Advanced Search

Amendments To The Cabinet Of Ministers On 1 April 2008 The Regulation No 240 "procedures For Granting State Aid In The European Union Fisheries Development Project Submission Open Competition In The Form Of The Measure" Investments In Aquaculture Enter...

Original Language Title: Grozījumi Ministru kabineta 2008.gada 1.aprīļa noteikumos Nr.240 "Kārtība, kādā piešķir valsts un Eiropas Savienības atbalstu zivsaimniecības attīstībai atklātu projektu iesniegumu konkursu veidā pasākumam "Investīcijas akvakultūras uzņēmumos""

Subscribe to a Global-Regulation Premium Membership Today!

Key Benefits:

Subscribe Now for only USD$40 per month.
Cabinet of Ministers Regulations No. 249 in Riga 29 March 2011 (pr. No 20 60) amendments to the Cabinet of Ministers on 1 April 2008 the Regulation No 240 "procedures for granting state aid in the European Union fisheries development project submission open competition in the form of the measure" investments in aquaculture enterprises "Issued under the agricultural and rural development Act article 5, fourth paragraph to make the Cabinet on 1 April 2008 the Regulation No 240" procedures for granting state aid in the European Union fisheries development project submission open competition in the form of the measure "investments in aquaculture enterprises" (Latvian journal in 2008, 54 no; 2009, 17, 177, no. 203; 2010, 97, 128 no). the following amendments: 1. Make paragraph 6 by the following: "6. the applicant is the merchant, farmer or fisherman's farm."
2. Make the following point 8.4: "8.4. application of the project (annex 2) confirm the economic viability of the provisions under this paragraph 10 of these requirements."
3. Make the introductory paragraph 10 by the following: "supporting the applicant 10.:".
4. Delete paragraph 10.1. and 10.2. in the introductory part of point words and figure "(does not apply where the applicant is this rule 6.2. referred to a business or merchant)".
5. Deleting the introductory part of point 10.3. words and figure "as well, if the applicant is this rule 6.2. company or referred Merchant".
6. Delete paragraph 11.
7. Deletion of subparagraph 12.1.1 and 12.1.2.. names and numbers "(this requirement does not apply where the applicant is this rule 6.2. and 6.3. referred to a business or merchant)".
8. To delete the words in point and 12.1.3. "or the support is this rule 6.2. company or referred Merchant".
9. Delete paragraph 12.1.4.
10. Amend paragraph 12.4.
11. Delete paragraph 12.10.
12. paragraph 12.13. To express the following: "12.13. procurement procedure documents – the subject of the procurement technical specification and all potential suppliers submitted tenders in accordance with the laws and regulations on the application of the procurement procedure. If you have received only one offer, support the applicant provides a price test, which certifies free-form description of the comparison of tenders for a particular purchase, information about the surveyed merchants and other information proving the impartiality in determining the price. If designed for new construction or reconstruction, construction and the purchase of the purchase of the subject of the technical specifications and all potential suppliers submitted tenders, submitted together with the application for the project or within six months after the entry into force of the rural support service of the decision on the application for the approval of the project. "
13. Express 12.2 and 12.3 points as follows: "12.2 the State revenue service after the rural support service request: 12.2 1. that statement to the applicant is not a tax, duty or other compulsory payment of debts to the State budget;
2. support the applicant 7.6 annual income declaration and its annexes "revenue from operating activities".
12.3 making procurement procedure, the period for the submission of tenders shall be fixed at least 10 working days from the day after the publication of the invitation to the procurement monitoring Bureau homepage on the internet, in accordance with the laws and regulations on the application of the procurement procedure, but if the application of the project eligible cost amount exceeds 300 000 lats, the period for the submission of tenders shall be fixed at least 15 working days after the date of publication of the call. "
14. Delete 14.3.1 14.3.2..., and
15. Express 16. paragraph by the following: "4. the 2007 to 2013 programming period for one applicant eligible costs aid amount does not exceed the measure of these two indicators: 16.1. two million lats;
16.2. the amount calculated at 150 000 lats plus 10 times the turnover of the applicant in support of the economic transactions of a previous project to the application before. "
16. Delete paragraph 17.
17. Express 19.1. subparagraph by the following: ' 19.1. new construction and reconstruction costs (excluding this provision referred 27.9.1), on the basis of contracts with third parties, responsible for carrying out the work, but not exceeding the provision referred to in paragraph 21 cost: 19.1.1 the aquaculture animal breeding and incubation of a workshop building and reconstruction of the existing shop;
19.1.2. waterworks construction of new structures and reconstruction;
19.1.3. other new construction or reconstruction; ".
18.19.11 and 19.12. Expressing. the following subparagraphs: ' 19.11. acquisition of equipment necessary for the trees and bushes and sawing other than those of the izpļaušan of the birds nesting rushes and wild places of residence, according to the project, if the objective of the support to the applicant within the preceding financial year before the application of the project have been the proceeds from the sales of aquaculture products;
19.12. implements the aquaculture operation of the company, if the applicant for the preceding financial year prior to the application of the project have been the proceeds from the sales of aquaculture products; ".
19. Make the following paragraph 19.14: "19.14. purchase of equipment produced in aquaculture production in the company's retail nurseries in the area, where support for the preceding financial year to the applicant prior to the submission of the application, the project has been in the revenue from the sales of aquaculture products;".
20. Delete 19.15. section.
21. the introductory part of paragraph 24, replace the number "30" with the number "10".
22. Delete paragraph 26.
23. To supplement the provisions of the following paragraph 27.9.1: "27.9.1 earthworks (excavation and Earth align), including a new pool construction or reconstruction of existing pond;".
24. paragraph 30 expressing the following: "supporting the applicant 30 the last payment received after full implementation of the project and the company's aquaculture industry recognition procedure, the food and veterinary service."
25. in annex 2 be deleted words and table: "proof of registration of the application, the project (to be completed by the employee of the LADA): customer number: submission of project No.
 
Project submission date and time of recording: LADA RLP employee name, surname and signature: "26. Express 2. part A of the annex by the following:" (A). General (A). 1. General information about support for the applicant supports the applicant's full name:
 

Manager name: Support the operating type of NACE Rev. 2. code: Support the operating type of NACE Rev. 2. name of company registration No.
 
VAT no: a. 2. Legal aid the applicant address Street, House No., apartment No./House name: parish, municipality: City: statistical region (the EUROPEAN TREATIES: LOOKING BACK code): postal code: a. 3. Support the applicant's contact person (Project Manager) project leader name: supervisor's title: phone, fax: email address: (A). 4. Fill in the LADA employee name, employee last name: project submission date and time of registration: "27. Express 2. C. C. 9, 10. and (C) of section 11 the following: "(C). 9. The project site statistics – NUTS III region code: region-the EUROPEAN TREATIES: LOOKING BACK on statistics code: City: municipality, parish: Street, House No., apartment No.: cadastral numbers in the land buildings, structures and land, c. 10. Milestones of the project's results are no indicator results indicators BC last year before the project concluded in the year following the year of implementation of the project of business performance indicators 1.
The company's net sales, $2.
Total cost, $3.
The company's net turnover from the activities in fisheries, $4.
Profit and loss after tax payment, $5.
Revenue from sales of aquaculture products 6.
Aquaculture production in the total production (tonnes/year) 6.1 tonnes/year of bass, 6.2 tonnes/year of salmon, eel, 6.3 tonnes per year 6.4. carp, tonnes/year of freshwater farmed trout 6.5, 6.6 tonnes/year of other species, 7 tonnes/year.
In the hatchery produced juveniles, the number of total (per year) 7.1 annual number perch, salmon, 7.2 per year 7.3. eel, carp 7.4 per year, the annual 7.5. trout reared in freshwater per year 7.6. other species per year as a result of the implementation of the project achievable indicators 8.
Aquaculture production output growth due to the creation of the new operator (increase of project implementation) (tonnes/year) mussels 8.1, 8.2 tonnes per year tonnes/year of mussels, oysters, 8.3 tonnes per year 8.4 tonnes/year of bass, zobaiņ, 8.5 tonnes of turbot 8.6, 8.7 tonnes/year salmon, tonnes/year 8.8. sea reared trout tonnes per year 8.9. tonnes/year of eel, carp, 8.10. tonnes/year of freshwater farmed 8.11. trout tonnes per year, 8.12. tuna tonnes/year of other species, 8.13. tonnes 9.
Aquaculture production output growth of existing merchant expansion or modernisation (increase of project implementation) (tonnes/year) 9.1 tonnes/year of mussels, clams, 9.2 tonnes per year 9.3 tonnes/year of oysters, perch, 9.4 tonnes per year 9.5. zobaiņ, tonnes/year of turbot 9.6, 9.7 tonnes per year tonnes per year in the salmon, sea trout produced 9.8, 9.9 tonnes per year. tonnes/year of eel, carp, 9.10 tonnes/year of freshwater farmed 9.11 trout tonnes per year, 9.12. tuna tonnes/year of other species, 9.13. tonnes per year 10.
 Hatchery reared juvenile fish growth (per year) (increase of project implementation) 10.1 blue mussels, the annual number 10.2. bivalve molluscs per year 10.3 oysters per year 10.4. bass, per year 10.5. zobaiņ, per year, 10.6. turbot per year 10.7. salmon per year 10.8. sea reared trout per year 10.9. eel, the annual number 10.10. annual number of carp, 10.11. trout reared in freshwater per year 10.12. tuna 10.13. per year, another species, c. 11 per year. The project planned for the following eligible costs please select if the project provides for the following eligible costs: equipment for which grant selection criteria: the project equipment and/or technologies will provide a description of how the requirements for which the selection criteria awarded points for water motor filters and substrates for Bio systems and equipment for water quality for machine for the continuous control and management systems and equipment for high pressure apskābekļošan water basin for washing machine and termodezinficēšan for recirculation systems "28. Express 2. C. 17. section as follows : "(C). 17. The total cost of the project, sources of financial resources pre-financing source amount $1. Support the applicant's own financial resources-loans-3 2. Advance-4. Other means-together-or support the tenderer intends to apply for the loan fund loan Yes No "29. Express 2.1 D, the section as follows:" (D). 1. Documents: documents to be submitted (if the application is submitted in electronic form of a document in accordance with the rules of electronic documents, including the accompanying documents shall be submitted in accordance with the requirements of the said law) supports the applicant fill in fill in the staff notes with the LADIES X according to the answer Sheet marked with X number of appropriate response page number Yes No Yes No not applicable not applicable 1.
 Project application in two copies, one of which with a receipt given supports to the applicant (does not apply, if the application is submitted in accordance with the law on electronic documents): 1.1.
 If the application of the project's total eligible cost amount is up to $70 000,-a simplified business plan in accordance with annex 5 of project submissions for original 1.2.
 If the total eligible costs of the project amount is from $70 000 to 200 000,-a standardized business plan in accordance with the project application 1-6. the original annex 1.3.
 If the project's eligible cost exceeds $200 000 in free-form business plan according to the project in annex 7 of the application structure that encompasses the entire 1-6. the financial information set out in annex 2 of the original.
 Support original the applicant's declaration
  
  
  
  
  
  

  
  
 3. a statement from credit institutions, leasing companies or cooperative credit society for the provision of credit, where the project will take credit, the certificate must be specified for the creditor and the borrower's property and the loan amount to the original 4.
 If the project intends to invest private or any other money funds, the Tenderer shall submit the supporting documents which prove the availability of funds, the original 5.
 Permission from the nature protection management of specially protected and collectible and non-game species, if the project will purchase and install protection features and equipment to prevent injury caused by wild animals, by presenting the original copy of the 6.
 If the project includes investment in new aquaculture animal species production: 6.1.
 Nature protection authority permit, which is matched by the National Institute of food safety, animal health and Environmental Research Institute "and the food and veterinary service, presenting the original copy of the 6.2.
 National Research Institute for food safety, animal health and Environmental Research Institute "consistent market research about the market prospects of species, which in addition to the other information contained in the biological justification for assessing the risk of the natural ecosystem, by presenting the original copy of the 7.
 Master of resources permit, which matched the national scientific Institute "of food safety, animal health and Environmental Research Institute" and the environmental protection administration, if the business is, or of aquaculture are planned in natural bodies, presenting the original copy of the 8.
 Declaration on the economic operator compliance with the small, small or medium company category in accordance with the laws and regulations on economic activities and by whom deklarēšano according to petty, the definition of small and medium-sized enterprises in the original new construction and reconstruction projects ** 9.
 Planning and architectural task (if, at the time not technical design), the presentation of the original 10.
 Simplified reconstruction-proof card and seed documentation developed under the construction of laws and regulations governing the municipal binding rules, by presenting the original copy of the 11.
 The purchase of building materials (new construction and reconstruction) – accepted a construction technical stage of the project, presenting the original copy of the 12.
 Drawn up by the applicant supports the construction of them, where to buy building materials (simplified reconstruction) the original 13.
 Accepted technical project construction stage (if at the time of submission is the technical design), the presentation of the original 14.
 Building permit (if at the time of submission is the technical design), presenting the original 15.
 If the project activities will be in the interest of the European Union protected area Natura 2000-environmental monitoring national Office opinion on the final report of the EIA or the decision on the application, not of the EIA procedure or opinion on the impact of European importance specially protected natural areas (Natura 2000), which is required for the implementation of environmental impact assessment, presenting the original copy of the procurement procedure of the supporting documents, where the Republic of Latvia to apply laws on procurement procedures applicable Subscriber funded projects *** 16.
 Procurement technical specification of the subject of the original 17.
 All of the tenders submitted from potential suppliers, by presenting the original copy of the 18.
 Description in free form, indicating the manner in which a given purchase is set low price, adding information about the entrepreneurs surveyed, advertising booklets and other information proving the impartiality in determining the price, if the project equipment, equipment, facilities, information technology, software and general costs eligible costs the purchase amount does not exceed 50 000 lats as well if the construction or reconstruction of the eligible cost for the amount does not exceed 120 000 lats and support the applicant carried out the procurement procedure in accordance with the laws and regulations on the application of the procurement procedure, copy on presentation of the original 19.
If you have received only one offer, a free-form description of the comparison of tenders for a particular purchase, information about the surveyed merchants and other information proving the impartiality of the original prices of other documents submitted and of the documents submitted, the number of pages of notes.
submit a copy of the document, the applicant confirms its support for compliance with the original (the document is "copy matches the original" signature, printed name, date).
** For new construction and renovation of construction and purchasing documents shall be submitted together with the application for the project or within six months after the rural support service of the decision on the approval of the project application, entry into force (the exception is the purchase of building materials).
architects, engineers, consultants, and service are part of the overall costs, and purchase documents for those submitted with the project application or within six months after the rural support service of the decision on the approval of the project application, entry into force (the exception is the purchase of the building). "

30. The deletion of Annex 8 of annex 2.
31. Annex 3 to express the following: "3. the Cabinet of Ministers April 1, 2008 regulations no 240 project selection criteria, no PO box
Criteria group criterion point number 1.
The small size of enterprise (micro) businesses in 10 small business 5 averages and other companies 0 2.
Of the eligible cost, relative to the total eligible costs of the project water motor filters, biofilters and their substrates, systems and equipment for water quality for machine for continuous monitoring and management of systems and equipment for the provision of water with oxygen, high pressure equipment pool for washing and recirculation systems, termodezinficēšan 0.2 points for each 1% total not exceeding 10 points for other eligible costs 0 3.
Place of the project supports the applicant shall implement the project area with groups 4 and 5 development index ** 8 supports the applicant shall implement the project area with Group 3 development index ** 4 others 0 4.
Accepted projects accepted construction plan is filed together with the application of the draft *** 2 other projects 0 notes.
1. In accordance with the European Commission of 27 July 2006, Regulation (EC) no 1198/2006 on the European Fisheries Fund article 3 point "f".
2. Territorial development index value (on the adoption of the relevant draft submission round opening day) shall be determined in accordance with the laws of the territory development index for the calculation of the order and its values. Area development index group shall be determined in accordance with the laws and regulations concerning the criteria and procedures of the national budgets to local authorities and grant planning regions in the European Union's structural and cohesion funds for the implementation of projects co-financed.
3. In accordance with the laws and regulations on general provisions. "
Prime Minister v. dombrovsky Minister of Agriculture j. Dūklav in