MINISTRY OF COMMERCE
Number: 28 /2014/TT-BCT
THE SOCIALIST REPUBLIC OF VIETNAM.
Independence-Freedom-Happiness
Hanoi, 15 September 2014

IT ' S SMART

Regulation of the processing of incidents in the GI system a

________________

Base of Protocol 95 /2012/NĐ-CP November 12, 2012 the Government regulates the functions, duties, powers, and organizational structure of the Ministry of Commerce;

The Power Law Base on December 3, 2004 and the Amendment Law, added a number of Articles of Power Law on November 20, 2012;

Base of Protocol 137 /2013/NĐ-CP October 21, 2013 by the Government Regulation the implementation of some of the provisions of the Law of Power and Amendment Law, the addition of a number of provisions of the Power Law;

On the recommendation of the Bureau of Power Regulatory Affairs,

The Minister of Public Works Department of Commerce regulates the process of handling the incident in the national power system.

Chapter I

GENERAL REGULATION

What? 1. The adjustment range

1. This information regulates the principle and the sequence of the processing of the incident in the national power system to quickly rule out the incident, restoring the normal working mode of the national power system.

2. The case of purchasing power over the border, the handling of the bond line incident is done under the signed terms agreement.

What? 2. Subject applies

1. National Power System Control Unit (National Power Systems Center).

2. Power Unit.

3. Power transmission unit.

4. Power distribution unit.

5. Unit distribution and retail.

6. Customers use the power grid directly from the transmission grid, the customer uses a distributed grid with its own station.

7. The operator of the units.

8. The organizations, the individual are related.

What? 3. Explain words

In this Information, the terms below are understood as follows:

1. Quick Report is the report of the incident established shortly after the isolation of the incident and temporary remediation of the unabated operating status in the electrical system established by the Board of Statistics at Appendix 1 issued by this message.

2. Level Control Level is the command-Level Level, the provision of the power system by the hierarchy of control at the Regulation of the National Power System (National Power System) Regulation of the Ministry of Commerce.

3. Level Control Level is the above-level Level Level Level, which allows the Level Level Level, the operation management unit to exercise control to change the operating mode of the electrical system or electrical device under the National Power System-based Process Regulation Regulation (s). It's an executive order.

4. Normal mode of operation is the operating mode of the electrical system with the operating parameters located within the prescribed range at the Transmission Power System Regulation, the Code System Regulation issued by the Ministry of Commerce.

5. Attitude is the direct command, the control of the control system, including:

a) National:

b) Domain terms;

c) The division of the province, the central city of the Central;

d) The distribution of the county, the district.

6. Operation Management Unit is the organization, the individual who is responsible for managing and operating the line or electrical device connected to the national power system, including:

a)

b) The power transmission unit;

c) Electrical distribution unit;

d) Unit distribution and retail;

Client uses electrical power directly from the transmission grid, the customer uses a distribution grid with its own station.

7. Jump (or turn) incident It ' s the line, the power station or the electrical power grid that ' s being electroculed by the protection of the cell phone.

8. Operator. is the direct participant to control the process of electricity generation, electrical transmission and electrical distribution, including:

a) Head of the shift at the levels;

b) Head, Chief, Direct, Direct, Live at the power plant or at the power plant group control center;

c) Direct (or Chief), Direct at the power station or at the electrical station group control center;

d) Online power grid distribution.

9. Incident is the event of one or more of the equipment in the electrical system due to the impact from one or more of the causes that lead to unconventional operation, which causes a halt to power supply or loss of stability, loss of safety, and does not guarantee the electrical quality of the electrical system.

10. Serious incident. is the incident causing widespread power outage or incendiation, detonation of damage to the person and property.

11. Hot correction is the repair work, the maintenance on the line, the device is taking power.

12. Power station It ' s a transformer station, a cutting station, a protest power station.

13. Control Center is the center equipped with information technology infrastructure, telecommunications to be able to monitor, remote control of a group of power stations, lines, or power stations.

Chapter II

REQUEST AND PRINCIPLE OF HANDLING THE NATIONAL POWER SYSTEM INCIDENT

Item 1

ELECTRICAL SYSTEM GRID MAPPING

What? 4. The principle of basic wiring mapping in the power system

1. Make sure to provide safe, reliable power.

2. Make sure the stable operation of the entire national power system.

3. Make sure the power quality.

4. Make sure the national electricity system operates the most economically.

5. Ensure that the short line does not exceed the permitted value for the device placed at power plants or power stations.

6. Ensure the selection of the protective le le.

7. Inflexible, convenient in operation and handling of the incident.

What? 5. Connect at the power station

1. At the power stations with diagon2 (two) the bar or diagram 02 (two) the bar has 1 (one) the ring bar, 01 (one) the segment bar, the even number-cut machines connect to the even number bar, the number of odd-cut machines that connect to the odd number, the cutting machine It ' s often closed in the operating mode, except for the special case required by the operator.

2. For the power stations that are different from the regulation at Clause 1 This, the cutting machines designed in the working mode are often closed, the design cuts in the backup mode are regularly open. For an incomplete wire-ending power station, the operating management unit must implement the calculation and suggest that the treatment-level technical solutions have the control clearance and allow the operation to meet the overall safety operating requirement for the entire operation. Power grid.

What? 6. Circle or open circuit

1. Power lines with a voltage level from 110 kV back to the operating grid in the circuit mode except for grid-shaped grid cases or grid-shaped grid schemes but have to open the circuit due to a request for short-line restrictions, preventing expansion of the event. try or special methods that have been given specific consideration control over the basis for a secure, reliable power supply.

2. Do not connect the operating grid to the circuit circuit in the distribution grid, unless the case must close the circuit to transfer or exchange supplies aimed at raising the reliability of the electricity supply but must ensure that it does not extend the incident.

Item 2

DEFENSE AND PROTECTION.

What? 7. Request for protection of protection when bringing the device into operation

1. Power devices and power lines are only electronated when protection protection against any form of incident is included in the work.

2. When the protection of the guard is separated from work or because of the damage to some form of protection, the remaining protective measures still have to secure adequate protection against all sorts of incidents, the short elimination of the circuit for electrical devices and wiring. Electricity.

3. The case does not guarantee the regulation requirement at paragraph 2 This, the operator must perform one of the following solutions:

a) Cut the power of electrical appliances or lines, that power station out of operation;

b) Do not cut the power but have to set temporary protection and be granted the right to control the permissions.

4. When bringing protection to the fast-moving part from the operation, it is subject to a stable condition that must provide temporary effects protection or to protect the backup or re-edit the other protection for the appropriate protection.

What? 8. le-guard and automatic

1. The electrical equipment of the power system must be equipped with a protective and automatic defense against all forms of the circuit, the damage in normal operating mode by protective gear, the apmine or the outflow and the automatic equities in which there is self-defense. It ' s an adjustment and an anti-incident automatic.

2. The protective and automatic sr (including low-frequency load) or low-frequency load (including the operating system) must be regularly in the operating mode, except for the le-class equipment, which, according to the principle of operation, condition the working mode of the energy system and the selection. We have to split from the operation.

3. The device noted the incident and the warning must always be ready to work.

4. The operating mode lacks a protective or automatic t-page must be granted the right to a specific regulatory authority.

What? 9. Follow the operation and the defective corrects of protective and self-defense equipment.

1. The case of the wrong impact or rejection of the impact of the protective and automatic t-site equipment, the shortcomings detected during the operation must be considered analyzed and ruled out in the shortest time.

2. The case of the wrong impact or rejecting the impact of the protective and automatic e-site equipment, the case of detection is damaged in the circuit or the device must inform the operating management unit and the Level Level has control.

3. The isolation or delivery of protection and automatic operation back to the operation is only done when there is an order to allow the Level Level to be controlled.

Section 3

REQUIREMENTS, PRINCIPLES AND HIERARCHY HANDLING THE NATIONAL POWER SYSTEM INCIDENT.

What? 10. General requests for the handling of the national power system incident

1. The operating management unit is responsible:

a) The operation process and handling of the incident of the management scope in accordance with the regulations at this level;

b) The periodic inspection, maintenance, repair, equipment repair and control system, the protection of the air line, the cable line, the power station, the power station, the control center to ensure safe operation and minimize the likelihood of the incident.

2. The National Power System Task Unit is responsible for the operation of the operation and handling of the control of the control system in accordance with the regulation at this level.

3. Every year, the National Power System Control Unit, the operating management unit that is responsible for organizing training, examines the exercise of the incident handling the incident to the operator of at least 01 (one) time.

4. Shortly after isoling the element of the incident and temporarily remediation of the unconventional operation in the national power system, the relevant units are responsible:

a) Apply all measures to overcome the breakdown of the device by regulation to quickly restore the electrical system of normal operating mode;

b) The investigation of the cause of the incident and the proposition of repeated incidents of incidents.

5. Event Report Mode

a) Shortly after the isolation of the element of the incident and temporarily remediation of the unusual operational status in the national power system, the operator operates at the power station, the power plant, the control center charged with sending Quick Report of the incident to the Level Level. has the right to control the prescribed pattern at Appendix 1 issued by this message;

b) Within the 24-hour period since the incident occurred, the operation management unit is responsible for sending the incident Report to the Level Level controlled device in accordance with the prescribed pattern at Annex 2 issued by this Information;

c) Within the 48-hour period since the incident, the Level of Control has the responsibility to send the incident report to the Level of Examination of the prescribed pattern at Annex 3 issued by this Information;

d) After the recovery of the incident, the National Power System Control Unit and the operational Management Unit are responsible for sending the Report of the Control of the Power Systems Division in the control or management of the operation to the rank management unit on the prescribed form at Annex 4. It was issued with this message when requested.

6. The form of the incident report:

a) The quick report of the incident is sent via fax or email (Email) under the address provided by the Level of Controllers;

b) The incident report and incident analysis report are sent in the following forms:

-Send in a fax or email (Email) under the command-Level Level address;

-To be officially delivered by the rapid transfer method (the text).

What? 11. The principle of handling the national power system incident

1. The operator is responsible for applying regulatory treatment measures to quickly rule out the incident and prevent widespread incidents.

2. The operating staff has a quick responsibility to restore power supply to the customer, especially the important side loading and ensuring the power quality of the frequency, voltage.

3. During the processing of the incident, the National Electric System System Unit is allowed to operate the power system with frequency and other voltage with regulatory standards in the normal operating mode at the transmission of the transmission power system, Regulation of the National Electric System. mixed by the Ministry of Commerce but must quickly implement solutions to restore the electrical system to the normal operating state, ensuring the steady work of the electrical system.

4. The operator must hold the event of the incident, the condition of the device was separated when the incident, the analysis of the incident phenomena, predicted the recovery time.

5. Command handling the incident is transmitted by word or by a control signal.

6. The command of command processing the verbal incident by the Level of Subordinate Qualifications directly to the subordinated Executive Officer in accordance with the National Power System Regulatory Regulatory Regulation Regulation. The command to handle the incident must be accurate, brief and clear. The executive order was given the order to take full responsibility for his command during the processing of the incident.

7. During the incident processing time, the prohibition of using communications services to other purposes.

8. During the processing of the incident, the operator must comply with the provisions of this Smart, Technical Regulations, TCVN, process, specialized regulation, other regulation of law and the safety standards of the regulated power equipment.

What? 12. Deliver the National Power System incident

1. The device in the control of the degree level, the level of which is responsible for the command handling of the incident on that device.

2. While handling the incident, the command-control level is entitled to change the work mode of the control equipment prior to the report to the Level Level that checks the device.

3. In case of an emergency, it is not possible to delay such as explosions or risk threatening human life and equipment safety at the power plant, power station or control center, the operator at the power plant, the power station or the operating center. The controls are conducted in isolation of the operation of the operation and handling of the power plant incident, the power station, or the control center without permission to provide the right to control and be responsible for its handling of the incident. After processing, the operator at the power plant, the power station or the control center must report immediately to the degree of control.

What? 13. The operation of the operator in the handling of the incident

1. Handled the incident according to the operation process and handle the incident of the power plant, the power station, the control center.

2. Apply all necessary measures by regulation to prevent widespread incidents and restore power supply to customers in the shortest time.

3. In areas where the incident occurred, it must be reported in time, precisely the phenomenon and the execution of the incident to the top-level Transport Staff.

4. In areas where the incident does not occur, must regularly monitor the fluctuations of the incident through the number of parameters on the grid within the management range, report to the top-level Transport Officer who knows special, unusual phenomena.

5. After the execution of the incident, the top-level operating officer provides summary information about the incident handling situation that changes the normal operating mode of the electrical system under the control of the subordinate transport staff under the regulation of the operating system. The right to hold information at the National Power System Regulatory Regulation Regulation.

6. When there is an incident in the internal electrical grid portion of the power plant, the power station, the operator at the power plant, the power station or the control center is responsible for handling the incident and reporting to the top-level operating officer directly to coordinate the compartment. Prevention of development.

7. Notice for a cause of the cause of the incident and expected the time of power to return if the incident disrupts the electricity supply.

What? 14. Work relationship in handling incident

1. Work relations between the subordinate Transport Officer and the Transport Officer on the ground.

a) The subordinate operator must accept the orders of the superior operational staff. There are threats that threaten the human life and the safety of the device, but it has to be reported.

b) The above-level operating officer has the right to recommend the direct Leader of the Subordinate Operating Officer to replace this operator in the event of sufficient reason to show that the subordinate Transport Officer is not sufficient to handle the incident or serious breach. the technical standard, the relevant process.

2. Work relations between the Senior Transport Officer with the superior Transport Officer and the Direct Leadership of the Under-Level Transport Staff.

a) Direct leadership of the Under-Level Transport Officer has the power to order the employees to operate under their right to handle the incident, but that order is not left with the order of the superior Transport Officer and the technical, standard, other regulation that is relevant. And,

b) When the command of the Leader directly contradicts the order of the Chief Transport Officer, the subordinate operating officer has the right to not enforce the direct Leadership command and report on the above, unless the case is at risk of threatening the child's life. And the safety of the device.

c) When there is sufficient reason to show that the operator is not qualified to handle the incident, the Direct Leader has the right to suspend the employee operating in that shift, handle the incident or specify the other operator instead, and report it. for the top-level operator.

3. Strict those who do not have a mandate to enter the control room when the operator is handling the incident, unless the superior leader is responsible, the direct Leader of the unit. The required case, the Executive Officer or Direct Leader of the unit has the right to ask the professional cadres involved in handling the incident to the unit ' s control room to handle the incident.

4. When there is a serious incident, the operator must promptly report the incident to the direct Leader of the unit he knows. Direct leadership is responsible for reporting superior leadership or related units.

Chapter III

PROCESSING STRING INCIDENT

Item 1

HANDLING OF THE AIR LINE INCIDENT WITHOUT VOLTAGE 500 KV

What? 15. Limit the transmission on the 500 kV line

1. The limit of the 500 kV line transfer limit is the smallest value in the following values:

a) The routing current of the 500 kV line is determined by the minimum voltage line of the wire or the serial power device on the line that takes into account the impact factor of the operating environment conditions of the device;

b) The limit to the stability of the electricity system;

c) Limited to the voltage standard at the transmission of the transmission power system issued by the Ministry of Commerce.

2. The operator at the power plant, the power station or the control center must report to the degree of control when the operating parameters on the line exceed the limit limit.

3. When the transmission on the line exceeds the required transmission limit, the Condition Condition must be handled by an extremely emergency regime stipulated at Article 53 of this.

What? 16. Employee processing at the power plant, the power station, the control center when the 500 kV line incident is located.

1. When the 500 kV wire cutter jumps incident, the employees operate at the power plant, the power station or the control center where the connection line is forced to report immediately to the Level Level that controls the following information:

a) The time of the incident, the name of the line and the cutting machine, the signal to protect the impact;

b) The line or electrical device is operating overload, overpressure, low pressure (if present due to the incident), local weather;

c) Other information is relevant.

2. Shortly after the execution of the incident, the operator operator at the power plant, the power station or the control center must send a quick report of the incident to the degree of control of the degree in accordance with the regulation at Point A 5 Article 10 This Information.

What? 17. Processing of the Section when the 500 kV wire incident

1. The auto-protection case closed successfully, having to take the following work:

a) Collacing information from the power plant, the power station, the control center at the two end of the incident wire;

b) Request for employees to operate at the power station, the power plant, the control control center of the cutting machine, the protective and automatic equipment;

c) The specified line intersection has a transient incident for the Management Control Management Unit with the eye note that is carrying the power, the point of doubt the incident (if any);

d) Complete the incident report by the operation process and process the electrical system incident provided by the rank-control system.

2. The case where the line is cut off the incident, must handle the incident according to the following sequence:

a) Processing to prevent extension incidents:

-Process overload, electrical equipment if overloaded due to the 500 kV wire incident;

-Control the voltage on the 500 kV grid if located outside the permitted limit;

-Do the frequency control measures if the frequency is outside the permitted value;

b) Record of the line incident report from the operator of the operator at the power plant, the power station, the control center;

c) Rapid analysis of the incident based on the information recorded from the power station, the power plant, the control center on the protection and automatic relay to decide whether to close or isolate the line by regulation at Article 18 of this Information;

d) Complete the incident report by the operation process and process the electrical system incident provided by the rank-control system.

3. The case of the incident line multiple times and closed successfully, has to handle the incident according to the following sequence:

a) During the period of 8 hours, if the line has appeared to be fixed by 2 (two) the good closing time, the automatically closed after point of incident close to the previous incident, then ordered the lock of the circuit to shut down;

b) After 8 hours from the time of the second successful closure, if the incident is not reappeared, the order of the protection of the protection is made;

c) During the period of 8 hours from the time of the second successful closure, if the incident appeared, the order to isolate the line and hand over the operating management unit for inspection, repair;

d) Complete the incident report by the operation process and process the electrical system incident provided by the rank-control system.

What? 18. Regulation closed 500 kV line after incident

1. When the incident 01 (one) phase the line, allows the closing of line 1 (one) time, including the closed-end automatically failed.

2. The automatic protection case closed does not work.

a) Not allowed to close the line when the line is having a hot repair work;

b) Be allowed to close the line 01 (one) immediately after the preliminary examination of the equipment and the impact protection that determine the point of a phase one incident on the protected line and there is no further reporting on the detection of the damaged incident on the line from the line. Operation Management Unit.

3. The automatic le rr closed 1 (a) phase failed, allowing the closing of line 01 (one) the next time when the following information is determined:

a) Automated to close 1 (a) phase failed to be due to channel transmission, binary circuit, or untrusted work protection that leads to the fact that the line reality has not been closed;

b) automatically close 1 (a) phase has been good at one end but is cut due to the contact from the other end.

4. It is not allowed to close the line section if the specified circuit 2 (two) is made up when both circuits protect the impact, which has a clear directive of the device positioning the incident position on the same phases and close proximity, the function of the order. action closing 01 (a) phase has locked all the relevant cutlers. In this case, the Operator must separate the line of the line as a safety measure, assigned to the Management Unit for the Operations Control and Circulation Examination of the incident suspected of the incident.

5. Being allowed to close the second line in the event of a loss of 500 kV line link has a major effect on the supply of stable, continuous power supply, when the self-closure of 1 (one) phase is not successful or has closed for the first time by a degree command. Prior to the closing of the line, the operator must thoroughly review all the equipment and weather conditions of 500 kV transmable stations, selecting the head of the electric power to ensure safe operation for the electrical system.

6. It is not allowed to close down the line as the storm passes through with the wind gusts from level 10 or above, landslides that cause landslides that threaten to lose the safety of the line, the fire in the way the lines pass through or the devices do not qualify for the operation.

7. Be allowed to close the line in case this line is cut due to the contact from another place after the specified and elimination of the cause of the incident.

8. After the Operations Management Unit repairs the injured elements on the 500 kV line, the confirmation ensures sufficient operational standards and returns to the Level Level that has the right to control, which must be based on the actual operating mode to refer to the required operating system. The operation, the operation, the operation.

Item 2

HANDLING OF THE OVERHEAD WIRE INCIDENT ABOVE 35 KV TO 220 KV

What? 19. Procking process overload on air voltage above 35 kV to 220 kV

1. The limit of the line transmission on non-voltage level above 35 kV to 220 kV is determined to be the smallest value in the following values:

a) The routing line of the wire or the serial power device on the line is charged with the impact factor of the operation environment conditions of the device;

b) The limit to the stability of the electricity system;

c) The limit to the voltage standard at the transmission of the transmission power system, Regulation of the Distributed Electricity System by the Ministry of Commerce issued by the Ministry of Commerce.

2. The operator at the power plant, the power station or the control center must report to the level of command that is controlled when the transmission on the line exceeds the permitted limit.

3. When the transmission on the line exceeds the permitted limit, the Section must handle the incident in an extremely urgent state of regulation at Article 53 of this.

What? 20. Employee processing at the power plant, the power station, the control center when the upper-line incident does not grant voltage above 35 kV to 220 kV.

1. When the wire-line cutter, the operator at the power plant, the power station or the control center has a fixed line-to-report line immediately for the Level Level that controls the following information:

a) The time of the incident, the name of the line and the cutting machine, the signal to protect the impact;

b) The line or electrical device is operating overload, overpressure, low pressure (if present due to the incident), local weather;

c) Other information is relevant.

2. Shortly after the execution of the incident, the operator operator at the power plant, the power station or the control center must send a quick report of the incident to the prescribed control level at Point A 5 Article 10 This Information.

What? 21. The handling of the Condition when the upper line incident does not grant voltage above 35 kV to 220 kV

1. The auto-protection case replays successfully, the condition must perform the following work:

a) Gather information from the two-headed power stations the incident;

b) Request for employees to operate at the power station, the power plant or control center examining the status of the cutting machine, protective and automatic equipment;

c) The line intersection is determined to have transient incidents for the Control Management Unit with the eye note with the line note bearing the power, the point of doubt;

d) Complete the incident report by the operation process and process the electrical system incident provided by the rank-control system.

2. The automatic protection is not successful, and the degree must take necessary measures to prevent further expansion (overloading the line or electrical device, the voltage is beyond the permitted value). After the system of the power of stability, rapid analysis of the incident to restore the fixed line of incidents at Article 22 of this Smart and complete the incident report by the Operations Process and the handling of the power system incident provided by the command of the board. Go.

What? 22. Regulations closing the overhead line above 35 kV to 220 kV after the incident.

1. When the line incident has a voltage level above 35 kV to 220 kV, allow the closing of the line no more than 2 (two) times, including the closed-end automatically. For lines that pass through the densely populated area and residential areas, only allow a second-line closure after the Control Management Unit, which confirmed the line to be eligible to operate and ensure the safety of the person, electrical equipment.

2. Do not allow the closure of the line while in the time of the heating correction.

3. Do not allow the wiring of the line in the event of a jump line cutter when there is a 606th wind, flooding that leads to a high level of water resulting in a safe distance from the design of the line threatening to lose safety, fire in the lines that pass through. Or devices that do not qualify.

4. During the period of 8 hours, if the line has appeared to be transient after 3 (three) a good closing (including automatically closed), the operator must lock the circuit. If the next 8 hours do not reappear the incident, then bring back the self-closure to work. If the next 8 hours appear on the incident, the operator must report to the Level Level which has the control to command:

a) She set up the line and handed over to the operational management unit for repairs;

b) If the line has the segment, conduct the segment to close the line sections, determine the incident and do the safety measure, deliver the Control Management Unit.

5. For lines that have multiple branches, before the full-line (not to tell a self-reclosure) must cut off the total cut of the transmusing machine on the line. Prior to the restoration of the brandiated variable, it must be checked and adjuvated the hiccups of the oppresso that has a under-load regulator in the appropriate position with the line voltage.

6. For the permanent incident lines, prior to the delivery of the operating management unit to test repairs, the command-Level Level must require the operator to operate at the power plant, the power station, or the control center for the preliminary examination of the situation. The device is connected to that line within the power of the power plant, the power station, the control center. The operator must complete the procedures and safety measures according to technical standards, safety procedures and other regulations that are relevant.

7. After the Operations Management Unit repairs the injured elements on the line, the confirmation ensures sufficient operational standards and returns to the Governing Degree with control to restore, the actual operating mode of the operation to command the operation to take the necessary action. -Yeah, yeah, yeah, yeah.

Section 3

HANDLING THE AIR LINE INCIDENT WITHOUT VOLTAGE FROM 35 KV BACK DOWN

What? 23. The handling of the operator when the upper-line incident does not grant electricity from 35 kV back down

When the wire cutter, the operator operator at the power plant, the power station, the control center or the distribution grid has a fixed line-up line that is immediately reported to the Level Level that controls the following information:

1. The name of the cutter, the number of jumps, the status of the cutting machine.

2. Rous for automatic automatic protection, the signals have instructed, the record number of incidents recorded in the tile or other specialized devices.

3. Wireless voltage status.

4. The work status of the other devices is relevant.

5. local weather.

What? 24. The handling of the Condition when the upper-line incident does not level voltage from 35 kV back down

1. The auto-closed case closed successfully, which must gather information from the incident-terminal power stations, check the status of the cutter, the protective and automatic equipment, the line-up identified with the transient incident to the Transport Management Unit. Eye-checking with wire note bearing power, the point of suspicion of incident and completion of the incident report by the operation process and handling of the electrical system incident provided by the Level of Control that has the authority to control the issue.

2. The auto-closed case is not successful, having to take the necessary measures to prevent further expansion (overloading of line or equipment), quick analysis of the incident to restore the fixed line of the incident in accordance with regulations at Article 25 of this and complete. The incident report follows the operation of the operation and handles the electrical system incident due to the level of the administration's control over the issue.

3. The case shows the ground touch on the grid with a neutral point not connecting the land or connecting the soil through the arc of the arc, which must proceed immediately to the measures necessary to isolate the ground touch and implement some basic measures to identify and isolate the point. touch the ground to the grid with a neutral point or connecting the ground through the specific arc roll as follows:

a) Based on the record parameters received by the occurrence of the incident to determine the element of the incident, proceed to the segment, isolate the ground to the processing;

b) The case is not identified as the element of the incident, which must take steps in the following order:

-Check out the female elements and from the bar to the power station fence;

-The split grid has ground points to the areas for inspection;

-The operation to separate individual elements in the region with a soil touch point in the principle of separation of the element is less important until the detection of the element is found.

-After you locate the damaged element, you must proceed and isolate the ground to the ground.

4. In case of an undelayed emergency (the fire where the line passes or the device insufficiently standard operating is at risk of threatening the human life and the safety of the device; or flood that leads to a higher water level than the design water level) The line threatens to lose safety and other information issued by the Operations Management Unit, commander of the process line-cutting operation and is responsible for the manipulation of his incident.

What? 25. The regulation closes the line on the air voltage from 35 kV back down

1. When the line incident, was allowed to close the line no more than 03 (three) times, including the failed attempt to shut down. For the roads through the residential area, the Management Unit operates the base on the actual situation to decide to close the electricity on the basis of ensuring the safety of the person, electrical device, and the ability to close it successfully.

2. Not allowed to close the line while in the time of the heating correction.

3. For the return of the Level 06 wind case, the Secondary Level Article has the control of the active control for the self-closed key of the line-cutting machines. If the line had an incident, the return of power was made after the Management Unit ran the line with the eye line with the eye and did not detect any abnormties.

4. During the period of 8 hours, if the line has made a transient incident after 04 (four) the good closing (including the automatic closed), the operator must lock the circuit. If you don't show up in the next 08 hours, you can get yourself back to work. If the next 8 hours appear on the incident, the operator must report to the Level Level that has the control to order:

a) She set up the line and handed over to the Control Management Unit, the repair;

b) If the line has a segment, conduct the segment to close the line segments to determine the incident and make a safety measure, assigned to the Control Management Unit, the repairs.

5. For lines with segment, if the first blackout is not successful, the operator must report to the Level Level that has the control over the command to order:

a) Progress segment at the point was specified specifically, circled the area to detect and isolate the incident wire section, quickly regrade the power to the customer;

b) Based on the protective relay signal, the incident alarm device, the short line (if measured) to segment;

c) To take safe measures to communicate the permanent incident of the incident to the operational management unit, repair.

Section 4

POWER GRID INCIDENT

What? 26. Process overload, touch power grid

1. Electric power lines with a voltage of under 35 kV may allow overload, time, and overload to be dependent on the load of this cable line prior to the fabrication of the maker and taking into account the actual operating conditions. For electric power lines that have a voltage level from 35 kV or more, do not operate overload if there is no provision of time for the fabrication of the maker.

2. In the case of grid-neutral power grid, time allows the power cable to work in a state-made state of an earthquake according to the maker ' s regulation and is charged with actual operating conditions. Upon the discovery of an earthquake, the operational management unit must immediately find and repair damage in the shortest time.

What? 27. The processing of the operator at the power plant, the power station, the control center when the power cable incident

1. When the cable of the cable line jumps, the employee operates at the power plant, the power station or the control center where there is a fixed line of communication cables, and the report immediately provides the right to control the following information:

a) The name of the jump machine, the protection of the action under the command signal in the central control room;

b) The line, the power cable or electrical device is operating overload, overpressure, low pressure (if present due to the incident).

2. Shortly after the execution of the incident, the operator operator at the power plant, the power station or the control center must send a quick report of the incident to the degree of control of the degree in accordance with the regulation at Point A 5 Article 10 This Information.

What? 28. Processing of the Condition when the power cable incident

1. Make the necessary measures to prevent further expansion.

2. Ask the staff to operate at the power plant, the power station or the control center examining the device that connects the device to the electrical power line being tried within the power of the power plant or power station.

3. Full implementation of the procedures and safety measures prescribed prior to the delivery of power cables to the Control Management Unit, fixing, noting the time of the closing of the local time by its own regulations for each type of cable.

4. Restoration of the electrical power line is fixed by regulations at this Article 29.

5. Complete the incident report by the operation process and handle the electrical system incident provided by the Executive Level with the control of the board.

What? 29. Restart the power cable after jumping incident

1. For the cable line:

It is not allowed to close down the cable line when protecting the Pr against the short-circuit forms within the impact cable road range. The condition only is allowed to close the cable line in the following circumstances:

a) The operating management unit, which confirmed the cable to qualify for the operation or determine the electrical failure of the incident, is due to a delicate circuit error and has been overcome;

b) After analysis of the attempt to protect the impact is due to the transient short circuits outside the scope of the cable.

2. For the air and cable mix line:

a) Be allowed to close the line with a voltage level from 220 kV onwards after the Transport Management Unit has determined the breakdown of the air line section and rectify the incident;

b) Being allowed to close 1 (one) the line with a voltage-level 110 kV has a cable line that is only a short section of the air line (including automatically closed) on the recommendation of the operating management unit. If the closure is not successful, the restoration of the mixed line is in accordance with the provisions of this Article 1 Article;

c) Being allowed to close 1 (one) time the line has a voltage level from 35 kV or down (including automatically closed). If the closure is not successful, the operator must conduct the segment (if there is a segment) to close the line on the air by regulation and perform the test-insulation test of this line.

3. Being allowed to close 1 (a) time for the cable line that has a voltage level from 35 kV back to many air transition stations (do not allow automatic closure). If the closure is not successful, the operator must conduct the segment (if there is a segment) to close the line on the air by regulation and perform the test-insulation test of this line.

4. The operating management unit is responsible for coordinating with the Level Level that controls the calculation and proposes that the lines are allowed automatically to close once.

Chapter IV

HANDLING THE POWER STATION INCIDENT, THE POWER PLANT

Item 1

PROCESSING GENERATOR INCIDENT

What? 30. Process the generator warning signal

When the generator appears warning (overload, the rotor overload, minimal stimulus or other warning), the processing is as follows:

1. For the Head of Power Plant, the control center:

a) Handled the electrical generator warning signal under the operating process and handles the electrical generator incident issued by the Administration Management Unit;

b) The report immediately provides the Level of Time to control the time to process and petition the warning processing requirements.

2. For the Condition:

a) Accept of the handling petition of the Head of the Power Plant, the control center in the emergency case that threatens to stop the electrical generator incident or issue a processing method in accordance with the electrical system;

b) Implementers the frequency or voltage control measures when changing the power of the effect (P) or the resistance capacity (Q) of the generator depending on the frequency and voltage of the electrical system;

c) Processing the electrical system incident in the emergency mode if the frequency or voltage is outside the permitted limit.

What? 31. Processing when the generator is jumping incident

1. For the Head of Power Plant, the control center:

a) Processing of the electric generator by the operation Process and handling of the electrical generator incident issued by the Management Management Unit;

b) The report immediately gives the Level Level the right to control the following information:

-The name of an incident generator, the protection of the security of the command signal in the central control room;

-The effect of the electrical generator at the power plant;

c) The completion of the report quickly follows the regulation at Point A 5 Article 10 This Information.

2. For the Condition:

a) Processing the electrical system incident in a warning or emergency mode or extremely emergency due to the electrical generator incident;

b) Give the generator back to the operation by regulation at this Article 32;

c) Complete the incident report by the Executive Process and the handling of the electrical system incident provided by the Executive Level with the control of the board.

What? 32. Restart the generator after the incident

1. The School of Electrical Power Plant, the preliminary inspection control center, confirmed the protection of the impact caused by the incident outside the generator, the generator had no unusual phenomena and affirmed the standard of operation, allowing the Commandate to be delivered. The generator is in operation.

2. The School of Power Plant Master, the control control center that protects the impact caused by internal incidents in the generator or the device incident associated with the generator, Head of the Power Plant, the control control center that reports the operator has the right to control. allows the operation to create a generator for repairs. The generator was introduced only after the operational management Unit confirmed that the generator was qualified to operate.

Item 2

PROCESSING VARIABLE MACHINE INCIDENTS

What? 33. Processing the transformer

1. If there is no specific regulation of the maker ' s transmable machine pressure capacity, the transformer is overloaded than the routing line according to the following limits:

a) Short-term overload for the oil transplants:

Overload compared to current (%)

30

45

60

75

100

Overload time (minutes)

120

80

45

20

10

b) Short-term overload for dry transplants:

Overload compared to current (%)

20

30

40

50

60

Overload time (minutes)

60

45

32

18

5

c) The long-term overload for transmuces is allowed to be higher than the 5% limit of the corresponding voltage step if the voltage in that notch is not higher than the voltage voltage.

2. The operator at the power plant, the power station, the control control center overload the machine that follows the following sequence:

a) The Level Level Report has the right to control the following information:

-Time starts and levels carry over 90%, 100%, 110% valuation value;

-The oil temperature and coil of the transformer (continuous tracking, report as soon as there is a change);

-Time for the prescribed overload at Clause 1 This.

b) Check out the work status of the transmable machine cooling system and processing the operation and handling of the transmable machine incident issued by the Management Management Unit.

3. The process of handling the transmusing process is controlled by the command, emergency, and extremely urgent modes of regulation at Articles 49, 51, and 53.

What? 34. Procking process processing

1. If there is no specific regulation at the request of the maker, the transformer is too applied as follows:

a) In normal operating conditions:

-The long-running transformer with a higher voltage of no more than 5% voltage of the corresponding level with a decompressate head in the transformer is not overloaded; no more than 10% voltage voltage corresponds to the decompresso input in the transformer. no more than 25% of the standard capacity of the transformer;

-The transformer is operated short (less than 6 hours in 24 hours) with a higher voltage of no more than 10% voltage of the corresponding level with a decomposition head in the unoverloaded transformer.

b) In incident conditions:

-The transmable and lower-voltage transplants, the autotransmable transmaction machine at neutral point without a decomposition point or are not connected to the serial adjuvable transmaction machine, which is allowed to work long longer with a higher voltage than no more than 10% voltage voltage in transmable machine conditions not overloaded;

-For a self-imposed transformer at a neutral point that has a decomposition point or links with a serial adjuvable machine, the voltage increase allows to be determined according to the maker ' s figures.

c) Not allowing the operating voltage to exceed 20% from the voltage of the corresponding substandard, the operator operates at the power plant, the power station, or the control center to perform a separation from the operating system to avoid damage.

2. Employees operate at the power plant, the power station or the control center that processes the machine that transforms the following sequence:

a) The case of a transformer under the load, which is automatically transferred the pressure to the pressure machine not to be overapplied to the extent of the regulation at Clause 1 This article, then report the Level of Control;

b) The case of the transmusing machine has fixed-pressure hiccups, which must report immediately to the degree of control if the transformer is too limited to allow.

3. The voltage control operator under the National Power System Regulation Regulation provided by the Ministry of Commerce so that the transformer is not allowed to be overcharged.

What? 35. The transmusing machine has other unusual phenomena.

1. The case of detection of transplants has other phenomena such as oil runoff, lack of oil, overheating, which has an unusual appeal, local heating at the head of the porcelain, the under-load operating system, the operator at the power plant, The power station or control center has to find all regulatory processing measures to resolve, simultaneously reporting to the Level of Control, direct leadership, and log of the operating journal.

2. When the value of the signal signals signals, the operator must conduct a review outside the transformer machine, sample the gas in the tile to analyze and test the combustion properties of the gas:

a) The case of fire gas is or in the gas containing the products due to the insulation of insulation must report immediately to the Level Level that is controlled to separate the transformer;

b) The case of non-smelly, odorless, non-burning gas is still possible for the transmable machine to continue to operate and must reinforce the monitoring of the transmplant condition.

What? 36. The cases must separate the transplants from the operation

1. There is an uneven loud voice and an electrical discharge in the transformer.

2. The warming of the transformer is increased to abnormal and continuous in normal cooling conditions and is not overloaded.

3. Oil spills off the machine through the extra oil tank, breaking the open room glass or oil spewing through the safety valve.

4. Level of low oil below regulation level and continue to lower.

5. The colors of the oil change suddenly.

6. The porcelain, broken, surface-fired missions, the oil pressure of the hidden missions are not in the regulations of the maker, the head is red-hot.

7. Oil analysis results show that oil does not reach the standards.

8. Other unusual cases at the request of the Management Management Unit.

What? 37. Processing when the machine transplants the incident

1. Employees operate at the power plant, the power station or the treatment control center as follows:

a) Report immediately for the Level Level that controls the following information:

-The name of the transformer, the protection of the action by the command signal in the central control room;

-The effect of a transformer.

b) Processing the transmusing machine in accordance with the operation Process and processing of a transmable machine incident issued by the Management Management Unit. Use rotation rotation to receive from other backup sources if the loss is rotated due to the transfixed machine incident;

c) The completion of the report quickly follows the regulation at Point A 5 Article 10 This Information.

2. The degrees of the Level Level conditional control of the command process is as follows:

a) Processing of the electrical system incident in warning mode, emergency, extremely emergency due to the prescribed transformations of regulations at articles 49, 51, and 53.

b) The commander isolated or put the transformer back to the prescribed operation at Article 38 of this Information;

c) Complete the incident report by the Executive Process and the handling of the electrical system incident provided by the Executive Level with the control of the board.

What? 38. Restart the transformer after incident

1. The case of the transformer was cut off the incident due to protection other than deviation, vapour, oil flow, oil pressure, the Command-Command Coordinator returned to the operation after the employee ran the test, reports the external status of the undetected transformer. Unusually, the protective circuit does not affect the wrong.

2. The case of the transformer was cut off the incident caused by the effects of two internal protective machinery that were either deviated and slightly (or the oil line, the oil pressure), the command-commanding officer put the transformer on the operation back when the following conditions were sufficient:

a) The operation management unit conducted the experiment, testing tests of parameters, sample analysis of gas, oil samples, remediation of the unusual drawbacks discovered;

b) The operation management unit has a text confirming the operating system that is qualified to send the command-controlled condition.

3. The case with only one of the internal protective circuits in action, the Commander in command of the operation to isolate the transformer and delivery machine to the Operations Management Unit conducting the experiment, examining the internal defense of the transformer machine. The commanding officer was given the transformer in the operation back when:

a) Through the internal protection of the internal protective circuit of the transformer is caused by the damage in the protective and damaged circuit that has been overcome;

b) Through internal security circuits test and failure to detect damage, the Operations Management Unit carried out the provisions at Section 2 This.

4. The case of a cessation of the transmusing machine that led to a cessation of power of a large area, the Commander-in-command sent the transformer to operate once the following conditions were sufficient:

a) The staff of the inspection, confirmed, reported that the transformer was only cut to one of the internal guards of the transformer and did not see an external indication of the failure of the damaged transformer;

b) The operator of the transformer has been agreed upon by the Leader of the Management Unit to return to the operation.

Section 3

HANDLING OTHER DEVICES.

What? 39. Process of overloading the most electricity device

1. The overload and duration of the overload of the device's most secondary (cut-cut machine, insulation knife, power generation machine, vertical capacitor, and other related equipment) must be based on the maker's regulations.

2. The operator at the power plant, the power station or the control center must report immediately to the Level Level that controls the overload and time that allows the overload of the device.

3. The handling of the most electrical device under control of the command in the alert, emergency, extremely urgent, regulatory regime in accordance with Articles 49, 51, and 53.

What? 40. The process of processing the most electrical device

1. The greatest voltage to allow the most other thing to operate long-term long-term, according to the maker ' s regulations.

2. The operator at the power plant, the power station or the control center must report immediately to the degree of control if the voltage on the electrical device is too high to allow.

3. The voltage control operator under the National Power System Regulation Regulation provided by the Ministry of Commerce to the control power device is not allowed to be overcharged.

What? 41. Processing of the offset device

1. For the operator operator at the power station or control center:

a) Processing of the fixed-process equipment operation and handling of the incident issued by the Administration Management Unit;

b) The Level Level Report has the right to control information about the protection and automation of the action, the ability to bring the compensated device back to the operation.

2. For the Qualified Degrees level:

a) Processing of the line incident, the power station, the electrical device involved if the attempt to offset the incident jump;

b) voltage control, power source, by-load of the National Power System Regulation Regulation provided by the Ministry of Commerce if voltage, the current on the grid of the control grid exceeds the limit limit;

c) The analysis of le protection of the impact of the compensated device to decide whether to put the equipment in the operation or isolate following the following circumstances:

-If determined by internal damage in the interior of the device, the operation of the operation is to be compensated and the delivery unit for the Operations Management Unit. The compensated device is brought back to the operation when there is confirmation information standard of the operational management Unit;

-If defined by external factors, allow the return of the compensated device to operate when qualified.

What? 42. Processing of the cutting machine, power flow machine, voltage transmusing

1. For the operator operator at the power plant, the power station or the control center:

a) Processing the operation of the operation process and handling the incident issued by the Administration Management Unit;

b) The immediate report for the Level Level has the right to control the incident, the operation status of the line or other electrical device at the power plant, the power station;

c) Processing the incident under the command of the command-Level Level command;

d) The completion of the report quickly followed the regulation at the point of a paragraph 5 Article 10 This message.

2. For the Qualified Degrees level:

a) Processing the wiring incident, electrical equipment, the relevant bar;

b) Command employees operate at the power plant, the power station, or the control center she set up the incident and hand equipment to the operating management unit for repairs. The device is only brought into operation again when there is confirmation of the operational standards of the operating management unit;

c) Complete the incident report by the Executive Process and the handling of the electrical system incident provided by the Executive Level with the control of the board.

Section 4

HANDLING THE BAR INCIDENT AT THE POWER STATION, THE POWER PLANT

What? 43. The staff of the employee operates the power station, the power plant when the bar incident

When the bar incident occurred, the employee operating the power station, the power plant, the control center implemented the following sequence:

1. Do the processing of the incident according to the operation process and handling the incident issued by the Administration Management Unit.

2. Cut the entire bar mend to the incident if the female bar loses power.

3. Report immediately for the Level Level which has the right to control the bar incident and the operation status of the relevant devices.

4. Check out the entire bar with the incident and the relevant equipment to decide whether to isolate or put the bar into operation under the following conditions:

a) The event of an incident does not occur on the female bar, ensuring that the bar and the devices eligible for the operation are ready to receive the charge again, and report that the degree of control allows for the power to be shut down;

b) The event of the incident occurred on the female bar, recommended that the degree be in control of the operation isolated the line, the device being tried.

5. Complete Quick Report by Regulation at Point A 5 Article 10 This Information.

What? 44. Processing of the Section when the bar incident

1. Do the appropriate control measures to prevent further expansion.

2. Analysis of the incident, which determines the cause of the loss of the female electrical power at the power station or the power plant.

3. Command the isolated operation, the device causing an electrical loss of power stations or power plants.

4. The commander restored the bar and the line, the power grid device after having isolated the incident element or repaired the incident bar.

5. Complete the incident report by the operation process and handle the electrical system incident provided by the Executive Level with the control of the board.

Section 5

HANDLING THE POWER OUTAGE, THE POWER PLANT.

What? 45. Employee processing at the power station

When the power station is lost, the operator at the station performs the following sequence:

1. Do the processing of the operation by the operation and handling of the incident issued by the Administration Management Unit, which converts to the power supply of the electricity-issued electricity to the power station.

2. Progress cut all the cutting machines in the power station. Special cases due to technical requirements cannot cut the entire cutting machine to be appropriate.

3. Check the status of the devices in the power station.

4. The report right on the Level Level has the power to control the state of the cutting machines.

5. Check out the entire power station to decide whether to isolate or take the power station into operation under the following conditions:

a) The event that the incident does not occur in the power station, ensuring that the qualified equipment is ready to receive the power, report that the degree of control allows for the power to be shut down;

b) The event of incident occurred in the power station, which recommended that the degree of control take control of the operation isolated the line, the device being tried.

What? 46. The processing of the operator at the power plant

When the power station is lost, the operator at the power plant performs the following sequence:

1. Do the processing of the operation by the operation and handling of the incident issued by the Administration Management Unit, which converts to the power supply of the electricity-issued electricity to the power plant.

2. Progress cut the entire cut in the power station of the power plant. In the special case due to a requirement that the technique cannot cut the entire cut machine must have its own regulation of the operating management unit.

3. Check out the state of equipment in the power plant, the state of the power generator.

4. Report immediately for the Level Level that controls the state of the cutting machines, the state of the generator of the generator.

5. Make sure the devices, the machines that are not being tried to reconcile.

6. Proposal for the Level Level that controls the isolated operation, the device is tried (if any).

7. Recommend the right-to-control system to quickly restore the power plant itself (if the power of the backup power).

What? 47. The handling of the Capsule when the incident blackout power station, the power plant

1. Make control measures to prevent further expansion.

2. Analysis of the incident, which determines the cause of the loss of electrical power station or power plant.

3. An isolated operation of the line, the device causing an electrical power outage or power plant.

4. The order to restore the entire power station or power plant affected by the incident.

5. Complete the incident report by the operation process and handle the electrical system incident provided by the Executive Level with the control of the board.

Chapter V.

HANDLING THE ALERT MODE, EMERGENCY AND EXTREMELY EMERGENCY.

Item 1

PROCESSING WARNING MODE

What? 48. Warning Mode

The transmission power system operates in a warning mode when there exists one of the following conditions:

1. The frequency of the air-conditioning, the rotating backup, the launch room is faster than the specified standard operating mode in accordance with the regulations.

2. The level of loading of the main lines and power stations in the transmission grid is above 90% but does not exceed the rating value.

3. The ability to occur natural disasters or adverse weather conditions can affect electrical system security.

4. The possibility of a security problem, the defense can threaten the security of the electrical system.

What? 49. Processing of the Condition when the transmission power system in the warning mode

1. The power control of power plants is on the rise, launching machine-to-room factories to provide the frequency of the frequency of the frequency to reach or higher than the specified level.

2. Control the power of power plants (spin-up, quick boot) so that the load levels of the lines and main power stations in the transmission grid do not exceed 90% of the standard value.

3. Reduction of transmission capacity on a 500 kV line, 220 kV in the area of the capacity to occur in an accident or abnormal weather conditions or the possibility of a security problem, the defense may threaten the security system security.

4. Provide information to publish the alert information to the official Web site when it has taken the necessary measures but does not bring the system back to normal operating mode.

Item 2

EMERGENCY MODE PROCESSING

What? 50. Emergency Mode

The transmission power system operates in an emergency mode when there exists one of the following conditions:

1. The system frequency exceeds the scope of the normal mode of operation but is within the frequency range that allows for the event of an incident of one element in the system under the transmission of transmission power systems issued by the Ministry of Commerce.

2. The voltage at any node on the transmission grid is outside the scope of permission in the normal operating mode but is in the voltage strip that allows for the event of an incident of one element in the electrical system under the transmission of the transmission power system. It was issued by the Ministry of Commerce.

3. The carrying level of any electrical device in the transmission grid or electrical device that connects to the transmission grid exceeds the level of the valuation but below 110% of the valuation value that this device is when the overload incident can lead to the operating mode. It's extremely urgent.

What? 51. Processing of the Condition when the transmission power system is in emergency mode

1. frequency-control, voltage under the National Power System Regulatory Regulation Regulation to give the frequency, voltage of the scope to allow in normal operating mode.

2. Handout the line overload or electrical device

a) Control the power of power plants (backup, quick boot) so that the line or electrical device is not overloaded;

b) A change of the grid by the result was calculated in order to change the power flow movement on the power system to reduce the transmission capacity on the line or the power device is overloaded.

Section 3

EMERGENCY MODE HANDLING

What? 52. Emergency Mode

The transmission power system operates at an extremely urgent mode when there exists one of the following conditions:

1. The system frequency outside the frequency range allows for the event of an incident of one element in the system under the transmission of transmission power systems issued by the Ministry of Commerce.

2. The voltage at any node on the transmission grid is outside the voltage strip which allows for the event of a partial death by the Department of Commerce issued by the Ministry of Commerce.

3. The loading level of any device in the transmission grid or device that connects to the transmission grid over 110% of the standard value that this device is when the problem is caused by overcrowing can lead to partial disintegration of the electrical system.

4. When the transmission grid is in an emergency operating mode, the measures taken to bring the system back to the unstable stable operating state are led to the disintegration of each part of the system, dissecting or collapsing the system voltage.

What? 53. The handling of the Condition when the transmission power system is at an extremely emergency mode

1. frequency-control, voltage under the National Power System Regulatory Regulation Regulation to give the frequency, voltage of the scope to allow in normal operating mode.

2. Handout the line overload or electrical device

a) Control the power of power plants (the spin room, fast boot) so that the line does not exceed the transmission limit or the power device is not overloaded above 110%;

b) A change of the grid by the result was calculated in order to change the power flow movement on the power system to reduce the transmission capacity on the line or the power device is overloaded above 110%;

c) The lower-voltage or input-source layup is specified so that the line does not exceed the transmission limit or the power device is not overloaded above 110%.

Chapter VI

THE ORGANIZATION.

What? 54.

1. Power Regulatory Bureau has a common sense of responsibility, guidance, and examination of this Information.

2. Vietnam Electric Power Corporation is responsible for directing the units directly to this.

What? 55.

1. This message has been in effect since 5 November 2014. Number Decision 13 /2007/QĐ-BCN March 13, 2007, of the Secretary of the Ministry of Industry of the Ministry of Industry of the Ministry of Planning on the Process of Handling of the National Power System, the implementation of the action from this date is effective.

2. During this course of execution, if there is an entangrium, the new content arise, the relevant units are responsible for reporting the Department of Electrical Condition to Research, the proposal, the Minister of Amended Commerce, supplematuation to the wizard. Come on.

KT. MINISTER.
Chief.

(signed)

The Supreme.