Cabinet of Ministers Regulations No. 151 in Riga 2009 17 February (pr. No 13, 5. §) rules on "operational programme human resources and employment ' 1.2.1.1.2. in Appendix apakšaktivitāt" vocational education teachers involved in the promotion "of competence issued under the European Union's structural and cohesion funds act 18 paragraph 10 of article i. General questions 1. determines: 1.1. procedures implemented by the operational programme" human resources and employment ' priorities Appendix 1.2. "education and literacy" UR1.2.1.pas this measure "vocational training and skills development General 1.2.1.1." activity "professional education system development , quality, relevance and attractiveness "1.2.1.1.2." apakšaktivitāt vocational education teachers involved in the promotion of competence "(hereinafter referred to as apakšaktivitāt);
1.2. requirements the project applicant;
1.3. the application of the project evaluation criteria;
1.4. the responsible institution and liaison body, the distribution of competence between these institutions and cooperation arrangements, as well as the responsible authorities and cooperation agencies functional form of subordination. 2. the purpose of the Apakšaktivitāt is to raise in initial vocational education, vocational education and vocational education and the teaching practice supervisor competence, to ensure the renewal of skills, in particular in relation to the modernized professional education content, innovation and knowledge-based economy, as well as improve vocational teacher training. 3. the meaning of these provisions initial vocational training includes professional education, vocational training and vocational secondary education, which provides the first, second and third level vocational qualifications. 4. the purpose of the Apakšaktivitāt reached in implementing the provisions of paragraph 6 of these activities and contribute to WMD the following monitoring indicator: outcome indicators 4.1-5000 professional education educators who have developed their competence and qualifications, of which: 4.1.1 Riga planning region – 2400;
4.1.2. Vidzeme planning region – 500;
4.1.3. in the region of Kurzeme-700;
4.1.4. Zemgale planning region – 500;
4.1.5. the Latgale planning region – 900;
4.2. results indicators – General and vocational education, the proportion of teachers who have developed their competence in vocational and general education, in relation to the total number of teachers-50 percent. 5. the purpose of the group is Apakšaktivitāt in professional education in vocational initial and further training, vocational education teacher, involved in practice managers, artisans involved in vocational education (crafts) academic staff involved in the preparation of teachers and learners in the teaching of vocational qualifications. 6. The project is supported by the following: 6.1 in initial vocational education, vocational training and vocational education teachers involved in the training and professional and pedagogical competence required courses for promotion development and implementation;
6.2. the supervisor of the pedagogical competency, or professional and pedagogical competence development courses required for the development and implementation;
6.3. initial vocational training and continuing education of teachers involved in professional and practice Manager internship and experience exchange activities at the sector of economic activity, to the post of master of the offender and other vocational training institutions;
6.4. measures of vocational teacher training to improve the professional training under the streamlined content development needs of vocational training and labour market requirements;
6.5. the support measures for the vocational qualification of teachers abstraction;
6.6. the innovative solution development and implementation of vocational education teacher and supervisor in the preparation and further education;
4.2. e-resource and environmental e-learning solutions (including information and communication technology subject learning or practical training and teaching practice), or the use of information technology in improving the skills of educators in relation to course content or teaching methods, if the improvement project. 7. Apakšaktivitāt projects implemented within the co-financed from the European Social Fund. Apakšaktivitāt total available for public funding is $7441454, consisting of the European Social Fund co-financing 6325236 lats and national public funding from the State budget funds 1116218 lats. Up to 65 these provisions referred to indirect cost rate determination of fixed maximum total eligible cost of the project is $6697309. 8. Maximum co-financing from the European Social Fund has about 85 percent of the total eligible project cost totals. National public finance 15 percent of the total eligible cost of the project, ensure the State budget funds. 9. Apakšaktivitāt implement the project application to the limited selection. The responsible authority restricted the application of the selection of projects organised by the apakšaktivitāt of all the funding available and no more than two project application selection rounds. The competent authority is entitled to re-arrange the project application selection round no later than the year 2010 December 31, if not proficient in everything apakšaktivitāt the available funds by sending a call for project submissions, the applicant of the project which the project application is filed within the time limit or been rejected. 10. Apakšaktivitāt responsible authorities within the functions provided by the Ministry of education and Science (hereinafter referred to as the responsible authority). Responsible authority: ensures project 10.1 application selection and evaluation: 10.1.1. develop project appraisal form submissions and the submission of a project evaluation and project appraisal form filling application methodology;
10.1.2. creates a project application to the Evaluation Commission (hereinafter the Commission);
10.1.3. developed and approved the Statute of the Commission;
10.1.4. send a limited range of applicant projects call for project submissions;
10.1.5. assess the project submissions and decides on the approval of the project application, approval or rejection of the condition, as well as assess the decision on approval of the application, the project provided the conditions are met;
10.2. accumulate data on project submissions under the laws and regulations of the European Union's structural funds and the cohesion fund management information system design and use;
10.3. This provision referred to in paragraph 58 of the draft amendment;
10.4. the plan and implementation of information activities for the implementation of apakšaktivitāt;
10.5. ensure that these rules are not exceeded, paragraph 7 of the funding available for the implementation of apakšaktivitāt, and monitors the available European Social Fund funding, including the Council of 11 July 2006, Regulation (EC) No 1083/2006 laying down general provisions on the European regional development fund, the European Social Fund and the Cohesion Fund and repealing Regulation (EC) No 1260/1999, article 93 1 and 2 listed in the implementation of the principle of the apakšaktivitāt level. 11. cooperation authority provides public education development agency (hereinafter referred to as cooperation body). The liaison body: 11.1 10 working days after the date of entry into force of the provisions of the agreement and the agreed development projects on the implementation of the project in accordance with these rules and regulations that govern the European Union's structural and cohesion funds, implementation, and monitoring of implementation, and shall submit it to the authority responsible for the coordination;
11.2. the switch with the beneficiary of the financing according to the legal status of a contract or agreement for the implementation of the project and determine the requirements for the implementation of the project beneficiaries;
11.3. ensure the monitoring of project implementation and monitoring, including audits of the project and monitor the Council of 11 July 2006, Regulation (EC) No 1083/2006 laying down general provisions on the European regional development fund, the European Social Fund and the Cohesion Fund and repealing Regulation (EC) No 1260/1999, article 93 1 and 2 of the principle referred to in the implementation of the project;
11.4. the responsible authority provides information on State budget planning for project implementation;
11.5. the beneficiaries of the buying plan and submit it to the procurement monitoring Bureau;
11.6. prepares and submits the information to the authority responsible for the implementation of the apakšaktivitāt and the funding available to it, at the request of the competent authorities providing the information about a single project;
7.3. payment forecasts prepared and submitted to the paying authority;
11.8. European Social Fund demand forecasts for the current and the following year and shall submit it to the leading authority and the responsible authority;
7.4. test and approve funding requests the payee and shall draw up a declaration of expenditure;

11.10. provide information on the beneficiaries of the contract or the terms of the agreement, the requirements of performance and enforcement;
11.11. the draft amendments under this rule 57 and 58 of the conditions referred to in paragraph 1;
11.12. accumulating data on the implementation of the project according to the laws of the European Union's structural funds and the cohesion fund management information system design and use;
11.13. plans and implements public awareness measures on the conclusion of the contract or agreement with the beneficiary. 12. the cooperation body is the functional supervision of the responsible authority. II. Requirements for the project the applicant 13. Project applicants can be: 13.1. Vocational Training Administration;
13.2. the higher education institution that implements the vocational educator education programmes;
13.3. the Organization of the social partners, which delegated the right to operate at the national level;
13.4. the national regulatory authority that law duly implement the national policy for kultūrizglītīb and professional kultūrizglītīb administration. 14. the project applicant project application may be made and implemented individually or in partnership, concluding with a partner of the cooperation agreement for the implementation of a project. If the project is implemented in partnership, the application shall be accompanied, the managing partner, who is responsible for the implementation of the project and is considered a project and if the project is approved, the beneficiary of the financing. If the project involved partners, their choices are reasonable (the competence of partners meet the project's planned activities, and provides a rationale for why the involvement of partners is not required). 15. the project minimum total eligible cost maximum is LVL 210841 eligible cost total is $4216824. III. Project preparation and submission of applications 16. Responsible Authority not later than 60 working days from the date of entry into force of the provisions sent to the call for submission of projects (hereinafter referred to as the notice) the project for the applicant who complies with the provisions of paragraph 13 of those requirements. 17. The invitation shall: 17.1. project application submission deadline, which is not shorter than 20 working days from the date of dispatch of the invitation;
17.2. the application of the project site and order;
17.3. the website which published the application to be used for the preparation of project documents;
17.4. other information the competent authority considers it necessary to specify in the call. 18. the project applicant project application submitted, subject to the following requirements: 18.1. allowed to submit one application per project the project application selection round;
18.2. the project application form a completed project application form (annex 1) and the following annexes: 18.2.1. the project applicant questionnaire-application of value added tax in accordance with the laws and regulations on the procedures for issuing and verifying the information on the application of value added tax to the European structural funds co-financed unit Sa project and take a decision on the inclusion of value added tax to the project-related costs;
18.2.2. the project financing plan drawn up by the applicant of the project the national budgetary authorities in accordance with the budget of expenditure classification of economic categories (if the applicant is a public body) (annex 2);
18.2.3. receipt of partners for participation in the implementation of the project (if the project is expected to involve partners) (annex 3);
18.2.4. draft cooperation agreement, specifying the responsibilities of partners and the rights, responsibilities and the payment order (if the project is expected to involve partners);
18.3. the project application to the institution of the applicant, the signature of the project manager or his authorised person and the project is added to the application. 19. in order to ensure the conformity of the application of the draft provisions referred to in paragraph 29.5. bottom criterion, the project applicant project application form sections, subsections and their names do not change and do not delete. 20. the project applicant project application to the responsible body can submit to: 20.1. paper form in triplicate (one original copy marked "original" and two copies marked "copy"). All the documents placed in a package and seal;
20.2. the electronic document, signed with a secure electronic signature and confirm with the time stamp in the laws on electronic document design. 21. the responsible authority shall record the receipt of project submissions a day. Proof of receipt of the application, the project authority in charge of the project to the applicant personally immediately or within 10 working days from submission of the project submission deadline shall be sent by post or electronically signed with a secure electronic signature according to the regulations on electronic document design. IV. Project evaluation 22. Project submissions of the applicant and project submissions valued in the following order, according to the rules referred to in paragraph 29 administrative criteria, mentioned in paragraph 30, the eligibility criteria referred to in paragraph 31, the quality criteria and the funding referred to in paragraph 32 of the award criteria. 23. within the framework of Apakšaktivitāt project application submitted to the Commission. Panelists include the Ministry of education and science and the Ministry of culture. 24. the meetings of the Commission as observers may participate in the managing authorities and the liaison body. The Commission may invite one or more experts (without voting rights). 25. The Commission shall determine the responsible authorities approved the Statute of the Commission. 26. When starting, the members of the Commission, experts and observers signed a declaration that the Commission obtained during the meetings of the information and the content of the document will not disclose to third parties, as well as the members of the Commission and experts to sign a declaration that there are no circumstances in which they might violate laws and regulations that govern the European Union's structural and cohesion funds, implementation, and monitoring of implementation, the limits the European Union fund management person involved in and which might be considered that they are interested in a specific project approval submissions. 27. project submissions valued pursuant to these provisions, the responsible authorities develop and approve project submissions and evaluation of laws and regulations that govern the European Union's structural and cohesion funds, implementation, and monitoring of implementation, as well as through the application of the project assessment and project evaluation forms filled out the application of the methodology. 28. the project on application of administrative compliance criteria, eligibility criteria and funding criteria assessed with "Yes" () and "no" (no matches). Application of project compliance with quality criteria assessed by giving a certain number of points. 29. Administrative criteria (project design and submission of the application, the eligibility criteria) are the following: 29.1. the applicant is hereby invited the project to submit a project application to the limited application of the selection of projects;
29.2. the project proposal is submitted to the responsible authorities within the time limit laid down;
29.3. the project is drawn up into the application;
29.4. the project proposal is prepared for the Latvian language;
29.5. the project proposal is prepared according to the rules referred to in paragraph 18.2 project submission form, and all form sections are completed;
18.4. the project proposal is submitted in paper form in triplicate (one original and two copies), the original and the copy of the application is cauršūt (caurauklot) or the project application is filed in electronic form, documents signed with secure electronic signatures, and confirm with the time stamp according to the regulations on electronic document design;
18.5. the project application is signed by the project head of the institution to the applicant or his authorised person;
29.8. project application is accompanied by all these rules in the annex referred to in paragraph 18.2;
29.9. project duration and cost allocation over the years correspond to the provisions referred to in paragraph 54 of the project implementation period;
29.10. project application requested to the European Social Fund funding and total eligible cost specified in lats;
29.11. project application requested to the European Social Fund funding percentage does not exceed the provisions mentioned in paragraph 8 of the allowable amount;
29.12. project submissions requested in total eligible cost of which is not less than that referred to in paragraph 15 of the rules of the minimum amount of eligible costs and do not exceed the provisions mentioned in paragraph 15, the maximum amount of the eligible cost;
29.13. submission of project eligible costs over the years specified in full in the arithmetic right and meet the budget totals listed in the summary;
29.14. submission of project eligible costs specified in the heading appropriate to the 43 and 51 of the rules referred to in paragraph 1, eligible costs;

No 29.15. project planned in the application costs do not exceed that rule 46, 49 and 50. referred to cost constraints. 30. the eligibility criteria (projects of the applicant and project eligibility criteria application) are the following: 30.1. the project applicant is that rule 13, the authority referred to in paragraph or institution;
30.2. the aim of the project comply with the rules referred to in paragraph 2, the purpose of the apakšaktivitāt;
30.3. the project involves implementing one or more of the provisions referred to in paragraph 6, eligible activities;
18.9. the project application is defined in the problem addressed and justified the chosen target group needs;
5. submission of the project and planned activities provide the problem and define target groups needs are met;
30.6. the project activities are clearly defined, proportionate with the planned time schedule for implementation and ensure the planned results;
19.1. in the application of the project results and planned performance is explicit and measurable (reachable results are specified in units with specific values);
19.1. the expected results for the project and their indicators contribute to the provision in paragraph 4 of these indicators;
19.2. the applicant undertakes the project project implementation to prevent discrimination (sex, race, ethnic origin, religion, disability and other factors);
30.10. project application describes the project management, implementation, and monitoring system and the required resources (in the number of staff involved, qualifications and responsibilities, the available material and technical base), and they meet the needs of the project;
30.11. project application is justified, as it will ensure the sustainability of the results achieved and maintenance after completion of the project;
30.12. project costs indicated in the application corresponds to the period of project implementation, it is necessary and reasonable to achieve the project objectives and the implementation of the planned activities;
30.13. project planned in the publicity and information dissemination activities comply with the European Union's structural funds and the cohesion fund projects in the implementation of the publicity requirements. 31. quality criteria (specific horizontal priorities and eligibility criteria) are the following: 19.3. the project involves cooperation between beneficiaries, in order to implement the projects and achieve the target of apakšaktivitāt: collaboration provides 31.1.1. (0);
31.1.2. intends to prepare a submission of the project to prevent projects overlapping the activities planned (one point);
31.1.3. intends to prepare project submission and information on project implementation and results (two points);
31.1.4. intends to prepare project submission and information on implementation and results of the project, as well as involving the implementation of specific project activities (three points);
31.2. the readiness of the project implementation started: 31.2.1. target groups of training needs are determined and they planned to identify, initiate the implementation of the project (0);
31.2.2. the target groups of training needs have been identified in General, developed the necessary continuing education courses for the General description of the training needs of the concerned groups for the teachers, launching the implementation of the project (one point);
31.2.3. the target groups of the training needs of the concerned groups of educators have been identified and developed the necessary continuing education course description (two points);
31.3. the project activities to be implemented by the development of vocational training in conformity with the needs and requirements of the labour market: 31.3.1. project needs and training courses are planned to be implemented to develop, in cooperation with the employers or relevant sectoral professional organizations or educational institutions which implement the profile (0);
31.3.2. project training needs and pursued courses planned to develop cooperation with employers or relevant sectoral professional organizations or educational institutions which implement the corresponding profile programs (one point);
31.3.3. project training needs and pursued courses planned to develop cooperation with employers or sectors concerned professional bodies and educational institutions which implement the profile (two points);
19.5. innovative solutions (modern teaching methods, creative and interactive approach, the use of modern technologies and learning learning process, alternative models for teacher training and further training, the involvement of partners, who have experience and expertise in the implementation of innovative solutions) the development and implementation of the teaching of vocational training and practice in the preparation and training of managers: 31.4.1. not for (0);
31.4.2. is for (two points);
31.5. the project application solutions provided for in the awareness of the target audience for the project implementation of continuing education and competency improvement measures: 31.5.1. clarification is not provided, as will the target audience awareness or for general information measures, which are not directly focused on a specific target audience and its needs (0);
31.5.2. for information measures, which are aimed at a specific target audience and its needs (two points);
19.6. the project takes account of direct targeting opportunities to participate in further education and competence building activities, providing training opportunities for diversification and adaptation to the needs of the target audience (a flexible training schedule, the availability of public transport and other factors): 31.6.1. does not take into account the (0);
31.6.2. target audience needs identified in part the possibility of diversification and adaptation to take account of the part (one point);
31.6.3. target audience needs have been identified for the diversification and customization to suit your needs (three points);
19.7. risk assessment of project implementation: project submission not 31.7.1. assess potential risks (0);
31.7.2. project risk assessment in the application are incomplete, the action plan identified risks are not developed or are not completely developed (one point);
31.7.3. submission of the project risks are assessed in qualitative, action plan identified for the elimination or reduction of risk developed a stub (two points);
31.7.4. submission of the project risks are assessed in qualitative, including the estimated potential cost incidence, develop a reasoned plan of measures identified for the elimination or reduction of risks (three points);
19.8. the impact of the project on the balanced development of the territory the horizontal priority: project submission 31.8.1. not specified, as the territory will be complied with the principle of sustainable development in the implementation of the project (0);
31.8.2. project of sustainable development of the territory, the principle of respect, for the provision of support to vocational educators and managers all planning practice areas or providing for mutual cooperation with at least one higher education institution providing vocational teacher training (one point);
31.8.3. project of sustainable development of the territory, the principle of respect, for the provision of support to vocational educators and managers all planning practices in regions under the vocational training institutions and the existing number of student teachers and regional labour market requirements or providing for mutual cooperation with all higher education institutions providing vocational education teacher training (two points);
19.8. the activities provided for in the project contribute to the fundamental principle of equal opportunities (gender equality, active aging and disabled people): 31.9.1. not conducive to respect for the fundamental principles of equal opportunities (0);
one 31.9.2. promote respect for the basic principles (one point);
31.9.3. promote respect for the fundamental principles of two (two points);
31.9.4. promote respect for the fundamental principles of three (three points);
31.10. the impact of the project on the information society: the horizontal priority project does target 31.10.1. group training to work with information and communications technologies (0);
31.10.2. project for the target group of the training information and communication technology skills to use and for use in the training process (one point);

31.10.3. project for the target group of the training information and communication technology skills to use and for use in the learning process, as well as e-resources and e-learning environment for the implementation of the solution in the process of further education of teachers (two points). 32. the criterion for the award of funding – if the project submission complies with these rules 29.2 29.3 29.1.,.,.,.,., 30.1 29.4 29.5, 30.2, 30.3.., 19.1 and 19.2.. referred to evaluation criteria, as well as 19.3. these provisions, 31.2, 31.3.,.,., 19.8 19.8 19.6. and evaluation referred to in paragraph 31.10. criteria in each has received at least one point and 31.5. these provisions and 19.7. the evaluation referred to in paragraph below criteria each has received at least two points then, listing of project applications in order of priority, starting with the most points earned, submission of the project has enough available funding within the apakšaktivitāt. V. decision on approval of the project application, approval with conditions or disapproval and its notification 33. the responsible authority shall take a decision on the approval of the project application, if all 29 of these rules, 30 and 32 of the project referred to in the submission evaluation criteria have been assessed with "Yes". 34. the responsible authority shall take a decision to reject or not further assessment, if the project application: 34.1. the project submission does not comply with any of these rules 29.2 29.3 29.1.,.,.,.,., 30.1 29.4 29.5, 30.2, 30.3.., 19.1 or 19.2. criteria referred to in paragraph;
21.3. the assessment of compliance with any of these terms, 31.2, 31.3 31.1...,.,., 19.8 19.8 19.6. or 31.10. projects referred to the quality criteria of the application received less than one point or of compliance with any of these terms or 31.5.19.7. projects referred to the quality criteria of the application – less than two points. 35. the responsible authority shall take a decision to reject the application of the project, if the rules referred to in paragraph 32 of the funding criteria are evaluated with "no". 36. The competent authority may take a decision on the approval of the application, the project on condition that must be met for the project, the applicant can enter into a contract or agreement for the implementation of the project. That decision may include the following: 36.1. clarification of the application of the project according to this provision, 29.8 29.7 29.6.,., 29.9., 29.10 29.11, 29.12.,.,.,., 29.13 29.14 No 29.15., 18.9., 5., 19.0, 19.1, 30.10 30.11 30.12.,., or 30.13. criteria referred to in subparagraph;
36.2. cost clarification, but not exceeding that rule 46, 49 and 50. referred to cost constraints;
36.3. other specific legal authority to take action based on the conclusion of an agreement or contract. 37. the responsible authority shall within five working days after the date of adoption of the decision: sent to the applicant of the project – 37.1. a decision on the application of the project or the project of authorisations requested transmit application rejection, or project approval submissions;
37.2. cooperation authority-the decision on the application of the project of authorisations requested transmit and two copies of the approved project or project submission, presented in the form of electronic documents signed with secure electronic signatures, and confirm with the time stamp in the laws on electronic document design. 38. If the application is approved, the head of the project had the time limit laid down in the decision, which does not exceed 30 working days from the date of entry into force of the decision, shall ensure the fulfilment of the conditions and submitted to the responsible body for evaluation information on the fulfilment of the conditions. Decision within the time limit set in the information about the conditions of the project, the applicant may submit a maximum of two times. 39. the responsible authority shall be 20 working days after the deadline set in the decision, assessed the information provided by the applicant of the project and draw up an opinion on the decisions contained in the conditions (opinion). In the opinion of Justice control is done just like the decision, which contains the conditions to control this opinion is drawn up. 40. If the applicant shall ensure the fulfilment of the conditions contained in the decision, the time limit set in the opinion of the responsible authority is positive and responsible authority within five working days from the date of signing the opinion sent: 56.1. project-opinion of the applicant;
40.2. the cooperation body – a decision on project approval with the opinion of the sacījum, and two copies of the approved project or project submission, presented in the form of electronic documents signed with secure electronic signatures, and confirm with the time stamp in the laws on electronic document design. 41. If the applicant does not provide the draft decision contained in the conditions or not provide it within the time limit laid down in that decision, the responsible authority opinion is negative and the project application is considered to have been rejected. The responsible authority within five working days from the date of signing the opinion sends the draft opinions to the applicant. 42. If the application is approved, the liaison body with the beneficiary of the financing contract or agreement for the implementation of the project in accordance with the laws that determine the order in which the European Union's structural and cohesion funds in the participating institutions provide the planning document preparation and implementation of these funds. Vi. Eligible and ineligible costs 43. Projects eligible costs are broken down into the following headings: 43.1. application and supporting project documentation preparation costs;
43.2. the administrative costs of the project;
43.3. in the implementation of project activities the provisions of paragraph 6 of the activities supported in this implementation;
43.4. project information and publicity costs according to the laws of the European Union's structural and cohesion funds publicity and funded projects visual identity requirements;
43.5. unforeseen costs. 44. This rule 43.1 and 43.2. bottom point. these costs are indirect costs of the project. This rule 43.3 43.4 43.5, and in those costs are direct costs of the project. 45. This rule 43.1. cost referred to in heading may include costs of enterprise application project and supporting the preparation of the dossier, including State social security payments, if the Enterprise contract person involved is not registered as a commercial activity of the taxable income. 46. This rule 43.1. costs referred to in subparagraph does not exceed 2000 lats. 47. This rule 43.2. cost referred to in items may include the following costs: the cost of the project. the remuneration 29.3 administration work, including the national compulsory social insurance contributions, if the project administration go the cue is not registered as a business income tax payer;
47.2. mission expenses, travel expenses;
47.3. communication costs (postage, telecommunications, internet services);
47.4. Office supplies and inventory costs (value of up to 150 Lats per unit), except furniture;
29.5. room and furniture rental, if the project requires the Administration to rent space outside of the legal beneficiaries addresses;
29.6. project management for information technology equipment (hardware, software, printers, data storage equipment) rental;
29.6. the project of introduction of information systems development and maintenance costs. 48. This rule 43.3. the cost referred to in items may include the following costs: 29.9. cost of the consideration of the implementation of project activities in parties, including State social security payments if the person involved in the implementation of the project is registered as a business income tax payer;
48.2. mission expenses, travel expenses;
48.3. communication costs (postage, telecommunication and internet services);
30.1. Office supplies and inventory costs (value of up to 150 Lats per unit), except furniture;
30.1. room and furniture rental, if you need to rent a room outside of the legal beneficiaries addresses;
30.2. project activities required for the implementation of information technology equipment (hardware, software, printers, data storage equipment) rental;
30.3. the transport costs (fuel costs, vehicle hire, purchase of transport services, charges for the use of public transport);
30.3. the training and the organisation of seminars and related implementation costs, provision of handouts;

30.4. costs that are reasonable and related to the implementation of project activities. 49. That rule 43.4. cost referred to in the heading does not exceed one percent of the project's eligible direct costs. 50. This rule 43.5. referred to cost position does not exceed 0.2 per cent of direct eligible project costs, and it uses this rule 43.3. the costs referred to in point. 51. the eligible costs recoverable value added tax payments are eligible. 52. the project costs not included in the application, which is not specified in these rules or in paragraph 43.51. 53. Financing from the European Social Fund or the national budget funds not eligible costs: 53.1. these provisions do not match, or 46 49.50. costs referred to in point limit;
53.2. no project activities incurred during implementation or for payments made later than the month after the expiry of the implementation of the project;
justified 53.3. does not meet the principles of financial management, in particular value for money and cost effectiveness and not related to the implementation of the project activities;
53.4. not justified by supporting documents or the costs incurred by the law of the non-compliance. VII. Project implementation conditions 54. Funding recipient project implementation commenced not later than two months after the conclusion of the contract or agreement and implement the project a maximum of 31 December 2013. 55. cooperation authority according to legislation, establishing procedures for the expected State budget co-financed by the Fund of the European Union for the implementation of the projects, as well as payment and arrangements for the preparation of declarations of expenditure, is transferred to the beneficiary (other than the budget authority) advance payment of 20% of the total eligible cost of the project, of the arrangement or the time limits laid down in the Treaty and in order. 56. The beneficiary on its Web site at least once every three months puts up-to-date information on the implementation of the project. 57. the draft amendments shall be consistent with the laws that determine the order in which the European Union's structural and cohesion funds in the participating institutions provide the planning document preparation and implementation of these funds, except for the provision in paragraph 58. 58. The draft amendments to coordinate with the responsible authority, if the changes are related to: 58.1. project objectives;
58.2. change of the beneficiary;
58.3. the project achieved the monitoring indicators;
58.4. the total cost of the project. 59. The beneficiary, without making amendments to the project, you can make the project cost reallocation: 59.1. between this provision and paragraph 26.9. set cost 43.4 positions, not exceeding five percent of the cost of a transferable and subject to the provisions set out in paragraph 49 of the cost constraints;
59.2. this rule 43.3. and 43.4. bottom line referred to in paragraph 1. 60. The beneficiary shall provide the authority with a request for payment, accompanied by an explanation for this rule 59 costs referred to redistribution. If this explanation is not submitted or not justified, liaison body cost reallocation may be considered unreasonable, not taking it into account in considering the reallocation of costs or not to have occurred. 61. the responsible authority shall have the right to request information from beneficiaries on the implementation of the project and results achieved compliance with the planned results. 62. The responsible authority, if necessary, have the right to propose amendments to the project, preparing and sending the liaison body and the recipient of funding proposals for the necessary amendments to the draft. 63. The beneficiary within 10 working days of that rule 62, paragraph of the date of receipt of the proposal prepared and submitted a draft amendment to the request for cooperation or provide reasoned justification also the responsible authority and the liaison body of the decision not to propose an amendment to the draft. 64. If the beneficiary does not reach the specified in the application of the project results or does not provide the learning agreement or funding arrangement to the extent and within the time limits laid down, or other agreement or arrangement laid down, the liaison body shall inform the competent authority. VIII. Closing questions 65. this rule 43.2. bottom administrative costs referred to in paragraph 1 and the level of incidence, the Cabinet will decide on the indirect cost rate constant. 66. This provision referred to in paragraph 65 of the indirect cost rate constant determination of administrative costs is not planned. 67. by the rules referred to in paragraph 65 of the indirect cost rate constant determining the administrative costs of the plan in accordance with the indirect cost rate constant. 68. If the project is launched, before these rules referred to in paragraph 65 of the indirect cost rate constant, not variable indirect cost rate applicable from the agreement or the date of conclusion of the contract. Prime Minister i. Godmanis, Minister of education and science t. koķe Ministry of education and science of the presented version of annex 1 of the Cabinet of Ministers of 17 February 2009. Regulations No 151 annex 1 PDF format, Minister of education and science t. koķe annex 2 Cabinet of 17 February 2009. Regulations No 151 annex 2 PDF format, Minister of education and science t. koķe annex 3 of the Cabinet of Ministers of 17 February 2009. Regulations No 151 annex 3 PDF format, Minister of education and science t. koķe