Amendments To The Cabinet Of Ministers On 1 April 2008 The Regulation No 241 "the Procedures For Granting State Aid In The European Union Fisheries Development Project Submission Open Tender Way Measure" Fishing And Aquaculture Products ""

Original Language Title: Grozījumi Ministru kabineta 2008.gada 1.aprīļa noteikumos Nr.241 "Kārtība, kādā piešķir valsts un Eiropas Savienības atbalstu zivsaimniecības attīstībai atklātu projektu iesniegumu konkursu veidā pasākumam "Zvejas un akvakultūras produktu apstrāde""

Subscribe to a Global-Regulation Premium Membership Today!

Key Benefits:

Subscribe Now for only USD$40 per month.
Cabinet of Ministers Regulations No. 530, Riga, 15 June 2010 (pr. No 31 20) amendments to the Cabinet of Ministers on 1 April 2008 the Regulation No 241 "the procedures for granting state aid in the European Union fisheries development project submission open tender way measure" fishing and aquaculture products "Issued under the agricultural and rural development Act article 5, fourth paragraph 1. make Cabinet April 1, 2008 the Regulation No 241" the procedures for granting state aid in the European Union fisheries development project submission open tender way measure "fishing and aquaculture products '" (Latvian journal , 2008, 55 no; 2009, 19, 129 no). the following amendments: 1. provisions supplementing with 8.1, 8.2 and 8.3 points to the following: "8.1 field support service after the project submission acceptance: 1. launch it evaluation 8.1 in accordance with the laws of the State of the European Union and the granting of aid for the development of the rural and fisheries;
8.1 2. published on its website information on the event for the balance of the financing granted by updating information at least once a week.
8.2 from the date of implementation of the projects approved for funding reaches 80 percent of the available funding, the rural support service continues to accept project submissions for at least 30 calendar days, the gathering and line up at the project selection criteria (annex 2).
5.2 assessing the project submissions in accordance with the laws of the State of the European Union and the granting of aid for rural and fishery development, Field support services to first assess the project submissions and support compliance of applicant the following main conditions of eligibility: 1. project objective 8.3 compliance with the objective of the measure;
2. support the 8.3 compliance status of the beneficiary;
3. support the 8.3 compliance with economic viability parameters. ";
1.2. make 10.1. subparagraph by the following: "10.1. application of the project, which is the cost amount to 70 000 lats (does not apply where the applicant is 6.4. This provision referred to the merchant) adds a simplified business plan. The cash flow statement include the project in the year of application, the subsequent years up to the end of the project, and a year after the project implementation (by years). Economic viability is positive cash flow of the project in the year of application, the subsequent years up to the end of the project, and a year after the implementation of the project. Cash flow statement cash balance at the end of each year, as well as a positive cash flow enabled the project demonstrate to implement and achieve objectives; "
1.3. make 10.2.1. subparagraph by the following: "10.2.1. a standardized business plan. It shall include information on the production, costs, fixed assets and creditors, indicating the income statement, the balance sheet for the last year and signed for the subsequent years up to the end of the project, and a year after the implementation of the project, as well as the cash flow statement to the application of the draft year, in subsequent years up to the end of the project, and a year after the implementation of the project. Cash flow statement cash balance at the end of each year is positive; "
1.4. the express section 10.2.3. the following wording: "10.2.3. evidence summary of support the economic viability of the applicants in the year after the project implementation (in compliance with the rules referred to in paragraph 10.2.2.2. pointer and one from 10.2.2.1. these provisions or 10.2.2.3. the indicators referred to in subparagraph);";
1.5. to express 10.3.1.14. subparagraph as follows: "10.3.1.14. financial information on production volumes, costs, fixed assets and creditors, indicating the income statement, the balance sheet for the last year concluded, the subsequent years up to the end of the project implementation and for three years after the implementation of the project, as well as the cash flow statement to the application of the draft year, in subsequent years up to the end of the project, and three years after the implementation of the project (by years). Cash flow statement cash balance at the end of each year is positive; "
1.6. make 10.3.3 point as follows: "a collection of evidence on 10.3.3 supports the economic viability of the applicants in the year after the project implementation (in compliance with the rules referred to in paragraph 10.2.2.2. pointer and one from 10.2.2.1. these provisions or 10.2.2.3. the indicators referred to in subparagraph).";
1.7. the express section 11.1.13. the following: "financial information – 11.1.13. cash-flow statements to the application of the draft year, in subsequent years up to the end of the project, and three years after the implementation of the project (by years). Cash flow statement cash balance at the end of each year is positive, as well as cash flow shows possibility of implementing project and achieving goals; "
1.8. make 12.1. the introductory part of subparagraph by the following: "the application of the project 12.1. (including the business plan) in two copies, one of which supports the applicant gets back to a field support service mark of receipt (not applicable if the project application submitted in the form of an electronic document):";
1.9. the express section 12.10. by the following: "12.10. by purchasing the equipment – national environment service regional environmental management certificate of the polluting activity will be carried out when implementing the project, and that polluting activities permit or certificate (category (A) or (B) the authorization of a pollutant or pollutants in category C certificate of operation) the tenderer is required to receive;"
1.10. the deletion of 12.2, 12.3, 12.6, 12.7, and 12.8 12.11.1. section;
1.11. to supplement the rules with 12.2 12.3 and 12.4 points, as follows: "12.2 on real estate in which to implement the project, the applicant shall have a land registry Department issued 50 inscription or the land registry certificate is registered in the land registry or a long term lease in which the rent period is not less than seven years from the date of submission of the application.
12.3 the State revenue service after field support service request information: 1. the tenderer support 12.3 tax payment;
12.3 2. carried out State social security payments last year concluded the project before the application.
12.4 rural support service of the food and veterinary service of the company in the register that supports the applicant's compliance with paragraph 6 of these rules. ";
1.12. Express 18.4 section as follows: "18.4. General costs (including architects, engineers and consultants, legal services, feasibility study, patents and licences costs) directly linked to the project preparation or implementation. General costs shall not exceed eight percent of the rest of the rules referred to in paragraph 18 of the total eligible cost. Project application preparation, consulting and legal service costs does not exceed two percent of the rest of the rules referred to in paragraph 18 of the total eligible cost. ";
1.13. Express 32 and 33 the following: "32. If the applicant is this rule 6.4 or 6.5 referred Merchant, that payment shall be subject to the full implementation of the project and the fish processing or animal by-products processing procedure of recognition, as evidenced by the inclusion of food and veterinary service of the company subject to the registry.
33. the beneficiary at the same time with the last payment application is submitted to the rural support service of the statement of the results of the implementation of the project (annex 4) and the report on the beneficiary of economic indicators (annex 5). ";
1.14. Express of annex 1 D section 1 the following: "(D). 1. Documents: documents to be submitted (if the form is submitted in accordance with electronic document requirements of the law, including accompanying documents must be submitted according to the requirements of the said law) supports the applicant fill in fill in the staff notes with the LADIES X the corresponding answer number of pages marked with an X in the appropriate number of pages the answer yes no not applicable yes no not applicable 1.
Project application in two copies, one of which with a receipt given supports to the applicant (does not apply, if the application is submitted in accordance with the laws and regulations on the circulation of electronic documents): 1.1.
If the application of the project's total eligible cost amount does not exceed 70 000 lats – simplified business plan according to the project application, the original annex 6 1.2.
If the total eligible costs of the project amount is 70 000-200 000 lats – a standardized business plan in accordance with the project application 1., 2., 3., 4., 6 and 7 of the original annex 1.3.
If the eligible cost of the project exceeds 200 000 LVL or if the applicant is an existing operator that creates a new fish processing, fish by-products or waste processing plant – free-form business plan according to the project application structure specified in annex 8, but including all project application 1., 2., 3., 4., 6., 7. the financial information set out in the annex to the original 1.4.

If the applicant is a newly created economic operator that creates a new fish processing, fish by-products or waste processing company first reference or taxation year is not yet complete, the business plan of the project indicated in annex 9 of the application structure, but including all project submissions 6. financial information set out in annex 2 of the original applicant's Declaration of support for the original 3.
Statement from credit institutions, leasing companies or cooperative credit society for the provision of credit, where the project will take credit, the certificate must be specified for the creditor and the borrower's property and the loan amount (or submitted within six months after the entry into force of the rural support service of the decision on the application for the project-approval) original 4.
If the project intends to invest private or any other money funds, the Tenderer shall submit the supporting documents which prove the availability of funds, the original 5.
Annual report for the last year concluded (complete set) support eligible applicants must be submitted in accordance with the annual accounts Act (environmental mark of receipt), showing the original 6.
The annual income declaration for the last year concluded with an attachment "revenue from operating activities" support applicants to whom it is to be submitted in accordance with the laws and regulations of people's annual income statement and filling out (with a check mark on the receiving ENVIRONMENT), by presenting the original copy 7.
Declaration on the economic operator compliance with the small, small or medium company category in accordance with the laws and regulations on economic activities and by whom deklarēšano according to petty, the definition of small and medium-sized enterprises in the original 8.
Purchasing equipment – national environment service regional environmental board certified on the polluting activity will be carried out when implementing the project, and that polluting activities permit or certificate (category (A) or (B) the authorization of a pollutant or pollutants in category C certificate of operation) the tenderer is required to receive the original of new construction and reconstruction projects ** 9.
Planning and architectural task (if submitting a project application, not technical design), the presentation of the original 10.
Simplified reconstruction-proof card and seed documentation developed under the construction of laws and regulations governing the municipal binding rules, by presenting the original copy of the 11.
Purchase of building materials (new construction and reconstruction) – accepted a construction technical stage of the project, presenting the original copy of the 12.
Drawn up by the applicant supports the construction of them, where to buy building materials (simplified reconstruction) the original 13.
Accepted technical project construction stage (if submitting a project application is technical project), the presentation of the original 14.
Building permit (if submitting a project application is technical project), by presenting the original copy of the formal procurement procedure if LR should apply laws on procurement procedures applicable Subscriber funded projects *** 15.
Procurement technical specification of the subject of the original 16.
Procurement monitoring Bureau (IUB) published a call for proposals 17 prints.
The statement published in the IUB on procurement documents print 18.
All of the tenders submitted from potential suppliers, presenting the original copy * 19.
The notice published in the IUB decision making prints 20.
Description in free form, indicating the manner in which a given purchase is set low price, adding information about the entrepreneurs surveyed, advertising booklets and other information proving the impartiality in determining the price, if the project equipment, facilities, equipment, work tool, information technology, software and general costs eligible costs the purchase amount is 500 – 50 000 lats as well if the construction or reconstruction of the eligible cost for the amount does not exceed 120 000 lats and support the applicant carried out the procurement procedure in accordance with the laws and regulations on the application of the procurement procedure, copy on presentation of the original of the other documents submitted and of the documents submitted, the number of pages of notes.
1. Submit a copy of the document, the applicant confirms its support for compliance with the original (the document is "copy matches the original" signature, printed name and date).
2. New construction and reconstruction of construction and purchasing documents shall be submitted together with the application for the project or within six months after the entry into force of the rural support service of the decision on the approval of the project application (the exception is the purchase of building materials).
3. Architects, engineers, consultants, and service are part of the overall costs, and purchase documents for those submitted with the project application or within six months after the entry into force of the rural support service of the decision on the approval of the project application (the exception is the building materials purchase). ";
1.15. deletion of annex 5 of annex 1.
2. In these rules, the above requirements shall not apply to design applications which were submitted for the Field support services before the date of entry into force of the provisions.
Prime Minister – Environment Minister r. vējonis farming Minister j. Dūklav in