Cabinet of Ministers Regulations No. 1387 in 2013 (3 December. 64 26) amendments to the Cabinet of Ministers of 5 December 2006, the provisions of no. 982 "energy infrastructure protection zone detection methodology" Issued under the protection zone likuma59 the first part of the article make the Cabinet of Ministers of 5 December 2006, the provisions of no. 982 "energy infrastructure protection zone detection methodology" (Latvian journal, 2006, nr. 195) the following amendments: 1. Express 3.2. subparagraph by the following: "3.2. kabeļlīnij-three metres wide band." 2. Supplement with 3.1, 3.2, 3.3, 3.4, 3.5, 3.6, 3.7, 3.8, 3.9, 3.10 and 3.11 of the following paragraph: "3.1 forbidden to grow trees and shrubs will route the electrical network, located on forest land. 3.2 the Cordon cut trees, bushes and branches is a land owner or legal possessor of the property under the civil code. 3.3 If the land owner or legal possessor within 15 days after the information about the track cleaning jobs have not expressed their will to act to cut shrubs, electrical network owner or possessor is handled at our discretion (leaving them route or crushing), keeping the route in the State, which ensures safe operation of the power line. 3.4 If the trees in the zone outside of the overhead power line route strike land owner or legal possessor, it at least 15 days in advance, inform the owner of the electrical network or possessor, indicating its land cadastral designation of the unit where the power line protection zone of the overhead will be carved in wood, the land cadastre number and owner's contact information. Electrical network owner or possessor, the receipt of such information, if necessary, arrange for appropriate Powerline atslēgum for free. 3.5 If, in accordance with article 61 of the law establishes the tenth and part of trees in zone 10.1 strike, electrical network owner or possessor: 3.5 1. Article 61 of the law establishes the fifth part down the potentially risky felling of trees it marks with a well visible signs; 3.5 2. nozāģēto tree, without damaging the quality of the wood and leave the sagarumot tapping into the Powerline route last metres (along the side of the track), if the land owner or legal possessor and electrical network owner or possessor is not agreed otherwise (annex 5); 3.5 3. do not damage the trees and the leaves of trees not cut; 3.5 4. trees and shrubs saw that tree and shrub stumps should not be higher than 10 cm; 3.5 5. growing trees saw it to prevent damage to the tree trunk; 3.5 6. nozāģēto trees, tree branches and shrubs leaves the stand, smack 3.5 7. branches saw the trunk, thus leaving not to cut off the branch stumps; 3.5 8. nozāģēto trees apkrauj with not branches. 3.6 special protection (his) tree branches sawn-kokkop arborists. 3.7 electrical network owner or possessor, through systematic protection zone Act article 61 in the fifth part of that potentially risky tree felling outside the power line route, the tree felling and their further use shall inform the land owner or legal possessor, sending owner (the legal possessor) information about potentially hazardous tree felling (annex 5), and also inform the authorities that the area in which the property is located will be carved in potentially risky-trees. 3.8 the land owner or legal possessor of information within the time specified in the letter, but not earlier than 15 days after the sending of potentially threatening the tree felling should arrive in the land, to agree on a Strip of the law referred to in article 61 potentially-threatening sagarumošan or deployment of trees (stowage). Electrical network owner or possessor and the land owner or legal possessor may agree on a different time and place of arrival or other rules specified in annex 5 for harmonization of the information (by telephone, electronically), land owner or legal possessor of contacting electrical network owner or possessor through information letter specified telephone number or electronic mail address. 3.9 If 30 days after information on potentially threatening the tree felling dispatch from the land of the owner or legal possessor is not an answer for the tree felling, processing and placement according to annex 5 of these rules or he failed to provide the information specified in annex 5, trees allowed to chop off without coordination with the land owner or legal possessor. 3.10 of the information referred to in these provisions letters are sent to a person's declared place of residence address if the land owner or legal possessor is not written in a bargain with the owner or possessor of a different address or electronic communication. 3.11 the laws promulgated in accordance with the procedure laid down in an emergency or when the driven to object trees or hanging that they or their branches are interfering with the operation, the trees strike electrical network owner or possessor of the forest law article 12 of part 1 and paragraph 2. " 3. Delete paragraph 5. 4. Make the following point 12: ' 12. Electrical network protection zone will track maintained by the owner or possessor of the object in the State that provides the object operation. The protection zone outside the route according to the type of land use maintains the land owner or legal possessor or owner of the electrical network or possessor by mutual written agreement. " 5. Add to 2.3. subheading with 13.1 points by the following: "13.1 electrical network owner or possessor shall conclude a mutual cooperation agreement with JSC" Latvian National forests ". The agreement provides for the exchange of information and coordination of the works. " 6. Express annex 1 (1) of the following: "1. Informative signs to denote cordon along the overhead lines, which meet the following conditions (examples): 1.1 the power line voltage – 20 kV power line, located in an uninhabited place, power line cord in the distance from the Earth (h) is 6 m, the width – 6.5 m zone on either side of the line of vertical axis (Figure 1); 1.2. the power line voltage 0.4-20 kV-Powerline, is uninhabited and undeveloped place, power line cord in the distance from the Earth (h) is 6 m, the width – 6.5 m zone on either side of the line of vertical axis (Figure 1.1); 1.3. the power line voltage-kV power line 6-20, located in an uninhabited place in the forest, the power line cord to the distance from the Earth (h) is 6 m, the width – 30 m zone on either side of the line of vertical axis (Figure 1.2); 1.4. the power line voltage 0.4 kV, the Powerline-is located in a built-up area, town, village, in the area of production, home, power line cord in the yard the distance from the Earth (h) is 6 m, the width – 2.5 m Strip on each side of the line of vertical axis (Figure 1.3); 1.5. the power line voltage-kV power line 6-20, is located in a built-up area, town, village, in the area of production, home, yard, power line cord in the distance from the Earth (h) is 7 m, the width – 2.5 m Strip on each side of the line of vertical axis (Figure 1.4). " 7. Supplement to annex 1.1, 1.2, 1.3 and 1.4 image by the following: "1.1 1.2 1.3 the image image image 1.4 image". 8. Express 1. point 2 of the annex by the following: "2. the informative sign to represent the spirit of the kabeļlīnij zone, which meet the following conditions (examples): kabeļlīnij 2.1 to 20 kV voltage, cable-laying depth – 1 m, width 1 m zone on either side of the line of the horizontal axis (Figure 2); 2.2. kabeļlīnij voltage 0.4-20 kV, cable-laying depth – 0.7 m, width-1.5 m zone on either side of the line, mark the horizontal axis should be set to kabeļlīnij for posts (Figure 2.2). " 9. Supplement to annex 1 2.2 image by the following: "2.2 image". 10. To supplement annex 1 with 2.1 and 3 by the following: "2.1 informative sign to denote the building transformer (example) – a sign installed on the 0.4-20 kV voltage in closed or compact transformer substation doors, strip width, 1 m on each side of the building.
  "Figure 3". 11. To supplement the provisions of annex 5 with the following: "5. the annex to Cabinet of Ministers of 5 December 2006, regulations no 982 information/arrangements on tree felling overhead Powerline in a protection zone established pursuant to article 61 of the law of 10.1 part that determines that an object's owner or legal possessor of the object in accordance with the established methodology of determining is entitled to cut only the trees that are not cut off the land owner or legal possessor and who, in accordance with article 61 of the law of the Zone's fifth is a potentially hazardous trees the land owner or legal possessor and electrical network owner or possessor shall agree on such severed tree handling and placement.
Recipient (forest owner's first name, last name, address) i. electric network owner or legal possessor of information provided we inform you that your property (property name) (Cadastre and land cadastral designation of the unit)

Powerline protection zone has found and highlighted potentially hazardous trees. To prevent the risk of electrical activity, the trees have to be cut. Please come to this g. ____ ____ ____ ____ ____ ____ ____ 5. _____ _____, (the arrival address) to agree on the treatment and placement of trees. If you are unable to attend at a specified time, please align the arrival time by calling ____ ___ ____ or writing to e-mail address _____ _____ _____.
Planned work done (name) (contacts) contact person (first name, last name) (signature) date ___ ___ ___ _____ ___ II. Landowner or legal possessor (1) information provided by the work I am aware of the planned works and agree that their execution will organise the power line owner, the legal possessor of power line action potentially risky tree felling organising itself 2. Timber sagarumošan timber sagarumot are not Tievgaļ to leave the average up to........ cm; sagarum........ m Tievgaļ of average length up to........ cm; sagarum........ m Tievgaļ of average length up to........ cm; sagarum........ m length 3. stowage of timber wood set Powerline route last metre wood set the agreed place (place of stowage must not be more than a kilometre from the felling site contact person (first name, last name) (signature) date _____ ____ ____ ____ the forest owner or legal possessor (first name, last name) (signature) date _____ ____ ____ ____ "Prime Minister Valdis Dombrovskis, Minister of the economy, environmental protection and regional development Minister ad interim of Daniel Pavļut