By order of 12 February 1998 from the Minister of public works, approved the instruction on actions to consider in project (IAP) highway bridges. The purpose of this instruction was the definition of actions and their combinations, as well as the establishment of the weighting coefficients, to be considered in the project of the State road network bridges, to allow the verification of such elements of road infrastructure from the point of view of functionality and the structural safety.

In the years since the adoption of the statement until now existing, there has been a fact of great importance in the structures concerning regulatory landscape: the drafting of the structural Eurocodes and their gradual adoption by various European countries as technical codes for the bridges project. The scope of the IAP is entirely contained within the scope of the EUROCODE 0, Bases of calculation, and the EUROCODE 1 actions on structures. Adaptation of the contents of the IAP to these two European standards is that, fundamentally, has inspired the drafting of the text of the IAP-11 instruction.

On the other hand, the evolution of the national regulatory framework in the field of structures, both in different facets which may be subject to regulations (bases of projects, actions, calculation, execution or quality) and in the various fields of application (building, railway and road), has guided update looking for greatest possible coherence in this regulatory context.

This instruction includes, also, some functional criteria that must be met bridges road, for the verification of the States limit service, regardless of their constituent materials.

This order has been submitted to the procedures established in the Royal Decree 1337 / 1999 of 31 July, which regulates the submission of information on standards and technical regulations and regulations on information society services, and Directive 98/34/EC, of the European Parliament and of the Council June 22, as amended by the Directive 98/48/EC of the European Parliament and of the Council of 20 July.

By virtue of and in accordance with the provisions of articles 29, 40, 51 and sole final provision of the General Regulation of roads, approved by Royal Decree 1812 / 1994, of 2 September, I have: first article. Approval of the «instruction on actions» to consider bridges road (IAP-11) project.

Approves the «instruction on actions to consider in the bridges of Highway (IAP-11) project», which is then inserted.

Second article. Scope of application.

The instruction approved by this order shall apply in the project of bridges and other structures of the network of highways of the State, which is referenced in the first paragraph of this instruction.

Sole transitional provision. Application to projects and works.

The provisions of this order shall not apply to projects of bridges of Highway whose order of study had issued prior to its entry into force, nor of them derivative works, provided that these are initiated in a period not exceeding three years from that entry into force. In those cases, projects are governed by the current statement at the time he was given the order of corresponding study.

Sole repeal provision. Repeal legislation.

Subject as indicated in the single transitional provision, the order of 12 February 1998, that approves the instruction on actions to consider in project (IAP) highway bridges, and many provisions of equal or lower rank to oppose to this order is repealed.

First final provision. Skill-related title.

This order is issued under cover of the provisions of article 149.1.24. ª of the Constitution, which attributes to the State competition on public works of general interest.

Second final provision. Faculty of development.

It empowers the Director General of roads so that you can modify the relationship of standards referenced in the annex 3 of the instruction on actions to be considered in the project of highway bridges, when such modification is intended to accommodate its content to the technical progress or Community rules.

Third final provision. Entry into force.

This order shall enter into force the day following its publication in the "Official Gazette".

Madrid, 29 September 2011.-the Minister of public works, José Blanco López.