TEXT

The Ministry of Agriculture, Food and the Environment has a Central Laboratory for the Testing of Materials and Equipment of Riego, as part of the facilities of the National Center for the Technology of Irrigation (CENTER). on the farm "El Palomar" that the Ministry of Agriculture, Food and Environment has in San Fernando de Henares (Madrid). The Laboratory was created for conducting tests on irrigation, materials and irrigation equipment, dependent on the Subdirectorate General of Regadios and Water Economy of the Directorate-General for Rural Development and Forestry Policy.

The Laboratory provides service to meet specific demands voluntarily requested by users. These services generate an additional cost that is not attributable to the normal development of administrative management.

The work in the Laboratory is developed under the guidelines of a quality system based on the regulations UNE-EN-ISO/IEC 17.025 "General requirements for the competence of test and calibration laboratories" which ensures the competent management and the technical capacity of its facilities.

Law 8/1989, of 13 April, of taxes and public prices, sets out in Title III, the rules on the concept, value, fixing and administration of public prices. Article 24 defines the latter as the financial benefits which are satisfied by the provision of services or the performance of activities under the law of the public when, in addition, such services or activities are provided by the sector private, be of voluntary request on the part of the administered.

Applications for tests to perform the above activities have been increased in recent years, as well as the complexity of the test methods used, which makes it necessary to standardise carrying out the testing activities and the adequacy of their economic and administrative management to the existing rules on public expenditure and revenue. It is therefore advisable to issue an order fixing the public prices, which must be governed by the abovementioned measures, in the light of the fact that, in Article 26.1 (a) of Law 8/1989 of 13 April 1989, the establishment or Changes in public prices will be made in the order of the ministerial department on which the body is to be charged and on a proposal from the latter.

In its virtue and as provided for in Article 26.1 of Law 8/1989 of 13 April, I have:

Article 1. Object.

The purpose of this order is to establish public prices for the provision of the services of the Central Laboratory for the Testing of Irrigation Materials and Equipment referred to in Annex 1 of this Standard.

Article 2. Public pricing.

Public prices to be charged for the services referred to in this Ministerial Order are fixed in the amounts determined in Annex 1 of this Standard, all of which are inclusive of VAT.

Article 3. Submission of requests.

The application of the services to be provided must be in the model that to this effect is established by the Subdirectorate General of Regadios and Water Economy of the Directorate General of Rural Development and Forestry Policy.

The instance model can be downloaded on the website of the Ministry of Agriculture, Food and Environment (www.magrama.es), within the section of the National Center for Irrigation Technology (CENTER), and transmitted to the E-mail from the General Subdirectorate of Regadios and the Economy of Water.

It may also be filed through the media, and in the terms laid down in Law 30/1992, of November 26, of the Legal Regime of Public Administrations and of the Common Administrative Procedure, and in Law 11/2007, of 22 June, Electronic Access of Citizens to Public Services.

Article 4. Method of payment.

The payment of the public prices fixed in the Annex of this Order will be made by the income of its amount in the Public Treasury by the means provided for in the General Regulations of Collection, approved by Royal Decree 939/2005 of 29 July, for which the General Rules of Collection are adopted.

Article 5. Obligation of payment.

The public prices set out in this provision shall be payable before the delivery of the results of the provision of the services concerned. The obligation to pay the regulated public prices in this order, is born, in general, since the service is started.

Single additional disposition. Administrative resources.

The administrative acts resulting from the management and collection of the public prices covered by this Order may be challenged in the form and time limits laid down in Articles 107 et seq. of Law No 30/1992 of 26 May 1992. November, the Legal Regime of Public Administrations and the Legal Procedure.

Single end disposition. Entry into force.

This order shall enter into force on the day following that of its publication in the "Official State Gazette".

Madrid, February 17, 2015. -Minister of Agriculture, Food and Environment, Isabel García Tejerina.

ANNEX

37

\

Pressure shutter resistance differential

55,10

Essays

VAT Trial Price

Repetitions Price

-

Percentage

Aspersion

Curve

127.15

100

2

flow-pressure curve

64.15

100

3

Spin Speed

Distribution uniformity for different frames Irrigation

48.40

5

Characterization CD, Q-P, CU, V

239.70

100

6

Sprinkler Durability

3.833.29

Accountants

7

_table_table_izq"> Curva error-flow. Counters

211.59

60

8

Losses loading

157.99

60

9

Wear tests

3955.31

10

Rate of pulse loss on a pulse emitter associated with a counter

129.99

60

11

Static Pressure Essay

110,21

12

121.71

100

13

60.86

60.86

60.86

100

Effective Scope

24,20

Flow Uniformity

48.40

16

Table_table_izq"> Diffuser Characterization CD, Q-P, CU, A

230.97

100

17

Resistance to hydrostatic pressure at room temperature

55,10

18

Dextenders Durability

3833.29

100

Issuers and pipes

19

Coefficient Offset-manufacturing variation

50.92

100

20

128.57

20

100

21

Non-Compensating Variation Coefficient

37.56

100

22

Flow Curva-No compensants

88.49

100

23

Resistance to hydrostatic pressure at room temperature

37.56

24

75,22

25

Exterior pressure (vacuum test)

Hidrants

Load Losses

167.63

60

27

Verification of each of the regulatory functions (pressure reducer, flow limiter, pressure holder, altitude)

143.43

60

28

Curve error-flow

211.59

60

29

Enclosure Resistance to Hydrostatic Pressure

75.22

30

Exterior pressure (vacuum test)

61.81

31

Table_table_body_izq"> Rate of pulse loss on a heartbeat emitter associated with a hydrant

129.99

100

32

Power tests: Power to different voltages, power losses, and polarity reversal.

104.61

100

33

Actuals of the remote: By valve acting, by reading the counter pulse and when reading the analog input

104.61

100

34

34 Work_table_body"> Study of Working Conditions: Environmental, Electrovalve Performance, and Counter-Pulse Reading.

188.93

100

35

Protection from anomalous situations: Overtones, overintensity, and short circuits on specific points. Rebounds, concurrent and asynchronous pulses.

104.61

100

Valves

Load Losses

167.63

Verification of each of the regulatory functions (pressure reducer, flow limiter, holder pressure, altitude)

143.43

60

38

\expndtw-2

39

55,10

40

the housing and all components under pressure to the inside pressure

41

41

41

External pressure pressure components

55,10

42

High differential pressure seat tightness

43

43

43 low

55,10

44

Resistance trials and full-time

165.31

45

55.10

90

46

Differential Pressure Shutter Resistance

55,10

90

47

Housing and all pressure-under-pressure elements

55,10

90

48

Housing and all elements under pressure under outside pressure

55,10

90

49

High-pressure seat stanchity

55,10

90

50

51

90

51

Resistance and full-time testing

165.31

90

Collarines

52

Housing and all the components under internal pressure

75.22

90

53

Minimum momentum open/close-Lazo clean water

36.66

100

54

Minimum impulse open/close voltage-Lazo water clean

36.66

100

55

Minimum pressure/maximum pressure open/close-Lazo clean water

36.66

100

56

Pressure-flow ratio-Clean water

49.13

100

57

Fatigue-Clean Water

907.50

58

Clean Water Complete-Leg Clean Water

968.00

59

Minimum time impulse open/close-Lazo water turbid

36.66

100

60

Minimum opening/closing momentum-Lazo murky water

36.66

100

61

Pressure minima/maximum opening/closing pulse-Lazo water turbid

36.66

100

62

Pressure-flow ratio-Lazo water turbid

49.13

100

63

Fatigue-Lazo water turbid

907.50

64

electrovalve solevalve-Lazo water turbid

968.00

65

Climate Chamber

18.15

teaching

66

Verifying free sheet and speed sensors. Error-Flow Curve

51.10

80