Key Benefits:
Having regard to Royal Decree 413/2014 of 6 June 2014 regulating the production of electrical energy from renewable energy sources, cogeneration and waste, in which the fourth additional provision is regulated by the the establishment of a specific remuneration scheme for a maximum of 120 MW applicable to installations or modifications of installations of different technologies to wind, solar thermal and photovoltaics under the additional provision Fourteenth of Law 24/2013, of December 26, of the Electrical Sector.
View of Order IET/1045/2014 of 16 June 2014 approving the remuneration parameters of the standard facilities applicable to certain electrical energy production facilities from energy sources renewable, cogeneration and waste, in which the third and fourth additional provisions provide for the time limit and method of submission, the documentation to be submitted and the other requirements for applications for registration in the register of remuneration specified in Preallocation status of the facilities defined in the disposition Fourth, Royal Decree 413/2014, of 6 June.
View Law 30/1992, of November 26, of the Legal Regime of Public Administrations and of the Common Administrative Procedure.
Having regard to the content and accompanying documentation of the applications submitted in time and form, in accordance with the provisions of the additional provision of Order IET/1045/2014 of 16 June 2014, as well as, where appropriate, the subsanatory documentation submitted by the interested parties within the time limit set.
Whereas the legal deadlines granted to the stakeholders for the submission of their requests have been met.
Whereas the power quota of 120 MW set out in paragraph 1 of the fourth additional provision of Royal Decree 413/2014 of 6 June 2014 for the establishment of a specific remuneration scheme for those installations which have not been entered in the remuneration pre-allocation register or in the first section of the register of electrical energy production facilities, are in one of the following situations:
(a) That they would have submitted an application for registration in the pre-allocation register under Article 4 of Royal Decree-Law 6/2009 of 30 April 2009 laying down certain measures in respect of the the energy sector and the social bond is approved, that said application would have had entry in the administrative register of the Ministry of Industry, Energy and Tourism, and that they met the requirements of article 4.3 of the Royal Decree-Law 6/2009, of 30 of April, all before the date of entry into force of the Royal Decree-Law 1/2012, of January 27.
(b) Having a definitive entry into service for the whole of the power for which registration is sought in the register of remuneration in the pre-allocation state in the 30 days natural after the entry into force of Law 24/2013 of December 26.
Considering the prioritization of the applications set out in paragraph 6 of the fourth additional provision of Royal Decree 413/2014 of 6 June, according to the following criteria:
1. º The compliance with paragraph 1.a) of the fourth additional provision of Royal Decree 413/2014, of June 6.
2. º The compliance with paragraph 1.a), with the exception of the requirements of Article 4.3 of Royal Decree-Law 6/2009 of 30 April 2009 and the fulfilment of paragraph 1.b) of the fourth additional provision of Royal Decree 413/2014, of 6 of June.
3. º The compliance with paragraph 1.b) of the fourth additional provision of Royal Decree 413/2014, of 6 June.
Whereas as a result of the application of the criteria for prioritisation, in the event of equality of several applications which will result in the anticipated quota being exceeded, a single one of these criteria will be established prioritization according to the date of administrative authorization, in the case of the criterion of prioritization 1. º, and of the date of authorization of definitive exploitation for the criterion of prioritization 2. º and 3. º, as provided in paragraph 6 of the provision Fourth, Royal Decree 413/2014, of 6 June.
Whereas, as provided for in paragraph 6 of the fourth additional provision of Royal Decree 413/2014 of 6 June 2014, the coverage of the 120 MW power quota shall be made by default, i.e. the first application which is not The estimate will be that, for which, its consideration would be to exceed the expected quota.
This Directorate-General, by virtue of the powers conferred upon it by the legislation in force, resolves:
1. To register, in the register of specific remuneration in the pre-allocation state regulated in Royal Decree 413/2014, of 6 June, the installations or projects of installations listed in Annex I to this resolution.
2. Declare not registered, in the register of specific remuneration in the pre-allocation state governed by Royal Decree 413/2014, of 6 June, to the installations or projects of installations listed in Annex II to this Regulation resolution.
3. To declare inadmissible applications for registration in the register of specific remuneration in the pre-allocation state dealt with under the provisions of the fourth Royal Decree 413/2014, of 6 June 2014, of the installations or projects of installations listed in Annex III to this resolution.
As provided for in paragraph 7 of the fourth additional provision of Royal Decree 413/2014 of 6 June 2014, this resolution will be published in the Official Gazette of the State.
Against this resolution, it is possible to bring an appeal before the Secretary of State for Energy, within one month of publication in the Official Gazette of the State, in accordance with the provisions of Law 30/1992, On 26 November, the Legal Regime of the Public Administrations and the Common Administrative Procedure, as amended by Law 4/1999 of 13 January, and Article 14.7 of Law 6/1997 of 14 April, of the Organization and the Functioning of the General Administration of the State.
As provided for in the fourth additional provision of Order IET/1045/2014 of 16 June 2014, that appeal must be submitted exclusively by electronic means, with electronic certificate, through the application of the accessible from www.minetur.gob.es, in the electronic headquarters of the ministry, within the section procedures and electronic services, option all types of procedure, option resources and claims, or directly through the following link:
https://sede.minetur.gob.es/es-S/procedimientoselectronicos/Paginas/Administrativos.aspx? ShowResults=True &SortExpression=Title &SortDirection=Ascending &Page=0 &Source= listadements.aspx&CommandName=Search&Title = resource
The case number must be quoted in the communications or resources relating to this resolution.
Madrid, July 15, 2015. -Director General of Energy Policy and Mines, Maria Teresa Baquedano Martin.
ANNEX I
Facilities entered in the register of specific remuneration in the pre-allocation state in the quota provided for in the fourth additional provision of Royal Decree 413/2014 of 6 June 2014 governing the activity of production of electrical energy from renewable energy sources, cogeneration and waste
prioritization Criterion (1) | Installation Holder | Name of the installation | Registered power (kW) | Technology subgroup | Associated type installation (2) | Definitive Operating Authorization | Number of identification of the request | ||
---|---|---|---|---|---|---|---|---|---|
1. º | EMAYA, S.A. | CENTRAL ELECTRIC BIOGAS EDAR PALMA 1. | 2.130.00 | b.7.2 | IT-00936 | 13/12/2011 | PER-000085-2014-E | ||
JULIA GARCIA HENAREJOS. | COGENERATION THE PACHECA. | 500,00 |
a.1.1 | IT-01472 | 19/12/2011 | PER-000039-2014-E |
|||
1. | BERIOSKA, S.L. | BERIOSKA COGENERATION. | 1,000,00 | a.1.1 |
IT-01475 | 22/02/2012 | PER-000045-2014-E | ||
1. º | SEAT, S.A. | CG SEAT (FASE N. 2). | 1.030.00 | a.1.1 | IT-01496 | 28/02/2012 | PER-000032-2014-E | ||
1. º | INDUSTRIES ROKO, S.A. | MODIFY. INST. COGENERATION BY INCREASE OF POWER RIPRE-23. | 282.00 | a.1.1 | IT-01508 | 06/03/2012 | PER-000060-2014-E | ||
1. º | CHILDREN OF FEDERICO LIS, S.A. | CHILDREN OF FEDERICO LIS S.A. | 1,000,00 | a.1.1 | IT-01475 | 27/04/2012 | PER-000006-2014-E | ||
1. º | FERROVIAL SERVICES, S.A. | COGENERATION POLIETPORTIT TXURDINAGA. | 500,00 | a.1.1 | IT-01472 | 05/07/2012 | PER-000040-2014-E | ||
1. º | FERROVIAL SERVICES, S.A. | POLYDEPORTIVO SAN IGNACIO. |
| a.1.1 | IT-01472 | 05/07/2012 | PER-000041-2014-E | ||
1. º |
PENAFIEL CITY COUNCIL. | PENAFIEL MICROWIND. | 50.00 | a.1.1 | IT-01472 | 03/04/2013 | PER-000112-2014-E | ||
1. º | BURGALESA COGENERATOR, S.L. | FIELD. | 2.838.00 | a.1.1 | IT-01511 | 19/12/2013 | PER-000089-2014-E | ||
DIEL SILEX BIOMASS, S.L. | CENTRAL PIEDRABABLE BIOMASS THERMOELECTRIC. | 15,000.00 | b.6 | IT-00848 | ... | PER-000072-2014-E | |||
1. | BIOMASS 6, S.L. | TORREDONJIMENO BIOMASS THERMOELECTRIC CENTRAL. | 15.000.00 | b.6 | IT-00848 | ... | PER-000074-2014-E | ||
1. º | MARGUA ENERGIES, S.A. | MARINE ENERGY ICMA. | 500,00 | a.1.1 |
IT-01473 | ... | PER-000079-2014-E | ||
1. º |
MARGUA ENERGIES, S.A. | MWATER CENTER. | 500.00 | a.1.1 | IT-01473 | ... | PER-000080-2014-E | ||
1. º | HYDROGRAPHIC CONFEDERATION GUADALQUIVIR. | HYDROELECTRIC POWER. | 2,800.00 | b.4.2 | IT-00771 | ... |
PER-000084-2014-E | ||
1. º | ENERGY EFFICIENCY COGENERATION, S.L. | COGENERATION CENTER FITNESS ILLES MARRATXI. | 500,00 | a.1.1 | IT-01474 | ... | PER-000103-2014-E | ||
1. º | ALGABAEN, S.L. | CG BM ALGABAEN. | 99.00 | b.6 | IT-00848 | ... | PER-000132-2014-E | ||
2. º | E-COGENERATION CABANILLAS, S.L. | CABANILLAS E-COGENERATION BIOGAS PLANT. | 349.00 | b.7.2 | IT-00914 | 29/02/2012 |
PER-000117-2014-E | ||
2. º | EGICAM PLAN YOUNG, S.L. | MICROWIND INSTALLATION 240 HOUSING GETAFE PARC. B-10. | 30.00 | a.1.1 | IT-01472 | 09/07/2012 | PER-000009-2014-E | ||
2. º | EGICAM PLAN YOUNG, S.L. | 268 VIV MOSTOLES PAU-4. | 99.00 | a.1.1 | IT-01472 | 11/09/2012 | PER-000008-2014-E | ||
3. º | TIMBER FINANCIAL, S.A. | FINSA PADRON. | 3.740.00 | a.1.1 | IT-01511 | 28/07/2011 | PER-000099-2014-E | ||
3. |
HC-NATURGAS ENERGY SERVICES COMPANY, S.L. | MICRO_BEN_TERO_175. | 5.50 | a.1.1 | IT-01472 | 13/10/2011 | PER-000050-2014-E | ||
3. º | TANNING INDUSTRIES, S.A. | INCUSA II. | 995.00 | a.1.1 | IT-01475 | 17/01/2012 | 3. º |
| NUM 7995 |
3. | 500.00 | a.1.1 | IT-01472 | 09/03/2012 | PER-000024-2014-E | ||||
3. º | VISCOFAN, S.A. | VISCOFAN. | 2.146.00 |
a.1.1 | IT-01514 | 16/03/2012 | PER-000086-2014-E | ||
3. | TORRE SANTAMARIA SCOOPCL. | BG TORRE SANTAMARIA. | 220.00 | b.7.2 | IT-00914 | 13/04/2012 | PER-000019-2014-E | ||
3. º |
NESTLE ESPAÑA, S.A. | NESTLE (PHASE No. 3). |
1.396.00 | a.1.1 | IT-01493 | 23/04/2012 |
PER-000030-2014-E | ||
3. º | SOLVIDA SANXENXO S.L. | SOLVIDA SANXENXO S.L. | 100.00 | a.1.1 | IT-01505 | 23/05/2012 | PER-000027-2014-E | ||
3. º | HC-NATNATAS ENERGY SERVICES COMPANY, S.L. | MICROGRANDIELLA_25. | 5.50 | a.1.1 | IT-01472 | 24/05/2012 | PER-000058-2014-E | ||
3. |
SALE OF GREEN ENERGY NAVA, S.L. | NAVA 1. | 100.00 | b.6 |
IT-00846 | 28/05/2012 | PER-000115 -2014-E | ||
3. º | ROYO, S.L. | ROYO I. | 1,000,00 | a.1.1 | IT-01475 |
04/06/2012 | PER-000052-2014-E | ||
3. | UNILEVER FOODS INDUSTRIAL SPAIN S. L. |
2.677.00 | a.1.1 | IT-01478 | a.1.1 |
06/07/2012 | PER-000092-2014-E |
||
3. º | PEROXYCHEM SPAIN, S.L. | ZAIDA COGENERATION CENTRAL. | 5.330.00 | a.1.1 | IT-01493 | 22/08/2012 | PER-000033-2014-E | ||
3. º | J. G. C. COGENERATION DAIMIEL, S.L. | COGENERATION PLANT JGC COGENERATION DAIMIEL SL. | 8.350.00 | a.1.1 | IT-01478 | 23/08/2012 | PER-000023-2014-E | ||
3. | ENERGYWORKS ARANDA, S.L. | 945.00 |
a.1.1 | IT-01460 |
24/09/2012 | PER-000073-2014-E | |||
3. º | GRANULATED AND NATURAL STONE BROTHERS SALAZAR, S.L. | THE MILL. |
400.00 | b.4.2 | IT-00744 | 02/10/2012 | PER-000119-2014-E | ||
FONT SALEM, S.L. | PRODUCTION CENTRAL POWER WITH BIOGAS GENERATOR ENGINE IN SALEM FONT. | 500,00 | b.7.2 | IT-00914 | 11/10/2012 |
3. º | |||
| echin, | PLANTA DE BIOMETHANIZATION OF 350 KW. | 350.00 | b.7.2 | IT-00914 | 25/10/2012 | PER-000046-2014-E | ||
3. º |
ESTEBAN ESPUNA, S.A. | CG SPAIN. | 196.00 | a.1.1 |
IT-01505 | 31/10/2012 | PER-000037-2014-E | ||
3. º | FARMHISPANIA, S.A. | COGENERATION FARMHISPANIA. | 3.350.00 | a.1.1 | IT-01478 | 09/11/2012 | PER-000026-2014-E | ||
3. º | PORCINE LIVESTOCK INVESTMENTS, S.L. |
| 350.00 | b.7.2 | IT-00914 |
15/11/2012 | PER-000070-2014-E |
||
3. º | BECTON DICKINSON, S.A. | COGENERATION BECTON DICKINSON FRAGA. | 999.00 | a.1.1 | IT-01475 | 26/11/2012 | PER-000100-2014-E | ||
3. | HC-NATURGAS ENERGY SERVICES COMPANY, S.L. | MICRO_MAESE_ALONSO_400. | 5.50 | a.1.1 | IT-01472 | 05/12/2012 | PER-000057-2014-E | ||
3. º | COGENERACIÓ BEGUDA, S.A.U. | CG NOEL (PLANTA II). | 4,995.00 | a.1.1 | IT-01478 | 11/12/2012 | PER-000034-2014-E | ||
3. º | CAILA & PARES, S.A. | CAYPA. | 2.498.00 | a.1.1 | IT-01493 | 13/12/2012 |
. º | ||
| A. LLENSA. | S. A. LLENSA. | 714.00 | a.1.1 | IT-01505 | 13/12/2012 | PER-000059-2014-E | ||
3. º | HC-NATURGAS ENERGY SERVICES COMPANY, S.L. |
MICROVALPARAISO_15. | 5.50 | a.1.1 | IT-01472 | 19/12/2012 | PER-000051-2014-E | ||
3. º | HYDROPALANCAR, S.L. | PALANCAR-PONT DE BAR. | 4.945.00 | b.4.1 | IT-00718 | 28/12/2012 | PER-000125-2014-E | ||
3. º |
CESPA URBAN SERVICES OF MURCIA, S.A.U. | COGENERATION CESPA. | 1.413.00 | b.7.1 | IT-00892 | 08/01/2013 | PER-000146-2014-E | ||
3. º | AGRI-food BONNYSA, S.A. | NORTH MELENCHON COGENERATION PLANT. | 4.044.00 | a.1.1 | IT-01478 | 10/01/2013 | PER-000003-2014-E | ||
3. º | MUNICIPAL WATER AND SANITATION ENTERPRISE OF MURCIA, S.A. | 56.00 | b.4.2 | IT-00744 | 56.00 |
| 10/01/2013 | PER-000093-2014-E | |
RIBPELLET LIMITED PARTNERSHIP |
| 1.255.00 | b.6 | IT-00846 | 18/01/2013 | PER-000078-2014-E | |||
3. º | HC-NATURGAS ENERGY SERVICES COMPANY, S.L. | MICROGRANDIELLA_6. | 5.50 | a.1.1 | IT-01472 | 04/02/2013 | PER-000049-2014-E | ||
3. | HC-NATURGAS ENERGY SERVICES COMPANY, S.L. | MICRO_MAESE_ALONSO_110. | 5.50 | a.1.1 | IT-01472 | 04/02/2013 | PER-000056-2014-E | ||
3. º | ELECTRIQUES TANQUEL, S.L. | CH BARBENS. | 100.00 | b.4.2 | IT-00744 |
13/02/2013 | PER-000114-2014-E | ||
3. º | SYRAL IBERIA, S.A. | AMYLUM IBERICA. | 13.600,00 | a.1.1 | IT-01496 | 01/03/2013 | PER-000069-2014-E | ||
3. º | BROTHERS DIAZ REDONDO, S.A. | COGENERATION BROTHERS DIAZ ROUND. | 999.00 | a.1.1 | IT-01505 | 01/03/2013 | PER-000083-2014-E | ||
3. | BUILDING AND HIRING, S.A. | CENTRAL COGENERATION ENVIRONMENT COMPLEX BARBANZA. | 130.00 | b.7.1 | IT-00892 | 07/03/2013 | PER-000105-2014-E | ||
3. º | BONNY, S.A. | BENEFIT COGENERATION PLANT. | 6.066.00 | a.1.1 | IT-01478 | 12/03/2013 | PER-000002-2014-E |
(1) In accordance with paragraph 6 of the fourth additional provision of Royal Decree 413/2014, of 6 June.
(2) The associated type installation codes are provisional until the installation has passed to the register of specific remuneration in the operating state.
As provided for in paragraph 8 of the fourth additional provision of Royal Decree 413/2014 of 6 June 2014, the facilities provided for in paragraph 1 (a) of that provision shall have a period of 30 months and six months. from the publication in the "Official State Gazette" of this resolution of registration in the register of specific remuneration in the state of pre-allocation, for the fulfilment of the requirements for registration in the register of remuneration in the state of operation covered by Article 46 of the said royal decree.
ANNEX II
Non-registered installations in the register of specific remuneration in the pre-allocation state in the quota provided for in the fourth additional provision of Royal Decree 413/2014 of 6 June 2014 governing the activity for the production of electrical energy from renewable energy sources, cogeneration and waste
According to the prioritization established in paragraph 6 of the Additional Disposition fourth of Royal Decree 413/2014, of June 6, the definitive exploitation authorization of the last application that enters into the quota is scheduled to be dated March 12, 2013.
The applications contained in this Annex have not been registered in the Register of specific remuneration that is regulated by Royal Decree 413/2014, of 6 June, in accordance with the aforementioned prioritization, by the following reasons:
-Do not fall within the criteria of prioritization 1. º and 2. º, having not submitted application for registration in the Register of preallocation of remuneration under the provisions of article 4 of the Royal Decree-Law 6/2009, 30 April, with the date of entry into the Register of the Ministry of Industry, Energy and Tourism prior to the entry into force of Royal Decree-Law 1/2012 of 27 January, as provided for in paragraph 1.a) of the Additional 4th of the Royal Decree 413/2014 of 6 June.
-Entran within the prioritization criterion 3. º, but they have definitive operating authorization, or in their case of a completed Low Tension Certificate, dated back to the last request that falls within the Expected quota.
Identification Number | Installation Holder | Installation Name | Requested power (kW) | Definitive exploitation | |
---|---|---|---|---|---|
PER-000144-2014-E | COGENERACIÓ BEGUDA, S.A.U. | 4.040.00 |
13/03/2013 | ||
PER-000053-2014-E | BAYER MATERIALSCIENCE, S.L. | BAYER MATERIALSCIENCE, S.L. | 933.00 | 27/03/2013 | |
PER-000090-2014-E | ROBLEGAL FARMS, S.L. | COGENERATION 500 KW FROM ROBLEGAL FARMS S.L. | 500.00 | 05/04/2013 | |
PER-000036-2014-E | 550.00 | 11/04/2013 | |||
PER-000044-2014-E | ROQUETTE LAISA SPAIN, S.A. | ROQUETTE LAISA SPAIN, S.A. (FASE N. 2). | 4.320.00 | 03/05/2013 | |
PER-000071-2014-E |
| 250 KW cogeneration PLANT | 250.00 | 13/05/2013 | |
PER-000081-2014-E | MONDELEZ ESPAÑA PRODUCTION, S.L. | COGENERATION KRAFT FODDS. | 2.000.00 | 29/05/2013 | |
PER-000004-2014-E | BONNYSA AGROALIMENTARIA, S.A. | COGENERATION PLANT. | 5.044.00 | 19/06/2013 | |
PER-000091-2014-E | NAVARRA CHANNEL, S.A. | GROUP I FROM CH TOMA. | 10.000.00 | 05/07/2013 | |
PER-000022-2014-E | POLYPROPYLENE OF GALICIA, S. A.U. | 1,000,00 | 21/08/2013 | ||
PER-000054-2014-E | IKEA IBERICA, S.A. | COGENERATION IN STREAM IKEA STORE IKEA (VALLADOLID) |
500,00 | 07/10/2013 | |
PER-000064-2014-E | LEFT CARTONAGES, S.A. | LEFT CARTONAGES | 1,000,00 | 09/10/2013 | |
PER-000143-2014-E | RIOBOO CERAMICS, S.L. | RIOBOO CERAMICS, S.L. | 500,00 | 18/10/2013 | |
PER-000017-2014-E | FENOSA NATURAL GAS RENEWABLES, S.L.U. | HYDRAULIC BELESAR II. | 20.780.00 | 24/10/2013 | |
PER-000018-2014-E | GAS RENEWABLE NATURAL FENOSA, S.L.U. | HYDRAULIC POWER PLANTS II. | 18.150.00 | 24/10/2013 |
|
PER-000067-2014-E | CERAMIC MILES CHILDREN, S.A. | CERAMIC MILES AND CHILDREN. | 5.190.00 | 20/12/2013 | |
PER-000082-2014-E | LINGEGAS BV. | LINGEGAS BV. | 3.120.00 | 20/12/2013 | |
PER-000029-2014-E | SOLUTEX GC, S.L. | SOLUTEX. | 1,000,00 | 26/12/2013 | |
PER-000106-2014-E | COGENERATION ENERGY EFFICIENCY, S.L. | COGENERATION PONENT | 500,00 | 17/01/2014 | |
PER-000025-2014-E | PRESERVES cerqueira, S.A. | 950.00 | 22/01/2014 | ||
PER-000126-2014-E | BIOGAS FUEL CELL, S.A. | BIOGAS PLANT. BIOGAS FUEL CELL, S.A. | 248.00 | 23/01/2014 | |
PER-000007-2014-E | ELWELL POWER, S.A. | COGENERATION ELWELL. | 17.200.00 | 24/01/2014 | |
PER-000012-2014-E |
GEGSA II. | 37,000.00 | 24/01/2014 | ||
PER-000013-2014-E | PENINSULAR ELECTRICAL GENERATION, S.A. | GEGSA I. | 37,000.00 | 24/01/2014 |
|
PER-000014-2014-E | PENINSULAR ELECTRICAL GENERATION, S.A. | GETESA. | 38.559.00 | 24/01/2014 | |
PER-000095-2014-E | BERNABEU CARTONAGES, S.A. | CARTONAJES BERNABEU, S.A. | 1.044.00 | 24/01/2014 | |
PER-000104-2014-E | WATER CONSORTIUM RIOJA WASTE. | EDAR CIDACOS COGENERATION. | 347.00 | 24/01/2014 | |
PER-000120-2014-E | TECHNOLOGY AND ENGINEERING ADVANCED TELECOMMUNICATIONS SYSTEMS AND SERVICES. | WALHALLA CASTELLON. | 3.000.00 | 24/01/2014 | |
PER-000075-2014-E | JUAN AND JUAN INDUSTRIAL, S.L.U. (IN CONSTITUTION). | COGENERATION PLANT WITH 1 MW ALTERNATIVE ENGINE IN JUAN AND JUAN INDUSTRIAL, S.L.U. | 1,000,00 | 27/01/2014 |
ANNEX III
Facilities not allowed in the call for the distribution of the quota provided for in the fourth additional provision of Royal Decree 413/2014 of 6 June, which regulates the activity of the production of electric energy from renewable energy sources, cogeneration and waste
Identification Number | Installation Holder | Installation Name | Inadmission | |
---|---|---|---|---|
PER-000011-2014-E |
| GEGSA II. | GEGSA II. Zant_table_izq">-Haber expressly renounced your request. | |
PER-000102-2014-E | ENERGY FARM COMPANY, S.L. | CDAMM. | -As provided for in Article 71 of Law 30/1992, of November 26, Legal Regime of Public and Public Administrations Joint Administrative Procedure, the request for failure to respond within the time limit set for such a decision is withdrawn. effect on the subhealing requirement | |
PER-000133-2014-E | ISOLATION, S.L. |
| -According to the provisions of article 71 of Law 30/1992, of November 26, Legal Regime of Public Administrations and Administrative Procedure Common, your request is withdrawn by not responding within the time limit set for such an effect to the request for a remedy. | |
PER-000134-2014-E | ISOLATIONS DECALITY, S.L. | PHOTOVOLTAIC ROOF WAITS 22. |
-According to the provisions of article 71 of Law 30/1992, of 26 November of the Legal Regime of Public Administrations and of the Common Administrative Procedure, its application to the non-member state is abandoned. respond within the time limit set for such an effect to the remedy requirement | |
PER-000135-2014-E | SQUARE ENGINEERING, S.L. | COTTON FIXED CEILING 1. | ||
PER-000136-2014-E | ENGINEERING BRACKET, S.L. | PHOTOVOLTAIC ROOF 12 KW THE BARBUO. | ||
PER-000055-2014-E | AUTHENTIC DISTRIBUTED GENERATION OF CASTILLA Y LEÓN, S.L. | COGENERATION CEDEIRA AGDS. |
-According to the provisions of article 71 of Law 30/1992, of 26 November of the Legal Regime of the Public Administrations and of the Common Administrative Procedure, your request for failure to respond is withdrawn. within the time limit set for such an effect to the remedy requirement. | |
< | PER-000129-2014-E | CLEAN ENERGIES, S.L. | MINICENTRY LALUEZA. | As provided for in Article 71 of Law 30/1992, of 26 November of the Legal Regime of the Public Administrations and of the Common Administrative Procedure, its request is withdrawn because it does not respond within the time limit set for this purpose. Healing requirement |
PER-000123-2014-E | HUESCA DIPUTACIÓN. | ALQUEZAR HYDROELECTRIC POWER. | -Failure to comply with Article 11.9 of Royal Decree 413/2014, June 6 | |
PER-000128-2014-E | THE MAESTRAZGO, S.L. | MINICENTRY HYDRAULICS "MEDIUM JUMP". |
-Failure to comply with Article 11.9 of Royal Decree 413/2014, of June 6 | |
PER-000130-2014-E | UBE CHEMICAL EUROPE, S.A. | UBE CHEMICAL EUROPE, S.A. | -Failure to comply with paragraph 10 of the Disposition Royal Decree 413/2014, fourth, of June 6, to be considered a substantial modification. -Failure to comply with Article 11.9 of Royal Decree 413/2014, June 6 | |
PER-000131-2014-E |
| |||
PER-000121-2014-E |
| ENVIRONMENTAL CITY BIOMASS. | -Failure to comply with the requirements of paragraph 10 of the Additional provision fourth to Royal Decree 413/2014, of 6 June, to be considered as substantial modification. -Failure to comply with Article 11.9 of Royal Decree 413/2014 of 6 June. | |
PER-000005-2014-E | NORVENTO, S.L. | XUSTAS BIOGAS EXPERIMENTAL PLANT. | -Not having contributed enrollment request in the Preallocation Record of remuneration under the provisions of Article 4 of Royal Decree-Law 6/2009 of 30 April 2009, with the date of entry into the Register of the Ministry of Industry, Energy and Tourism prior to the entry into force of Royal Decree-Law 1/2012, of 27 January, as provided for in paragraph 1.a) of the Additional Disposition fourth to the Royal Decree 413/2014, of June 6. -Not having provided definitive operating authorization, or in its case Certificate of Low Tension, dated prior to the deadline as set forth in paragraph 1.b) of Royal Decree 413/2014, additional Disposition fourth, of June 6 | |
PER-000038-2014-E | GENERAL COMMUNITY OF REGIONS ARAGÓN IMPERIAL. | HYDROELECTRIC POWER VALDETRÉTRO RIANAN. | -No application for registration in the Register of Preallocation of Remuneration under the provisions of Article 4 of Royal Decree-Law 6/2009 of 30 April 2009, dated entry in the Register of the Ministry of Industry, Energy and Tourism prior to the entry into force of Royal Decree-Law 1/2012 of 27 January, as provided for in paragraph 1.a) of the Additional Disposition fourth to Royal Decree 413/2014, June 6. -Failure to provide operating authorization definitive, or in its case Certificate of Low Tension, dated before the deadline as set forth in paragraph 1.b) of the Additional Disposition fourth to Royal Decree 413/2014, of June 6 | |
PER-000031-2014-E | CHILDREN OF LUIS MARTINEZ NORENA, S.L. | THE MOURTID. | -No have provided an application for registration in the Register for the provision of remuneration under the terms of provided for in Article 4 of Royal Decree-Law 6/2009 of 30 April 2009, with the date of entry into the Register of the Ministry of Industry, Energy and Tourism prior to the entry into force of Royal Decree-Law 1/2012 of 27 January, as established In paragraph 1.a) of the Additional Disposition fourth to Royal Decree 413/2014, of 6 June. -Not having provided definitive operating authorisation, or in its case Certificate of Low Tension, dated prior to the deadline as set out in point 1.b) of the fourth Additional Disposition Royal Decree 413/2014, June 6 | |
PER-000015 -2014-E | PROJECTS MORAL 2002, S.L. |
| -Failure to comply with the requirements of Section 1.a) of the Additional Disposition fourth to Royal Decree 413/2014, of 6 June, for failure to provide the documentation certifying compliance with paragraph 2.a) 5 of the Additional Disposition third of Order IET/1045/2014, dated June 16, prior to the entry into force of Royal Decree-Law 1/2012, of January 27. -Not having provided definitive operating authorization, or in its case Certificate Low Voltage, dated prior to the deadline as set out in section 1.b) of the Additional Disposition fourth to Royal Decree 413/2014, of June 6 | |
PER-000042-2014-E | ALDEBARAN ENERGY GUADALQUIVIR, S.L. | GROUP B. 6 AGRICULTURAL BIOMASS ELECTRICAL GENERATION PLANT. | -Failure to comply with the requirements of section 1.a) of the fourth Additional Disposition Royal Decree 413/2014 of 6 June 2014 for failing to provide the documentation certifying compliance with paragraph 2.a) 4 of the Additional Disposition third of Order IET/1045/2014 of 16 June, prior to the entry into force of the Royal Decree Decree-law 1/2012, of January 27. -Not having provided authorization to definitive holding, or in its case of a certified low-tenement, dated from the date before the deadline as set out in paragraph 1.b) of the fourth Royal Decree 413/2014, of 6 June 2014 | |
PER-000043-2014-E | INSTITUTE FOR ENERGY DIVERSIFICATION AND SAVINGS. | HYDROELECTRIC POWER MILL ALBA BRIDGE ". | -Failure to meet the requirements of 1.a) of the fourth additional provision of Royal Decree 413/2014 of 6 June 2014 for failing to provide the documentation certifying compliance with paragraph 2 (a) 3 of the third Additional Provision of Order IET/1045/2014 of 16 June 2014, with prior to the entry into force of Royal Decree-Law 1/2012 of 27 January. -Not having provided definitive operating authorisation, or in its case Certificate of Low Tension, dated before the The deadline as set out in point 1.b) of the fourth Royal Disposition Decree 413/2014, June 6 | |
PER-000068-2014-E | MIRANDA I, S.L. | CENTRAL MIRANDA DE EBRO BIOMASS THERMOELECTRIC. | -Failure to comply with the requirements of paragraph 1.a) of the fourth Royal Decree 413/2014, fourth, of June 6, for failure to provide the documentation certifying compliance with paragraphs 2 (a) 3 and 2 (a) 4 of the 3rd Additional Disposition of the Order IET/1045/2014, dated June 16, prior to the entry into force of Royal Decree-Law 1/2012, of January 27. -Not having provided definitive operating authorization, or in its case Certificate of Low Tension (a) the date before the deadline as set out in point 1.b) of the fourth Royal Decree 413/2014, 6 June | |
PER-000076-2014-E | SOMED, S.L. (IN CONSTITUTION). | CER SPARSPARAS. | -Not having submitted application for registration in the Register of Preallocation of Remuneration under the provisions of Article 4 of Royal Decree-Law 6/2009 of 30 April 2009, with the date of entry into the Register of the Ministry of Industry, Energy and Tourism prior to the entry into force of Royal Decree-Law 1/2012, of 27 January, as established in the paragraph 1.a) of the fourth additional provision of Royal Decree 413/2014, of 6 June. Izqui_table_izq">-Not having provided definitive operating authorization, or in your case Certificate of Low Tension, dated before the deadline as set forth in section 1.b) of the Additional Disposition 4 Royal Decree 413/2014, June 6 | |
PER-000077-2014-E | SERLASA, S.A. | SERLASA, S.A. | -Failure to comply with the requirements of paragraph 1.a) Additional provision, fourth, of Royal Decree 413/2014 of 6 June 2014 for failure to provide the documentation certifying compliance with paragraph 2 (a) 4 of the Additional Provision third of Order IET/1045/2014 of 16 June 2014 to the entry into force of Royal Decree-Law 1/2012, of January 27. -Not to have provided definitive operating authorization, or in its case Certificate of Low Tension, dated before the deadline as set out in point 1.b) of the fourth additional provision of the Royal Decree 413/2014, June 6 | |
PER-000087-2014-E | HYDROESCARPS, S.L.U. | HYDROESCARPS. | -No application for registration in the Register of Preallocation of Remuneration under the provisions of Article 4 of Royal Decree-Law 6/2009 of 30 April 2009, with the date of entry into the Registration of the Ministry of Industry, Energy and Tourism prior to the entry into force of Royal Decree-Law 1/2012, 27 January, as set out in paragraph 1.a) of the Additional Disposition fourth to Royal Decree 413/2014, of 6 June. -Not having provided definitive operating authorisation, or in its case Certificate of Low Voltage, dated prior to the deadline as set out in Section 1.b) of the fourth Royal Decree 413/2014, 6 June | |
PER-000088-2014-E | INDUSAL CANTABRIA LAUNDROMAT, S.A. | LAUNDROMAT INDUSAL CANTABRIA SA. | -Failure to comply with the requirements of paragraph 1.a) of the fourth Additional Provision of Royal Decree 413/2014 of 6 June 2014, for failure to provide the documentation certifying compliance with paragraph 2.a) 3 of the Additional Disposition third of Order IET/1045/2014 of 16 June, prior to the entry into force of Royal Decree-Law 1/2012 of 27 January. -Not having provided definitive operating authorization, or in your case Certificate of Low Tension, dated prior to the deadline as set out in Section 1.b) of Royal Decree 413/2014, fourth, of June 6 | |
PER-000101-2014-E | S. A. LLENSA. | CG-GN LLENSA. | -Failure to comply with the requirements of paragraph 1.a) of the Additional Disposition fourth to Royal Decree 413/2014, of June 6, for no have provided the documentation attesting to the fulfilment of paragraph 2.a) 10 of the Additional Disposition third of Order IET/1045/2014 of 16 June, prior to the entry into force of Royal Decree-Law 1/2012 of 27 January. -Have not contributed definitive operating authorization, or if applicable Certificate of Low Tension, dated prior to the deadline as set out in Section 1.b) of Royal Decree 413/2014, fourth, of June 6 | |
PER-000116-2014-E | CONSELL COMARCAL PLA URGELL. | PL. ENERGY USE BIOGAS LANDFILL. | -Not having provided an application for registration in the Register of Preallocation of Remuneration under the provisions of Article 4 of the Royal Decree-Law 6/2009 of 30 April, with the date of entry in the Register of the Ministry of Industry, Energy and Tourism prior to the entry into force of Royal Decree-Law 1/2012 of 27 January, as set out in paragraph 1.a) of the Additional Disposition Royal Decree 413/2014, of June 6. -Not having contributed the final operating authorisation, or in the case of a certified low-voltage certificate, from the date before the deadline as set out in point 1.b) of the fourth additional provision of Royal Decree 413/2014, of 6 June. | |
PER-000122-2014-E | CHILDREN OF GANGVALENTINES, S.A. | CH HARINES THE WINDOW. |
-Have not contributed enrollment request in the Preallocation Record of remuneration under the provisions of Article 4 of Royal Decree-Law 6/2009 of 30 April 2009, with the date of entry into the Register of the Ministry of Industry, Energy and Tourism prior to the entry into force of Royal Decree-Law 1/2012, of 27 January, as provided for in paragraph 1.a) of the Additional Disposition fourth to Royal Decree 413/2014 of 6 June. -Not having provided definitive operating authorisation, or in its case Certificate of Low (a) the amount of the amount of the amount to be taken into the accounts; Additional provision fourth to Royal Decree 413/2014, June 6 | |
PER-000124-2014-E | REDONDO BROTHERS, S.L. |
| Failure to submit an application for registration in the Pay Preallocation Register under the provisions of Article 4 of the Royal Decree-law 6/2009 of 30 April, with the date of entry in the Register of the Ministry of Industry, Energy and Tourism prior to the entry into force of Royal Decree-Law 1/2012, of 27 January, as set out in paragraph 1.a) of the Additional Disposition fourth to Royal Decree 413/2014, of 6 June. ||
PER-000127-2014-E | CLEAN ENERGIES, S.L. | MINICENTRY BALSA LA RAMBLA. | -Do not meet the requirements of section 1.a) of the Additional Disposition fourth of Royal Decree 413/2014 of 6 June, for failing to provide the documentation certifying compliance with paragraphs 2.a) 2 and 2 (a) 10 of the third additional provision of the IET/1045/2014 Order of 16 June 2014, prior to the entry into force of Royal Decree-Law 1/2012, of January 27. -Not to have (a) a final operating authorisation, or in the case of a Certificate of Low Tension, of a date prior to the deadline as set out in paragraph 1 (b) of the Additional Disposition 4 of Royal Decree 413/2014, of 6 of June. | |
PER-000145-2014-E | BIN ECKER, S.A. | COGENERATION TRASH. |
-Failure to submit an enrollment request in the Register pre-allocation of remuneration under the provisions of Article 4 of Royal Decree-Law 6/2009 of 30 April 2009, with the date of entry into the Register of the Ministry of Industry, Energy and Tourism prior to the entry into force of the Royal Decree-Law 1/2012, of 27 January, as set out in paragraph 1.a) of the Additional Disposition fourth to Royal Decree 413/2014, of 6 June. -Not having provided definitive operating authorisation, or in its case Certificate of Low Tension, dated from the date before the deadline as set out in the Article 1 (1) (b) of Royal Decree 413/2014, fourth subparagraph, of 6 June | |
PER-000035-2014-E | UNIBAIL RODAMCO SPAIN, S.L. | INSTALLATION OF COGENERATION THE ARCS. | -Failure to comply with paragraph 1 of the Additional Disposition fourth to Royal Decree 413/2014 of 6 June. The facility is registered in the Register of Preallocation of Remuneration under the provisions of Article 4 of Royal Decree-Law 6/2009 of 30 April 2009 |