Resolution Of December 31, 2008, Of The Directorate-General For Energy And Mines, Why The Remuneration Of Regulated Activities, The Rights Of Rush And The Counters And Telemedi Equipment Rent Rates Are Published...

Original Language Title: Resolución de 31 de diciembre de 2008, de la Dirección General de Política Energética y Minas, por la que se publican la retribución de actividades reguladas, los derechos de acometida y las tarifas de alquiler de contadores y equipos de telemedi...

Subscribe to a Global-Regulation Premium Membership Today!

Key Benefits:

Subscribe Now for only USD$40 per month.

TEXT

In the fourth additional provision of Order ITC/3802/2008 of 26 December establishing the tolls and charges associated with third party access to gas installations, the rate of last resort, and certain In the case of regulated activities in the gas sector, it is delegated to the holder of the Directorate-General for Energy Policy and Mines to establish the fixed remuneration and the specific parameters for determining remuneration. variable of the regulated activities of the natural gas sector to which the Articles 16.6 and 20.5 of Royal Decree 949/2001 of 3 August, which regulates third party access to gas installations and establishes an integrated economic system for the natural gas sector.

Order ITC/3993/2006 of 29 December 2006 establishing the remuneration of certain regulated activities in the gas sector determines the procedure for calculating the remuneration of the gas distribution activity and of the transport facilities prior to 1 January 2008. In this order, it is also indicated the form of updating of the rights of the affected, and the rates of rental of meters and equipment of the telemedida.

Royal Decree 326/2008 of 29 February establishing the remuneration of the activity of transport of natural gas for installations with the putting into service as from 1 January 2008 determines the method of calculation of the the remuneration of the transport facilities with a post-2008 commissioning date. In particular, in Article 6 it determines that remuneration shall be payable as from 1 January after the date on which the premises are put into service.

Order ITC/3994/2006 of 29 December 2006 laying down the remuneration of regasification activities and Order ITC/3995/2006 of 29 December 2006 establishing the remuneration of storage Natural gas subways included in the core network, establish the remuneration of the basic network's regasification and underground storage facilities.

On the other hand, Order ITC/3994/2006 of 29 December 2006 determined the unit values of investment reference and fixed and variable maintenance values of new approved regasification facilities The application will be directly applicable for the year 2007, together with the update formulas for successive years. The updated reference unit values are published in this resolution.

Similarly, Order ITC/3995/2006 of 29 December 2006, in its Additional Provision 6, established the procedure for the review of the provisional operating costs. The provisional values of the updated operational and maintenance costs for the year 2009 are published in this resolution.

the second provision of Royal Decree 326/2008 of 29 February establishing the remuneration for the activity of natural gas transport for installations with a service as from 1 January 2000 2008, provides that the National Energy Commission shall report to the Ministry of Industry, Tourism and Trade on the remuneration of certain regulated activities for the following year, before 15 November of each year. In compliance with the above, the National Energy Commission evacuated the report dated November 27, 2008.

This resolution is dictated by the delegation of the Minister of Industry, Tourism and Trade as regards the first paragraph and by its own competence as regards the rest of the resolution, in accordance with the Director General of Energy Policy and Mines included in the related orders. In its virtue, I have:

First.-The following remuneration for the year 2009 of companies engaged in regulated activities in the gas sector is set out in Annex I to this resolution:

1. Remuneration for companies carrying out distribution activities.

2. Remuneration in respect of depreciation, financial remuneration and fixed operating and maintenance costs of the undertakings holding transport assets with a service on 1 January 2008.

3. Remuneration in respect of depreciation, financial remuneration and fixed operating and maintenance costs of undertakings engaged in regasification activities.

4. Definitive remuneration for the depreciation and financial remuneration of the assets affected by the underground storage activity for the year 2009, as well as for the years 2007 and 2008.

5. Remuneration for transport facilities put into service after 1 January 2008.

Second.-The unit values of investment and operation and maintenance of updated regasification plants are set out in Annex II.

Provisional unit values for operation and maintenance of underground storage for 2009 are set out in Annex III.

Third.-The rental fee for telemedide meters and equipment for the year 2009 is set out in Annex IV.

The rights of connection for supplies connected to networks with supply pressure of less than or equal to 4 bar are set out in Annex V.

Fourth. This resolution shall have effect from the day following its publication in the "Official State Gazette".

Fifth. -Against this resolution, it may be brought, within one month, to be brought before the Secretary General of Energy, in accordance with the provisions of Law 4/1999, of January 13, of amendment of the Law 30/1992, of 26 November, of the Legal Regime of Public Administrations and of the Common Administrative Procedure, and in Law 6/1997, of 14 April, of the Organization and the Functioning of the General Administration of the State.

However, in front of the first paragraph of this resolution, which has been dictated by delegation, as set out in the Additional Disposition Fourth of the Order of the Minister of Industry, Tourism and Trade, 26 of December, establishing the tolls and charges associated with third party access to gas installations, the rate of last resort, and certain aspects relating to the regulated activities of the gas sector, is a potential resource In the case of the Minister for Industry, Tourism and Trade within one month, the of the day following that of its publication, meaning that in the event of a replacement appeal, an administrative-administrative appeal may not be brought until the replacement facility is expressly resolved or the dismissal is produced. presumed of the same.

If there is no recourse to a replacement, the Order may be challenged directly before the Administrative Board of the National Court, within two months of the day following the receipt of the request. this notification.

Madrid, December 31, 2008. -Director General of Energy Policy and Mines, Jorge Sanz Oliva.

ANNEX I

Remuneration activities regulated for the year 2009

1. Remuneration for companies carrying out distribution activities

Here are several images in the original. See the official and authentic PDF document.

The figure of Endesa Gas Distribution, S.A. includes the remuneration of Gas Alicante, S.L. and Southern del Gas, S.A.

2. Remuneration in respect of depreciation, financial remuneration and fixed operating and maintenance costs of the undertakings holding transport assets with a service on 1

2008

Here are several images in the original. See the official and authentic PDF document.

The above figures include the remuneration for the transport facilities put into service from 1 January 2008, as detailed in paragraph 5 of this Annex.

3. Remuneration in respect of depreciation, financial remuneration and fixed operating and maintenance costs of undertakings holding regasification facilities

Here are several images in the original. See the official and authentic PDF document.

4. Definitive remuneration for the depreciation and financial remuneration of the assets affected by the underground storage activity for the year 2009, as well as those for the years 2007 and 2008

Here are several images in the original. See the official and authentic PDF document.

5. Remuneration for transport facilities put into service after 1 January 2008

K-48.03 of the San Juan-Villarroledo Alcazar Pipeline in Villarroledo.

T-05 of the Semi-Ring Pipeline of Madrid in El Escorial (Madrid).

K-48.05 from the Villarrobledo-Albacete Pipeline in La Roda.

K-48.07 of the Albacete-Montesa Pipeline in Albacete.

Carrier of the Gas, S.A.

Natural Gas Transport

Enterprise

Installation

Retribution 2008

Enagas, S.A.

New Compression Station in Zaragoza.

4.308.798, 90

1.393.966.24

Enagas, S.A.

The BBV Pipeline Unfolding. Arbos-Planta section of Barcelona. Section I. Barcelona Province.

3.069.853.00

735.264.00

Enagas, S.A.

The BBV pipeline. Arbos-Planta section of Barcelona. Tranche I. Tarragona Province.

322.553.57

77.004.00

Enagas

, S.A.

The BBV Pipeline Unfolding. Arbos-Planta section of Barcelona. Tranche Ib.

949,516.83

235.980.00

Enagas, S.A.

Unfolding of the BBV pipeline. Arbos-Planta section of Barcelona. Tranche Ib.

2,516.43

457.08

Enagas, S.A.

6.009.801.71

1.537.596.00

Enagas, S.A.

Madrid Tramo II Grinon-Alpestrete Pipeline.

1.715.201, 75

448.914.00

Enagas, S.A.

Villarroledo Pipeline- Executor.

7.048.335.03

1.805.868.00

Enagas, S.A.

Partial Unfolding of the Ramal to the Gibraltar Field. Phase II.

656.877.88

160.190.40

Enagas, S.A.

9.095.789.26

2.388.837.96

Enagas, S.A.

Albacete-Montesa Pipeline (Valencia Province).

3.286.518.12

856.011.24

Enagas, S.A.

The BBV Pipeline Unfolding. Arbos-Planta section of Barcelona. Stretch II-a.

1.686.152.94

447,914.88

Enagas, S.A.

2.040.968.85

559.148.40

Enagas, S.A.

The BBV Pipeline Unfolding. Arbos-Planta section of Barcelona. Tranche II-b-1.

57.846.15

592,924.84

Enagas, S.A.

ERM G-100 in POS. K-48.02 of the San Juan-Villarroledo Alcazar Pipeline in Socuellamos.

34.536.05

9.017.00

ERM G-650 on POS

42,496,16

11.851.00

ERM G-400 on POS

29.733.53

8.455.00

S.A.

ERM G-650 at POS. T-06 of the semi-ring pipeline in Madrid in Villanueva de la Cañada.

42,496,16

11.851.00

ERM G-400 on POS

39.123.07

11.125.00

S.A.

EM G-2500 POS. K-02.3.1.A of the Ramal Unfolding to the Gibraltar Field (Phase II) in San Roque (Cadiz).

54.887.70

13,816.04

G-1600 on POS

56,919.64

16.069.00

Enagas, S.A.

ERM G-250 on POS. K-48.10 of the Albacete-Montesa Pipeline in Almansa.

36.142.19

10.398.00

Enagas, S.A.

ERM G-160 on POS. K-48.08 of the Albacete-Montesa Pipeline in Chinchilla.

34.949.70

9.966.00

Enagas, S.A.

ERM G-1000 on POS. A-09 of the Serrable-Zaragoza Pipeline in Juslibol (Zaragoza).

48.456.15

14.179.00

S.A.

ERM G-400 in Pos. A-8, Zorongo, Zaragoza.

37.268.90

11.125.00

Enagas

, S.A.

EM G-250 In new Pos 26A Magallon-Gallur (Zaragoza).

35.275.69

10.398.00

Enagas, S.A.

ERM G-250 in new Pos A. 3.1.A (Tierz, Huesca).

35.275.69

10.398.00

Enagas, S.A.

ERM G-250 in Pos 20.5 (Altorficon, Huesca).

35.275.69

10.398.00

Enagas, S.A.

EM G-1600 in pos. 1D Barcelona Plant.

4.070.81

48.347.44

Enagas, S.A.

Third ERM G-4000 Line in Pos B-22 in Getafe (Madrid).

89.073.06

22.905.00

Enagas, S.A.

EC of San Juan Alcazar.

9.047.256.54

4.085.245.60

Enagas, S.A.

ERM G-400 in Pos. L-06 of the Cordoba-Jaen-Granada Pipeline in Albolote (Granada).

2.781.25

42.831.40

S.A.

EM G-250 in the Pos. D-07,01 (Riano) of the Burgos-Santander-Asturias Pipeline, in Santillana del Mar (Cantabria).

1.975.62

30.760.76

Enagas, S.A.

Third Line in ERM G-650 in the Pos. 15.02 in Tortosa (Tarragona). Barcelona-Bilbao-Valencia Pipeline.

1.975.17

46.446.49

Enagas, S.A.

Fifth line in ERM G-6500 in the Pos K-01 pipeline Tarifa-Córdoba Singular.

11.513.33

121.256.65

Endesa Gas Carrier, S.L.

P20.03a (Fraga)-Mequinenza-Tramo I.

3.893.44

263.690.29

Carrier

Regional of the Gas, S.A.

Medina del Campo-Arevalo (tm Arevalo).

3.476.56

34.660.06

Carrier Gas, S.A.

Medina of the Campo-Arevalo.

484.116.93

94.163.47

of the Campo-Areval.

14.529.61

196.715,

ERM G-650 in P04.5 Medina of the Campo-Arevalo (Medina-Arevalo-Medina Pipeline Header).

4.937.92

46.446.49

Carrier of the Gas, S.A.

ERM G-250 at O14.02 Aldealengua (ca-Penaranda).

1.949, 63

32.762.15

Naturgas

Transport Energy, SAU

Basic Transport Network Pipeline for Power to Soto de Soto Combined Cycle Thermal Ribera.

66.449.66

14.316.12

Naturgas Energy Transport, SAU

ERM Soto.

50.819.32

14.179.00

Naturgas Energy Transport, SAU

Vergara-Irun Replication (Phase I: Vergara-Zaldivia).

92.722.89

2.168.804.51

Natural Gas Transport

Argentona-Canet-Tramo I.

443.694.52

70.020,54

Natural Gas

Argentona-Canet- Tramo II.

129.83

17.22

Natural Gas

Argentona-Canet- Tramo III.

401.14

49.51

Argentona-Canet- Tramo IV

53.89

6.46

Natural Gas Transport

ERM G-160 in Sant Andreu de Llavaneres.

3.114.38

31.657.55

ERM G-400 in Canet II.

3.476.56

34.660.06

Gas Extremadura

Tramo from the 22 position of the Silver Pipeline-Caceres.

10.736.66

363.408.38

Extremadura Gas

1.772.38

43.007.14

2.759.71

2.759.71

2.759.71

2.759.71

2.759.71

Der_table_body_der" > 220.886.51

SuerEuropean Carrier Gas

ERM G-400 of the Albolote-Pinos Puente secondary transport pipeline.

695.31

34.660.06

SuerEuropean Gas Carrier

EM G-250 of the Albolote-Pinos Puente secondary transport pipeline.

493.91

24,8899.23

Reganosa

Southern Pipeline I-leg Pipeline I.

45,493.64

2.128.353.10

51.207.930.40

21.614.280.27

ANNEX II

Unit investment and operation and plant maintenance settings

regasification

First. -Reference unit values of fixed operating and maintenance costs for the year 2009.

Storage Tanks (): 1,616.289 + 13,277429 *V

(Where V = Tank capacity expressed in m3).

Regasification Installations (/m3/h emission capacity): 4,96.

LNG Tankers (/Unit): 41,951.

Port and land civil work (/plant): 1.227.085.

Second. -Reference unit values of variable operating and maintenance costs for the year 2009.

Cost per regasified kWh (/kWh): 0.000160.

Variable cost per kWh loaded in cisterns (/kWh): 0.000192.

Cost per Transvases/Cold Bets (/kWh): 0.000192.

Third. -Investment reference unit values for new investments in directly authorized regasification facilities for installations put into service in 2008.

Storage Tanks (/m3): 698.19.

Tanker (/unit) ports: 3.129.393.

Civil and port work (/plant) (investment value up to the maximum of): 52.756.448.

Regasification Installations (/m3/h emission capacity): 138.14.

ANNEX III

Interim operating and maintenance unit values for underground storage for 2009

Here are several images in the original. See the official and authentic PDF document.

ANNEX IV

Counter-hire rate for telemedide counters and equipment for the year 2009

The prices without taxes of rental of meters and equipment of telemedida, to the users or subscribers by the companies or entities supplying them will be the following:

1. Counters

Here are several images in the original. See the official and authentic PDF document.

Flow

(m3/hour)

Average Value ()

Up To 10

197,65

To 63

363.78

Up to 64

705.52

Up To 65

1.441.25

To 100

1,951,16

To 160

3.060.44

To 250

6.476.96

The collection of the monthly rental by the owners of the accounting devices implies the obligation on the part of these entities to carry out their maintenance on their own.

Telemedida equipment for the transmission of information to a remote control center.

Equipment for a single line: 81.72 /month.

Additional line equipment: 15.67 /month.

ANNEX V

Laid rights for supplies connected to pressure networks

supply less than or equal to 4 bar for the year 2009

1. The applicant shall pay the distribution company the amount resulting from the application of the following formula:

Amount (Euro) = 98.71 * (L-6)

Being "L" the length of the connection in meters. In case of negative amounts the amount will be zero.

For these purposes, the natural or legal person requesting the connection shall be considered to be the applicant without necessarily having to contract the new supply or extension.

2. The contractor of a new point of supply or consumption, or of the extension of an existing one, must pay the distribution company, at the time of the contract, the amount collected in the following table on the basis of the tariff or toll contracted:

Here are several images in the original. See the official and authentic PDF document.