Regulation (2010:853) Of Guarantees Of Origin For Electricity

Original Language Title: Förordning (2010:853) om ursprungsgarantier för el

Subscribe to a Global-Regulation Premium Membership Today!

Key Benefits:

Subscribe Now for only USD$40 per month.
General provisions



section 1 of this regulation includes provisions relating

to Act (2010:601) of guarantees of origin for electricity.



Words and expressions used in this regulation have the same

meaning as in the Act on guarantees of origin for electricity.



section 2 of the State's energy authority is the supervisory authority and

kontoföringsmyndighet. Regulation (2014:1090).



Definitions



paragraph 3 of the guarantees of origin may relate to electricity produced from renewable

energy sources, high efficiency cogeneration, nuclear,

peat burning and fossil energy sources and other electricity pursuant to

the following definitions:



electricity from renewable energy sources "shall mean electricity produced by

renewable energy sources, which are ickefossila wind energy,

solar energy, aerotermisk energy (air thermal), geothermal energy,

hydro-thermal energy (heat), ocean energy, hydropower,

biomass, landfill gas, sewage treatment plant and biogas,



aerotermisk energy: energy stored in form of heat in

the ambient air,



geothermal energy: energy stored in form of heat beneath the

solid surface of the Earth,



hydro-thermal energy: energy stored in form of heat in

surface water,



"biomass" means the biodegradable fraction of products,

waste and residual products of biological origin from agriculture

(including materials of plant and animal

origin), forestry and related industries, including

Fisheries and aquaculture, as well as the biodegradable fraction

of industrial and municipal waste;



liquid biofuels: liquid fuels produced

of biomass,



electricity from high-efficiency cogeneration "shall mean electricity from cogeneration as

as the provisions of European Parliament and Council directive

2012/27/EU of 25 October 2012 if energy efficiency, if

Amendment of Directive 2009/125/EC and 2010/30/EU and if

repeal of directives 2004/8/EC and 2006/32/EC, in the wording

in accordance with Council Directive 2013/12/EU,



electricity from nuclear energy: electricity is produced in a nuclear reactor,



El from peat loss: electricity produced by burning

of peat,



electricity from fossil energy sources "shall mean electricity produced with non

renewable energy sources such as coal, oil and natural gas, and



other electricity: electricity from any other source of energy than those who

defined above. Regulation (2014:353).



Information on guarantees of origin



section 4 of a guarantee of origin shall specify:



1. the energy source energy is produced from and the start and

the ending date for the production,



2. the name of the facility where the energy is produced, the

is located, the type of facility and its

capacity,



3. whether, when and to what extent the plant or

Energy Unit has been supported by a national support system

and the type of support system,



4. date of the facility was in operation, and



5. the date and country of issue.



5 § If guarantees of origin relating to electricity from high-efficiency

cogeneration should guarantees of origin in addition to what is stated in paragraph 4 of the

also include details about



1. energy source lower calorific value (the effective

calorific value),



2. the amount and use of the heat produced

through cogeneration process;



3. the primary energy savings calculated in accordance with established

reference values for efficiency and in accordance with annex II to

European Parliament and Council directive 2012/27/EU, in wording

in accordance with Council Directive 2013/12/EU, and



4. the facility's nominal electrical and thermal

efficiency. Regulation (2014:353).



Measurement and reporting



Measurement and reporting of production data



section 6 Of the electricity produced in an electricity generating plant is fed into a grid covered by network concession, the concession will measure the amount of electric power input and the distribution over time and report the information to the kontoföringsmyndigheten in accordance with that laid down in the Regulation (1999:716) if measurement, calculation and reporting of transfer of electricity and the regulations made in relation to the regulation. Regulation (2015:264).



section 7 Of the electricity produced in an electricity generating plant is fed into a grid which is not subject to concession, producer of network to measure the amount of electricity input electricity during hourly and report the information to the kontoföringsmyndigheten in accordance with that set out in the regulations issued by the regulatory authority.

Regulation (2015:264).



Other reporting



section 8 If a guarantee of origin relates to electricity from high-efficiency

combined heat and power, the producer of electricity, in particular, report the

information guarantee of origin required under section 5 of the

kontoföringsmyndigheten.



section 9 If, upon production facility is possible to

generate electricity with different fuels or energy sources, to

producer of electricity in particular, calculate and report on

production to kontoföringsmyndigheten in accordance with the

as set out in the regulations issued by

the supervisory authority.



section 10 of the Swedish Board for accreditation and conformity control

Announces rules on the requirements for and control of

measuring equipment and supervise the observance of such

regulations pursuant to the maximum extent permitted by law

(1992:1514) units of measurement, measurements and measuring instruments.



Account for guarantees of origin



11 § Kontoföringsmyndigheten to set up an account for

guarantees of origin



1. for the producer of electricity after the information according to section 11 of the Act

(2010:601) of guarantees of origin for electricity has come in to

authority, and



2. for electricity suppliers, and in other cases, after notification.



Guarantees of origin from other Member States of the European

Union



section 12 of the regulatory authority shall inform the

kontoföringsmyndigheten on measures in accordance with section 14 of the Act

(2010:601) of guarantees of origin for electricity.



Kontoföringsmyndigheten to record the information referred to in the first

the paragraph on the guarantee of origin concerned. If a

guarantee of origin are not recognized, will kontoföringsmyndigheten see

It can not be canceled according to the purpose as set out in

section 2 of the Act on guarantees of origin for electricity.



Fees



13 § Producer of electricity will pay a fee of 0.05 kroons

per the issued guarantee of origin to kontoföringsmyndigheten.

Other account holders will pay an account fee of 200

per year to kontoföringsmyndigheten.

Regulation (2013:147).



Appropriations



section 14 of the supervisory authority may provide for the

information to be submitted in an application for the right to

the award of guarantees of origin in accordance with article 9 of the Act (2010:601)

of guarantees of origin for electricity metering and reporting

According to 7 to 9 of this regulation and the additional

provisions necessary for the implementation of the law on

guarantees of origin for electricity and this regulation.



Appeal



section 15 of the 22 AOF the Administrative Procedure Act (1986:223) provides

If an appeal to the General Administrative Court.



2010:853



1. This Regulation shall enter into force on 1 december 2010, when

Regulation (2006:331) of guarantees of origin for highly effective

cogenerated electricity and renewable electricity shall be repealed.



2. The repealed regulation remains in force for

guarantees of origin has been issued before 1 december

2010.