The Provisions On "operational Programme Infrastructure And Services" Appendix "support Activity 3.1.3.2. General Education Institutions Network Optimization"

Original Language Title: Noteikumi par darbības programmas "Infrastruktūra un pakalpojumi" papildinājuma 3.1.3.2.aktivitāti "Atbalsts vispārējās izglītības iestāžu tīkla optimizācijai"

Subscribe to a Global-Regulation Premium Membership Today!

Key Benefits:

Subscribe Now for only USD$40 per month.
Cabinet of Ministers Regulations No. 346 in 2010 in April (13. § 3 No. 19) the rules on the "operational programme infrastructure and services" Appendix "support activity 3.1.3.2. General education institutions network optimization" Issued under the European Union's structural and cohesion funds act 18 paragraph 10 of article i. General questions 1. determines: 1.1. procedures for implementing the action programme ' infrastructure and services ' addition ' Infrastructure priorities 3.1 human capital contributes to the strengthening of the "UR3.1.3.pas" educational infrastructure for the provision of General skill "3.1.3.2. activity" support for general education institutions network optimization "(hereinafter referred to as the activity);
1.2. The European regional development fund project (hereinafter draft) submission evaluation criteria;
1.3. the requirements of the project the applicant;
1.4. the responsible institution and liaison body, the distribution of competence between these institutions and cooperation arrangements, as well as the responsible authorities and cooperation agencies functional form of subordination.
2. The purpose of the activity is to improve the quality of secondary education in the country, by supporting educational institutions network optimization plan that focuses on economic sustainability and the essential quality standards.
3. the purpose of the activity reached through one or more of the provisions in this paragraph 9.
4. Activity implemented in public selection of projects application (hereinafter referred to as the open selection). The responsible authority organises the open selection for all activity funding available and no more than two open selection rounds. The responsible authority until 1 august 2011 is entitled to re-arrange the open selection round, if not the entire learning activity available funds. 
5. the activities to be co-financed by the European regional development fund. The overall activity within the European regional development fund is LVL 2 229 231.
6. activities within the responsible authority provides the Ministry of education and Science (hereinafter referred to as the responsible authority). Responsible authority: ensures project 6.1 the application selection and evaluation: 6.1.1. project development application form filling methodology;
6.1.2. develop and approve the submission of the project evaluation form, the submission of the project assessment and project evaluation forms filled out the application methodology, as well as the project application selection and evaluation procedures;
6.1.3. the draft invitation application selection;
6.1.4. a project application to the Evaluation Commission (hereinafter the Commission);
6.1.5. developed and approved the Statute of the Commission;
6.1.6. application of the project evaluated and adopted a decision on the approval of the project application, approval or rejection of the condition, as well as assess the decision on approval of the application, the project provided the conditions are met;
6.2. the accumulated data on project submissions under the laws and regulations of the European Union's structural funds and the cohesion fund management information system design and use;
6.3. under this provision the project referred to in paragraph 50 of the amendments;
6.4. plan and implement information measures on the implementation of the activity;
6.5. ensure that these rules are not exceeded, paragraph 5, of the activities available for the implementation of the European regional development fund, as well as monitor and control available in the European regional development fund, including a learning Council of 11 July 2006, Regulation (EC) No 1083/2006 laying down general provisions on the European regional development fund, the European Social Fund and the Cohesion Fund and repealing Regulation (EC) No 1260/1999 93. Article 1 and 2 of the principle referred to in the performance of the activity level;
6.6. place your website project application form filling methodology, project submission form and the evaluation, the project application selection and evaluation procedures.
7. activities within the co-operation authority provides public education development agency (hereinafter referred to as cooperation body). The liaison body: 7.1.  10 working days after the date of entry into force of the provisions of the agreement on the development of the project (hereinafter referred to as the agreement) project, setting the conditions for the implementation of the project beneficiaries in accordance with the requirements of the rules and regulations that govern the European Union's structural and cohesion funds, implementation, and monitoring of implementation, and shall submit it to the authority responsible for the coordination;
7.2. the agreement concluded with the beneficiary;
7.3. ensure project monitoring and control, including checks at the place of implementation of the project and the Council of 11 July 2006, Regulation (EC) No 1083/2006 laying down general provisions on the European regional development fund, the European Social Fund and the Cohesion Fund and repealing Regulation (EC) No 1260/1999, article 93 1 and 2 of the principle referred to in the implementation of the project;
7.4. the Ministry of education and science provides information on State budget planning for project implementation;
7.5. the beneficiaries of the appearance of the procurement plan and submit it to the procurement monitoring Bureau;
7.6. prepare and provide the information to the authority responsible for the implementation of the activity and the activity of learning available funding, as well as by the responsible authority provides information on individual projects;
7.7. preparing forecasts of payment and submit it to the paying authority;
4.8. preparing the European regional development fund demand forecasts for the current and the following year and shall submit it to the leading authority and the responsible authority;
4.9. checking and confirming the beneficiary's payment request and prepare the Declaration of expenditure;
7.10. provide information about the recipient of the funding agreement requirements and terms of execution;
7.11. the accumulated data on the implementation of the project according to the laws of the European Union's structural funds and the cohesion fund management information system design and use;
7.12. plans and implements public awareness measures on the conclusion of the implementation of the agreement;
7.13. the amendments to the draft.
8. the cooperation body is the functional supervision of the responsible authority.
9. activities supported under the following eligible activities of the city or municipality education institutions network optimization, and access, quality and cost effectiveness of: 9.1. educational infrastructure and optimizing adjustment (except sports infrastructure), carried out the necessary works for the expansion of the education authorities or customization of the student increase, including the creation of a common infrastructure for several educational institutions;
9.2. the educational expansion or customization required for training equipment and furniture (except sports equipment).
II. conditions of funding the project applicant has 10 counties or cities of the Republic authorities.
11. The County or City Government of the Republic in accordance with the laws and regulations on financial stabilisation is not in financial stabilization process.
12. the minimum project total eligible cost is $351 402, the maximum eligible cost of the project amounts to $557 307. 
13. the maximum permitted by the European regional development fund co-financing is 100 percent of the total eligible costs of the project totals. 
III. submission of Project selection and project submission notification filing 14. the responsible authority shall issue a public notice of the selection of open selection (hereinafter referred to as the notice) by publishing the newspaper "Latvian journal" and the Ministry of education and Science website (URwww.izm.gov.lv). 
15. Notification: 15.1 project application submission deadline, which is not shorter than 40 working days from the day of promulgation;
15.2. the application of the project site and order;
15.3. the website which published the application to be used for the preparation of project documents;
15.4. submit paper copy of the application for the project.
16. The open selection issued not earlier than a month, and not later than three months after the date of entry into force of the provisions.
17. the project applicant project application submitted, subject to the following requirements: 17.1. selections found in one round may submit one project submission;
17.2. the project application form a completed project application form (annex 1) and the following annexes: 17.2.1. This provision of the annex referred to in point 1.8. the county or city in the educational institutions of the Republic network development concept;
17.2.2. the applicant's statement of the project project implementation, which will be carried out in project construction, training equipment, or installation of furniture (including the address of the place), and one of the following documents: 17.2.2.1. identity document copy that indicates that the infrastructure for the project funds will be allocated to investments, is the property of the applicant of the project (certified registered with the land registry in the copy of the document);

17.2.2.2. proof that up to the end date of the project applicant project infrastructure for project funds will be allocated to investments, take over your property, and the infrastructure owner proof of transfer of the infrastructure project the property of the applicant. Vocational training institutions in the case of takeovers, the Ministry added, which is subordinated to the vocational training authority, proof that it agreed with the project applicant on the reorganization of vocational education institutions and vocational training institutions for the transfer of the infrastructure project, the property of the applicant;
17.2.3. vocational educational development and investment strategy that aligned with the Ministry of education and science or other ministries, if professional education institution is subordinated to the Ministry of another (true if the planned takeover of vocational education institutions);
17.3. the project application to the institution of the applicant, the signature of the project manager or his authorised person, project submission by adding the appropriate authorisation.
18. in order to ensure the conformity of the application of the draft of this provision in annex 2 in paragraph 1.5 above requirements, project does not change the applicant and does not delete the project submission form section, subsection and their names.
19. the project applicant project application to the responsible body can submit to: 19.1. paper form (caurauklot form, the page number, the page was last on the other side of the thread ends are glued, the label provides information about the document number and the number of sheets, caurauklot proof of the correctness of the copy of the document, the project name of the applicant, the date of preparation of the application projects, project official of the signature of the applicant), adding an identical project submission form and this provision 17.2.1. discharge or referred to Republican city education network development concept of the electronic version of the electronic media. All the documents placed in closed packaging (envelope) and sealed;
19.2. the electronic document, signed with a secure electronic signature and confirm with the time stamp before the draft application deadline according to the law on electronic document design requirements.
20. the notice specified in the project application submission period end date is the last day when the project applicant project application may be made in person, in the form of electronic document or sent by mail.
21. the competent authority shall register the project application submitted to it on the date of receipt. Proof of receipt of the application, the project authority in charge of the project to the applicant personally immediately or within 10 working days after the end of the period for lodging applications sent by mail or electronically to the electronic form of a document, signed with a secure electronic signature according to the law on electronic document design requirements. 
IV. Project evaluation 22. application activity within the project application submitted to the Commission. Panelists included representatives from the Ministry of education and science. The Commission may include representatives from the municipalities of Latvia.
23. the meetings of the Commission as an observer without the right to vote can participate in the managing authorities and the liaison body. The Commission in the evaluation process may invite one or more experts without voting rights.
24. The Commission shall determine the responsible authorities developed and approved regulations.
25. the launching of the Commission, Commission members, experts and observers signed a declaration that the Commission obtained during the meetings of the information and the content of the document will not disclose to third parties, and the members of the Commission and experts to sign a declaration that there are no circumstances in which they might violate the limits the European Union involved in the management of the Fund, established by the laws of the European Union's structural and cohesion funds, implementation, and monitoring of implementation.
26. project submissions valued according to annex 2 of these rules 1, 2, 3 and 4 of the project referred to in paragraph submission evaluation criteria, subject to these rules, laws and regulations that govern the European Union's structural and cohesion funds, implementation, and monitoring of implementation, and the responsible authorities develop and validate the project application selection and evaluation procedures, as well as through the application of the project assessment and project evaluation forms filled out the application of the methodology. 
27. project submissions valued in the following order, by the provisions of annex 2, paragraph 1, the administrative evaluation criteria, referred to in paragraph 2, the eligibility criteria for the evaluation referred to in paragraph 3, the quality evaluation criteria and the funding referred to in paragraph 4, the award criteria.
28. the project on application of administrative compliance criteria, eligibility criteria and funding criteria is assessed by rating (meet), "Yes" or "no" (no matches). Application of project compliance with quality criteria assessed by giving a certain number of points.
V. decision on approval of the project application, approval with conditions or disapproval of acceptance and notification 29. the responsible authority shall take a decision to approve the project application, if all those provisions of annex 2 1, 2, and 4. the project mentioned in paragraph submission evaluation criteria have been assessed with "Yes" and quality evaluation criteria project application has received the required number of points.
30. the responsible authority shall take a decision to reject the application of the project and do not continue the evaluation of the application of the project according to the project application, evaluation criteria, if the one of the following circumstances: 30.1. the project submission does not comply with any of the provisions of this annex 1.1., 1.2., 1.3, 1.4, 1.5 or 1.6. referred to administrative criteria;
30.2. the project submission does not comply with any of the provisions of this annex 2 2.1.1., 2.1.2, 2.1.3, 2.1.4.. or 2.2.1. referred to the eligibility criteria;
30.3. the project submission does not comply with any of the provisions of annex 2, 1.6, 1.7 1.9., 1.10., 1.11, 1.12, 1.13, 1.14, 1.15., 1.16, 2.1.5, 2.1.6, 2.1.7.., 2.1.8 2.1.9 2.1.10,.,.,., 2.1.12.2.1.11 or 2.2.2. referred to the assessment criteria and the prevention of non-compliance affects the project the application on the merits;
18.9. the assessment of any of the provisions of annex 2, 3.1 3.3 or 3.4. quality evaluation referred to the criteria of the project application has been received by less than two points in any of these rules or to annex 2 3.6, 3.7 or 3.9. quality evaluation referred to in criteria received less than one point.
31. the responsible authority shall take a decision to reject the application of the project, if this provision of the annex 2 referred to in paragraph 4, the funding criteria are evaluated with "no".
32. If the result of the evaluation, a number of project submissions receive the same number of points and all project submissions referred to does not have enough activity, available funding priority is the project supported the application of these provisions, that annex 2 3.5. quality evaluation referred to in subparagraph criteria has received the greatest number of points. If even more project applications received the same number of points, the priority is the project supported the application of these provisions, that annex 2 3.7. quality evaluation referred to in subparagraph criteria has received the greatest number of points.
33. The competent authority may take a decision on the approval of the application, the project on condition that must be satisfied in order to project the applicant would conclude the agreement. That decision may include the following: 33.1. clarification of the application of the project according to annex 2 of these regulations, 1.6, 1.7 1.9., 1.10., 1.11, 1.12, 1.13, 1.14, 1.15. or 1.16 referred to administrative criteria, if the prevention of non-compliance does not affect the substance of the application for the project;
33.2. clarification of the application of the project in accordance with the provisions of annex 2, 2.1.6.2.1.5, 2.1.7 2.1.8 2.1.9.,.,.,., 2.1.10 2.1.11, 2.1.12. or 2.2.2. eligibility criteria referred to in the prevention of non-compliance, if the project does not affect the substance of the application;
33.3. the clarification of costs, provided that this provision in 40.1.7 and 42 and 43 above cost limit is not exceeded;
20.8. other specific legal authority to justify action, which is focused on the conclusion of the agreement.
34. the responsible authority shall within five working days after the date of adoption of the decision: sent to the applicant of the project-34.1. the decision on the application of the project approval or rejection of the application, project, or project approval submissions;
21.3. cooperation authority-the decision on the application for the approval of the project and the project approved, the original of the application on paper or project submission, presented in the form of electronic documents signed with secure electronic signatures, and confirm with the time stamp in the laws on electronic document design.

35. If the application is approved, the applicant in the decision of the project the project approval, provided the application within the time limits of not less than 15 working days and no more than 30 working days from the date of dispatch of the decision, shall ensure the fulfilment of the conditions and submit to the authority responsible for the evaluation of the written information on the conditions. Decision within the time limit set in the information about the conditions of the project, the applicant may submit a maximum of two times.
36. the responsible authority shall be 20 working days after the decision on approval of the application, the project on condition the expiry of that period, assess the project submitted by the applicant information and drawing up an opinion on the conditions in the decision (hereinafter referred to as the opinion).
37. If the applicant in the decision approving the project submission deadline provided met the conditions laid down in the decision, the opinion of the responsible authority is positive and responsible authority within five working days from the date of signing the opinion sent: 37.1. the project applicant, opinion;
37.2. cooperation authority-the decision on the application for the approval of the project, and the project approved, the original of the application on paper or project submission, presented in the form of electronic documents signed with secure electronic signatures, and confirm with the time stamp in the laws on electronic document design.
38. If the applicant does not provide the decision on approval of the application, the project provided the conditions contained in or does not ensure compliance within the time limit set in the decision, the responsible authority opinion is negative and the project application is considered to have been rejected. The responsible authority within five working days from the date of signing the opinion sends the draft opinions to the applicant.
39. cooperation authority within 10 working days after the conclusion of the agreement in writing inform the responsible authority.
Vi. Eligible and ineligible costs 40. The project has the following applicable items: cost of 24.9. direct costs: 40.1.1. buildings, structures, facilities and infrastructure renovation and reconstruction (including public works), as well as the improvement of the work site;
40.1.2. required training equipment, equipment and accessory acquisition costs;
40.1.3. purchase procedure, the cost of the provision;
40.1.4. technical project development costs;
40.1.5. building and autoruzraudzīb costs;
40.1.6. project implementation in the material value of the insurance costs, if they apply to the project implementation period;
40.1.7. real estate (land) acquisition cost – to 10 per cent of the total direct eligible costs of the project;
40.2. the indirect costs or project information and publicity costs, consistent with the laws of European Union funds publicity and visual identity requirements;
40.3. the non-recoverable value added tax payments if they cannot recover the legislation.
41. This provision referred 40.1.2. costs may include: 41.1. new teaching equipment, accessories and equipment acquisition cost;
41.2. the necessary costs of purchase of furniture;
41.3. training facility and equipment delivery, installation and usage instructions.
42. This provision, 40.1.4 40.1.3., and 40.1.6 in 40.1.5. these costs do not exceed 10 percent of that rule, and 40.1.7 40.1.2 40.1.1. the cost amount referred to.
43. This rule 40.2. costs referred to in subparagraph does not exceed 0.1% of the total direct eligible costs of the project.
44. within the framework of the activity is not applicable and the project application shall not include the following costs: 44.1. project administration costs;
44.2. vehicle purchase and rental costs;
27.5. expenses, which does not provide the immediate purchase of equipment or technology (leasing);
27.6. fee for loan processing, presentation, and service, the reservation fee on financial transactions, interest on arrears, penalties and expenses of litigation;
27.7. costs not specified in the rules in paragraphs 40 and 41;
27.7. the costs that do not meet these rules, 40.1.7.42 and 43 in the cost limit;
27.8. the costs associated with the implementation of project activities;
27.8. the costs that are not incurred by the project during the implementation of activities or payments made later than the month following the expiry of the implementation of the project;
27.9. costs not justified by supporting documents, or there are legislative non-compliance;
44.10. costs that do not meet the reasonable financial management principles (especially the cash value and cost effectiveness).
VII. Project implementation conditions 45. Beneficiary of the project can start before the conclusion of the agreement, but not later than two months after the conclusion of the agreement. The project no longer than 31 December 2013. 
46. The beneficiary within five working days after the conclusion of the cooperation agreement shall submit to the institution of the procurement plan. If the beneficiary of the project before the agreement is purchasing, it procurement plan shall be submitted to the liaison body before launching a procurement procedure.
47. The beneficiary first procurement procedure for the supply of equipment, works or projects development issued no later than 90 calendar days of the conclusion of the agreement.
48. The beneficiary shall ensure the implementation of the project related loading snapshot, the beneficiary authority Web site at least once every three months.
49. the project is carried out in accordance with the amendments to the regulations establishing procedures for European Union structural and cohesion funds in the participating institutions provide the planning document preparation and implementation of these funds, in so far as these rules otherwise.
50. The draft amendments to coordinate with the responsible authority, if the changes are related to: 50.1. project objectives;
50.2. change of the beneficiary;
50.3. the project sample outcome indicators.
51. The beneficiary, without making amendments to the project, you can make the project cost reallocation: 51.1. between this provision and 25.0 24.9. these costs in line, not exceeding five percent of the cost of a transferable and subject to this provision, 40.1.7.42 and 43 above cost limit;
51.2. This provision and 25.0 24.9. the position referred to.
52. The beneficiary shall submit a request for payment of the cooperation body, accompanied by an explanation of the rules referred to in paragraph 51 of the reallocation of costs. If this explanation is not filed or the explanation is not justified, liaison body cost reallocation may be considered not to have occurred.
53. If the project occurs during non-eligible expenditures or costs, the incidence in the beneficiary to bear from its own funds.
54. the responsible authority shall have the right to request from the beneficiary's information about the progress of the implementation of the project and results achieved compliance with the planned results.
Prime Minister v. dombrovsky, Minister of education and science t. koķe Ministry of education and science of the presented version of annex 1 of the Cabinet of Ministers of 13 April 2010 Regulation No. 346 of the education and Science Minister t. koķe annex 2 Cabinet 2010 April 13, Regulation No 346 application evaluation criteria Project performance program number and name of the infrastructure and services priority number and name 3.1. Infrastructure to strengthen Measures of human capital and title of 3.1.3. General education infrastructure for ensuring skills activity number and name 3.1.3.2. General support The OPTIMIZATION of the educational institutions of the project application selection type open PROJECT application selection responsible authority Ministry of education and science 1. Administrative criteria rating (yes/no) 1.1.
Project applicant meets the Cabinet of Ministers of 13 April 2010 No. 346 of the provisions of the "rules for the operational programme ' infrastructure and services ' 3.1.3.2. Appendix" support activity general education institutions for network optimization "(hereinafter referred to as the rules) referred to in paragraph 11 of the draft applicant requirements N 1.2.
The project proposal is submitted to the responsible authorities within the specified N 1.3.
The project application is drawn up into N 1.4.
Project submission is prepared in Latvian language N 1.5.
The project application has been drawn up according to the provisions referred to in paragraph 17.2. project submission form, and all sections are completed, N 1.6.
The project application is filed on paper, has the required number of copies of the application for the project, the original project submission (copy also, where provided) is cauršūt (caurauklot) or filed electronically in the form of a document signed with a secure electronic signature and confirm with the time stamped electronic documents under the procedures laid down in the law, as well as all documents submitted are formatted according to the specified requirements P 1.7.

The project application is signed by the project head of the institution to the applicant or his authorised person P 1.8.
The application is added to the project in question or of the City Municipality education development concept N 1.9.
Project application in addition to the district or the Republican city education network development concept was added to all of the provisions referred to in section 17.2.2. attachment P of 1.10.
The period of project implementation and cost allocation over the years correspond to the provisions referred to in paragraph 45 of the project implementation period P 1.11.
The project required the application of the European regional development fund co-financing and the total eligible costs indicated in lats P 1.12.
The project required the application of the European regional development fund co-financing percentage shall not exceed the provisions mentioned in paragraph 13 of the allowable amount of co-financing P 1.13.
Application of the project required a total eligible cost of which is not less than the provisions referred to in paragraph 12 of the minimum amount of eligible cost and shall not exceed the provisions mentioned in paragraph 12, the maximum eligible cost amount P 1.14.
Application of the project eligible costs over the years specified in full in the arithmetic right and meet the project budget totals listed in the summary P 1.15.
The project's eligible cost specified in the application to the positions correspond to rules 40 and 41 eligible costs listed in P 1.16.
The project specified in the application to the planned costs do not exceed 40.1.7 of the rules, in 42 and 43 in these cost restrictions P 2. eligibility criteria rating (yes/no) 2.1 application the project eligibility criteria 2.1.1.
The aim of the project activity meets purpose – to improve the quality of secondary education in the country, by supporting educational institutions network optimization plan that focuses on economic sustainability and the essential quality of education standards 2.1.2 N.
The project provides for the implementation of the provisions set out in paragraph 9 of the eligible activities N 2.1.3.
The project application is defined in the problem addressed and justified the chosen target group needs N 2.1.4.
Application of the project and the planned activities provide the problem and define the target group needs N 2.1.5.
Project support for the educational institution or institutions are included in the district or the Republican city education network optimization and development plan P 2.1.6.
The project planned activities do not overlap with the European regional development fund activities "for qualitative 3.1.3.1. learning the appropriate material science base" and "learning activity 3.1.1.1. equipment upgrades and infrastructure improvements in the implementation of vocational training programmes" within P 2.1.7.
Project activities are clearly defined, proportionate with the planned implementation timetable and ensure planned results P 2.1.8.
Application of the project results and the planned figures are accurately defined and measurable (reachable results are specified in units with specific values) P 2.1.9.
Project application describes the project management, implementation and monitoring system and the required resources (in the number of staff involved, qualifications and responsibilities, the available material and technical base), and they are appropriate to the needs of the project P 2.1.10.
The project application is justified, as it will ensure the sustainability of the results achieved and maintenance for at least five years after the implementation of the project P 2.1.11.
Project costs indicated in the application corresponds to the period of project implementation, it is necessary and reasonable to achieve project results and the implementation of planned activities P 2.1.12.
The project planned in the publicity and information dissemination activities comply with the laws and regulations of European Union funds for the implementation of the project publicity measures P 2.2 project eligibility criteria 2.2.1 of the applicant.
The project applicant is a district of the city or municipality N 2.2.2.
Infrastructure for the conduct of the European regional development fund contribution, is the property of the applicant or of the project to the European regional development fund, the project end date will be recorded in the beneficiary's property P 3. Quality criteria rating (point scale) 3.1.
The project attached to the application or of the City Municipality education institutions network development concept: should reach at least 2 points 3.1.1. contain education network optimization and development plan or the plan, only the following content year 0 3.1.2. education content network optimization and development plan of at least the following two years 2 3.1.3. education content network optimization and development plan of at least the following three years 3 3.1.4. education content network optimization and development plan for at least the next five years 5 3.2.
The project attached to the application or of the City Municipality education institutions network development concept: not exclusive Criteria 3.2.1. analyse the situation and make proposals for the county or the city of the Republic, general education development network 1 3.2.2. analysing the situation and make proposals for the county or the city of the Republic, general education and vocational training in the development of the network, evaluating the possibilities of the municipality to take vocational training authority or authorities in its management 3 3.3.
The number of trainees 2009/2010 academic year educational institution, which is adjusted to the increase in the number of trainees or on the base of which is created the common infrastructure of several educational institutions: at least 2 points must be reached 3.3.1. country-less than 150; Republic city – less than 300 0 3.3.2. municipality – from 150 to 200; Republican city, from 300 to 500 2 3.3.3. more than 200 in the County; the city of Republic-more than 500 4 3.4.
The number of learners educational institution after the adjustment increases the number of trainees or the number of learners who learn to total number of education tailored to the needs of infrastructure: To reach at least 2 points less than the municipality 3.4.1-200; Republican city, less than 400 municipality, from 0 3.4.2.200 to 300; Republican city, from 400 to 600 2 3.4.3. more than 300 in the County; the city of Republic-more than 600 4 3.5.
General education institutions pooling or common infrastructure with professional education institution, municipality taking over professional education institution in management: your Criteria are not exclusive to 3.5.1 project for 0 is for project 3.5.2 10 3.6.
Public transport accessibility of the educational institution, which is adjusted to the increase in the number of trainees or on the base of which is created the common infrastructure of several educational institutions: To reach at least 1 paragraph 3.6.1. transport runs less frequently than two times a day 0 transport ply 3.6.2 twice a day 1 transport ply 3.6.3. three to four times a day 2 transport ply 3.6.4 five times a day or more often or the municipality provides transport services for the transport of 3 trainees 3.7.
Planned activities the project ready to start: must be at least 1 paragraph 3.7.1. the project is not ready to start (not drawn works and provides a list of equipment and cost calculation, not up the purchase documentation) 3.7.2. project medium 0-ready to start (and based works and provides a list of equipment and cost estimates, prepared documentation for the purchase of at least one of the planned execution of purchases or for the purchase of equipment) 1 3.7.3. project is a high readiness to start (developed the technical design of the works , delivered the tāmētāj drawn up certified construction cost estimate prepared the technical documentation for the purchase of equipment, started at least one of the planned execution of purchases or for the purchase of equipment) 3 3.8.
Project cost effectiveness – the project's eligible costs per student captured in connection with the school network optimization Criteria are not exclusive of: 3.8.1. the eligible costs of the project to one student captured in connection with the school network optimization is greater than 10 percent of the average cost of all the projects submitted about 0 3.8.2 project eligible costs per the student due to the optimization of the network of schools corresponds to the average cost of all the projects submitted or is 10 percent of the average costs in the interval 1 3.8.3. eligible costs of the project to a single student admitted due to the school network optimization is about 10 percent less from the average cost of all the projects submitted claims 2 3.9.
The risk of the implementation of the project (construction and supply procurement and sales risks, possible incidence of costs) evaluation: at least 1 paragraph 3.9.1. project risk assessment in the application do not complete action plan identified risks are not developed or are not completely developed 0

3.9.2. in application of the project risks are assessed in qualitative, action plan identified for the elimination or reduction of risk developed in incomplete submission of the project 1 3.9.3 potential risks are assessed in qualitative, including the estimated potential cost of incidence, designed substantiated the risk identified in the action plan for the elimination or reduction of 2 3.10.
The planned duration of the project: the criteria are not exclusive in 3.10.1. for more than two years 0 3.10.2. for two years or less than two years 2 quality criteria on HORIZONTAL priorities assessment (point scale) 3.11.
The project is intended for the implementation of activities, while respecting the principle of balanced development of the territory: the criteria are not exclusive to Riga planning region 3.11.1 1 3.11.2 Kurzeme, Vidzeme, Zemgale Latgale planning region or 3 3.12.
The project of the specific activities provided for the principle of equal opportunities, in particular by improving accessibility for people with functional disabilities: Criteria are not exclusive to 3.12.1. project specific activities not provided for equal opportunities for the project for 3.12.2.0 one to three specific activities the principle of equal opportunities for 3.12.3. project 2 four and more specific activities the principle of equal opportunities for 3 4. criteria for the award of FUNDING assessment (yes/no) 4.1.
If the application complies with the provisions of annex 2 1.1., 1.2., 1.3, 1.4, 1.5, 1.8, 2.1.1, 2.1.2, 2.1.3.., 2.1.4, and referred to in 2.2.1. evaluation criteria, as well as 3.1, 3.3 and 3.4. assessment criteria referred to in point each has received at least two points, 3.6, 3.7 and 3.9. assessment criteria referred to in point each has received at least one point, then the appropriate criteria, listing of project applications in order of priority starting with the most points winning the project application, the application of the draft legislative act on enough activities for implementation within available funding N notes. 1. project submissions valued under a certain point scale according to quality criteria. Criteria, where appropriate, the specified minimum number of points that must be achieved to the project application will not be rejected.
2. project submissions valued with "Yes" and "no" in accordance with the administrative and eligibility criteria. Criteria that are assessed by "Yes" or "no", there are two rating: N-negative rating in case the application is rejected for the project;
P-can make a decision on project approval with conditions.
Education and Science Minister t. koķe