Cabinet of Ministers Regulations No. 328 in Riga, 30 March 2010 (pr. 37. § 16) rules on "operational programme human resources and employment" apakšaktivitāt "Appendix 1.3.1.1.1. Support for the training of employees for the promotion of competitiveness of economic operators – support the partnerships organized training" project application selection the second and subsequent rounds were issued under the European Union's structural and cohesion funds act 18 paragraph 10 of article i. General questions 1. determines: 1.1. procedures implemented by the operational programme "human resources and employment ' priorities 1.3 of Appendix" employment promotion and health work "based on" employment "UR1.3.1.pas 1.3.1.1. activity" Including the age of the population increases the competitiveness of the labour market , including retraining of employed and active employment measures ". apakšaktivitāt" support 1.3.1.1.1 employee training – competitiveness of economic operators support the partnerships organized training "project application selection second and subsequent rounds (hereinafter activity);
1.2. the European Social Fund (hereinafter the project) submission evaluation criteria;
1.3. the requirements of the European Social Fund activity the project applicant (hereinafter referred to as project applicant);
1.4. the responsible institution and liaison body, the distribution of competence between these institutions and cooperation arrangements;
1.5. the responsible bodies and authorities functional cooperation in the form of subordination.
2. the European Social Fund (hereinafter referred to as the funding) within the framework of this activity in accordance with the Commission on 6 august 2008, Regulation (EC) No 800/2008, which recognize certain categories of aid compatible with the common market in application of articles 87 and 88. (General block exemption regulation) (Official Journal of the European Union, august 9, 2008, no L 214) (hereinafter referred to as Commission Regulation No 800/2008).
3. The purpose of the activity is to encourage investment in human capital and the economic actors and associations (with the exception of the society that is the employers ' organisation the Association to which it has rights to operate at the national level) available to them for direct participation in the labour force training, thereby enhancing productivity, promoting labour market and business development, raising economic competitiveness.
4. "operational programme human resources and employment ' 1.3.1.1. Appendix activities" Including the age of the population increases the competitiveness of the labour market, including the retraining of employed and active employment measures "within the monitoring indicators to be achieved are the following: 4.1-2013 training involved 28 400 employed persons;
4.2. by 2013 it economically active economic actors, which trained personnel with the support of the European Social Fund, has 0.4% of the total number of perpetrators of economic activity. 
5. the implementation of the activity is detected in the project application selection.
6. the implementation of the activity provided by the responsible authority and the liaison body. The responsible authority is the Ministry of Economic Affairs (hereinafter referred to as the responsible authority). The cooperation body is the national investment and development agency of Latvia (hereinafter referred to as cooperation body). The cooperation body is the functional authority.
7. the responsible bodies and cooperation bodies competence: 7.1 the responsible authority: ensures activities 7.1.1. implementation, monitoring and control, including applied n + 2 and n + 3 principle of activity level, the implementation of the Council of 11 July 2006, Regulation (EC) No 1083/2006 laying down general provisions on the European regional development fund, the European Social Fund and the Cohesion Fund and repealing Regulation (EC) No 1260/1999 (hereinafter referred to as the Council Regulation No 1083/2006) 1. Article 93, and principles referred to in paragraph 2;
7.1.2. activity provides financial planning;
7.1.3. provide the public with information and provides publicity on matters related to the implementation of the activity;
7.2. cooperation authority: 7.2.1 creates a project application to the Evaluation Commission (hereinafter the Commission) and develop the activities of the Commission;
7.2.2. prior to the adoption of the draft application develop, approve and publish the cooperation agencies in the internet homepage of the project application and assessment of evaluation method of filling out a form, as well as draw up and publish in the internet homepage of the cooperation institutions in the project application form filling methodology and implementation of the project agreement, including the interim and final report forms, filling out an agenda and supporting documents for the expenditure list;
7.2.3. the project application selection and provides project evaluation of the application;
7.2.4., shall decide on the approval of the project application, approval or rejection of a conditional and shall inform the applicant of the project;
7.2.5. evaluate and adopt a decision on the draft amendments under the contract for project implementation and regulations, arrangements for the European Union's structural and cohesion funds in the participating institutions provide the planning document preparation and implementation of these funds;
7.2.6. provide information about the project applicant project application preparation, implementation of the project and the contract for the project implementation conditions;
7.2.7. project implementation contracts with beneficiaries;
7.2.8. provide activities for implementation, monitoring and control, including applied n + 2 and n + 3 principle on the project level, implementation of the Council Regulation No 1083/2006 and article 93, paragraph 2, of the enforcement principle;
7.2.9. analyzes problems and projects, as well as provide the responsible authority proposals for activities and improvement of the implementation of the project;
7.2.10. test and approve the funding requested a progress report and a payment request and prepare the Declaration of expenditure;
7.2.11. provide information to the public and provide publicity matters relating to activities within the project submissions;
7.2.12. provide data on project applications and projects, the accumulation of European Union structural funds and the cohesion fund management information system.
8. activities implemented in the framework of projects co-financed by the European Social Fund and the beneficiaries. Activities within available funding is $10 076 293. The beneficiaries of co-financing is 4 191 589 lats. 
9. Small (micro), small and medium-sized merchants is merchants who comply with the provisions of Commission Regulation No 800/2008 1 the definition laid down in the annex. 
10. The big merchants is merchants who comply with the provisions of Commission Regulation No 800/2008 article 2 the definition laid down in point 8.
II. Project requirements the applicant 11. activities within the project, the applicant may be society (hereinafter referred to as project applicant) shall satisfy the following conditions: 11.1. it is the employers ' organisation the Association to which it has rights to operate at the national level, the society, which is the European Association of Chambers of Commerce or associations representing the manufacturing, information technology and telecommunications, research, creative industry, transport and communications, accommodation or car sales and repair industry analyst of economic activity;
11.2. the members registered in Latvia (economic operator), the aggregate turnover of the last closed accounting year has exceeded 100 million lats (is taken into account in their economic turnover of whom that is not a member of the applicant in the project, but there is a member in one of the organizations that are members of the applicant of the project);
11.3. it is registered in the register of companies, associations and foundations register not later than three years before the application of the cooperation projects;
11.4. If the applicant is a society, representing the manufacturing, information technology and telecommunications, research, creative industry, transport and communications, accommodation or car sales and repair industry analyst of economic activity, more than 50% of the members of the applicant representative of the project that this sector of the industry and members, the turnover shall constitute not less than 100 million dollars from the associations in Latvia registered member (economic operator), the total turnover of the last closed accounting year (takes into account also the operating staff turnover that is not the applicant of the project members, but there is a member in one of the organizations that are members of the applicant of the project);
11.5. these provisions 11.1. sectors referred to shall be determined in accordance with the provisions of annex 1. 
12. the partners involved in the project (hereinafter referred to as partners) may refer to: 12.1. associations (other than the society that is the employers ' organisation the Association to which it has rights to operate at the national level);
12.2. the economic agents, entrepreneurs and self-employed persons. 
13. the funding will not be eligible if: 13.1. applicant of another project during the implementation of projects of cooperation between the authority and the responsible authority have provided false information or intentionally misled in connection with the implementation of projects co-financed by the structural funds;

13.2. the project in the interests of the applicant natural person has committed a criminal offence, which hit the Republic of Latvia or the European Union's financial interests, and the project for the applicant under the criminal code is applied to the forced influence;
13.3. the project obtained by the applicant or provides for funding for the same eligible costs of other activities in the framework of local, regional, national or European Union funds;
13.4. the partner (economic agents) meet the ailing merchant status. Economic difficulty is the merchant whose losses exceed half of the share capital and the last 12 months before the date of submission of the application for the project – a quarter of the share capital. This condition does not apply to small, small and medium businesses that are registered for less than three years from the date of submission of the project application;
13.5. the project applicant has violated these terms or other conditions of the laws and regulations of European Union funds;
13.6. the applicant and the project partners are satisfies the Commission Regulation No 800/2008 article 1 point 6 "a" above. 
14. the project applicant project application selection round may submit one project submission. Each subsequent project applications may be submitted only after the preceding cooperation project has been approved by the Authority's requests for payments at least 90% of the eligible costs of the project amount, or of receipt of the decision on the project submission, or after the rejection of the agreement on the cessation of the project. 
15. the project, which the applicant concluded a contract for the implementation of the project "support for apakšaktivitāt 1.3.1.1.1. employee training – competitiveness of economic operators support the partnerships organized training" under the Cabinet of Ministers of 25 March 2008. Regulations No 203 "provisions for the operational programme" human resources and employment "apakšaktivitāt" Appendix 1.3.1.1.1. Support for the training of employees for the promotion of competitiveness of economic operators – support the partnerships organized training "and" 1.3.1.1.4. apakšaktivitāt support for the training of employees for the promotion of competitiveness of economic operators – aid the individual merchants organized training "project application selection first round" You can submit the application to a project in accordance with these terms, even if a initiated the implementation of the project, pursuant to the Treaty on the implementation of the project in accordance with the aforementioned provisions of the Cabinet of Ministers is completed and the final report is submitted. 
III. eligible and ineligible activities funding 16 economic actors in the partnership organised general training. General training: training that corresponds to Commission Regulation No 800/2008 the definition laid down in article 38. The project and the applicant can train project (with the exception of the society that is the employers ' organisation the Association to which it has rights to operate at the national level) employed persons, both partners employed persons.
17. If the project manages the project applicant or partner-associations-employed person, that society may not be eligible for the funding of the operational programme "human resources and employment" 1.5.2.2.2. apakšaktivitāt "Appendix of non-governmental organisations ' administrative capacity. The project applicant or partner that receives funding under this provision may not be eligible for the European agricultural fund for rural development funding for training in the same rural development programme 2007-2013 axis 1 measure 111 "vocational training and information actions". 
18. The training provider is a legal or natural person. Training provider (instructor) qualification match at least one of the following requirements: 18.1. instructors have at least three years of work experience in the industry, which trained workers, or at least three years of experience in the provision of training in the industry, which trained workers;
18.2. teacher education training is not lower than the sector qualifications that will benefit employees, by the end of the training programme.
19. the financing shall not be granted: 19.1. training programmes in higher education;
19.2. driving courses A1, A, B1, B and M categories.
20. Language training is to be welcomed, and the liaison body confirms the payment request, the training costs not exceeding 20% of the project total eligible costs. 
21. the training project management in accordance with laws and regulations on the classification of education is to be welcomed, and the liaison body confirms the payment request, the training costs not exceeding 20% of the project total eligible costs.
22. training in quality assurance and management according to laws and regulations on the classification of education is to be welcomed, and the liaison body confirms the payment request, the training costs not exceeding 20% of the project total eligible costs. 
23. Associations (excluding society that is the employers ' organisation the Association to which it has rights to operate at the national level) the training of persons employed is to be welcomed, and the liaison body confirms the payment request, the training costs not to exceed five percent of the project's total eligible costs. 
24. the funding recipient project must provide at least 100 workers training.
25. the economic operator or the society in one project application selection may be a partner in one or more projects in the framework of the activity. If the employee participates in the training of several projects in the framework of the selection sort, it should not be multiple projects to learn the same training courses or one course for different fitness levels. 
IV. Eligible and ineligible costs 26. activities within the eligible costs are the following items: 26.1. training course costs. Training course costs can create the following subheadings: 26.1.1 costs. total staff wages for the hours of work shall not exceed the duration of the training courses (including national employers ' compulsory social insurance contributions);
26.1.2. cost of materials and services directly related to training courses: 26.1.2.1. training teaching material to be used for the cost of printed or audiovisual materials prepared by the end of the training project trained staff remain in the estate (as the number of employees trained. The recipient of funding under this provision must be 51 provides one copy of the material or the law on the development and design of a document in the possession of the copies certified, so the subject is also one additional copy costs, if necessary);
26.1.2.2. training room rental and used equipment rental costs for the period of study;
26.1.2.3. interpreters and translators service costs;
26.1.2.4. costs related to workers ' training needs discovery, career advice and knowledge testing;
26.1.2.5. certification and examination costs;
26.2. the staff missions and duty travel costs (per diem, hotel expenses (accommodation), travel (transport)), visa and work permit receipt cost, does not use an intermediary service. The liaison body confirms the payment request for the costs referred to in this paragraph, eligible costs shall not exceed the norms laid down in the regulations on the procedures for recoverable with the missions and the staff of travel-related expenses;
26.3. employment in the travel and travel costs (per diem, hotel expenses (accommodation), travel (transport) expenditure), the cost of obtaining a visa, without using an intermediary services. The liaison body confirms the payment request for the costs referred to in this paragraph, eligible costs shall not exceed the norms laid down in the regulations on the procedures for recoverable with the missions and the staff of travel-related expenses;
26.4. unforeseen expenses, you can use this rule 26.1. costs mentioned in points, not exceeding five percent of the project's eligible direct costs. Contingencies the beneficiary can be used if the above line with the cooperation of the authority, on the basis of the agreement on the implementation of the project;
26.5. the project administrative costs (indirect costs – project management staff costs, the jobs costs of equipment (equipment rental only), transport costs (the cost of fuel for a vehicle lease, purchase of transport services for the use of public transport), space rental and lease costs of premises, management costs (heating, electricity, water supply of management services), office supply costs, internet and telecommunications costs, business travel, or travel costs, audit costs) not exceeding five percent of the project's eligible direct costs;

16.5. the eligible cost of the project value added taxes, if the applicant cannot recover it according to the laws and tax policy;
16.6. the wages of employees (including the public employers ' compulsory social insurance contributions) for the hours of work for teacher training. Employed in the working hours for the purpose of training must not exceed this provision 26.1.1. referred to the number of hours of work that pays him. 
27. the project direct eligible costs referred to in this provision, 26.2, 26.3 26.1..., and 16.6 in 16.5.
28. This provision, 26.4, 26.5 26.1.2.2..., and 16.6. eligible costs referred to in point a may not exceed the total amount of all other eligible cost total. This limit controls the cooperation authority, confirming the final payment request.
29. This rule 26.2 and 26.3. in those days money costs applied a flat-rate payment, which shall apply to the determination of this rule 26.2 and 26.3.. the conditions referred to and which is calculated according to the duration of the course. The flat-rate payment shall apply from the date of entry into force of the provisions. 
30. activities not eligible are the following cost items: 30.1. duties and taxes charges, except for this provision, 16.5 and 16.6 26.1.1... the costs referred to in point;
30.2. the costs that exceed this rules 20, 21, 22, 23, 26 and 28. the costs referred to in paragraph 1;
30.3. costs that are funded rural development programmes 2007-2013 axis 1 measure 111 "vocational training and information measures";
18.9. the rules referred to in paragraph 26 of the costs associated with the training courses, in which the training service provider during the implementation of the project is training less than three performers of economic activities of employees.
31. the project costs not included in the application, other than those referred to in this provision in paragraph 26 and 30.
32. in the framework of the activity financed only eligible costs directly linked to project activities are reasonable, justified, and comply with the principles of sound financial management. 
33. This rule 26.5. referred to project management activities can be attached only to the artist, company, or service contract, remuneration including the national employers ' compulsory social insurance contributions, as determined by the laws and regulations in the field of taxation. Company or service contract does not specify the hourly rate, but indicates the results.
V. funding 34. determination of the maximum intensity of the financing of the project total eligible costs are: 34.1. self-employed persons, petty and small business operators – 80%;
21.3. the average economic operators – 70%;
21.3. large economic operators – 60%;
21.4. society – 60%. 
35. the approved funding for the project effort and amount of financing adjusted by requesting interim or final payment, according to the actual number of employees trained from small, small, medium and large economic operators. 
36. the Funding intensity increased by 10 percentage points if all the parties involved in training workers for disabled or disadvantaged workers, in accordance with Commission Regulation No 800/2008, article 2. 
37. If a partner has received funding for venture capital investment and the first three years of the first risk capital investment project application is filed within this activity, the amount of funding requested in the application of the said partner shall be reduced by 20%. Reduction in the amount of funding may not exceed the total amount of risk capital received. This reduction in the amount of financing institution of cooperation, through interim or final payment. 
38. If a partner is a great merchant, it must justify the incentive effect of funding according to Commission Regulation No 800/2008 article 8 paragraph 3. 
39. One project application the maximum funding amount is 1 000 000 lats.
40. activities under the projects, not combined with other funding programmes or individual project funding funding provided under (except this rule referred to in paragraph 37 cases). 
Vi. submission of Project proposals and selection project application submission application submission 41. Project organised by the project application selection rounds. For the duration of the selection round and round of funding available to the responsible authority decides. 
42. the notice of project application submission, submission suspension or termination of the liaison body shall: 42.1. the newspaper "Gazette";
26.2. the liaison bodies homepage on the internet (URwww.liaa.gov.lv).
43. the notice of project application submission shall issue at least a month before the project start date of submission of the application, specify the total funding available, the project application selection round of the funding available, the submission of the application, the project start and end date. 
44. To apply for funding of the project, the applicant shall submit to the institution of cooperation project submissions: 44.1. fill the project application form (annex 2);
44.2. in addition to supporting documents: 44.2.1. quarterly activity plan (annex 3);
44.2.2. the project manager of the life course description (CV) (annex 4);
44.2.3. each partner's consent letter for participation in the project (annex 5).
45. the project application can be submitted in paper form or electronic form of a document. Project submissions in paper form may be submitted personally or sent to the institution of cooperation by registered mail. The project application to the electronic document may be submitted in person collaboration, sent by post or send to the liaison body of the electronic mail address provided in the notice of project application submission.
46. If the project application submitted in paper form, it shall be submitted in one copy in the caurauklot, with consecutive number the pages, on the back of the last page of the thread ends are glued on the label is an indication of the document number and caurauklot number of pages, proof of the correctness of the copy of the document, the project name of the applicant, the date of the application for the project, the name of the document's author, the development of the document and the signature of an official of the applicant for the project. 
47. If the project application submitted in paper form, the applicant not later than three working days after submission of the application to the institution of cooperation submitted electronically or sent to the electronic mail address veidlapa@liaa.gov.lv the completed project submission form and all annexes documents DOC, xls or PDF file format. 2. The provisions referred to in the annex to the project submission form and 6.2 section 6.1 the information contained in the file submitted to the xls format.
48. If the application is submitted by electronic means of the project document, the following requirements shall be met: 29.9. project submission developed and presented according to the law on electronic document circulation;
project submission is 48.2. developed in DOC, xls, PDF or JPG file format;
48.3. the project submission form and in addition to the original document to be submitted are signed by each individual author secure and certified electronic signatures with time stamp before the current project selection rounds.
49. If the project application submitted personally, at the time the application for the project is a collaborative office stamp contains the receipt date.
50. the application shall be accompanied, where the electronic document when you send to the liaison body of the electronic mail address, the application time is the moment when it is sent by electronic mail. In the event of a dispute concerning the application of the project, the project applicant must demonstrate that the project is sent to the application before the application deadline for the submission of projects, but a project of the cooperation body based at the applicant's request that the application is not received or received after the submission of the project application. 
51. the project is the responsibility of the applicant to prepare and store the original application and the project with project implementation related original documents or regulations on the development and design of a document in a fixed order certified copies of them until the end of the evaluation of the project, but if the project is approved, the beneficiary is obliged to store documents until 2021 December 31, as well as to provide the European Union and the authorities of the Republic of Latvia access to those documents or regulations on the development and design of a document in a fixed order certified copies thereof. 
52. If the application is filed in electronic form or document sent by mail, the liaison body within five working days after receipt of the application, notify the applicant in writing of the project the project application to the registration number. If the application is submitted in person, the registration number of the application, the project is assigned a project at the time of receipt of the application. 
VII. submission of Project evaluation and adoption of decisions 53. activities within the project submission evaluation provides the Commission: 53.1. the Commission consists of representatives of State agencies "the investment and development agency of Latvia" and the Ministry of the economy;

53.2. Commission meetings as observers without the right to vote can participate in the managing authorities, the responsible authorities and the liaison body. 
54. the launching of the Commission, the members of the Commission, experts and observers shall sign a declaration that they do not exist in such circumstances violates the European Union's structural and cohesion funds, the law limits the European Union's structural and cohesion funds to the person involved, and not the circumstances that it could be argued that they are interested in a specific project in the project submitted by the applicant for the approval or rejection of the application. 
55. project submissions valued under the provisions referred to in annex 6, quality, compliance, administrative and funding criteria. Project submissions valued using the project application selection and evaluation methodology and project submission form of valuation set out in laws and regulations, arrangements for the European Union's structural and cohesion funds in the participating institutions provide the planning document preparation and implementation of these funds and the European Union's structural and cohesion funds management and control system.
56. the criteria of evaluation order: 56.1. starting the evaluation, first project submissions valued compliance with this provision of the annex 6 14.8 in this criterion. If the application does not meet this criterion, it does not continue the assessment;
56.2. If the project application meets the provisions of this annex 6 14.8 in this criterion, valued project application, compliance with this provision of the annex 9.1., 6, 9.2, 9.3, 9.4, 9.6, 9.7, 9.9, 10.2 and 14.9. criteria referred to in point. 6. the provisions of this annex 10.2. criteria referred to in point scored, making use of this provision in annex 7 not supported in the list. If the application does not meet these criteria, the evaluation could not continue;
56.3. If the project submission complies with these provisions, annex 6, 9.1, 9.2, 9.3, 9.4, 9.7, 9.9 9.6.10.2 and 14.9. criteria referred to in the application for the evaluation of the project continue after this rule 6 the quality criteria referred to in annex (1., 2., 3., 4., 5., 6., 7 and 8;)
56.4. If the project submissions by this provision of the quality criteria referred to in annex (1., 2., 3., 4., 5., 6., 7 and 8), several projects receive the same number of points then, listing the projects comply with the following principles: 56.4.1. higher assessment receives project, which received the highest assessment criteria for project planned training in thematic areas and programme in accordance with the regulations on the classification of education;
56.4.2. If the assessment criteria for project planned training is equal, the higher the rating gets more projects with the project trained a number of persons employed;
56.4.3. If the project trained a number of persons employed is equal, the higher the rating gets projects involving a greater number of business operators that employees are trained during project implementation;
56.4.4. If the economic activity involved in the project number of traffickers, which employees are trained during project implementation, is equal, the higher the rating gets the project with higher assessment criteria for project management capacity;
56.4.5. If the assessment criteria for project management capacity is equal, the higher the estimate projects with lower receives the requested funding intensity;
56.4.6. If the requested funding intensity is equal, the higher the rating gets the project that received the highest assessment criteria for compliance with the principle of non-discrimination;
56.5. all project submissions, judged by the rules referred to in annex 6, quality criteria, judged by the rules of annex 6, paragraph 15, of the criteria. If the application does not comply with the provisions of annex 6, paragraph 15, criterion, it does not continue the assessment;
56.6. This provision by the other 6. criteria referred to in the annex continue to rate only the project submissions that meet these rules in annex 6, paragraph 15 of the criterion.
57. Where the application does not have sufficient information to assess the project submissions conform to one or more of the criteria, and if such information is not legible, believes that the project submission does not meet the criterion or criteria is assigned the lowest rating.
58. to project the application received a rating of this rule 6, paragraph 7 of the annex, the criteria specified in the requested funding intensity should be reduced and all project partners for the same amount of effort percentage point of the maximum permissible intensity according to the funding partners for compliance in a small, small, medium or large operator category. 
59. cooperation authority Manager, based on the assessment by the Commission, shall take a decision on the application for approval of a project if the project submissions, project submission complies with the provisions of annex 6, paragraph 15 of this criterion. If the application does not comply with the provisions of annex 6, 9.1, 9.2, 9.3, 9.4., 9.6, 9.7, 9.9, 10.2., 14.8, 14.9 in paragraph 15 this criterion, head of liaison bodies shall take a decision on the rejection of the application for the project. The decisions referred to in this paragraph, the liaison bodies shall be adopted by the heads of two months after the notice of project application submission in the specified project application submission date.
60. the decision on the application of the project approval may include conditions to be met in order to project the applicant may enter into a contract for the implementation of a project.
61. the decision on the application for the approval of the project provided the cooperation project, the applicant authority shall indicate what additional or clarifying information is needed to meet the project's application of these provisions, annex 6, 9.8, 10.1 9.5., 14.1, 14.2, 14.3, 14.4.., 14.5, 14.6, 14.7, 14.10 and 14.11..., as well as 11, 12 and 13 of this criterion and the time limit within which the information must be submitted. Specifying the project submission must not increase the total amount of eligible costs, funding amount and intensity.
62. cooperation authority decision on the approval of the application, the project on condition the condition of due date may not be less than 10 working days and longer than 20 working days from the date of dispatch of the decision to the applicant for the project.
63. in paragraph 62 of these provisions that date cannot be extended.
64. the decision on the application of the project approval, the approval or rejection of a conditional and its opinion on the draft of the information submitted by the applicant in the decision on the project's conformity with the approval of the application, provided the conditions set out in the liaison body shall be sent by post to the applicant of the project within five working days after the decision or opinion of the signing. 
65. the decision on the application of the project approval, the approval or rejection of a conditional and its opinion on the draft of the information submitted by the applicant in the decision on the project's conformity with the approval of the application, provided the conditions laid down in the cooperation of the authority within two working days after the decision or opinion of the signature of the applicant and must be forwarded to the project specified in the application to the fax number or electronic mail address.
66. Information about the decision on approval of the application, the project provided the conditions contained in the project applicant submits a collaborative institution evaluation. The liaison body 20 working days after the receipt of the information the applicant shall assess the project submissions and prepares opinion on its conformity with the decision approving the project application, provided the conditions laid down.
67. If the applicant does not submit the decision on approval of the draft provided the necessary additional specified or information, or non-performance of fine-tuning the conditions laid down in the decision, or cooperation bodies within the time limit set in the invitation does not conclude a contract with the liaison body for the implementation of a project, the authority has the right to invite a contract for the implementation of the project the project applicant, which project the application after application of the ranking of projects in order of priority are the next most points winning but that is a decision on the rejection of the application for the project as a result of insufficient funding. 
68. The liaison body, this provision in paragraph 67 of the project the applicant sends a letter with the request to certify readiness to implement the project. If the applicant within five working days after the liaison body sent a letter, has shown a willingness to implement the project, the collaborative leader of the authority, within three days following receipt of the decision of the legal administrative act unfavourable and submission of the project approval or approval with conditions. 
VIII. Project implementation and funding conditions

69. the maximum duration of the project is three years from the date on which the Office received the collaboration application for project implementation, the applicant initiated the project activities after the project supported the application. If the applicant intends to initiate the actions to be supported after the conclusion of the contract for the project implementation, the maximum duration of the project is three years from the date of conclusion of the contract for the project implementation. 
70. the shopping required for project implementation, project carried out by the applicant in accordance with the laws and regulations in the area of procurement.
71. cooperation authority course economic reasonableness of costs and compliance with market prices be valued before the project applicant has launched a procurement procedure. Project applicant before launching a procurement procedure, submit to the liaison body of the technical specifications for the procurement of the relevant training courses. The liaison body within 15 working days after receipt of the documentation referred to evaluate technical specifications and shall inform the applicant of the planned project cost compliance or non-compliance with market prices. If the planned training courses cost does not exceed the market price, the applicant may initiate a procurement procedure.
72. If the applicant intends to initiate the actions supported by the application of the cooperation project, the project applicant before the contract with the winner of the purchase procedure on the part of the purchase, which refers to training courses which are planned to be implemented before the contract is concluded for the implementation of a project agreed with the liaison authority of the procurement procedure, compliance with laws and regulations in the area of procurement. Collaborative procurement documentation submitted to the authority shall within 15 working days of receipt of such documents.
73. If the applicant intends to initiate the actions to be supported after the conclusion of a contract for the implementation of a project, the project applicant before the contract with the winner of the procurement procedure shall be coordinated with the liaison authority of the procurement procedure, compliance with laws and regulations in the area of procurement. The beneficiary of the procurement authority verifies the cooperation after the agreement on the implementation of the project.
74. If one of the sectors in which the beneficiary or partners, no investment and funding recipient or partner qualify for the implementation of the project eligible sector, the beneficiary and the partners clearly differentiates the eligible sectors of the financial implementation of the project feeds from other sectors of activity of financial flows during project implementation and after three years of project implementation, if the beneficiary or a partner meets the little, small or medium merchant status but five years after the implementation of the project if it meets the great merchant status. Not eligible are set out in Appendix 6 of this rule 10.2. criteria referred to in subparagraph 7. these rules and in the annex.
75. The beneficiary provides a snapshot of the project implementation insert the beneficiary's homepage on the internet (if applicable) not less frequently than once every three months.
76. the beneficiaries during the implementation of the project the project can involve new partners or to replace existing partners with new partners. New partners may not match this rule and 13.6 13.4. the condition laid down in point and must comply with the provisions of annex 6, 9.5 and 9.6 in. this criterion. If a new partner is the big merchant, it must justify the stimulative impact of funding in accordance with the provisions of paragraph 38. 
77. The beneficiary, without making amendments to the project, you can perform the reallocation of costs between these provisions referred to in paragraph 26 the cost positions pursuant to this rule 26 and 28 referred to cost constraints.
78. The beneficiary to the agreement on the implementation of the project shall be submitted within the time limits the authority of cooperation activities for the next quarter (annex 3). The first quarter activity plan shall be submitted together with the application for the project. 
79. If the applicant intends to initiate the actions supported by the application of the cooperation project, the project applicant not later than one month before the start of the next quarter, submit to the authority of the cooperation activities for the next quarter.
80. The beneficiary not later than five working days before the intended training course shall provide cooperation institution updated training plan in accordance with the agreement on the implementation of the project. Information about the changes to courses in progress or in the place (if any) shall provide cooperation authority no later than one day before the training course, sending information cooperation authority by fax or electronic mail and the original submission of the cooperative institution. 
81. The beneficiary receives the funding, if the following conditions are met: 81.1. the beneficiary with the cooperation of the authority has entered into a contract for the implementation of the project;
81.2. application submitted for the project collaboration, before the beneficiary has just launched a project supported activities. If the beneficiary carries out a project supported activities, before the application is submitted to the project cooperation, funding is not granted;
81.3. the beneficiary and the partners in the implementation of the project, provides the individual with the implementation of the project of the financial transactions related to the revenue and expenditure accounting that meets the requirements of the laws and accounting, as well as financial statements are prepared in accordance to the laws and regulations on the procedures for recording the financial statements for State, local, foreign, European Community, other international organizations and institutions, financial aid (financial assistance), gifts and donations, whether in cash or in kind;
81.4. is ready and the agreement for the implementation of a project on time filed interim cooperation institution (if necessary) and closing statements, and have added costs, copies of the supporting documents in accordance with the agreement on the implementation of the project;
81.5. project implementation costs are recognised as eligible by the authorities of cooperation carried out interim or final payment request inspections in accordance with the regulations on the structural funds of the European Union;
81.6. checks out the project of cooperation in place of the authority is entitled to make, in accordance with the regulations on the structural funds of the European Union, when the submission is filed for the project collaboration.
82. Cooperation authority shall decide whether to terminate the contract for the implementation of a project agreement for the implementation of a project, as well as the cases: 82.1. If the beneficiary of the first procurement procedures has not started within three months after the agreement on the implementation of the project;
82.2. If the beneficiary during project implementation deliberately provided the cooperation body of false information.
83. If 12 months from the date of conclusion of the contract for the project implementation, cooperation Office of the request for payment has been submitted for at least 25% of the eligible cost of the project, but not less than the amount of the advance received the appropriate amount of the eligible costs, or 24 months from the date of conclusion of the contract for the project implementation, cooperation Office of the request for payment has been submitted for at least 60% of the eligible costs of the project amount , the liaison body reduced the funding for the volume.
84. The liaison body shall be reduced on a pro rata basis for funding: 84.1. where the actual use of the funds is less than that provided for in the project application;
52.3. If costs exceed this rules 20, 21, 22, 23, 26 and 28. the costs referred to in paragraph 1;
84.3. If not implemented any of the agreement on the implementation of the project activities envisaged, but the aim of the project is reached;
84.4. If examination of the cooperation body in place of the project finds that the training course will not be implemented;
84.5. If there are no available financial resources, the use made of the supporting documents;
84.6. If use is not proportionate and reasonable;
If the purchase is made to 84.7. consistent with the laws of procurement;
84.8. If the beneficiary of five working days before the start of the course have not yet been submitted to the authority of cooperation updated training plan or if the beneficiary one day before the training course has not yet submitted a collaborative institution for information about changes to the training course. 
85. cooperation of the authority shall be entitled to interim and final evaluation report, as well as by making a payment request from the beneficiary's additional information related to the interim and final evaluation reports.
86. cooperation authority have the right to review of interim and final ratings during the invite experts to check whether the project cost estimates specified eligible costs are reasonable and economically justified.
87. Payment by Cashless settlement form on implementing the project in the beneficiary account specified in the agreement for the implementation of a project.

88. During project implementation the beneficiaries can receive advance payment, not exceeding 35% of the funding. To receive advance payment, the beneficiary shall submit to the institution of cooperation bank guarantee for the amount of the advance. Bank guarantee period is shorter than the period of project implementation.
89. the funding recipient may receive interim payments of no more than once every three months, if the project lasts more than six months. 
90. the interim payment can be claimed only after the completion of activities under the project, when implemented, specific training courses or, if the course is organized in the acquisition of several groups, has been implemented in accordance with the Group course. 
91. the Funding recipient project closing report and the request for payment shall be submitted to the liaison body of the 15 working days following the completion of the project, but not later than July 1, 2015.
92. cooperation authority beneficiaries of the amounts payable to be determined on the basis of the eligible costs of the project and eligible costs supporting documents, subject to the legislative requirements of the payment and transaction documents in the field of developing and designing.
Prime Minister, Minister of finance e. Repše economic Minister a. camphor annex 1 Cabinet 30 March 2010 the regulations No 328, which is representing the industry associations for support funding of operational programme "human resources and employment ' priorities 1.3 of Appendix" employment promotion and health work "based on" employment "UR1.3.1.pas 1.3.1.1. activity" Including the age of the population increases the competitiveness of the labour market, including the retraining of employed and active employment measures ". apakšaktivitāt" support 1.3.1.1.1 employee training – competitiveness of economic operators support the partnerships organized training "within the associations is provided representing the following sectors of economic activity for the operator: 1. Manufacturing (restrictions shall be determined in accordance with NACE Rev. 2 section C "manufacturing").
2. Information technology and telecommunications sector (restrictions shall be determined in accordance with NACE Rev. 2. "J information and communication services" "Telecommunications 61 Chapter 62 chapter" "computer programming, consultancy and related activities" and "chapter 63 information services").
3. the scientific research sector (restrictions shall be determined in accordance with NACE Rev. 2. "professional, M, scientific and technical services" chapter of the "72 scientific research work").
4. Creative industries sector (restrictions shall be determined in accordance with NACE Rev. 2. "professional, M, scientific and technical services" 74.10 class "specialised design work (excluding operational workers, operating in the interior decorators in scope) and no 71.12 class" Inženierdarbīb and related technical advice "(funding is provided only to economic operators that operate in the field of engineering)).
5. the Transport and communications sector (restrictions shall be determined in accordance with NACE Rev. 2 section H of the "Transport and storage").
6. Accommodation sector (restrictions shall be determined in accordance with NACE Rev. 2. "section I accommodation and food services" chapter of the "55 accommodation").
7. the automotive sales and repair industry (restrictions shall be determined in accordance with NACE Rev. 2 section G wholesale and retail trade; automotive and motorcycle repair "45.2 group" automotive service and repair ").
Economic Minister a. camphor at the Ministry of the economy presented in annex 2 versions of the Cabinet of Ministers of 30 March 2010. the Regulation No. 328 Minister of economics a. camphor annex 3 Cabinet 30 March 2010. the Regulation No. 328 Minister of economics a. camphor 4. Annex Cabinet 30 March 2010. the Regulation No. 328 Minister of economics a. camphor annex 5 cabinet 30 March 2010. the Regulation No. 328 Minister of economics a. camphor annex 6 Cabinet 30 March 2010 the regulations No 328 Project submission evaluation criteria apakšaktivitāt "1.3.1.1.1. Support for the training of employees for the promotion of competitiveness of economic operators – support the partnerships organized training "1. Criteria of quality evaluation system of notes scores 20 points Min-(all criteria must be able to obtain a total of at least 20) 1. project management capacity project manager above the total cost of implementing the project in relation to the total amount of the project planned in the application of the amount of eligible costs 0-10 criterion gives additional points 1.1. Project leaders have previously implemented projects that total cost total is greater than 100% of the project application in the planned amount of the eligible costs, and workers the training projects, the total cost amounts to at least 50% of the funding requested in the application of the project 10 1.2. Project leaders have previously implemented projects where the total cost amount is 50-100% of the project application in the planned amount of the eligible costs, and workers ' training projects, the total cost amounts to at least 50% of the funding requested in the application of the project 9 1.3. Project leaders have previously implemented projects the total cost of which totals 25-49% of the project application in the planned amount of the eligible costs, and workers ' training projects, the total cost amounts to at least 50% of the funding requested in the application of the project 8 1.4. Project leaders have previously implemented projects, the total cost total is greater than 100% of the project application in the planned amount of the eligible cost, or the supervisor in advance of projects total cost total is less than 25% of the project application in the planned amount of the eligible costs but project leaders previously have implemented employment training projects, the total cost amounts to at least 50% of the funding requested in the application for the project 5 1.5. Project leaders have previously implemented projects where the total cost amount is 50-100% of the project application in the amount of eligible costs scheduled 4 1.6. Project leaders have previously implemented projects, the total cost will total 25-49% of the project application in the amount of eligible costs scheduled 3 1.7. Project managers not previously implemented projects or projects the total cost total less than 25% of the project application in the planned amount of the eligible cost 0 2. Economic operator the number of employees are trained during project implementation if the rating 0-15 is less than 10 points, the project applications rejected more than 50 15 2.1 2.2 2.3.31-50 12 15 30 10 2.4. Less than 15 0 3. Project number 0-15 trained if the rating is less than five points application is rejected, the project 3.1 the project will train more than 500 workers 15 3.2. The project will train 250 – 500 employees 10 3.3. The project will train 100-249 employees 5 3.4. Project will be trained less than 100 workers 0 4. Project planned training of the following thematic areas and programme in accordance with the laws of the Latvian education rankings (the proportion of the training referred to in the draft Bill, the training costs against the total cost of training and the result is expressed as a percentage) : design 217 214 creative industry and the European economy bizness1 345 02 345 04 quality assurance and vadība2, Small and medium business 3 345 05-345 06 vadība1 Port Management and logistics 345 12 345 07 telematics and logistics Telemehānik 345 16 Hotel management project vadība2 345 21 345 20 institutions and organisations external sakari1 345 24 production engineering and management science 46 44 physical mathematics and statistics Datorik of 48 52 engineering and technologies of production and processing 54 811 03 hotel 84 Transport Services Services notes.
Only 1 project in the application submitted by the employers ' organization of Latvia Association to which it has rights to operate at the national level, or society, the European Association of Chamber of Commerce of 2 Just learning the information technology and telecommunications sector economic activities of employees of whom Only 3 training on Lean approach to all sectors of economic activity and by whom (Lean manufacturing and service management system for limiting losses and customer needs in order to satisfy the maximum effective) 0-20 If rated less than five points application is rejected, the project 100% 4.1 planned training provided in these training areas 20 95-99% 4.2 planned training provided in these training areas 15 4.3.85-94% of the planned training provided in those areas of training 10 4.4.75-84% of the planned training provided in these training areas less than 75% 5 4.5 planned training provided in those areas of training quality criteria for 0 horizontal priorities 5. Horizontal priority "sustainable development" project includes training of environmental protection or energy efficiency 0-5

Criterion gives additional points 5.1 the project includes training of environmental protection or energy efficiency 5 5.2. Project does not include the training of environmental protection or energy efficiency 0 6. Horizontal priority "equal opportunities" Project will ensure that the principle of non-discrimination by providing for actions that promote gender equality and active ageing, as well as the rights of persons with disabilities are respected in this criterion will be judged on whether the project is intended for the following basic principles: 1. The project will be training disadvantaged workers or workers with disabilities and this person at least 15% of the total number of employees of the trainees in the project. "Disadvantaged worker" and "the working person with a disability" means a person who meets the Commission's august 6, 2008, Regulation (EC) No 800/2008, which recognize certain categories of aid compatible with the common market in application of articles 87 and 88. (General block exemption regulation), 2 the definition laid down in article 2. Project applicant has validated the project target groups social portrait, including breakdown by gender age and disability, 3. a Special Project activities, taking into account the differing needs of employees in relation to gender, age group and other possible social exclusion risks 0-10 criterion gives additional points 6.1. The project is respect for the fundamental principles of all three of 10 6.2. Project is 2. and 3. observance of the fundamental principles 8 6.3 project is 2. observance of the basic principle 6 6.4. Project is not for the respect of the fundamental principles in the horizontal priority of 7.0 "macroeconomic stability" required of the applicant in the project European Social Fund funding intensity (reducing the intensity of one percentage point , you receive a rating two points). If the requested funding intensity is reduced by at least 7.5 percentage points, the criteria receives the maximum rating of 0-15 Criteria gives extra points 8. Horizontal priority "information society" project includes training for working with information and communications technologies 0-10 criterion gives additional points 8.1. The project includes training for working with information and communication technology project does not include 10 8.2. training to work with information and communications technologies 0 2. eligibility criteria ranking system Yes/No 9. Project applicant eligibility criteria 9.1. the applicant is a society of the project N
9.2. the project applicant is the employers ' organisation the Association to which it has rights to operate at the national level, the society, which is the European Association of Chambers of Commerce or associations representing the manufacturing, information technology and telecommunications, research, creative industry, transport and communications, accommodation or car sales and repair industry operating workers N Project applicant 9.3 in Latvia registered member (economic operator), the aggregate turnover of the last closed accounting year has exceeded 100 million lats (takes into account also the operating staff turnover that is not the applicant of the project members, but there is a member in one of the organizations that are members of the applicant) of the project N 9.4 Project applicant is registered in the register of companies, associations and foundations register not later than three years before the submission of the application to a project in the cooperation Project applicant N 9.5. and partners involved in the project do not administer the State revenue service tax and other State or local Government set compulsory payment of debt P 9.6. applicant and Project partners involved in the project are recognised as insolvent- including not in the bailout process, or the process of legal protection, the economic activity is not terminated or in accordance with the information available to business registers they are not wound up N 9.7. Project the applicant complies with the regulations on the implementation of the apakšaktivitāt requirements in the application of the project N 9.8. are identified and justified in the project application to the training needs of the industry, and the project has relevant training courses P 9.9. Project from each of the training providers will be purchased at least three training operating staff person N 10. project industry sector 10.1. the project is in accordance with NACE Rev. 2.
 
P 10.2. operator of the economic activities that employees will be trained in running the project, eligible sector.
Not eligible are: 1. arms, tobacco production and marketing 2. Gambling and betting 3. operations with real estate Trade 5 4 insurance, financial intermediation and banking 6. Vehicles, machinery and equipment, personal effects, household hardware and equipment leasing N 11. activities envisaged under the project comply with the laws and regulations on the implementation of the requirements of the apakšaktivitāt eligible activities P 12. Project costs 12.1. eligible costs of the project comply with the laws and regulations on the implementation of those apakšaktivitāt eligible costs project costs 12.2 P (the total eligible costs of the project total project eligible costs and not project total cost estimate of the project costs) is the arithmetic mean calculated correctly and the laws have been respected on the implementation of the apakšaktivitāt eligible costs set limits to P 12.3. The requested funding is calculated the arithmetic correctly and in compliance with the laws and regulations on the implementation of the P apakšaktivitāt 12.4. the requested amount of funding does not exceed the regulations for the implementation of apakšaktivitāt the maximum funding for a planned expenditure of 12.5 P is proportional to , economically justified, necessary for the implementation of the project, according to the project goals and tasks, and provides measurable results for physical generation P 13. Implementation of the project shall not exceed regulations on the implementation of the deadline apakšaktivitāt P 3. Administrative criteria ranking system Yes/No 14. project application project submission 14.1 is prepared according to the project submission form, you add all the additional documents to be submitted, and they are designed according to the laws of the Republic of Latvia of the requirements for the development and design of a document as well as the project submission complies with the regulations on the implementation of the apakšaktivitāt requirements of the P 8.8. project application form is fully completed project submission 14.3 P original is to number the pages of the project application, P 14.4. not specified corrections – deletions, aizkrāsojum, deletion and addition of project submission 14.5 P to the original of the document or the laws drafting and design for the certified copy thereof is the document legal force P project submission is 14.6. explicit training needs in the sector of the project. the project application, P 9.1-used currency is the lats P 14.8. project submission filed submission deadlines for the receipt of project N Project applicant project 9.3. submission within the selection round has submitted one application for the project N project submission is 14.10. completed typed application 14.11. Project P is filed in one copy, and the project application form submitted in electronic form (if filed in paper form) P 4. Funding criteria ranking system Yes/No 15.
If the application meets the 9.1 9.2, 9.3, 9.4, 9.6, 9.7, 9.9, 10.2, 9.2, and 9.3. evaluation criteria. and 2. quality evaluation criteria is received at least 10 points, 3. quality evaluation criteria is received at least five points, 4. quality evaluation criteria is received at least five points and has received at least 20 points, after assessing the quality evaluation criteria, then the project submissions, listing in order of priority starting with the most points winning the project application, insufficient activity of the project application selection round of funding available in the N Designation.
1. N – if you received a negative rating, the application is rejected.
2. P-if you received a negative assessment, decide on approval of the draft on condition (project applicant, within the time limit laid down in the decision to ensure compliance with the criteria).
Economic Minister a. camphor annex 7 Cabinet 30 March 2010 the regulations No 328 sectors are not expected to support the funding of the operational programme "human resources and employment ' priorities 1.3 of Appendix" employment promotion and health work "based on" employment "UR1.3.1.pas 1.3.1.1. activity" Including the age of the population increases the competitiveness of the labour market, including the retraining of employed and active employment measures ". apakšaktivitāt" support 1.3.1.1.1 employee training – competitiveness of economic operators support the partnerships organized training "is delivered within the following sectors :

1. arms production (restrictions shall be determined in accordance with NACE Rev. 2. "25.4 weapons and munitions production and 18.9 group" military combat vehicles "(NACE UR1.1.red." the group 29.6 weapons and munitions production ")) and manufacture of tobacco products (restrictions shall be determined in accordance with NACE Rev. 2." chapter 12 manufacture of tobacco products "(NACE UR1.1.red. Chapter 16 of" tobacco products ")).
2. Gambling and betting (restrictions shall be determined in accordance with NACE Rev. 2. ' 92 gambling and betting "(NACE UR1.1.red. class 92.71 gambling and betting" ")).
3. operations with real estate (restrictions shall be determined in accordance with NACE Rev. 2. "operation with L real estate" (NACE UR1.1.red. 70. ' operations with the real estate ")).
4. Marketing (restrictions shall be determined in accordance with NACE Rev. 2 section G wholesale and retail trade; automotive and motorcycle repair ", except group 45.2" automotive service and repair "(NACE section G" UR1.1.red wholesale and retail trade; cars, motorcycles, personal effects, household hardware and machine repair ", with the exception of" Automotive Group 50.2 maintenance and repair "and the group" personal item 52.7, household hardware and machine repair ")).
5. Insurance, financial intermediation and banking services (restrictions shall be determined in accordance with NACE Rev. 2 section K financial and insurance activities "(NACE section J UR1.1.red." financial intermediation ")).
6. Vehicles, machinery and equipment, personal effects, household hardware and equipment rental (restrictions shall be determined in accordance with NACE Rev. 2.77. ' leasing and operating leasing "(NACE UR1.1.red. 71. ' vehicle, machinery and equipment, personal effects, household hardware and equipment leasing")).
Economic Minister a. camphor