Key Benefits:

Subscribe Now for only USD$40 per month.
Cabinet of Ministers Regulations No. 1025 Riga 2010 (November 1. No 56) rules on "operational programme infrastructure and services" Appendix apakšaktivitāt "new 3.1.2.1.2. college courses, the development of the aviation sector" Issued under the European Union's structural and cohesion funds act 18 paragraph 10 of article i. General questions 1. determines: 1.1. procedures for implementing the action programme ' infrastructure and services ' addition ' Infrastructure priorities 3.1 human capital contributes to the strengthening of the "UR3.1.2.pas" higher education infrastructure "3.1.2.1. activities of higher education institutions ' premises and equipment modernisation including by providing educational programs for learning opportunities to persons with functional disabilities 3.1.2.1.2. "apakšaktivitāt" new college graduate program of the development of the aviation sector "(apakšaktivitāt);
1.2. The European regional development fund project (hereinafter draft) submission evaluation criteria;
1.3. the requirements of the project applicant;
1.4. the responsible institution and liaison body, the distribution of competence between these institutions and cooperation arrangements, as well as the responsible authorities and cooperation agencies functional form of subordination.
2. the purpose of the Apakšaktivitāt is to improve the economic development and labour market needs the necessary professional training, providing support for a new first level professional higher education study programme development in the aviation sector.
3. Apakšaktivitāt-financed by the European regional development fund. Total restricted selection available within the European regional development fund is LVL 1 699 999.
4. Apakšaktivitāt implement the project application to the limited selection. The responsible authority shall restrict the application of the selection of projects organized funding available for all apakšaktivitāt in no more than two project application selection rounds. The responsible authority until 1 July 2011 is entitled to re-arrange the project application selection round, if there is no apakšaktivitāt available to the learned public funds, including in the first round of projects submitted has been rejected, the application is not filed or filed after the application deadline.
5. Apakšaktivitāt responsible authorities within the functions provided by the Ministry of education and Science (hereinafter referred to as the responsible authority). Responsible authority: 5.1 ensure project selection and evaluation of application: 5.1.1. formulate and approve the project application form, project evaluation, the application assessment and evaluation of the project application form, as well as the methodology for project submission and evaluation procedures of the selection;
5.1.2. creates a project application for the evaluation of the Commission (hereinafter referred to as the Evaluation Commission), develop and approve the rules of procedure of the Commission of the assessment;
5.1.3. sent the invitation to the applicant to submit a draft project submissions;
5.1.4. assess the project submissions and decides on the approval of the project application, approval or rejection of the condition, as well as assess the decision on approval of the application, the project provided the conditions are met;
5.2. the accumulated data on project submissions under the laws and regulations of the European Union's structural funds and the cohesion fund management information system design and use;
5.3. provide information to the public and provide publicity on matters related to the implementation of apakšaktivitāt;
5.4. ensure that there will be exceeded this rule 3, paragraph apakšaktivitāt for the implementation of the European regional development fund, as well as monitor and control available in the European regional development fund, including a learning Council of 11 July 2006, Regulation (EC) No 1083/2006 laying down general provisions on the European regional development fund, the European Social Fund and the Cohesion Fund and repealing Regulation (EC) No 1260/1999 , article 93 1 and 2 listed in the implementation of the principle of the apakšaktivitāt level;
5.5. the provision laid down in paragraph 46 of the draft amendment;
5.6. on its Web site the project submission form and the evaluation, the project application selection and evaluation procedures.
6. Apakšaktivitāt cooperation within the authority supports national education development agency (hereinafter referred to as cooperation body). The liaison body: 6.1.  within 10 working days following the entry into force of the agreement on the development of the project (hereinafter referred to as the agreement) project, specifying the project recipient of funding requirements in accordance with these rules and regulations that govern the European Union's structural and cohesion funds, implementation, and monitoring of implementation, and shall submit it to the authority responsible for the coordination;
6.2. the switch with the beneficiary of the financing agreement;
6.3. ensure project implementation monitoring and control, including audits of project implementation and monitor the Council of 11 July 2006, Regulation (EC) No 1083/2006 laying down general provisions on the European regional development fund, the European Social Fund and the Cohesion Fund and repealing Regulation (EC) No 1260/1999, article 93 1 and 2 of the principle referred to in the implementation of the project;
6.4. the beneficiaries of the buying plan and submit it to the procurement monitoring Bureau;
6.5. the Ministry of education and science of the State budget for the planning of the necessary information on the implementation of the project;
4.1. prepare forecasts of payment and submit it to the paying authority;
6.7. the European regional development fund demand forecasts for the current and the following year and shall submit it to the leading authority and the responsible authority;
6.8. prepare and submit to the body responsible for the implementation of apakšaktivitāt and apakšaktivitāt in the funding available for learning;
4.3. test and approve funding requests for payment and the recipient shall prepare a declaration of expenditure;
6.10. provide information about the recipient of the funding agreement requirements and their enforcement;
6.11. the review and approval of amendments to the project;
6.12. store data on the implementation of the project according to the laws of the European Union's structural funds and the cohesion fund management information system design and use;
6.13. provide the public with information and provides publicity on matters related to the agreements concluded within the apakšaktivitāt.
7. Cooperation authority has functional authority.
8. the purpose of the implementation of Apakšaktivitāt reached by one or more of the following eligible activities: 8.1. new first level professional higher education study programmes (or program) in the aviation sector development necessary buildings, structures, facilities and infrastructure reconstruction and renovation (if necessary, new building construction);
8.2. new first level professional higher education study programmes (or program) in the aviation sector development the necessary equipment, facilities and technology (information technology, program and other courses required for process technology), including modern facilities.
9. The rules referred to in point 8.1 of the new building construction is supported, if the cost of the new construction is cost-effective than existing building reconstruction.
II. Project applicant requirements and the European regional development fund, the conditions for the award of the project applicant has 10 State founded the College, located in the Ministry of education and science in the monitoring and implementation of the first level professional higher education programs in engineering, information technology, social studies and in the field of transport services, and that the responsible authority is invited to submit a project application.
11. within the framework of the project the applicant apakšaktivitāt shall submit a single application for the project, the amount of which does not exceed the funds available in the apakšaktivitāt.
12. the maximum permitted by the European regional development fund is 100 percent financing of the project's total eligible cost.
13. Infrastructure, designed to make the European regional development fund contribution, is a project of the applicant or in the public domain and is recorded in the land register. If the infrastructure is State owned, it passed to the project the applicant's possession or use for a period of not less than five years after the completion of the project.
14. The project investments made can not be used for commercial activities, which can be regarded as State aid and may create barriers to competition, providing benefits to specific merchants, the production of certain goods or services.
III. submission of the project selection procedure 15. the responsible authority shall, not later than 40 working days after the entry into force of this provision sends a call for project applications (hereinafter referred to as the notice) to the project applicant.
16. The invitation shall: 16.1. application submission period for the project that is not less than 30 working days from the date of dispatch of the invitation;
16.2. the application of the project location and the type of the order;
16.3. the paper form, submit a copy of the application to the number of the project;

16.4. Web site address containing the application to be used in the preparation of project documents;
16.5. the other information that the responsible authority considers it necessary to specify in the call.
17. the project applicant project application submitted, subject to the following requirements: 17.1. project application form a completed project application form (annex 1) and the following annexes: 17.1.1. completed a financing plan for the project in accordance with the budget of expenditure classification of economic categories (annex 2);
17.1.2. institution of higher education and the development of long-term strategy for 2009-2015 according to these rules 18 and annex referred to in point 3.1.;
17.1.3. the possession, usage or ownership documents (or copies) of real property in which the project is planned to make investments;
17.1.4. grounds for the construction of new buildings as a cost-effective way of aid compared with the reconstruction of the existing building, specifying the exact positions and their cost (applicable if new buildings planned for construction);
17.2. the project application to the institution of the applicant, the signature of the project manager or his authorised person by adding the appropriate application of the project authorisation;
17.3. to ensure compliance with the project application, this provision of the annex referred to in point 1.5. requirements, project submission form section, subsection and their names do not change and do not delete.
18. The provisions referred to in paragraph 17.1.2. higher education institutions in the operation and development of the long-term strategy for 2009-2015 is the document in which the project applicant, taking into account the labour market, the economy and technology and innovation trends, provides detailed information on its activities and the planned development in the period from 2009 to 2015, indicating the main lines of action, development needs (planned field of study and study program) cooperation with the industry, professional bodies and companies, as well as the implementation of the strategy for funding by sources of Finance (State budget, structural funds of the European Union, foreign financial aid or private funds), including giving a new first level professional higher education programs (or program) in the aviation sector for the implementation of the planned investment performance and sustainability.
19. the project the applicant in addition to the provisions referred to in annex 17.1. you can submit other documents that it considers necessary to submit in support of the application for the project's compliance with these rules in the draft application evaluation criteria.
20. the project applicant project application to the responsible body can submit to: 20.1. paper form by adding an identical project submission form and 17.1.2. these provisions of the strategy referred to in the electronic version of the electronic media, all documents posted to the packaging and sealing;
20.2. the electronic document in the form of laws and regulations for the design of electronic documents in the order, subject to the following requirements: 20.2.1. the project application has been designed for the DOC, xls or PDF file format;
20.2.2. the project submission form, and in addition to the original document to be submitted must be signed by the individual author's secure electronic signature and confirm with the time stamp of the selection before the project submission deadline. If additional documents are copies of the documents must be certified by each individual to the project the applicant secure electronic signature and a time stamp prior to the submission of the draft selection.
21. the invitation specified in the project application submission period end date is the last day when the project applicant project application may be made in person in paper form, electronic form, or send documents by post.
22. the responsible authority shall record the receipt of project submissions a day. Proof of receipt of the application, the project authority in charge of the project to the applicant personally immediately or within 10 working days of the submission of the project submission deadline shall be sent by post or electronic form, a document signed with a secure electronic signature law on electronic document design.
IV. evaluation of the application of the draft article 23 within the Apakšaktivitāt project application submitted to the Evaluation Commission evaluated. Scoring panelists include the Ministry of education and science and the Ministry of transport.
24. The Evaluation Commission meetings as observers (without voting rights) can participate in the managing authorities and the liaison body. Evaluation the evaluation process, the Commission may invite one or more experts without voting rights.
25. evaluation the Commission shall determine the responsible authorities approved evaluation rules of procedure of the Commission.
26. When starting, the Evaluation Commission members, experts and observers signed a declaration that the Evaluation Commission during the meetings of the information and the content of the document will not disclose to third parties. The Evaluation Commission members and experts to sign a declaration that there are no circumstances in which they might violate laws and regulations that govern the European Union's structural and cohesion funds, implementation, and monitoring of implementation, the limits the European Union fund management to the person involved.
27. project submissions valued under the project application to the assessment criteria (annex 3), subject to these rules, responsible authorities develop and validate the project application selection and evaluation procedures and laws and regulations that govern the European Union's structural and cohesion funds, implementation, and monitoring of implementation, as well as through project application evaluation and project submission form filled out the evaluation methodology.
28. the first project submissions valued in conformity with this provision of the annex referred to in paragraph 1, the administrative criteria – annex 3 of this Regulation referred to in paragraph 2, the eligibility criteria and the provisions of paragraph 3 of annex 3 of the above quality criteria.
29. the project submission compliance administrative criteria and eligibility criteria is assessed by "Yes" or "no" ("Yes", "no" – meets does not meet). Application of project compliance with quality criteria assessed by giving a certain number of points.
V. decision on approval of the project application, approval with conditions or disapproval and its notification 30. the responsible authority shall take a decision on the application for the approval of the project, if it complies with all the provisions of annex 3 1 and 2 of the project referred to in the submission evaluation criteria have been assessed with "Yes", as well as quality evaluation criteria project application has received the required number of points.
31. the responsible authority shall take a decision on the rejection of the application of the project and not further assessed the project application, if: the application does not project 31.1 match one of these provisions 3.1.1., 1.2., 1.3, 1.4 or 1.8. referred to administrative criteria;
31.2. the project submission does not comply with any of the provisions of annex 3 2.1.1., 2.1.3, 2.1.4, 2.1.2, 2.2.1 or 2.2.2. referred to the eligibility criteria;
31.3. in conformity assessment rules 3.3.2 the criteria referred to in the application for the project have received less than one point or in compliance with this rating rule 3.4 of annex 3 in this criterion received less than two points assessment of compliance, or those provisions of annex 3 3.1 or 3.3. criteria referred to in paragraph received less than three points.
32. The competent authority may take a decision to approve the application, the project on condition that must be satisfied in order to project the applicant would conclude the agreement. That decision may include the following: 32.1. streamline project in accordance with the following criteria: 32.1.1. This provision of the annex 3 1.5, 1.6, 1.7, 1.9, 1.10, 1.11, 1.12, 1.13.., 1.14, 1.15 or 1.16. referred to administrative criteria;
32.1.2. This provision of the annex 3 2.1.4, 2.1.5, 2.1.7, 2.1.8..., 2.1.9., 2.1.10. or 2.1.11. referred to the eligibility criteria;
32.2. the other responsible authorities determined legally justified actions associated with 32.1. the conditions referred to in the conclusion of the agreement.
33. the responsible authority shall within five working days after the decision sent to the applicant of the project: 33.1.-the decision on the application of the project approval, project submission or the rejection of an application for the approval of the project;
33.2. cooperation authority-the decision on the application for the approval of the project agreement and the project application: where the application 33.2.1. filed on paper, send the original of this certificate;
33.2.2. If the application is filed in electronic form of a document, send it to the appropriate electronic document circulation of regulatory legislation.

34. If the application is approved, the applicant in the decision on the project project approval submissions, provided the prescribed period (the period down from 20 to 40 working days after the decision to dispatch) provides the conditions and submitted to the responsible body for evaluation information on the fulfilment of the conditions. Decision within the time limit set in the information about the conditions of the project, the applicant may submit a maximum of two times.
35. the responsible authority shall be 20 working days after this provision in paragraph 34 that decision deadline assessed projects applicant information and to draw up an opinion on the decisions contained in the conditions (opinion).
36. If the applicant within the time limit laid down in that decision ensures the fulfilment of the conditions contained in the decision, the opinion of the responsible authority is positive and responsible authority within five working days after the signing of the opinion sent: 36.1. the project applicant, opinion;
36.2. the cooperation body – a decision on project approval, opinion and approved project application: where the application 36.2.1. filed on paper, send the original of this certificate;
36.2.2. If the application is filed in electronic form of a document, send it to the appropriate electronic document circulation of regulatory legislation.
37. If the applicant does not provide the draft decision contained in the conditions or not provide it within the time limit laid down in that decision, the responsible authority opinion is negative and the project application is considered to have been rejected. The responsible authority within five working days after the signing of the opinion sends the draft opinions to the applicant.
Vi. conditions for implementation of the project. Eligible and ineligible costs 38. The project has the following applicable items: 38.1. buildings, structures, facilities and infrastructure renovation and reconstruction costs, where necessary, the construction of new buildings, as well as the site of a home improvement job costs;
38.2. the real property (land) acquisition costs up to 10 percent of the project's eligible direct costs;
23.8. new or used equipment, supplies, equipment and technology for the cost of the acquisition to create a logistic base first level professional higher education study programmes in the aviation sector;
23.9. costs that are reasonable and related to the implementation of project activities: 38.4.1. purchase documentation development costs and the costs of the procurement procedure;
38.4.2. technical project development costs;
38.4.3. autoruzraudzīb and building costs;
38.4.4. project implementation in the material value of the insurance costs, if they apply to the project implementation period;
38.5. the project information and publicity costs according to the laws of the European Union's structural and cohesion funds publicity and funded projects visual identity requirements;
24.0. eligible costs are irrecoverable value added tax payments if they cannot recover the legislation.
39. This rule 38.1 38.2 38.3, 38.4, and. in point costs are the direct eligible costs of the project. 38.5. This provision States the project costs are indirect eligible costs.
40. If the project for the building and space energy efficiency measures, the condition that the efficiency measures should not overlap with climate change to be implemented within the framework of the financial instrument transactions.
41. This rule 38.3. in point costs can include: 41.1. new equipment, supplies, equipment and technology, including information technology and software acquisition costs;
41.2. the use of equipment, supplies, equipment, and technology acquisition cost (if the appropriate equipment, supplies, equipment and technologies are not available on public funds);
41.3. equipment, supplies, technology and equipment delivery and installation costs.
42. This rule 38.4. in point costs do not exceed 10% of that rule 38.1., 38.2 and 38.3. in point. the cost amount.
43. This provision is 38.5. in point costs do not exceed 0.3% of the direct eligible costs.
44. the financing of apakšaktivitāt do not apply and are not included in the project application to the following costs: 44.1. project administration costs;
44.2. fee for loan processing, presentation, and service, the reservation fee on financial transactions, interest on arrears, penalties and expenses of litigation;
27.5. expenses, which does not provide the immediate purchase of equipment or technology (leasing), except when the equipment or technology transfer is intended to project implementation deadline;
27.6. costs not specified in paragraph 38 of these rules;
27.7. the costs in excess of that rule 42 and 43 in the specific costs;
27.7. costs that are not related to the implementation of project activities;
27.8. the costs that are not incurred by the implementation of project activities (with the exception of those provisions and in 38.4.2 38.4.1. those costs that apply from the date of entry into force of the provisions) or payments made later than the month after the expiry of the implementation of the project;
27.8. the costs that do not meet the reasonable financial management, in particular value for money and cost-effectiveness;
27.9. costs not justified by supporting documents or the costs incurred by the law of the non-compliance;
44.10. costs incurred on a contract basis.
45. Amendments to the project is carried out in accordance with the laws and regulations that determine the order in which the European Union's structural and cohesion funds in the participating institutions provide the planning document preparation and implementation of these funds, in so far as these rules otherwise.
46. The draft amendments to coordinate with the responsible authority, if the changes are related to: 46.1. project objectives;
46.2. change of the beneficiary;
46.3. the project sample outcome indicators;
46.4. the project start and end date;
46.5. the total cost of the project by a year.
47. The beneficiary, without making amendments to the project, you can perform the reallocation of costs between these rules, 38.2, 38.3 38.1..., and 38.4 38.5. cost mentioned in points positions, not exceeding five percent of the cost of common positions reallocated eligible costs and subject to this provision, paragraph 42 and 43 in certain cost limits.
48. The beneficiary shall provide the authority with a request for payment, accompanied by an explanation of the rules referred to in paragraph 47 of the reallocation of costs. If this explanation is not filed or the explanation is not justified, liaison body cost reallocation may be considered not to have occurred.
49. The beneficiary within five working days after the conclusion of the agreement on the procurement plan shall be submitted to the Liaison Office. If the beneficiary of the project before the agreement is purchasing it before launching a procurement procedure, procurement plan shall be submitted to the Liaison Office.
50. The beneficiary of these rules referred to in point 8 of the activities supported implementing the first tender for works, supplies or equipment, the acquisition of equipment and technology issued not later than 90 days after the conclusion of the agreement.
51. The beneficiary shall ensure the implementation of the project related loading snapshot, the beneficiary authority Web site at least once every three months.
52. The beneficiaries of the activities provided for in the project implementation started: 52.1 of the date of conclusion of agreement, but not later than one month after the conclusion of the agreement;
52.2. the rules from the date of its entry into force, if necessary, to ensure the conformity of the application of the draft provisions in the annex 3.3 States criterion.
53. If the project occurs during non-eligible expenditure or the incidence costs shall be borne by the beneficiary of the funding from its own resources.
54. the responsible authority shall have the right to request information from beneficiaries on the implementation of the project and results achieved compliance with the planned results.
55. The responsible authority, if necessary, have the right to propose amendments to the project, preparing and sending the liaison body and the recipient of funding proposals for the necessary amendments to the draft.
56. The beneficiary within 10 working days after this rule 55, paragraph proposal receipt prepare and submit project request the cooperation of the amendment, agreed with, or provide a reasoned justification to the responsible authority and the liaison authority of the decision not to propose an amendment to the draft.
57. the project will be implemented within three years after the project started, but no later than 31 December 2014.
Prime Minister v. dombrovsky, Minister of education and science t. koķe Ministry of education and science of the presented version of annex 1 of the Cabinet on 1 November 2010 by Regulation No 1025, Minister of education and science t. koķe
 

2. the annex to Cabinet of Ministers 2010 November 1, Regulation No 1025 State budget institutions financing plan project title project submission, registration No.
 
Project code applicant Number name 20 ___. the amount of the year January February March April May June July August September October November December 21710 general order the grant from the general revenue, the 1000-9000 expenditure-total 1000-4000; 6000-7000 maintenance costs 1000-2000 current expenses remuneration of 1000 1100 1200 employers pay State social insurance contributions, social benefits and compensation for the goods and services in 2000, 5000 equity Executive Officer (name) (signature) (name) (signature) Z.v. information about paraksttiesīgaj officials (in accordance with the Cabinet of Ministers on 6 November 2007, the instruction No 17 "payment order to the Treasury ') name 1. name of the post code of the authority the Person (the first or the second signature) term (specify a period of time) 2.



Phone number ____ ____ ____ ____ ____ ____ ____ date of preparation of the __ _____ _____ _____ _____ education and Science Minister t. koķe annex 3 Cabinet 2010 November 1, Regulation No 1025 Project submission evaluation criteria for the operational programme number and name of the infrastructure and services priority number and name 3.1. Infrastructure to strengthen Measures of human capital and title of 3.1.2. Higher education infrastructure activity number and name 3.1.2.1. Higher education institutions the modernisation of premises and equipment, including providing educational programs for learning opportunities to persons with functional disabilities Apakšaktivitāt number and name 3.1.2.1.2. New College graduate program development in the aviation sector the project application selection way limited project application selection responsible authority Ministry of education and science 1. Administrative criteria rating (yes/no) 1.1 Project applicant is invited to submit a project application to the limited application of the selection of projects N 1.2 project submission is submitted to the responsible authorities within the specified N 1.3. project application is drawn up into N 1.4. Project application is made in the Latvian language N 1.5. Project application has been drawn up according to the provisions specified in paragraph 17.1. project application form and all of the forms are filled in the section 1.6. application of the project P filed in paper form, has the required number of copies, the original and the copies of the application (if provided) is cauršūt (caurauklot) or filed electronically in the form of a document signed with a secure electronic signature and confirm with the time stamp according to the law on electronic document design requirements the project application, P 1.7. is signed by the project head of the institution to the applicant or his authorised person P 1.8. Project submissions are higher education institutions in the operation and development of the long-term strategy – 2009. 2015 N 1.9. application of the project in addition to the higher education institution and the development of a long-term strategy for 2009-2015 has added other provisions 17.1. this subparagraph annexes P 1.10. Project duration and cost allocation over the years corresponds to the rule laid down in paragraph 57 of the project implementation period P 1.11. Project required in the application of the European Regional Development Fund funding and total eligible cost specified in lats P 1.12. The project required in the application of the European regional development fund, the percentage shall not exceed the funding rules set out in article 12. the allowable size of P in the application project 1.13. the eligible cost total amount requested does not exceed the provision laid down in paragraph 3 of the apakšaktivitāt funding of the project application, P 1.14. eligible costs over the years specified in full in the arithmetic right and meet the project budget totals listed in the summary P 1.15. project eligible costs specified in the application to the positions meet this provision set out in paragraph 38 of the eligible costs of the project application, P 1.16 planned costs exceed this rules 42 and 43 of the cost constraints set out in P 2. eligibility criteria rating (yes/no) 2.1 application of the project 2.1.1. the eligibility criteria of the project comply with the rules laid down in paragraph 2, the objective of the apakšaktivitāt project 2.1.2 N to implement one or more of the provisions referred to in point 8 total N application of the project in 2.1.3 define the problem addressed and justified the chosen target groups where N application and project 2.1.4. the planned activities provide the problem and define the target group needs N 2.1.5. the planned European regional development fund contribution to the modernisation of the infrastructure to meet the higher education institution and the development of a long-term strategy for 2009-2015. year P 2.1.6. Project activities are clearly defined, correspond to planned implementation time schedule and ensure the planned results in the application of the project P 2.1.7 planned results and indicators are clearly defined and measurable (reachable results are specified in units with specific values) 2.1.8. Project application, P describes the project management, implementation and monitoring system and the required resources (in the number of staff involved, qualifications and responsibilities the available materials, technical base), and they are appropriate to the needs of the project. the project submission 2.1.9 P is justified, as it will ensure the sustainability of the results achieved and maintenance for at least five years after the implementation of the project. the project application, P 2.1.10 contains costs match the expected period of the project implementation, it is necessary and reasonable to achieve the project objectives and the implementation of planned activities planned in the project P 2.1.11. publicity and information dissemination activities comply with the laws and regulations of the European Union's structural and cohesion funds publicity and funded projects visual identity requirements Security Project of the applicant 2.2 P eligibility criteria 2.2.1. Project applicant is a State founded in the College, located in the Ministry of education and science in the monitoring and implementation of the first level professional higher education programs in engineering, information technology, social studies and transport services N infrastructure 2.2.2 envisaged in the European regional development fund contribution is the property of the applicant or of the project also state-owned, but passed to the project the applicant's possession or usage of N 3. Quality criteria rating (point scale) 3.1 higher education institution for a new first level professional higher education programs (or program) in the aviation sector, the introduction, is the operation and development of the long-term strategy for 2009-2015. The quality of the strategy describes: based analysis of the situation (economic analysis and labour market developments in relation to higher education institutions planned in the field of study and study programmes);
the higher education institution of the strengths and weaknesses, threats and opportunities analysis;
certain key development needs and lines of action, taking into account the technology and innovation developments and assessing threats, including demographic projections;
scheduled based numerically measurable results;
based on the European Regional Development Fund planned efficiency of investment economic competitiveness (population in economic activity, including self-employment, productivity and eksportspēj) increase;
alternative evaluation strategy objectives;
the implementation of the strategy planned funding by sources of finance must obtain at least three points 3.1.1. 
The planned development strategy takes into account all the parameters provided seven and their characteristics, defined numerically measurable performance, provides a clear picture of the activities of higher education institutions for the next seven years, the strategy planned 5 3.1.2. development takes into account at least three of these parameters and to provide justification for the institution of higher education for the next seven years 3 3.1.3. planned development strategy takes into account two parameters provided in or less justification is not provided, the institution of higher education for the next seven years 0 3.2. alternative project implementation analysis and project economic analysis (economic costs and benefits) must obtain at least one point 3.2.1. 

The project is provided in the application to the analysis of alternatives and the project economic analysis based on numerical calculations, and justify the proposed alternatives, and selected the alternative with the lowest cost 3 3.2.2. 
The project is provided in the application to the analysis of alternatives and the project economic analysis based on numerical calculations, and justify the proposed alternatives, the selected alternative is not at the lowest cost 2 3.2.3. 
The project is provided in the application to the analysis of alternatives or project economic analysis to justify proposed alternatives without numeric calculations 1 3.2.4. 
Project application analysis of alternatives is not provided or the project economic analysis 0 3.3. planned activities the project readiness for initiation must obtain at least three points 3.3.1. 
The project has a high readiness to start (developed the technical design of the works, provided the tāmētāj drawn up certified construction cost estimate prepared the technical documentation for the purchase of equipment, started at least one of the planned execution of purchases or for the purchase of equipment) 5 3.3.2. 
The project is ready for the launch of the medium (and based on the purchased equipment or works list and cost estimates, prepared documentation for the purchase of at least one of the planned execution of purchases or for the purchase of equipment) 3 3.3.3. 
The project is ready for the launch of the Earth (prepared and based on equipment purchased or a list of the works to be carried out and the calculation of costs, purchase documentation not up) 0 3.4. risk assessments of the implementation of the project (construction and supply procurement and sales risks, potential cost, low incidence of academic staff, insufficient number of studētgribētāj and other risks) should be at least two paragraphs 3.4.1. 
Project submissions are assessed potential risks, developed a plan of measures identified for the elimination or reduction of risks 3 3.4.2. 
Project risk assessment in the application in part, action plan identified for the elimination or reduction of risk developed in incomplete 2 3.4.3. 
The project submission does not assess potential risks, or in the application of the project risks identified and partially developed action plan risks 0 quality criteria for the assessment of HORIZONTAL priorities (point scale) 3.5. Project-specific activities in the framework of equal opportunities (gender equality, active aging and disabled people), especially higher education institutions to customize for persons with functional impairment Criteria are not exclusive to 3.5.1. 
The project provides for four and more specific activities the fundamental principle of equal opportunities for the provision of 3 3.5.2. 
The project provides for from one to three specific activities the fundamental principle of equal opportunities for 2 3.5.3. 
The project is not intended for specific activities of the equal opportunities principle for 0 3.6. Impact of the project on horizontal priority "information society", the criteria are not exclusive to 3.6.1. 
The project is intended for the information and communication technology equipment purchase first level professional higher education programs in the aviation sector development and information and communication technology solutions in the process of study 3 3.6.2. 
The project is intended for the information and communication technology equipment purchase first level professional higher education programs in the aviation sector development 2 3.6.3. 
The project provides no information and communication technology equipment purchase first level professional higher education programs in the aviation sector development 0 notes.
1. project submissions valued by assigning a certain number of points in accordance with the quality criteria. Criteria, where appropriate, the specified minimum number of points that must be obtained for the project application will not be rejected.
2. project submissions valued with "Yes" or "no" in accordance with the administrative and eligibility criteria. Criteria that are assessed by "Yes" or "no", there are two rating: N-if the assessment is negative, the project application is rejected;
P-can make a decision on project approval with conditions.
Education and Science Minister t. koķe