Advanced Search

The Provisions On "operational Programme Infrastructure And Services" Appendix 3.1.5.3.1. Apakšaktivitāt "development Of Hospital Health Care"

Original Language Title: Noteikumi par darbības programmas "Infrastruktūra un pakalpojumi" papildinājuma 3.1.5.3.1.apakšaktivitāti "Stacionārās veselības aprūpes attīstība"

Subscribe to a Global-Regulation Premium Membership Today!

Key Benefits:

Subscribe Now for only USD$40 per month.
Cabinet of Ministers Regulations No 44 in Riga 2009 January 13 (pr. 3. § 45) the rules on the "operational programme infrastructure and services" 3.1.5.3.1. apakšaktivitāt "Appendix of hospital health care development" Issued under the European Union's structural and cohesion funds act 18 paragraph 10 of article i. General questions 1. determines: 1.1. procedures implemented by the operational programme infrastructure and services "services" Appendix 3.1. priority "infrastructure, strengthening of human capital based on the definition of" UR3.1.5.pas "health care infrastructure" activity "STA 3.1.5.3. cionār health care provider development" 3.1.5.3.1. "hospital activity sub health development" (hereinafter activity);
1.2. the responsible authority and liaison body, the distribution of competence between these institutions and cooperation arrangements, as well as the responsible authorities and cooperation agencies functional form of subordination;
1.3. the requirements of the European regional development fund project (hereinafter the project) to the applicant;
1.4 project submission evaluation criteria.
2. The purpose of the activity is in health services the DSB figured network optimization, raising the quality of health services, thus providing quick and effective treatment, rational and effective health care resource allocation and utilization.
3. cooperation activities within the framework of the authority sends the project applicants call for project applications (hereinafter referred to as the notice): up to 1 September 2009 – the first project application selection round and during the period from 1 January 2011 until 1 April 2011 – second round of project submissions (invitation sent at least four project applicants from each planning region): 3.1 the first application round project will invite at least three of the applicants from each project in the planning region;
3.2. the second project application selection round will be invited at least one project from each applicant a planning region.
4. the activity exercised limited project submissions in the form of the selection of two project application selection rounds. If the application of the selection of projects project application is rejected, the liaison body within 15 working days after the decision on rejection of the application the project invite again rejected the project the applicant to submit a project application. Activity within the cooperation project applicant authority again invited to present project submissions of no more than two times each project application selection round.
5. the total funding available for the activity is 135 391 470 dollars, including the European regional development fund co-financing 115 082 749 dollars, and the national public co-financing to 20 308 721 lats, including State budget co-funding: not more than 9 120 237 lat: 5.1 the first application round project total funding does not exceed 60 per cent (81 234 882 Lati) of the total financial volume available to the activity;
5.2. the second project application selection round selects candidates for the remainder of the total funding available for the activity.
6. the activities provided for in the framework of the implementation of the project site is the territory of the Republic of Latvia, by ensuring the availability of hospital health care service recipients nationwide.
II. The responsible authority and cooperation body 7. Responsible authorities functions provide the Ministry of health, the authority of cooperation provides the health statistics and medical technologies State Agency.
8. the cooperation body is the functional supervision of the responsible authority.
9. the competence of the authority responsible: 9.1. provide information on the preparation and submission of the project from the secure application form filling project methodology;
9.2. collect information about activity on legislation that the European Union's structural funds and the cohesion fund management information system and the use of the prescribed order;
9.3. monitoring available in the European regional development fund, including a learning Council of 11 July 2006, Regulation (EC) No 1083/2006 laying down general provisions on the European regional development fund, the European Social Fund and the Cohesion Fund and repealing Regulation (EC) No 1260/1999, article 93 1 and 2 of the enforcement of this principle in the activity level;
9.4. the development of the project application and assessment of evaluation methodology for completion of the form;
9.5. the liaison bodies of the draft agreement and the draft agreement for the implementation of a project;
9.6. to plan and implement information measures on the implementation of the activity.
10. Cooperation authority: 10.1 create project submission Evaluation Commission (hereinafter the Commission) by the Commission for participation of the Ministry of health, and the health statistics and medical technologies State agency representatives, in their capacity of members of the Commission and the managing authorities and responsible authorities, representatives and observers, to elaborate the Statute of the Commission;
10.2. develop project submission evaluation procedures;
10.3. send a limited range of projects – these rules referred to in annex 1 to the project the applicant – an invitation in accordance with the provisions of paragraphs 3 and 4;
10.4. to assess the project submissions, and according to the project the applicant the status of disk Jura issue a management decision or administrative act concerning the application of the project approval, approval with conditions or disapproval;
10.5. the development of draft agreement and the draft Treaty on the implementation of the project;
10.6. the agreement or enter into a contract with the European Regional Development Fund for the beneficiary (hereinafter called beneficiaries) on the implementation of the project. If the infrastructure in which to invest in the project, is a sidewalk ro State or municipal property, the agreement or the agreement on the implementation of the project also with infrastructure owners switch, adding that agreement or contract with the obligation to provide the infrastructure owner infrastructure use health care services for at least five years after the implementation of the project;
10.7. consider funding the purchase of the requested plan and submit it to the procurement monitoring Bureau;

10.8. ensure not to exceed this provision in paragraph 5 the available implementation of the activity the European regional development fund, as well as to ensure the implementation of the project monitoring and control, including verification and implementation of projects to promote the Council of 11 July 2006, Regulation (EC) No 1083/2006 laying down general provisions on the European regional development fund, the European Social Fund and the Cohesion Fund and repealing Regulation (EC) No 1260/1999 93. Article 1 and 2 of the principle referred to in the implementation of the project;
10.9. provide information to beneficiaries on the implementation of the project agreement or the provisions of the Treaty;
10.10. to prepare the European Union funds the payment projections and submit their payment authority and the managing body;
10.11. the beneficiary submitted requests for payment, to approve the amounts of the eligible expenses to prepare payment orders and declarations of expenditure and submit them for inspection leading body;
10.12. ensure the function of the authority responsible for the preparation of the information required;
10.13. collect information about projects, consistent with the laws of the European Union's structural funds and the cohesion fund management information system design and use;
10.14. to plan and implement public awareness measures for the implementation of projects, including the publishing information on activities within the year a transmit projects;
10.15. develop descriptions of the internal procedures of these regulations, 10.7, 10.8 10.6..., 10.10 and 10.11. functions referred to.
III. activities of the implementation conditions and the project applicant and beneficiary requirements 11. applicant of the project can be State and local hospital around Rue Peso authority (hereinafter the authority), which is contracting with health insurance compulsory, obligatory State Agency and which are mentioned in annex 1 of these rules in the box "applicant".
12. the applicant shall submit a Draft project submissions, may be eligible for the total amount of eligible costs not exceeding: 12.1. This provision of the annex under the column "the principal of the Project (including the European regional development fund co-financing and national public financing, which includes the national budget of co-financing and other public co-financing)" specified eligible costs of the project amount;
12.2. This provision of the annex under the column "amount of the project (including the European regional development fund co-financing and national public financing, which includes the national budget of co-financing and other public co-financing), create a project of the Association of the applicant" indicate the amount of eligible costs: project amount 12.2.1., related to the project the applicant associations (annex 1), where the applicant on the filing date of the application for the project is provided from a reorganization of the registration in the commercial register by adding another project to the applicant authority, referred to in annex 1 to these rules as the project or another project the applicant Association, taking over the combined body;
12.2.2. project the amount that the authority be granted for cooperation during project implementation, if the applicant for the project until 30 June 2009 to enroll and up to 30 June 2010 provides the reorganisation of registration in the commercial register, adding another project to the applicant authority, referred to in annex 1 to these rules as the project or another project the applicant Association, taking over the combined body;
12.3. in paragraph 13 of these regulations specified the additional eligible costs of the project amount which the liaison body shall grant the applicant a period of Project 2010 to 30 June 2010 and 30 September, if the following conditions are met: 12.3.1. applicant to draft 30 June 2010 provides the reorganisation of registration in the commercial register, adding another project to the applicant authority, referred to in annex 1 of these rules under "Project applicant", taking up a combined body;
12.3.2. the project applicant in the commercial register of the reorganisation of the authority until 30 June 2009, adding another project to the applicant authority which defines the rules for 1 mi. Add Kuma box "applicant", taking over the nojam authorities amalgamated;
12.3.3. the merged institutions located in different administrative a whole. threshing;
12.3.4. Association of the institutions is spatially uniform.
13. activities within the additional eligible costs of the project amount to 6 000 000 lats from the rule referred to in paragraph 5, the total available funding to the activity that the liaison body shall be distributed as follows: 13.1. each project applicant who meets this rule 12.3. the conditions referred to in point, for each authority to combine 500 000 lats in accordance with this rule 12.3. off the cījum referred to in common activities within combine number of institutions is not more than 12;
13.2. each project applicant who meets this rule 12.3. the conditions referred to in one additional eligible costs of the project amount determined by dividing the total additional amount the eligible cost with a number of institutions to combine that meet this rule 12.3. the conditions referred to in paragraph below, where the overall activity within the number of institutions to combine at least 13 14 project application consists of the completed project submission form (annex 3) and the following separate cauršūt (caurauklot), father of Kuma 14.1. the applicant's project: value added tax payer registration certificate, if the applicant is registered with the State revenue service value added tax register of taxable persons;
14.2. the project applicant questionnaire-application of value added tax in accordance with the laws and regulations on the application of value added tax to fund the European Union funded projects;
14.3. the project authorisation the applicant signing the project application and related documentation supporting documents certified copies;
14.4. documentation showing the applicant 14.4.1. project: ownership of the infrastructure, which should invest for the European regional development fund, the project applicant is the owner of the infrastructure;

14.4.2. the infrastructure owner (national or local) agreement that Pro Ject the applicant made in infrastructure and close cooperation with the authorities of the agreement or contract for the project implementation, determining the infrastructure owner to ensure infrastructure health care through the provision of serve you for at least five years after the implementation of the project (4. Add Kuma), if the applicant is not the owner of the infrastructure;
14.5. each of the institutions that provide the financing for the project (to finance), written proof of funding (līdzfinan volume);
14.6. project documentation from the applicant stating: the project applicant 14.6.1. plans to carry out reorganisation (if applicable);
14.6.2. the project the applicant made the reorganization of commercial register registration, adding another project to the applicant authority, referred to the rules of annex 1, Kuma taking over the combined commitment of the institution (if applicable);
14.7. the proof of the authority, the certifying authority with the agreement of the joint project with the applicant, the applicant for carrying out the project, taking over the combined commitment of the institution (if applicable).
15. the project applicant project application form shall be drawn up pursuant to annex 2 of these provisions laid down in point 1 of the administrative criteria.
16. the project applicant project application form contents dealt with in accordance with the provisions of this annex 2 in paragraph 2 and the eligibility criteria set out in annex 2 set out in paragraph 3, the threshing quality fell.
17. Fill in the project application, the applicant of the project required project cost plan according to this rules set out in chapter V of the eligible activities eligible for the State budget and the European regional development fund costs and limits, as well as the expected costs of the project and ensure compliance with project objectives, planned activities and anticipated results. The European regional development fund co-financing and Government funding for the project in the application intends only the eligible cost of the project.
18. the project applicant, analyzing the project's socio-economic costs and benefits, the analysis takes into account such essential requirements: 18.1. project duration is 15 years from the date of approval of the application;
18.2. the socio-economic indicators of return: 18.2.1. maintenance costs reduction;
18.2.2. the benefits of the human lifespan extension and faster return to the labour market;
18.2.3. indirect benefits from infrastructure improvements;
18.2.4. other project applicants identify indicators in money terms;
18.3. social discount rate 5.5 percent;
18.4. depreciation charges and development part is 3.5 percent of the year the country provided paid health care and emergency medical services (including patient contributions).
19. the project applicant project application submitted to the liaison body of the 35 calendar days after the date of dispatch of the invitation.
20. the project applicant information about this rule referred to in paragraph 36 of the conditions of implementation submitted to the authority for consideration of cooperation within 21 calendar days after the rules referred to in paragraph 36 the date of dispatch of the decision.
21. the project applicant project application submitted to the authority of the cooperation this provision 19. the time limit referred to in paragraph 1 in one of the following ways: 21.1. electronic form, by sending the document by e-mail, signed with a secure electronic signature according to the regulations on the procedure for the circulation of electronic documents;
21.2. sending by post in paper form in triplicate (original and two copies) indicate, respectively, the "original" or "copy", accompanied by an electronic copy of the electronic medium;
21.3. the submitting person in paper form in triplicate (original and two copies) indicate, respectively, the "original" or "copy", accompanied by an electronic copy of the electronic medium.
22. the maximum permitted by the European regional development fund co-financing amount is 85 percent of the project's total eligible cost.
23. the national public co-financing of the project is not less than 15 percent of the total eligible cost of the project and consists of: 23.1. State budget authorities available government funding in accordance with the laws and regulations that determine the order in which the expected State budget Fund of the European Union for the implementation of projects co-financed;
23.2. public corporations, local authorities and municipal corporation in the State of the budget available for the co-financing of up to 9 120 237 lats, which is divided into the following: 23.2.1. to 15 percent from 12.1 of these rules, and referred to in paragraph 12.2 of the eligible costs of the project amount, if this provision in the draft annex 1. the status of the applicant as specified in the specialized hospital or specialised centre;
23.2.2. these provisions 13.21 percentage of 12.1 and 12.2 in the mentioned project eligible cost amounts, if this provision in the draft annex 1. the status of the applicant designated as local hospitals or regional multi purpose multi purpose hospital;
23.3. the project co-financing by the applicant or municipality.
24. The project's minimum eligible cost total is 316 261 lats, the maximum eligible cost of ma's brief 10 542 060 Lati.
25. cooperation authority transferred to the beneficiaries of the project advances to the European regional development fund and, if the project is expected from the State financial budget, taking into account the time limits and procedures laid down by the agreement or the agreement on the implementation of the project, in the following order: 25.1.30 percent, if the planned project duration is 12 months;
25.2.25 percent, if the planned project duration is from 13 to 24 months;
25.3.20 percent, if the planned project duration is from 25 to 36 months.
26. the funding recipient (if the applicant is mentioned in annex 1 of these rules) in the framework of the activity can implement only one project in each of the two project application selection round.
27. The beneficiaries of the first tender issued no later than three months from the date of approval of the application.
28. The beneficiary all project incidence arising during project implementation, covered from own resources.

29. The beneficiary shall ensure that up-to-date information on the progress of the implementation of the project to the funding recipient institutions's homepage on the internet at least once every three months.
IV. Project submission evaluation criteria, evaluation and decision making project submissions 30. judged by this provision of the annex 2 in paragraph 1, the administrative criteria, specified in paragraph 2, the eligibility criteria specified in paragraph 3 of the specified quality criteria and specified in paragraph 4, the funding criteria.
31. the project submissions valued according to annex 2 of these rules 1, 2 and 4, paragraph administrative, compliance and funding criteria: 19.3. "Yes" (meet), "Yes" provided "(provided that the applicant carries out cooperation projects in specific activities of the authority in accordance with the rules laid down in paragraph 36 to project could properly exercise) or" no "(not match) scored 2 of the annex to these provisions, 1.6 1.7. , 1.8, 1.9, 1.10, 1.11, 1.12, 1.13, 1.14., 2.1., 2.2., 2.3., 2.7., 2.8., 2.9, 2.10, 2.11, 2.12, 2.13, 2.14, 2.15, 2.16, 2.17, 2.19 and 2.20. referred to evaluation criteria;
31.2. "Yes" () or "no" (not match) scored 2 of the annex to these provisions 1.1., 1.2., 1.3, 1.4, 1.5, 2.4, 2.5, 2.6, 2.18, 2.21., 4.1., and 4.2. evaluation criteria mentioned in point.
32. the project submissions valued under the provisions of paragraph 3 of annex 2 of the quality criteria referred to under apakškritērij, assigning the appropriate number of points: 32.1. Annex 2 to these regulations, paragraph 3 of the quality criterion 3.3, 3.6, 3.7, 3.8, 3.9, 3.10 and 3.12. apakškritērij assessment referred to provides additional points;
32. This provision of the annex referred to in paragraph 3, the quality criteria 3.1., 3.2., 3.4 and 3.5. apakškritērij assessment referred to is appropriate, if the minimum received ratings of at least one point.
32.3. This provision of the annex referred to in paragraph 3, the quality criteria referred to in paragraph 3.11. apakškritērij assessment is appropriate, if the minimum rating is received at least two points.
33. project submissions valued on the basis of this provision listed in annex 2 evaluation criteria and cooperation bodies for the evaluation of the application of the draft agenda, through the authorities responsible for the application of approved project assessment and evaluation method of filling out a form.
34. the responsible authority shall publish on its homepage on the internet (www.vm.gov.lv) the project application and assessment of evaluation method of filling out a form, as well as the project application form filling methodology. The liaison body shall publish on its homepage on the internet (www.vsmtva.gov.lv) project for the evaluation of the application procedure.
35. cooperation authority approves the application, the project if all those provisions of annex 2, paragraph 1 administrative criteria of annex 2 of these provisions referred to in paragraph 2, the conformity criteria and annex 2 referred to in paragraph 4 of the funding criteria evaluated with "Yes" and all Annex 2 of these provisions referred to in paragraph 3 of the quality criteria of assessment are appropriate.
36. Where the application has at least one of these rules 31.1. in assessing the criteria referred to in subparagraph with "Yes" and the other provided by "Yes", but in all these rules referred to in paragraph 31.2 scoring criteria with "Yes" and annex 2 to these regulations, paragraph 3 of the quality assessment criteria are appropriate cooperation authority project application, and the applicant of the project 20 these provisions within the time limit referred to in paragraph shall take the decision on the cooperation project approval conditional on certain transactions to project could properly exercise. Project approval with conditions may include: 36.1. planning of project activities according to the clarification this provision 2.2.1., 2.2., 2.8., 2.9, 2.11, 2.12, 2.13, 2.14, 2.15, 2.16, 2.17, 2.19 and 2.20. criteria of assessment of point expressed instructions (time schedule changes, up to the time of the planned project, activity or breaking off), which can affect the quality of the assessment results;
36.2. the project financing plan clarification according to annex 2 of these regulations 1.14, 2.7, 2.10, 2.11, 2.12, and 2.16) (criterion rating instructions expressed in (reduction or exclusion, compliance arithmetical), which can affect the quality of the assessment results;
36.3. the project technical clarification of the application of these provisions, according to annex 2 1.6, 1.7, 1.8, 1.9, 1.10, 1.11, 1.12, 1.13, 1.14., 2.3., 2.8., 2.9, 2.10, 2.11, 2.12, 2.13, 2.14, 2.15 and 2.16. criteria of assessment of point expressed instructions, which can affect the quality of the evaluation results.
37. cooperation authority rejects the project application, if at least one of these rules 2. referred to in paragraph 1 of the annex to administrative criteria referred to in paragraph 2 or in the eligibility criteria referred to in paragraph 4, the funding criteria assessed by the "no" or at least one of these rules, annex 2, paragraph 3 of the quality assessment criteria is not considered appropriate.
38. after the applicant received the draft of this provision in the conditions referred to in paragraph 36 of the execution, the authority shall assess the conditions of cooperation and draw up an opinion on the implementation of the decision no later than 60 calendar days of the rule referred to in paragraph 36, the date of dispatch of the decision: 38.1. the applicant project provides that the conditions referred to in paragraph 36 of the enforcement of this provision 20. the time limit referred to in paragraph , the liaison body shall prepare a positive opinion on the conditions;
38.2. the project the applicant does not provide that the conditions referred to in paragraph 36 of the execution or enforcement of the provisions do not provide that rule 20, the time limit referred to in the opinion of the authority on cooperation conditional execution is negative and the project application shall be deemed to have been rejected.
39. The rules referred to in paragraph 38 of the opinion, Justice shall be carried out as in the decision, which contains the conditions to control it.
V. European regional development fund project supported activities, eligible and non-eligible costs

40. The project, taking into account the provisions laid down in point 41 of the passengers, the consumer is eligible for such State of paid health care and emergency medical service infrastructure development activities as well as information and publicity activities: 24.9. Building external refurbishment and reconstruction, energy efficiency bošan farm;
40.2. the refurbishment and reconstruction surgery;
40.3. the refurbishment and reconstruction of infrastructure associated with the surgery type profiles, which are indicated in annex 5 of these regulations;
40.4. renovation and reconstruction of the maternity wards;
25.2. infrastructure refurbishment and reconstruction related to maternity-type profiles, which are indicated in annex 5 of these regulations;
40.6. refurbishment and reconstruction of infrastructure associated with the therapy type profiles, which are indicated in annex 5 of these regulations;
40.7. renovation and reconstruction CPR unit;
25.4. the refurbishment and reconstruction of the reception section;
25.4. the refurbishment and reconstruction Department, which supports the healing process: 40.9.1. disinfection and sterilisation service;
40.9.2. laboratory and diagnostic, patient functional evaluation departments;
40.9.3. Department of Pathology with the morgue or the premises for the storage of the dead;
40.10. construction of new buildings;
40.11. technology delivery and Assembly;
34.64. project information and publicity.
41. When planning this provision referred to in paragraph 40 of eligible project activities, must be taken into account the following limitations: 25.5 24.9. these provisions. the operations referred to in point is supported, with a total building area of at least 70 percent of the total building area is directly used state of paid health care and emergency medical services;
41.2. this rule 40.2. the activities referred to in subparagraph renovējam and compensated under the operation number of the medicinal product shall be determined by dividing the operations unit, the number of operations performed a year with 800 (received round down to an integer);
41.3. this rule 40.3. referred to action is supported, if the operation of the unit operations performed per year at least 800;
25.7. this rule 40.3. activities referred to in those provisions, where 41.3. limits referred to is not met, are eligible for the surgery type profile which, in adjusting the existing number of beds to the existing load to 85 percent occupancy, the number of beds at least 10;
25.8. This provision and 25.2 25.1. activities referred to in paragraph below is to be welcomed, if provided by the institution of confinement number of the assistance service in the previous calendar year at least 300;
25.8. this rule 40.6. referred to action is supported, if the institution mean therapy type profile bed per profile is at least 20;
25.9. this rule 40.6. the activities referred to in point a, where this provision is 25.8. referred to limit is not met, are eligible for the therapy of type profile which, in adjusting the existing number of beds to the existing load to 85 percent occupancy, the number of beds is at least 20;
41.8. this rule 25.4.40.7 and below aims at eligible if at least one of the following requirements: 41.8.1. the operations unit, the number of operations performed in at least 800 years;
41.8.2. institution of confinement provided assistance services per year at least 300;
41.8.3. the average therapy the institution profile the number of beds to one profile is at least 20;
41.9. this rule 25.4. the activities referred to in point, where this provision is 26.0. the requirements referred to in subparagraph are not fulfilled, the refurbishment and reconstruction support in the following areas: 41.9.1. uzgaidīšan and patient registration;
41.9.2.-the patient viewing, and investigation;
41.9.3.-therapeutic procedures and manipulation;
41.9.4. room patients the hygiene needs, providing an enclosed shower or bath facilities;
41.9.5.-patients with infectious diseases isolation and observation of patients;
41.9.6. corridor and staircase;
40.10 41.10. the provisions referred to in the action are eligible if the new building area is from 40 to 100 square meters on the bed and the total area of the new building at least 70 percent of the total building area is directly used state of paid health care and emergency medical services.
42. This provision of the project referred to in paragraph 41 of the limitation of actions supported, project applicants, the following information and data: 42.1. the first application round project project applicants to limit used for the calculation of the 2007 statistical data;
26.2. the second project application selection round of project applicants to limit calculation uses the 2010 statistics.
43. This provision, 25.0 25.0 24.9.,.,.,., 40.4 40.5 40.6., 40.7, 25.4 25.4. States and eligible actions shall include the following items: the eligible cost 43.1. sketch project preparation costs;
43.2. technical project preparation costs;
43.3. the technical evaluation of the project independent costs;
43.4. reconstruction or renovation costs;
43.5. equipment costs to ensure access for persons with functional disabilities;
27.1. the process of treatment required for the delivery of equipment and incorporated into the Assembly costs;
27.2. internal communication and inženiertīkl of development and creation costs;
43.8. works autoruzraudzīb charges;
43.9. building services.
44. The provision laid down in subparagraph 40.10 eligible activities eligible costs include the following headings: 44.1. sketch project preparation costs;
44.2. technical project preparation costs;
44.3. the technical evaluation of the project independent costs;
27.6. the cost of the works;
27.7. equipment costs to ensure access for persons with functional disabilities;
27.7. the process of treatment required for the delivery of equipment and incorporated into the Assembly costs;
44.7. internal communication and inženiertīkl of development and creation costs;
27.8. the works autoruzraudzīb charges;
27.9. building services.
45. This provision is laid down in paragraph 40.11 eligible activities include technology deliveries and Assembly costs.
46. The provisions referred to in paragraph 45 of the project's eligible cost of funding will not exceed zīcij po 50 percent from 12.3. these provisions States the additional amount of the eligible cost.

47. The provision laid down in subparagraph 34.64. eligible actions include costs directly related to the mandatory information and publicity measures in accordance with the laws and regulations on the information and publicity requirements of European Union funds projects.
48. The rules referred to in paragraph 47 of the draft heading of eligible costs funding does not exceed 0.5 percent of the total eligible project funding.
49. This provision, 25.0 25.0 24.9.,.,.,., 40.4 40.5 40.6.,.,., 40.7 25.4 25.4 40.10 and 40.11,. activities referred to in the total eligible direct costs of the project amount.
50. This provision 34.64. referred to action creates the total project eligible indirect cost amount.
51. the estimated cost of the project will not be considered eligible costs, shall not exceed five percent of the total eligible direct costs of the project amount. Application of project cost plan as one expense items, and project its previously unplanned spending to cover the costs under this provision, 25.0 25.0 24.9.,.,.,., 40.4 40.5 40.6.,.,., 40.7 25.4 25.4 40.10 and 40.11, in this provision and 41, 43 and 44, to the conditions laid down in the cooperation agreement with the above.
52. funding from the European regional development fund and the State budget resources do not apply and are not included in the application of the project costs: 52.1. not specified in that rule 43, 44, 45 and 47;
52.2. above this rule 48 46, and 51 above cost lines;
52.3. not conforming to these rules 12, 13, 22, 23 and 24. laid down in point total eligible costs of the project limits;
52.4. for which payments are made before the entry into force of these regulations;
52.5. for which payments are made after the expiry of the implementation of the project;
52.6. which is not justified by the appropriate supporting documents, or costs incurred by legislative non-compliance.
53. The value added tax payments are eligible costs depending on whether the project delivered goods and services received are for taxable or non-taxable transaction or transactions to provide assurance not provided for in the law on value added tax.
VI. final question 54. the responsible authority during the period from 1 October 2010 to 31 December 2010 to ensure the amendment of these rules, a division of this provision referred to in paragraph 5 does not obtain financial resources between this provision of the annex under "Project applicant" mentioned in the second application round project project applicants.
The Prime Minister's site-traffic Minister a. Health Minister shlesers i. Morris Editorial Note: rules shall enter into force on the 11 February 2009.
 
1. the annex to Cabinet of Ministers of 13 January 2009. of Regulation No. 44 hospital health services according to the laws of outpatient and inpatient health care provider development Health Minister i. Morris annex 2 of the Cabinet of Ministers of 13 January 2009 Regulations No 44 of the draft application evaluation criteria of the operational programme number and name 3.
Infrastructure and services priority number and the name of 3.1.
Infrastructure strengthening Measures of human capital and title of the 3.1.5.
Health care infrastructure activity number and name 3.1.5.3.
Hospital health care provider development Apakšaktivitāt number and name 3.1.5.3.1.
Development of hospital health care project application selection way limited the project application selection responsible authority Ministry of health no PO box
Criteria for the assessment of the minimum number of points/Benchmark impact on decision making 1. Administrative criteria 1.1.
The European regional development fund project, the applicant is invited to submit to the European regional development fund project application (yes/no) NA/N 1.2.
The European regional development fund project, the applicant of the European regional development fund project application has been submitted to the authorities of cooperation within the time specified in the invitation Yes/No/NA N 1.3.
The European regional development fund project application is drawn up into yes/no/NA N 1.4.
The European regional development fund project application is made in the Latvian language (yes/no) NA/N 1.5.
The European regional development fund project application financial statement is made in the Yes/No/NA N 1.6.
The European regional development fund project application is fully completed and drawn up according to the project application form (yes/no) NA/P 1.7.
The European regional development fund project application laid down in the annex attached yes/no NA/P 1.8.
The European regional development fund project application is without deletions, aizkrāsojum, not specified amendments, deletions and additions (yes/no) NA/P 1.9.
The European regional development fund project, the original application is cauršūt (caurauklot) (if the European regional development fund project application filed in paper form) Yes/No NA/P 1.10.
The European regional development fund project application filed in electronic form on an electronic data carrier (if the European regional development fund project application filed in paper form) Yes/No NA/P 1.11.
The European regional development fund project application is designed according to the circulation of electronic documents regulatory laws (where the European regional development fund project application filed in electronic form of a document) (yes/no) NA/P 1.12.
The European regional development fund project application is signed by an authorised person (yes/no) NA/P 1.13.
If the European regional development fund project application attachments are not Latvian language documents is attached a certified translation of the Latvian language in the document in accordance with the laws and regulations on the procedures for translation of documents in which the national language (yes/no) NA/P 1.14.
The European regional development fund project application financial statement is accurately and correctly arithmetic developed yes/no NA/P 2. Eligibility 2.1.
European regional development fund, the project submission complies with the conditions of implementation of the activity (yes/no) NA/P 2.2.
European regional development fund, the project cost planned meet the conditions required for the implementation of the activity (yes/no) NA/P 2.3.

European regional development fund, the project's planned activities are in fixed infrastructure health authorities organize in support of a room renovation, reconstruction, construction of new buildings, the medical staff working environment or patient treatment, improvement of the environment and meet the conditions required for the implementation of the activity (yes/no) NA/P 2.4.
The European regional development fund, the project is focused on health care quality, ensuring a quick and effective treatment, rational and effective health care resource allocation and use the Yes/No/NA N 2.5.
European regional development fund, the project is intended to improve the infrastructure of the hospital health care institution yes/no/NA N 2.6.
The European regional development fund, the application of the project activities is based on statistical analysis and cost-effectiveness, impact assessment of activities proposed, compared with alternative activities yes/no/NA N 2.7.
The European regional development fund project funding is from late 316 261 to lats 10 542 060 yes/no NA/P 2.8.
European regional development fund, the project's planned activities in the application are clearly defined, justified, appropriate project time schedule and focus on the achievement of the objectives of the project, the target group's needs (yes/no) NA/P 2.9.
The European regional development fund project expected results planned in the application and it is clearly defined, reasonable, measurable, according to project implementation time schedule and focus on the achievement of the objective of the project, the target group's needs (yes/no) NA/P 2.10.
The European regional development fund project expenditure planned in the application are proportionate, justified, necessary for the European regional development fund and provides for the implementation of the project (physically measurable) results (yes/no) NA/P 2.11.
To the European regional development fund project in the end of the first year for an amount of not less than 30% from the European regional development fund project funding (yes/no) NA/P 2.12.
To the European regional development fund project in the end of the second year for an amount of not less than 60% of the European regional development fund project funding (if applicable) Yes/No NA/P 2.13.
The European regional development fund project implementation duration does not exceed 18 months, if the European regional development fund, the project's total eligible cost amount is up to 999 999 lats (yes/no) NA/P, 2.14.
The European regional development fund project implementation duration does not exceed 24 months, if the European regional development fund, the project's total eligible cost amount is from 1 000 000 lats to the lats 2 999 999 (yes/no) NA/P 2.15.
The European regional development fund project implementation capacity is sufficient and reasonable yes/no NA/P 2.16.
The European regional development fund within the framework of the project planned activities do not overlap with the activities financed by other structural funds of European Union activities and of other financial instruments within the Yes/No NA/P 2.17.
The European regional development fund projects planned in the publicity and information dissemination activities are in accordance with the legislation on the information and publicity requirements of European Union funds projects (yes/no) NA/P 2.18.
European regional development fund, the project applicant is a hospital health care authority, which has a contractual relationship with the health compulsory insurance State Agency and which is designed as a hospital in 2010 (yes/no) NA/N 2.19.
European regional development fund, the project applicant has available sufficient financial resources to finance the project yes/no NA/P 2.20.
Infrastructure for the conduct of the European regional development fund contribution is the European regional development fund project in the possession of the applicant or the owner of the infrastructure has been submitted (national or local) proof that the holder agrees that the European regional development fund, the project applicant will make infrastructure investments and it will be used for health services for at least five years after the project implementation (yes/no) NA/P 2.21.
The European regional development fund project, the applicant has stated that it will provide funding from its own resources to increase project costs in the case of the Yes/No/NA N 3. Quality criteria 3.1.
The European regional development fund, the application of the project activities is based on 1/N 3.1.1. 
Application of justification of project, analyzing statistics and cost effectiveness, the evaluation of the impact of the proposed activity, compared to alternative activities, welcome 1 3.1.2. 
Application of justification of project, analyzing statistics and cost effectiveness, the evaluation of the impact of the activity, compared with the alternative activity, judged negatively 0 3.2.
The European regional development fund, the project focused on cost effective healthcare services, if applicable (criterion applies only to those projects, which provided support services) 1/N 3.2.1.
Implementation of the project, the revenue from the project development services will be able to settle with the provision of the services directly and indirectly associated infrastructure depreciation costs 2 3.2.2.
Implementation of the project, the revenue from the project development services will be able to settle with the provision of the services directly related infrastructure depreciation costs 1 3.2.3.
Implementation of the project, the revenue from the project development services can not be settled with the delivery of services directly related infrastructure depreciation costs 0 3.3.
The European Regional Development Fund for the implementation of project readiness Criteria provides additional points 3.3.1.
The project with a room renovation, reconstruction and new building construction activities have developed the technical design or project is not intended to take the room renovation, reconstruction and new construction of buildings 2 3.3.2.
The project is part of the renovation of premises, reconstruction and new building construction activities has developed the technical design 1.5 3.3.3.
The project with a room renovation, reconstruction and new building construction activities have developed draft sketch 1 3.3.4.

The project is part of the renovation of premises, reconstruction and new building construction activities have developed the sketch project 0.5 3.3.5.
The project with any room renovation, reconstruction and new building construction-related activity has developed the technical design or sketch project 0 3.4.
The European regional development fund project implementation duration 1/N 3.4.1.
The project duration is 18 months 3 to 3.4.2.
The project duration is from 19 to 24 months 2 3.4.3.
The project duration is from 25 to 36 months 1 3.4.4.
The project duration is from 37 months and longer 0 3.5.
The European Regional Development Fund for the maintenance of the results of the project duration 1/N 3.5.1.
The results achieved by the implementation of the project will be maintained for 10 years and longer 2 3.5.2.
The results achieved by the implementation of the project will be maintained for five to nine years 1 3.5.3.
The results achieved by the implementation of the project will be maintained for up to four years 0 3.6.
The European Regional Development Fund for the financing of the project plan and planned to spend, in cooperation with the health authorities of the members of the Association Criteria provides additional points to 3.6.1.
The project the applicant does not have plans to add health services 2 3.6.2.
Project applicant has provided planned health care institutions or part of them to add to the application for the project 2 3.6.3.
The applicant certifies the project that will provide health care institutions or part of them to add to the European regional development fund project to completion 1 3.6.4.
The project applicant is not provided by any health authority planned to add to the project or the application is not assured that provide at least one health care body to the European regional development fund to complete a project 0 3.7.
The European regional development fund, the project promotes the hospital health care provider network optimization criterion gives you additional points 3.7.1.
Project applicant combines three or more representatives of the arc project 2 3.7.2.
Project applicant combines two project representatives of applicant 1 3.7.3.
The project the applicant represents a single project of the arc representative 0 3.8.
The European regional development fund, the project promotes the priorities "of the balanced development of the territory" the introduction of Criteria provides additional points to 3.8.1.
The project is expected to be implemented in the territory of the local government development index below-0.326 2 3.8.2.
The project is expected to be implemented in the territory of the local government development index between-1 to 0.247 3.8.3 0.325.
The project is expected to be implemented in the territory of the local government development index above 0.248 0 3.9.
European regional development fund, the project contributes to the priorities of the "macroeconomic stability" criterion, additional points for 3.9.1.
The project planned investments average per population registered in the service area is up to 299 lats 2 3.9.2.
The project planned investments average per population registered in the service area is from 300 to 599 lats 1 3.9.3
The project planned investments average per capita registered crew area is 600 lats from 0 3.10.
European regional development fund, the project contributes to the priorities of the "sustainable development" provides additional Criteria points 3.10.1.
The project is planned for activities directly focused on the protection of the environment 2 3.10.2.
The project is planned activities that are not directly focused on the protection of the environment 1 3.10.3.
The project is not planned actions aimed at the protection of the environment 0 3.11.
European regional development fund, the project contributes to the priority of "equal opportunity" 2/N 3.11.1.
The project provides for four or more specific activities the principle of equal opportunities, in particular by improving accessibility for people with functional disabilities 3 3.11.2.
The project provides for one to three specific activities the principle of equal opportunities, in particular by improving accessibility for people with functional disabilities 2 3.11.3.
The project is not intended for specific activities the principle of equal opportunities, in particular by improving accessibility for people with functional disabilities 0 3.12.
European regional development fund, the project contributes to the priority "information society" provides additional Criteria points 3.12.1.
The project is intended to create or improve internal communications network 1 3.12.2.
The project is not intended to create or improve communication networks 0 4. Funding criteria 4.1.
The European regional development fund project application meets 1.1., 1.2., 1.3, 1.4, 1.5, 2.4, 2.5, 2.6, 2.18, 2.21. referred to evaluation criteria, as well as 3.1., 3.2., 3.4., 3.5. valuation criteria referred to in point each has received at least one point 3.11 assessment criteria referred to in subparagraph has received at least two points and has received at least 10 point, judging by quality criteria yes/no/NA N 4.2.
Line up the in point 4.1 "Yes" reviewed the European regional development fund project applications in order of priority, starting with the most points winning the project application, the application of the project has enough activity to available funding, the Yes/No/NA N notes.
1. N – if you received a negative rating, the application is rejected.
2. P – criteria that may make a decision on project approval with conditions (project shall ensure full compliance with the criteria laid down in the decision).
3. NA – not applicable.
Health Minister i. Morris attachments 3 and 4 ZIP 366kb Ministry of health submitted to the annex 3 of the Cabinet of Ministers of 13 January 2009 Regulations No 44 Health Minister i. Morris annex 4 of the Cabinet of Ministers of 13 January 2009 Regulations No 44 Health Minister i. Morris annex 5 of the Cabinet of Ministers of 13 January 2009 Regulations No 44 profile Division no PO box
The profile type profile bed profile classification code 1.
Therapy – child Allergology 08 2.
Allergology-07 3 adults.
Dermatoveneroloģij-child 57 4.
Dermatoveneroloģij-adult 56 5.
Endokrinoloģij-child 12 6.
Endokrinoloģij-adult 11 7.
Gastroenterology-06 8 children.

Gastroenterology-adult 05 9.
Geriatric 82 10.
Hematology-child 16 11.
Hematology, adult 15 12.
Infection – child 14 13.
Infection-adults 13 14.
Temporary social care 79 15.
Cardiology – adult 03 16.
73 17 addiction.
Renal diseases, child 18 18.
Renal diseases: adult 17 19.
Neurology-adult 48 20.
Neurology-children's 49 21.
Not carrying the newborn 60 22.
Oncology 39; 38 23.
Palliative care 85 24.
The paediatric Pack.
59 25.
Psychiatry-child 51 26.
Psychiatry – adult 50 27.
Pulmonology-64 28 children.
Pulmonology-63 29 adults.
Radiology 58 30.
CPR 69; 68 31.
Rehabilitation-10 32 children.
Rehabilitation-adult 09 33.
Rheumatology-75 34 children.
Rheumatology-adult 74 35.
Therapy 02 36.
Toxicology 71 37.
Tuberculosis: children 46 38.
Tuberculosis – adult 44 39.
General 01 40.
Baby 81; 61 41.
Surgery of burns-child 31 42.
Burns-adult 30 43.
Vascular Surgery 70 44.
Gynaecology-42 45.
Surgery – child 21 46.
Surgery-adult 20 47.
Neurological-23 48 children.
Bring – adult 22 49.
Ophthalmic 53; 52 50.
Oncology 38; 39 51.
Orthopaedic-33 52 children.
Orthopaedic-adult 32 53.
Otorhinolaryngology-55 54 children.
Otorhinolaryngology-adult 54 55.
Plastic and reconstructive surgery 78 56.
Proktoloģij-62 57.
Cardiac surgery-children 27 58.
Cardiac surgery-adult 26 59.
Purulent surgery – child 77 60.
Purulent surgery – adults 76 61.
Thoracic surgery-children 25 62.
Thoracic surgery-adult 24 63.
Transplant 86 64.
Orthopaedics-children 29 65.
Orthopaedic surgery-adult 28 66.
Urology-child 35 67.
Urology-adult 34 68.
Dental-37 69 children.
Dental care-adult 36 70.
Maternity maternity 40 71.
Pregnancy pathology 41 72.
Not carrying the newborn 60 73.
Healthy newborn maternity chapter 93 74.
Neonatal CPR Health Minister Morris I.