Advanced Search

The Provisions On "operational Programme Human Resources And Employment" 1.3.1.1.5. Apakšaktivitāt "supplement To Support Unemployment Risk Training"

Original Language Title: Noteikumi par darbības programmas "Cilvēkresursi un nodarbinātība" papildinājuma 1.3.1.1.5.apakšaktivitāti "Atbalsts bezdarba riskam pakļauto personu apmācībai"

Subscribe to a Global-Regulation Premium Membership Today!

Key Benefits:

Subscribe Now for only USD$40 per month.
Cabinet of Ministers Regulations No. 785 in Riga, 14 July 2009 (pr. No 48 62) rules for the operational programme "human resources and employment" 1.3.1.1.5. apakšaktivitāt "Supplement to support unemployment risk training" Issued under the European Union's structural and cohesion funds act 18 paragraph 10 of article i. General questions 1. determines: 1.1. procedures implemented by the operational programme "human resources and employment ' priorities 1.3 of Appendix" employment promotion and health work "based on" employment "UR1.3.1.pas 1.3.1.1.5." apakšaktivitāt support for the risk of unemployment for the training of persons "(hereinafter referred to as the activity);
1.2. the European Social Fund (hereinafter the project) submission evaluation criteria;
1.3. the requirements of the project applicant;
1.4. the responsible institution and liaison body, the distribution of competence between these institutions and cooperation arrangements, as well as the responsible authorities and cooperation agencies functional form of subordination.
2. The purpose of the activity is to promote the development of human resources, raising the risk of unemployment, the competitiveness of individuals in the labour market and helping them to save jobs.
3. the purpose of the activity reaches, in implementing this provision set out in paragraph 5 and assisted when executing the outcome indicators-supported risk of unemployment is 11 000 persons. 4. activities to target merchants employed persons (excluding State and local capital company employees), which established the working time may not exceed 20 hours per week.
5. The project supported the following: 5.1 the employer's professional training related to the activity (maximum duration of training six months) to be consistent with the laws of the active employment measures and preventive measures to reduce unemployment in organizing and financing arrangements and measures implementing these check the principles, in so far as the rules do not stipulate otherwise;
5.2. project administration;
5.3. information and publicity measures for the implementation of a project.
6. implement a limited activity in the project application in the form of a selection in one round, with the exception of those provisions referred to in paragraph 18.
7. Activity total eligible funding available is 9 970 643 lats, including European Social Fund funding 7 639 444 lats, and the State budget funding 2 331 199 dollars.
II. Responsible authorities and cooperation bodies and the Division of competences within the activity 8 responsible authority provides the Ministry of welfare (hereinafter referred to as the responsible authority). Responsible authority: 8.1 establish restricted the application of the selection of projects project application Evaluation Commission (hereinafter the Commission);
8.2. send the limited range of the project call for project submissions;
8.3. provide information about the project applicant project application preparation and elaborate exhibit project submission form to be filled out;
8.4. ensure the evaluation of the application of projects and adopt the Administration's decision on the application of the project approval, approval with conditions or disapproval;
8.5. accumulate data on project submissions under the laws and regulations of the European Union's structural funds and the cohesion fund management information system design and use;
8.6. participating in the agreement on the implementation of the project (hereinafter referred to as the agreement) project;
8.7. the rules set out in paragraph 51 of the draft amendments and, if there are objections, deliver an opinion to the liaison body of the deficiencies identified by the project;
8.8. the plan and implementation of information activities for the implementation of the activity, including information on the activities are published within the projects approved;
5.5. ensuring not to exceed the provisions prescribed in section 7 activities available for the implementation of eligible funding, and monitor the available European Social Fund funding, including the Council of 11 July 2006, Regulation (EC) No 1083/2006 laying down general provisions on the European regional development fund, the European Social Fund and the Cohesion Fund and repealing Regulation (EC) No 1260/1999 (hereinafter referred to as the Council Regulation No 1083/2006) 93. Article 1 and 2 of the principle laid down in the execution of the activity level.
9. The liaison authority of the country of employment agency (hereinafter referred to as cooperation body). The liaison body: 9.1. draft agreement in the development;
9.2. the switch arrangement with beneficiaries;
9.3. developing a methodological support materials for the beneficiaries, who buys for the project in accordance with the public procurement law and who is a subscriber of that law;
9.4. consider funding requested procurement plan and submit it to the procurement monitoring Bureau;
9.5. provide information to the Department of Public Welfare budget request, subject to the laws and regulations that govern the public financial management and planning of national budgetary resources for the European Union agenda, the Fund co-financed projects and making payments;
9.6. provide implementation monitoring and control, including checks in the project locations and manages the Council Regulation No 1083/2006 Article 93 1 and 2 of the principle laid down in the execution of the project;
9.7. provide information about the recipient of the funding arrangement;
9.8. checks the recipient's funding requests for payment submitted by the eligible expenditure approved amount and prepare payment orders, as well as the declarations of expenditure shall be prepared and sent to the managing authority for the examination;
9.9. the draft amendments under this rule 50 and 52, but this provision in paragraph 51 of the cases approves the amendments if they matched with the responsible authority under this rule 8.7.;
9.10. the responsible authority shall provide information on the activities available for the implementation of the European Social Fund funding;
9.11. the accumulated data on projects consistent with the laws of the European Union's structural funds and the cohesion fund management information system design and use;
9.12. plans and implements public awareness measures for the implementation of projects;
9.13. the review and approval of funding European Social Fund projects submitted by receiving progress reports.
10. the cooperation body is the functional supervision of the responsible authority.
III. the applicant and the project cost a total of 11 Projects, the applicant is the national regulatory authority (labour market institutions), which according to the law on the support of the unemployed and jobs seekers to implement the national policy for the reduction of unemployment and unemployed, job seekers and persons at risk of unemployment support.
12. the maximum eligible European Social Fund funding is 76.62 percent of the total eligible cost of the project, but no more as set out in section 7 of these regulations.
13. the minimum Project total eligible costs is not limited. The project's total eligible cost maximum is 9 970 643 lats.
IV. Project application selection 14. the responsible authority shall send to the applicant of the project call for project applications (hereinafter referred to as the notice).
15. The invitation shall: 15.1 project application procedures, if submitted in person, by post or by electronic means;
15.2. the project submission deadline. Period not less than 10 working days from the date of dispatch of the invitation;
15.3. the Web site containing the application, to be used for the preparation of the project documents (these provisions and consumables to the project submission form to fill out);
15.4. the Web site on which you placed in the draft agreement.
16. the applicant shall submit Project application, subject to the following conditions: the applicant shall provide the project 16.1. one project submission;
16.2. the project application consists of the completed project submission form (annex 1) and the project budget materials, technical equipment and room rentals and rental costs of supporting documents (if applicable for the implementation of the plan of the project these costs);
16.3. the project submission form section, subsection and the names project, the applicant does not change and do not delete;
16.4. the project shall ensure the conformity of the application of the draft provisions set out in annex 2 of the administrative, compliance and quality criteria;
16.5. completing the project submission form section, the project shall ensure compliance with the information, that is, describe the project up-to-date by identifying the problem and its solution, linking it with the project objectives, the results to be achieved, the selected target group, planned activities, time and the design of the eligible costs, as well as the rules for the implementation of the project;

16.6. the application by filling in the project, the project applicant required project cost plan according to this provision, 36, 37, 38, 39, 40, 41, 42 and 43 of the cost and limits, giving the project the expected costs and ensuring compliance with the project purpose, results to be achieved, planned activities and the time schedule. The European Social Fund and State budget funding for project planning in the application only the eligible cost of the project;
10.4. the project applicant project application to the responsible body can submit one of the following forms: 16.7.1. paper form in triplicate (original and two copies to the relevant "original" or "copy"). Project submissions are presented according to the laws that govern the development and presentation of documents;
16.7.2. electronic document (with signature of the project application to the secure electronic signature pursuant to the electronic movement of regulatory laws and requirements);
16.8. the project application submitted within the time limit indicated in the invitation in person, by mail or electronically.
17. the competent authority shall register the project application submitted to it on the date of receipt, as well as the identification number. Proof of receipt of the application, the project authority in charge of the project to the applicant personally immediately or within two working days of receipt sent by mail or electronically (signed with a secure electronic signature).
18. The competent authority is entitled to organise the more limited application, if: this rule 15.2 18.1. within the time limit set in point project application is filed;
18.2. the project application is rejected;
18.3. the project application is approved for an amount that is less than the rules specified in section 7 activity the total eligible funding available.
V. Project submission evaluation activities within the 19 projects submitted to the evaluation of the application, provided by the Commission. The Commission establishes the following order: 19.1. the President of the Commission, the voting members of the Commission and their alternates are from the Ministry of welfare, the members of the Commission as an observer without voting rights – from managing authorities and cooperation agencies. The personnel of the Commission approved by the responsible authorities;
19.2. the members of the Commission or its substitute in their absence, replaced by another authorized representative. Such authorisation shall be made in writing to the Commission in accordance with the procedure laid down in the Statute.
20. The Commission shall determine the responsible authorities developed and approved the Statute of the Commission.
21. the project submission compliance is assessed on the basis of this provision listed in annex 2 of the draft application evaluation criteria and using the procedures developed by the responsible authority of the project application selection and evaluation, as well as the project application form of evaluation, developed in accordance with the laws and regulations that determine the European Union's structural and cohesion funds in institutions involved in planning documents for the preparation and implementation of these funds and the European Union fund management and control system. The documents referred to in this paragraph, the competent authority shall publish the website (URwww.lm.gov.lv/sf).
22. submission of project compliance with Annex 2 of these rules 1 and 2 of the project referred to in the submission evaluation criteria assessed with "Yes" () and "no" (no matches). The project's compliance with this provision the application to annex 2, paragraph 3 of the criteria assessed by giving a certain number of points.
Vi. Regulatory decision making on project approval submission, approval or rejection of a conditional and its notification to the responsible authority of the 23 project application is approved if: 23.1. the project submission complies with all the rules referred to in annex 2 of the administrative and eligibility criteria;
23.2. the application of this provision of the project 2. quality criteria referred to in the annex of assessment received at least the minimum number of points.
24. the project's responsible authority approves the application, where the application to specify the appropriate one of these rules annex 2 1 and 2 of the project referred to in the submission evaluation criteria that permit the application of the project approval with conditions.
25. in paragraph 24 of these rules in these conditions may include: 25.1. additional explanation of the submission;
25.2. the implementation of the project or the cost of refining the design by years;
25.3. the cost adjustment (reduction or exclusion), in so far as it does not affect this provision in paragraph 39, 40 and 37.1, 37.2 and 23.8. in certain cost limits;
25.4. other legally reasonable action to ensure compliance with the application of the draft rules annex 2 1 and 2 of the project specified in the submission evaluation criteria that permit the application of the project approval with conditions.
26. the responsible authority continues the project evaluation and their application is rejected, if there was at least one of the following circumstances: 26.1. the project submission does not satisfy any of the rules in Appendix 2 1 and 2 of the project specified in the submission evaluation criteria that are not running the project application is rejected;
26.2. the project submission does not have added this provision in paragraph 16.2. certain documents;
26.3. the project evaluation of the application of any of the provisions of annex 2, paragraph 3 of the draft application evaluation criteria received a lower rating than the minimum number of points.
27. the Board's decision on the application for the approval of the project, the definition provided in the approval or rejection of the responsible authority within five working days after the Government sent a draft of the decision to the applicant.
28. the Board's decision on the application of the project approval, the responsible authority shall include information on the conclusion of the agreement.
29. the responsible authority shall within five working days after the Board's decision on the approval of a project application shall inform the liaison body. The liaison body switch arrangement in accordance with these rules and regulations, arrangements for the European Union's structural and cohesion funds in the participating institutions provide the planning document preparation and implementation of these funds. The responsible authority shall send to the liaison body of the Board's decision on the application for the approval of the project, and two copies of the project approved. The responsible authority approved projects can send an electronic document, if it is filed under these rules in 16.7.2..
30. the Board's decision on the application for the approval of the project to the responsible authority of the conditions specified in the application for the project details in accordance with the provisions of paragraphs 24 and 25.
31. the Board's decision on the application for the approval of the project provided the conditions contained in the project, the applicant provides the information contained in the decision and the conditions provided by the responsible authority of the prescribed period, not longer than 60 days from the date of entry into force of the decision. The information that applicants may submit a project in one of the following ways: 31.1. paper form in triplicate (original and two copies to the relevant "original" or "copy"). Details of the decision contained in the conditions presented in consistent with the laws that govern the development and presentation of documents;
31.2. the electronic form of a document (for information on the conditions in the decision to sign with secure electronic signature pursuant to the electronic movement of regulatory laws and requirements).
32. the Commission examined this provision the information referred to in paragraph 31, and the responsible authority shall draw up an opinion on the Board's decision the conditions contained in the 10 working days prescribed by the responsible authority of the submission deadline.
33. Where the applicant has complied with the Board's decision on the application for the approval of the project provided the conditions laid down by the responsible authority within two working days, following the rules laid down in paragraph 32 of the expiry of the time limit, the applicant shall send the draft opinion on the Board's decision contained in the conditions, but the cooperation body of four working days, the Board's decision on the application for the approval of the project provided the opinion on the Board's decision contains the conditions and two copies of the approved project as well as two projects submitted by the applicant with a copy of the document for information on the conditions contained in the decision. The liaison body switch arrangement in accordance with these rules and regulations, arrangements for the European Union's structural and cohesion funds in the participating institutions provide the planning document preparation and implementation of these funds. The responsible authority approved projects can be sent to the liaison body of the electronic form of a document, if it is presented at the bottom of these terms. in paragraph 16.7.2.

34. If the applicant has not fulfilled the regulatory decision on approval of the application, the project provided the conditions laid down or has not fulfilled the prescribed period, the application is deemed to have been rejected. The opinion that the decision contained in the conditions are not met, the responsible authority shall send the draft to the applicant within two working days, following these rules referred to in paragraph 32.
35. If the Government adopted the decision to reject the application of the project or the project, the applicant has not complied with the Board's decision on the application for the approval of the project provided the conditions laid down by the responsible authority in addition to the provisions laid down in paragraph 27 of the draft document to the applicant be returned or sent by mail two copies of the application for the project. The responsible authority for the project the applicant project application can be sent electronically if it is filed under these rules in 16.7.2..
VII. Eligible and ineligible costs 36. Project eligible costs the following cost plan positions: 36.1. direct costs, or the cost of the project, which includes the following subdivisions: cost 36.1.1. target groups of security costs that rule 5.1. eligible activities referred to in (a);
36.1.2. other project costs;
36.1.3. logistical and equipment costs;
36.1.4. project information and publicity costs according to the laws of the European Union's structural and cohesion funds publicity and funded projects visual identity requirements;
36.1.5. unforeseen costs;
36.2. the indirect costs as the cost of one position the following subheadings: 36.2.1 costs. administration costs of the project;
36.2.2. project submissions and supporting documentation preparation costs.
37. This provision cost laid 36.1.1. subheading includes the following costs: 37.1. training costs per person up to 500 lats;
37.2. the monthly stipend of 70 dollars per calendar month.
36.1.2.38. This provision States the cost includes the following subheading: 38.1. procurement procedure implementation costs;
38.2. the remuneration (excluding allowances and compensation which does not calculate State income tax and compulsory social insurance contributions, bonuses, incentives and tangible prize money) cost and Enterprise contract costs these rules 5.1 and 5.3. implementation of the activities set out in point. If the operator is registered with the State revenue service as the European Social Fund project applicant (the beneficiary), eligible workers is also the employer of the State social insurance compulsory contribution charges;
23.8. domestic travel and business travel costs (daily allowance, accommodation and transport costs) project personnel, Office supplies and inventory costs (Office supply and inventory cost value of objects up to 150 Lats per unit, if the lifetime is less than a year) and the electronic communications service costs.
36.1.3.39. This provision States the cost of rental of premises include subheading and rental costs, as well as the equipment, inventory and equipment repair, technical service, rental and lease costs. Within this cost amount shall not exceed two percent of the project's eligible direct costs.
40.36.1.5. These provisions prescribed in paragraph subheadings of the cost amount shall not exceed five percent of the total eligible direct project costs. The project cost plan as one expense items, and they are used not previously planned to cover the costs of the eligible direct costs of the project.
41. This provision 36.2.1. referred to in subheading includes costs, such costs, used this provision set out in point 5.2 of eligible actions: 25.5. consideration (excluding allowances and compensation which does not calculate State income tax and compulsory social insurance contributions, bonuses, incentives and tangible prize money);
41.2. domestic travel and travel cost (daily allowance, accommodation, transport and fuel costs);
41.3. postal, telephone and other communication services;
25.7. utilities (including space management and maintenance) costs;
25.8. space rental and lease costs;
25.8. Office supplies and inventory (not essential items of equipment value up to 150 Lats per unit, if the lifetime is less than a year).
42. This provision is laid down in paragraph 36.2.2 cost includes the costs of remuneration within the project for the preparation of submissions.
43. the non-recoverable value added tax payments are eligible.
44. Financing from the European Social Fund and State budget of the applicable products, laid down in section 7 of these regulations, does not apply a cost: 44.1. not specified in these rules, in 37 36.1.4., 38, 39, 40, 41, 42 and 43 or does not comply with these terms, 23.1, 23.8 37.1. the bottom point, 39, and 40 of the eligible cost specified in the limitation of the amount;
44.2. for which the beneficiary has undertaken and payments made before the entry into force of those provisions (except paragraph 42 of these rules, such costs).
VIII. conditions for implementing the project 45. Project implementation plan from the date of conclusion of the agreement to 31 December 2013.
46. The project site is the territory of the Republic of Latvia.
47. in implementing the project, the European Social Fund, the beneficiary shall ensure information and publicity measures, laid down in the Commission of 8 December 2006, Regulation (EC) no 1828/2006 laying down provisions for the implementation of Council Regulation (EC) No 1083/2006 laying down general provisions on the European regional development fund, the European Social Fund and the Cohesion Fund, and the European Parliament and Council Regulation (EC) No 1080/2006 on the European regional development fund as well as the legislation of European Union funds publicity and visual identity requirements.
48. The European Social Fund, the beneficiary on its Web site at least once every three months puts up-to-date information on the implementation of the project.
49. the structural funds of the European Union for the implementation of the project the necessary financial resources for the implementation of the plan, a project funded by the national budget and payments made to the authority in accordance with the laws and regulations governing the Fund's European Union funding conditions.
50. the draft amendments be made according to the regulations on the procedures for European Union structural and cohesion funds in the participating institutions provide the planning document preparation and implementation of these funds, in so far as these rules otherwise.
51. the cooperation of harmonisation in the responsible authority shall submit the draft amendments to the institution, if the changes are related to: 51.1. project objectives;
51.2. European Social Fund financing requested;
51.3. the deadline for implementation of the project;
51.4. the project results to be achieved;
51.5. project total eligible cost, or the amount of programming over the years.
52. Up to this rule 37.1, 37.2, 23.8. in paragraphs 39 and 40, and set limits on the amount of costs and advance cooperation in coordination with the authority, the European Social Fund funding recipient project can take: 52.1. reallocation of costs between 36.1.1. these provisions, and 36.1.4 36.1.2., bottom point 36.1.3. cost provided for in headings, not exceeding five percent of the cost of a transferable within the total amount of the eligible cost;
52.2. the reallocation of costs between these rules 37, 38 and 39 of the cost complies. This reallocation of costs to this provision, 36.1.2 36.1.1. and 36.1.3. costs prescribed in paragraph 1a, shall not exceed 10 per cent of the cost of the total reallocated the eligible cost;
52.3. the reallocation of costs this rule 36.1.4. referred to below under the heading of costs, not to exceed 10 percent of the cost of the total reallocated the eligible cost;
52.4. reallocation of costs this rule 37.1, 37.2.., 38.1 and 38.3 38.2..., referred to cost up to 20 percent of the cost of the total reallocated the eligible cost;
52.5. This provision set out in paragraph 40 of the redistribution of costs.
IX. Closing questions 53. For this rule 36.2. cost of imputability referred to and decided by the Cabinet of Ministers.
54. To this provision referred to in paragraph 53 the indirect cost rate constant: 54.1. this rule 36.2. cost referred to plans to no more than five percent of the project's eligible direct costs;
54.2. the maximum eligible cost of the project amounts to 8 973 579 lats;
54.3. filling the project application, the applicant of the project required project cost plan according to this rule 54.1 and 54.2. subparagraph.;
54.4. assessing the project submissions, this provision of the annex 2 1.15 and 1.17. criteria referred to in subparagraph, in addition to also assess the compliance of the project application, this provision and paragraph 54.1.; 54.2.

54.5. putting this rule 25.4. the conditions referred to in paragraph below, follow that rule 54.1. the costs specified in point limit.
55. If the project is launched, before these rules referred to in paragraph 53 the indirect cost rate constant, not variable indirect cost rate shall apply from the date of conclusion of the agreement.
Prime Minister Dombrovskis Welfare Minister V. U. a drafting Note: Augul rules shall enter into force on 29 July 2009.
 
Ministry of welfare submitted version of annex 1 of the Cabinet of Ministers of 14 July 2009. Regulations No 785 Welfare Minister u. Augul Ministry of welfare has submitted version of the annex 2 Cabinet 14 July 2009. Regulations No 785 project submission evaluation criteria 1. Administrative criteria evaluation system Criteria the impact on decision making (P, N) Yes/No 1.1.
The project applicant is invited to submit a project application to the limited application of project selection X N 1.2.
The project proposal is submitted to the responsible authorities within the specified X N 1.3.
The project application is signed by the authorised person of the applicant in the project (Officer) X N 1.4.
The project application was made under the electronic movement of documents regulatory requirements in laws (applicable if the project application submitted in the form of an electronic document) X N 1.5.
The project application is drawn up into X N 1.6.
Project submission is prepared in the national language X N 1.7.
This provision is made in paragraph 16.7.1 project application copies (original and copy) and they have been certified (applicable if the project application submitted in paper form) X P 1.8.
The project application of the original and copies thereof is cauršūt (caurauklot) (true if project application submitted in paper form) X P 1.9.
The project application is fully completed and drawn up according to the project application form and have been added to the rule laid down in paragraph 16.2. Annex X P 1.10.
Copies of the application, the project comply with the project's original application (applicable if the project application submitted in paper form) X P 1.11.
All project application copies (original and copy) pages are numbered (true if project application submitted in paper form) X P 1.12.
Application of the project financial statement is made in the X P 1.13.
Application of the project financial statement is drafted in precise arithmetic according to the project application form requirements X P 1.14.
Project application of the ESF funding will not exceed this rules set out in section 7 of the funding for X 1.15 P.
Application of the project eligible cost specified in total not exceed this provision in paragraph 13 the maximum project funding for X P 1.16.
Project costs included in the application meet this provision 37, 38, 39, 40, 41, 42 and 43 and in 36.1.4 cost X P 1.17.
Application of project cost estimates exceed this provision in paragraph 39, 40, 37.1, 37.2 and 23.8. in certain cost limits X P about 1.18.
Project deadlines and costs you over the years corresponds to paragraph 45 of these rules in a particular project implementation period X P 2. eligibility criteria evaluation system Criteria the impact on decision making (P, N) 2.1.
The aim of the project contributes to this rule laid down in paragraph 2, the objective of the activity X N 2.2.
Application of the project projected expenditure need is based X P 2.3.
Project application based on the chosen target group needs and identifies the challenges X h 2.4.
Application of the project planned project activities project of solving the problem defined in X h 2.5.
The project planned in the application outcome indicators contribute to the rule laid down in paragraph 3 of the outcome indicators of achievement X P 2.6.
The project provides for the application to ensure the maintenance of the results achieved after completion of the project X P 2.7.
Project submissions are defined in project personnel job responsibilities and qualifications requirements X P 2.8.
Project application are defined in the project administration personnel job responsibilities and qualifications requirements X P 2.9.
Application of the project reflect the existing and planned logistic support (applicable if the project is planned for the implementation of logistical support) X 2.10 P.
The project reflects the application of the project management, monitoring and quality assurance system X P 2.11.
Application of the project planned in the publicity and information dissemination activities comply with the rules for the implementation of the activity of the BOM for 47 and 48 requirements set out in paragraph X P 3. Quality criteria ranking system mini clay need compress the number of points/Apakškritērij point scale fees in the clay will get the number of points and award the point of procedure 3.1.
The project, the applicant may provide the personal risk of unemployment aid availability across the territory of Latvia 3.1.1. project, the applicant may provide the personal risk of unemployment aid availability across the territory of Latvia – 8 points 8 points 3.1.2.8V project applicant can not provide personal risk of unemployment aid availability across the territory of Latvia-0 3.2.
The project is included in the submissions of participants of project activities the selection mechanism for project submission 3.2.1 is included in the project charter member selection mechanism-4 points 4 .4V points 3.2.2. project submission does not contain members of project activities optional mechanism-0 3.3.
The project provides for new unemployment prevention measures appropriate to the economic and social situation 3.3.1. project for new unemployment prevention measures appropriate to the economic and social situation-4 .4V 4 points 3.3.2. project does not provide for new unemployment prevention measures appropriate to the economic and social situation-0 3.4.
Application of the project are identified and reflected in the project implementation risks, assess their impact and the probability of occurrence, as well as certain risk mitigation actions 3.4.1. contents of the project submission deadline for implementation of the project risk analysis – 2 6S 4 points 3.4.2. submission of project content the project financial risk analysis-2 project submission 3.4.3 contains results of project activities and the monitoring of performance indicators of risk analysis-2 3.5.
The project is a direct or indirect positive effect on the horizontal priority of equal opportunities.
3.5.1. the project has a direct positive impact – 5 .5V 3 points 3.5.2. project has an immediate positive impact – 3 3.5.3. project does not apply to the horizontal priority of equal opportunities – 0 cases of non-compliance with the Criteria in the responsible authority shall take a decision on the application for the approval of the project, pursuant to Cabinet of Ministers of 14 July 2009. Regulations No. 785 "provisions for the operational programme" human resources and employment "1.3.1.1.5. apakšaktivitāt" Supplement to support unemployment risk training ".
** In the event of non-compliance with the criterion the determining authority takes a decision on the rejection of the application for the project.
(V) apply the relevant criteria one.
S apply all applicable criteria (the sum of the number of points applicable to them).
Welfare Minister u. Augul States