Advanced Search

Regulation (2007:215) If Exemption From The Requirement Of Network Concession Pursuant To The Electricity Act (1997:857)

Original Language Title: Förordning (2007:215) om undantag från kravet på nätkoncession enligt ellagen (1997:857)

Subscribe to a Global-Regulation Premium Membership Today!

Key Benefits:

Subscribe Now for only USD$40 per month.
Introductory provisions



section 1 of this regulation provides for exceptions to the

the requirement on net concession pursuant to Chapter 2. section 1 of the electricity Act (1997:857).



2 section With internal network "means one or more starkströmsledningar

which the holder uses for the transmission of electricity for own use.



§ 3 If the holder of an internal network has commissioned someone

else to answer for the operation of the grid, the transmission of electricity

the holder shall be deemed to be made on its own behalf.



section 4 On an internal network operated without the support of the network licence

in accordance with the provisions of this regulation,

transmission of electricity on behalf of others does not take place in other cases

than those specified in §§ 23 to 31. Regulation (2012:163).



Exemptions from licence requirement



Internal networks in some areas



section 5 internal networks, which are located on or within a building,

may be built and used without network concession.



section 6, an internal network, in which electricity is transferred to the facilities

and buildings not intended for residential and located

in the immediate vicinity of a residential building may be constructed and used

without network concession.



section 7 of the internal networks in a fenced area that is intended for

holder's own account and where the general public does not own

access may be built and used without network concession.



section 8 an internal network within the area of an industrial plant,

built and used without network concession. The same is true between the

parts of such areas, which are separated only by a

traffic ranks.



section 9 of an internal network within the scope of a general or individual

institution may be built and used without network concession.

The same is true between the parts of that area, which is separated

access only by a road.



With the institution referred to one or more buildings where care,

teaching, research or similar activities are carried out.



section 10 of an internal network within the area of an airport approved

for general use, belong to the State or used for

State purposes may be built and used without network concession.



section 11 of an internal network within the area of a construction site or

other temporary work place may be built and used without

Online concession.



section 12 of an internal low-voltage networks in the area of a

agricultural property must be built and used without network concession.



The owner of an agricultural property, with no network licence

build and use an internal low voltage also outside

agricultural property if the net is intended for the operation of the

Agriculture.



section 13, an internal network within the area of a road, a channel or

other water traffic led with associated buildings and

used to meet the needs of traffic may be built and

be used without network concession. Regulation (2013:4).



section 14 of an internal network with a maximum of forty thousand Volt voltage within

the area of such a facility within the total defence whose

existence or location shall be kept secret may be built and

be used without network concession.



section 15 of an internal network within the transport for rail,

tram, Metro or trolleybus operation and used for

to meet the needs of traffic may be built and used without

Online concession.



section 16 of an internal network within a range of leisure activities,

such as sports ground, engine course, riding stables, horse-and/or

Racecourse, park theater, amusement park, swimming pool, campground and

similar may be built and used without network concession.



section 17 of an internal network within the area for a Yacht Club, a marina,

Marina, winter lay-up site for recreational boats or

similar facility may be built and used without network concession.



section 18 of an internal network within the area of a cemetery,

built and used without network concession.



section 19 of an internal network within the area for a garden center,

built and used without network concession.



Certain types of internal networks



section 20 of an internal part of a telecommunication system,

built and used without network concession.



section 21 of an internal low voltage network used exclusively for

signalling, control or measuring purposes may be built and used without

Online concession.



section 22 of an internal network which is intended for the operation of a

lighting system may be constructed and used without

Online concession.



22 a of an internal network that connects two or more electrical

installations for the production, which constitute a functional unit,

may be built and used without network concession.

Regulation (2008:897).



22 b of an internal low voltage system intended primarily

for Automotive electrical needs must be built and used without

Online concession. Regulation (2012:163).



Transmission of electricity on behalf of others on internal networks



section 23 of such electricity network which was originally

used for the transmission of electricity exclusively for his own account and

which may be used without the aid of power concession, transfer of

electricity on behalf of others take place in the cases set out in paragraphs 24 to 31.



The first subparagraph applies only if there are

noteworthy reason for transmission of electricity on behalf of others

should be take place on the grid. In determining whether there is

such grounds shall take into account, first, how the transfer affects

the network activities carried out by the holders of

Online concession and, on the other hand, the costs of connecting relevant

users of electricity to the electricity grid that is used with the support of

Online concession. Regulation (2012:163).



section 24 transfer of electricity on behalf of another person may take place on a

electricity transmission grid is located at or within a building that may

be used without the aid of net concession. This also applies if the network

as a whole did not originally have been used for the transfer of

electricity exclusively for his own account.



section 25 of the transfer of power on behalf of another person may take place on a

electricity networks that are located within the area of an industrial plant and

which may be used without the aid of net concession.



section 26 of the transmission of electricity on behalf of another person may take place on a

electricity networks that are located within the area of an airport approved

for general use, belong to the State or used for

State purpose and which may be used without network concession.



paragraph 27 of the transfer of power on behalf of another person may take place on a

low-voltage power supply network that is located within the area of a

agricultural property and may be used without the aid of

Online concession.



section 28 of the transfer of power on behalf of another person may take place on a

electricity networks that are located within the area for recreational activities, such as

sports ground, engine course, riding stables, horse-and/or race track,

Park theater, amusement park, swimming pool, campground, and similar

and that may be used without network concession.



section 29 of the transfer of power on behalf of another person may take place on a

electricity networks that are located within the area of a boat Club, marina,

Marina, winter lay-up site for recreational boats or

similar facility and which may be used without the aid of

Online concession. This also applies if the network as a whole

originally not used for the transmission of electricity exclusively

for its own account.



section 30 On such internal network referred to in article 22,

transmission of electricity between the installations take place even if the

plants which are part of the functional unit has different

holders. This also applies if the network as a whole

originally not used for the transmission of electricity exclusively

for its own account. Regulation (2008:897).



section 31 in such internal low voltage system referred to in paragraph 22 (b)

may the transfer of electricity on behalf of others. This applies to

Although the net as a whole did not originally have been used for

transmission of electricity exclusively for his own account.

Regulation (2012:163).



Transitional provisions



2007:215



1. This Regulation shall enter into force on 1 June 2007.



2. the holder of an electricity network which at the entry into force of this

Regulation is used without the aid of power concession, even then

use the net without the support of network concession.



However, this applies only



a. electricity networks in kolonistugeområden,



b. electricity networks that transmit electricity in hotels, Conference and

ski resorts, and



c. electricity networks that transmit electricity to apartment buildings.



On these grids may also transfer of electricity for the cardholder's

counting take place.



3. If the transmission of electricity in a power grid referred to in section 27 at

the entry into force of this regulation is done on behalf of others

outside the agricultural property, this transfer

even then, take place.