Cabinet of Ministers Regulations No. 403 Riga, 5 May 2009 (pr. No 29 54) amendments to the Cabinet of Ministers of 17 February 2004 No. 91 "in the terms of the order in which the regional environmental authority to issue technical rules for the operation, which does not require an environmental impact assessment issued in accordance with the law" on environmental impact assessment "in article 4 second subparagraph 1. make Cabinet 17 February 2004 No. 91" in the terms of the order in which the regional environmental Board to issue technical rules for the operation that does not require an environmental impact assessment "(Latvian journal, 2004, nr. 29; 2005, 80, no. 147) the following amendments: 1. make paragraph 3 by the following:" 3. the Person who is going to take action (hereinafter the applicant), before the start of the written application submitted to the national environment service regional environmental Board (hereinafter called the Government) in the territory of which it is intended to carry out the operation. ";
1.2. make paragraph 5 by the following: "5. the application shall contain the following information: 5.1 the application date and place;
5.2. the name and surname, identity code (the operator-company commercial register and registration number), address, and phone number;
5.3. the name and address of the place of activity;
5.4. Description of the action and technology used, linked to a specific operation: 5.4.1 the main raw material consumption per year, indicating all dangerous chemicals and hazardous chemical products (preparations);
5.4.2. the production and its quantity;
5.4.3. water source (existing, planned) attachment sites, the planned quantity of water (cubic metres a day, month or year);
5.4.4. drinking and technical water scarcity;
5.4.5. the planned waste water quantity (cubic metres a day, month or year), pollutants in effluents, their quantity and concentration before and after purification, wastewater effluent outfalls, receiving ūdensobjekt;
5.4.6. the production of heat and electricity, need maximum power, fuel type and quantity;
5.4.7. the emission of pollutants (pollutant quantities and concentrations), smells;
5.4.8. wastes generated, the type, quantity and management;
5.4.9. the electromagnetic radiation, vibration, noise and other physical impacts on the environment; ' portability ' in ground area 5.4.10., indicating that land intended to transform (forest or agricultural land);
5.4.11. impact on specially protected natural areas, especially protected species and habitats of special conservation interest;
5.4.12. effects on the surrounding water bodies and watercourses;
5.4.13. appludinām areas and border areas. ';
1.3. to supplement the provisions under point 5.1 by the following: "5.1 the application shall be accompanied by: 1.5.1 the opinion of the fisheries inspection this provision 1.2. of annex 1 and those set out in point 8.3. operations;
5.1 land 2 copies of a plan that shows the location of the action envisaged, or territory map (scale 1:10 000-or greater) that displays the location of the operation;
5.1. If the action is building 3-būvvald issued by the planning and architectural task copy. ";
1.4. to make point 7 by the following: "7. On application or the receipt of the additional information the Board their premises (where the relevant information can be found on every interested party) provides the opportunity to consult the information notice on technical regulations submitted request (hereinafter referred to as the information notice) as well as the informative notice placed in the national environmental services home page on the internet. Public information notice environmental services home page on the internet is available to the Government for a decision on the application. ";
1.5. to replace the words in point 9.1 "name" with the word "firm";
1.6. the deletion of point 9.5.;
1.7. Add to paragraph 12 with the second sentence as follows: "If the transaction is conducted preliminary assessment and action is provided for construction or construction management include technical provisions shall be issued within 14 days of planning and architectural task copies.";
1.8. to replace the second sentence of paragraph 16, the words "draft technical regulation" by the word "action";
1.9. delete paragraph 18.2., the words "and culture";
1.10. delete paragraph 18.2.2.;
1.11. to express the following point 19: "19. Administration technical rules, opinion, or the refusal to issue the applicant and place national environmental services home page on the internet within five working days from their date of issue. If the action might affect another administration or specially protected natural areas, administration, technical regulations, opinion or denial within three working days electronically to the relevant authority or administration. ";
1.12. express the point 20 as follows: "article 20 validity of technical regulations is five years. If the būvvald extended planning and architectural task duration of validity for a further four years, it also extends into the technical rules, up to a maximum of architectural and planning task validity. ";
1.13. Express annex 1 as follows: "1. the annex to Cabinet of Ministers of 17 February 2004, regulations No 91 operation that requires technical rules 1. Agriculture, forestry, woodworking and fishing: 1.1. animal housing installation according to regulations for the specific requirements of the environment polluting activities in animal yards where they are intended: 1.1.1. five and more animal units according to the laws and regulations on water and soil conservation of the agricultural activities of pollution by nitrates If storage is in a particularly sensitive area;
1.1.2.10 or more animal units in the rest of the territory;
1.2. fish breeding pond installation and other aquaculture facilities;
1.3. the slaughterhouses;
1.4. developing peat extraction site into a cranberry plantation deployments, if the intended territory of water regime change;
1.5. woodworking shop and sawmill installation;
1.6. wood impregnation plant;
1.7. the production of matches;
1.8. the proliferation of genetically modified crops into the environment or breeding.
2. Energy: 2.1 installation of the electricity, steam and hot water production if it entered a heat capacity exceeding 0.2 MW;
2.2. installation of wind farms or construction;
2.3. installing the production of charcoal.
3. Metals and their products manufacture and processing: 3.1. metal ore roasting and milling plant;
3.2. the crude extraction of pig iron or steel (primary or secondary fusion) and the smelter equipment;
3.3. the processing of ferrous metals: 3.3.1 the hot mill;
3.3.2. the forge;
3.3.3. Galvanic plant;
3.4. ferrous metal foundries;
3.5. installation of the melting and installation, the non-ferrous metal alloy and alloy metal smelting equipment installation and installation (except precious metal and enrichment of processed products and equipment for smelter);
3.6. installation of equipment or facilities of metal and plastic surface processing by electrolytic or chemical processes;
3.7. the nail and screw installation of production units.
4. Mineral extraction, processing and use: 4.1 open mineral extraction;
4.2. cement production;
4.3. asphalt concrete and aerated concrete production;
4.4. the concrete, concrete products or iron concrete construction plant construction;
4.5. the melting or the production of mineral fibres;
4.6. the industrial ceramic products, including tiles, bricks, refractory bricks, tiles, clay vessel, firing, and porcelain facilities;
4.7. glass, including glass fibre plant installation.
5. chemical industry: 5.1 oil, petrochemical products and chemical products storage facilities;
5.2. the perfumes and cosmetics product production;
5.3. fotoprodukt production of that installation.
6. Food industry: 6.1. plant and animal products and production of primary processing;
6.2. processing of milk – a stationary installation or installation of equipment for milk collection and pretreatment of milk, if the amount of milk has more than one tonne per day (if one tonne a day is the annual average);
6.3. non-alcoholic and alcoholic drinks plant;
6.4. fish products and fish oil plants;
6.5. meat processing plant;
6.6. coffee, tea, spices and food additives production;
6.7. the grain processing plant;
6.8. ceptuvj installation;
6.9. the installation of the production units of the yeast.
7. The textile industry, leather, wood and paper production: 7.1 the production of paper and paperboard;
7.2. material pre-treatment (operations such as washing, bleaching, the Mercer in sation) and fiber and fabric dye or installation;
7.3. skin tanning equipment Setup or installation, if the action to be taken on an industrial scale;
7.4. the industrial production of footwear;
7.5. the industrial production of toys;
7.6. the industrial production of clothing;

7.7. flax industrial processing plant installation.
8. infrastructure projects: 8.1. dry cleaner, underground and multi-storey car parks and commercial complex installation, including the handling of goods station and the construction of the Logistics Centre;
8.2. the railway line construction;
8.3. the waterworks structures construction and reconstruction;
5.2. gas stations, liquid and well compressed gas filling stations and oil bases;
8.5. artificial groundwater recharge;
8.6. artificial ūdensobjekt creation, if the area is greater than 0.1 ha, and they meet one of the following criteria: 8.6.1. located in specially protected natural territory, except the neutral zone;
8.6.2. the make up of the surface water runoff or surface is ūdensobjekt;
8.7. the street, bridge, estakāž, Depot and tunnel construction and reconstruction, which is made from a new exploitable areas (outside the path of land partition bar), as well as the reconstruction of the road (outside the path of land partition bar);
8.8. garage or automobile washing place;
5.5. installation of commercial printing.
9. Tourism, sport and Recreation: bobsled runs in 9.1 installation, as well as artificial snow capturing;
9.2. recreation complex, a recreational park and amusement park;
9.3. golf courses;
9.4. the venue of sport competitions and mass measures standing place (for example, ice haļļ, sports, Stadium, swimming pool, horse race) installation.
10. General: 10.1. waste recycling, equipment installation or construction waste for storage, sorting, including over loading of the station having a capacity greater than 30 m3;
10.2. landfill and dump closures and conditioning;
10.3. sewage treatment plant construction or reconstruction of a power of five cubic metres per day or more;
10.4. new building construction or reconstruction of existing buildings where the building is located: 10.4.1 the cordon of surface ūdensobjekt, except local authorities planning scales laid down in the village, as well as the limits of the city;
10.4.2. specially protected natural territory, except the neutral zone and local government planning scales laid down in the village, as well as the limits of the city;
10.5. human habitation or economic activities of the artificially created, floating, not connected with earth construction;
10.6. the waste composting site;
10.7. cord production;
10.8. production of aukstumnesējiekārt;
10.9. the area of the iežogošan game or game species of wild animals. ";
1.14. deletion of annex 2, the words "shall lapse if the activity is not started within two years of the issue";
1.15. to supplement the annex to the note as follows: "Note. Document properties in the "signature" and "date" does not fill in, if an electronic document is drawn up according to the law on electronic document design. "
2. The rules referred to in paragraph 1.11. the requirement of technical rules, the denial of opinion or insert State environmental services home page on the internet comes into effect January 1, 2010.