Cabinet of Ministers Regulations No. 859 Riga 2008 October 21 (pr. No 75 41. §) rules on "operational programme infrastructure and services" 3.1.4.1.3. apakšaktivitāt "Appendix of this infrastructure of social rehabilitation services for persons with Visual and hearing disabilities" Issued under the European Union's structural and cohesion funds act 18 paragraph 10 of article i. General questions 1. determines: 1.1. procedures for implementing the action programme ' infrastructure and services ' addition ' Infrastructure priorities 3.1 human capital contributes to the strengthening of the "UR3.1.4.pas" in the employment and social services infrastructure "3.1.4.1. activity" capacity assessment and the implementation of social service institutions for the development of infrastructure "3.1.4.1.3. the bottom of the activity "development of infrastructure for social rehabilitation services for persons with Visual and hearing impairments" (hereinafter referred to as the activity);
1.2. the European Regional Development Fund (hereinafter draft) submission evaluation criteria;
1.3. the requirements of the project applicant;
1.4. the responsible institution and liaison body, the distribution of competence between these institutions and cooperation arrangements, as well as the responsible authorities and cooperation agencies functional form of subordination.
2. The purpose of the activity is to create an infrastructure of social services opportunities for persons with disabilities and persons with predictable disabilities (people who have a disease or injury induced effects of the functional limitations that can lead to disability, if is not made the necessary treatment and rehabilitation services), improving social services, diversity, accessibility and quality, and the system of State aid for the disabled, persons with Visual and hearing impairments.
3. the purpose of the activity reaches the implementation of this provision in paragraph 5 that the eligible operations and execution of the following indicators: monitoring outcome indicators 3.1, if implemented within the framework of the project, which will create the infrastructure of social services opportunities to persons with hearing impairments, the two social rehabilitation centers for persons with hearing disabilities (one of Riga planning region, one in the region of Kurzeme);
3.2. outcome indicators when implementing the project, which will create the infrastructure of social services opportunities to persons with visual impairments: 3.2.1. four specialised workshops for persons with visual impairments (one of Riga planning region, one in the region of Kurzeme, Latgale planning region two);
3.2.2. improved accessibility within six days of rehabilitation and centres for persons with visual impairments (two Riga planning region, two in the region of Kurzeme, Latgale planning region two);
3.3. results indicators – supported social services institution made use of the services provided by the personal growth of two percent.
4. activities to target persons with visual impairments and persons with hearing impairments.
5. The project to be supported are the following: 5.1. social rehabilitation centres and equipping their operation and services for individuals with hearing impairments;
5.2. the specialized workshops and fitting their activities and to ensure the provision of services to persons with visual impairments;
5.3. environmental improvement availability of social rehabilitation, and day centres for persons with visual impairments;
5.4. information and publicity measures for the implementation of a project.
6. implement a limited activity in the project application selection.
7. Activity total eligible funding available is 1 330 841 lats, including the European regional development fund and the funding of 1 131 215 dollars, State budget financing 199 626 lats.
II. The responsible authority and the authority of the cooperation activities within 8 responsible authority provides the Ministry of welfare. Responsible authority: 8.1 establish restricted the application of the selection of projects project application Evaluation Commission (hereinafter the Commission);
8.2. send the limited range of the project call for project submissions;
8.3. provide information about the project applicant project application preparation and elaborate exhibit project submission form to be filled out;
8.4. assess the project submissions and issued an administrative act concerning the application of the project approval, approval with conditions or disapproval;
8.5. to accumulate data on project submissions in accordance with the laws and regulations of the European Union's structural funds and the cohesion fund management information system design and use;
8.6. participates in the implementation of the project of the Treaty (hereinafter referred to as the Treaty) in the development of the project;
8.7. the provision laid down in paragraph 60 of draft amendments, but, if you have complaints, advising on the deficiencies identified by the project;
8.8. the plan and implementation of information activities for the implementation of the activity, including information on the activities are published within the projects approved;
5.5. ensuring not to exceed the provisions mentioned in paragraph 7, the available funding for the implementation of the activity, and monitors the available European regional development fund, including a learning Council of 11 July 2006, Regulation (EC) No 1083/2006 laying down general provisions on the European regional development fund, the European Social Fund and the Cohesion Fund and repealing Regulation (EC) No 1260/1999 (hereinafter referred to as the Council Regulation No 1083/2006) 93. Article 1 and 2 of the principle referred to in the performance of the activity level.
9. cooperation authority provides the Central Finance and contracts. The liaison body: 9.1. Design draft Treaty;
9.2. the contract with the European regional development fund, the beneficiary of the financing;
9.3. the European Regional Development Fund requested the procurement plan and submit it to the procurement monitoring Bureau;
9.4. provide information to the national budget for the preparation of the request in accordance with the laws and regulations establishing procedures for public financial management and planning of national budgetary resources to fund the European Union co-financed projects and making payments;
9.5. the review and approval of the European regional development fund projects submitted by receiving progress reports;

9.6. provide implementation monitoring and control, including the project implementation checks the site and managed by the Council Regulation No 1083/2006 and article 93, paragraph 2, of the enforcement principle project level;
9.7. information provided by the European Regional Development Fund beneficiaries on the implementation of the provisions of the Treaty;
9.8. checks the European regional development fund, the beneficiary of the payment requests submitted, approved and eligible expenditure shall prepare payment orders, as well as the declarations of expenditure shall be prepared and sent to the managing authority for the examination;
9.9. the draft amendments under this rule 59. and paragraph 61, as well as 60. in the case referred to in paragraph, if the responsible authority under this rule 8.7. subparagraph agreed amendments to the draft;
9.10. the responsible authority shall provide information on the activities available for the implementation of the European regional development fund financing;
9.11. accumulates data about the projects in accordance with the laws and regulations of the European Union's structural funds and the cohesion fund management information system design and use;
9.12. plans and implements public awareness measures for the implementation of projects.
10. the cooperation body is the functional supervision of the responsible authority.
III. requirements for project applicants 11. project applicants may be public organisations whose core activity is the provision of services and support for persons with Visual and hearing impairments, if the public organisation: 11.1 a registered social service provider registry, its aim is to promote the rights of persons with hearing impairments to integration in society, to achieve this aim, it provides social rehabilitation services nationwide, it has regional departments in all planning regions of Latvia It meets the legal requirements of social rehabilitation service provider that provides services to individuals with hearing impairments;
11.2. combines at least 3000 visually impaired, represents and defends the interests of the State, municipalities and other institutions, promotes its members comprehensive rehabilit tion, adaptation and in integration into society, it has territorial units in all the planning regions of Latvia.
12. After the adoption of the draft project, the applicant is the sole European regional development fund, the beneficiary of that agreement with the liaison body for the implementation of a project. Project applicant project does not constitute a partnership. The European regional development fund shall be invested in the beneficiary's property.
13. the maximum eligible European regional development fund is about 85 percent of the total eligible project cost totals.
14. the minimum Project total eligible costs is not limited. The maximum eligible cost total: 14.1. project, within which the infrastructure will be created to receive social services extensibility, persons with disabilities and persons with disabilities, improving the forecast of social diversity, service availability and quality, and the national support system for people with hearing impairments, is 610 841 lats;
14.2. the project, which will create the infrastructure to receive social services extensibility, persons with disabilities and persons with disabilities, improving the forecast of social diversity, service availability and quality, and the national support system for people with visual impairments are 720 000 lats.
IV. Project selection 15 application. the responsible authority to the applicant, the project calls for project submissions (invitation) sent to the following time limits: 15.1 these rules 11.1 project referred to the applicant until 30 December 2008;
15.2. this rule 11.2. project referred to the applicant until 30 December 2009.
16. The invitation shall: 16.1. project application procedures for submitting it in person, by mail or electronic transmission;
16.2. the project submission deadline. Period no shorter than 30 die from Tajikistan, the date of dispatch of the invitation;
16.3. a Web site on the internet containing the project application and used to draw up documents (these provisions and consumables to the project submission form to fill out);
16.4. Web site on the internet where you inserted the draft Treaty.
17. the applicant shall submit Project application, subject to the following requirements: 17.1. project applicant submits one project submission;
17.2. the project application consists of the completed project submission form (annex a) and the following: 17.2.1. the project applicant questionnaire-application of value added tax, provided for in the laws and procedures and checks the information provided on the application of value added tax to the European Union's structural funds in the framework of projects funded and shall take a decision on the inclusion of value added tax to the project-related costs;
17.2.2. project budget materials, technical and equipment acquisition cost calculations, supporting documents;
17.2.3. documents certifying that the property, which is intended to make the European regional development fund, the investment project is the property of the applicant;
17.3. the project submission form section, subsection and the names project, the applicant does not change and do not delete;
17.4. the presentation of the project application, the project shall ensure compliance with these provisions 24.1. referred to administrative criteria. Preparing the project application, the project shall ensure that its contents match this rule 24.2. referred to the eligibility criteria and 24.3. referred to quality criteria;
17.5. completing the project submission form section, the project shall ensure mutual consistency of the information provided, it is describing the project up-to-date by identifying the problem and its solution, linking it with the project objectives, the results to be achieved, the selected target group, planned activities, time and the design of the eligible costs, as well as the rules for the implementation of the project;

10.9. the application by filling in the project, the project applicant required project cost plan according to this provision, 45, 46, 47, 48, 49 and 50 of the costs referred to in paragraph 1, and about restrictions, giving the project the expected costs, and ensure their compliance with the objective of the project, the results to be achieved, planned activities and the time schedule. The European regional development fund project in the application intends only to cover the eligible costs of the project;
17.7. the project submissions is provided in the evaluation of alternative investments and offer the most efficient solutions;
11.1. the project applicant project application can be submitted to the responsible authority: paper 17.8.1. in triplicate (original and two copies to the relevant "original" or "copy"). Project submissions are presented according to the laws that govern the development and presentation of documents;
17.8.2. electronically (the project application must be signed with a secure electronic signature pursuant to the electronic movement of regulatory laws and requirements);
11.1. the project application submitted in paragraph 16.2. these provisions within the time limit specified in person, by mail or electronically.
18. the competent authority shall register the project application submitted to it on the date of receipt, as well as the identification number. Proof of receipt of the application, the project authority in charge of the project to the applicant personally, on the same day or within two working days, shall be sent by mail or electronically (signed with a secure electronic signature).
19. the responsible authority shall have the right to organize a more limited application of additional selection if: 19.1. this rule 16.2. the time limit referred to in subparagraph a of these rules mentioned in paragraph 11 of the applicant does not submit the draft project submissions;
19.2. any of the submitted project applications have been rejected;
19.3. the project submissions are approved for an amount that is less than the rules specified in section 7 activity the total eligible funding available.
V. evaluation of the application of projects 20. activities within the project application submitted to the evaluation provided by the Commission. The Commission establishes the following order: 20.1. personnel of the Commission (the President of the Commission, members of the Commission balsstiesīgo and their replacements) consists of representatives of the Ministry of Welfare, and confirmed by the responsible authorities;
20.2. the managing authority and the representatives of the liaison bodies entitled to participate in meetings of the Commission as an observer;
20.3. the members of the Commission or its substitute in their absence, replaced by another authorized representative. Such authorisation shall be made in writing to the Commission in accordance with the procedure laid down in the Statute.
21. The Commission shall determine the responsible authorities developed and approved the Statute of the Commission.
22. the project submission compliance is assessed on the basis of these provisions referred to in paragraph 24 of the draft application evaluation criteria and with the responsible authorities the project application selection and evaluation procedures, as well as the application form for the evaluation of the projects mentioned in the regulations on the procedures for European Union structural and cohesion funds in the participating institutions provide the planning document preparation and implementation of these funds, and the European Union fund management and control system. The documents referred to in this paragraph, the competent authority shall be published on the internet site (URwww.lm.gov.lv/sf).
23. the project submission's compliance with this provision and 24.1 24.2. projects referred to in the application of the evaluation criteria evaluated with "Yes" () and "no" (no matches). The project's compliance with this provision the application 24.3. criteria referred to in point scored, giving a certain number of points.
24. the project submission is judged by the following project submission evaluation criteria: 24.1. administrative criteria (design and submit eligibility criteria): 24.1.1. or the applicant is invited to submit a project application to the limited application of the selection of projects;
24.1.2. or the application is submitted to the responsible authorities within the time limit laid down;
24.1.3. or the application is signed by the authorised person of the applicant in the project (Officer);
24.1.4. or the application is designed according to the circulation of electronic documents regulating legislative requirements (applicable if the project application submitted electronically);
24.1.5. or the application is made in the text;
24.1.6. or project submission is prepared in the national language;
24.1.7. or have filed this provision referred to in paragraph 17.8.1. project application copies (original and copy) and they have been certified (applicable if the project application submitted in paper form);
24.1.8. or the project application, the original and copies thereof is cauršūt (caurauklot) (true if project application submitted in paper form);
24.1.9. or the application is fully completed and drawn up according to the project submission form and are attached to this provision, 17.2.2 17.2.1. and referred to in paragraph 17.2.3. bottom attachments;
24.1.10. copies of the submission or the project comply with the project's original application (applicable if the project application submitted in paper form);
24.1.11. or all copies of the application project (original and copy) pages are numbered (true if project application submitted in paper form);
24.1.12. or project submission, financial calculation is made in local currency;
24.1.13. or project submission, financial calculation is designed to accurately and appropriately mean project application form;
24.1.14. or the application under the European Regional Development Fund funding does not exceed the provisions mentioned in paragraph 13 of the funding;
24.1.15. or the application of the eligible cost specified in total not exceeding 14. these provisions referred to in paragraph 1, the maximum project funding;
24.1.16. or project costs included in the submissions comply with this provision, 45, 46, 47, 48 and 50 costs referred to in paragraph 1;
24.1.17. or project submission, the planned costs do not exceed that laid down in point 49 of the rules of costs;
24.1.18. or the period of project implementation and cost allocation over the years correspond to the provisions referred to in paragraph 53 of the implementation period of the project;
24.2. eligibility criteria (substantive, financial and eligibility criteria in the implementation):

24.2.1. or the aim of the project contributes to this provision referred to in paragraph 2, the objective of the activity;
24.2.2. or project submission is based on the projected expenditure need;
24.2.3. or project environmental impact assessment;
24.2.4. or project submission, justify the need for the implementation of the project and identifies the challenges (including target groups);
24.2.5. or project submission, the planned project activities as defined in project problem solving;
24.2.6. or in the application of the project results and planned results indicators contribute to the rule laid down in paragraph 3 of the monitoring indicators;
24.2.7. or project submission seeks to ensure the maintenance of the results achieved by the implementation of the project for at least five years;
24.2.8. or the application are defined in the project administration personnel job responsibilities and qualifications requirements;
24.2.9. or project submission reflect existing and planned facilities security;
24.2.10. or project submission reflect project management, monitoring and quality assurance system;
24.2.11. or project planned in the application of publicity and information dissemination activities comply with these regulations, paragraph 55 and 56;
24.2.12. is the project the applicant complies with this provision in paragraph 11.1 or 11.2. requirements the project applicant;
24.2.13. or infrastructure, which provides for the conduct of the European regional development fund contribution, is the property of the applicant of the project;
15.1. quality criteria (specific to the policy implementing the eligibility criteria): 24.3.1. project application include project implementation readiness assessment;
24.3.2. submission of the project includes the implementation of the project risk analysis;
24.3.3. project synergies with European Social Fund support for social rehabilitation services for persons with Visual and hearing impairments, providing targeted, comprehensive and complementary support;
24.3.4. project for the current investment follow-up;
24.3.5. project submissions is provided in the evaluation of alternative investments and offer the most efficient solutions;
24.3.6. project-specific activities, the principle of equal opportunities, in particular by improving accessibility for people with functional disabilities.
25. For this rule 24.3.1. the quality criteria referred to in compliance with the maximum you can get seven points. The determination of its conformity with the applicable one of the following apakškritērij and scoring: 25.1. to project the application time has developed a construction (including sketch project and technical project), if the project requires development projects – seven points;
25.2. the project includes investment in each application object a readiness assessment of the works (including the reconstruction and renovation), including required documentation have been identified and action sequences to initiate this work, four points;
25.3. the project submission does not include project implementation readiness assessment – 0 point.
26. about this rule referred to in paragraph 24.3.2. quality criteria for compliance with the maximum you can get four points. The determination of its conformity with the applicable one of the following apakškritērij and scoring: 26.1. a project application are identified and reflected in the project of NASA, I will pursue their impact assessed and the probability of occurrence, as well as certain risks mitigation measures – four points;
26.2. the project submission does not include a risk analysis of project implementation – 0 point.
27. about this rule referred 24.3.3. quality criteria can obtain compliance with the maximum six points. The determination of its conformity with the applicable one of the following apakškritērij and scoring: 27.1. the project provides synergies with European Social Fund support for social rehabilitation services for persons with Visual and hearing impairments, six points;
27.2. the project provides synergies with European Social Fund support for social rehabilitation services for persons with Visual or hearing impairments – three points;
27.3. the project provides synergies with European Social Fund support for social rehabilitation services for persons with Visual and hearing impairments, 0 point.
28.24.3.4. These rules the quality criteria referred to in compliance with the maximum you can get five points. The determination of its conformity with the applicable one of the following apakškritērij and scoring: 28.1. project investment analysis and the evaluation of the continuity of five points;
28.2. the project does not provide its contribution to the analysis and evaluation of continuity – 0 point.
29.24.3.5. These rules the quality criteria referred to in compliance with the maximum you can get 10 points. The determination of its conformity with the applicable one of the following apakškritērij and scoring: 29.1. project submissions is provided in the evaluation of alternative investments and offered the most effective solution-10 points;
29.2. the project submission does not provide investment alternatives evaluation – 0 point.
30. about this rule referred 24.3.6. quality criteria for compliance with the maximum you can get 10 points. The determination of its conformity with the applicable one of the following apakškritērij and score: 30.1. project for three and more specific activities the principle of equal opportunities, in particular by improving accessibility for people with functional disabilities,-10 points;
30.2. the project has two specific activities the principle of equal opportunities, in particular by improving accessibility for people with functional disabilities, five points;
30.3. the project is one of the specific activity of the principle of equal opportunities, in particular by improving accessibility for people with functional disabilities, two points.
Vi. Administrative acts on the application of the project approval, the approval or rejection of a conditional and its notification to the competent authority 31 project application is approved if it meets all the following conditions: 31.1. its compliance with this provision and 24.1 24.2. apply referred to the administrative and eligibility criteria is evaluated with "Yes";

31.2. This provision it, 24.3.2 24.3.1.,.,., 24.3.3 24.3.4 24.3.5. and 24.3.6. quality criteria referred to in point of assessment receives a number of points equal to that rule 22.1 22.1 22.0.,.,.,.,., and 22.2 22.2 22.3 in the quality criteria defined for the minimum number of points that must be obtained or higher than that.
32. the project's responsible authority approves the application, provided that the applicant projects that rule 40 within the time limit set in point eliminates the shortcomings noted in the application if the one of the following circumstances: 32.1. project submissions need to clarify, according to one of these rules, 24.1.8 24.1.7 24.1.9 24.1.10.,.,.,., 24.1.11 24.1.12, 24.1.13., 24.1.14., 24.1.15., 24.1.16., 24.1.17. and 24.1.18. referred to administrative criteria, except in the case where the application is not added to this provision and paragraph 17.2.2.17.2.3. the annex below;
32.2. the project application to the need to clarify the appropriate one of these rules 24.2.3 24.2.4 24.2.2.,.,.,.,., 24.2.6 24.2.5 24.2.7.,.,., 24.2.10 24.2.8 24.2.9. and 24.2.11. referred to the eligibility criteria.
33. in paragraph 32 of these provisions that the condition can include: 33.1. additional explanation of the submission;
33.2. project implementation time or cost planning clarification by years;
33.3. This provision in the annex referred to in paragraph 17.2.1. set-up;
20.8. clarification of costs (reduction or exclusion), in so far as it does not affect the provisions referred to in paragraph 49 of the cost amount of the limit positions;
33.5. other steps to ensure the conformity of the project application, this provision, 24.1.8 24.1.7 24.1.9 24.1.10.,.,.,., 24.1.11 24.1.12, 24.1.13., 24.1.14., 24.1.15., 24.1.16., 24.1.17. and 24.1.18. referred to administrative criteria.
34. If that rule 32 and 33. compliance with the conditions referred to in paragraph 1 affect any other application referred to in paragraph 24 of the conformity assessment criteria the assessment, the responsible authority in the administrative application of the project approval provided accompanied by appropriate instructions. Conditions do not affect the quality criteria for the evaluation of the results.
35. the responsible body stops and does not continue the project evaluation, and their application is rejected, if there was at least one of the following circumstances: 21.8. the project submission does not meet any of these rules, 24.1.2 24.1.3 24.1.1..,.,.,., or 24.1.6 24.1.5 24.1.4. independent of the administered referred to in criteria;
35.2. project submissions have not been added to this provision and paragraph 17.2.2.17.2.3. the annex below;
35.3. the project submission does not comply with these rules, or 24.2.1 24.2.12.24.2.13. referred to the eligibility criteria;
35.4. the project evaluation of the application of these rules in 24.3.1. Accordingly the bottom above quality criteria is below four points;
22.1. the project application, rated according to this provision the bottom above 24.3.2. quality criteria is below four points;
35.6. the project application, rated according to this provision the bottom above 24.3.3. quality criteria of less than three points;
22.2. the project application, rated according to this provision the bottom above 24.3.4. quality criteria is below five points;
22.2. the project application, rated according to this provision the bottom above 24.3.5. quality criteria is below 10 points;
22.3. the project application, rated according to this provision the bottom above 24.3.6. quality criteria is less than two points.
36. Administrative provisions for the approval of the project application, approval or rejection provided the determining authority along with supporting documents (extract from the minutes of the Commission by Commission decision) within five working days from the date of adoption of the decision must be forwarded to the applicant.
37. the administrative act concerning the application of the project approval, the responsible authority shall contain information on the terms of the contract.
38. the responsible authority shall within five working days after the administrative act was adopted on the application of the project approval shall inform the liaison body. The liaison body shall conclude a contract in accordance with the law establishing procedures for the structural funds and the European Union cohesion fund management in the participating institutions provide the planning document preparation and implementation of these funds. The responsible authority shall send to the liaison body of the administrative provisions for the approval of the project application and two copies of the project approved. The responsible authority cooperation authority approved projects can be sent electronically if it is submitted that rule referred to in paragraph 17.8.2..
39. the administrative act on approval of the application, the project provided the determining authority indicates in the application of the project details in accordance with the provisions of paragraph 32 and 33.
40. the administrative act on approval of the application, the project provided the conditions contained in the project, the applicant provides information on administrative law and in conditions providing the responsible authorities within the prescribed period. This time-limit shall not exceed 60 days from the date of entry into force of the decision. The information that applicants may submit projects: 24.9. paper form in triplicate (original and two copies to the relevant "original" or "copy"). Details of the decision contained in the conditions presented in consistent with the laws that govern the development and presentation of documents;
40.2. electronically (for information on the conditions in the decision must be signed with a secure electronic signature pursuant to the electronic movement of regulatory laws and requirements).
41. the Commission examined this provision the information referred to in paragraph 40, and the responsible authority within 10 working days after this provision in paragraph 40 to the end of the statutory period, drawing up an opinion on the administrative provisions contained in the chapter for you. In the opinion of Justice controls are carried out as an administrative act, which includes compliance with the conditions for the control of this opinion is drawn up.

42. Where the applicant has fulfilled the administrative act on approval of the application, the project provided the conditions laid down by the responsible authority within two working days, following this rule 41. the expiry of the period referred to in paragraph 1, the applicant shall send the draft opinion on the administrative act contains the conditions, but the authority-administrative cooperation for the application of the project approval, on condition that the administrative act of the opinion on the conditions contained two copies of the approved project as well as two copies of the document, which contains information about the administrative act contains the conditions. The liaison body shall conclude a contract in accordance with the law establishing procedures for the structural funds and the European Union cohesion fund management in the participating institutions provide the planning document preparation and implementation of these funds. The responsible authority cooperation authority approved projects can be sent electronically if it is presented in paragraph 17.8.2. these provisions.
43. If the applicant has not provided the administrative act on approval of the application, the project provided the conditions are met, the application shall be deemed to have been rejected. Finding that the administrative act contains the conditions are not met, the responsible authority shall send the draft to the applicant within two working days, following this rule 41. the expiry of the period referred to in paragraph 1.
44. If adopted administrative act to reject the application of the project or the project, the applicant has not fulfilled the administrative act on approval of the application, the project provided the conditions laid down by the responsible authority in addition to the provisions referred to in paragraph 36 of the draft be returned to the applicant or sent by mail to the two projects submitted by the applicant a copy of the application for the project. The responsible authority for the project the applicant project application can be sent electronically if it is presented in paragraph 17.8.2. these provisions.
VII. The project 45. Project eligible costs the following cost plan positions: 45.1. direct costs, or the cost of project implementation the following cost headings: 45.1.1. with the preparation of project related costs;
45.1.2. construction, logistical means and equipment costs;
45.1.3. other project costs;
45.2. indirect costs the following cost headings: 45.2.1. information and publicity costs according to the regulations on the European Regional Development Fund funded project publicity and information measures;
45.2.2. project implementation would cause the value of the materials cost of insurance (apply during project implementation);
45.3. the unexpected costs.
46. This provision 45.1.1. cost referred to in heading includes company costs of supporting the implementation of the project for the preparation of the dossier (including costs associated with the procurement and technical implementation of the projects). If the operator is registered with the State revenue service as beneficiary, eligible employees of the employer are also state social security payment costs.
47. This provision 45.1.2. cost referred to in heading includes the following subdivisions: 29.3. costs of buildings and premises, construction, renovation and strukcij rekon space repair costs;
47.2. the environmental costs of the access rules referred to in paragraph 5.3 below the eligible actions;
47.3. furniture, equipment, hardware and software acquisition costs these rules 5.1 and 5.2 eligible activities referred to in point.
45.1.3.48. This provision referred to the cost line includes the following subdivisions: the cost of procurement of 29.9. implementation costs;
48.2 contract costs. the company's construction and technical development of the project (if it is not designed to project the date of presentation of the application);
48.3. the company's costs of construction, reconstruction, and repairs in the Recon.
49. That rule 28.1. referred to the cost of the position shall not exceed five percent of the total eligible direct project costs. The project cost plan as one expense items, and its previously unplanned spending to cover the costs of the project's eligible direct costs.
50. The value added tax payments are eligible costs depending on whether the project will purchase goods and services received are for taxable or non-taxable transaction or transactions to provide assurance not provided for in the law "on value added tax".
51. funding from the European regional development fund and the applicable state budget resources, referred to in section 7 of these regulations, does not apply a cost: 51.1. not specified in that rule 45, 46, 47, 48 and 50 point or does not comply with the provisions referred to in paragraph 49 of the eligible cost about limits;
51.2. for which the European Regional Development Fund beneficiaries is not undertaken the implementation of project activities (other than those referred to in paragraph 46 of the rules costs) and for which no payments have been made within the time limit laid down in the Treaty.
52. The costs incurred in the implementation of the project in addition to (including project costs incidence of costs), if the European regional development fund are not available to the recipient of that rule 28.1. the costs referred to in (a), the European regional development fund shall be borne by the beneficiaries of their funds.
53. The implementation of the project plan: 53.1. This provision 14.1 above, for this project, no later than 1 July 2011 from the day of conclusion of the contract;
53.2.14.2. these provisions referred to in the project – not more than three years from the date of conclusion of the contract.
54. The project site is the territory of the Republic of Latvia. Project international cooperation does not apply.

55. Implementation of the project, the European regional development fund, the beneficiary of the funding provided by the Commission on 8 December 2006, Regulation (EC) no 1828/2006 laying down provisions for the implementation of Council Regulation (EC) No 1083/2006 laying down general provisions on the European regional development fund, the European Social Fund and the Cohesion Fund, and the European Parliament and Council Regulation (EC) No 1080/2006 on the European regional development fund and regulations of European Union funds publicity and visual identity requirements laid down by the provision of information and publicity measures.
56. the European regional development fund, the beneficiary of your website on the internet at least once every three months puts up-to-date information on the implementation of the project.
57. the European regional development fund, the beneficiary of this rule 5.1, 5.2 and 5.3 eligible activities referred to in the first purchase for the implementation of a call for competition is made no later than 90 days from the date of this provision in paragraph 31 of the decision or this provision in paragraph 42 of the date of its entry into force.
58. the European regional development fund, the beneficiary according to the regulations on the procedures foreseen in the State budget to fund the European Union funded projects, as well as payment and arrangements for the preparation of declarations of expenditure, the amount specified in the maximum advance payment received pursuant to the provisions of the Treaty.
59. the project is carried out in accordance with the amendments to the regulations establishing procedures for European Union structural and cohesion funds in the participating institutions provide the planning document preparation and implementation of these funds, in so far as these rules otherwise.
60. the cooperation of harmonisation in the responsible authority shall submit the draft amendments to the institution, if the changes are related to: 60.1. project objectives;
60.2. the European regional development fund, the requested change;
60.3. the deadline for implementation of the project;
60.4. the project results to be achieved;
37.6. the total eligible costs of the project amount, or to the distribution of programming over the years.
61. within the rules referred to in paragraph 49 of the eligible costs and the amount previously announced cooperation authority, European regional development fund, the beneficiary of the project can be performed: 61.1. reallocation of costs between these rules, 45.1.3 45.1.1 45.1.2.,.,., and bottom 45.2.1 45.2.2. the costs referred to in points positions, not exceeding five percent of the cost positions reallocated the total amount of the eligible cost;
61.2. reallocation of costs between these rules, 46.47 and 48 the costs referred to in paragraph subheadings. This reallocation of costs to this provision, 45.1.2 45.1.1. and 45.1.3. cost referred to under heading, up to 10 percent of the cost of a transferable within the total amount of the eligible cost;
38.1. the cost of these provisions 45.2.1. reallocation referred to under the heading, up to 10 percent of the cost of a transferable within the total amount of the eligible cost;
61.4. reallocation of costs this rule 29.3., 47.2, 47.3, and 30.0 30.0. subheadings referred to in point not exceeding 20 percent of the cost of the total reallocated the eligible cost;
61.5. this rule 49, paragraph reallocation of costs.
Prime Minister i. Godmanis Welfare Minister i. Muzzle is the Editorial Note: rules shall enter into force on 29 October 2008.