and operate large power plants, meaning particularly important regarding the socio-economic, defense and security.
3. Apply scientific and technological progress in the operation and use of electrical power to save, enhance the efficient use of energy resources, protecting the ecological environment.
4. promote the exploitation and use of new energy sources, renewables for power generation article 5. International cooperation in electricity activities expand international cooperation and international economic integration on the operations of electricity on the basis of respect for the independence, national sovereignty and mutual benefit. The State shall encourage and create favourable conditions to foreign individuals, institutions involved in Vietnam electricity activity; organizations and individuals in the country in cooperation with foreign organizations, international organizations active in electricity.
Article 6. Advocacy, education, common law on electric power 1. Ministries, ministerial agencies, government agencies, people's committees, the power unit levels within the scope of his responsibility coordinating with mass information bodies and popular organizations, school education and guide people to use electricity safely, saving, efficient and accepted the provisions of the law on electricity.
2. the Vietnam Fatherland Front and the Member organizations in the scope of his responsibility coordinating with state regulators on the operations of electricity and use of mobile advocacy, mobilization of the people use electrical safety, savings, efficiency and accepted the provisions of the law on electricity.
Article 7. The acts prohibited in the electric power operation and use 1. Sabotage of electric equipment, instruments for measuring of electrical power and counting.
2. electric power activities without a license under the provisions of this law.
3. Close the power cut, the rules of law.
4. Violation of the regulations on safety in power generation, transmission, distribution and use of electricity.
5. Obstructing the test power operation and use electricity.
6. Stealing electricity.
7. Use power to trap, catch animals or as means of protection, except in cases specified in article 59 of this law.
8. Violation of the regulations on protecting the safety lobby grid, safe distance of transmission lines and power stations.
9. Provide information honestly not harming the legitimate rights and interests of the organization or individual operating the electricity and use electricity.

10. Taking advantage of position and powers to cause harassment, troublesome, in nefarious activities gain power and use electricity.
11. other acts violating the provisions of the law on electricity.
CHAPTER II of the PLANNING and DEVELOPMENT of ELECTRICITY article 8. Electricity development plan 1. Electricity development plan includes development of national power development plan, the local power. Power development plan is established, the approval to serve as a basis for the development of investment in the electricity and be adapted to the socio-economic conditions in each period.
2. Development of national power was created on the basis of the strategy of socio-economic development of the country. Development of national power was created for each of the ten-year period and has driven for the next ten years.
3. Development of local power is the power development plan, central cities, including electricity development planning district, district, town, city in the province.
The planning of local electric power development was established on the basis of the strategy of socio-economic development of the region and are in accordance with the national electricity development plan and other planning related. Development of local power are established for each stage in the year and has driven for the next five years.
4. Every organization, individuals must comply with the electricity development plan has to be competent State agencies for approval.
Article 9. Created, approved and announced the development of electric power 1. The industry held up development of the national power the Prime Minister for approval; Specifies the content, sequence, procedure, evaluation of electricity development plan; announced and instructions, tracking, checking the implementation of electricity development plan has been approved.
2. the people's committees, the central cities (hereafter referred to collectively as the provincial people's Committee) held up the planning of local electric power development the Council the same level through prior to submission to the Minister of industry for approval; steer the organisation and planning electricity development district, district, town, city in the province; announced and instructions, tracking, check the implementation of the development plan of local power has been approved.
3. the competent authority approval of the electricity development planning to decide the adjustment of the planning.
Article 10. Funding for projecting 1. The central budget funding to carry out the task, due diligence, disclosure and regulate electricity development planning of countries.
2. the budget of the central cities, the level of funding to implement the tasks set, due diligence, disclosure and adjust the planning of local electric power development.
3. the State has a policy of mobilizing other funding sources for electricity development planning.
4. The Ministry of finance, in cooperation with the Ministry of industry issued the costs to establish, assess, and adjust the power development plan.
Article 11. Electricity development investment 1. Electricity development investment must match electricity development plan. The project is not yet in power development planning is only done when the approval authority is granted planning permission.
2. electric power project owner is responsible for the correct implementation of the provisions of the law on investment, construction and environmental protection.
3. power unit, power transmission, power distribution is responsible for building power stations, power lines and counters to the counters to sell electricity.
4. organizations and individuals to build new or renovate, expand electricity works to use technical equipment and modern technology in accordance with the rules, industry standards, standards of Vietnam by the competent State Agency regulations.
5. The Ministry of industry, the provincial people's Committee announced the portfolio of power projects to attract investment in each period and investment projects have been licensed.
Article 12. Use of land for the construction of electricity 1. The base electricity development planning and zoning, land use planning has been the competent State agencies approved by the people's Committee, the levels are responsible for the layout of land fund enough for construction of power works.
2. The owner when establishing investment projects electricity works must clearly define land use and compensation projects, clearance.
3. after electric power investment project has been approved, the competent State agency decisions, lease the land to the owner of the project.
4. the people's Committee in the scope of the task, their powers are responsible, in coordination with the owner electricity projects created and implemented the clearance plan, migration, resettlement; compensation for loss of land, property; protecting the land for the project and safe corridors of power works.
CHAPTER III the SAVINGS in ELECTRICITY, transmission, DISTRIBUTION and USE of ELECTRICITY article 13. Policies and measures to encourage and promote power saving 1. The State supports, encourages saving by using the following policy: a) to encourage domestic production or import, tax incentives applicable for products in the category of electric saving products and equipment, materials, technology to produce power-saving products;
b) application projects the results of scientific research and technological development, investment projects, production of electricity-saving products or investment project aims to save electricity are preferential loans from the development assistance Fund and the Fund for science and technology development;
c) project to develop power plants using new energy sources and renewable energy are entitled to incentives on investment, tax and electricity rates under the guidance of the Ministry of finance.
2. Ministries, ministerial agencies, government agencies, provincial people's Committee has the responsibility to build the program, projects promoting the use of savings and efficiency; the layout appropriate funding for scientific research and technological development serves the goal of saving electricity.
3. the target base for socio-economic development, the Ministry of industry in collaboration with the ministries involved building the national target programme on energy savings the Government decision.
Article 14. Saving in electricity 1. Generator unit is responsible for the choice of advanced technology, high performance and make optimal operation methods electricity device to save fuel and energy sources used generators, contributing to ensuring national energy security.
2. automatic power systems used in power plants must be designed, installed and are deployed during operation fit with automatic power-saving requirements.
Article 15. Savings in transmission, power distribution system of power lines and power stations must ensure the economic standards and parameters-advanced techniques, are operated with the optimal method in order to meet the requirements of a stable power supply, safety, continuity and minimize power loss.
Article 16. Savings in electricity use 1. The Organization, individuals using electricity to produce responsibly: a) the programme management of power demand to reduce the disparity between the peak and the peak of power system load chart;
b) improvement, rationalization of production processes, application of technology and the equipment used has low power consumption to save electricity;

c) maximum limitation of the use of large capacity electric equipment in peak hours of extra power system load chart;
d) coefficient warrants according to technical standards and minimize the use of non electrical load;
DD) Organization energy audit periodically and make the adjustment solution after having concluded the audit according to the regulations of the Ministry of industry.
2. The retail pricing of electricity for production and service activities, be sure to promote the Organization, individuals use saves electricity, encourage use of electricity in peak, reduce electricity usage during peak hours of extra power system load chart.
3. organizations and individuals who manufacture or import equipment, lighting, ventilation, air-conditioning, water pump, hot water supply, elevator and other equipment other activities serving to ensure the target of electricity consumption in order to reduce the cost of advanced energy, contribute to make savings.
4. Agency, the organization responsible for issuing the regulation power-saving use within the Agency, his organization.
5. The Government directing the construction and enactment of the energy consumption standards for these types of products, goods or use electricity.
CHAPTER IV section 1 ELECTRICITY MARKET rules, the OBJECT, the form and CONTENT of the ACTIVITIES of the ELECTRICITY MARKET article 17. Principle of operation 1. Guaranteed publicity, equality, healthy competition, without discriminating between the objects involved electric power market.
2. Respect for the right to choose partners and forms of transaction of purchase and sale of electrical objects on the market consistent with the level of development of the electricity market.
3. the State regulate operation of the electricity market in order to ensure the development of sustainable power systems, power supply to meet the requirements of safety, stability, efficiency.
Article 18. Formation and development of the market of electricity 1. Electricity markets are formed and developed under the order of the following: a level) competitive power market;
b the electrical wholesale market) competition;
c) retail market competitive power.
2. The Prime route of regulation, the conditions for the formation and development of the electricity market level.
Article 19. Audience participation power market 1. Unit generator.
2. power transmission unit.
3. power distribution unit.
4. the electrical wholesale unit.
5. mobile retail unit.
6. Units of national power.
7. The unit operating the electricity market transactions.
8. Customers use electricity.
Article 20. Buy and sell electricity on the electricity market 1. Selling electricity on the electricity market, including: a) generator units;
b the electrical wholesale unit);
c) retail unit cell;
d) customers use electricity.
2. The sale of electricity on the electricity market are done in two forms: a) buying and selling through the duration of the contract between the seller and the buyer;
b) traded for immediate delivery between the seller and the buyer power through operating unit of electricity market transaction.
3. The unit operating the electricity market trading is responsible for coordinating activities, trading power and auxiliary services electricity market.
Article 21. Operations Executive, trading on the market of electricity 1. The regulations mainly on the trading activities on the electricity market, including: a) the rights and obligations of the participants with appropriate electric power market the level of development of the electricity market;
b) technical characteristics of the power generation equipment, power transmission, power distribution;
c) of national power in the electricity market;
d) troubleshooting process;
power purchases) for immediate delivery on the electricity market;
e) bids and determine the market price;
g) billing and payment between the purchase and sale of electrical objects specified in clause 1 of article 20 of this Law and the provider of ancillary services;
h) provide supporting services and auxiliary services;
I) handle violations and resolving disputes, complaints about the activities of buying and selling electricity and ancillary services in electricity market;
k) provide, publish information related to operating activities, trading in the electricity market.
2. The content of the transaction operating on electricity market include: a) active control of the transaction participants electricity market to ensure the market operates in accordance with the rules of market transactions, the operating agreement between the parties and the other provisions of the law;
b) announced the price of electricity for immediate delivery and the types of service fees set forth in paragraph 1 of this article;
c) provide transaction services and bill payment for the power and the capacity to be traded in the form of immediate delivery and ancillary services;
d) receiving and processing of petitions related to electricity trading activities on the electricity market in order to ensure the stability, efficiency and prevent acts of unfair competition;
DD) provided information related to operating activities, transactions on power market for the parties concerned;
e) report on the operations of electricity trading on the electricity market with electricity regulatory agency.
3. Ministry of industry regulation of content in clause 1 and lead content in clause 2 of this match each level of development of the electricity market; rules of the Organization, specific powers, duties of the unit operating the electricity market transactions.
2 ENTRIES for the SALE of ELECTRICITY and POWER SUPPLY SERVICE CONTRACT HAS a TIME LIMIT Article 22. The power purchase agreement has a term of the contract for the sale of electricity that the deadline must be made in writing, include the following: 1. The subject of the contract;
2. Purpose of use;
3. The standards and quality of service;
4. Rights and obligations of the parties;
5. The price of electricity, the method and time limit for payment;
6. termination of the contract conditions;
7. Liability due to breach of contract;
8. The duration of the contract;
9. Other content due to the two parties to the agreement.
Article 23. Payment of electricity 1. The buyer must pay the full power and time power amount stated in the invoice for electrical power rate the sellers were competent State agencies for approval. Electricity bills are paid at Headquarters, the residence of the buyer or favorable location because the two sides agreed in the contract of purchase and sale of electricity.
2. The buyer pays the electric slow cooker to pay both the interest of slow money paid to the seller.
3. The seller your excess income money to reimburse the buyer power, including the interest charge.
4. the amount of interest paid or overpaid due to slow the parties agreed in the contract, but not exceeding the highest lending rate of the bank where the vendor has the account stated in the contract at the time of payment.
5. Buyer power has the right to require the seller to review the amount of electrical power to pay. Upon receipt of the request of the buyer, the seller of electric power has the responsibility to solve within a period of fifteen days. The case does not agree with the solution of electric power buyer, the seller may offer to the Agency, the competent organization to organize the reconciliation. In the case of non-recommended reconciliation or conciliation fails, the buyer has the right to sue in the courts under the provisions of the law on civil procedure. During the pending, the buyer still must pay for electricity and power seller is non-stop power supply.

6. In case the buyer does not pay electric and power were the sellers of electricity announced three times then after fifteen days from the date of the first notice, the seller has the right to stop power power supply. The seller must inform the stop time power power supply for 24 hours before your party and do not take responsibility for damage caused by stopping the power supply cause.
Article 24. Measuring cell count 1. Power unit, power transmission, power distribution is responsible for investing and installing the entire cell count measurement equipment and auxiliary equipment for measuring cell count, unless the parties have agreed otherwise.
2. cell counting equipment must conform to the standards of Vietnam and is the State Agency of Metrology calibration and sealing.
3. Counters must be installed in the area of management of the buyer of electricity, except where the parties have agreed otherwise. Location of installation and the installation of counters to assure, landscape, favorable for the buyer to check power supply indicators and seller of electric meter indicator records.
4. The buyer has the responsibility to protect counters installed in your management zone and timely notification to the seller of electricity when the counters are lost or broken. The seller has the responsibility to protect counters installed in outside management of buyer power.
Article 25. Cell count measurement equipment calibration 1. The only competent organization or authorized by regulations of the State administration of the new measurement is allowed the mobile counting measuring device inspection.
2. The seller has the responsibility to organize the cell count measurement and auditing in accordance with the requirements and time limits by State regulators about measurement rules.
3. When in doubt cell count measurement inaccuracies, the buyer has the right to ask the seller your check; within three days from the date of the request of the buyer, the seller of electric power to check, repair or replace it. The case does not agree with the test results, the repair or replacement of the electric power buyer, seller has the right to recommend the governance bodies of power operations and power use at local independent auditing organization. Within a period of fifteen days from the date of the party's proposal to buy electricity, the State administration of electric power operations and use local power is responsible for auditing the organization.
4. Costs for the cell count measurement test as prescribed in paragraph 3 of this article shall be as follows: a) the case of independent testing organizations determine the cell count measurement standard activity Vietnam then the buyer your auditing fees;
b) where independent testing organizations determine the measurement cell counting operation, the Vietnam standard seller electricity auditing fees.
5. in case of independent testing organizations determine the count of the indicators measuring cell count exceeds the number of actual use of the power, the seller must refund your excess charge for the buyer.
Article 26. Power quality assurance 1. Power unit, power transmission, power distribution must ensure the voltage frequency, match the Vietnam standards, capacity, power and power supply time according to the contract. The case does not guarantee the standard of frequency, voltage, capacity, power and power supply time according to the contract signed that cause damage to the buyer then must power seller power compensation to the buyer of electricity under the provisions of the law.
2. The buyer has the responsibility to ensure that equipment used his power to safe activities do not cause problems for your system, do not affect the quality of the grid voltage.
Article 27. Stop, reduce the level of the power supply 1. Cases to stop or reduce the level of the emergency power supply, except in the case specified in clause 6 of this Law, 23 Things the seller must notify the buyer of electricity power to know in advance the time of stopping or reducing the level of electricity supply at least five days by the announcement of three consecutive days on the mass media or other form of information.
2. in case of stopped or reduced the level of emergency power supply disruptions due to unforeseen events, which sell uncontrolled electrical risk losing serious safety for people, equipment or lack of power threatening to the safety of the electrical system, the power generation unit , power transmission, power distribution be ceased or reduced the level of electricity supply for the buyer to process and power within 24 hours to notify the buyer of electricity known causes, estimated time power supply back.
3. where the power unit to stop or reduce the level of electricity supply regulations left stop, reduce power supply then sanctioned under the provisions of the law on handling administrative violations; If damage shall compensate the buyer of electricity under the provisions of the law.
4. in case the buyer does not properly implement the power specified in point a and point b item 2 Article 46, point b and point c of paragraph 2 of this Law, the 47 Things seller of electricity has the power stop power supply to the buyer.
Article 28. Purchase and sale of electricity with foreign countries 1. The sales of the foreign power must be competent State agencies allow and recorded in the license to operate the electricity.
2. The purchase and sale of electricity with foreign countries through national power system must ensure the following principles: a) does not affect the safety, reliability and stability of national power system;
b) meet the technical-economic standards, legal processes, manage the national power system;
c) did not do harm to the interests of customers who use electricity in State and national energy security.
3. Customers who use electricity in the border area are buying electricity directly with no foreign national power system but must ensure the electrical safety standards and the provisions of relevant laws.
Section 3 REVIEWS the POWER Thing 29th. Power price policy 1. Create conditions for the economic component of electricity development investment profitable, saving energy resources, use the new form of energy, the renewable energy does not pollute the environment in electric power activities, contribute to promoting socio-economic development, especially in rural , mountains, Islands.
2. Encourage use saves electricity and effectively.
3. Make reasonable price clearing mechanism between client groups. Tapered and proceed to delete the offset cross between electric power price and production cost of living, contribute to promote the production and increase the competitiveness of enterprises.
4. Ensuring the right to decide on the purchase price, sell electricity in framing, pricing electricity due to State regulation of the selling of electricity on the electricity market.
5. Ensure the legitimate rights and interests of units and electric power customers use electricity.
Article 30. The base and adjust the price of electricity 1. Power price policy.
2. conditions for socio-economic development of the country, people's income in each period.
3. supply and demand relations of power.
4. The cost of production, business and reasonable profits of the power unit.
5. The level of development of the electricity market.
Article 31. Electricity prices and fees 1. Retail electricity rates due to the Prime Minister for approval. Electric power regulatory bodies help the Minister of construction industry retail electric rates the Prime Minister for approval.

2. Framing generator, electrical wholesalers and fees power transmission, power distribution, moderation system, operating the electricity market transactions, the ancillary service fees due to relevant power unit construction, electricity regulatory agency evaluation process of the Minister of industry for approval.
3. price, wholesale price, the retail price of electricity as power purchase contracts have limited time due to the power unit decided but not exceed the frame price, rates were competent State agencies for approval.
4. power purchase Price for immediate delivery are formed according to the time of the transaction on the electricity market and by operating unit of electricity market transaction announced match the specified in point e and point h paragraph 1 article 21 of this law.
Chapter V ELECTRICITY OPERATION LICENSE Article 32. Objects, conditions were granted, modified, additional license to operate electric power 1. Each organization, the individual is granted a license to carry one or more types of electrical activity.
2. organizations and individuals are granted, modified, additional license to operate electric power when the following conditions: a) has a project or scheme viable electricity activity;
b) Have a valid profile grant proposals, amendments, supplements electricity activity licence;
c) administrators, who have the management capacity, expertise, professional match electricity activities.
3. Organize, personal grant proposals, amendments, supplements electricity operating licence fees in accordance with the law.
4. specific government regulations about the conditions, sequence, procedure, modification, additions and term of the license to operate the electricity for each type of power operations.
Article 33. Profile grant proposals, amendments, supplements electricity activity licence 1. Grant proposal application, amendments, supplements electricity activity license.
2. Projects or active power scheme.
3. The report reviews the environmental impacts of the project activity electricity were competent State agencies for approval.
4. List of background, qualifications, proven management capacity, expertise, business administrators, who runs power unit.
Article 34. Exclusion power operating licence 1. The following cases are exempt license to operate power: a) individual, organization construction facility to use, not to sell electricity to other private organizations;
b) Organization, active personal generators installed capacity below the level prescribed by the Ministry of industry;
c) Organization, your personal business in the countryside, mountains, islands of buying power is under 50 kVA from distribution grid to sell electricity directly to customers using electricity in the countryside, mountains, Islands;
d) units of national power systems and operating units of electricity market transaction.
2. organizations and individuals who are active license exemption of electricity under the provisions of paragraph 1 of this article must comply with the legal process, management, regulations on electricity prices, technical conditions, the safety of this law.
3. provincial people's Committee has the responsibility to manage, test, personal power activities defined in point a, b and c of paragraph 1 of this article.
Article 35. The content of the license to operate electric power 1. Name, address of the headquarters of the Organization, the individual licensed electricity operation.
2. active power type.
3. Rights and obligations of the Organization, the individual licensed electricity operation.
4. active power range.
5. Engineering, technology used in electric power operations.
6. The term of the license to operate the electricity.
Article 36. The time limit granted, modified, additional electricity activity licence within thirty days from the date of receipt of a valid application, the competent State authorities to grant or modify, Supplement power operating licence; the case rejected it must inform, in writing and stating the reason.
Article 37. Revocation of license to operate the electricity organization, individuals operating license revoked electricity in the following cases: 1. Do not deploy operations after six months from the date of licensing power operation;
2. Does not guarantee the operational conditions of electricity under the provisions of this law;
3. Do not perform properly the contents stated in the license to operate the electricity;
4. Rent, lend, arbitrarily fix the license electricity activities.
Article 38. Issued, modified, supplemented, to revoke the license of operation electrical power 1. The Ministry of industry to license works for power generator units, power transmission, power distribution electrical system connections have countries, wholesale units, retail consultants, electrical power.
2. provincial people's Committee licensed electricity activities for organizations, individuals with power operation with small scale local in scope under the guidance of the Ministry of industry.
3. the licensing authority power activities has the right to modify, Supplement, revoke the license to operate the electricity. The amendments, supplements electricity activity license must match the capabilities of the Organization, the individual is granted the license.
4. The licensing power operation of power generation, transmission and distribution of electricity must match electricity development plan has been approved.
CHAPTER VI rights, OBLIGATIONS of the POWER UNIT and the CUSTOMER USING YOUR Article 39. Rights and obligations of the power unit 1. Power unit has the following rights: a) activities and other activities under the license to operate the electricity;
b) connect to the national electric system when it meets the conditions and specifications;
c) sells electricity to the buyer under the contract and sale pricing of electricity for immediate delivery on the electricity market;
d) provided the necessary information regarding the activity generator;
DD) suggested the State Agency has the authority to modify, complement the rules, standards, technical-economic norms served activity generator;
e) other rights prescribed by law.
2. power unit has the following obligations: a) comply with legal processes, about the operation of power plants, electric grid;
b) in compliance with the method of operation, command and control of the unit of national power;
c) troubleshooting;
d) where there is the risk of the threat to human life and safety of the equipment must be stopped or reduced power level if no other solution;
DD) in compliance with the rules of the market power of this law and the provisions of the relevant legislation;
e) report on the availability, extent of prevention, the implementation of the method of operation of the power plant at the request of the unit of the national power system, the operating unit of electricity market transaction, the Agency regulate electricity or competent State agencies;
g) implementation of the provisions of the law on the protection of the environment in power generation activities;
h) immediately notify the unit of national power systems and institutions, the individual concerned when there is a problem on the power play;
I) investment in power stations, power lines and counters to the counters to the buyer, unless otherwise agreed with the unit power transmission, power distribution unit or the buyer power;
k) other obligations prescribed by law.
Article 40. Rights and obligations of the unit power transmission 1. The unit of transmission has the following rights: a) works and transmission power operating licence;

b) build and browse free power transmission;
c) provided the necessary information related to the operation and transmission;
d) suggested the State Agency has the authority to modify, complement the rules, standards, technical-economic norms of service operation and transmission;
DD) other rights prescribed by law.
2. power transmission units have the following obligations: a) insure power grid and electrical transmission equipment safe, stable, reliable;
b) secure transport service providers and ancillary services for the parties concerned, except where the grid is overloaded as confirmed by the Agency regulate electrical power;
c) in compliance with the method of operation, command and control of the unit of national power;
d) troubleshooting;
DD) where there is the risk of the threat to human life and safety of the equipment must stop or ask the unit of national electric power transmission level reduction if there is no other solution;
e) construction investment development plan transmission grid and make investment in development of the grid to transmit power transmission needs according to the power development plan; cell count measurement equipment investment and ancillary equipment, unless agreed otherwise with the power unit, power distribution units, or use electricity;
g) report on the transport availability, redundant mode of transmission equipment as required by the unit of the national power system, the operating unit of electricity market transaction, the Agency regulate electricity or competent State agencies;
h) immediately notify the unit of national power systems and institutions, the individual concerned when there is a problem with the transmission grid;
I) other obligations prescribed by law.
Article 41. Rights and obligations of the power distribution unit 1. Power distribution unit has the following rights: a) power distribution activities and other activities under the license to operate the electricity;
b) building and electrical distribution free browser;
c) Was in the area of management of the buyer for the operation, maintenance, repair and replacement of electrical equipment of the new power distribution units;
d) provided the necessary information related to electric distribution operations;
DD) suggested the State Agency has the authority to modify, complement the rules, standards, technical-economic norms serve electric distribution operations;
e) other rights prescribed by law.
2. power distribution units have the following obligations: a) insure power grid and electrical distribution equipment safe, stable, reliable;
b) secure the electric distribution service provider for customers using mobile retail unit, electric, electric wholesale unit meet the technical standards, quality of service, safety, according to the contract, except where the distribution grid is overloaded as confirmed by the Agency regulate electrical power;
c) construction investment development plan of distribution grid and make investment in development of distribution grid to meet the demand of electricity by electricity development plan; investment in power lines and counters to the counters, the buyer power, unless otherwise agreed with the buyer power;
d) made national target program on managing user needs;
DD) in compliance with the method of operation, command and control of the unit of national power;
e) report on the operational availability, backup level of the grid and power distribution equipment, electrical needs in the area of their activities at the request of the unit of the national power system, the operating unit of electricity market transaction, the Agency regulate electricity or competent State agencies;
g) troubleshooting;
h) where there is the risk of the threat to human life and safety of the equipment to stop or reduce the level of distribution if no other solution;
I) restore the power supply at the latest is 2 hours from when the incident or received notice of the buyer; the case is not made within the time limit on, they must immediately notify the buyer of the cause of power and projected time power supply;
k) other obligations prescribed by law.
Article 42. Rights and obligations of the unit of national power systems 1. The unit of national power systems have the following rights: a) command, control the power unit, power transmission, power distribution implement method of national electricity system operator;
b) is adjusted, the method of plan to mobilize the capacity of power plants;
c) command to handle emergencies or unusual in the national electricity system; mobilization capacity, electricity power plants in the national power system; Commander of the transmission grid operation and distribution grid; stop or reduce the level of electricity supply in the event of a threat to the safe, reliable operation of the system of national power;
d) requires the relevant power unit provides information on the technical characteristics, the ability to be ready to join the operation and bring loads of equipment for power generation, transmission and distribution of electricity; use power needs of customers to determine the mode of operation of the national electricity system;
DD) other rights prescribed by law.
2. Units of national power systems have the following obligations: a) ensure the operation of the national electricity system, stability, economy;
b) ensure the standards of the national power system frequency and voltage on the national transmission grid;
c) in compliance with the regulations of national power in the electricity market, grid and guide the Agency's power to regulate, operating unit of electricity market transaction; non-discrimination in the mobilization capacity, the power of the generator unit in the national power system;
d) prepare and implement method of national power system on the basis of the plans, the method of raising the capacity of power plants and other ancillary services by operating units of electricity market transaction announced;
DD) reported the number of power, capacity and ancillary services have been mobilized to the operating units of electricity market transaction billed payments;
e) timely reporting to regulatory agencies and inform the power operating unit electricity market trading about emergency situations or unusual serious threats to the safety, reliability of electric systems in countries;
g) other obligations prescribed by law.
43 things. The rights and obligations of the wholesale power unit 1. Wholesale power unit has the following rights: a) wholesale operations and other activities under the license to operate the electricity;
b) Buy direct power of generator unit according to the contract term or buy electricity for immediate delivery on the electricity market;
c) wholesale price of electricity in the wholesale price of electricity was browsing to compete to buy, sell electricity on the electricity market;
d) use the services to transmit, distribute your match each level of power market;
DD) Was in the area of management of the buyer to check power, scoring only number of counters, and contact with the customer;
e) provided the necessary information regarding your wholesale operations;
g) other rights prescribed by law.
2. the electrical wholesale unit has the following obligations: a) selling electricity in the correct quantity, quality and power price agreed in the contract;

b) in compliance with the rules of the market power of this law and the provisions of the relevant legislation;
c) compensated when damage to the buyer or seller of electricity under the provisions of the law;
d) provides the necessary information related to wholesale electrical power at the request of the unit cell of the country or the competent State agencies;
DD) other obligations prescribed by law.
Article 44. The rights and obligations of the retail unit of electricity 1. The mobile retail unit has the following rights: a) the electricity retail operations under the license to operate the electricity;
b) compete to buy, sell electricity on the electricity market;
c) valuing the retail electric market competition in the price of electricity in the frame rates of retail electricity due to the Prime Minister for approval, except in the case prescribed in clause 2 Article 62 of this law;
d) use the services to transmit electric power distribution, suitable to each level of the electricity market;
DD) Was in the area of management of the buyer to check power, scoring only number of counters, and contact with the customer;
e) provided the necessary information regarding the sale of electricity;
g) other rights prescribed by law.
2. mobile retail unit has the following obligations: a) selling electricity in the correct quantity, quality and power price agreed in the contract;
b) in compliance with the rules of the market power of this law and the provisions of the relevant legislation;
c) building and the provincial people's Committee approved the retail price of electricity for rural activities, mountains, Islands in the area where the production, electricity supply according to market mechanisms are not sufficient to offset costs for the retail unit of electricity;
d) listed at Headquarters and where electricity pricing transactions was browsing; writing guide of procedures made power supply, measuring cell count, scoring index counters, invoicing, collecting money and end your service; content licensing and technical standards applicable to the Organization, the individual is granted a license to operate the electricity on the electricity retail; the text of regulations on the time and costs needed to power levels for new clients connect to the electrical system; the provisions on stopped or reduced the level of electricity supply in accordance with article 27 of this law;
DD) instructions on electrical safety for customers using mobile;
e) compensation when harm to the buyer or seller of electricity under the provisions of the law;
g) provides the necessary information related to retail power as required by competent State agencies;
h) other obligations prescribed by law.
Article 45. The rights and obligations of the specialized advisory units of electricity 1. Consultants specialized in electric power has the following rights: a) advisory activities under the license to operate the electricity;
b) suggested the State Agency has the authority to modify, additional rules, standards, technical-economic norms serve specialized consultancy activities electrical power;
c) suggest the relevant bodies to provide the necessary information in accordance with the law to serve the specialized consultancy activities for electric power;
d) in cooperation with the Organization, foreign individuals in the field consultants electrical power;
DD) other rights prescribed by law.
2. specialized consulting unit of electricity have the following obligations: a) apply the rules, standards, technical-economic norms of Vietnam relating to the work of the planning and investment advice to build power. Applicable rules and standards of foreign countries must be competent State agencies approved;
b) applies technology and advanced calculation methods to set up the project of electricity development and planning documents, documents about investment in electric power construction consistent with modernization requirements in the field of power generation, power transmission, power distribution, in order to enhance economic efficiency and ensure safety highly reliable, construction investment in electric power;
c) responsible for the quality of the product, the service has done;
d) other obligations under the provisions of the law.
Article 46. Rights and obligations of customers using mobile 1. Customers use electricity have the following rights: a) selected seller of electricity in the retail electricity market competition;
b) provided sufficient quantities of power, power, power quality assurance agreed in the contract;
c) require seller to timely power power supply recovery after power failure;
d) provided or introduce the information related to the purchase and sale of electricity and electrical safety guidelines;
DD) to compensation for damage caused by the electricity vendor under the provisions of the law;
e) requires the seller of electric power services quality control, accuracy of measurement of electric power amount to count payments;
g) complaints, accusations of violations of the law on the electricity of the seller;
h) other rights prescribed by law.
2. Customers who use electricity have the following obligations: a) the payment of your full, on time and made other deals in the power purchase contracts;
b) use electrical safety, savings and efficiency; implementation of the regulations on the management of user needs;
c timely power cut) or reduce power consumption when the notification was received by the seller in the case specified in article 27 of this law;
d) notify seller of electricity know before the day when the pause needs to use electricity, before fifteen days when wishing to terminate power purchase contracts;
timely notification) to the seller when detecting the abnormal phenomenon can cause power outages, loss of security for people and property;
e) create conditions to the seller your check, write only the number of counters, and contact with customers;
g) ensure the use of mobile equipment meet technical standards and safety requirements;
h) compensation when harm the seller of electricity under the provisions of the law;
I) is responsible for the investment of conductive lines from behind counters to buy electricity to where use of mobile;
k) other obligations prescribed by law.
Article 47. The rights and obligations of customers using large power 1. Customers using large power has the following rights: a) the rights specified in paragraph 1 to article 46 of this law;
b) Buy direct power of generator units through the contract term or buy electricity for immediate delivery on the electricity market;
c) Are connected directly to the national transmission grid.
2. large power users have the following obligations: a) The obligation specified in clause 2 Article 46 of this law;
b) user mode execution at the request of the unit of the national power system, measures to ensure the safe voltage, standard cell and other content has been agreed upon in the contract of purchase and sale of electricity and transmission;
c) secure the equipment using mobile, connection equipment page meet the technical standards and safety requirements to connect to the national transmission grid;
d) made the operation command of units of national power.
CHAPTER VII PROTECTION of ELECTRIC EQUIPMENT, POWER STRUCTURES and ELECTRICAL SAFETY Article 48. The responsibility to protect the power equipment, power structures and electrical safety 1. The Organization, individuals are responsible for implementation of the provisions of the law on the protection of electrical equipment, electrical works and electrical safety.
2. The organization, individuals are responsible for timely notification to the power unit or the competent State agencies when discovered the phenomenon of electrical safety, the violation of the provisions on the protection of electrical equipment, electrical works and electrical safety.

3. The ministries, ministerial agencies, government agencies, people's committees of the levels are responsible for organizing and directing the implementation of the provisions of the law on the protection of electrical equipment, electrical works and electrical safety.
Article 49. Responsible for coordination when building, renovating power works and other works 1. When building, renovating and expanding the public works or other works likely to affect the safety of electrical equipment, electrical works and electrical safety, the investor must coordinate with power unit to solve.
2. When remodeling, renovating, building and installation of electrical equipment and power structures capable of affecting the public works or other works, the power unit must coordinate with organizations and individuals involved to solve.
3. where the parties do not settle, the requesting State authorities have jurisdiction and implemented by decision of the competent State bodies.
Article 50. The safe guard corridors of high-voltage grid 1. Safe corridor high-voltage grid is about limited space along the power lines or power station and is surrounded by the provisions specific to each voltage.
2. the safe guard corridors of high-voltage grid include: a) the protective corridor road safety overhead power conductors;
b) corridors and protect road safety cables;
c) safe guard corridors power stations.
3. specific government regulations about the safe guard corridors of high-voltage grid.
Article 51. Safety protection of overhead power lines 1. Owners or users of housing, the building has been allowed to exist in safe guard corridors of conductive lines on the roof may not be used or not any part of the House, works on those purposes may violate the safe discharge distance according to the voltage and must comply with the rules on the protection of safe mains power on not when repairing, renovating houses, works.
2. Before granting permission for the Organization, individuals build new or renovated housing, built-in, works in the corridors of safe protection overhead power lines, the licensing authority must require the owner to build houses, the work agreed upon in writing with the management unit of high-voltage grid of measures ensuring the safety wire and safety in the process of construction, built-in, restoration, use accommodation, this works.
3. Do not allow the existence of houses and buildings have often lived, worked in the corridors protect electrical wires on the road safety there is no voltage from 500 kV and above, except for the specialized works serves to operate the grid.
4. Prohibited conduct all work in the corridors protect overhead power lines if the use of the equipment, instruments, vehicles capable of violating the safe discharge distance according to the voltage. Special case, due to the urgent request of the defense, security, must have the agreement with the management unit works on grid security measures necessary.
5. In the delivery of cross between overhead power lines, railway lines, the minimum height of the wire at the lowest point when the wire is in a State of maximum 4.5 metres by hammock plus discharge safety distance according to the voltage.
The case of the highest point on the transport height greater than 4.5 metres, then the server must contact the management units of high-voltage power grid works to implement the required safety measures.
6. In the delivery of cross between overhead power lines with the railroad for electric trains, the minimum height of the wire at the lowest point when the wire in the sagging status by 7.5 metres plus the maximum safe distance charge according to the voltage.
7. In the delivery of cross between overhead power lines to inland waterways, the minimum height of the wire at the lowest point when the wire in the sagging State of maximum static height by not according to the technical level of inland waterway combined with safe discharge distance according to the voltage. Hydraulic transport vehicle when going through the intersection point cross between overhead power lines with the inland waterways to ensure the height does not exceed the static height not according to the technical level of inland waterways.
Safe distance of overhead power lines cross the intersection with sea transport is specified for each particular case.
8. When conducting the work on the ground, under ground in near or in the hallways protecting the mains power on does not have the ability to affect the normal operation of the line or risk of causing electrical accidents, incidents, the Unit conducted the work that must have the agreement with the management unit works on grid security measures make sure the necessary safety.
Article 52. Safety cable protection tube 1. Prohibited goods, substances, hole digging pile, plant trees, build houses and other buildings, moored boats in the cable protection corridor.
2. Prohibition of sewage and corrosive substances, equipment cables into cable protection corridor.
3. where the waste water and other substances apart from verandas cable protection tube that has the ability to penetrate, corrosion, damaged cables, then the owner or Manager, using houses, water projects, waste must be responsible to not harm the cable.
4. When the construction works in the ground or dredging rivers, lakes within the corridor protects Cable construction, underground, party notice at least ten days for the unit power nets and works management must implement measures to ensure the safety of underground power cables.
Article 53. Power station safety 1. Not build houses, public buildings and trees taller than 2 meters in the corridors safe guard power stations; not infringe its way out into the station.
2. The housing, the construction work near the corridor of protection of power stations must ensure not to damage any parts of the station.
Article 54. Electrical safety 1. Electrical substations, power plants must be strictly protected, must be fenced wall protection, electrical safety, signs of fire, fire; those who do not have a duty to not allowed on power plants, electric substations.
Water reservoirs serving hydroelectric plants must be protected to meet the required safety area of the plant's water. Prohibits the acts stupid Lake and pollute the water sources affect the ability to generate power.
2. place the electrical equipment must be guaranteed safe, explosion-proof; There are signs of dangerous areas, escape, full lighting, ventilation systems, cooling equipment, ventilation grid must be protected against the penetration of the animals, the maximum limit of bad influences of the environment.
3. Depending on the technical characteristics and requirements of each type of protection electrical equipment, must place the protective grid, bulkheads and hanging signs safely; to ensure the safe distance from the grid protection or to bring your septum of the equipment not be smaller than the distance prescribed measures and minimize the bad influence of the environment to the operation of electrical equipment.
4. In the region have flammable, explosive, electrical systems must be designed, installed according to the regulations on safety, explosion; only use the type tool and equipment to fight fires;
5. electric cable systems in power plants, power stations must meet the following safety regulations:

a) power cable must be arranged according to the order type, technical features, voltage and was put on the rack. Electrical cables passing through the area of influence of high temperature must be insulated and go in the pipe;
b) cable Tunnel, ditch the cable must have a lid sealed, drained, preserving clean, dry. Not to water, oil, chemicals, material accumulates in the cable tunnel, ditch cable. Basement wall must have prevented cable to avoid fire from spreading; have fire alarm systems and sprinkler systems, outdoor lighting using safety voltage in accordance with technical standards, electrical safety.
6. The equipment and lightning protection, earthing systems in power plants, power stations, power distribution stations have to be the correct design and installation are checked, periodically check the correct rules, technical standards of electrical safety.
Article 55. Safety in electrical distribution, power transmission 1. Home electric networks be responsible: a) the Latest electrical safety signs in the stations, power pole;
b) and put the lights on the top of the column in the column of height and special place to safe guard the high-voltage grid.
2. In the location of the intersection cross between high-voltage power lines, underground cable line with rail, road, inland waterways, setting and managing signage, forbidden sea crossing for the transportation is made according to the regulations of the Ministry of transportation. The investor of the construction work after expenses for placing billboards, the sea.
3. When handed the grid, the owner of works management unit to operate the grid full of technical documents, minutes, decisions, lease the land and materials related to compensation, clearance according to the provisions of the law.
4. operational management unit grid must periodically test organization, technical maintenance and overhaul the grid, ensuring the safe operation of the system as specified; regularly check, detect, prevent violations of regulations on electrical safety, safety of high-voltage grid and coordinate implementation of technical solutions, optimal operation to reduce power loss during transmission.
5. When repairs, maintenance of electrical networks, operational management unit and the unit grid made repairs, maintenance must be responsible for the full and proper implementation of the order of the prescribed safety measures of technical safety.
6. high pressure line Segments pass the House, works often live, work must use the wire support column is the column type steel or reinforced concrete column, the wire is not allowed to have connections in about the column, except the wires with 240 square millimetres from the over, allowing no more than one connections for single-phase and must ensure the other standards of the law on the protection of the safety of high-voltage grid. Management units to operate the grid not overloading the line.
7. The power cable goes in the ground, are in structure or with communication lines, must ensure safe distance prescribed in rules of electrical equipment and the provisions of relevant laws.
8. The equipment and lightning protection, earthing system of power transmission and distribution grids must be properly designed and installed to be inspection, periodic test in accordance with the rules, technical standards of electrical safety.
Article 56. Safety in electrical systems connect to the country 1. Power unit, power transmission, power distribution and customers using mobile meets the conditions, the technical standards and the implementation of the procedure of connect in accordance with the Ministry of industry is the electrical system connections to the national electricity system.
2. independent power grid to ensure the conditions, technical standards prescribed by The new industry was connected to the national power system.
Article 57. Safety in using electricity to produce 1. The Organization, individuals using electricity to produce to perform electrical safety regulations, rules, technical standards of electrical safety standard-fit Vietnam.
2. The equipment, systems, devices that use electricity, lightning, the ground connection must be inspection, periodic inspections and tests under the unusual rules, technical standards of electrical safety. A diagram of this system must be true and must be kept with the minutes of inspection during the operation.
3. Electrical equipment, high-voltage and high-voltage internal line must be installed and operated according to management rules, technical standards of electrical safety.
4. The electrical equipment must be compatible with "standard Vietnam-low voltage electrical equipment-General requirements for protection against electric shock" and "Vietnam-legal standards of ground connection and connect electrical devices not" to combat accidents electrocution.
5. The electrical path must be designed, installed in a secured production sites, to avoid the chemical, mechanical impact can cause damage. Do not use the metal structures of buildings, machinery, metal pipe to do the wire "neutral", except in special cases, a designer must be competent State agencies for approval.
6. electrical systems in the area have flammable, explosive must be designed, installed and used according to the provisions in clause 4 of this law, 54.
7. The electrical equipment used in mining, electric equipment, power tools, welding, electroplating, electrolysis is consistent with legal, technical standards on safety are concerned.
Article 58. Safety in use of power for living, service 1. Total capacity use of the electrical equipment used in Office, student activities and Services service must match the design capacity; power conductors must have an insulation durability and match specifications.
2. Not to play the heat power equipment near flammable objects, explosion.
3. The electrical equipment must be checked, maintained under the rules, ensuring electrical safety standards and do not endanger the user.
4. organizations and individuals use your responsibility to inspect its power system safety, timely detection and prevention of the risk of causing electrical accidents, incidents.
5. low voltage grid only built after the design has been browsing.
6. The electric lines into the housing, works to ensure electrical safety conditions, and do not hinder the operation of the means of transport, ambulance, fire.
7. in the three phase four wires circuit, Moto-cooler, breaker, fuses and other electric equipments are not fighting on the neutral wire.
8. In a phase two circuit wires, fuses and switches must match on the line, not on neutral wire. Encourage installation of pressure-kid-cool, two pole breaker to close simultaneously cut both wires.
Article 59. Use mobile to do direct protection 1. Use mobile to do direct protection is to use the power source has the proper voltage level connect directly into the fence, obstructions, shielding of the protected areas (hereinafter referred to as electrical barriers) to prevent the continued infringement of protected areas and signals the alarm for the protection of that area know.
2. Use mobile to do direct protection means only be done when using the other protective measures are not effective and must be competent State agencies allow.

3. electric fences must be designed, installed to avoid any random exposure for people and livestock, there are signs of danger, does not impair the operation of the electric system, does not pose a risk to nearby areas and Habitat. The Manager, use electric fences have to be trained, professional training, professional power.
4. The Minister of public security, the Minister of defense in the scope of its powers and duties prescribed areas are allowed to use electric fences.
5. Minister of industry standard rules and conditions to use electricity to do direct protection.
CHAPTER VIII ELECTRICITY SERVES rural, mountainous ISLAND of Article 60. Rural power development policy, mountainous island of 1. Solicit resources to invest to build electricity infrastructure, accelerating the process of rural electrification, mountainous island.
2. Create favorable conditions for the people of the remote areas, ethnic minority areas, the socio-economic conditions particularly hard is used to produce electricity and serving life.
3. organizations and individuals of all economic sectors to operate generators, electrical distribution, electrical business in rural, mountainous island has a social-economic conditions difficult and especially hard to enjoy the preferential policies on investment, financial and other incentives under the provisions of the law on investment incentives.
4. Encourage organizations and individuals to invest to build the grid or the power stations use the energy in place, new energy, renewable energy to provide electricity for rural, mountainous island.
5. Priority to full power supply, hydro pump stations for timely farm irrigation, flood prevention, drought-resistant.
Article 61. Electric power investment development in rural, mountainous island of 1. The State has a policy of support for power unit in operation in areas where the investment and operation of electricity with no economic efficiency.
2. State policy to support investment in power lines from behind counters to where use of electricity for households in the social policy area have particularly difficult circumstances following the confirmation of a local people's Committee.
3. The support of State policies include: a) support of capital;
b) support on investment loan interest rates;
c) incentives.
The Ministry of finance, in cooperation with the Ministry of industry guides the implementation of support policies.
4. the people's committees of the levels have a responsibility to create conditions for the Organization, individuals invest, renovate, upgrade the electrical grid in rural, mountainous island.
Article 62. The retail price of electricity in rural, mountainous island of 1. The retail price of electricity in the countryside, mountains, islands are made according to the schedule of the retail price of electricity specified in clause 1 of article 31 of this Law, except in the case specified in clause 2 of this Thing.
2. Retail power in areas where the investment and operation of electricity with no economic efficiency due to the provincial people's Committee rules, but not outside the framework of the retail electric rates prescribed in clause 1 article 31 of this law.
Article 63. Pay hydro farm 1. The time limit for payment for the mining business was power irrigation used to irrigate vegetables, rice, pepper, color, industrial plants in the intercropping of rice, vegetables, coloration due to the two parties buy, sell electricity agreement but must not exceed one hundred and twenty days from the date of the payment notice paper money.
2. State funding payment of electricity pump water flood prevention, drought prevention exceeded the norms prescribed by the law on the exploitation and protection of irrigation works.
3. The Ministry of finance, in cooperation with the Ministry of agriculture and rural development guidelines stipulated in this article.
Article 64. Electrical safety in rural, mountainous island of 1. The organization or individual operating the electricity and use of electricity in the countryside, mountains, islands are taken seriously the rules, technical standards of electrical safety.
2. Operators, electrical repairs in rural, mountainous, island must ensure the following: standard a) be 18 years of age;
b) Are certified health authorities the health enough to work;
c) certificate or diploma majoring electricity due to vocational level;
d) Have a safe card by the State administration of electric power operations and provincial-level user.
3. Only operate the power unit of the new grid is organized to repair, installation of electrical equipment, electrical network in range management.
4. Ministry of industry regulation technical standards of electrical safety, safety card level and guide the electrical safety measures in rural, mountainous island.
CHAPTER IX GOVERNANCE of POWER OPERATIONS and USE YOUR Article 65. Responsible for managing the State of power operation and use 1. Unity Government activity governance and use your power within the country.
2. The Department of industry is responsible before the Government implement state management on the operations of electricity and use electricity.
3. The ministries, ministerial-level agencies in the scope of its powers, the mission is responsible, in coordination with the Ministry of industry in implementing State management on the operations of electricity and use electricity.
4. the people's Committee in the scope of the task, their powers are responsible in implementing State management on the operations of electricity and electricity used locally.
Article 66. Regulate the operation of electricity 1. Content moderator power activity: a) the construction of the regulation on operation of electricity market competition and implementation guides;
b) research, proposed the solution to adjust supply and demand relations and management of the implementation process to balance supply and demand on the electricity;
c) levels, modify, Supplement and revoke the license to operate the electricity under the provisions of paragraph 1 and paragraph 3 Article 38 of this law;
d) guide the conditions, sequence, procedure to stop power supply, power cut or reduce power consumption, conditions, sequence, procedure to connect to the national electricity system;
DD) research, build electric retail rates and implementation mechanisms, policy on the price of electricity;
e) organizations consulted the organs, organizations are concerned about retail electricity rates;
g) regulated power price bracket, the wholesale price of electricity, approval fees and transmission, distribution and other costs;
h) monitor the implementation of plans and projects of the power development, transmission grid, grid distributed to ensure consistent development with electricity development plan approved;
I) determines the rate of capacity and power ratio between purchase and sale forms through term contracts and purchasing for immediate delivery in accordance with the level of the electricity market;
k) inspecting the implementation of the approved power tariff;
l) resolve complaints and disputes on the electricity market.
2. electricity regulatory agency is the Agency helps industrial Minister made the content moderated power activities defined in paragraph 1 of this article. Prime specific provisions on the Organization, functions, duties and powers of the Agency regulate electrical power.
Article 67. Inspection of electric power industry Ministry inspectors perform specialized inspections functions of electric power, have the task of inspection of the observance of the law on electricity; detect, prevent, handle according to the authorities and competent bodies propose handling violates the law on electricity; propose measures to ensure enforcement of the law on electricity.
CHAPTER X TERMS Enacted 68. Regulations for the Organization, individuals are active electric power

1. Contract or written agreement relating to the operation of electricity that existed prior to the time this law is in effect still has value follow the time limit stated in the contract or agreement.
2. After this law takes effect, the additional amendments in the contract or agreement specified in clause 1 of this article must be made according to the provisions of this law.
3. Government regulations and conditions the time organization, active power personal expedite adjust the structure, organization and operations consistent with the provisions of this law.
Article 69. Effect of this Law has effect from 1 July 2005.
Article 70. Government enforcement guide detailing and guiding the implementation of this law.
This law was the National Assembly of the Socialist Republic of Vietnam tags XI, session 6 through December 3, 2004.