der the agreement of the Government's Delegation for Economic Affairs, I have:

Article 1. Object.

This is the object of this order:

(a) The fixing of the values of the remuneration for the operation for the second calendar half of 2016 resulting from the application of the IET/1345/2015 Order of 2 July 2015 laying down the methodology for updating of the remuneration for the operation of the facilities with specific remuneration to the type of facilities to which it is applicable.

b) The establishment of a new type facility, defining for the same the equivalence between the category, group and subgroup defined prior to the entry into force of Royal Decree 413/2014, of 6 June, and the new category, group and sub-group set out in that royal decree, also indicating their corresponding code for the purposes of determining the applicable remuneration scheme.

Also in this order are the remuneration parameters of the new type installation that will apply to the first semi-regulatory period defined in the first provision of Royal Decree 413/2014, 6 June, subject to the provisions of Article 20 thereof.

Article 2. Update of the remuneration to the operation for the second half of 2016.

1. The update of the remuneration for the operation, corresponding to the second half of 2016, of the standard facilities for which a value of the remuneration for the non-zero operation has been approved by ministerial order and the costs of which are In order to ensure that the price of the fuel is essentially dependent on the price of the fuel, it will be carried out in accordance with the provisions of Order IET/1345/2015 of 2 July 2015 laying down the methodology for updating the remuneration for the operation of the facilities with specific remuneration arrangements. The above mentioned facilities are those for the following collectives:

(a) Facilities type of groups a.1, b.6 and b.8 as defined in Article 2 of Royal Decree 413/2014 of 6 June.

(b) Type facilities for installations covered by the first transitional provision of Royal Decree 413/2014 of 6 June 2014, which would have been granted to the second transitional provision of Royal Decree 661/2007, May 25, by which the activity of electrical energy production is regulated under special conditions.

The data necessary for the application of the above methodology are set out in Annex I.

2. The values of the remuneration for the operation corresponding to the second calendar year 2016 resulting from the application of the updating methodology established by Order IET/1345/2015 of 2 July 2015 to the type-a-facility Those referred to in the previous paragraph are included in Annex II.

The values of the parameters A, B and C of the second half of 2016, of the type installations listed in Annex II, are those set out in Order IET/1345/2015 of 2 July 2015, Order IET/1344/2015 of 2 July, the Order IET/2735/2015, of 17 December, and in this order.

Article 3. Remuneration aspects of the type installation.

1. The equivalence between the category, group and sub-group defined prior to the entry into force of Royal Decree 413/2014 of 6 June 2014 and the new category, group and sub-group set out in that royal decree are set out in Annex III. for a type installation and its corresponding code.

The above equivalence, as well as the established type-installation, shall apply to installations for the production of electrical energy from renewable energy sources, cogeneration and waste that have been recognised (a) the remuneration first paid to the entry into force of Royal Decree-Law 9/2013 of 12 July 2013 adopting urgent measures to ensure the financial stability of the electricity system, referred to in the second and second provisions First transitional provision of Royal Decree 413/2014 of 6 June 2014 and those which do not correspond none of the facilities defined in Order IET/1045/2014 of 16 June 2015, Order IET/1344/2015 of 2 July 2015 and Order IET/2735/2015 of 17 December 2015.

2. The remuneration parameters of the type-installation setting out the specific remuneration scheme applicable for the year 2013 are those set out in Annex IV.1

3. The remuneration parameters of the type-installation setting out the specific remuneration scheme applicable for the years 2014, 2015 and 2016 are those set out in Annex IV.2. This Annex sets out:

(a) The value of the remuneration for the investment to be applied in the years 2014, 2015 and 2016,

(b) the value of the remuneration for the operation to be applied in the year 2014 and the first half of 2015,

(c) the value of the remuneration for the operation to be applied to the second half of 2015, as well as the values of the parameters A, B and C as defined in Order IET/1345/2015 of 2 July 2015,

(d) the value of the remuneration for the operation to be applied for the first half of 2016.

4. The remuneration parameters referred to in paragraphs 2, 3 (a) and 3 (b) above have been calculated in accordance with the provisions of Royal Decree 413/2014 of 6 June 2014 governing the production of electrical energy from sources of electricity. renewable energy, cogeneration and waste and in Order IET/1045/2014 of 16 June 2014 approving the remuneration parameters of the standard facilities applicable to certain installations for the production of electrical energy from renewable energy sources, cogeneration and waste, taking into account the calculation assumptions listed in Annex V to that order and the parameters listed in Annex V of that order.

5. The remuneration parameters referred to in paragraph 3.c above have been calculated on the basis of the methodology for updating, assumptions and data set out in Order IET/1345/2015 of 2 July 2015 laying down the methodology for updating of the remuneration for the operation of the facilities with specific remuneration.

6. The remuneration parameters referred to in point (3) (d) above have been calculated on the basis of the updating methodology set out in Order IET/1345/2015 of 2 July 2015 and the data set out in Annex VI to Order IET/2735/2015 of 17 December 2015. December.

Article 4. Regulatory life and standard value of the initial investment of the type installation.

1. The regulatory lifespan for the type facility defined in this order is 25 years.

2. The value of the regulatory useful life and the standard value of the initial investment of the type facility defined in this order may not be revised, as provided for in Article 14.4.1. of Law 24/2013 of 26 December of the Sector Electric, and in Article 20.1 of Royal Decree 41for Economic Affairs has authorised the Minister of Industry, Energy and Tourism to issue this order.

In Royal Decree 160/2016, of April 15, it was arranged that the Minister of Economy and Competitiveness in office assume the ordinary office of the cases corresponding to the Ministry of Industry, Energy and Tourism. However, after and pursuant to Royal Decree 290/2016 of 13 July, it has been provided that the Vice-President of the Government and the Minister of the Presidency in office replaces the Minister for Economic Affairs and Competitiveness in the the processing and approval of the Order setting out the values of the remuneration for the operation for the second calendar year of 2016 and approving a standard facility and its corresponding remuneration parameters. This is why this order will be signed by the Vice-President of the Government and Minister of the Presidency

Un3/2014, of 6 June.

Single additional disposition. Methodology for updating the remuneration for the operation for the second half of 2016 for installations using as main fuel biomass, with definitive operating authorisation in 2015 and 2016, including in the Order IET/2212/2015 ,of 23 October, which regulates the procedure for allocating the specific remuneration scheme in the call for new installations for the production of electrical energy from biomass located in the electrical system peninsular and for wind technology installations, convened under Royal Decree 947/2015, of 16 October, and their remuneration parameters are approved.

1. For the purpose of updating the remuneration for the operation, for the second half of 2016, of the type-installations falling within the scope of Order IET/2212/2015 of 23 October 2015, which they use as main fuel Biomass shall apply the methodology described in Article 6 of Order IET/1345/2015 of 2 July 2015.

2. For installations with definitive operating authorisation in 2015:

a) The value of ΔPcombs will be equal to the increase in the price of biomass between the second half of 2016 (Pcomb2016-2) and the value established as a mean of the price of biomass for the year 2015 (Pcomb2015), as expressed in the following equation:

ΔPcombs = Pcomb2016-2 -Pcomb2015

Where:

Pcomb2016-2: Estimated biomass price for the second half of 2016, expressed in €/MWhPCI.

Pcomb2015: Estimated price of biomass for 2015, expressed in €/MWhPCI.

b) The value of the biomass price for the second half of 2016 (Pcomb2016-2) is calculated assuming an annual increase of 1% from the biomass price for the second half of 2015 (Pcomb2015-2), according to the following equation:

Pcomb2016-2 = Pcomb2015-2 -(1 + Ta)

Where:

Pcomb2015-2: Estimated biomass price for the second half of 2015, expressed in €/MWhPCI.

Pcomb2016-2: Estimated biomass price for the second half of 2016, expressed in €/MWhPCI.

Ta: Annual rate of increase in the price of biomass, as a result of one, taking as a value 0.01 in accordance with Annex III and Annex VI of Order IET/1045/2014 of 16 June.

c) The biomass price for the second half of 2015 (Pcomb2015-2) is calculated as follows:

Pcomb2015-2 = Pcomb2015 -(1 + tb)

Where:

Pcomb2015-2: Estimated biomass price for the second half of 2015, expressed in €/MWhPCI.

tb: Is the quarterly rate of increase in the price of the biomass, by one, calculated using the following equation:

tb = (1 + Ta)1/4 -1

Ta: Annual rate of increase in the price of biomass, as a result of one, taking as a value 0.01 in accordance with Annex III and Annex VI of Order IET/1045/2014 of 16 June.

d) The value of Ros-1 shall be equal to the value of the remuneration for the operation for the year 2015 published for each IT in Order IET/2212/2015, of 23 October.

e) The values of the biomass price shall be obtained by considering a calorific value equal to that set out in Order IET/1045/2014 of 16 June for fuels in the group b.6, equal to 3.49 MWhPCI/t.

3. For installations with definitive operating authorisation in 2016:

a) The value of ΔPcombs will be equal to the increase in the price of biomass between the second half of 2016 (Pcomb2016-2) and the value established as a mean of the price of biomass for the year 2016 (Pcomb2016), as expressed in the following equation:

ΔPcombs = Pcomb2016-2 -Pcomb2016

Where:

Pcomb2016-2: Estimated biomass price for the second half of 2016, expressed in €/MWhPCI.

Pcomb2016: Estimated price of biomass for the year 2016, expressed in €/MWhPCI.

b) The biomass price for the second half of 2016 (Pcomb2016-2) is calculated as follows:

Pcomb2016-2 = Pcomb2016 -(1 + tb)

Where:

Pcomb2016-2: Estimated biomass price for the second half of 2016, expressed in €/MWhPCI.

tb: Is the quarterly rate of increase in the price of the biomass, by one, calculated using the following equation:

tb = (1 + Ta)1/4 -1

Ta: Annual rate of increase in the price of biomass, as a result of one, taking as a value 0.01 in accordance with Annex III and Annex VI of Order IET/1045/2014 of 16 June.

c) The value of Ros-1 shall be equal to the value of the remuneration for the operation for the year 2016 published for each IT in Order IET/2212/2015.

(d) The biomass price values shall be obtained by considering a calorific value equal to that set out in IET/1045/2014 of 16 June for fuels in the group b.6, equal to 3,49 MWhPCI/t.

4. In the case where the value of the remuneration for the operation obtained from the previous methodology is less than zero, the remuneration for the transaction shall be deemed to be zero.

5. The values of the remuneration for the operation of the updated facilities as provided for in the previous paragraph, for the second half of 2016 are included in Annex III.

Single transient arrangement. Applicability of the values of the remuneration to the operation and the new type installation.

1. The values of the remuneration for the operation of the second half of 2016 shall apply from 1 July 2016.

2. The remuneration aspects of the new standard facility and its remuneration parameters, as referred to in Article 3, shall apply from the date of entry into force of Royal Decree-Law 9/2013 of 12 July 2013.

Single repeal provision. Regulatory repeal.

Any provisions of equal or lower rank are repealed as set forth in this order.

Final disposition first. Competence title.

This order has a basic character and is dictated b paragraph 1 of Annex IV introduces a third line which has the following content:

IT-02077

Code

Regulatory life (years)

Pay to Investment Rinv 2013 (€/MW)

Remuneration for Operation Ro 2013 (€/MWh)

Maximum Operating Hours for Perception 2013 Ro (h)

Nh minimum operating hours 2013 (h)

Operating threshold

Uf 2013 (h)

25

-

-

-

560

180

Two. The following tables are inserted at the end of paragraph 2 of Annex IV:

IT-02077

code

Regulatory life (years)

Adjustment Coefficient C1 ,a

Repay to investment Rinv 2014-2016 (€/MW)

Remuneration for Operation Ro (€/MWh) 2014 and first semester 2015

Maximum operating hours for Ro (h) perception

Annual minimum operating hours Nh annual

2014-2016 (h)

Annual Uf performance threshold 2014-2016 (h)

Annual Nh and Uf applicable for the calculation of the minimum operating hours and the operating threshold for the 3, 6 and 9 month periods (%)

3 months

6 months

9 months

25

-

-

0.000

2.760

840

15%

30%

45%

Final disposition third. Entry into force.

This order shall enter into force on the day following that of its publication in the "Official State Gazette".

Madrid, 20 July 2016.-The Minister of Industry, Energy and Tourism, P.S. (Royal Decree 160/2016 of 15 April 2016), the Minister for Economic Affairs and Competitiveness, P.S. (Royal Decree 290/2016 of 13 July 2016), the Vice-President of the Government and Minister of the Presidency, Soraya Saenz de Santamaria Anton.

ANNEX I

Data necessary for the updating of the remuneration for the operation to be implemented in the second half of 2016, for the implementation of the update methodology set out in Order IET/1345/2015, of 2 July

mr16

IT-01054

IT-01069

IT-01042

IT-01219

IT-01331

21.020

IT-01483

IT-01489

IT-01498

IT-01455

IT-01465

Dato (as defined in Order IET/1345/2015)

Value

0.00005

16

0.002

16

16-2

1.1046 c€/kWhPCS

Br16-2

42.9264 $/bbl

16-2

1.1339 $/ €

Trf16

1.9612 c€/kWh/day/month

Trc16

1.0848 c€/kWh/day/month

Tfc16.2

6.8683 c€/kWh/day/month

Tfc16.3

4,4971 c€/kWh/day/month

Tfc16.4

4,1210 c€/kWh/day/month

Tfc

3,7887 c€/kWh/day/month

Tfc16.6

3.4848 c€/kWh/day/month

Tvc16.2

0.1540 c€/kWh

Tvc16.3

0.1249 c€/kWh

Tvc16.4

0.1121 c€/kWh

Tvc

0.0983 c€/kWh

16.6

0.0852 c€/kWh

Tvr16

0.00116 c€/kWh

Tgnl16

3,240 c€/MWh/day

Drs16

IT-01043

72,804

IT-01044

70.698

IT-01045

68,154

IT-01046

66,238

IT-01047

63,685

IT-01048

62,705

IT-01049

59.712

IT-01050

58.707

IT-01051

58.070

IT-01052

57.624

IT-01053

57,197

56,860

IT-01055

56,171

IT-01056

55,824

IT-01057

55,410

IT-01058

52,124

IT-01059

52.096

IT-01060

52.079

IT-01061

52.052

IT-01062

52.034

IT-01063

52,008

IT-01064

50,156

IT-01065

48,546

IT-01066

47,166

IT-01067

45.959

IT-01068

44.886

43,986

IT-01070

43,281

IT-01071

42.682

IT-01072

42,046

IT-01073

41,506

IT-01074

41.248

IT-01075

41,023

IT-01076

40,856

IT-01077

40,497

IT-01078

39,949

IT-01079

39,609

IT-01080

39,209

IT-01081

32,854

IT-01082

33.032

IT-01083

33,205

IT-01084

33,379

IT-01085

33.546

IT-01086

33.714

IT-01087

32,802

IT-01088

32.053

IT-01089

31,409

IT-01090

30,883

IT-01091

30,418

IT-01092

30,017

IT-01093

29,703

IT-01094

29,423

IT-01095

29,161

IT-01096

29,071

IT-01097

29,009

IT-01098

29,114

IT-01099

29,041

IT-01100

28,910

IT-01101

28,744

IT-01039

75,878

IT-01040

75,545

IT-01041

74,612

73,589

57.543

IT-01163

57.070

IT-01164

44.533

IT-01165

44.708

IT-01166

44.888

IT-01167

45.052

IT-01168

45,215

IT-01169

45,373

IT-01170

44,250

IT-01171

43,289

IT-01172

42,497

IT-01173

41.822

IT-01174

41,245

IT-01175

40,744

IT-01176

40,313

IT-01177

39,923

IT-01178

39,638

IT-01179

39,532

IT-01180

39,680

IT-01181

39.810

IT-01182

40,061

IT-01183

40,094

IT-01184

40,000

IT-01185

39,783

IT-01186

39,513

IT-01187

39057

IT-01188

39,597

IT-01189

39,745

IT-01190

39,894

IT-01191

40,042

IT-01192

40,189

IT-01193

40,347

IT-01194

39,628

IT-01195

39,027

IT-01196

38,536

IT-01197

38.124

IT-01198

37,771

IT-01199

37,478

IT-01200

37,285

IT-01201

37,381

IT-01202

37,209

IT-01203

37,152

IT-01204

37,149

IT-01205

37,263

IT-01206

37,324

IT-01207

37,136

IT-01208

36.987

IT-01209

36,778

IT-01210

36,500

IT-01211

36.044

IT-01212

34,244

IT-01213

34,389

IT-01214

34.533

IT-01215

34,678

IT-01216

34,820

IT-01217

34,974

IT-01218

34.417

33.966

58,600

IT-01159

58.523

IT-01160

58,264

IT-01161

57.814

IT-01162

IT-01282

93,244

IT-01283

89,245

IT-01284

72,066

IT-01285

72,074

IT-01286

71,981

IT-01287

70,435

IT-01288

66,961

IT-01289

66,212

IT-01290

59.940

IT-01291

60,047

IT-01292

60,154

IT-01293

60,260

IT-01294

60.383

IT-01295

60.487

IT-01296

59,556

IT-01297

58.765

IT-01298

58.111

IT-01299

57,553

IT-01300

57,184

IT-01301

55,949

IT-01302

55,942

IT-01303

56,030

IT-01304

55,861

IT-01305

57.987

IT-01306

58.089

IT-01307

58.189

IT-01308

58,293

IT-01309

57,562

IT-01310

56,940

IT-01311

55,963

IT-01312

55,584

IT-01313

54,633

IT-01314

54,703

IT-01315

54,651

IT-01316

57,204

IT-01317

57,306

IT-01318

57,407

IT-01319

57,209

IT-01320

56,698

IT-01321

56,284

IT-01322

55,931

IT-01323

55,675

IT-01324

55,079

IT-01325

54,726

IT-01326

54,307

IT-01327

43,160

IT-01328

40,315

IT-01329

39,945

IT-01330

39,838

39,545

IT-01332

39,072

IT-01333

38,727

IT-01334

38,323

IT-01335

29,423

IT-01336

28,563

IT-01337

28,476

IT-01338

28,439

IT-01339

28,347

IT-01340

27,97982,000

IT-01278

81,401

IT-01279

80.999

IT-01280

81,212

IT-01281

81,871

IT-01471

20,521

IT-01472

58,163

IT-01473

57,952

IT-01474

57,673

IT-01475

40,018

IT-01476

39,857

IT-01477

39,584

IT-01478

36,999

IT-01479

36.832

IT-01480

36.550

IT-01481

32,613

IT-01482

32,286

32.011

IT-01484

31,519

IT-01485

31,415

IT-01486

30,920

IT-01487

55,467

IT-01488

55,172

54,813

IT-01490

39,413

IT-01491

39,131

IT-01492

38,782

IT-01493

28,231

IT-01494

28,026

IT-01495

27,451

IT-01496

23,991

IT-01497

23,798

23,275

44.428

IT-01433

44.144

IT-01434

52,412

IT-01435

51,732

IT-01436

51,199

IT-01437

46.561

IT-01438

46,294

IT-01439

45.516

IT-01440

45,228

IT-01441

38,525

IT-01442

36,773

IT-01451

16,624

IT-01452

16,634

IT-01453

16,642

IT-01454

16,640

17,005

IT-01457

56,573

IT-01458

56,284

IT-01459

55,933

IT-01460

40,302

IT-01461

40,026

IT-01462

39,682

IT-01463

28,756

IT-01464

28,557

27,983

IT-01466

24,498

IT-01467

24,308

IT-01468

23,786

IT-01469

21,175

p>

88,238

IT-01399

87,946

IT-01400

87.691

IT-01401

87.965

IT-01402

-

106.18

-

13.67

-

-

68.85

17.07

78,239

3,800

1,140

15%

30%

45%

Code

Parameter A ' 2. º sem. 2015

Parameter B ' 2. º sem. 2015

Parameter C' 2. º sem. 2015

Retribution for Operation 2. 2015 (€/MWhE)

Parameter A 1. ° sem. 2016

Parameter B 1. º sem. 2016

Parameter C 1. ° sem. 2016

Pay to operation

1. º sem. 2016

(€/MWhE)

Parameter A

2. º sem. 2016

Parameter B 2. º sem. 2016

Parameter C

2. º sem. 2016

IT-01527

2,910

1,000

-0.873

67.541

2,910

1,000

0.206

61,548

2.910

1,000

ANNEX V

Parameters considered for the calculation of the remuneration parameters of the type installation

Identification code: IT-01527.

Characterization of type installation:

Initial investment standard value (€/MW): 640,227.

Regulatory life (years): 25.

Fuel Cost

Operating Costs

Revenue sales to the system

Revenue sales to the system by market price

Other royalty income/cost avoided treatment

Operating equivalent hours

Exported electricity/gross electricity (Cogen.)

Historical

Future

Historical

Future

Future

Future

Future

-

€/MWhE gross

€/MWhE gross

€/MWhE gross

€/MWhE raw

€/MWhE gross

€/MWhE gross

h gross

p.u.

2004

40.03

10.84

-

54.99

-

12.93

-

-

2005

2005

Centro_table_body "> 45.26

12.56

-

77.06

13.16

7.514

-

66.00

13.30

-

78.15

-

13.30

7.495

-

-

2007

69.04

-

93.43

-

-

-

Centro_table_body "> 13.43

7.476

-

-

2008

80.41

14.78

-

98.70

-

13.56

7.472

-

-

2009

62.75

16.33>

Rind investment retribution 2014-2016

(€/MW)

Retribution to the Operation ro (€/MWh) 2014 and first half 2015

Maximum operating hours for the perception of Ro (h)

N ° hours of minimum working Nh annual 2014-2016 (h)

Annual Uf performance threshold 2014-2016 (h)

Annual Nh and Uf applicable for the ca

-

7.465

101.25

-

38.11

-

15.02

-

7.465

2028

101.25

-

38.43

-

15.02

-

7.465

2029

101.25

-

38.74

-

15.02

-

7.465

0.954

Historical: Parameters up to July 13, 2013.

ANNEX VI

Updated values of the remuneration for the operation of the type installations using as main fuel biomass, with definitive operating authorisation in 2015 and 2016, included in Order IET/2212/2015 by the the procedure for the allocation of the specific remuneration scheme in the call for new installations for the production of electrical energy is regulated

Securities of remuneration for the operation for the second half of 2016 of the type facilities subject to the update provided for in Article 20.3 of Royal Decree 413/2014 of 6 June, as defined in the Order IET/2212/2015, and in the first provision of this order

IT-04001

Centro_table_body "> 51,742

Code

Parameter A

2. º sem. 2015

Parameter B

2. º sem. 2015

C Parameter

2. º sem 2015

Retribution to the operation

2. º sem. 2016 (€/MWhE

4,480

1,000

0.113

51,742

IT-04002

1,000

0.000

1,000

1,000

td>

2018

101.25

-

34.76

-

15.02

-

7.465

2019

101.25

-

35.19

-

15.02

-

7.465

2020

101.25

-

35.68

-

15.02

-

7.465

2021

101.25

-

36.08

-

15.02

-

7.465

2022

101.25

-

36.49

-

15.02

-

7.465

2023

101.25

-

36.90

-

15.02

-

7.465

2024

101.25

-

37.20

-

15.02

-

7.465

2025

101.25

-

37.50

-

15.02

-

7.465

2026

101.25

-

37.81

-

15.02