Cabinet of Ministers Regulations No. 417 in Riga 5 May 2010 (pr. No 22 34) climate change financial instruments project financed by public tender "Complex solutions to reduce greenhouse gas emissions national and local training institutions buildings" Charter Issued in accordance with the law "on the participation of the Republic of Latvia, the Kyoto Protocol's flexible mechanisms" in article 10 the third paragraph 1 of part i. General issues 1. determine the climate of the financial instrument (financial instrument) funded project open competition complex solutions to reduce greenhouse gas emissions national and local training institutions in buildings "(hereinafter referred to as the competition) regulations , evaluation criteria and application, examination, approval and financing procedures.
2. The aim of the competition is the reduction of carbon dioxide emissions, reducing heat and lighting electricity consumption of the Republic of Latvia founded and established local training institutions (hereinafter referred to as the State and municipal vocational training institutions) buildings.
3. The implementation of the responsible authority is the Ministry of the environment (hereinafter referred to as the responsible authority). The monitoring of the implementation of projects carried out under the limited liability company "environmental investment fund" (hereinafter referred to as the environmental investment fund).
4. The competition within the financial instrument for the funding available is 10 225 798 dollars. The competition within one project the minimum financial instruments available funding is 30 000 lats, maximum funding of financial instruments – 1 000 000 lats.
5. The maximum amount of funding of the financial instrument is 85% of the total eligible costs of the project amount. The remaining eligible costs of the project shall be borne by the applicant (hereinafter referred to as project applicant) who has entered into an agreement with the responsible authority and the environmental investment fund for project implementation (beneficiary). National professional educational institutions of 15% of the project total eligible costs provided from the State budget.
6. in each building where the implemented project activities, must be complied with the following criteria: 6.1. consumption of heating heating not exceeding 100 kWh/m2 per year. Heat consumption year calculated in accordance with the laws and regulations on energy efficiency calculation method;
6.2. reduction of carbon dioxide emissions the efficiency indicator (efficiency), the carbon dioxide emission reductions relative to the project for the required funding of the financial instrument is not less than 0.35 kgCO2/Ls/year. Carbon dioxide emission reductions calculated in accordance with Annex 1 of these rules.
7. within the framework of the contest projects approved for activities implemented by the beneficiary up to December 1, 2011.
8. in order to ensure the quality of implementation of the project and its relevance to the greatest possible reduction of carbon dioxide emissions, the project applicant comply with sustainable design and construction, as well as the "green procurement" principles, including defining the constructor and contractor selection criteria.
9. If the beneficiary establishes that the activities provided for in the project may not be implemented until 2011. on 1 December, the beneficiary no later than 1 November 2011 we can request an extension of the contract of the project, submitted to the responsible body and environmental investment fund the application, specifying the circumstances which hinder the implementation of the agreement. If the responsible authority in the application of these conditions is recognised, the beneficiary, the responsible authority and the environmental investment fund enters into a written agreement on the amendment of the Treaty, extending the agreement, but not longer than a year. Amendment to the agreement in connection with the extension of the project agreement may be done once.
10. Financial instrument for the implementation of the projects financed the preparation of contract conclusion, amendment and termination of the project implementation review of the inspection and control arrangements for the implementation of the project is determined by the laws and regulations concerning the financial instrument for the implementation of the projects financed, reporting and verification.
II. Requirements for the project applicant 11. project applicants are State or municipal vocational training institutions.
12. One project applicant may submit one project submission. Project application can include activities that are intended to implement one or more buildings. On the same building may submit only one project submission.
13. the applicant Project eligible for funding within the framework of the competition if: 13.1. project application is submitted to the responsible authority in the prescribed period, and it is signed by the officer;
13.2. the project applicant project application or its annexes has provided truthful information;
13.3. the project applicant for financial instrument funded eligible costs for the project has not received or do not qualify to receive co-financing in the context of other funding from other financial instruments, European Union or foreign financial assistance;
13.4. the project applicant project application, evaluation is not trying to get its limited availability information or affect the application of the evaluation of the project, including the project application for the evaluation of the Commission, the responsible authority or other tender evaluations involving officials and experts.
III. The tender requirements within buildings, assisted activities, eligible and non-eligible costs within the framework of the contest on 14 may qualify for funding projects that include activities planned to implement buildings that meet the following requirements: 14.1. the building is the property of the applicant of the project or the possession of, or, if the building is a State or municipal property, is requesting project uses a term not less than five years after the planned completion of project implementation and is recorded in the land register;
14.2. the building uses the function of vocational training, and in accordance with the laws and regulations that govern the classification of the structures, corresponds to one of the following building classes: 14.2.1. schools, universities, and scientific research for building (code 1263);
14.2.2. the hotel (code 12110102);
14.2.3. sports building (code 1265).
15. in the framework of the competition supports the following project activities:

15.1. energy audits, technical research findings, including the evaluation of alternatives, construction and preparation of the technical documentation and coordination according to the energy performance of buildings and the construction of the regulatory laws;
15.2. energy efficiency enhancing reconstruction, renovation or simplified renovation;
15.3. heating Exchange from fossil energy sources to renewable energy sources, including renewable energy sources (solar collectors, heat pumps air or earth, granular or chips boilers) installation and connection;
15.4. the reconstruction and renovation of utilities, including simplified reconstruction and renovation, work out, if they are appropriate to reduce the consumption of heat energy audits;
9.6. energy-efficient lighting Setup;
15.6. the buildings delimiting structural test construction, gaiscaurlaidīb test carried out according to gaiscaurlaidīb tests measuring regulatory laws, and termofotografēšan;
15.7. the project publicity measures.
16. in the framework of the competition are the following applicable project costs: 16.1 these rules 25.2, 25.3, 25.4.. and 15.8. design application referred to in the technical documentation preparation costs;
16.2. the implementation of the project technical documentation – a construction or renovation projects, simplified development costs;
16.3. the cost of the building if the building of the performers concluded service agreement;
16.4. autoruzraudzīb costs if the performers concluded with the autoruzraudzīb service contract;
16.5. the cost of the works and buildings for reconstruction or refurbishment, if such works are included in the energy audit report and certified architects or certified civil engineer (if planned simplified renovation) signed memorandum as the measures to be taken and provides heat to reduce consumption;
16.6. the reconstruction and renovation of utilities, including simplified reconstruction and renovation, the cost of the work, where such work is included in the energy audit report and certified architects or certified civil engineer (if planned simplified renovation) signed memorandum as the measures to be taken and provides heat to reduce consumption;
16.7. energy-efficient lighting installation costs, if it is for an energy audit report and supports the reduce consumption of electricity;
16.8. renewable energy sources (solar collectors, heat pumps air or earth, granular or chips boilers) connection and installation costs, if the way is supplied heating system switching from fossil energy sources to renewable energy sources;
10.5. the costs relating to information and publicity measures in implementation of the project;
16.10. the costs associated with building construction inspection of delimiting construction, gaiscaurlaidīb test carried out according to gaiscaurlaidīb tests measuring regulatory laws, and termofotografēšan;
16.11 energy plan development costs if the plan service agreement has been concluded;
16.12. building the dissemination through the manufacturing and installation costs, if the energy certification of buildings was carried out according to the regulations on the energy performance of buildings.
17. the costs considered eligible if they meet the following provisions: 17.1. paragraph 16 of the above-mentioned costs;
17.2. is necessary for the implementation of the project and are included in the project application and agreement with the responsible authority and the environmental investment Fund (hereinafter the project);
17.3. is encountered after invitation to tender (except for the preparation of the technical documentation of the project costs), but not later than the expiry of the implementation of the project;
17.4. is actually carried out, subject to the financial management, economy and efficiency, sustainable design and construction, the cultural monuments protection requirements, if the building is a national protected cultural monument or part thereof, as well as the "green procurement";
17.5. the project is specified in the applicant's bookkeeping, identifiable, separate from the rest of the cost of the test, as well as certified with the appropriate justification of the original document or the original of the document derivatives made according to the laws governing the proceedings laid down in the document production and design requirements;
10.9. the project is specified, interim or final report, adding the treaty draft copies of documents (for example, project agreements, the work of the reception and transmission of acts, invoices, payment orders);
17.7. are included as depreciable fixed assets are those assets, which are recorded in the project included building.
18. the eligible costs of the project are subject to the following ceilings: 18.1. this rule 16.1, 16.2, 16.3 and 16.4 of the technical documentation referred to in development, autoruzraudzīb and building costs together must not exceed 10% of the project application in the estimated eligible costs;
18.2. the project costs related to information and publicity measures for the implementation of the project, shall not exceed 0.5% of the application specified in the project scheduled for eligible costs;
18.3. the unexpected costs of technical project design or construction and comply with this rule 17, can be included in the eligible costs of the project, by amending the contract of the project, but may not exceed 5% of the project specified in the application scheduled for eligible costs of the works;
18.4. the eligible costs that exceed the approved project total eligible costs shall not be covered from the project budget.
19. The project budget included in ineligible costs borne by the beneficiary.
20. in the framework of the competition does not apply are the following: 20.1. costs not mentioned in this provision in paragraph 16 and 17;
20.2. the costs that exceed this provision of paragraph 18 of the cost constraints;
20.3. costs incurred prior to the invitation to tender (except this rule 16.1 and 16.2. projects referred to in the application and implementation of the project for the preparation of the technical documentation costs) or after the expiry of the implementation of the project;
20.4. the replacement or repair of electrical equipment costs (for example, washing machine, tv, or the acquisition or repair of refrigerators);

20.5. costs not specified in the energy audit report and certified architects or certified civil engineer in the explanatory memorandum or these documents are indicated as non-eligible costs of the project;
20.6. routine maintenance expenses;
20.7. working capital acquisition costs;
12.9. leasing and lease transaction costs;
20.9. payment for loan processing, design and booking, interest payments, payments on money transfers, commissions, losses due to currency exchange and other direct financial expenditure;
20.10. the value added tax payments if they are recoverable from the State budget;
20.11. costs associated with the preparation of project submissions, including pay for consultancy services and other services, except for this provision, paragraph 16;
20.12. costs incurred, if the purchase is not carried out in accordance with the public procurement law;
20.13. area home improvement and landscaping costs, excluding the costs of organizing the construction of the zone in the area around the building after work.
20.14. any type of mobile equipment and the acquisition cost of the vehicle;
20.15. costs related to the purchase of equipment, lease or repairs, intended for the transport of persons or which are used for loading, unloading, handling or transportation;
20.16. second-hand and the acquisition cost of the equipment;
20.17. consideration of the legal, financial and technical consultancy fees during the implementation of the project;
20.18. investment costs of the public service;
20.19. costs related to the investments of the financial revenue generating project.
IV. Invitation to tender procedures 21. Tender advertised 15 working days after the date of entry into force of the provisions of all these provisions referred to in paragraph 3.
22. the responsible authority shall call for competition is made by placing an advert in the newspaper "journal", the responsible authority website (www.vidm.gov.lv) and environmental investment fund's Web site (URwww.lvif.gov.lv). The date of the invitation to tender for the responsible authority internet site is placed in the draft guidelines for applicants.
23. The advertisement shall state the name of the project tender submission deadline (date and time) and location (address of responsible authority).
24. the deadline for submission of projects may not be less than 45 working days from the date of the invitation to tender.
V. application and project submission procedures 25. To enter the competition, the applicant shall provide the project responsible body project submission. Application of the project include: 25.1. fill the project application form (annex 2);
25.2. in accordance with the laws and regulations on the energy performance of buildings certified energoauditor made energy audit report (annex 3);
25.3. the certified architects or certified civil engineer (if planned simplified renovation) signed a memorandum with the construction cost estimate (annex 4);
25.4. the technological equipment specification with them (if applicable);
25.5. the building energy consumption calculation in accordance with Latvian standards LV EN ISO 13790:2009 "energy performance of buildings. Space heating and cooling energy calculation (ISO 13790:2008) ' using the passive building design program, the variable power system simulation program, or an analog calculation software, if applicable. The calculation shall be submitted, if the application includes a building with the heat consumption for heating, which, after implementation of the project shall not exceed 60 kWh/m2 per year;
6. in addition to supporting documents: If the project applicant 25.6.1. is municipal vocational training authority – municipal decision statement on the implementation of the project and the necessary co-financing;
25.6.2. national cultural monument protection Inspectorate issued certificate to show the national protected cultural monument status (if applicable). If the applicant does not have the application of the draft statement added, it retrieves the responsible authority of the administrative procedure law;
25.6.3. national cultural monument protection Inspectorate's opinion on this rule 25.3. in compliance with the document referred to the cultural monuments protection requirements, if the building is a national protected cultural monument or part thereof;
25.6.4. copies of the notice on the results of the procurement procedure if the applicant is a project from this rule 16.2., 25.2, 25.3, 25.4.. and those under 25.5. technical documentation components are developed before the invitation to tender;
25.6.5. industry Ministry issued a statement that the professional education institutions development and investment strategy are coherent;
25.6.6. a statement that the building in which the project activity for at least five years after the implementation of the project will not use or it will not be dismantled. The attestation shall be issued by the Ministry of industry, which is subordinated to the State institutional vocational training authority, if the applicant is a national professional education institution or municipality, if the applicant is a local professional education institution.
26. Purchases, you need this rule 25.2, 25.3, 25.4.. and 25.5. the application referred to in the preparation of the technical documentation, the implementation of the project technical documentation (construction or building project and simplified renovation receipt card) design and implementation of the project, the project applicant or beneficiary shall be carried out in accordance with the public procurement law and according to the "green procurement". If the applicant is one of this rule 16.2., 25.2, 25.3, 25.4.. and those under 25.5. technical documentation components are developed before the invitation to tender, the project applicant must ensure compliance with the joint submission dossier.
27. the project application can be submitted in paper form or electronic form of a document. Project submissions in paper form may be submitted personally or sent by mail (original) by adding identical fill the project application form electronically on the electronic media. The project application to the electronic document sent by electronic mail, signed with a secure electronic signature and confirm with the time stamp under the electronic Act.
28. the responsible authority shall submit an application for the project shall be established in accordance with the following conditions:

28.1. If the application is sent by post, at the time it considered the postmark shows the date of shipment. In the event of a dispute, the applicant must prove to the time when the post put post;
28.2. where the application is submitted in person, at the time it considered the stamp of the authority responsible for the project specified in the date of receipt of the application;
28.3. the application shall be accompanied, where the electronic document, for its submission shall be deemed to be the time when the project application is sent via electronic mail. In the event of a dispute, the applicant must prove to the time when the application is sent to the project.
29. the project applicant, prepare a project application, comply with the following conditions: 29.1. the project prepared and presented in accordance with the laws governing the proceedings laid down in the document production and design requirements;
29.2. the project submission form prepared into Latvian language except the project submission form section 2.2.2;
29.3. in addition to the deliverables documents drawn up into Latvian language. If this is not possible, they shall be accompanied by the Latvian language translations of documents that certify the legal order;
29.4. the project submission form is used in all the calculations currency – lats, funding of the financial instrument and the total eligible costs indicated in dollars, rounded to two decimal places;
29.5. the project application is completed without deletions, not specified for deletions, aizkrāsojum, corrections and additions;
18.4. the project is added to the application in addition to submit original or a copy of the document to which the relevant authority has evidence of compliance with the original copies;
18.5. the project application to the project the applicant's signature paraksttiesīg official institution or its authorized person;
29.8. If the project application submitted in paper form: 29.8.1. project submission form should be identical to the project attached to the application the application form electronically;
29.8.2. project application adds a compact disc (CD) with the project application form electronically, in DOC, DOCX, xls, XLSX, PDF, JPG or file format;
29.9. If the project application submitted electronic document: it draws up corresponding 29.9.1. electronic document design, presentation, storage and movement of the regulatory laws;
29.9.2. application form in DOC or DOCX format development, energy audit report and opinion of the technical survey: DOC, DOCX, PDF or JPG format, drawings-PDF format, and a timeline-xls or XLSX format.
30. when sending the application for the project by mail or submit it in person, the responsible authority shall be placed in sealed packages marked "Tender for complex solutions to reduce greenhouse gas emissions national and local training institutions buildings" and "not to be opened before the start of the" evaluation of the project.
31. the competent authority shall register the project submissions, give them identification numbers and seven working days after the project submission deadline for the submission of written notice to the applicant of the project the project application identification number. If the project applicant project application submitted personally, project identification number assigned to the application and notify the applicant of the project right away.
Vi. evaluation of the application and the draft decision on financing the project submissions 32. valued project submission Evaluation Commission (hereinafter referred to as the Evaluation Commission). The Evaluation Commission and operational procedures for the assessment of the Commission, determine the rules. The assessment and Evaluation Commission Regulation Commission approved by order of the responsible authority.
33. evaluation of the Commission chaired by a representative of the responsible authority. The Evaluation Commission includes four representatives of the responsible authority and one representative of the Ministry of the economy, regional development and local government Ministry, the Ministry of education and science and the Ministry of culture. If any of the above ministries do not delegate representative to work in the Commission for evaluation, the Evaluation Commission is not extended.
34. the administrative application evaluation of projects is carried out in accordance with the rules referred to in annex 5, the administrative evaluation criteria. Criteria for the evaluation of conformity is assessed with "Yes", "no" or "NA" ("Yes", "no" meet-does not meet, "NA"-not true).
35. in the case of non-compliance with one or more of the provisions of annex 5, 3.4, 3.6.1, 3.6.2, 3.6.3., 3.6.4, 3.6.5, 3.6.6..., 4.1., 4.2., 4.3, 4.4, 4.5, 4.6, 4.7, 4.8, 5.2, 5.3, 5.5, 5.6, and in paragraph 15.3.8, 13, 14, 16, 17, 18, 19, 20, 21, 22, 23 and 24 of the above evaluation criteria, the responsible authority shall inform the applicant of the project and found calls to clarify the application of the project. Clarification of the application of the project deadline is 10 working days from the receipt of the information by the responsible authority.
36. Where the applicant authority shall specify the time limit set, the application of the project, the project application under the administrative evaluation criteria evaluated again, determining whether a project meets the application requirements and are directional quality evaluation criteria for evaluation.
37. Where the applicant authority is not made within the time limit specified in the project application or after the submission of the draft assessment does not meet one or more of the administrative evaluation criteria, the responsible authority shall take a decision on the application of the non-compliance of the draft administrative evaluation criteria and project submissions not evaluated further.
38. project quality evaluation of the application of these provisions is carried out in accordance with annex 6 quality referred to in the evaluation criteria. Maximum per project are awarded 30 points.
39. evaluation by the Commission, if necessary by experts, examine the application specified in the project achievable indicators (annex 2 to these regulations 2.7) compliance with planned project activities and the technical documentation submitted. Within the assessment of the inspection by the Commission or its external experts, if necessary, surveyed the site of the project-building, which planned to implement project activities and project applicant experts provides access to them.

40. where the application of the project evaluation process are found arithmetic errors or non-compliance with one or more of the quality evaluation criteria, the responsible authority for the project the applicant offers in writing to clarify the application of the project in the respective buildings or off the planned project activities from the project application and to specify the project's application. Clarification of the application of the project deadline is 10 working days from receipt of the authority responsible.
41. If during the test is determined that the project applicant project application or its annexes has provided false information, the responsible authority is entitled to take a decision on the rejection of the application for the project.
42. After the submission of projects for the evaluation of the quality evaluation criteria the Evaluation Commission ranked in descending order according to the quality evaluation criteria the resulting points.
43. If multiple project submissions received the same number of points, the responsible authority in deciding the project's approval of the application, the priority given to the application of the project with the highest energy efficiency indicators in accordance with the quality evaluation criteria.
44. the responsible authority shall decide on the approval of the project application based on the assessment of the Commission, if the following conditions are met: 44.1. the project submission complies with all administrative evaluation criteria;
44.2. the application of the project project activities envisaged in the implementation of these provisions by ranking 43, in the order mentioned in paragraph sufficient funding is available;
44.3. the Ministry of industry, which is subordinated to the State institutional vocational training institution or municipality has shown that building, for the application of the project for at least five years after completion of the project will not use or it will not be dismantled.
45. the project evaluation shall be two months from the project calendar for the submission of the last days. The Evaluation Commission is entitled to extend the term, but not longer than one calendar month.
VII. conclusion of the contract and the project implementation conditions 46. the responsible authority within 10 working days after the decision on the application of the project approval or rejection is sent to the applicant, the relevant draft decision. If the applicant is a national vocational training authority, the decision shall also be sent to the Ministry of industry, which is subordinated to the institutional vocational training authority.
47. the project the applicant within 10 working days after the decision on the application for the approval of the project receiving the settlement account opened the Treasury (hereinafter the project), to be eligible for funding, as well as the conclusion of the contract of the project to make all the payments related to the implementation of the project. If the applicant is a national vocational training authority, the industry Ministry will open a project account according to legislation on the budget and financial management.
48. the project the applicant within 30 days after receipt of the decision of the authority responsible for the approval of the project application, concluding the project agreement. If the applicant is a national professional education institution, the contract is concluded with a responsible authority environmental investment fund and Ministry of industry, which is subordinated to the institutional vocational training authority.
49. If the applicant does not conclude a project agreement within 30 days after receipt of the decision of the responsible authority, the project, the applicant loses the right to enter into this agreement. The responsible authority and the environmental investment fund project agreement to conclude the applicant whose application has the next highest number of points according to the quality evaluation criteria, if the balance of the funding of the financial instrument is sufficient to finance this project.
50. All project expenses incurred by the beneficiaries with written contracts and accounting documents.
51. in order to ensure the publicity of the project, the funding recipient: 51.1. during project implementation not less frequently than quarterly to prepare information about project activities and results, including the impact on the environment and energy efficiency in General and open discussion will inform the professional education institutions management, training forces and students;
51.2. during the implementation of the project have at least one measure, which inform the public about the project activities and results;
51.3. not less frequently than quarterly insert the beneficiary's Web site for information about planned and implemented the publicity measures, the implementation of the project, the financial implementation and the enhancement of the quality of the environment;
51.4. after completion of the project, prepare and deploy training institution in the public space of the Visual information that demonstrates the results of the project and the dissemination of the building after reconstruction;
51.5. at each building in which the project activity, affix information plate according to the project requirements laid down in the Treaty.
52. The duration of the contract for each three-month period (hereinafter referred to as project quarter) to the project in the following month of the quarter, the twentieth date, the beneficiary shall submit an environmental investment fund report on project implementation progress (hereinafter the interim report), prepared in accordance with the model annexed to the project. The interim report shall be accompanied by the project project activities set out in the contract and supporting documents of payment (for example, contracts, acceptance and surrender provisions, invoices, packing slips).
53. During the month following the expiry of the deadline for implementation of the beneficiary shall submit an environmental investment fund report on the entire project implementation period (hereinafter referred to as the final report), prepared in accordance with the model annexed to the project. The final report of the project is added to the project activities set out in the contract and supporting documents of payment (for example, contracts, acceptance and surrender provisions, invoices, packing slips).
54. five years after the implementation deadline the beneficiary each year conduct project monitoring and the results until next January 31, submit an environmental investment fund project monitoring report of the results of the project to the model annexed to the Treaty.
VIII. Funding available to the recipient of the payment and receipt conditions

55. If the beneficiary is a public vocational training authority, implementing the project, the payments shall be made within the financial instrument for the implementation of the project for the Ministry's budget, which is subordinated to the institutional State professional education institution. The share of the financial instrument for the implementation of the project plan as a transfer received from responsible authorities in a separate programme or subprogrammes in the budget.
56. Beneficiaries-municipal vocational education authority-is available in the following types of payments: 56.1. advance payment up to 50% of the projects approved for funding in the amount of the financial instrument;
56.2. one or more interim payments, which total amount is up to 40% of the projects approved for funding in the amount of the financial instrument;
56.3. final payment, taking into account the funding recipient paid advances and intermediate payments shall not exceed the approved project funding, the amount of the financial instrument.
57. The beneficiaries-municipal professional education institution – payments can be obtained if the following conditions are met: 57.1. the advance payment can be paid if the beneficiary has submitted an environmental investment fund advance payment request drawn up according to the project the model annexed to the Treaty;
57.2. interim payment can be paid if the beneficiary has submitted an environmental investment fund interim report on the previous quarter and the project's request for an interim payment, as well as add interim payment request for eligible costs included in the supporting documents under the project contract and environmental investment fund have approved the interim report. Interim payments to the beneficiary may receive no more than once a quarter of the project;
57.3. final payment can be paid if the beneficiary has submitted an environmental investment fund closing statements and the final request for payment, as well as added a final demand for payment of eligible costs included in the supporting documents under the project contract and environmental investment fund has approved the final report.
58. payments to the beneficiaries-municipal authority – of vocational training carried out by the responsible authority, based on the opinion of environmental investment fund for financing the payment request submitted by the beneficiary and the beneficiary of the proof of report.
IX. The beneficiary's liability for the results of the implementation of the project beneficiary is 59. responsible for project submission and project planned results specified in the contract, including carbon dioxide emissions reduction.
60. If environmental investment fund according to the beneficiary submitted the monitoring report for the first and second year of operation of the building after completion of the project finds that the submission of the project contains the planned reduction of carbon dioxide emissions a year, compared with the monitoring report shows the average reduction is not achieved, environmental investment fund calculates the extent of non-compliance (hereinafter referred to as carbon dioxide emission reductions mismatch) in accordance with the laws and regulations on energy efficiency calculation method and writing to inform the beneficiary of the financing and the responsible authority.
61. The beneficiary within 30 working days after this rule 60 of receipt of the information referred to submit environmental investment fund measures carbon dioxide emissions cuts for the prevention of non-compliance (hereinafter referred to as the plan). Environmental investment fund may make appropriate recommendations.
62. the financial plan includes receiving reasonable heat consumption reduction organisational and technical measures room temperature control and regulation and, if necessary, other energy audit report included in the measures that were taken in the framework of the Treaty or of the project was not carried out sufficient quality.
63. the plan shall be developed and implemented separately for each project included in the building, which found carbon dioxide emissions cuts.
64. the financial plan shall be implemented in the beneficiary, at its own expense during the year after this rule 60 of the information referred to in the receipt.
65. If environmental investment fund according to the requested funding for the monitoring report submitted for the third and fourth year of operation of the building after completion of the project repeatedly finds that the application contains the planned reduction of carbon dioxide emissions a year, compared with the monitoring report shows the average reduction is not achieved, environmental investment fund calculates carbon dioxide emission reductions and inconsistencies in writing inform the beneficiary of the financing and the responsible authority. The responsible authority shall take a decision on the financial instrument for the project funds for ineligible and the recovery of the financial instrument.
66. in order to determine the recoverable amount of the eligible funds not corresponding to the detected carbon dioxide emission reductions for compliance, not for the third and fourth year of operation of the building after completion of the project the average carbon dioxide emissions divided by project specified in the application to the carbon dioxide emissions reduction performance and result for the European Central bank's refinancing rate in force on the day the decision on the recovery.
Prime Minister v. dombrovsky's Minister for the environment, regional development and local government responsibilities to the Minister, in place of the Minister of agriculture j. Dūklav of annex 1 of the Cabinet of Ministers of 5 May 2010 Regulation No. 417 of carbon dioxide emission reduction calculation 1. Carbon dioxide (CO2) savings achieved by reducing national or local training institutions building heat consumption, determined in accordance with the CO2 emission factor-0.264 t/MWh (hereinafter referred to as the average emissions factor).

2. the average emissions factor describes how much CO2 is emitted in the atmosphere, producing 1 MWh of heat. Average emission factor is calculated according to the emission total transformation sector in Latvia (boilers and CHP) corresponding to the district heat consumption-average during the period from 2000 to 2007, by adjusting the indicator value for the CHP in the quantity of fuel used, consumed in the production of electricity, i.e. not taking into account CO2 emissions arising from the production of electricity.
3. If a particular building autonomous heating or central heating provides the fuel, which is higher than the specified emission factors emission factors in the average value, the applicant may use the appropriate fuel CO2 emissions factors according to table 1 of this annex.
table 1 carbon dioxide (CO2) emission factor no PO box
Energy fuel used in obtaining the type ECO2 (t/MWh) 1.
Natural gas 0.201 2.
Liquefied petroleum gas (propane, butane) 0.225 3.
Turf (40% moisture) 0.374 4.
Peat briquettes 0.342 5.
Coal 0.332 6.
Coke 0.313 7.
Diesel 0.266 8.
Fuel oil 0.276 9.
Shale oil 0.272 10.
11. Autobenzīn in 0.247
Kerosene 0.257 4. Average emission factor applied to heat their buildings using biomass (e.g. wood, chips, granules), or which are connected to the central heating system, which is used to heat production biomass.
5. Actual emissions shall be calculated using the following formula: E = ECO2/ɛ, where E x Q-emissions (t);
ECO2 – CO2 emission factor (t/MWh) in accordance with table 1 of this annex;
Q-produced energy (MWh);
ɛ-the efficiency of boilers in accordance with the energy audit data.
6. Electricity emission factor is equal to t CO2/MWh 0.397. reduction of carbon dioxide emissions, which result from the reduction of the power consumption is calculated using the following formula: E = ECO2 x Qe, where E-emission (t);
ECO2 – production and transmission of electricity emission factors (t/MWh 0.397);
QE-produced electricity (MWh).
7. the heat output of the heat pump the CO2 emission factor is calculated using the following formula: ECO2 heat pump = (x k sil-ECO2 ee ECO2)/k, which heat pump – CO2 emissions ECO2 factor (t/MWh);
ECO2 sil – CO2 emissions factor in accordance with table 1 of this annex or average emission factors, in accordance with paragraph 4 of this annex;
ECO2 ee-transmission of electricity production and emission factor (t/MWh 0.397);
k-factor of the transformation of the heat pump.
The Minister of the environment, regional development and local government responsibilities to the Minister, in place of the Minister of agriculture j. Dūklav in annex 2 of the Cabinet of Ministers of 5 May 2010 on Regulation No 417 climate change financial instruments project financed by public tender "Complex solutions to reduce greenhouse gas emissions national and local training institutions building in the" application form for the project name in the project, the applicant fills in the responsible authority project identification number date of presentation of the project approval date of the note. If the application is filed in electronic form of a document under the Cabinet of Ministers of 5 May 2010 on the Regulation No 417 "climate change financial instruments project financed by public tender" Complex solutions to reduce greenhouse gas emissions national and local training institutions building "regulations" (hereinafter referred to as the rules) paragraph 27 of these requirements, the project submission form page 1 the competent authority fills in as a single electronic document.
Title 1 – basic information about the project applicant Project applicant 1.1 1.1.1. Vocational educational institution name 1.1.2. Vat Yes No 1.1.3. Taxpayer registration number 1.1.4. Legal address Street, House No.
City, State zip code 1.2. Project person in charge of the applicant name 1.2.1 1.2.2 1.2.3. Post phone 1.2.4 1.2.5 fax e-mail Project applicant 1.3 contact 1.3.1. name 1.3.2 1.3.3 1.3.4 position. phone. fax 1.3.5. E-mail section 2-project description 2.1 project aims to formulate project objectives (maximum 500 characters) project summary 2.2 2.2.1. Project summary in Latvian language specify briefly the need for the project and the key project activities and results by showing the benefits of thermal energy consumption and CO2 emissions reduction, environmental protection and the impacts on the surrounding population (maximum 2000 characters) 2.2.2. Project Summary English English briefly describe the project objectives, the need, the main project activities and results, showing the benefits of thermal energy consumption and CO2 emissions reduction, environmental protection and the impacts on the surrounding population (maximum 2000 characters) 2.3. project need and justification of the appropriateness of activities indicate the main problems that will be addressed by the project, and to justify the relevance of resolving them. Specify the essential nature of the project activities, the project used technology and materials, including their advantages and disadvantages and basing their suitability for achieving the goals of the project (up to 6000 characters) 2.4. for the implementation of project activities to be used to purchase 2.4.1. Project planned procurement characteristics indicate the project planned for public procurement and the criteria (up to 1000 characters) 2.4.2. Environmental conditions, the use of public procurement to fill this section before then we recommend that you familiarize yourself with the information report on the recommendations green procurement promotion national and municipal institutions and recommendations for environmentally friendly construction and consult with the purchase of the veicināšanai1 Organizer in your institution. 
1 information report on the recommendations green procurement promotion national and municipal institutions and the recommendations of the eco-friendly promotion (taken note of the Cabinet's 2008 annual meeting (22 December. No 94 92)) (http://www.vidm.gov.lv/lat/darbibas_veidi/zalais_publiskais_iepirkums/?doc=8012), see your planned procurement procedures comply with the following conditions and criteria:

2.4.2.1. Contest name (contract), or the title of the tender (contract) contained in the energy efficiency and environmental conditions? For example: [building type] renovation in accordance with high performance requirements, and using environmentally friendly construction materials and products Yes No If not, what is the name of the tender/contract?
 
2.4.2.2. selection criteria Or are contained in the following conditions: the designer experience or education in environmentally friendly building design yes no Designer experience or education renewable energy technology in the development of projects (if applicable) Yes No Construction of the technical capacity to carry out the necessary environmental management measures and ensure the execution of the environmentally friendly way yes no exclusion of Tenderers (repeated environmental violations of legislation) Yes No if you do not comply with the or are there other selection criteria? If Yes, specify.
A brief listing of 2.4.2.3. Technical specifications/evaluation criteria Or conditions are included in the following categories?
Building operator training on energy efficiency, renewable energy, yes no user training on energy efficiency (if applicable) Yes No distribution screen Yes No Specific exclusion of building materials (extra points for eco-friendly building materials) Yes No timber origin (extra points for legal and sustainable sources of wood) Yes No volatile organic compound emissions in robežsliekšņ yes no water saving measures yes no noise mitigation measures during construction Yes No if used in other specifications , specify which.
2.4.2.4. Brief listing contract performance conditions conditions of performance of the contract must be clearly stated in the notice of procurement to be understood by all applicants.
Or your purchases include the following contract performance conditions?
Building air exchange rate test yes no construction material transport conditions yes no waste reduction and management Yes No if others contract performance conditions, specify.
Short listing 2.5. Buildings of project activities to be implemented no PO box
Building parameters characteristics 1. building name and address 1.1 cadastre of the No.
 
1.2. the function of the building commissioning year 1.3 1.4. Number of floors, t.sk. cellar 1.5. Total heated area (m2) 2.
 
 
3. under rule 14.2.
 
2.6. Project implementation time 2.6.1. for the implementation of the project, the planned time in months 2.6.2. Project completion date (yyyy. URdd.mm.)
2.6.3. the time schedule for the implementation of the project no BC
Job description the year 2010 2011 (I) (II) (iii) (IV) (V) (VI) (VII) (VIII) (IX) X XI XII I II III IV V VI VII VIII IX X XI XII 1. project preparation of the technical documentation of the application 1.
Purchase advertising application development technical documentation 2.
The contract with the designer on the project, the technical documentation of the application 3.
Application development technical documentation 2. For the implementation of the project preparation of the technical documentation 4.
The introduction of a purchase tender for the development of technical documentation 5.
The contract for the implementation of the project technical documentation 6.
The development of technical documentation 3. introduction the project 7.
Procurement tender for the construction of 8.
Construction contracts 9.
Construction works 10.
Autoruzraudzīb and building 11.
Publicity measures 2.7. indicators to be achieved in the project no BC
Results measurement indicators 1.
The planned energy efficiency indicators – heat consumption for heating per year, the average of all the buildings in kWh/m2 1.1.
The planned energy efficiency indicators – heat consumption for heating a year building No 1 kWh/m2 1.2.
The planned energy efficiency indicators – heat consumption for heating in the building No 2 year kWh/m2.
..
 
kWh/m2 2.
The planned reduction of the CO2 emissions performance, the arithmetic mean of all buildings kgCO2/$ 2.1.
The planned reduction of the CO2 emissions performance building No 1 kgCO2/Ls 2.2.
The planned reduction of the CO2 emissions performance building No 2 kgCO2/Ls.
..
 
kgCO2/Ls 3-project implementation 3.1. project implementation and management capacity to describe the experience of participants of the project similar to the scale and nature of the project implementation, as well as the construction and management of the organisation. Specify experience in implementing energy efficiency measures and environmental friendly construction work in the organisation, if applicable (maximum 2000 characters) 3.2 implementation of the project to identify the nature of the risks and the possible risks for the implementation of the project (maximum of 1000 characters) 3.3. measures for the implementation of the project to mitigate risk describe the preventive measures for the implementation of the project risk reduction (up to 1000 characters) 3.4 the project advances and interim payments (fill in the local vocational training institutions) 3.4.1. payment of the advance Or the project applicant project will want to get advance payment?
  Yes No 3.4.2. Interim payments Or project to the project the applicant wishes to receive an interim payment?
  Yes No section 4 – publicity publicity measures 4.1 plan briefly describe publicity measures plan, naming their target audience, and implementing key content elements (up to 1000 characters) 4.2 publicity way to note what kind of publicity measures will be taken during the implementation of the project at least once every quarter of the prepared information on project activities and results information authority Web site Organized in at least one public workshop Visual information about project results and the dissemination of the building hosted a training institution public room information plaque at each building in which the project activity

 

Title 5 – project financing indicators 5.1. project financing plan (LVL) year total costs are not eligible costs eligible costs financing financial instruments Project co-financing by the applicant 1 = 2 + 3 2 3 = 4 + 6 4 5 = 4/3 (%)
6 7 = 6/3 (%)
2010 2011.







Total activity cost 5.2 Summary no PO box
Cost categories in accordance with the rules laid down by the types of Activity eligible cost total cost (LVL) ineligible costs (LCY) eligible costs (LCY) proportion of the eligible costs (%)
Notes 1.
Technical documentation development costs, project building and autoruzraudzīb costs 2.
The cost of the works 3.
Unexpected costs total 5.3. Financial flows schedule (fill in the local vocational training institutions) first quarter second of the project the project the project's third quarter quarter fourth quarter project, the fifth quarter of the project the sixth quarter of the project the project's seventh quarter eighth quarter of the project advance payment (up to 50% of the approved amount of financial instruments) interim payments (up to 40% of the approved amount of financial instruments) final payment title 6-documents no PO box
1. Fill in the name of the document in the project application form (annex 2 of the rules) 2. application technical documentation Project: building energy audit 2.1 report (annex 3) 2.2 certified architects or certified civil explanatory memorandum with the construction cost estimate (provisions of annex 4) 2.3. technological equipment specification with them (if applicable) 2.4. building energy consumption calculation in accordance with Latvian standards LV EN ISO 13790:2009 "energy performance of buildings. Space heating and cooling energy calculation (ISO 13790:2008) "according to rule 25.5. section (if applicable) 3. Additional documents to be submitted: 3.1 municipal decision statement on the implementation of the project and the required provision of co-financing and not eligible to apply (if applicable) to cover the costs according to the provisions laid down in point 3.2 25.6.1. industry Ministry or authorities certifying that the building in which the project activity for at least five years after the implementation of the project will not use or it will not be dismantled the national cultural monuments 3.3 protection inspection issued to the State-protected cultural monument status ID the certificate (if applicable) 3.4 national cultural monuments protection inspectorates in the opinion on the compliance of the shipbuilding meta cultural monuments protection requirements, if the building is a national protected cultural monument (it) 3.5. of the copy of the notification of the results of the procurement procedure pursuant to rule 25.6.4. (a) 3.6. certificate that professional education institutions development and investment strategy is aligned with the industry Ministry 3.7. other documents (document name) section 7 – certification I , the undersigned applicant's project (the project name of the applicant) Officer (name), (position) I declare that to the moment of submission of the project – (URdd.mm. yyyy.)
the project application and its annexes include information true and the implementation of the project required the provision of a financial instrument will be used in accordance with the specified application to the project description;
the project activities are not and will not be co-financed by other financing programmes from other financial instruments, European Union or foreign financial assistance;
within the framework of the project tender submission activities are not included in the planned another project submission;
the building is the property of the applicant of the project or the possession of, or, if the building is a State or municipal property, the use by the applicant of the project to the time limit of not less than five years after the completion of the project, and is recorded in the land register.
Declare that, if the project were approved: the project activities included in the application will not be submitted for co-financing in the context of other funding from other financial instruments, European Union or foreign financial assistance;
the application of the project eligible costs will not be incurred before signature of the contract, except for the subject of the procurement costs of the project technical documentation (rule 16.1 and 16.2);
during implementation of the project will be implemented in the publicity in accordance with the rules referred to in paragraph 51;
procurement procedures will be carried out under competitive conditions, without collusion, according to Information on the recommendations for the message to green public procurement for State and local government bodies and recommendations environmental friendly construction;
the project's eligible costs indicated in the application will be carried out and listed the beneficiaries of accounts, will be identifiable, separate from the rest of the cost, and they could tell verifiable and appropriate justification of the original document;
any incidence that occur during the implementation of the project will be funded from project funds of the applicant;
application in the project of the building will be used only in professional education institutions can function properly and will not be rented to third parties for the performance of economic activity.
Declare that the implementation of the project: the next five years, the project applicant or his authorised person each year until January 31 to submit the results of the project monitoring report.
Aware that the project may not approve of the financial instrument for co-financing of the project application, including this section, is not fully completed, and of high quality as well as on the financial regulations the implementation of the instruments planned co-financing the project approval time is used up.
I know that if the certificate contains incorrect information, administrative and financial penalties may be started against the project.
I certify that the attached copy of the application the project comply with the documents in my possession of the original and copies of the application and the project electronic version corresponds to the submitted application to the original project.
Signature date (dd/mm/yyyy) place of the stamp

Note the. Document properties "date", "signature" and "stamp" does not fill in, if an electronic document is drawn up according to the law on electronic document design.
The Minister of the environment, regional development and local government responsibilities to the Minister, in place of the Minister of agriculture j. Dūklav in annex 3 of the Cabinet of Ministers of 5 May 2010 on Regulation No 417 building energy audit report building address _____ _____ _____ _____ _____ _____ the content part 1. Basic information about the building and the operator part 2. The survey report part 3. Basic information about the audited object a. building b. heat and hot water supply and distribution (C). Energy consumption and carbon dioxide emissions data part 4. Building survey or termogramm fotodokumentācij in part 5. Building refurbishment project proposal part 6. Building energoreiting and its forecast of changes in part 1. Basic information about the buildings and operators 1.1. Basic information on building the building identification address building klasificējum building cadastre number building total area (m2) building parts of the total area (m2) indicates if the assessment carried out of the building for part of the Energoauditor in the name of the organisation the organisation registration number phone signature certificate issuer certificate number date date on which the report is building date of the survey 1.2. Background information about the operator 1.
Name 2.
Registration number 3.
Registered Office 4.
Contact 5.
Contact phone 2. The survey report 1.
Characteristics of the building (construction, size, year of construction, etc.)

2. Opinion on the building's overall thermal condition and its conformity with the requirements of the Latvian et seq 3.
Heating way system and consumption characteristics of adjustment 4.
Opinion on building energy consumption for heating and hot water preparation, respecting the building's location in the climatic conditions 5.
Opinion on the building's indoor climate and thermal comfort level 6.
Information about the so far achieved through initiatives or measures in the field of energy saving 7.
The proposed energy efficiency for buildings of the complex reasons (benefits) and economic benefit assessment 8.
Predictable consequences, if measures are not taken 9.
Opinion on management and energy management of buildings, recommendations 10.
Suggestions for further action in the recommended energy efficiency measures for the implementation of part 3. Basic information about the audited object a. building 3.1. General information 1.
Building constructive solution 2.
The total number of stands (in addition to standard floor must indicate separately the roof floor, attic floor, basement floor and the existence of the technical floor) 3.
Building thermal area zone no. 1 2 3 zone name area (m2) room height (m) temperature (° C) calculate the surface area (m2) 4.
Calculate the surface area (m2) 5.
Year of putting into operation 6.
Reconstruction (last) 7.
Information on the regulatory regime and microclimate breaks (for example, school holiday) 8.
Other information (for example, the boiler inspection, ventilation or air conditioning, or recuperation system test *) Note. * Checks must be completed and accompanied by appropriate legislation in accordance with the Cabinet of Ministers of 13 January 2009 rule no. 40 "rules for building energosertifikācij" 4 or 5.
3.2. information on the boundaries of the building structures no PO box
Defining construction material thickness (mm) square (m2) Būvelement heat transmission coefficient U (W/(m2K)) thermal heat bridge, the permeability coefficient ψ (W/(mK)) the thermal bridge length (m) temperature (° C) 1. Outer walls 2. building Cap 3. Attic floors 4. Roof Shelter 5. Basement shelter 6. Window and loggia balcony door/doors 7 3.3 building construction compliance delimiting LBN 002-01 et seq of the buildings delimiting the structure of heat transmission coefficient HT ____ _____ [W/K] existing ____ _____ [W/K] regulatory calculated in accordance with the Cabinet of Ministers of 27 November 2001, regulations no 495 "rules for the Latvian et seq of LBN 002-01" building construction siltumtehnik "delimiting" b. heat and hot water supply and distribution 3.4. delivery/production of heat supply system of Heat central heating boilers the efficiency of centralised () local heating boiler model year of manufacture of fuel efficiency (%)


Supply system pipeline network loss route (%)

3.5. "distribution of heat-heating system 1.
Heating system pipes, one pipe of two 2.
Siltummezgl type dependent connection diagram connection diagram independent of 3.
Pipe insulation condition 4.
Other information 3.6. Hot water distribution system 1.
Hot water supply the average temperature (oC) 2.
Cold water inlet temperature (° c) 3.
Hot water distribution system of the type without the circulation with circulation 4.
Pipe insulation condition 5.
Other information 3.7 ventilation 1.
The ventilation system in the natural way, serve the area (m2) forced, serviced area (m2) 2.
Exchange of air in the building and its method of determining h-1 detection method 3.
Other information 3.8 solar thermal benefits 1.
Global solar heat gains (kWh/m2/year) total if the planned consumption of thermal energy for heating is lower than 60 kWh/m2 per year, also indicate the details: South West North East horizontally 2.
The weighted average of the shaded buildings 3.
Other information 3.9. Internal heat gains 1.
Weighted average benefits W/m2 2.
Other information 3.10. air cooling 1.
Cooling system type 2.
Other information 3.11 lighting 1.
Lighting equipment characteristics 2.
Other information the tariff and duty 3.12. collection expenses tariff (LVL/MWh) average payment (LVL/m2 per month) 1.
Heating 2.
Hot water 3.
Electricity (C). Energy consumption and carbon dioxide emissions data note. Carbon dioxide (CO2) emissions calculated on the basis of the public limited liability company "Latvian environment, geology and Meteorology Centre" published emission factors used in the latest greenhouse gas inventory unit under the Cabinet of Ministers of 17 February 2009. Regulations No 157 "rules on greenhouse gas emissions inventory national system of units".
3.13. The energy consumption data by meter rādījumiem1

3.13.1. Space heating energy consumption year reading January February March April May June July August September October November December total average per month in 2007.
Total energy consumption (MWh) specific energy consumption (kWh/m2) CO2 emissions (t) 2008.
Total energy consumption (MWh) specific energy consumption, kWh/m2) CO2 emissions (t *).
Total energy consumption (MWh) specific energy consumption (kWh/m2) CO2 emissions (t *) Note. * Calculated by multiplying the total energy consumption with CO2 emission factor (t CO2/MWh).
1 points according the building actually set up counters, such as space heating, hot water, cold water, electricity. Place the table in the report according to the counter for being in the building. If the buildings heat meter records both the heating and the hot water, the data points in a single table.
 
3.13.2. consumption of Heating hot water operation display of the year January February March April May June July August September October November December total average per month in 2007.
Total energy consumption (MWh) specific energy consumption (kWh/m2) CO2 emissions (t) 2008.
Total energy consumption (MWh) specific energy consumption, kWh/m2) CO2 emissions (t *).
Total energy consumption (MWh) specific energy consumption (kWh/m2) CO2 emissions (t *) Note. * Calculated by multiplying the total energy consumption with CO2 emission factor (t CO2/MWh).
3.13.3 the cold water consumption year reading January February March April May June July August September October November December total average per month in 2007.
Cold water consumption (m3) in 2008.
Cold water consumption (in m3).
Cold water consumption (m3) in 3.13.4. Hot water consumption year reading January February March April May June July August September October November December total average per month in 2007.
Hot water consumption (m3) in 2008.
Hot water consumption (in m3).
Hot water consumption (in m3) 3.13.5. Electricity consumption year reading January February March April May June July August September October November December total average per month in 2007.
Total energy consumption (MWh) specific energy consumption (kWh/m2) CO2 emissions (t) 2008.
Total energy consumption (MWh) specific energy consumption, kWh/m2) CO2 emissions (t *).
Total energy consumption (MWh) specific energy consumption (kWh/m2) CO2 emissions (t *) Note. * Calculated by multiplying the total energy consumption with CO2 emission factor (t CO2/MWh).
3.13.6. Energy consumption in MWh/year breakdown kWh/m2 per year *% of total consumption of enerģijas2 i. II. For heating hot water preparation III. Electricity consumption t.sk. cooling ventilation lighting and other equipment total 100% IV. Notes.
* Indicates the energy consumption, adjusted in accordance with climatic conditions.
** The Amount 100%.
2 total energy consumption includes heating, thermal energy, heat energy, hot water and electricity consumption.
 
Part 4. Building survey or termogramm fotodokumentācij in part 5. Building renovation project proposal (the recommended package) energy efficiency assessment 5.1 kWh/m2 year MWh/year measured in the building's heating energy efficiency assessment estimated the building's heating energy efficiency assessment 5.2. energy and carbon dioxide savings no PO box
Pasākums1 the energy delivered to the specific savings in primary energy savings% of specific existing buildings energy efficiency measured in novērtējuma2 (%)
Samazinājums3 CO2 emissions (kg/m2) in kWh/m2 year MWh/year kWh/m2 year MWh/year 1.







2.







3.







...







The notes.
1 in determining the selection of measures, building energy audit report author works with certified architects or certified civil engineers, under the Cabinet of Ministers of 5 May 2010 on the Regulation No 417 "climate change financial instruments project financed by public tender" Complex solutions to reduce greenhouse gas emissions national and local training institutions buildings "Charter" to annex 4 shall prepare an explanatory memorandum, thus ensuring equal measures of anticipation in both documents.
2 the measured energy efficiency rating of the building – energy efficiency evaluation carried out on the basis of energy delivered and exported quantities measured.
3 carbon dioxide (CO2) emissions from the burning of fossil fuels for heating of buildings, air conditioning (cooling), hot water, ventilation and lighting the energy required for the production process. Reduction of CO2 emissions from the energy of the invoice delivered to specific savings.
Part 6. Building energoreiting and its forecast of changes in the situation forecast by implementing energy efficiency measures in buildings energy efficiency assessment measured in kWh/m2 per year estimated building energy efficiency kWh/m2 year assessment measured the CO2 emission rating kgCO2 year calculated an estimate of CO2 emissions in the year note: kgCO2 Energy savings estimates in accordance with the recommendations of the energy audit and building renovation project proposal slice and it determines how the measured energy consumption by doing so.
The Minister of the environment, regional development and local government responsibilities to the Minister, in place of the Minister of agriculture j. Dūklav in annex 4 of the Cabinet of Ministers of 5 May 2010 on Regulation No 417 Certified architects or certified civil explanatory memorandum 1. Basic information on the reasons for the originating name, architect or civil engineer Architect a certificate of number or civil certificate issuer
 

Architect or civil certificate period of validity 2. Certified architects or certified civil explanation 2.1. building location and the current situation 2.2. part of the Architecture. Description of the buildings delimiting the suitability of the structure proposed in the energy audit energy efficiency improvement measures. The potential technological solutions in the design, if the project boundaries to achieve a low index of heating energy (15-60 kWh/m2 year) 2.3. Structural part. Description of the building's load-bearing structure of the suitability of the proposed energy efficiency measures 2.4. Heating and ventilation. Ventilation and heating system description, description of technologies for improving energy efficiency, machine parameters 2.5. Indoor lighting, its compliance with the requirements, lighting fixtures and energy efficiency characteristics of indicators in relation to the previously used lighting fixtures (standard solution) 2.6. project the burden associated with the buildings being in urban monument protection zone or the building, or the local monument status, or lien in accordance with the decision of the local būvvald on the importance of building public space or lien in accordance with building technical survey results 3. Organization description of energy taupošaj construction methods which would be applicable to the project, and their compliance with the "green procurement". Requirements for the construction of energy-monitoring and building materials 4. accompanying measures accompanying measures which the certified architect or certified civil engineer deems necessary in addition to the energy audit report contains measures which do not directly affect the achievable reduction in CO2 emissions (mandatory costs to the project, but as a non-eligible costs).
4.1. Characteristics of the measures in the event name and description 4.2. Justification information on further measures for the reconciliation of the parties and of the applicant of the project additional funding sources 5. review of the documentation, no PO box
The name of the originating document, date of preparation, the personally identifiable information to other mandatory documentation under consideration 1.
Building technical surveys of opinion (per building) 2.
Energy audit report part 6 "the building renovation project proposal" under the Cabinet of Ministers of 5 May 2010 on the Regulation No 417 "climate change financial instruments project financed by public tender" Complex solutions to reduce greenhouse gas emissions national and local training institutions buildings "Charter" to annex 3 (per building) 3.
With the building being in the urban monument protection zone or by building national or local monuments status related documents 4.
Local būvvald decision or decisions on the importance of building public space in addition to examine documentation in annex 6:6.1 the works under construction koptām and regulating of public procurement regulations (cost assessment in the light of this memorandum the information contained) 6.2. Assumptions for the determination of costs 7. attestation Certifying that the energy audit this Memorandum opinion and in energy efficiency measures and their solutions differ, not meet the constraints of the financial instrument as well as meet building technical survey examined the opinions and other documents.
I certify that the applicant has agreed with the project this memorandum specified in paragraph 4 of the further measures that directly affect the CO2 emission reduction to be achieved.
Signature date note. Document properties in the "signature" and "date" does not fill in, if an electronic document is drawn up according to the law on electronic document design.
The Minister of the environment, regional development and local government responsibilities to the Minister, in place of the Minister of agriculture j. Dūklav in annex 5 of the Cabinet of Ministers of 5 May 2010 on Regulation No 417 administrative evaluation criteria no PO box
Criteria assessment yes no NA * i. application of and compliance with the project 1 project application is filed in prescribed form: 1.1. paper form, by post or by submitting personally 1.2. electronic document 1.3. sending by mail or filing a body personally responsible, the application is placed in a sealed container marked "Tender for complex solutions to reduce greenhouse gas emissions national and local training institutions buildings" and "not to be opened before the start of evaluation of the project" 2. a project proposal is submitted to the responsible authorities within the prescribed 3. application and project source : project 3.1 application form (the Cabinet of Ministers of 5 May 2010 on the Regulation No 417 "climate change financial instruments project financed by public tender" Complex solutions to reduce greenhouse gas emissions national and local training institutions building "regulations" (hereinafter referred to as the rules) Annex 2) 3.2 building energy audit report (annex 3) 3.3 certified architects or certified civil engineer works with the explanatory memorandum (rule 4) 3.4 the technological equipment specification (if applicable) 3.5. building energy consumption calculation in accordance with Latvian standards LV EN ISO 13790:2009 "building energy efficiency. Space heating and cooling energy calculation (ISO 13790:2008) "in accordance with the provisions of paragraph 25.5 (if applicable) 3.6. in addition to the documents Submitted, and they have the rule conditions: 3.6.1. confirmation of the applicant for the project required the provision of co-financing under the rules to point 3.6.2 25.6.1. National cultural monument protection Inspectorate granted national monument status of the protected cultural identity certificate (if applicable) 3.6.3. the national cultural monument protection Inspectorate on rule 25.3. in compliance with the document referred to the cultural monuments protection requirements If the building is a national protected cultural monument or the part of the copy of the notification for 3.6.4. procurement procedures according to the rules of 25.6.4 results. to point 3.6.5. certificate issued by the Ministry of industry, the development of vocational education institutions and investment strategy is a coordinated




3.6.6. certificate issued by the Ministry of industry, which is subordinated to the State institutional vocational training authority, if the applicant is a national professional education institution or municipality, if the applicant is a local vocational training authority, that the building in which the project activity for at least five years after the implementation of the project will not use or it will not be dismantled 4. project application is designed according to the requirements 4.1. the application for the project: is drawn into 4.2. project submission form has been drawn up in a language other than Latvian project submission form section 4.3 2.2.2. additional documents to be submitted are prepared for the Latvian language, or if they are not prepared for the Latvian language, accompanied by a certified translation into Latvian language project application 4.4 used currency is the lats 4.5. project application form is completely filled out application project is 4.6 signed the officer 4.7. additional documents to be submitted is the original or copies of the prepared and certified by the laws established in the application the project Directorate is not stipulated in the undertaking (deletion, deletion, aizkrāsojum and Appendix) 5. requirements that apply only to those project proposals submitted in paper form: 5.1 is one submitted the original application for the project 5.2 is connected to the compact disc (CD) with the project application form electronically, in DOC, DOCX, xls, XLSX, PDF file format JPG, or 5.3. project application form in paper form is identical to the project application form for electronic submission of the project 5.4 is inserted in a sealed container (envelope or box) of the original application projects 5.5 is cauršūt (caurauklot) 5.6. project submissions made all pages are numbered 6. requirements that apply only to project applications submitted to the electronic document: 6.1. electronic document is a secure electronic signature to an electronic document 6.2 is the time stamp 6.3. electronic document is drawn up DOC, DOCX, xls, XLSX, PDF or JPG file format II. 7 met the project. the project applicant is a State or municipal institution of vocational training Projects the applicant has 8. demonstrated a willingness to contribute to the co-financing of the eligible and non-eligible expenses to the extent necessary (if applicable) 9. Project applicant has stated that the application of the project activities are planned in other projects within the framework of the contest submissions 10. Project applicant has stated that all the buildings included in the project are the property of the applicant or project owned or, if the building is a State or municipal property, is requesting applications for the project period of not less than five years after the planned completion of the implementation of the project, and is recorded in the land register 11. Project applicant has stated that the project activities included in the project are not the time, and if the project will be accepted, will not be funded in the context of other funding from other financial instruments, European Union or foreign financial assistance for project submission, III. 12. conformity project meets the objective of the contest is a project of the 13 required justification 14. Project activities planned for 2011 until 1 December 15. Financial instrument funding: 15.1 overall project requested funding of a financial instrument is not less than 30 000 lats 15.2. project total requested funding of a financial instrument is not more than 1 000 000 lats 15.3. project financial instrument funding requested shall not exceed 85% of the project total eligible costs 16. Compliance with the "green procurement" principles on constructor and būvorganizācij selection criteria 17. planned activities the project in accordance with specified eligible activities in accordance with the provisions of paragraph 15 of the 18 Projects eligible costs included in accordance with specified eligible costs under rule 16. , 17 and 18 of 19. as a result of the implementation of the project in each building where the implementation of project activities, the expected heat consumption for heating exceeds 100 kWh/m2 year 20. as a result of the implementation of the project the expected efficiency indicator (carbon dioxide emissions reduction in relation to the financial instruments required for the project funding) is not less than 0.35 kg CO2/year $21. submission of the project are identified and described the possible risks for the implementation of the project and describes preventive measures for the implementation of a project to reduce the risk of project 22. application contains and describes the project publicity measures 23.
The project is described in the application project's impact on the local population 24. building energy audit report and certified architects or certified civil engineer in the explanatory memorandum is contained in equal measures to be included in the eligible costs of the project 25. Certified or certified civil engineer architect in the explanatory memorandum annexed to the statement of work is clearly the extent of the works and the works to be performed (materials, material characteristics, describes the constructive elements of the technical parameters) Note.
* Not applicable.
The Minister of the environment, regional development and local government responsibilities to the Minister, in place of the Minister of agriculture j. Dūklav in annex 6 of the Cabinet of Ministers of 5 May 2010 Regulation No. 417 of the quality evaluation criteria no PO box
Criteria and indicators for the possible number of points the actual rating 1. green public procurement requirements for the purchase of application technical documentation preparation phase 1.1. 
define selection criteria: the architect and the civil engineer and/or energoauditor is certified by the laws in the order, and he has the experience (customer feedback) or a certificate of completion of training in energy efficient building design and/or renewable energy technology deployment and logging 2 1 0 2 2 total.

Green procurement the procurement requirements application works and/or technological equipment installation phase 2.1. define selection criteria for contractors, specifications, training in the field of energy efficiency, energy monitoring, building materials, water resource utilization, contract performance conditions the level of noise and waste management during construction and/or other green procurement criteria 4 2.2. define selection criteria for contractors, specifications, training in the field of energy efficiency, energy monitoring, building materials and water savings as well as contract performance conditions, noise and waste management during construction 3 2.3. define selection criteria for contractors, specifications, training in the field of energy efficiency, energy management and building materials, as well as the conditions of performance of the contract for the management of waste during the works 2 2.4 define selection criteria for contractors, specifications, training in the field of energy efficiency and energy monitoring, as well as the conditions of performance of the contract for the management of waste during construction 1 2.5. not defined in green procurement requirements 0 0 4 total 2 3. project the expected efficiency indicator 3.1. heat consumption for heating up 20 kWh/m2 year 9 3.2 heat consumption for heating the 21-30 kWh/m2 year 8 3.3 heat consumption for heating 31-40 kWh/m2 year 7 3.4 heat consumption for heating 41-50 kWh/m2 year 6 3.5 heat consumption for heating 51-60 kWh/m2 year 5 heat consumption for heating 3.6 61-70 kWh/m2 year 4 3.7 heat consumption for heating 71-80 kWh/m2 year 3 3.8 heat consumption for heating 81-90 kWh/m2 year 2 3.9. consumption of heating heat 91- 100 kWh/m2 year 1 3.4.1-9 together project the expected CO2 emissions reduction performance 4.1 performance – 0,85 0,81 kgCO2/year or more $10 4.2. efficiency indicator 0.76 0.80 Ls kgCO2/year – 9 4.3 efficiency indicator 0 71-year 8 0,75 Ls kgCO2/4.4. performance – 0,70 0,66 kgCO2/year $7 4.5 performance 0.61-0.65 kgCO2/year $6 4.6 performance – 0,60 0,56 kgCO2/year $5 4.7 performance 0.51-0.55 kg CO2/ $ Year 4 4.8 performance 0.46 0.50 Ls kgCO2/year-3 performance 4.9 0.41 0.45 Ls kgCO2/year-2 4.10 performance 0.35-0.40 kgCO2/year total $1 4 1 10 5. co-financing rate requested in relation to the maximum allowable * 5.1.21-25% or more below the maximum allowable 5 16-20% below 5.2 maximum 4 5.3.11-15% below the maximum level 3 6-10% below the 5.4 maximum 2.5% below 5.5 maximum allowable total 1 5.
1-5 notes.
1. Green public procurement requirements for energy efficiency include quality criteria 2, 3 and 4. Projects that do not meet these criteria are minimum performance requirements, are not scored. Project applicant project application form (the Cabinet of Ministers of 5 May 2010 on the Regulation No 417 "climate change financial instruments project financed by public tender" Complex solutions to reduce greenhouse gas emissions national and local training institutions building "regulations" (hereinafter referred to as the rules) Annex 2) indicate how compliance with the green procurement requirements; While the project during the implementation of the green procurement requirements should include procurement, technical solutions and work organisation. Requirements must be defined with verifiable documents and monitoring.
2. See paragraph 5 of the rules.
The Minister of the environment, regional development and local government responsibilities to the Minister, in place of the Minister of agriculture j. Dūklav in