Advanced Search

Amendments To The Cabinet Of Ministers Of 14 July 2009. Regulations No 773 "rules On" Operational Programme Infrastructure And Services "3.4.1.5.2. Apakšaktivitāt" Appendix Waterworks Structures Reconstruction Of Flood Risk Prevention And Risk Reduction

Original Language Title: Grozījumi Ministru kabineta 2009.gada 14.jūlija noteikumos Nr.773 "Noteikumi par darbības programmas "Infrastruktūra un pakalpojumi" papildinājuma 3.4.1.5.2.apakšaktivitāti "Hidrotehnisko būvju rekonstrukcija plūdu draudu risku novēršanai un samazināšanai

Subscribe to a Global-Regulation Premium Membership Today!

Key Benefits:

Subscribe Now for only USD$40 per month.
Cabinet of Ministers Regulations No. 1466 in Riga 2009 on 15 December (pr. No 88 86) amendments to the Cabinet of Ministers of 14 July 2009. Regulations No 773 "rules on" operational programme infrastructure and services "3.4.1.5.2. apakšaktivitāt" Appendix Waterworks structures reconstruction of flood risks and threat reduction "issued under the European Union's structural funds and the cohesion fund management law, article 18, paragraph 10 do cabinet 14 July 2009. Regulations No 773" rules on "operational programme infrastructure and services" 3.4.1.5.2. apakšaktivitāt "Appendix Waterworks structures reconstruction of flood risk prevention and risk reduction" (Latvian journal 2009, 116 no). the following amendments: 1. Make paragraph 3 by the following: "3. the activities implemented in the framework of projects co-financed by the European regional development fund. Activity within the available public funds are 3514020 dollars, including the European regional development fund co-financing-2986917 lat and national public funds – 527103 lats. "
2. Supplement with 11.1 points as follows: "If you close down United 11.1 design and works contracts, this provision 8.1 and 8.2 the costs referred to in point limit, as well as the rules referred to in paragraph 11 the eligible costs related to a project planned in the application of cost."
3. Replace 16.1. "in" with the number "1 493 1 757 010 460".
4. Replace paragraph 16.2. "" with the number "1 493 1 757 010 457".
5. Replace paragraph 20.8. numbers and the words "paragraphs 10 and 11", with numbers and words "8 and 9 point".
6. Replace 33.5 in numbers and the words "in paragraph 13 and 14" with numbers and words "11 and 12 point".
7. Make the paragraph 39 by the following: "39. If the beneficiary is not the national budget authority, after the conclusion of the cooperation agreement, if available financial resources, including for the beneficiary's account in advance payment of up to 20 percent of the European regional development fund co-financing. "
8. Delete paragraph 43.
9. Express 44 the following: "44. Information on the results of the project are maintained in accordance with the provisions of annex 3 of the beneficiary annually for five years after the final payment under the project submitted to the responsible body, if the agreement specifies a longer period of time. The first time these rules laid down in annex 3 of the monitoring report the beneficiary shall provide the responsible authority during the year after the last payment is received for the project. "
Prime Minister Dombrovskis v. Minister of environment r. vējonis