Advanced Search

Amendments To The Cabinet Of 31 August 2010 Regulations No 824 "rules On" Operational Programme Infrastructure And Services "appendix" Of The Activity Measures 3.5.2.1 Centralized Heating System Efficiency "project (I)

Original Language Title: Grozījumi Ministru kabineta 2010.gada 31.augusta noteikumos Nr.824 "Noteikumi par darbības programmas "Infrastruktūra un pakalpojumi" papildinājuma 3.5.2.1.aktivitātes "Pasākumi centralizētās siltumapgādes sistēmu efektivitātes paaugstināšanai" projektu i

Subscribe to a Global-Regulation Premium Membership Today!

Key Benefits:

Subscribe Now for only USD$40 per month.
Cabinet of Ministers Regulations No. 583 in Riga, 26 July 2011 (pr. No. 45 29) amendments to the Cabinet of 31 august 2010 regulations No 824 "rules on" operational programme infrastructure and services "Appendix" of the activity measures 3.5.2.1 centralized heating system to increase the effectiveness of the project application selection to the second round and subsequent film "issued under the European Union's structural and cohesion funds control law paragraph 10 of article 18 to make a Cabinet of 31 august 2010 regulations No 824" rules on "operational programme infrastructure and services" Appendix "of the activity measures 3.5.2.1 centralized heating system to increase the effectiveness of the project application selection" second round and future rounds "(Latvian Journal No. 145, 2010) the following amendments: 1. Replace rule number in the name and the word" activity "with 3.5.2.1 number and the word" 3.5.2.1.1. "apakšaktivitāt.
2. paragraph 1 shall be expressed by the following: "1. the provisions laid down in the arrangements for implementing the operational programme ' infrastructure and services ' Appendix 3.5. priorities for environmental infrastructure and" green energy "contributes" UR3.5.2.pas energy "3.5.2.1. activity" measures the heating system to increase the effectiveness of the "apakšaktivitāt" of measures 3.5.2.1.1. centralized heating system efficiency "(hereinafter referred to as the activity) project application selection to the second round and round, the European Union cohesion fund project application evaluation criteria (criteria) , the European Union cohesion fund projects applicant (hereinafter referred to as project applicant), responsible institution and liaison body, the distribution of competence between these institutions and cooperation arrangements, as well as the responsible authorities and cooperation agencies in the form of functional subordination. "
3. The deletion of paragraph 2, the words "or other".
4. Express 6.2.3. and 6.2.4. subparagraph by the following: ' 6.2.3. before submitting the application, the project initiated, shall develop, approve and publish the website (www.liaa.gov.lv) the European Union cohesion fund project submission form (hereinafter referred to as the project submission form) methodology, project completion the application selection and evaluation procedures, project submission evaluation forms, of the Treaty on European Union cohesion fund projects (hereinafter the project) implementation samples and supporting documents for the expenditure list;
6.2.4. provides information about project applicant project application preparation; ".
5. Replace the number "7" with the number "35 618 167 35 815 555".
6. Express 64 and 65 of this.: "64. Closing statements submitted to the liaison institution within 15 working days after the end of the project, but not later than July 1, 2015. If the beneficiary shall submit a reasoned request to the institution of cooperation, cooperation authority may extend this period, but not longer than until 1 July 2015.
65. the activities envisaged under the project implemented within 30 months after the liaison authority contract for the implementation of a project, but not longer than until 1 June 2015. "
7. Annex 1:7.1. make the project submission form line "activity number and name" the following: "the number and name of activity: 3.5.2.1. activity" measures the heating system to increase the effectiveness of the "add to project" 7.2 application form behind the lines "number and name of the activity" with the following lines: "Apakšaktivitāt number and name: 3.5.2.1.1. apakšaktivitāt" central heating system, measures to increase the effectiveness of the "" 7.3. Express 3.3. thereof the following: "3.3. Project implementation time frame for the implementation of the project of the year (I) (II) (iii) interim payments (not to be filled in If the applicant does not wish to receive interim payments) I II III IV quarter I II III IV I II the European Union Cohesion Fund funding, LVL private eligible costs, LVL "7.4. Express 7.6. subsection 1. financial assumptions as follows: ' 1) project finance calculations carried out for 20 years, starting from the first year of implementation of the project. Project implementation point from the first to the third year, calculated according to the duration of the project (including all the project for investment, excluding value added tax). ";
7.5. the express 8. subsection first paragraph as follows: "the applicant is not by a decision of the Court of Justice recognized as insolvent, including not in the rehabilitation process, the economic activity is not terminated or in accordance with the commercial register of the information available, it is not in the process of liquidation, as well as the project was not punished for the Latvian Code of administrative offences article 189.2, third part of administrative offences and does not have adequate means of influence on the coercive criminal law article 280 referred to in the second paragraph of the criminal offence;".
8. Express 3. attachment the following: "3. the Cabinet of Ministers on 31 august 2010, regulations No 824 Project submission evaluation criteria no PO box
I. criteria of quality evaluation system of point scale notes 1. project application readiness it at the time: 0-10 if the rating is less than 2 points, the submissions rejected submission of the project 1.1 is not attached to the planning and architectural task 0 1.2. project application is added to the planning and architectural task 2 1.3. project application is added to the planning and architectural task and the task of planning and architecture in the technical rules for the application of the project 1.4 3 is connected to the construction of the būvvald consistent design stage of the project 5 project application 1.5. būvvald is connected to the construction of the technical design of the accepted stage 10 2. The project is due to energy or fuel saving or renewable energy, to increase the proportion of heating system: 0-35 if the rating is less than 10 points, the application is rejected for the project 2.1. implementation of the transmission and distribution system efficiency, heat reduction has been obtained by applying thermal energy saved per year (megavatstund) to the transmission and distribution system of the compensated stage year transferred heat quantity (megavatstund) before the implementation of the project and it is: 2.1.1. less than 1% 0% 1% to 4.99 2.1.2 2.1.3.5% to 10% 24 9.99 2.1.4.10% to 14.99% 28% 15% to 19.99 2.1.5 2.1.6 32.20% and over 35 2.2. in implementing the siltumavot efficiency that before the implementation of the project are used for renewables, or through a separate heating system, there has been a reduction of fuel and electricity obtained the year would save fuel and electricity (megavatstund) against the annual fuel consumed and the amount of electricity (megavatstund) before the implementation of the project, and it is: 2.2.1. less than 5% 0% 5% up to 11.99 2.2.2 2.2.3.12% to 10% 24 18.99 2.2.4.19% to 28%, 26% 25.99 2.2.5. up to 32% 33% 32.99 2.2.6 and over 35 2.3 switching from fossil fuels to renewable fuels for siltumavot renewable energy, increase the proportion of the total volume of fuel heating system are: 2.3.1. less than 1% 0% 1% to 4.99 2.3.2 2.3.3.5% to 10% 24 14.99 2.3.4.15% to 24.99% 28% 25% to 34.99 2.3.5 2.3.6.35% or more 32 35 3. for energy savings or the fuel cost reduction to the eligible costs: 0-35 if the rating is less than 10 points application is rejected, the project 3.1. transmission and distribution efficiency, ensure the system compensated phase passed energy reduction (megavatstund/year) against eligible costs (excluding value added tax) (thousands) are: 3.1.1. less than 1 0 1 to 3.1.2 3.1.3. up to 2.99 1.99 10 2 24 3 to 3.99 28 3.1.4 3.1.5.4 to 4.99 32 3.1.6.5 and over 35 3.2. implementing the siltumavot efficiency the fuel cost, decrease ($/year) against eligible costs (excluding value added tax) (thousands) are: 3.2.1. less than 20 0 20 to 29.99 10 3.2.2 3.2.3 3.2.4.30 to 60 to 79.99 59.99 24 28 3.2.5.80 to 100 and more 99.99 35 32 3.2.6 criteria for HORIZONTAL priorities ranking system point scale Notes 4. as a result of the implementation of the project will promote renewable energy, efficient use of the horizontal priority "sustainable development" goals: 0-5 Criteria gives extra points after project implementation 4.1 the heating system siltumavot as the fuel is not used in the renewables 0 4.2. after the implementation of the project concerned heating system siltumavot is used as fuel in the renewable and other energy sources 3 4.3. after the implementation of the project of siltumavot heating as fuel use renewables for at least 90% of the total volume of fuel heating system siltumavot 5


5. the applicant requested the project funding intensity (intensity of 1 percentage point reduced, you receive rating 1 point). If the requested funding intensity is reduced by more than 15 percentage points, the criteria is received the maximum rating. With criteria promote the horizontal priorities "macroeconomic stability" 0-15 implementation Criteria gives extra points II. eligibility criteria eligibility criteria for project evaluation system yes/no notes 6. project application is provided for investments in conversion from fossil fuels to renewable fuels or the transmission and distribution system to increase the effectiveness of the application of the project N 7 is not designed to create or restore the existing system of gas supply or parallel heating N 8. Project submissions is shown in the project technical solution the superiority over other heating solutions for alternative P 9.
The project application of planned measures, and the work description and the expected results and indicators are clearly defined, reasonable, measurable, consistent with the implementation of a project timetable and focused on project submissions objective specified in P 10. Project costs and financing in the application source allocation calculation is done arithmetically correct P 11. submission of project cost and amount corresponds to the Cabinet of Ministers regulations on the implementation of the activity specified P 12. Project is viable five years after its implementation, the transmission and distribution system, or of the siltumavot revenue after implementation of the project will cover all the transmission and distribution system, or the operating costs N siltumavot 13. submission of project expenditure planned is economically justified, necessary for the implementation of the project and provides measurable results for the physical creation N 14. Project implementation duration does not exceed the provisions of the Cabinet of Ministers on the implementation of the activity of the period P 15. the project applicant is committed to providing financing from its own resources if the project will increase the application of projected costs P 16. Infrastructure in which to invest in the project, are the property of the applicant of the project or the municipality it has transferred the project to the applicant, the lease or concession. Lease or concession agreement is concluded for a period of not less than five years after the implementation of the project N project application 17. comply with the provisions of the Cabinet of Ministers on the implementation of the activity requirements N 18. project submission is not, and has not been financed or co-financed from other Union financial sources as well as State and local budgets, as well as the submission of the project within the planned activities do not overlap with the activities that is financed by the other funds of the European Union and the activities of other financial instruments in the framework of the PROJECT the applicant P eligibility criteria ranking system yes/no notes 19. Project applicant is a public service provider – a company that has the license for the production of heat or transmission, or distribution, as determined by the laws and regulations in the field of energy, and it complies with the provisions of the Cabinet of Ministers on the implementation of the activity requirements N 20. project applicant has paid taxes and other State and local government at minimum payments in full and payment of taxes, regulations governing the time limits laid down by the legislation of P 21. the project applicant is not punished for the Latvian Code of administrative offences of the third paragraph of article 189.2 administrative infringement or it does not have adequate means of influence on the coercive criminal law 280. referred to in the second subparagraph of article 22 of the criminal offence, the applicant of the project N. project selection within the application is filed not more than one project application to the transmission and distribution system to increase the effectiveness of and not more than one application for the project to increase the effectiveness of siltumavot in one district or a territorial unit of the Republic city N III. Administrative criteria
Evaluation system yes/no notes 23. project submissions or the original of the document in the laws drafting and design for the certified copy thereof is the document legal force P 24. a project proposal is prepared according to the project submission form, you add all of the Cabinet of Ministers regulations on the implementation of the activity specified in addition to the documents, and they are designed according to the laws drafting and presentation of the document area P 25. project application form is completely filled in application of the project 26 P is not addressed in the fix-deletions , aizkrāsojum, deletion or addition of P 27. design application used currency is the lats P 28. project application is made in the Latvian language P 29. a project proposal is prepared into P 30. Project proposal is submitted to the authority of the cooperation within the N 31. project application is filed in one copy in the project submission form and submitted in electronic form (if filed on paper) P "Prime Minister, the Minister of Justice the obligation of the Minister of the Interior, the performer A. Economic Minister Štokenberg a. camphor