Cabinet of Ministers Regulations No. 272 in Riga in 2011 on April 5 (Mon. No 22 44) provisions on "operational programme infrastructure and services" 3.4.4.1. activities Appendix "apartment house siltumnoturīb improvement measures" the ninth project application selection round issued under the European Union's structural and cohesion funds act 18 paragraph 10 of article i. General questions 1. determines: 1.1. procedures for implementing the action programme ' infrastructure and services ' Appendix 3.4. Qualitative environmental priorities "life and economic activity" contributes "UR3.4.4.pas housing energy efficiency" 3.4.4.1. activities of siltumnoturīb apartment house "of" measures for improving the ninth project application selection round (hereinafter activity);
1.2. the European Regional Development Fund (hereinafter draft) submission evaluation criteria (criteria);
1.3. the requirements of the project applicant;
1.4. the responsible institution and liaison body, the distribution of competence between these institutions and cooperation arrangements;
1.5. the responsible bodies and authorities functional cooperation in the form of subordination.
2. The purpose of the activity is housing more energy efficient multi-family residential home, in order to ensure the sustainability of the housing stock and the efficient use of energy.
3. activities to target multi-family residential home apartment owners.
4. the implementation of the activity is detected in the project application selection.
5. the implementation of the activity provided by the responsible authority and the liaison body. The responsible authority is the Ministry of Economic Affairs (hereinafter referred to as the responsible authority). The cooperation body is the national investment and development agency of Latvia (hereinafter referred to as cooperation body). The cooperation body is the functional authority.
6. Responsible authorities and cooperation authority: responsible authority: 6.1 6.1.1. provide activities for implementation, monitoring and control, including applied n + 2 and n + 3 principle of activity level, the implementation of the Council of 11 July 2006, Regulation (EC) No 1083/2006 laying down general provisions on the European regional development fund, the European Social Fund and the Cohesion Fund and repealing Regulation (EC) No 1260/1999 (hereinafter referred to as the Council Regulation No 1083/2006) 93. Article 1 and referred to in paragraph 2;
6.1.2. inform the public and provide publicity on matters related to the implementation of the activity;
6.2. cooperation authority: 6.2.1. create project submission Evaluation Commission (hereinafter the Commission), develop and approve the activities of the Commission;
6.2.2. before the start of the project application submission, develop, approve and publish the cooperation bodies homepage on the internet (www.liaa.gov.lv) project application form filling methodology, project submission procedures for the evaluation of project applications of valuation procedures and filling out a form contract sample for project implementation;
6.2.3. provide information about the project applicant project application preparation;
6.2.4. the project application selection and ensure evaluation;
6.2.5. the decision on the application of the project approval, the approval or rejection of a conditional and shall inform the applicant of the project;
6.2.6. the contract for the implementation of a project by the European Regional Development Fund (ERDF) funding recipient (hereinafter called beneficiaries);
6.2.7. evaluate and adopt a decision on the draft amendments to the laws and regulations of the European Union in the field of the structural funds and to the agreement on the implementation of the project in the order;
6.2.8. support activities within the approved project monitoring and control, including applied and n + 2 n + 3 principle on the project level, implementation of the Council Regulation No 1083/2006 and article 93, paragraph 2;
6.2.9. the beneficiary of the funding information on the implementation of the project and the contract for the project implementation conditions;
6.2.10. examine and approve the funding recipient project progress report and request for payment and prepare payment orders and declarations of expenditure;
6.2.11. the preparation of the information to the authority responsible for the implementation of the activities available in the European regional development fund, the financing;
6.2.12. analyse problems related to the activities and the implementation of the projects and the responsible authority provides suggestions for activities and improvement of the implementation of the project;
6.2.13. ensure data retention in the European Union's structural funds and the cohesion fund management information system for project submissions and projects;
6.2.14. give information to the public and provide publicity matters relating to activities within the projects approved.
7. activities within a project co-financed by the European regional development fund and the beneficiaries. Activities available within the European Regional Development Fund (hereinafter referred to as the ERDF funding) is 27 337 186 dollars, and the beneficiaries of co-financing-19 796 538 lats.
II. Requirements for the project the applicant 8. activities within the project applicant is a multi-family residential home apartment owner community. Apartment owners submit a project application with the authorized person, if it complies with the provisions of annex 2 of section 5.1. A decision on the authorisation of the person concerned, shall adopt the apartment owner community.
9. the project the applicant authorized person certifies that the further implementation of the project within three years of it each year, pursuant to the agreement on the implementation of the project deadlines, will present an overview of the cooperation body for heat consumption by works (annex 1) the respective apartment living in the House.
10. the funding will not be eligible if: 10.1. project applicant authorized person (if it is a legal person) by a decision of the Court of Justice recognized as insolvent, including legal protection in the process of its economic activity or has been terminated in accordance with the commercial register of the information available, it is in the process of liquidation;
10.2. the beneficiary or his authorized person during project implementation to the liaison body of the competent authority and provided false information or intentionally misled in connection with the implementation of projects co-financed by the structural funds;

10.3. the project of the authorised person of the applicant (if it is a legal person) in the interest of a person is made a criminal offence in the Republic of Latvia or the European Union's financial interests, and trustee of the applicant (if it is a legal person) in accordance with the criminal law is applied to the forced influence;
10.4. the project applicant has received or anticipates receiving funding for the same eligible costs of other activities or individual aid project from local, regional, national or European Union funds;
10.5. the project applicant or the authorized person has failed or has violated these terms or other conditions of the laws and regulations of European Union funds.
11. House, apartment living that is subject to the submission of the project for at least five years after the end of project implementation does not change the usage or it is not demolished.
III. eligible activities funding: 12.1 12. execution of multi-family residential home apartment owner owned the existing parts, including a separate apartment within the existing exterior walls of the property window for the restoration or replacement, providing technical project or simplified renovation documentation of buildings and structural parts of the building energy audit report that the work of the energy efficiency improvement measures;
12.2. the preparation of the project documentation and project building and autoruzraudzīb.
13. The beneficiary may start implementation of the project after the adoption of the decision on the cooperation project application approval or has signed cooperation bodies contained in the decision on the fulfilment of the conditions, except that rule 18.1 referred costs attributable, cooperation has been taken before the decision on the application of the project approval or have signed cooperation bodies contained in the decision on the fulfilment of the conditions If such costs are carried out not earlier than 24 October 2006. If the project is started (except this rule 18.1. activities referred to in point and associated costs) before the authorities of cooperation has been taken the decision for the project submission, or may have signed cooperation bodies contained in the decision on the fulfilment of the conditions, the full cost of the project is irrelevant.
14. One project submission includes data about prospective job in one apartment living in the House, including in cases where the land in one address has two or more residential home, which is part of the joint ownership of all apartment owners owned the apartment property. 
15. activities within the funding on multi-family residential house can receive if on this House: 15.1 no funding another project submission;
15.2. funding has been received in accordance with the Cabinet of Ministers on 10 February 2009. Regulations No 138 ' rules on "operational programme infrastructure and services" 3.4.4.1. activities Appendix "apartment house siltumnoturīb improvement measures" first to eighth project application selection round ".
16. Purchase required for project implementation, project carried out by the applicant in accordance with the laws and regulations in the area of procurement.
17. The beneficiary before the conclusion of the contract with the winner of the purchase procedure shall be coordinated with the liaison authority of the procurement procedure, compliance with laws and regulations in the area of procurement. The beneficiary of the procurement liaison body checks after conclusion of a contract for the implementation of a project.
IV. Eligible and ineligible costs 18. activities within the eligible costs are the following items: 18.1. energy audits, technical survey, construction cost estimates, construction or renovation of the simplified documentation development cost and technical design expertise;
18.2. the project building and autoruzraudzīb costs;
18.3. the cost of the works and apartment living in the House: 18.3.1. Building external insulation design of the būvelement delimiting and replacement, including boundary of individual housing property in the outer wall and window replacement;
18.3.2. the basement and top floor shelter insulation;
18.3.3. staircase repair, if you make energy efficiency work in the stairwell, not exceeding five percent of the total eligible project costs;
18.3.4. heating and hot water distribution system renovation or reconstruction, except heating and production of hot water source installation, renovation or reconstruction;
18.3.5. the ventilation system, renovation or reconstruction;
18.3.6. with residential home into functionally related inseparable elements of renewal for the technical project or simplified renovation documentation if it ensures the sustainability of energy efficiency measures or measure is obtained by heat savings;
18.4. unforeseen expenses, you can use this rule 18.3. costs mentioned in points, not exceeding five percent of 18.1 18.2 18.3., and the cost amount referred to;
18.5. the eligible cost of the project value added taxes, if the applicant cannot recover it according to the regulations of the tax policy.
19. This rule 18.3. cost is referred to, if applicable: 19.1 is insured civil liability of a professional designer for the cover of not less than 100 000 Lats per year (this requirement does not apply to design applications which are submitted to a liaison body by 31 December 2011);
19.2. is insured for the construction of the warranty period for a minimum of two years from the date of the transfer of the sum insured, not less than five percent of the total project construction costs, or is the izsniegtaLatvij of a credit institution registered in the Republic of the warranty the warranty period for the construction of a term of at least two years from the date of transfer for the amount of the guarantee, which is not less than five percent of the total project construction costs;
19.3. the Superintendence of the works has been carried out;
19.4. the construction projects to meet the technical design stage or simplified renovation documentation and regulatory requirements in the field of construction.

20. This rule 18.1 and 18.2 referred to the total eligible costs must not exceed 10 percent of the project's total eligible costs.
21. activities within the non-eligible costs include the following headings: 21.1. costs that exceeds this 18 and 25 of the rules referred to in paragraph 1, the amount of costs;
21.2. the costs incurred on the basis of the employment contract;
21.3. the provisions of 19.1 and 19.2. referred to insurance costs;
21.4. the building's operating utilities systems, renovation or reconstruction, which is not mentioned in these rules and in 18.3.4 18.3.5.
22. application of the project shall include the costs referred to in this provision in paragraph 18 and 21.
23. the maximum ERDF funding intensity is 50% of the total eligible costs of the project.
24. If on the date of submission of the project application to the liaison body for at least 10 percent of the apartment buildings housing the owner is a certain needy personality, project the maximum ERDF funding intensity increased by 10 percentage points.
25. One project application activity within the maximum amount of financing FROM the ERDF shall not exceed 35 Lats per total dwelling area in square meters.
26. the project activities referred to in the application must be implemented within two years after the institution of cooperation contract for the implementation of a project.
V. Project application and selection of project proposals submissions submission 27. selection of project application to the ninth round of the organized activity of all the funds available.
28. the project application selection round of project submissions for evaluation and mutual comparison takes place within the calendar month.
29. Notice of project application submission, submission suspension or termination of the cooperation agreement with the authority, the authority shall issue the newspaper "Gazette" and published in the internet home page of the liaison bodies (URwww.liaa.gov.lv).
30. the notice of project application submission issued, indicating the available ERDF funding and project submission application start and end date. The statement said information is binding on the applicant, the cooperation of the project authority, the responsible authority and the managing authority.
31. To apply for ERDF funding of the project, the applicant shall submit to the institution of cooperation project submissions: 31.1. fill the project application form (annex 2);
19.4. additional supporting documents: 31.2.1. General meeting of owners of apartments, the minutes of the voting Protocol (including questionnaires) or mutual agreement (copy) in which: 31.2.1.1. included under the regulations apartment property decision on multi-family residential home renovation;
31.2.1.2. the renovation costs;
31.2.1.3. the specified authorized person who is entitled to submit a project application, as well as other ERDF funding of related activities;
31.2.2. housing inventory file (copy) or building cadastral Affairs determine (copy);
31.2.3. authorities issued certificates (copies) of the disadvantaged status of the person, the owner of the apartment and the time by which those persons assigned status (if the applicant apply for ERDF funding of 60 percent intensity);
31.2.4. certified energoauditor designed building energy audit report (copy), carried out in accordance with the laws and calculation of the energy performance of buildings in the area and developed, including the provision of the information referred to in annex 3 (until 31 December 2011 the project applicant project application can be added to the energy audit report that meets the Cabinet 10 February 2009 No. 138 of the rules "rules for the operational programme ' infrastructure and services ' addition of the activity" 3.4.4.1. Apartment house siltumnoturīb improvement measures "referred to in subparagraph 28.2.6. requirements);
31.2.5. If the application filed on a model apartment Uptown, built after 1957, with at least three floors above ground, with an average thermal energy consumption for heating in the last five calendar years from 105 to 165 kWh is the heated area per square metre per year and fitted heat meter in heating project, the applicant may not add this provision 31.2.4. building energy audit referred to in the report, but rather to add to the report of the survey of the building renovation measures (annex 4) and the project application form (annex 2) specify that the project will take at least the building insulation, top floor covering or insulation of the roof, the Windows or restore Exchange sharing rooms, as well as the front door of the building renewal or change;
31.2.6. būvvald coherent building project in the technical design stage (copy) of all projects planned in the framework of the works or if a simplified renovation, the harmonised certificate būvvald card for the works to be carried out in project (copy);
31.2.7. Designer professional liability insurance certificate (copy; this requirement does not apply to project submissions submitted by 31 December 2011).
32. If the additional documents to be submitted are not Latvian language, shall be accompanied by a certified translation of the Latvian language in accordance with the laws and regulations on the procedures which are translations of documents in the language of the country.
33. the project application can be submitted in paper form or electronic form of a document. Project application that is designed to be in paper form, may submit to the institution of cooperation or sent by registered mail. Project application that is designed to be an electronic document, may submit to the institution of cooperation, be sent by registered mail or sent to cooperation bodies in electronic mail to the address listed in the notice of project application.
34. If the application is submitted in person, on the application of the time considered the cooperation office stamp of the specified date and time.
35. If the application is sent by mail, on the date of submission shall be considered in the specified postmark date of dispatch. If sent by post to the project application is sent in one calendar month, but received a collaborative institution later than the fifth day of the following month, project submissions valued together with the project submissions, received the cooperation of the authority in the next calendar month.

36. Where the submission is sent to the liaison bodies in electronic mail address for submission shall be deemed to be the time when it is sent by electronic mail. In the event of a dispute, the applicant must demonstrate that the project is sent to the application before the application deadline for the submission of projects, but a project of the cooperation body based at the applicant's request that the application is received or that it was received after the submission of the project application.
37. activities within the project application for multi-family residential home renovation can not be resubmitted until the liaison body for the project submitted the application of these provisions has been adopted by the decision referred to in paragraph 46. Activities within the project, the application cannot be submitted if it included multi-family residential home renovation funding granted under the Cabinet of Ministers on 10 February 2009. Regulations No 138 ' rules on "operational programme infrastructure and services" 3.4.4.1. activities Appendix "apartment house siltumnoturīb improvement measures" first to eighth project application selection round ".
38. If the project application submitted in paper form, the following requirements shall be met: 38.1. the project shall be submitted in one copy in the application;
38.2. the project submission form DOC, xls, JPG file format (section 4.1 and 4.2 shall submit the information contained in the xls format) no later than three working days after submission of the application, the institution shall provide the cooperation in addition to the media or sent to the electronic mail address (veidlapa@liaa.gov.lv);
38.3. the project application submitted with the sequentially numbered pages, with table of contents, caurauklot, on the back of the last page of the thread ends are glued on the label is an indication of the document number and caurauklot number of pages, proof of the correctness of the copy of the document, the date of the application, the document author's name, the place and the development project of the authorised person of the applicant signature.
39. If the project application submitted to an electronic document, the following requirements shall be met: 24.3. the project submission developed and presented according to the law on electronic document circulation;
24.4. the project submission developed in DOC, xls, PDF or JPG file format;
39.3. the project submission form and in addition to the original document to be submitted are signed by each individual author's secure electronic signature and confirm with the time stamp before the project submission deadline. If additional documents are copies of documents, they are certified in each individual to the project the applicant secure electronic signature and time stamp before the project submission deadline.
40. it is the duty of the applicant to prepare and store the original application and the project with project implementation related original documents or regulations on the development and design of a document duly certified copies thereof to the project application to the end of the assessment, but, if the application is approved, the beneficiary is obliged to store documents until 2021 December 31, as well as to provide the European Union and the authorities of the Republic of Latvia access to those documents or regulations on the development and design of a document duly certified copy thereof.
41. cooperation authority within 10 working days after the end of the calendar month in writing notify the applicant of the project the project application registration number.
Vi. submission of project evaluation and decision-making activities within 42. submit application to the evaluation of projects provided by the Commission: 42.1. the Commission comprises cooperation bodies, responsible authorities and the representatives of the Ministry of the economy;
26.2. the Commission and the head of the balsstiesīgo members of the Commission approves cooperation bodies;
26.3. Observer status in the meetings of the Commission (without voting rights) can participate in the managing authority and the responsible authority.
43. the project submissions valued under the provisions referred to in annex 5, quality, compliance, administrative and ERDF funding criteria and with the project application selection and evaluation procedures and project submission form of valuation set out in laws and regulations, arrangements for the European Union's structural and cohesion funds in the participating institutions provide the planning document preparation and implementation of these funds and the European Union's structural and cohesion funds management and control system.
44. the criteria of evaluation order: 44.1. starting the evaluation, first project submissions valued compliance with these provisions of annex 5, paragraph 33 of this criterion. If the application does not comply with the provisions of annex 5, paragraph 33 of this criterion, it does not continue the assessment;
44.2. If the project submission complies with these provisions of annex 5, paragraph 33 of this criterion, valued project conformity with this provision of the application of annex 5, 6, 11, 12, 13, 17, 18, 20, 21, 22, 23 and 24 of this criterion. If the application does not comply with the provisions of annex 5, 6, 11, 12, 13, 17, 18, 20, 21, 22, 23 and 24 of this criterion, it does not continue the assessment;
27.5. If the application complies with the provisions of annex 5, 6, 11, 12, 13, 17, 18, 20, 21, 22, 23 and 24 of this criterion, the evaluation of the application, the project continues under the provisions of annex 5, 1, 2, 3 and 4 of this criterion;
27.6. all calendar months within the framework of the project submitted applications, which have been measured according to the provisions of annex 5, the 1, 2, 3, and 4 above criteria scored accordingly that provision of annex 5, paragraph 35 of this criterion. If the application does not comply with the provisions of annex 5, paragraph 35 of this criterion, it does not continue the assessment. If multiple project submissions receive the same total number of points, then, listing of project submissions, the following principles shall apply: 44.4.1. project application is preferred, with the highest score, comparing the results obtained in the heat savings in relation to the ERDF funding, calculated according to the provisions of annex 5, the criteria referred to in paragraph 1;
44.4.2. If multiple project submissions is equal project results the obtained heat savings in relation to the ERDF funding, with priority given to projects in which the application for energy efficiency work in a House with a larger number of dwellings;

44.4.3. If multiple project submissions for home energy-efficiency work, which is equal to the number of housing, with priority given to the application of the project, which will be implemented in the territory with a lower index of the development of the territory;
44.4.4. If multiple project submissions is the same project area development index, with priority given to the project application, which is submitted to the liaison body of the past;
27.7. According to this provision, the other 5. criteria referred to in the annex continue to rate only the project submissions that meet these rules of annex 5, paragraph 35 of this criterion.
45. If there is no information in the project application in order to assess compliance of the application for the project to one or more of the evaluation criteria, as well as if this information is not legible or is not provided in the Latvian language, it is considered that the project submission does not meet the relevant criteria, or criteria is assigned the lowest rating.
46. cooperation authority Manager, based on the assessment by the Commission, shall take a decision on the application for approval of a project if the project submissions, project submission complies with these provisions of annex 5, paragraph 35 of this criterion. If the application does not comply with annex 5, paragraph 35 of the criterion, head of liaison bodies shall take a decision on the rejection of the application for the project. The decision referred to in this paragraph, the liaison bodies shall be adopted by the heads of two months after the end of the calendar month in which the project application has been submitted.
47. The decision on the application of the project approval may include conditions to be met in order to project the applicant may enter into a contract for the implementation of a project.
48. the decision on the application for the approval of the project provided the cooperation project, the applicant authority shall specify additional or clarifying information required to meet the project's application of these provisions of annex 5, 6, 7, 8, 9, 10, 14, 15, 16, 19, 25, 26, 27, 28, 29, 30, 31, 32 and 34 points in this criterion and the time limit within which the information is to be submitted. After the submission of the information quality criteria of assessment is not changed. Specifying the project submission must not increase the total amount of eligible costs, ERDF funding amount and intensity.
49. Cooperation authority contained in the conditions shall not be longer than 30 working days from the date of dispatch of the decision.
50. The rules referred to in paragraph 49 of the conditions laid down for the period may not be extended.
51. the decision on the application of the project approval, the approval or rejection of a conditional and on the fulfilment of the conditions in the decision of approval of the project application, send the project to the applicant by post within two working days after the signing of the decision or opinion.
52. the decision on the application of the project approval, the approval or rejection of a conditional and on the fulfilment of the conditions in the decision of approval of the application, the project on condition, one day after the signing of the decision or opinion on the application of the project also sends the specified fax number or electronic mail address.
53. Information on the fulfilment of the conditions contained in the decision, the applicant shall provide the cooperation project authority for assessment. The liaison body within 10 working days of receipt of the information evaluated the information submitted by the applicant for the project and prepares opinion on its compliance with the conditions laid down in the decision.
54. it is the responsibility of the beneficiaries within 15 working days after the decision is taken on the application for approval of a draft or signed cooperation bodies contained in the decision on the fulfilment of the conditions to sign a contract for the implementation of a project.
VII. The implementation of the project and the ERDF funding conditions 55. funding available to the recipient of the payment type: 55.1. advance payment, not exceeding 20 per cent of the required funding by the ERDF, if the cooperation body available financial resources;
55.2. interim payments granted on the basis of the eligible expenditure, not more frequently than once every three months, if the project lasts more than six months;
55.3. final payment is granted after the implementation of the project on the basis of the eligible expenditure.
56. The advance payment and the total amount of interim payments shall not exceed 90 per cent of approved ERDF funding the project.
57. The beneficiary may receive advance payment if the following conditions are met: 57.1. the beneficiary with the liaison authority has entered into a contract for the implementation of the project;
57.2. beneficiaries to work the artist has entered into a contract for at least 50 percent of the total eligible costs of the project;
57.3. the beneficiary submits a collaborative institution purchase plan;
57.4. beneficiaries of the first procurement procedures are initiated not later than three months after the agreement on the implementation of the project;
57.5. setting the project is open in the current account in the Treasury, specified in the agreement for the implementation of a project.
58. where the advance exceeds the amount of the ERDF funding, calculated in proportion to the intensity of funding toward the project activities eligible costs, the beneficiary of the cooperation within the authority shall repay the excess funding authorities cooperation specified account.
59. The beneficiary can receive an interim or final payment if the following conditions are met: 59.1. beneficiaries with the liaison authority has entered into a contract for the implementation of the project;
59.2. the beneficiary shall provide the cooperation Office of procurement plan;
59.3. beneficiaries of the first procurement procedures are initiated not later than three months after the agreement on the implementation of the project;
59.4. funding recipient project has opened current account registered in the Republic of Latvia in the credit institution in which are made and received all the payments related to the implementation of the project;
59.5. is ready and the agreement for the implementation of a project on time filed in cooperation project progress report and other reports, as provided for in the contract, payment request, and is attached to the copies of the documents under the authority of the cooperation developed and approved the expenditure supporting documents list published and shown in the internet homepage of the cooperation institutions;

59.6. investment is actually made and listed in the beneficiary's book-keeping, cost is identifiable, separate from the rest of the cost, and verifiable, and they attest to the relevant source document, the original justification of expenditure documents comply with the laws and regulations in the field of accounting;
59.7. cooperation authority inspection and project progress report submitted to the inspection of the implementation of the project costs are recognized as eligible.
60. cooperation authority have the right to proportional reduction in ERDF funds amount if: 60.1. the actual use of the funds is less than that provided for in the project application;
60.2. are not implemented in any of the agreement on the implementation of the project activities envisaged, but the aim of the project is reached;
60.3. not submitted a financial leverage of the supporting documents;
60.4. leverage is not proportionate and reasonable;
37.6. the procurement has not been carried out according to the laws and regulations in the field of procurement.
61. Cooperation authority has the right to terminate the agreement for the implementation of the project and the funding recipient is obligated to repay the funds to the account specified by the liaison bodies of the agreement on the implementation of the project, as well as the cases when: 61.1. within three months from the date of conclusion of the contract with the liaison body for the implementation of the project, the beneficiary has not started procurement procedure;
61.2. within one year from the date of conclusion of the contract with the liaison body for the implementation of the project, the beneficiary has not entered into an agreement with būvkomersant for multi-family residential home renovation;
38.1. within 18 months after the conclusion of the contract with the liaison body for the implementation of a project beneficiary cooperation institution has not submitted a request for funding for payment of at least 50 percent of the project's eligible costs.
62. cooperation authority have the right to interim or statutory period, and also after the payment request from the beneficiary's additional information related to the interim and final evaluation reports.
63. cooperation authority have the right to review of interim and final ratings during the invite experts to check whether the project cost estimates specified eligible costs are reasonable and economically justified.
64. cooperation authority payment by Cashless settlement to separate project funding requested an open checking account or Treasury in Latvia registered credit institution specified in the agreement for the implementation of a project. Implementation of the project, the beneficiary all payments shall be made from the account to which the payment of the cooperation body.
65. the Funding recipient project closing statements submitted to the liaison body of the 15 working days following the completion of the project, but not later than July 1, 2015. The liaison body may extend the time limit of 15 working days referred to, but no longer than until July 1, 2015, if the beneficiary shall submit to the authority a reasoned request for cooperation to extend the project's final report.
Prime Minister v. Economic Minister Dombrovskis a. camphor annex 1 Cabinet 5 April 2011 regulations No 272 review of the heat consumption by the works of building economic Minister a. camphor at the Ministry of the economy presented in annex 2 versions of the Cabinet of Ministers of 5 April 2011 regulations No 272 A. Economic Minister camphor annex 3 Cabinet 5 April 2011 regulations No 272 building energy audit report economic Minister a. camphor 4. Annex Cabinet 5 April 2011 regulations No 272 building survey report renovation measures Minister of Economic Affairs for the implementation of a. camphor annex 5 cabinet 5 April 2011 regulations No 272 Project submission evaluation criteria 1. Criteria of quality evaluation system, the minimum number of points for criteria for individual or multiple criteria point number if you received a negative rating, the application is rejected (-N).
If you received a negative assessment, decide on approval of the draft on condition (if a project shall ensure compliance with the criteria laid down in the decision deadline) (-P) 1. residential home energy efficiency work implementing the resulting thermal energy savings (megavatstund/year) relative to the application specified in the draft ERDF funding (000): 0-55 min. 0 1.1. If on the application of the project less than 10% of days in apartment buildings housing the owner is a certain needy personality : 1.1.1. less than 2 0 1.1.2. from 2 to 2.99 11 3 to 3.99 1.1.3.22.4 to 4.99 33 1.1.4 1.1.5.5 to 5.99 44 1.1.6.6 and over 55 1.2. If on the date of submission of the application for the project to at least 10% of the apartment house apartment owner is a certain needy personality: less than 1.6 1.2.1 1.2.2 from 1.6 up to 2.49 0 11 22 from 2.5 to 1.2.3 1.2.4 from 3.3 to 3.29 4.09 33 1.2.5 from 4.1 to 4.99
1.2.6.5 and 44 more 55 2. number of multi-family residential Dwelling House: 0-15 min. 0 less than 10 0 2.1 2.2. from 10 to 24 3 2.3. from 25 to 49 6 from 50 to 74 9 2.4 2.5 2.6 from 75 to 99 12.100 and over 15 3. proportion of Apartment apartment living in the House, where the owners set the needy person : 0-42 Min 0 3.1. less than 5 0 5% to 3.2% 10 3.3 9.99 from 10% to 15% 14.99% 21 3.4 and CRITERION for 42 more horizontal priorities ranking system score 4. Project location (local) territorial development index project application selection round of the day: 0-10 Min 0 1 0 4.1 and 4.2 above from 0.001 to 0.999 1 4.3. from 0 to-3 from-4.4 0.999 1.000 – 1.999 4.5 from 6 to-2.000 or less
10 2. Eligibility 2.1. project eligibility criteria ranking system (yes/no) 5. activities financed under measures ensure energy efficiency, thus contributing to the horizontal priority ' sustainable development ' ' N uptake 6. Project activities comply with the Cabinet of Ministers regulations on the implementation of the activity of the eligible actions provided P 7.

Project cost and amount corresponds to the Cabinet of Ministers regulations on the implementation of the activity set P 8. Spending is economically justified, necessary for the implementation of the project and provides measurable results for physical generation P 9. the requested funding is calculated arithmetically correct and complies with the provisions of the Cabinet on the implementation of the specific activity of about 10 P. Project costs and financing source allocation calculation is done arithmetically correct P 11. Apartment living home energy audit has been carried out and the project application is connected to the energy audit report in accordance with the provisions of the Cabinet of Ministers on the implementation of the activity requirements N 12. Project application has been added to the construction plan of būvvald agreed technical design stage of the project in the works to be performed or if a simplified renovation, the harmonised certificate būvvald card for the works to be carried out in project N 13. Apartment living home heating savings after the renovation is not less than 20% of the project's energy audit report annexed to the application, the calculated energy efficiency rating N 14. Project applicant is committed to providing funding of their own means, if the increase in the cost of the project. the project is not P 15 and has not been financed or co-financed from other Union financial sources as well as State and local budgets, and the project planned activities do not overlap with activities financed from other funds of the European Union activities and of other financial instruments within the P 16. The requested amount of ERDF funding does not exceed 35 Lats per residential home total area square metre P 17. Apartment house is not included in the national list of protected cultural monuments N 18. Apartment residential home heat consumption for heating by renovation does not exceed 120 kWh per square metre of the year where apartment living House has one or two floors. Multi-family residential home heat consumption for heating by renovation does not exceed 100 kilowatt-hours per square metre of the year where apartment living House has three floors or more N 2.2. PROJECT eligibility criteria applicant ranking system Yes/No 19 By multi-family residential home energy efficiency work implementing the resulting thermal energy savings (megavatstund/year) relative to the application specified in the draft ERDF funding (000) is greater than or equal to 2. If on the application of the project day at least 10% of the apartment house apartment owners have established the secure mazn personality, multi-family residential home energy efficiency work implementing the resulting thermal energy savings (megavatstund/year) relative to the application specified in the draft ERDF funding (000) is greater than or equal to 1.6 P 20. Project applicant is an apartment house apartment owners. Apartment owners shall submit the draft to the authorized person, if the authorized person complies with the provisions of the Cabinet of Ministers on the implementation of the activity requirements N 21. Multi-family residential home, in siltumnoturīb improvement measures in the framework of the activity, construction started before 1993 (inclusive), and it is put into operation to 2002 (inclusive) N 22. Apartment house is divided into housing estate, and one owner belong to no more than 20% of the total number of residential property. The specified percentage of the amount of the distribution does not apply to State and local government-owned housing property N 23. Apartment house not in the residential area of the premises does not exceed 25% of the residential home total area N 24. The project site (municipality) at the beginning of the year, when the project application selection round, at least 2000 population of votāj on N 3. Administrative criteria ranking system Yes/No 25. submission of the project used currency is the lats P 26. project submissions or the original legislation for the certified copy thereof is the legal document force P 27. project application form is fully completed project submission 28 P is prepared according to the project submission form, you add all the additional documents to be submitted, and they are designed according to the laws drafting and presentation of documents in the field of application of the draft 29 P is not addressed in the fix-aizkrāsojum, erasures, deletions or additions (if filed on paper) P 30 project implementation duration does not exceed the terms of the Cabinet on the implementation of the activity period P 31. Project application is made in the Latvian language, P 32. project application is drawn up into 33. submission of project P is filed within the time limit set N 34. project application is filed in one copy, and the project application form is submitted in electronic form (if filed in paper form) P 4. Funding criteria ranking system Yes/No 35.
If the application meets 5, 11, 12, 13, 17, 18, 20, 21, 22, 23, 24 and 33. assessment criteria, then the project submissions, listing priority order (starting with the most points winning the project submissions), announced the project application selection round of project funding is sufficient for the application of the Economic Minister a. n. camphor