The European Economic Area Financial Instruments In 2009-2014 Period, "national Climate Policy" Project Submission Open Competition "sustainable Building, Renewable Energy Technology And Innovative Emissions-Reducing Technology Development

Original Language Title: Eiropas Ekonomikas zonas finanšu instrumenta 2009.–2014.gada perioda programmas "Nacionālā klimata politika" projektu iesniegumu atklāta konkursa "Ilgtspējīgu ēku, atjaunojamo energoresursu tehnoloģiju un inovatīvu emisiju samazinošu tehnoloģiju attīstība

Subscribe to a Global-Regulation Premium Membership Today!

Key Benefits:

Subscribe Now for only USD$40 per month.
Cabinet of Ministers Regulations No 149 in Riga 2014 (March 18. 17. § 19) European economic area financial instruments in 2009-2014 period, "national climate policy" project submission open competition "sustainable building, renewable energy technology and emissions-reducing technology, innovative development" Issued in accordance with the rules of the European economic area financial instrument, the financial instrument of the unNorvēģij 2009-2014 period, the management of the law article 15 paragraph 5 and 6 i. General questions 1. the European economic area financial instruments in 2009-2014 period, "national climate policy" (hereinafter the program) project submission open competition "sustainable buildings, renewable energy technology and emissions-reducing technologies in innovative development "(hereinafter referred to as the competition) and procedures, project assessment criteria, application requirements for applicants, as well as project financing and project implementation and monitoring arrangements. 2. The purpose of the contest is to introduce and demonstrate the Republic of Latvia under carbon dioxide (CO2) solutions – energy-efficient technologies and solutions for sustainable buildings, renewable energy technology for energy production and other new (innovative) technologies (including technological processes) or products (including products and services), which reduces CO2 emissions. 3. the projects implemented in the territory of the Republic of Latvia. 4. the project applicant is a direct or of the Republic of Latvia in the immediate authority in the Republic of Latvia, association or Foundation, as well as economic operators established in the Republic of Latvia. 5. Contest programme co-financing available is 5 000 000 euro, including: 5.1 this provision 8.1. the aid referred to in point-3 000 000 eur; 5.2. the provisions referred to in paragraph 8.2. support – 1 000 000 euro; 5.3. this rule 8.3. the aid referred to in paragraph-1 000 000 euro. 6. If the provisions of 5.1 or 5.3 programme co-financing referred to is not used or if after project ranking this provision in paragraph 56 in that order under this rule 57.2. section project sufficient funding is not available for the implementation of the project in full in accordance with the provisions of 5.1 or 5.3 referred to the funding available, funding shifts that rule 8.2. the aid referred to in point.
7. approved projects within the activities of the implementation time is no later than 2016 30 April. 8. in the framework of the competition supports the following project areas: 8.1. energy efficiency measures and renewable energy technologies, building low energy consumption buildings, as well as the existing buildings (re); 8.2. renewable energy technologies for heat and power production; 8.3. the development of (new) product or technology, testing and demonstration, as well as existing technology development, testing and demonstration of the greenhouse gas emissions no-emissions trading system (hereinafter referred to as non-ETS) sector, provided it fulfils the Commission's august 6, 2008, Regulation (EC) No 800/2008, which recognize certain categories of aid compatible with the common market in application of articles 87 and 88. (General block exemption regulation) (Official Journal of the European Union , august 9, 2008, L 214) (hereinafter referred to as Commission Regulation No 800/2008), article 30 (4). On the development of (new) product or technology is considered the establishment of scientific and technological new products or technologies, which represents the in-depth understanding of the sector, the use of scientific methods, as well as international products or technology patenting (experimental development). 9. The rules referred to in point 8.1, within the scope of the project can be submitted on the buildings, which in accordance with the legislation on the classification structure corresponds to one of the following classes: 9.1. building schools, universities, and scientific research for building (code 1263) (new construction or reconstruction of a building); 9.2. the mass of the building measures (code 1261) (new construction or reconstruction of a building). Apply only to buildings which are being implemented in the cultural institutions act, article 2, second paragraph, the specific functions; 9.3. the Museum and library (code 1262) (new construction or reconstruction of a building); 9.4. sports building (code 1265) (new construction or reconstruction of a building). 10. This rule 8.3. referred to the context does not support the experimental development, which includes regular or usual changes to products, production lines, manufacturing processes, existing services and other operations in the transaction process (even if such changes mean improvements).
II. Funding determination 11. One project available for co-financing of the programme is: 11.1.  1 000 000 175 000-euro-8.1. these provisions referred to in areas of support for the project; 11.2.175 000-500 000 euro – this rule 8.2. aid referred to a project; 11.3.175 000-300 000 euro – this rule 8.3. referred to in areas of support for the project. 12. the co-financing of the merchants provide the following: 12.1 the rules referred to in point 8.1 of the field, according to Commission Regulation No 800/2008 of 21 and 23; 12.2. This provision of the area referred to in paragraph 8.2., pursuant to Commission Regulation No 800/2008 of the provisions of article 23; 12.3. this rule 8.3. referred to the nave, according to Commission Regulation No 800/2008 article 31 conditions of experimental development; 12.4. this rule 26.1 26.2 26.3.,.,.,.,., 27.1 26.5 26.4., 27.2. and 17.7. the costs referred to in (a), pursuant to Commission Regulation No 800/2008 article 26 conditions support consultancy for small and medium businesses. 13. within the maximum allowable aid intensity of the program of the project total eligible costs shall not exceed the following: 13.1. these regulations 8.1 and 8.2 in support referred to: 13.1.1.  65%-micro (small) and small business operators; 13.1.2.55% – medium businesses; 13.1.3.45% – large economic operators; 13.1.4.85% for direct or direct administration institutions; 13.1.5.90% – associations, foundations; 13.2. this rule 8.3. referred to in subparagraph support area where all applicants are evaluated as the project the merchant according to Commission Regulation No 800/2008 annex 1 and those attributable to Commission Regulation No 800/2008 article 31 paragraph 3 of point "c" and "a" paragraph 4 States the aid intensity: 13.2.1.  45% – the micro (small) and small business operators; 13.2.2.35% – medium businesses; 13.2.3.25% for large merchants. 14. Aid intensity traders this rule 8.3. referred to in subparagraph aid increased by 15%, if at least one of the following conditions is fulfilled: 14.1. the project involves at least two independent merchants effective cooperation (subcontracting is not considered effective cooperation), of which at least one is a small or medium-sized merchants, and none of the economic operators involved in the project do not cover more than 60% of the project total eligible costs do not include the co-financing of the programme. The intensity of the aid established for each beneficiary of aid; 14.2. the project includes merchant and research cooperation, the research organisation bears at least 10% of the total eligible project costs and has the right to publish the project research results. 15. If the application of these provisions by 8.1 and 8.2 in that aid made a direct or in direct authority, society or the Foundation, is qualified as business support project, the State regional development agency (hereinafter Agency) these rules apply to conditions relating to economic operators.
III. Requirements to the applicant of the project 16. Project applicant be eligible for co-financing under the competition if: 16.1. project application has been submitted to the agency within the time limit laid down; 16.2. the project applicant is the operator corresponding to the micro (small), small, medium or big merchant merchant definition according to Commission Regulation No 800/2008 annex 1 (if applicable); 16.3. the project includes activities planned to implement on the ground or a building that meets the following conditions: 16.3.1. it is the property of the applicant or of the draft long lease; 16.3.2. as to the legislative authority's decision, contract or is available for use or possession of the applicant (if the applicant is a direct or in direct regulatory authority); 16.3.3. ownership or lease the right to it is fixed or to the conclusion of the contract of the project will be strengthened in the land for a period of not less than five years after completion of the project; 16.4. building local autonomous function is used (refer to the local government, which is implementing the project this provision 8.1 and 8.2 in these areas); 16.5. the project includes activities planned to implement the building of at least two recent calendar years prior to the application of the project the Agency has carried out any economic activity (refer to merchants when implementing the project this provision 8.1 and 8.2 in these areas). 17. the co-financing of the project does not qualify if: 17.1. project activities in the planned exercise equipment that are involved in the European Union emission trading system in accordance with the law "on pollution"; 17.2. the project in the interests of the applicant natural person has committed a criminal offence, which hit the Republic of Latvia or the European Union's financial interests, and the project for the applicant under the criminal code is applied to the forced influence; 17.3. the project the applicant has tax arrears, including State social security payment of debts, which total more than 150 euro; 17.4. to project the applicant is facing a claim for recovery from other national support programmes or projects, in accordance with previous Commission decision declaring an aid illegal and incompatible with the common market; 17.5. the project applicant is penalized for the Latvian Code of administrative offences 189.2 referred to in the third subparagraph of article administrative violations or criminal law 280. Article referred to in the second paragraph of Commission of a criminal offence or has applied herself to influence (if the applicant is a private-law legal person) the Commission of a criminal offence; 10.9. the project planned to produce hydroelectric energy or cogeneration stations; 17.7. the project applicant intends to implement the project in one of the eligible sectors not in accordance with Commission Regulation No 800/2008 article 1, paragraph 3. If one of the sectors in which the applicant is not eligible for the project, in accordance with Commission Regulation No 800/2008 article 1 paragraph 3 and project the applicant qualifies for the implementation of a project eligible sector, shall ensure the project assisted the project sector financial flows clear separation from other project activities of the applicant in the sectoral financial flows during project implementation and five years after completion of the project; 11.1. the project applicant or partner is a merchant who meet the ailing merchant status: 17.8.1. micro (small), small or medium-sized business person is considered to be in difficulty if it corresponds to Commission Regulation No 800/2008 article 1, point 7 of these conditions; 17.8.2. great merchant is considered ailing, if then: 17.8.2.1. by a judgment is rendered in insolvency proceedings or the judgment of the Court is the legal protection process, or by a decision of the Court of Justice is an out-of-court redress process, the operator is in the process of reorganisation or its economic activity is terminated;
17.8.2.2. design submission date of loss more than half of the share capital and the last 12 months – a quarter of the share capital, as well as the provision of a detectable 17.8.2.4. signs referred to; 17.8.2.3. date of submission of the application to a project in accordance with the last two years, the financial statements and operational review for the last available at the time of the application for the project are observable ailing merchant signs – damage increase, the reduction in turnover, declining cash flow, debt, interest payments rise, stock inventories, low liquidity, falling or zero value of assets – and is detected in this rule 17.8.2.4. as referred to in point; 17.8.2.4. no option to cover the losses from its own resources or with the funds it is able to obtain from your Members, shareholders, members or creditors, and it could not stop losses, without which national authorities external intervention in the short or medium term will lead to the economic operator is unable to continue operations; 11.1. in the application of the project estimated eligible costs are or have been funded from the European economic area financial instruments or other financial instruments; 17.10. Ministry of the economy has taken a decision on the award of the operator to sell the electricity produced in the amount of electricity purchased obligatory way or about empowering it to receive a guaranteed fee for power plant installed in the electrical power and the decision is valid (true if the project is implemented this provision or 23.2 22.8.. the activities referred to in point). 18. point 8 of these rules in the fields referred to in the project applicant project alone or in combination with one or more partners (hereinafter referred to as project partner). Project partner can be from donor countries (the Kingdom of Norway, Iceland and the Principality of Liechtenstein) and the European economic area financial instrument in the beneficiary countries (Bulgaria, Croatia, Czech Republic, Greece, Estonia, Latvia, Lithuania, Hungary, Malta, Poland, Portugal, Romania, Slovakia, Slovenia, Spain and Hungary). 19. project partner, if it is a merchant, match the micro (small), small or medium category of economic operator in accordance with Commission Regulation No 800/2008 annex 1 the conditions referred to in the micro (small), small or medium or large operator category of economic operator in accordance with Commission Regulation No 800/2008 article 2, point 8. 20. If the project is implemented in partnership, the project applicant submits a declaration of partnership and the partnership agreement for the project of the Latvian language project (related, if a partner is from Latvia) and English (subject, if there is a foreign partner). In the draft Treaty of partnership shall include at least the following information: 20.1. liability, obligations and rights, including the implementation of the project and used the intellectual and material benefits of ownership; 20.2. financial conditions, including the project partner program provided for co-financing and cost incidence conditions; 20.3. conditions for currency translation expenses and compensation arrangements; 20.4. the carrying out of inspections and audits; 20.5. the project activities implemented by detailed budget indicating the unit and the unit cost of financial flows; 20.6. the procedure for settling disputes. 21. the project applicant and project partner is directly involved in the implementation of the project – they may not act as intermediaries who carried out not on the implementation of the project with their human resources (permanent or linked), but most of the activity or the transfer of funding to subcontractors.
IV. The tender within the eligible activities, eligible and non-eligible costs 22. This provision 8.1. the aid referred to in the project activities are supported: 22.1. audits report and opinion of the technical survey (building reconstruction project), and the building energy consumption calculation (new project); 22.2. the construction and preparation of the technical documentation and coordination of the energy performance of buildings and the construction of regulatory laws in the order; 22.3. the construction estimates; 22.4. sworn auditor's findings (applies only to economic operators); 22.5. low energy consumption building construction; 22.6. energy efficiency enhancing reconstruction work; 14.1. the heating system from fossil energy sources to renewable energy – heating technology (solar collectors, chips or pellets boilers, heat pumps with a transform coefficient that corresponds to this provision for table of annex 1), installation and connection, if the equipment installed in the nominal heat capacity after the project does not exceed the calculated power required for heating and hot water supply for more than 10%; 22.8. electricity production technologies (wind farms and solar power plants) acquisition, construction, installation and connection of the electrical system; 14.2. the buildings delimiting structural examination of construction (gaiscaurlaidīb tests and termofotografēšan); 22.10. demonstration of the project (information activities, stands or exposure, which explains and helps to understand the project during the implementation of the achieved energy savings and reduction of CO2 emissions (demonstration event)) and publicity. 23. The rules referred to in paragraph 8.2. support to eligible project activities are: 23.1. heating Exchange from fossil energy sources to renewable energy – heating technology (solar collectors, chips or pellets boilers, heat pumps with a transform coefficient that corresponds to this provision for table of annex 1), installation and connection, if the equipment installed in the nominal heat capacity after the project does not exceed the calculated power required for heating and hot water supply for more than 10%; 23.2. electricity production technologies (wind farms and solar power plants) acquisition, construction, installation and connection of the electrical system; 23.3. the preparation of the documentation and the construction of regulatory harmonisation laws in the order; 23.4. preparation of the construction estimates; 14.6. the project demonstration and publicity. 24. This rule 8.3. the aid referred to in the project activities are supported: 24.1. create a product or technology, and playback test (with the condition that the product and technology has greenhouse gas emissions reductions in the non-ETS sector potential and practical application opportunities); 24.2. the existing technology development, testing and demonstration of the greenhouse gas emissions in non-ETS sectors; 24.3. the project demonstration and publicity. 25. the project costs are eligible if they: 25.1. co-financing is actually incurred or beneficiary of the project partner-relevance of costs within the period that is specified in the project agreement, and: this rule 16.5 25.1.1..,.,., 26.9 16.6 16.7., 26.10 26.11 26.12.,.,.,., 27.3 27.4 and 27.5 and 28 in (except 28.5) and referred to in paragraph 29. the costs are incurred after the date of conclusion of the contract with the Agency, but not later than the expiry of the implementation of the project; 25.1.2. this rule 26.1 26.2 26.3.,.,.,.,., 27.1 26.5 26.4., 27.2. and 17.7. the costs referred to in this provision are incurred after the date of entry into force of: micro 25.1.2.1. (small), small or medium merchant case corresponds to Commission Regulation No 800/2008 article 8, paragraph 2; 25.1.2.2. in the case of large undertakings satisfy the Commission Regulation No 800/2008 paragraph 3 of article 8; 15.7. the objective of the project is concerned with the needs for the project results and for the approved project budget; 25.3. is proportionate and necessary to the implementation of the project; 25.4. is used only for the project's objectives and results and made subject to cost-effectiveness, efficiency, economy, as well as the cultural monuments protection requirements, if the building is a national protected cultural monument or part thereof; 25.5. the justification documents are included in the accounts and paid for and the service has been provided or the goods are delivered under the contract of the project cost incidence period. The costs for which the invoice billed the cost question period last month, also are considered eligible costs, if the payment for services rendered or goods delivered is made within 30 days after the end date of the period of relevance; 15.9. the beneficiaries of co-financing are listed or project partner's accounting and tax accounting registers, identifiable, separate from the rest of the cost, and the test and certify the original source document; 25.7. the project is specified, interim or final report, adding the project contract document (including project contracts, work and certificate, invoice, payment order); 25.8. are included as depreciable fixed assets are its merchants, direct or mediated administrations, associations or Foundation assets, which are recorded in the draft included building; 16.1. This provision corresponds 30 and 31 of the said conditions. 26. This provision of the aid referred to in point 8.1 scope of project applicants and project partners eligible costs are: 26.1., technical energy audit reports survey and the opinion of the building energy consumption calculation preparation costs; 26.2. the construction estimates development costs; 26.3. the compilation of dossiers and the cost of construction of regulatory harmonisation laws in the order; 26.4. the Superintendence and autoruzraudzīb costs; 26.5. sworn auditor's opinion preparation costs (applies only to economic operators); 16.5. the cost of new construction (provided that they are related to the provisions referred to in paragraph 22.5 eligible activities); 16.6. the cost of the works and buildings reconstruction (provided that they are related to the provisions referred to in paragraph 22.6. eligible activities); 26.8. heat production technology (solar collector, heat pump, wood pellets or chips boiler) acquisition, supply, installation and connection costs, if that way you get the heating system from fossil energy sources to renewable energy; 26.9. electricity production technologies (wind farms and solar power) costs, acquisition, construction, installation and connection of the electrical system if the power lines, the implementation and other relevant infrastructure projects remain the property of the applicant; 26.10. the project linked specialist training, if the specialist training costs up most of the value of the fixed asset; 26.11. costs associated with the construction of the buildings delimiting test construction, gaiscaurlaidīb test carried out according to gaiscaurlaidīb tests measuring regulatory laws, and termofotografēšan; 26.12. value added tax payments, if they are not recoverable from the State budget. 27. The rules referred to in paragraph 8.2. support to project applicants and project partners eligible costs are: 27.1. the compilation of dossiers and the cost of construction of regulatory harmonisation laws in the order; 27.2. building preparation costs, estimates of the cost of building and autoruzraudzīb; 27.3. renewable energy technology for (the solar collector, biomass pellets and chips boiler, heat pump, solar power plants and wind farms) to the acquisition, construction, installation and tuning of costs directly related to the operation (including the project linked specialist training, if the specialist training costs up most of the value of the fixed asset (the book in conjunction with the asset), and connect the electrical system technology, if power lines and implementation remains the property of the applicant of the project); 27.4. the cost of the works, which are directly associated with eligible activities; 17.1. payment of value added tax, if they are not recoverable from the State budget. 28. This rule 8.3. the aid referred to project applicants and project partners eligible costs are: 28.1. staff involved in the implementation of the project (for example, scientific researchers, technical staff and support staff (staff)) wages and associated costs, not exceeding the appropriate qualifications and remuneration of the staff of the profile average costs, if the country concerned with the staff involved in the implementation of the project shall be concluded a contract of employment; 28.2. the employer shall carry out State social security payments for staff involved in project implementation; 28.3. the staff costs, according to average market prices, if the staff of the company or the service switch contract (amount of the contract shall contain all the necessary costs for the provision of services, the budget of the project separately don't plan); 28.4. project staff involved in the trip (travel) costs that are eligible under the laws of the order in which the recoverable costs associated with missions; 28.5. external costs that were necessary to achieve the project objectives (for example, legal services, accounting services); 28.6. cost of contractual research, technical knowledge and patents or licences in the market it costs, where the transaction has been carried out under competitive conditions and found no element of collusion involved. If the applications for licences and patent life beyond the time required for this rule 8.3. areas referred to in the implementation of activities eligible to be considered as licences and patents only depreciation costs, which are calculated in accordance with accounting, regulatory laws; 28.7. equipment and technological equipment acquisition cost, if they meet the average market prices and can purchase is necessary for the attainment of the objectives of the project. If the necessary equipment and technological equipment (including tools) while using the project does not cover all the instruments and equipment useful for the eligible costs shall be considered only the depreciation costs corresponding to the period of the project, and are calculated in accordance with accounting, regulatory laws; 17.9. the material and the cost of raw materials, if they need to achieve the objectives of the project; 46.8. value added tax payments, if they are not recoverable from the State budget. 29. in addition to this provision, 26, 27 and 28. referred to eligible costs direct or mediated administrations, associations and foundations, if they do not exercise an economic activity associated with the project, the provisions referred to in point 8 of the support areas eligible costs are: 29.1. publicity and demonstration activities, including building a temporary certificate in energy efficiency (only this rule 8.1. the aid referred to in point; after building commissioning) manufacturing and installation costs; 29.2. the project's administrative costs, which include: Project administrative staff 29.2.1. rewards – salary, sick-pay (disability page A), annual leave; 29.2.2. employers carried out State social security payments; 29.2.3. project staff involved in the administration of local and foreign travel (travel) costs that are eligible under the laws of the order in which the recoverable with costs of the mission; 29.2.4. the costs for the provision of administrative functions: 29.2.4.1. technical equipment rental costs; 29.2.4.2. communications services (such as telecommunications, internet, postal services); 29.2.4.3. stationery and office supplies costs. 30. the eligible costs of the project shall be subject to the following conditions: 30.1. the technical energy audit report, opinion survey and building energy consumption calculation, preparation of sworn auditors opinion preparation, documentation preparation and coordination of construction regulatory laws in accordance with the procedure laid down, estimates the development, building and autoruzraudzīb cost total amount does not exceed 10% of the estimated total eligible project costs; 30.2. the costs of connection to the electrical system of this provision and in 26.9 27.3 these electricity producing technologies does not exceed 10% of the eligible costs of the project; 30.3. the project's administrative costs, publicity and demonstration activities, including building a temporary certificate in energy efficiency (by building commissioning) manufacturing and installation costs shall not exceed 10% of the eligible costs of the project; 18.9. If the applicant is a business person: 16.5. these provisions 30.4.1. and 26.7. the costs referred to in the Commission Regulation No 800/2008 article 21, paragraph 3, in implementing this provision and 22.5 22.6. the activities referred to in point; 30.4.2.16.7. these provisions, 26.9. and 27.3. the costs referred to in the Commission Regulation No 800/2008 article 23 (3) requirements for implementing this rule, 22.8.14.1, and 23.1.23.2. the activities referred to in (a); 30.4.3. this rule 28.1, 28.2, 28.3..,.,., and 28.6 28.4 28.5. the costs referred to in the Commission Regulation No 800/2008 article 31 requirements for implementing this provision and 24.1 24.2. the activities referred to in point; 30.4.4. building and autoruzraudzīb costs are posted in the investment cost made in implementing this provision, 22.6 14.1 14.0..,.,., and 23.1.23.2 22.8. the activities referred to in point; 30.4.5. this rule 26.1 26.2 26.3.,.,.,.,., 27.1 26.5 26.4., 27.2. and 17.7. the costs referred to in the Commission Regulation No 800/2008 article 26(2) and (3) requirements and are eligible for 50%; 30.4.6. This provision of the aid referred to in point 8.1 scope of eligible project applicants considered additional costs (in accordance with Commission Regulation No 800/2008 article 21, paragraph 3), in order to achieve a higher level of energy saving, than Community standards, and the additional costs of the applicant (in accordance with Commission Regulation No 800/2008 article 23 requirements) arising from the difference between the cost of switching to a heating or hot water system or power using renewable energy sources, and the new fossil energy heating system or power plant establishment costs (without the aid of the environment). The eligible costs are not included in the economic benefits and costs of technology activities. Additional costs apply if: 30.4.6.1. building reconstruction project eligible costs apply to low-energy buildings for reconstruction works in the existing containment structure. If the reconstruction project is the construction of a new containment piebūvēt, eligible costs shall be calculated as the new construction project; 30.4.6.2. new eligible costs are the additional costs, which make up the difference between the calculated energy consumption low construction costs and construction costs that enforced the minimum required of LBN 002-01 et seq "buildings delimiting structural siltumtehnik ' requirements; 30.4.7. the rules referred to in paragraph 8.2. aid for eligible projects applicants only additional costs (in accordance with Commission Regulation No 800/2008 article 23 requirements) arising from the difference between the cost of switching to a heating or hot water system or power plant, which uses renewable energy sources, and the new fossil energy heating system or power plant establishment costs (without the aid of the environment). Eligible costs are calculated according to annex 1 of these rules; 30.4.8. If this rule 8.3. referred to aid projects are used later for commercial purposes, all income is deducted from the eligible costs of the project; 30.4.9. If the merchant has received venture capital, then the project's eligible costs set pursuant to Commission Regulation No 800/2008 article 7 paragraph 5 referred to "a". 31. This provision 8.1. aid referred to in the project's total eligible cost is determined according to the projected energy consumption for heating the buildings heated areas in square meters. The maximum total cost of the construction or reconstruction, of which calculates the eligible costs, per square metre (not including value added tax) does not exceed: 31.1. building the planned thermal energy consumption for heating is less than or equal to 15 kWh/m2 year-1400 euro/m2 year of construction project and 420 euro/m2 reconstruction project; 31.2. the building in which the planned thermal energy consumption for heating is greater than 15 kWh/m2 per year and less than or equal to 25 kWh/m2 per year,-1200 euro/m2 year of construction project and 350 euros/m2 the reconstruction project. 32. The eligible costs that exceed the approved project total eligible costs (including costs that exceed this provision in paragraph 30 and 31 these restrictions) shall be borne by the beneficiaries of co-financing. 33. within the framework of the project Tender applicants and project partners are ineligible: 33.1. costs that do not meet these rules referred to in paragraph 30; 33.2. costs that exceed the provisions mentioned in paragraph 31, cost constraints; 33.3. the costs incurred before the contract is concluded for the implementation of a project with the Agency (except 25.1.2. these provisions referred cases); 20.8. costs incurred after the implementation deadline of the project; 33.5. municipal electrical equipment replacement or repair costs (including washing machine, fridge, tv, or the acquisition or repair); 20.9. working capital acquisition costs; 20.9. leasing and rental, as well as leasing and lease transaction costs (excluding technical equipment rental costs for the provision of administrative function); the loan is 21.0 for examination., presentation and booking, interest payments, payments on money transfers, commissions, losses due to currency exchange and other direct financial expenditure; 21.1. the value added tax payments if they are recoverable from the State budget; 33.10. costs incurred, if the purchase is not carried out in accordance with the law regulating the purchase requirements or principles they contain; 33.11. any type of mobile equipment and the acquisition cost of the vehicle; 33.12. costs related to the purchase of equipment, lease or repairs, intended for the transport of persons or which are used for loading, unloading, handling or transportation; 33.13. second-hand and the acquisition cost of the equipment; 33.14. costs related to the investment in the attainment of the financial revenue as a result of the implementation of the project, if the project applicant is a direct or in direct authority, society or Foundation; 33.15. the efficiency costs siltumavot (boilers) that before the implementation of the project were used renewable energy resources; 33.16. the construction costs associated with the production of heat and electricity to the building and construction, the inadequacy of heat transmission and distribution runs in construction; 33.17. area home improvement and landscaping costs; 33.18. the other costs that are not identified as eligible. 34. Costs related to publicity and demonstration activities in the course of implementing the project, as well as administrative costs are not attributable to economic operators. 35. the project cost not included in the eligible costs shall be borne by the recipient of co-financing funds.
V. invitation to tender procedure 36. Tender issued for the whole of these provisions referred to in paragraph 5 of the co-financing of the programme. 37. the Agency tender issued by advertising in the official Edition of the "journal", the operator's website (URwww.varam.gov.lv), as well as the Agency's Web site (URwww.vraa.gov.lv), and sends information to the publication managing authorities maintain the European economic area financial instrument's Web site (www.eeagrants.lv) in the Latvian language and the Office of the financial instrument in maintaining Web site (www.eeagrants.org) in English. 38. The advertisement shall state the name of the contest, the contest for the co-financing of the programmes available, the project submission deadline (date and time) and space (the address of the Agency). 39. The Agency shall, not later than three months before the closing date of the competition put the Agency's website guidelines for applicants for the project project submission completed. Project applicants after invitation to tender may ask questions to the Agency about the contest rules, the Agency's electronic mail address pasts@vraa.gov.lv marked "open competition". Questions may be submitted not later than 10 working days before the expiry of the tender. The agency within five working days provided answers to the questions by placing the information in the Agency's Web site (URwww.vraa.gov.lv). 40. the project submission deadline is six calendar months from the date of the invitation to tender. Project applications can be submitted not earlier than two months before the competition deadline.
Vi. Project submissions and submission procedure 41. Project applicant may submit no more than one project in each of the application of this provision in paragraph 8 the following support areas.
42. the project application can include activities that are intended to be put in the same building. 43. to participate in the competition, the applicant shall submit to the Agency a project completed in the project application form (annex 2) and the following additional documents (hereinafter referred to as the project application): 43.1. those provisions referred to in point 8 support: 43.1.1. Declaration of conformity the company micro (small), small or medium company that was completed in accordance with the laws and regulations of the company declaration procedure according to the detail (micro), small or medium company (if applicable); 43.1.2. to the person concerned of the mandate to sign the project submission (if applicable); 43.1.3. ownership of identity document (copy) or a long term lease agreement (copy), the contract or an extract of the decision, on the basis of which the object is passed to the project the applicant use or possession (if applicable); 43.1.4. – the applicant's project decision on the implementation of the project, signed by the applicant's project representative and the paraksttiesīg which the identified project total eligible costs (co-financing of the programme and project funding of the applicant) and non-eligible costs, as well as the person who provides or will provide for the funding of the project. The decision to add one of the following documents: 43.1.4.1. in the case where there is funding by the project applicant, credit certificate, issued not earlier than one month before the application of the project and confirms that the project applicant is project financing (and does not apply to cover eligible costs) the necessary resources; 43.1.4.2. If the credit institution given financing-credit decision that credit institution guarantees the implementation of the project required funding and eligible costs apply. The project applicant is entitled to submit this decision to the credit institution for the conclusion of the contract of the project; 43.1.4.3. If the funding of other body or individual, other than a credit institution, a credit certificate, issued not earlier than one month before the project application and certifying that the sponsor has the project financing (and do not apply to cover eligible costs) the necessary resources; 43.1.5. project applicant-direct or mediated administrations (except State budget authority), society or foundation on the implementation of the project (if applicable) signed by paraksttiesīg representative, and indicating the total cost of the project, eligible costs of the project (co-financing of the programme and project funding of the applicant) and non-eligible costs, as well as the statement that contained a direct or in direct authority, society or Foundation or its founder will provide project funding. If the persons referred to in this subparagraph does not provide project funding, the project applicant decision to add one of the following documents: 43.1.5.1. If the credit institution given the funding, the credit for the fact that the credit institution guarantees to ensure the necessary financing for the project-specific and does not cover the eligible cost; 43.1.5.2. If the funding of other body or individual, other than a credit institution, a credit certificate, issued not earlier than one month before the project application and certifying that the sponsor has to finance the project (draft eligible and non eligible costs) the necessary resources; 43.1.6. proof of partnership and partnership, a copy of the draft contract; 43.1.7. foreign tax administration authorities to issue a certificate (must be issued not earlier than one month before the application of the project), which shows that the foreign partner of the project, at the time of the project is not a tax liability in the country where it has its principal place of business (if applicable); 43.2. the rules referred to in point 8.1 support area: energoauditor made of certified 43.2.1. the energy audit report (building reconstruction project), prepared in accordance with the provisions of annex 3; 43.2.2. certified energoauditor made of building energy consumption calculation for the new construction project; 43.2.3. the calculation of the eligible costs under this provision of the new subparagraph 30.4.6.2 (new project); 43.2.4. the cost estimate, the comparison between the new fossil energy heating systems or the establishment costs of the power plant, the absence of any environmental aid and the cost of switching to a heating or hot water system or power plant, which uses renewable energy sources, in implementing this rule 14.1 and 22.8. the activities referred to in accordance with Commission Regulation No 800/2008 article 23 (3) (applies to merchants associations or foundations, carrying out economic activity) (if applicable); 43.2.5. būvvald construction of the technical design of the accepted stages (copy) of all the planned project construction or project the graphical part that meets this provision in paragraph 4 of annex 4 of these requirements. 43.2.6. technical opinion survey according to the construction of laws framework (building reconstruction project); 43.2.7. construction estimate, prepared according to the construction sector regulatory laws; 43.2.8. renewable energy technologies using description that contains at least the following information: project submission technical indicator included in the rationale, principled scheme, feasibility study, technology, location, information about energy and its representative (if applicable); 43.2.9. copies of documents produced and consumed, the amount of electricity sold and produced, consumed and the amount of heat sold the building in which the project activity, at least for the last two calendar years to be concluded before the application of the project, indicating the data by month (megavatstund (MWh)), as well as the amount of fuel used; 43.2.10. the certified audit opinion on energy efficiency measures in the calculation of eligible cost accuracy and compliance with Commission Regulation No 800/2008 article 21. The opinion shall be included in the calculation of the eligible costs of these provisions 8.1. aid referred to in the framework of the year of construction and reconstruction of the eligible activities (applies to merchants, associations or foundations, carrying out economic activity); 43.3. the rules referred to in paragraph 8.2. aid for renewable energy sources: 43.3.1. technology using description that includes at least the following information: project submission technical indicator included in the rationale, principled scheme, feasibility study, technology, location, information on energy and their representative figures; 43.3.2. copies of documents produced, consumed and the amount of electricity sold and produced, consumed and the amount of heat sold the building in which the project activity, at least for the last two calendar years to be concluded before the application of the project, indicating the data by month (megavatstund (MWh)), as well as the amount of fuel used; 43.3.3. information about the wind resources of the instrumental measurements taken not less than 50 metres and not more than 10 kilometres of the proposed wind farm location (if the project wind farms planned for the acquisition, construction, installation and connection of the electrical system); 43.3.4. the cost estimate, the comparison between the new fossil energy heating systems or the establishment costs of the power plant, the absence of any environmental aid and the cost of switching to a heating or hot water system or power plant, which uses renewable energy sources, in implementing this rule 23.1 and 23.2. the activities referred to in accordance with Commission Regulation No 800/2008 article 23 (3) (applies to merchants , societies and foundations, carrying out economic activity); 43.3.5. the būvvald accept the construction of the technical design stage (copy) of all the works planned under the project (if applicable); 43.3.6. construction estimate, prepared according to the construction sector regulatory laws. 44. the Agency's regulations in the area of taxes and levies in accordance with the procedures specified in the request (if applicable) or obtained from the State revenue service information indicating that the applicant is not in the State revenue service administered the tax debt, including State social security payment for debt, which totals more than eur 150.
45. the project applicant project application of this provision can be added to the information referred to in paragraph 44 of the supporting documents. Where the applicant submits the documents referred to in this paragraph, they shall be issued not earlier than one month before the application of the project. 46. the project of a single copy of the application (the original project application) may be submitted in paper form or electronic form of a document. Project submissions in paper form shall be submitted personally or sent by mail (original) by adding identical fill the project submission in electronic form in the electronic media. The project application to the electronic document sent to the electronic mail address pasts@vraa.gov.lv ("the contest" sustainable building, renewable energy technology and emissions-reducing technology, innovative development "") signed with a secure electronic signature and certified with the time stamp in accordance with the laws and regulations on the development of electronic documents, presentation, storage, and movement. 47. the Agency's project at the time of submission shall be determined in accordance with the following conditions: If the project application 29.3. sending by mail, about the time it considered the postmark shows the date of shipment. In the event of a dispute, the applicant must prove to the time when the post put post; 47.2. the application shall be accompanied, where the person, it shall be deemed the time stamp of the Agency specified in the project application, the date of receipt; 47.3. If an application is submitted by electronic means of the project document, the project time to the application shall be deemed to be the moment when the project application sent by electronic mail. In the event of a dispute, the applicant demonstrates the fact that the application sent to the project submission deadline. If the Agency submits that the application is received, so this claim justified. 48. the applicant in the preparation of the Draft project submissions, the following conditions shall be satisfied: 29.9. preparation and submission of the project presented under the management of regulatory laws laid down in document production and design requirements. Submitting a project application in paper form, the cauršuj (cauraukl), saving a single page numbering; 48.2. the project application form shall be typed and Latvian language (except for project submission form 2.4.2. and 8.2.); 48.3. additional supporting documents be prepared into Latvian language. If you want to add to the document, which is not prepared for the Latvian language, shall be accompanied by translations of Latvian language, that laws and certified in the order (this provision does not apply to the project partnership agreement project); 30.1. the project submission form in all calculations use the currency-the euro. Co-financing of the programme and the total eligible costs indicated in euro, rounded to two decimal places; 30.1. the project is not specified in the application for deletion, deletion, aizkrāsojum, correction and addition; 30.2. the project submission form to add in addition to submit original or a copy of the document, which is the proof of the compliance with the original copies; 30.3. the project application to the signature in accordance with the following requirements: 48.7.1. signed by the designated officer or the authorized person with signature rights, if the applicant is a direct or in direct authority, society or Foundation; 48.7.2. it shall be signed by the person who has the authority to sign, if the applicant is a businessman; 30.3. If the application is lodged by the project electronic document: 48.8.1. it draws up corresponding regulations for the development of electronic documents, presentation, storage and circulation; 48.8.2. the project submission form DOC or DOCX format in design, energy audit report-DOC, DOCX, PDF, xls or XLSX format, drawings-PDF format, and a timeline-xls or XLSX format; 48.8.3. project application with secure electronic signature, in addition to the original documents be signed separately with a secure electronic signature and certify with a time stamp. If additional documents are copies of the documents certifying the applicant's project safe digital signature and a time stamp according to the laws on electronic documents and document legal force. 49. sending application project by post or by submitting it to the Agency in person, place it in a closed packing with "competition" sustainable building, renewable energy technology and emissions-reducing technology, innovative development ". 50. the Agency registers the project submissions, give them identification numbers and within five working days after the project submission deadline for the submission of written or electronic notice to the project applicant project application identification number. Where the applicant submits the application in person, the project the project identification number assigned to the application and notify the applicant of the project to the application project.
VII. submission of Project evaluation and decision on financing the project submissions under 51. This provision of the annex lists the administrative evaluation criteria evaluate Agency. 52. the project submissions under this provision 6. quality evaluation referred to in annex criteria assessed project submission Evaluation Commission (hereinafter referred to as the Evaluation Commission). The Evaluation Commission and operational procedures for the assessment of the Commission, determine the rules. The assessment and Evaluation Commission Regulation Commission approved by the Agency's order. 53. The assessment Commission chaired by a representative of the Agency. The Evaluation Commission with voting rights have included two representatives of the Agency, two environmental protection and regional development Ministry representatives and one representative of the Ministry of the economy. Evaluation of the work of the Commission may participate as observers representatives of the managing authority, the Committee of the financial instrument and the Norwegian Embassy in Latvia. In an advisory capacity at meetings of donor countries will be invited to participate in the program's partners. 54. the Agency tender submissions for evaluation the project attracts at least two independent experts in an advisory capacity. 55. If the expert assessment is different by more than 30% of a larger number of points assigned by one of the experts, the Agency is attracting a third expert. In this case, the expert assessment of the project originates from the two nearest rating average. 56. project submissions are ranked in order of priority, depending on the number of points received (higher priority is a project that has received the greatest number of points). If multiple project submissions received the same number of points, the following project ranking principles: 56.1. project application is preferred, which is designed for greater CO2 emissions indicators; 56.2. If multiple project submissions for the reduction of CO2 emissions by the same score, with priority given to projects in which the submission is greater efficiency indicator; 56.3. If multiple project submissions will have the same performance, with priority given to project applicants in the following order: direct or in direct authority, society, Foundation, the micro (small) merchants, the small businessman, the average business person, the great merchant. 57. Concerning the application of the project approval shall, if the following conditions are met: 57.1. the project submission complies with all administrative evaluation criteria (annex 5) and have received a quality rating, the quality evaluation criteria (annex 6); 57.2. in application of the project project activities envisaged for the implementation of this provision, after ranking 56. point out in sufficient funding is available. 58. the decision on approval of the application, the project on condition the agency project applicant to indicate what additional or clarifying information is necessary to meet the project's application of this provision to be listed in annex 5 criteria, and the time limit within which the information is to be provided. 59. the Agency's decision on the application for the approval of the project provided the conditions shall not be longer than 20 working days from the date of arrival. 60. Information on the fulfilment of the conditions contained in the decision, the applicant shall submit to the Agency a project for assessment. Agency within 10 working days of receipt of the information evaluated the information submitted by the applicant for the project and drawing up an opinion on whether or not it complies with the conditions laid down in that decision. 61. the project application be rejected if: 61.1. the project submission does not match any of the rules referred to in annex 5 of the criteria; 61.2. in application of the project project activities envisaged for the implementation of this provision, after ranking 56. point out in sufficient funding is not available. 62. the projects are rejected that rule 61.2. reason referred to, are included in the reserve list, the aim of which is to support high-quality projects which lack funding competition. These projects are financed from funds that are not used where: 62.1. deadline is not signed the agreement on the implementation of the project with one of the beneficiaries of co-financing; 62.2. project implementation in the first half with one of the beneficiaries of co-financing contract is terminated due to contractual obligations. 63. the decision on approval of the application, the project approval, rejection and on information provided by the applicant of the project's conformity with the conditions laid down in the decision approving the project application, the Agency shall send to the applicant of the project by mail within two working days after the decision or opinion of the signing. 64. If a decision is taken on the application of the project approval or opinion on the draft prepared for the applicant's compliance with the decision of the information (about the project approval submissions provided) conditions, the Agency invited the applicant to enter into the project agreement of the project. 65. If the project contributes to the implementation of the project partner, the project applicant before the draft contract submitted to the Agency a signed copy of the contract of partnership. 66. the decision on the approval of the project application, approval or rejection provided the Agency shall adopt the legislative act of the European economic area financial instruments in the management of the specified time limit, but not later than 31 December 2014.
VIII. conclusion of the contract of the project and the conditions of implementation 67. project contract with the beneficiaries of co-financing the regulatory agency closed Act on a European economic area for the management of financial instruments in the order and within the time limits. If the co-financing by the beneficiary within the time referred to the project agreement does not sign, it loses the right to enter into this agreement. 68. All project expenses incurred by the recipient based on co-financing accounting source documents. 69. in order to ensure the publicity of the project, beneficiaries of co-financing: 69.1. project implementation shall arrange at least two information activities (seminars, Conference, press conference, project opening or closing event), which inform the public about the project activities and results; EB 69.2. create (if not already created) and maintains a website which publishes current information on projects in both Latvian and English, giving the following information: 69.2.1. the aim of the project, the project partners, the project implementation period, key activities and planned results, the program assigned to the co-funding projects; 69.2.2. messages about the progress of the implementation of the project and results achieved, including putting photos on the implementation of the project; 69.2.3. messages about cooperation with donor organisations (if applicable); 69.2.4. contact information for beneficiaries of co-financing; 69.2.5. The European economic area financial instruments logo and reference to the donor; 69.3. information on planned and implemented the publicity measures, the implementation of the project, the financial implementation and achieve environmental quality not less frequently than quarterly insert the beneficiary's Web site; 69.4. building in which the project activity, after completion of the project, prepare and publicly available room located building and the dissemination of Visual information that demonstrates the results of the project (if applicable); 69.5. to each building in which the project activity shall be informative plate according to the project requirements laid down in the Treaty.
70. the monitoring of progress of the implementation of the project requested by the Agency to the beneficiary provides co-financing for examination following documents: 70.1. air permeability test report according to the construction stage, which may prepare reports (air permeability coefficients for buildings these rules specified in annex 4) (applies to this provision referred to in point 8.1 support); 70.2. the essential solution to the fotofiksācij of the project, including insulation and window installation solution of the construction fotofiksācij (applies to this provision 8.1. aid referred to). 71. the beneficiary provides Co-financing of project activities as a result of the implementation of the waste or the recycling of surplus disposal, recycling, treatment and (or) storage environment. 72. The co-financing by the beneficiary during the implementation of the project the project provides the reconstructed or built property, as well as purchase equipment insurance against loss (such as fire, theft and other cases).
IX. Co-financing available for receiving payments and receipt conditions 73. Co-financing beneficiary who is not a public authority, is available in the following types of payments: 73.1. advance payment of 40% of the project amount of co-financing allocated to programs. It costs 20 working days after the conclusion of the contract; 73.2. advances and one or more interim payments, the total of which must not exceed 90% of the project amount of co-financing allocated to programs; 73.3. final payment, taking into account the co-financing beneficiary paid advances and intermediate payments shall not exceed the program assigned to the co-funding the project. 74. the beneficiaries of co-financing, which is not a public authority can get a cash advance, if the following conditions are met: 74.1. co-financing beneficiary shall submit in advance the Agency's request, prepared in accordance with the project agreement; 74.2. co-financing requested, if it is a business person, society or the Foundation, submit to the Agency in the Republic of Latvia registered credit advance payment letter of guarantee guarantee for the full amount of the advance issued in favor of the Agency, and the credit guarantee period is shorter than the period of project implementation, as well as the conditions for the repayment of funds contents after the first request, and the terms of the warranty extension. 75. The co-financing beneficiary every four months according to the project agreement shall submit to the Agency a report on the project and the accompanying supporting documents regarding expenditure. 76. the Agency shall examine the draft report and the accompanying supporting documents regarding expenditure. 77. the Agency, in proportion to the decrease in funding allocated for the project if: 77.1. the actual use of funding is less than the project contract; 77.2. not implemented in any of the operations or activities of the project; 77.3. not submitted expenditure documents of financial resources; 77.4. cost is not reasonable and economically justified; 77.5. non-compliance is detected; 77.6. financial leverage is not carried out in accordance with legislative requirements in the area of public procurement. 78. All project related changes requested co-financing with the Agency. 79. the project objectives and the monitoring indicators reach related changes shall be assessed by the Agency and submitted to the program manager. Program Manager within 10 working days of changes in the submitted projects evaluated and presented the opinion, which shall be submitted to the financial instruments in 2009-2014 period, "national climate policy cooperation Committee.
Co-financing requested x responsibility for project results the project results in the 1980s must comply with the following indicators: 80.1.8.1. these provisions referred to in subparagraph aid projects: 80.1.1. legislation on energy efficiency calculation method laid down in the calculated heat consumption to the heated space heating areas after a project for the implementation of planned activities building, covered project activities do not exceed 25 kWh/m2 per year; 80.1.2. building reconstruction project for CO2 emissions reduction performance (efficiency), which represents a reduction of CO2 emissions in relation to the project for the required co-financing of the programme implemented in the project, the merchant is not less than eur 0.28 kgCO2/year, but direct or mediated administrations, associations or Foundation implemented in the project is not less than eur 0.21 kgCO2/year. CO2 emissions shall be calculated in accordance with the laws and regulations on the calculation of the energy performance of the building method and in accordance with Annex 7 of these rules; 80.1.3. as a result of the implementation of the project will ensure the building's technical compliance with the provisions of the indicators listed in annex 4; 80.2. the provision in paragraph 8.2. and 8.3. these areas of aid efficiency indicator that describes the reduction in CO2 emissions in relation to the project for the required co-financing of the programme, shall not be less than eur 0.42 kgCO2/year. CO2 emissions shall be calculated according to annex 7 of these rules. 81. At least five years after completion of the project the beneficiary provides co-financing: 81.1. project reconstructed or built in real estate or equipment it purchased conservation and use objectives of the project; 81.2. project reconstructed or built in real estate, as well as purchase equipment insurance against loss (such as fire, theft and other cases); 81.3. each year the funds specified in the project contract about project reconstructed or built proprietary or purchased equipment maintenance; the building is 81.4. forfeit (applies to this provision 8.1. aid referred to). If the building is seized, the Agency shall adopt a decision on the financial instrument for the project funds for ineligible and assigned to the co-funding of financial instruments and the national co-financing; 81.5. the building is used exclusively for municipal autonomous function, if the beneficiary is a municipality of co-financing; 81.6. all interested parties of the availability of project results, implementing measures, creating a playback information booth or exhibit about the project during the implementation of the achieved energy savings and CO2 emission reductions; project submission and 81.7. project outcomes specified in the contract (including the reduction of CO2 emissions) and the maintenance of the results. 82. Five years after the completion of the project co-financing by the beneficiary each year conduct project monitoring and the results until next January 31, provide the Agency with the results of the monitoring project report under the project agreement. 83. If the rules referred to in point 8.1 support under the agency receiving the submitted co-financing monitoring report for the first and second year of operation of the building after completion of the project finds that the submission of the project specified in the planned reduction in CO2 emissions per year (building reconstruction project), compared with the monitoring report shows the average, and the planned reduction of the energy consumption for heating (kWh/m2/year) (year of construction project) is not reached, the Agency calculated the extent of non-compliance (hereinafter referred to as the reduction of CO2 emissions from non-conformity) in accordance with the laws and regulations on energy efficiency calculation method and writing inform beneficiaries of co-financing, and operators. 84. If the rules referred to in paragraph 8.2. support for the Agency in accordance with the co-financing of the monitoring report submitted by the beneficiary on the first and second year of operation of the building after completion of the project finds that the submission of the project specified in the planned reduction in CO2 emissions per year, compared with the average reduction specified in the report, have not been achieved, the Agency calculated the extent of non-compliance and in writing, inform the beneficiaries of co-financing, and program managers. 85. beneficiaries of co-financing, within 30 working days after this provision in paragraph 83 and 84 of receipt of the information referred to in the action plan shall submit to the Agency a CO2 emissions reduction for the prevention of non-compliance (hereinafter referred to as the plan). The agency assesses and gives its opinion on the plan. 86. The co-financing by the beneficiary of the plan include reducing the power consumption of the reasoned and heat consumption reduction organisational and technical measures that were not made in the project agreement or were not made sufficient quality. 87. The co-financing by the beneficiary of the plan implemented at their expense during the year after this provision in paragraph 83 and 84 of the receipt of that information. The Prime Minister is the Rapidity of the Newsletters of the protection of the environment and regional development Minister ad interim, the Justice Minister, Bernadette pielikumsMinistr of 1 kabineta2014 Brok 18. Nos martanoteikum technology investment costs 149 1. Under Cabinet of Ministers of 18 March 2014 No 149 of the provisions "of the European economic area financial instruments in 2009-2014 period," national climate policy "project submission open competition" sustainable building, renewable energy technology and emissions-reducing technology, innovative development "Charter" 26.8. , and section 27.3.26.9 project eligible costs (I) that provision and paragraph 8.2 8.1 the following support areas if the planned activity is renewable energy technology purchase, delivery, construction or installation and connection of heating, hot water or electric system, is calculated using the following formula: I = (is-Ifo) × P, which is the project's planned renewable energy technology investments to one planned installed capacity of unit-kilowatt (or Euro/Euro/kWel kWth); Ifo-fossil energy technology investments to one planned installed capacity of unit-kilowatt (or Euro/Euro/kWel kWth): hypothetical situation. You must specify the exact informative reference to the fossil energy used technology investment costs; P-heat or electricity generation technologies planned for the rated power (kW). 2. The heat pump uses and their effectiveness: no p. k. Heat pump type efficiency 1. Water/water (W10/W35) ≥ 2 5.0. Direct evaporation/water (E4/W35) > = 5.0 3. Liquid/water (B0/W35) ≥ 4.0 4. Liquid/air (B0/A32) ≥ 3.0 5. Air/water (A2/W35) ≥ 3.0 6. Air/air (A2/A20) ≥ 3.0 note. Air/air heat pump can be installed for the type, if they are designed to work-20 ° c. Environmental protection and regional development Minister ad interim, Justice Minister Bernadette Brok and of environmental protection, Ministry of regional development proposed in annex 2 versions of the Cabinet of Ministers of 18 March 2014 regulations No 149 of the European economic area financial instrument 2009-2014 period, "national climate policy" project submission open competition "sustainable building, renewable energy technology and emissions-reducing technology, innovative development" application form for project name project name: the English language program name: national climate policy program number: LV02 Project applicant: fill in the State regional development agency: project identification no: ___/_____/____ ____/____/___ ___/___/_____ ____ ____/____ ____ project support the date of submission of the project: 1. A. section – basic information about the project applicant 1.1. Project applicant: name of applicant Projects Latvian and English the language of the applicant in the Project form the micro (small) small business person businessman average merchant big merchant direct or in direct authority or Foundation society VAT registration no yes no                                             Tax registration No.                                          
  Legal address Street, House No.         City, County State zip code 1.2. Project Officer of the applicant: name, last name, job title, Contact phone fax e-mail Project applicant 1.3 contact person: first name, last name, job title, Contact phone fax e-mail Project 1.4 met briefly describe the project met the requirements of the rules, to provide information on the project sector of activity of the applicant, including to give reasons (detailed) for micro, small, medium or large company for the application of the definition in respect of the applicant to provide information about the business period, specify a project the applicant's economic activity. Direct or mediated administrations, associations or foundations providing project submissions in relation to the experimental development (rule 8.3.) indicate the total number of employees, turnover or annual balance sheet, including the municipality to State population and the annual budget (if applicable) (maximum 2000 characters) b. section 1 – basic information about the partners of the project (s) 1.5 project partnership no. 1. Name of the country partner partner 2.
1.6. information 1. partner name Partner in Latvian and English activities form the micro (small) small business person businessman average merchant big merchant direct or in direct authority or Foundation society VAT registration no yes no                                             Taxpayer registration number, registered address, street, House No.         City, County State zip code persons first name, last name, job title, Contact phone fax e-mail name of contact person title of contact phone fax email address If there are several project partners, include a 1.6 point necessary information according to the number of project partners. 1.7. the role of the partners in the project and the Association grounds: Please give reasons why the partner/s of the project selection and the role of the project, indicating the activities in the implementation of the project partner will be involved.
 

section 2 – description of Projects 2.1. within the framework of the planned project Competition support area for the implementation of energy efficiency measures and renewable energy technologies, through low energy consumption building construction as well as renovation of existing buildings (rule 8.1) renewable energy technologies for heat and power production (rule 8.2) the development of (new) product, or technology, testing and demonstration, as well as existing technology development, testing and demonstration of the greenhouse gas emissions no-emissions trading system (rule 8.3) 2.2. The aim of the project to formulate project objectives ( no more than 500 characters) 2.3. conformity of the project to describe the project's compliance with the financial instruments of the programme "national climate policy" goal, EU and national regulations and strategic planning documents (no more than 500 characters)
 
2.4 2.4.1. Project summary project summary in Latvian language specify briefly the need for the project and all project activities and outputs (max 1500 characters) 2.4.2. Project Summary English briefly describe the project objectives, the need and all project activities and outputs (max 1500 characters) 2.5. project need and justification of the appropriateness of activities to name a major issue that will be addressed, and to justify the relevance of resolving them. Name a major planned activities of the project, be described in the project technology and material, with their advantages and disadvantages and basing their suitability for achieving the goals of the project (up to 6000 characters) 2.6. Planned activities of the project: to describe each of the project activities required for the implementation of successive operations, dividing the apakšaktivitāt and support of project partners involved in implementation. Please ensure that the project activities and apakšaktivitāt are in accordance with the project application and detailed in paragraph 4.5 of the information provided in the budget. 0. Project management activity description activity Description 1 name 2. activity name.......... the activity results of the project description of the play …. activity publicity description 2.7. Project does not overlap with the other financial instruments, as will ensure that the project planned activities did not overlap with the project applicant planned or implemented during project activities, which are financed from the European economic area or other financial means (maximum 1500 characters): 2.8. implementation of project activities and project procurement to be used in the planned procurement characteristics to name and describe the project planned purchases and those criteria. If the purchase of the jobs project for the implementation of the planned activities have been carried out to the project application for submission to the Agency, specify the identification number of the purchase (if applicable (maximum 2000 characters) 2.9. Specify the renewable energy technology specification (if applicable) boilers, turbines, generators, water heaters, water pump, fuel network feeders, solar collectors, heat pumps, steering gear operation and capital equipment, etc.
Nr. PO box Number of important equipment technical specifications 1.          2.          ...          
2.10. maintaining project results describe how project results will be ensured of maintenance for five years after completion of the project, as well as specify which way will ensure the sustainability of the project results, including specified as will ensure the availability of project results to all interested parties (up to 6000 characters) 2.11. building characteristics apply only to this rule laid down in paragraph 8.1. aid no. p.k. Building parameters characteristics 1. The building name is 1.1. Address and cadastre number 1.2. The building features a 1.3. The total heated area m2 2. The total heat consumption for heating kWh/year 3. Heat consumption for heating per year per 1 kWh/m2 heated area m2 4. Building classification: 4.1. schools, universities, and scientific research for building 4.2. the mass of the building measures 4.3. the Museum building, or library 4.4. Sports building 2.12. Project implementation – real property cadastre number, address reference legislation, on the basis of which the object is passed to the project the applicant uses or possession (maximum 100 characters) 2.13 the project achievable indicators CO2 emission reduction calculation for project activities which the applicant chose the project objective of the project.
Funding is determined in euro and euro cents by indicating the amount to two decimal places, rounding the number to the nearest hundredth down if the third decimal is to "5" (inclusive), or up if the third decimal is "6" or higher. Project application of the reduction in CO2 emissions given in kilograms (kgCO2), not round numbers and points to two decimal places. Kwh/m2 per year in the calculation should be on the actual building height and the height of the buildings converted (translated if applicable).
No PO box Results measurement indicators 1. The reduction in CO2 emissions in the year year 2 kg CO2. Efficiency indicator (ratio between CO2 emission reductions per year and of the financial instruments of the requested co-funding) kgCO2/year 3. Heat consumption to the heated area heating of the premises (if applicable) kWh/m2 2.14 project achieved a reduction of CO2 emissions in the justification and calculation to justify the project achieved a reduction of CO2 emissions and show its calculations in accordance with the regulations in the Act for the calculation of the energy performance of the building and of the provisions specified in annex 7 method (up to 5000 characters) 2.15. justification of the need for Funding (completed in the only major economic operators pursuant to Commission Regulation No 800/2008) No. PO box Need explanation of funding (up to 1000 characters) 1. project total spent on growth: the beneficiaries of the increase of the investment made in the project; changes to the project budget (if no corresponding budget cuts in other projects); the changes, which the beneficiary pays a proportion of the total project turnover 2. increase in the volume of project: the project's expected growth of services 3. extension of the scope of the project: the total project costs (without dropping the beneficiary's expenditure compared to the situation without the public funding); the increase in the number of people who are asked to work in the areas associated with the project 4. project execution speed increase: take less time to complete the project in comparison with it, if this same project completed without public funding title 3-project implementation 3.1. Planned duration of the project (in months) 3.2 for the implementation of the project and describe the project management capacity in the applicant's experience in the implementation of energy efficiency measures, renewable energy technology similar to the scale and nature of the project implementation, as well as the construction and management of the organisation. Specify experience in renewable energy, the implementation of the improvement measures and eco-friendly construction work organization (if any) (maximum 2000 characters) 3.3. possible project risks and preventive measures for preventing risks: Risk Assessment Risk description mitigation plan probability [low/medium/high] effect [low/medium/high] 3.4 the project advances and interim payments (do not fill in the national budgetary institutions) 3.4.1. payment of the advance Or the project applicant project will want to receive advance payments Yes No 3.4.2. Interim payment or a project within the project applicant want to receive interim payments yes no title 4-project financing indicators 4.1 Project applicant data on financial performance (applies to merchants) no PO box Year net turnover Euro 1. 2011 2. 2012 3. 13 4.2. project financing plan year total costs EUR Not eligible costs eligible costs *, EUR, EURO finance financial instruments Project co-financing by the applicant 1 = 2 + 3 2 3 = 4 + 6 4 5 = 4 / 3 (%) 6 7 = 6 / 3 (%) 2014               2015               2016               Kopā         **    
Piezīmes. 1. eligible costs under the heading also includes value added tax (VAT), if you can get it from the State budget, and the costs as the difference, in addition to contributing to the cost calculations. 2. If the project includes energy audits, technical report-survey and the opinion of the building energy consumption calculation of cost of preparing construction estimates development costs in the preparation of documentation and the cost of construction of regulatory harmonisation legislation in a fixed order, and the cost of building autoruzraudzīb, sworn auditor's opinion preparation costs as eligible costs, then not completed (refer to the micro (small), small and medium-sized business operators). 4.3. The project budget summary, including indicative project cost plan: no PO box The name of the position cost a total amount of Euro 1. Administrative costs 2. The costs for the implementation of activities 3. Publicity costs total 100% 4.4. Project cost estimate, see the submission form Annex 1 4.5 technical analysis, see the submission form Annex 3 4.6. Project implementation time schedule to specify the planned activities under the project implementation time (mark with an "x" in the appropriate year and month).
The project of the first year of the first month is the month when the project agreement was concluded. The indicative time of conclusion of the contract of the project contest is the 2014/2015 4th quarter. quarter 1, no PO box The activity name in the years and months of project implementation the first year of implementation of the project the second year 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1.                                                   2.                                                   3.                                                   ..

Title 5 – publicity plan 5.1 the project information and publicity measures (with their numbers): press releases informing the mass media Information on the Web site of the Seminar Conference other (Please specify) 5.2 the purpose of publicity plan, the planned financing, implementation mechanisms and publicity measures under the European economic area financial instruments set out in the framework of the information and publicity requirements: 5.3 planned information and publicity: no PO box Event target group organizer partners planned spending 5.4. Timing: publicity 1 year 2 year 3 year I II III IV I II III IV I II III IV 1.                         ...                                                  
5.5. Information and publicity events, responsible contact person (Department/person): 5.6. Information and publicity regarding the evaluation of the project and to the European economic area the recognition of financial instruments, information about the project and to the European economic area for the purposes of financial instruments and effects, as well as donor countries reflected the role: 5.7. information on the results of the demonstration project implementation (specify how the planned and implemented measures to play) Title 6-horizontal priorities 6.1. Project activities contribute to horizontal compliance activities : good governance, environment-friendly actions ensuring the economic sustainability of the principles of the promotion of the social sustainability of promoting gender mainstreaming 6.2. Project's compliance with horizontal priorities: 6.2.1. good governance, please select the appropriate with X: immediate positive impact indirect positive impact does not affect these areas please describe how the project will provide the principle of good governance: 6.2.2 ensure eco-friendly principles of operation assurance please select corresponding to X: immediate positive impact indirect positive impact does not affect these areas please , describe how the project will provide eco-friendly operating principle: provide economic sustainability 6.2.3 promotion please select corresponding to X: immediate positive impact indirect positive impact does not affect these areas please describe how the project will provide promotion of economic sustainability: sustainability in 6.2.4. social promotion please select corresponding to X: immediate positive impact indirect positive impact does not affect these areas please describe how the project will provide the social sustainability assurance : 6.2.5. achieving gender equality please select corresponding to X: immediate positive impact indirect positive impact does not affect these areas please describe how the project will provide gender mainstreaming: 7. PROJECT title applicant's attestation the applicant's Project (the project name of the applicant) Officer (name) (title) certify that the date of the presentation of the project: 7.1 project and the information contained in the annexes is true and the implementation of the project the required co-financing of the programme will be used in accordance with the project schedule and subject to the provisions; 7.2. the project the applicant shall have: 7.2.1. direct or in direct administrative authority; 7.2.2. in the Republic of Latvia, association or Foundation: 7.2.3. Republic of Latvia registered merchant. 7.3. the project the applicant – the merchant – meet the micro (small), small or medium merchant definition laid down in Commission Regulation No 800/2008, annex 2, paragraph 1, or the great merchant in the definition laid down in Commission Regulation No 800/2008 article 2, point 8 and the large merchant project complies with Commission Regulation No 800/2008 article 8, paragraph 3 these criteria (if applicable); 7.4. the project is available for free to the financial means or the credit will be available to the applicant in the project requires funding; 7.5. the project submission signed by the person with signature rights; 7.6. project application programming for the eligible costs co-financed are not and were not financed from the European economic area or other financial means and does not overlap with the activities and related costs that are funded from other financial instruments; 7.7. in the case of direct approval of the project in the project application will not be submitted for funding for co-financing from other public/financial sources; 7.8. the project is not directed against the applicant's claim for the recovery of other national support programmes or projects, in accordance with previous Commission decision declaring an aid illegal and incompatible with the common market; 7.9. the project applicant is not punished for the Latvian administrative violations code 189. ² referred to in the third subparagraph of article administrative violations or criminal law article 280 referred to in the second paragraph of Commission of a criminal offence or has applied herself to influence (if the applicant is a private-law legal person) the Commission of a criminal offence; 7.10. the project activities are not included in the planned exercise equipment that is not involved in the European Union emission trading system in accordance with the law "on pollution"; 7.11. the project in the interests of the applicant natural person did not do crime that hit the Republic of Latvia or the European Union's financial interests, and the project for the applicant under the criminal code are not suitable for the forced influence; 7.12. the project includes activities planned to implement: 7.12.1. on land or buildings that are: 7.12.1.1. the property of the applicant or of the draft long lease; 7.12.1.2. on the legislative authority's decision or contract basis available for use or possession of the applicant (if the applicant is a direct or in direct regulatory authority). Ownership, possession, or use of, or the right of rental is fixed or to the conclusion of the contract of the project will be strengthened in the land for a period of not less than five years after completion of the project; 7.12.2. buildings in which at least two past closed calendar years prior to the application of the project the Agency has carried out any economic activity (refer to merchants, if implemented these provisions 8.1. project and 8.2 in these areas); 7.12.3. the building used by the local autonomous function (refer to local government, implementing the project this rules 8.1 and 8.2 in these areas of support); 7.13. the project activities are planned to implement any of the eligible sectors not according to Commission Regulation No 800/2008 article 1, paragraph 3. If one of the sectors in which the applicant is not a project, the project assisted the applicant will provide eligible project implementation of the sector financial flows clear separation from other project activities of the applicant in the financial flows during project implementation and five years after the implementation of the project; 7.14. the project the applicant does not meet the ailing merchant status and is not covered by rule 11.1. the conditions referred to in point; 7.15. the project business will be carried out in the conditions of competition and does not have a secret agreement.
I agree that in case of need the State regional development agency is requesting from the State revenue service information indicating that the applicant is not in the State revenue service administered the tax debt, URt.sk., the State social insurance compulsory contribution. I know that the application may not approve of the financial instruments for co-financing, where the application did not meet the project criteria for the evaluation of applications, as well as on the financial regulations the implementation of the instruments planned co-financing the project at the time the application is used. I know that if the information given on the proof will not, against the applicant for the project can be started in the financial and administrative sanctions. I certify that the attached copy of the application the project meet in my possession the original document and project submission, and the electronic version of the project submission complies with the original. Agree during project implementation to ensure project reconstructed or built property, as well as purchase equipment insurance against loss.

Signature date (yyyy. URdd.mm.)

Note the. Document property "signature" does not fill in, if an electronic document is drawn up according to the law on electronic document design.
8. Partnership title proof (Latvian language fills the Latvian partners involved in the project, in English filled in foreign project partner) 8.1. Latvian language in the partnership Declaration Declaration of Partnership project (project name) I, project partner (partner name) Officer (title, first name, last name), certify that: 1) I have read the submission of the project and the project partnership agreement content and understand their role in the implementation of the project; 2) I am familiar with all the project funding and project implementation will follow them; 3) project application form and the attached documents on the information provided by the partners of the project are correct; 4 the project partner institutions) has the requisite experience and expertise in the area of project implementation to perform project tasks provided in the application; 5) project partner institutions is not declared insolvent, including not on redress or liquidation process, its economic activity is not stopped or interrupted, not judicial proceedings for its winding up or insolvency (does not apply to government institutions); 6) project partner institution not tax debt and the State social insurance compulsory contribution (does not apply to government institutions); 7 project partner institutions) professional activities no irregularities are observed and that the decision in force is not found guilty of the offence in connection with professional activities (does not apply to government institutions); 8 I'm not done) the prevention of fraud, corruption or any other illegal activity; 9) project partner institutions does not match any of the payment of the debt to other projects funded from the European economic area or other financial sources as well as State and local budget resources; 10) undertake to ensure publicity of the programme requirements associated with the implementation of project activities and information materials; 11) project partner institution stores all project-related documentation for implementation five years after conclusion of the report of the project, as well as Latvian or donor countries will agree with the authorities of the controls and audits or during the project implementation period of five years following the closing of the project report; 12) authorized the project applicant to assume the contractual arrangements with the Agency and represent yourself in all project related issues;
13) undertake to execute project tasks provided in the application and give the project the applicant necessary information.
      (signature)   (date)
Note the. the document properties in the "signature" and "date" does not fill in, if an electronic document is drawn up according to the law on electronic document design. 8.2. Declaration of Partnership in English (To be filled out by foreign partners) Partnership statement for the project (title of the project) as the responsible official I, a of the project Partners (title of the project Partners, first name, surname, position) confirm, that the project Partners: 1) correspond to the eligibility provision of project partners; 2) is familiar with the project application and is aware of its own role in the project implementation; 3) is familiar with the condition for receiving grant, which are defined in the regulations, and the respectiv undertak to respect them during the implementation of the project; 4) confirm that all the information about the project Partner organization provided in the project applications and attached documents is correct; 5) has appropriate experience and knowledge in implementing projects to fulfill the tasks foreseen in the project application; 6-the undertak ensur) publicity requirements while implementing the activities and publishing information materials related to the project; 7 to keep all documentation undertak) related to the project implementation for five years after approval of the final project report, as well as consent to the control and audit of the institutions of the United States or Donor State during the project implementation or for a period of five years after approval of the final project report; 8) of the project Promoter authoriz their represen the project Partner organization in communications with the Agency regarding issues of the project implementation; 9) to fulfill all the undertak tasks foreseen in the project application and provide all the information upon the cessary not request of the project Promoter.
      (signature)   (date)
Note. The document properties "signature" and "data" shall not be filled out provided that the electronic document is drafted according to requirements set forth in the drafting of normative acts on electronic documents. In addition to the documents to be submitted no PO box Document title page notes the required 1. Renewable energy technology description that includes at least the following information-the application of the project technical rationale, the principled scheme, feasibility study, technology, location, information about energy and its representative (if applicable) 2. Calculation of costs that made the comparison between the cost of switching to a heating or hot water system or power plant, which uses renewable energy sources, and the new fossil energy heating or hot water system or power plant establishment costs (without the aid of the environment) (if applicable) 3. Certified energy audit report carried out by the energoauditor (building reconstruction project) 4. Certified energoauditor made the building energy consumption calculation (year of construction project) 5. Calculation of the eligible costs under this provision of the new 30.4.6.2. section (if applicable) 6. The technical opinion of the survey according to the construction of laws framework (if applicable) 7. Construction estimate according to the construction of laws framework (if applicable) 8. The construction of the Būvvald accept the technical design stage (copy) of all the planned project construction or project the graphical part that meets this provision in paragraph 4 of annex 4 to the requirements (if applicable) 9. Copies of documents produced, and sold the electricity consumed and produced, consumed and the amount of heat sold the building in which the project activity, at least for the last two calendar years to be concluded before the application of the project, indicating the data by month (megavatstund (MWh)), and the amount of fuel used (if applicable) 10. Information about the wind resources of the instrumental measurements taken not less than 50 metres and not more than 10 km of the planned wind farm location (if the project planned wind farm acquisition, construction, installation and connection of the electrical system) (if applicable) 11. Certified Auditor's opinion on the implementation of energy efficiency measures in the calculation of eligible cost accuracy and compliance with Commission Regulation No 800/2008 article 21. The opinion shall be included in the calculation of eligible cost 8.1. areas of support within the year of construction and reconstruction of the eligible activities (applies to merchants, associations or foundations, carrying out economic activity);     12. Decision concerning the implementation of the project and additional documents to be submitted in accordance with rule 43.1.5.43.1.4. and section 13. Declaration of conformity the company micro (small), small or medium company that was completed in accordance with the laws and regulations on company reporting procedures under the micro (small), small or medium company (if applicable) 14. Power of Attorney of the person concerned to sign the project submission (if applicable) 15. Declaration of partnership and partnership agreement project (copy) 16. Foreign tax administration authorities issued a statement confirming that the foreign partner of the project, at the time of the project is not a tax liability in the country where it has its principal place of business in accordance with the provisions of subparagraph 43.1.7. (if applicable) 17. Property rights certificate, long-term lease agreement (copy), the contract or the decision of the Authority (copy) on the basis of which the land or building available for use or possession of the applicant (if applicable) submission form Annex 1 estimates the cost of funding is determined by the amount of euro and cents, pointing to two decimal places, rounding the number to the nearest hundredth down if the third decimal is to "5" (including) , or up if the third decimal is "6" or higher; This provision is laid down in point 8.1 support cost estimates costs reflect each building separately (apakšail or individual cost estimates), if a project contains multiple buildings, and indicates the cost estimate for the entire project together.
Nr. PO box Cost item name unit name number of units unit cost, euro (without VAT) total cost eur (without VAT) total cost of eur (including VAT), costs Euro eligible ineligible (t.sk. VAT VAT VAT) (fills in when not recoverable)% of the total eligible izmaksām1 1 2 3 4 5 6 7 8 9 10 11 1. the costs associated with the development of project documentation (energy audit report, construction, technical opinion survey, sworn auditor's opinion, building, autoruzraudzīb, estimates, etc.)                   1.1. ...
              N/a   2. the construction cost of the new N/a 2.1. …
                  3. the cost of the works and buildings reconstruction n/a 3.1. …
                  4. heat-the Sun collector technology, heat pump, pellet or chips boilers – acquisition, supply, installation and connection costs, if such heating is provided in Exchange, moving from fossil energy sources to renewable energy resources n/a 4.1. …
                  5. electricity generation technology costs, wind farms and solar power plant – acquisition, construction, installation and connection of the electric system costs n/a 5.1. …
                  6. the project linked specialist training costs n/a 6.1. …
                  7. costs associated with the construction of the buildings delimiting check under construction (gaiscaurlaidīb test termofotografēšan) n/a 7.1. …
                  8. publicity and demonstration project, the cost of the measure 8.1 N/a. …
                  9. the administrative costs of the project 9.1. ...                     Total cost of the project, this provision provided for in paragraph 8.2. aid no.. PO box Cost item name unit name number of units unit cost, euro (without VAT) total cost eur (without VAT) total cost of eur (including VAT), costs Euro attiecināmās2 (t.sk not apply. VAT VAT VAT) (fills in when not recoverable)% of the total eligible izmaksām1 1 2 3 4 5 6 7 8 9 10 11 1. preparation of the technical documentation and construction of regulatory harmonisation laws in the order, as well as the cost of building and autoruzraudzīb 1.1. …
                  2. renewable energy technologies – for solar collectors, biomass pellets and chips boiler, heat pump, solar power plants and wind farms to the acquisition, construction, installation and tuning costs n/a 2.1. …
                  3. the cost of the works, which are directly associated with eligible activities n/a 3.1. …
                  4. publicity and demonstration project activity costs n/a 4.1. …
                  5. project administration costs 5.1. ...                     Project total cost n/a this rule 8.3. support provided for in point No. PO box Cost item name unit name number of units unit cost, euro (without VAT) total cost eur (without VAT) Total cost, € (incl. VAT) costs Euro attiecināmās2 (t.sk not apply. VAT VAT VAT) (fills in when not recoverable)% of the total eligible izmaksām1 1 2 3 4 5 6 7 8 9 10 11 1. labour remuneration – involved in project implementation staff remuneration and related costs or staff costs n/a 1.1. …
                  2. the employer shall carry out State social security payments for the staff involved in the implementation of the project N/a 2.1. …
                  3. the staff involved in the implementation of the project for foreign travel (travel) costs n/a 3.1. …
                  4. the external costs that were necessary to achieve the project objectives (for example, legal services, accounting services) 4.1. …
                  5. equipment and technological equipment acquisition cost n/a 5.1. …
                  6. cost of materials and inputs of N/a 6.1. …
                  7. publicity and demonstration project activity costs n/a 7.1. …
                  8. the project administrative costs 8.1. ...                     Project total cost n/a notes. 1 Please observe the rules referred to in paragraph 30 of the eligible cost. 2 Not eligible costs under the heading also includes value added tax (VAT), if you can get it from the State budget, and the costs as the difference, in addition to contributing to the cost calculations. If necessary, the applicant may supplement the project cost items.  
Submission form Annex 2 calculation of the eligible costs (investment in renewable energy – apply to merchants, and implementing the provisions 8.1.8.2. in the areas referred to in subparagraph) heat or electricity generation technologies planned for the project, the planned capacity, kW heat or electricity technology investment without VAT, euro Project planned in the heat or electricity technology investment without PVN2, Euro/Euro/kWel kWth or renewable energy sources using heat or electricity generation technology, maximum permissible cost of investment Euro/Euro/kWel kWth or Fossil energy sources using heat or electricity technology investment, Euro/Euro/kWel kWth or eligible costs, Euro/1 4 5 6 1 2 3 = 2 = (3 or 4-5) x 1 1.            2.            ...          
The notes. 1 If the project planned to install several heat and/or electricity production technologies, information filled in for each of them. 2 Results must be accurate to two decimal places.  
Submission form Annex 3 technical analysis (if applicable) 1. Power supplies technical indicators: 1. heating equipment No.  PO box Indicator unit of measurement estimated the size of the existing lielums1 1. The installed thermal capacity in kW 2. Efficiency: 2.1. the heating period% 2.2. Summer 3. The average amount of siltumslodž connected to: 3.1. the heating period kW 3.2. summer kW 4. Heat transfer characteristics of planned: 4.1. steam: 4.1.1. pressure MPA 4.1.2. temperature ° C 4.2. network water: 4.2.1. inlet temperature ° C 4.2.2. atgait temperature ° C 5. Heat pumps – the transformation factor 6. Fuel-7. Fuel consumption t or m3 2. Produced and consumed energy in existing technologies completed where the project is planned to replace the heat no PO box The heat produced in the year apjoms2, kWh consumed apjoms2 kWh of heat, heat apjoms2, kWh sold 1. 20. _         2.20 __.         3. at least the last two calendar years concluded the average notes. 1 kind of heating technology for at least two years of any previous averages. 2 must be accompanied by supporting documents (copies) on at least two recent calendar years concluded, produced and consumed energy volumes sold the building in which to implement project activities, showing data by month (kWh). Accompanied by documents (copies), which shows the amount of the used fuel, including fuel purchase costs supporting documents (rule 43.3.2.). "
Environmental protection and regional development Minister ad interim, Justice Minister Bernadette Brok and of environmental protection, Ministry of regional development proposed in annex 3 versions of the Cabinet of Ministers of 18 March 2014 regulations No 149 building energy audit report name address: fotofiksācij object content 1. General 2. Basic information on production processes for the provision of basic information on building 3 4. building technical systems and power distribution 5. energy consumption and inventories 6. Energy efficiency proposals 7. Energy efficiency indicators and changes forecast by the energy efficiency of the implementation of the proposal of annex
  1. General information 1.1. building identification 1.1.1. Address 1.1.2. The building cadastre number 1.1.3. Building classification in 1.1.4. Part of a building (explain, if estimates of a building part) the nearest residential area Ārgais in the average temperature of the heating period in the normative (° C) heating days per Dnapr 1.2. Basic information on the building owner or holder 1.2.1. Name/first name, last name (if the owner or holder is a natural person) 1.2.2. Registration number 1.2.3. 1.2.4. Legal address Contact 1.2.5. Contact phone Energoauditor 1.3 to 1.3.1. Name 1.3.2. Certificate number 1.3.3. Company * 1.3.4. Company registration number * 1.3.5. Phone number note. * Not specified if energoauditor is a natural person, the data on energoauditor of 1.4 1.4.1. Building survey date 1.4.2. Energy audit report number 1.5. assessment of energy efficiency within the unit name field short process description of power distribution and power flow estimated output/energy consumption kWh/m2 year% of total total-basic unit-note. If energy efficiency rating and energy audit report includes information on the building in which there is no separate energonesēj records, but the building is one of several buildings with common energy, this part shall produce a comprehensive energy balance of the system by specifying all logical units located within the limits of energy accounting, which are consumed in the production of energy-. Energy balance should be included also in the unit for which the statement is drawn up. as a share (%) of the total energy consumption of vehicle tracking range **-it is recommended to add to prepare a schematic representation of the flow of energy between the buildings and process. 2. Basic information on building Information on building 2.1 2.1.1. The constructive solution 2.1.2. Commissioning year 2.1.3. 2.3.1. the basement floors (yes/no) 2.3.2. typical floor (number) 2.3.3. technical stand (number) 2.3.4. attic floor (yes/no) 2.3.5. penthouse (yes/no) 2.1.4. Total calculated area (m2) 2.1.5. External dimensions of the building (if the building is of irregular shape, add a sketch in the annex) 2.1.5.1. length (m) 2.1.5.2. width (m) height (m) 2.1.5.3.2.1.6. Energy efficiency measures taken above, no PO box Gads Pasākums                              2.1.7. Other information 2.1.8.  Survey of the building or in the annex to fotodokumenntācij termogramm to pages 2.2. information on the calculation areas and space groups in the heating period calculation parameters in the Aprekina parametri cooling period no PO box The zone number and the name of the Included space/space group name calculates the area average height Calculation of the temperature, the duration of the Period of calculation of air exchange, temperature of air, the duration of the Exchange Period calculation Calculation of outdoor air outdoor air m2 m m3 ° C ° C day 1/h ° C ° C day 1/h zone way under 1 zone LBN 002-01 type of Zone 1 according to the type of zone LBN 002-01 under the LBN 002-01                                         Together-on average-a-note. * Indicate the calculated energy used for the determination of parameters for the period 3. building containment structures 3.1. Information about each type of external structures delimiting, which covers the area of calculation in the heated room no PO box Defining construction material (s) the thickness of the area Būvelement of heat transmission coefficient (U) temperature difference between the warm and cold construction parties design heat loss factor mm m2 w/(m2 K) K W/K no PO box Thermal bridges name length thermal transmittance coefficient of thermal bridges (ψ), the temperature difference between the warm and cold construction parties design heat loss coefficient of m W/K W/K (BOM) total area 1 no PO box Defining construction material (s) the thickness of the area Būvelement of heat transmission coefficient (U) temperature difference between the warm and cold construction parties design heat loss factor mm m2 w/(m2 K) K W/K                                                                                                                                             No PO box Thermal bridges name length thermal transmittance coefficient of thermal bridges (ψ), the temperature difference between the warm and cold construction parties design heat loss coefficient of m W/K W/K (BOM) total no PO box Defining construction material (s) the thickness of the area Būvelement of heat transmission coefficient (U) temperature difference between the warm and cold construction parties design heat loss factor mm m2 w/(m2 K) K W/K no PO box Thermal bridges name length thermal transmittance coefficient of thermal bridges (ψ), the temperature difference between the warm and cold construction parties design heat loss coefficient of m W/K W/K (BOM) total buildings delimiting the design heat loss factor actual HTA (W/K), regulatory (W/K) Note: * Calculated in accordance with the Cabinet of Ministers of 27 November 2001, regulations no 495 "rules for the Latvian et seq of LBN 002-01" building construction siltumtehnik "delimiting". ** If necessary be supplemented after the number of the zone. 4. building technical systems and power distribution for 4.1 ventilation building zones 4.1.1 calculation parameters no PO box The zone number and the name of the calculated volume calculates the temperature of the air vent. siltuma zudumu koeficients Hve Ventilācijas sistēmas veids Darbības ilgums, gadā Enerģijas atgūšana, vidēji m3 °C 1/h W/K h % Parametri apkures periodā                                                                                                             Parametri dzesēšanas periodā                                                       Cita informācija:  
Piezīme. * including * if infiltration area is operated at different temperature and ventilation modes, each mode separately, indicating the mode parameter 4.1.2. Air conditioning – data on equipment, no PO box Machine name, model year of manufacture of the produced energy (kWh/year) * added inspection (yes/no) date note. * In accordance with the Cabinet of Ministers of 9 July 2013 the Regulation No 383 "rules for building energosertifikācij", performing the Energosertifikācij building, to perform the check and to draw up the Act of inspection of the cooling plant 4.1.3. other information 4.2. Calculate heat gains in 4.2.1 building characteristics Calculation no PO box The zone number and the name of the internal heat gains in solar heat gain coefficient of use benefits total heat gains From lighting the metabolic device of your hot water system from/to/from AVK systems processes, objects kWh/m2/m2 per kWh/m2/kWh kWh/m2/kWh/m2/m2 kWh/m2/kWh kWh per year in the period of heating characteristics of cooling period note. Distribution in accordance with the Cabinet of Ministers of 25 June 2013 the Regulation No 348 "building energy efficiency calculation method" 94. point. ** total estimated heat gains in a given period/mode. 4.2.2. other information 4.3. heat supply/production and transmission heating equipment 4.3.1. facility name, model year of manufacture fuel fuel consumption (annual average), specify the unit of measure the efficiency of Energy Production (kWh/year) * added inspection (yes/no) date note. * In accordance with the Cabinet of Ministers of 9 July 2013 the Regulation No 383 "rules for building energosertifikācij", performing the energosertifikācij building, a check must be run and draw up a law on the inspection of the boiler.
4.3.2. Heat supply system for centralized heating depends on the connection scheme   Independent connection scheme for local heating 4.3.3. Information on the company's energy mix in existing, deployed outside the territory of the siltumpārvad network (network length, pipe and insulation parameters, technical state) 4.3.4. Other information 4.4 distribution of heat-heating system * 4.4.1. Heating system pipes, one pipe of two other (specify): 4.4.2. Heat supply control, control and accounting areas 4.4.3. The total length of siltumtras 4.4.4. Pipe insulation condition 4.4.5. Other information of note. If the situation is different in different areas of the building, you can specify a separate table for each zone. 4.5. The hot water distribution system 4.5.1. Hot water supply the average temperature (° C) 4.5.2. Cold water inlet temperature (° C) 4.5.3. Hot water preparation preparation siltummezgl centralized supply individual 4.5.4. Hot water distribution system of the type without the circulation with circulation 4.5.5. The total length of the pipe distribution scheme in 4.5.6. Pipe insulation condition 4.5.7. Other information how to prepare hot water 5. energy consumption and inventory 5.1. Energy distribution (based on calculated data) no PO box Breakdown of energy consumption * 3 measured data, year 1 average corrected 2 distinctive corrected * 2 calculated data, year 3 Warm-energy, energy-average, average total average specific year year Warm-energy, energy-average, average total average specific emission factor quantity of CO2 emissions per year kWh kWh kWh kWh/m2/m2 kWh kWh kWh kWh per kWh, kWh/m2 kg/kWh per kg 5.1.1. Apkurei                         5.1.2. Hot water preparation 5.1.3. Dzesēšanai                     5.1.4. Mechanical ventilation 5.1.5. Apgaismojumam                     5.1.6. Citi patērētāji*4                     5.1.7. Kopā                         5.1.8. Explanation of power distribution systems with common counter notes * 1 displays the average consumption data for the last two years (2012 and 2013) from tables 5.3 part. If not the measured data, displays the calculated data from tables 5.3 part. Where is the total records, data presented in one box, explaining in part 5.1.8. 2 indicate the energy consumption, which is adjusted according to the climatic conditions, the adjustment may not exceed 10% when compared with the average measured data. 3 must take the distribution calculation by the positions also if there is no shared accounts. 4 indicate other consumers that are not separately detalizējam, but not together represent more than 10% of the total average measured power consumption or heat. 5.2. Fuel consumption * — show all fuel types, which are consumed in the production, heating, or other process for broken down by energy (if not counter display, specify the amount and the distribution of calculated month by month, rather than buying, as consumption levels).
The year of the distribution by energy January February March April May June July August September October November December total fuel emission factor units the lowest combustion heat *                                                                                                                                                                                                                                                                                                                                                                                                                                                          
Note: do not include the transport of fuel consumed. the calculation used to specify the lower calorific value (kWh/unit) 5.3. Energy consumption data for heat consumption for heating 5.3.1 provision of the year January February March April May June July August September October November December total 2012 total energy consumption, kWh 2013 Total energy consumption, kWh, the total average (kWh) calculated data (fill in if there are no counters), total energy consumption, kWh expert method description 5.3.2 thermal energy consumption for hot water preparation year January February March April May June July August September October November December total 2012 total energy consumption, kWh 2013 total energy consumption, kWh, the total average (kWh/year) (calculated data filled in if not counter) the total energy consumption, kWh expert description of the method used 5.3.3. Cold water consumption year January February March April May June July August September October November December total 2012 cold water consumption, m3 2013 cold water consumption, total average m3 (m3/year), calculated data (to be completed if no meter) cold water consumption, m3/year expert description of the method used 5.3.4. Hot water consumption ņš year January February March April May June July August September October November December total 2012 hot water consumption, m3 2013 hot water consumption, total average m3 (m3/year), calculated data (to be completed if no meter) hot water consumption, m3/year the expert method description power consumption year 5.3.5. January February March April May June July August September October November December total 2012 total power consumption by 2013 the total energy consumption in kWh, kWh, the total average (kWh) calculated data (fill in if there are no counters), total energy consumption, kWh expert method description 6. Energy efficiency proposals 6.1. energy and carbon dioxide savings no PO box Measure the delivered energy savings in kWh/year of carbon dioxide savings by changing technology, which uses fossil energy sources, to technologies that use renewable energy sources for heating cooling hot water operation of mechanical ventilation lighting other consumers energy savings, emission factors in kWh/year **, kg/kWh, kWh energy savings/year emission factor *, kg/kWh, kWh energy savings/year emission factor *, kg/kWh, kWh energy savings/year emission factor * , kg/kWh, kWh energy savings/year emission factor *, kg/kWh, kWh energy savings/year emission factor, kg/kWh */replaced quantity of energy produced *** emission factor, kg/kWh *                                                                                                                                                                                                                                                                                                                                                                                                   Kopā - - - - - -  -
Piezīme. The calculated energy savings by implementing energy-efficiency measures. According to if any energy efficiency measures to reduce the consumption of one energonesēj, but increases the consumption of another energonesēj – it should be noted in detail. If the given position energy efficiency measures increases in energy consumption, indicates negative savings. ** If the value is adjusted, the emission calculation of factors should be presented in part 6.2. If you make energy efficiency measures and also fossil energy substitution, replacing fossil energy is calculated from the energy calculated by other energy efficiency measures for the calculation of emission factors used 6.2 (specify what emission factors for each fuel used) 6.3 further measures measures certified architect or certified civil engineer deems necessary in addition to the energy audit report contains measures which do not directly affect the achievable reduction in CO2 emissions (costs to be included in the draft mandatory as ineligible costs).
Event name and description of the justification information on additional measures with the project applicant, as well as additional sources of funding energy efficiency indicators 7 and changes forecast by the energy efficiency of the implementation of the proposal of no PO box Breakdown of energy consumption situation (calculated data from table 5.1) forecast by implementing energy-efficiency measures (in accordance with section 6) difference-reduction CO2 emissions ** total consumption specific CO2 emissions total consumption specific CO2 emissions per kWh/m2 per year kWh per year in annual kWh per year kWh kgCO2/m2 per year year year kgCO2 kgCO2 decrease in consumption 7.1. Apkurei               7.2. Hot water preparation 7.3. Cooling of 7.4. Mechanical ventilation of 7.5. Lighting 7.6. Other consumers *** 7.7. Total energy FROM FOSSIL REPLACED resources replaced the amount of energy (kWh/year) specific (kWh/m2/year) CO2 emissions ** 7.8. Carbon dioxide savings by changing technology, which uses fossil energy sources, to technologies that use renewable energy sources 7.9. Note the total carbon dioxide (CO2) emissions calculated on the basis of the public limited liability company "Latvian environment, geology and Meteorology Centre" published emission factors used in the latest greenhouse gas inventory unit under the Cabinet of Ministers of March 27, 2012 rules no 217 "rules on greenhouse gas emissions inventory national system of units". the data must match exactly with the calculated data for these positions, as shown in other energy audit report. * The total amount of energy saved and CO2 emissions reductions may not exceed the initial estimated scores before the energy efficiency proposals. indicate other consumers that are not separately detalizējam, but not together represent more than 10% of the total average measured power consumption or heat. Total "7.6. other consumers" must be split by position, if it includes equipment that will change the energy efficiency project, presenting these equipment and energy consumption alone. 8. adjustment of heating consumption (where the average room height calculation areas exceeds 3 m, energoauditor performs the conversion of heat consumption for heating to a height of 3.5 m above the areas) the total volume of the calculation the total calculated displacement divided by 3.5 energy consumption forecast for heating (part 7 of "heating") converted into consumption for heating the unit area at a height of 3.5 m (3. column divided by column 2).        
 
Energoauditor (name) (signature) (date) Annex 1. building survey photo documentation, or termogramm 2. building containment structures and technical systems indicators to be achieved by the energy efficiency measures 2.1. Information about each type of external structures delimiting, covering a total area of calculation in the heated room no PO box Defining construction material (s) the thickness of the area Būvelement of heat transmission coefficient (U) temperature difference between the warm and cold construction parties design heat loss factor mm m2 w/(m2 K) K W/K no PO box Thermal bridges name length thermal transmittance coefficient of thermal bridges (ψ), the temperature difference between the warm and cold construction parties design heat loss coefficient of m W/K W/K (BOM) total area 1 no PO box Defining construction material (s) the thickness of the area Būvelement of heat transmission coefficient (U) temperature difference between the warm and cold construction parties design heat loss factor mm m2 w/(m2 K) K W/K                                                                                                                                             No PO box Thermal bridges name length thermal transmittance coefficient of thermal bridges (ψ), the temperature difference between the warm and cold construction parties design heat loss coefficient of m W/K W/K (BOM) total no PO box Defining construction material (s) the thickness of the area Būvelement of heat transmission coefficient (U) temperature difference between the warm and cold construction parties design heat loss factor mm m2 w/(m2 K) K W/K no PO box Thermal bridges name length thermal transmittance coefficient of thermal bridges (ψ), the temperature difference between the warm and cold construction parties design heat loss coefficient of m W/K W/K (BOM) total buildings delimiting the design heat loss coefficient of the HTA is predicted (W/K), regulatory (W/K) Note: * Calculated in accordance with the Cabinet of Ministers of 27 November 2001, regulations no 495 "rules for the Latvian et seq of LBN 002-01" building construction siltumtehnik "delimiting". ** If necessary be supplemented after the number of the zone. 2.2. the ventilation areas of the building – achievable indicators after energy efficiency improvement measures 2.2.1. Calculation parameters no p. c Zone number and the name of the calculated volume calculates the temperature of the air vent. siltuma zudumu koeficients Hve Ventilācijas sistēmas veids Darbības ilgums Enerģijas atgūšana, vidēji m3 °C 1/h W/K   h % Parametri apkures periodā                                                                                                             Parametri dzesēšanas periodā                                                      
Piezīme. * Including * If infiltration area is ventilated different modes each mode separately, indicating the mode parameters 2.2.2. Ventilation and air conditioning – data on uzstādāmaj equipment no PO box Machine name, model equipment for electric power equipment yield heat recovery efficiency of the planned amount of energy consumption projected energy produced is the planned working hours per year kWh/kW/m3/h% per year kWh/year (h) 2.3. calculated heat gains in building no p. c Zone number and the name of the internal heat gains in solar heat gain coefficient of use benefits total heat gain ** From the apg-metabolic outbreaks devices From hot water system from/to/from AVK systems processes , priekšmetiem kWh/m2 kWh/m2 kWh/m2 kWh/m2 kWh/m2 kWh/m2   kWh/m2 kWh gadā  Parametri apkures periodā                                                                                                                                         Parametri dzesēšanas periodā                                                                      
Piezīme.* Sadalījums saskaņā ar Ministru kabineta 2013.gada 25.jūnija noteikumu Nr.348 "Ēku energoefektivitātes calculation method of the "94. ** Total estimated heat gains in a given period/mode. 3. technical information and light power no p. k space/space or group situation forecast difference illuminates the Lighting equipment-you-you (media) lx W total power Consumption h hours per year to enlighten you of lighting equipment--you level (middle) lx W total power hours per year of Energy Consumption-consumption, h kWh/year kWh/year kWh                                                                                                                                                                 *-Indicates the type of luminaire type, light bulb power, total number of light bulbs. 4. energy consumption before and after renovation measures other equipment * no PO box The type of equipment before the energy efficiency measures By energy efficiency measures starpiba nominal capacity of weighted average power of work hours in a year, the Energy-consumption rated power a weighted power working hours per year, the Energy-consumption of Energy-consumption, kW kW kW kW kW h h kWh kWh together does not specify equipment and energy consumption is not affected as a result of the implementation of the project.
  Energy saving in kwh/year, the emission factor ECO2 (kgCO2/kWh) carbon dioxide reduction (kgCO2) kWh/m2 per year for heating, Electricity Siltumerģij, along other technology replacement building energy efficiency ASSESSMENT of environmental protection and regional development Minister ad interim, Justice Minister Bernadette Brok 4. Annex Cabinet 18 March 2014 regulations No 149 project requirements building technical indicators 1. boundaries of the building construction must comply with the following indicators : 1.1. buildings with energy consumption and 25 kWh/m2 year: 1.1.1 application Windows with triple glass package heat permeability coefficient value Uw does not exceed 0.8 W/m2K; 1.1.2. the rest of the buildings delimiting the structure transmission coefficient U heat value, including thermal bridges, not exceeding 0.30 W/m2K, roofs and floors 0.2 W/m2K; 1.2. the centralised ventilation system must be with the efficiency of the recovery, at least 75%; 1.3. structure of air permeability delimiting factor (expressed as air leaks n50 (h-1), if the pressure difference 50 Pa) the entire building as a whole must meet: 1.3.1. buildings with an energy consumption that is equal to or less than 15 kWh/m2 a year, air permeability coefficient n does not exceed 0.6-1 h residential buildings and public buildings; 1.3.2. buildings with an energy consumption that is more than 15 kWh/m2 per year and less than or equal to 25 kWh/m2 a year, air permeability coefficient not exceeding 1.0 n h-1 residential buildings and 1.2 h-1 public buildings; 1.4. all buildings at the project, the total primary energy consumption (heating, hot water and electricity consumption amount) must not exceed 150 kWh/m2/year. 2. the total heated area of the building is determined in square metres (m2), summing up the whole room area where you intend to provide indoor climate. Room area down the building's floors between the internal surfaces of the walls (including the basement and attic floor). The landing of all or part of the area including its floor area, from which a staircase led upward. 3. building indoor temperatures reach 18 ° C. 4. building technical project or the graphical part includes: 4.1 master plan with the specified orientation, the most noēnojoš objects, their dimensions and height; 4.2. building floor plans M 1:100 or 1:200 with gauge sizes, construction type ("pie"), and the front door window, mark; 4.3. the facade of the building construction planes delimiting, window and door sizes and areas; 4.4. the cutting diagram with labeled nodes locations, construction type ("pie"), height marks and gauge sizes; 4.5. the most important node solutions: insulation CAP, balcony and loggia insulation, window installation node, the cornice and roof siltinājum node, a node in the cold to prevent other bridge structures; 4.6. the structure type ("pie") specification with the specified materials, layers, according to the thickness of the material to the adjustment conductivity (λ) and the design of the overall heat transmission coefficient (U). Environmental protection and regional development Minister ad interim, Justice Minister Bernadette Brok annex 5 cabinet 18 March 2014 regulations No 149 administrative evaluation criteria Nr. p. c. Criteria yes no NA * P/N ** 1. Project eligibility criteria: 1.1. is submitted to the project application form (under the Cabinet of Ministers of 18 March 2014 No 149 of the provisions "of the European economic area financial instruments in 2009-2014 period," national climate policy "project submission open competition" sustainable building, renewable energy technology and emissions-reducing technology, innovative development "rules" (hereinafter referred to as the rules) Annex 2) N 1.2. the project submission complies with the provisions of paragraph 43 N 1.3. the project application has been submitted to the agency within N 1.4. the project application is filed: 1.4.1. in the form of a paper document N 1.4.2. electronic document 1.5. the project applicant is a provision referred to in paragraph 4:1.5.1. economic operators registered in the Republic of Latvia N 1.5.2. direct or in direct administrative authority N 1.5.3. Association or Foundation N 1.6. the project includes activities planned to implement: 1.6.1. to land or a building that is the property of the applicant or of the draft long lease pursuant to the provisions of paragraph 16.3.1 N on earth or in the building, which is in use or possession of the applicant pursuant to paragraph 16.3.2 1.6.2 of the rules. the building, in which at least two recent calendar years prior to the application of the project the Agency has carried out any economic activity (refer to merchants that implement the project rules 8.1 and 8.2. in the areas referred to in subparagraph) N the building, used by the local autonomous function (refer to local government, implementing the project rules 8.1 and 8.2. in the areas referred to in subparagraph) 1.7. project applicant: 1.7.1. the project the applicant does not have tax debt, including State social security payment for debt, which totals more than eur 150 P 1.7.2. the project applicant is the operator corresponding to the micro (small), small or medium, the definition of authorised economic operator in accordance with the Commission's august 6, 2008, Regulation (EC) No 800/2008, which recognize certain categories of aid compatible with the common market in application of articles 87 and 88. (General block exemption regulation) (hereinafter referred to as Commission Regulation No 800/2008), annex 1 or big merchant definition according to Commission Regulation No 800/2008 article 2, point 8 (if applicable) N 1.7.3. the project, the applicant does not meet the ailing merchant status and is not covered by provisions 11.1 the conditions referred to in paragraph N 1.7.4. the project is not directed against the applicant's claim for the recovery of other national support programmes or projects, in accordance with previous Commission decision declaring an aid illegal and incompatible with the common market N 1.7.5. the project was not punished for the Latvian Code of administrative offences 189.2 referred to in the third subparagraph of article administrative violations or criminal law 280. Article referred to in the second paragraph of Commission of a criminal offence or has no suitable forced influence (if the applicant is a private-law legal person) the Commission of a criminal offence, N 1.7.6. in the interest of the applicant in the project a physical person has not committed a crime that hit the Republic of Latvia or the European Union's financial interests, and the project for the applicant under the criminal code are not suitable for the forced influence N 1.7.7. the project the applicant does not intend to implement the project in one of the eligible sectors not in accordance with Commission Regulation No 800/2008 article 1 point 3 N 1.7.8. the project the applicant does not intend to produce hydroelectric energy or cogeneration units of N 2. The project design of the application eligibility criteria: 2.1. the project has been prepared for submission into P 2.2. the project application is fully filled P 2.3. the project is not specified in the application for amendment (erasures, deletions, and additions to the aizkrāsojum) P 2.4. project application form is ready for the Latvian language (except for project submission form section 2.4.2. and 8.2.) P 2.5. In addition to the documents are prepared in Latvian language or if they are not prepared for the Latvian language, accompanied by a certified translation into Latvian language P 2.6. In addition to the documents to be submitted is the original or copies of them, which is the proof of the compliance with the original copy of the P 2.7. application of the project in all calculations use the euro currency — P 2.8. requirements that apply only to those project proposals submitted in paper form: 2.8.1. have filed one of the original P 2.8.2. the project application is placed in closed packaging according to the rules in paragraph 49 N 2.8.3. added project submission in electronic form electronic data carrier (CD, DVD, USB) prepared DOC, DOCX, xls, XLSX, PDF file format JPG or P 2.8.4. project submission signed by:-officer or authorized person with signature rights, if the applicant is a direct or in direct authority, society or Foundation; -a person who has authority to sign, if the applicant is a proprietorship N 2.8.5. project application form and accompanying documents in paper form is identical to the project application form and the attached documents electronic P 2.8.6. the original application is the project cauršūt (caurauklot) P 2.8.7. all project submissions, the original pages are numbered P 2.9. the requirements apply only to project applications submitted to the electronic document: 2.9.1. According to the laws of development of electronic documents, presentation, storage and movement of P 2.9.2. application form DOC or DOCX format developed in the energy audit report-DOC, DOCX, PDF, xls or XLSX format, drawings-PDF format, estimate and time schedule-xls or XLSX format P 2.9.3. project application signed with a secure electronic signature and confirm with the time stamp, in addition to the original document submitted to each separately signed with a secure electronic signature and confirm with the time stamp of the P 3. Project application form in addition to attached documents: 3.1. renewable energy technology description that includes at least the following information: project submission technical indicator included in the rationale, principled scheme, feasibility study, technology, location, information about energy and its representative (if applicable) N 3.2. calculation of costs (in accordance with the provisions of annex 1), which made a comparison between the cost of switching to a heating or hot water system or power plant, which uses renewable energy sources, and the new fossil energy heating system or power plant establishment costs (without the aid of the environment) (if applicable) N 3.3. certified energoauditor made energy audit report (building reconstruction project), prepared in accordance with the provisions of annex 3 (if applicable) N 3.4. certified energoauditor made of building energy consumption calculation (year of construction project) N 3.5. calculation of the eligible costs under the new rules of 30.4.6.2. (if applicable) to point N 3.6. the technical opinion of the survey according to the construction of laws framework (if applicable) N 3.7. the construction plan of būvvald accepted the technical project (copy) of all the planned project construction or project the graphical part that corresponds to the provisions of paragraph 4 of annex 4 of these requirements (if applicable) N 3.8. construction estimate according to the construction of laws framework (if applicable) N 3.9. copies of documents produced, consumed and for sales volume and production of electricity, heat consumed and sold the building in which the volume of planned project activity (if applicable) pursuant to rule 43.2.9 and (a) N 3.10 43.3.2. information about the wind resources of the instrumental measurements in accordance with rule 43.3.3. section N 3.11. decision on the implementation of the project and additional documents to be submitted (credit certificate or guarantee letter confirming that the applicant is required to finance the project funds) in accordance with rule 43.1.5.43.1.4. and section P 3.12. power of Attorney of the person concerned to sign the project submission (if applicable) P 3.13. Certified Auditor's opinion on the implementation of energy efficiency measures in the calculation of eligible cost accuracy and compliance with Commission Regulation No 800/2008 article 21. The opinion included in the calculation of the eligible costs (applicable to economic operators, associations or foundations, carrying out economic activity) N 3.14. Declaration of conformity the company micro (small), small or medium company that was completed in accordance with the laws and regulations on company reporting procedures under the micro (small), small or medium company (if applicable) 3.15 P. proof of ownership, long-term lease agreement (copy), the contract or the decision of the Authority (copy) on the basis of which the land or building available for use or possession of the applicant (if applicable) P 4. If the project involves partner involvement in project implementation or financing, should be submitted to: 4.1. the project applicant and project partners signed declaration of partnership and the partnership agreement for the project in accordance with the provisions of draft paragraph 20 (if applicable) P 4.2. foreign tax administration authorities issued a statement confirming that the foreign partner of the project, at the time of the project is not a tax liability in the country where it has its principal place of business (if applicable) P 5. The application of and compliance with the project after the tender spirit: 5.1. the project will be implemented in the territory of the Republic of Latvia N 5.2. the project complies with the objective of the tender N 5.3. project partner meets the rules 18, 19 and 21 the conditions referred to in paragraph 5.4 N. project partner does not meet the ailing merchant status and is not covered by provisions 11.1 the conditions referred to in paragraph N 5.5. given the need for justifying the project N 5.6. the project activities planned for 2016 until 30 April N 5.7. the project corresponds to one of the provisions referred to in point 8 of aid N 5.8. the project planned activities in accordance with specified eligible activities in accordance with rule 22, 23 and 24 P 5.9. building class corresponds to the provisions of paragraph 9 N 5.10. After the implementation of the project in accordance with the provisions of paragraph 14.1. equipment fitted with a heat capacity not exceeding the calculated power required for heating and hot water supply for more than 10% N 5.11. 8.1. the provisions referred to in subparagraph aid, after the implementation of the project the expected efficiency indicator (carbon dioxide emission reductions relative to the project for the required co-financing of financial instruments) of the projects submitted, the Merchant shall not be less than eur 0.28 kgCO2/year, but direct and sub-delegation authorities, associations or Foundation projects submitted not less than 0.21 kgCO2/year P 5.12. rule 8.2. and 8.3. the aid referred to in point-after the implementation of the project the expected efficiency indicator (carbon dioxide emission reductions relative to the project for the required co-financing of the financial instrument) is not less than 0.42 kgCO2/year P 5.13. heat consumption calculated on the heated area heating of the premises after the implementation of the planned activities of the project building, covered project activities do not exceed 25 kWh/m2 year P 5.14. building energy audit report contains measures correspond to those specified in the project application and comply with the eligible costs 5.15 P. certified architects or certified civil engineers prepared the technical project information specified in annex 4, under the provisions of paragraph 4 of the N 5.16. ensure compliance with the provisions of Commission Regulation No 800/2008, article 8, point 2 and 3, year of construction is not started the construction of the project (if applicable) N 5.17. application of the project are identified and described the possible risks for the implementation of the project and describes preventive measures for the implementation of a project to reduce the risk of P 5.18. the project description is provided in the application how the project applicant will ensure the maintenance of the project's results and project sustainability P 5.19. project application project planned activities do not overlap with the activities, which are financed from the European economic area financial instruments or other financial instruments P 5.20. the project is in the application lists and describes the project publicity measures P 5.21. provided the project partners (if applicable) description of experience and role in the project P 5.22. the project has at least one measure the results achieved in the project demonstration and provides a description of the N playback 6. The funding of the financial instrument: 6.1. the project required a total co-funding of the financial instrument is not greater than the rule 11.1, 11.2 and 11.3. amount referred N 6.2. the project required a total co-funding of the financial instrument is not less than 175 000 euro N 6.3. the project required the provision of a financial instrument does not exceed the 13 and 14 of the provisions referred to in paragraph 1, the aid intensity N 6.4. the project included in the eligible costs shall be the arithmetic mean calculated accurately and in accordance with specified eligible costs under rule 26, 27, 28, and (if applicable) 29 P 6. the project included in the eligible costs correspond to rules 30 and 31 the conditions referred to in paragraph P notes: 1. Not applicable. 2. P-administrative evaluation criteria, which are to be specified according to the rules in paragraph 58; N – administrative evaluation criteria that were not to be. Environmental protection and regional development Minister ad interim, Justice Minister Bernadette Brok annex 6 Cabinet 18 March 2014 regulations No 149 quality evaluation criteria (I). the implementation of the energy efficiency measures and renewable energy technologies, through low energy consumption building construction as well as renovation of existing buildings (the Cabinet of Ministers of 18 March 2014 No 149 of the provisions "of the European economic area financial instruments in 2009-2014 period," national climate policy "project submission open competition" sustainable buildings , renewable energy technology and emissions-reducing technology, innovative development "rules" (hereinafter referred to as the rules) 8.1.) No.  p. k. Criteria Criteria indicators number of points possible in the actual rating 1. The project's expected consumption of the energy efficiency indicator heat for heating less than or equal to 15 kWh/m2 year 5 heat consumption for heating more than 15 and less than or equal to 20 kWh/m2 year 3 heat consumption for heating more than 20 and less than or equal to 25 kWh/m2 year. Total 1-5 1 1 2. Project the expected CO2 emission reduction efficiency indicator kgCO2/year (the only building reconstruction project) project with the highest efficiency score 5 project with the second highest performance 4 project with the third highest performance 3 project with a fourth (or below) the highest efficiency score 0 total 0 – 2.5 3. The heat consumption for heating kWh/m2 (the only building reconstruction project) less than or equal to 120 kWh/m2 5 greater than 120 and less than or equal to 140 kWh/m2 4 higher than 140 and less than or equal to 160 kWh/m2 3 greater than 160 and less than or equal to 180 kWh/m2 2 greater than 180 kWh/m2 total 1 5 1 3 4. Project expected efficiency indicator – the heat consumption for heating kWh/m2 per year (just a year of construction project) project with the highest energy efficiency indicator 10 project with the second highest energy efficiency indicator 7 project with the third highest energy efficiency indicator 5 project with a fourth (or below) the highest energy efficiency indicator 0 total 0-4 10 5. Project expected efficiency indicator – the heat consumption for heating kWh/m2 per year (bonus points the best projects according to the specified classes of buildings) project with the highest energy efficiency indicators in their building (new building) class 3 Projects with the second highest energy efficiency indicators in their buildings (new construction) 1 class project with a third (or below) the highest energy efficiency indicators in their building (new building) 0 class project with the highest energy efficiency indicators in their building (reconstruction) of class 3 Projects with the second highest score in his building energy efficiency class 1 projects (reconstruction) with a third (or below) the highest energy efficiency indicators in its class of buildings (reconstruction) 0 0 3 total 5 6. The project partner will be involved in the project the project partners from Iceland, Liechtenstein or Norway 1 Project will not be involved in the project partner from Iceland, Liechtenstein or Norway 0 0 1 total 6 7. Project readiness Before the submission of the project būvvald in the construction of a coherent technical design stage (copy) of all the works planned under the project (if applicable) and the publication of a notice of the results of the procurement procedure, that public procurement regulatory legislation is not appealed within the time limit set for submission of the draft Before 1 būvvald harmonious construction of the technical design stage (copy) of all the works planned under the project, project activities can be implemented 0 0 7 total 1 8. Renewable energy technologies Project includes three or more different types of renewable energy technology in the project included 5 of one or two different types of renewable energy technology 3 Project does not include a renewable energy technology on 0 total 0-5 8 9. Sustainable design and construction requirements for the project are provided for indoor climate, individual adjustment options 1 Project is not intended for indoor climate, individual adjustment options 0 project is designed for energy saving lighting room 1   The project is not intended for energy saving in the indoor lighting is designed for individual 0 energy counters 1 project is not designed for consumers of individual energy meters consumers 0 project is intended for the storage of waste sorting containers (at least 4 pieces) 1 project is not designed for storage of waste sorting containers (at least 4 pieces) 0 project is for bicycle storage at building 1 project is not designed for bicycle storage at building 0 0 5 9 total total total 40 II. Renewable energy technologies for heat and power production (rule 8.2) no p. k. Criteria Criteria indicators number of points possible in the actual rating 1. CO2eq. emission reductions of CO2 emission reductions annually (thco2) 0-10 0-1 10, together 2. Project the expected CO2 emission reduction efficiency indicator (kgCO2/year) more than 1.4 kgCO2/year 8 from 0.7 to 1.4 kgCO2/year (not including) 7 from 0.42 to 0.7 kgCO2/year (not including) together 6-8 6 2.3. The project partner will be involved in the project the project partners from Iceland, Liechtenstein or Norway 1 Project will not be involved in the project partner from Iceland, Liechtenstein or Norway 3 0 0 1 4 total. Project readiness Before the submission of the project būvvald in the construction of a coherent technical design stage (copy) of all the planned project construction activities and the publication of a notice of the results of the procurement procedure, that public procurement regulatory legislation is not appealed within the time limit set for submission of the draft būvvald 4 Before the agreed technical construction stage of the project (copy) of all the works planned under the project, project activities can be implemented 0 0 4 4 total 5. Bonus points for evaluation of the project of technology If one project in each rule 23.1 and 23.2. technology referred to have received the first or the second highest rating (points) according to the following table 1-4. the above criterion, then 15, respectively, or 10 bonus points. If the proposed project application is planned to set up a number of renewable energy technologies, the project membership for a specific technology for the technology with the most projected the amount of energy produced (MWh) per year 0-15 0-15 total 5 total 38 (iii). The development of (new) product or technology, testing and demonstration, as well as existing technology development, testing and demonstration of the greenhouse gas emissions in non-ETS sectors (rule 8.3.) no p. k. Criteria Criteria indicators number of points possible in the actual rating 1. CO2eq. emission reductions of CO2 emission reductions annually (thco2) 0-10 0-1 10, together 2. Project the expected CO2 emission reduction efficiency indicator (kgCO2/year) more than 4.2 kgCO2/year 8 from 2.8 up to 4.2 kgCO2/year (not including) From 1.4 to 2.8 kgCO2/7 Euro per year (not including) 6 from 0.42 to 1.4 kgCO2/year (not including) 5 2 3 5-total 8. General assessment of innovation innovation affect the entire product or technology in General, 7 individual product innovation or technology or components of the 5 stages of a product or technology development and innovation in activities not 0 0 7 total 3 4. Innovation evaluation product or technology in Latvia so far has not been realized in Latvia 8 plays in Latvia already available technologies or innovative product improvement for the purpose of this contest 5 product or technology is already implemented in Latvia 0 4 0-8.5. The project partner will be involved in the project the project partners from Iceland, Liechtenstein or Norway 4 will not be involved in the project, the project partners from Iceland, Liechtenstein or Norway 0 total 0 4 5 6. The readiness of the project published a notice of the results of the procurement procedure, that public procurement regulatory legislation is not appealed within the time limit set 1 is the publication of a notice of the results of the procurement procedure 0 0 1 total 6 total 38 note. the Rating is calculated in the following order: 1) calculates the average (arithmetic mean) of the indicators specified in project submissions that meet the administrative evaluation criteria and has passed the quality evaluation: Rvid = R (1 project) + ... + R (n)/n 2) defines the offset from the project index average index: offset from the average = ((R (project)/Rvid)-1) x 100% 3) assigns ratings according to the following scale: no p. k. Offset from the mean index score 3.1. Less than-95% (not including) 0 3.2. From 95% to 75%, – (not including) 1 3.3. From 75% to 55% – – (not including) 2 3.4. From 55% to 35% – – (not including) 3.5 3. From-35% to-15% (not including) 4 3.6. From-15% to 15% (not including) 5 3.7. From 15% to 35% (not including) 3.8 6. From 35% to 55% (not including) 7 3.9. From 55% to 75% (not including) 8 3.10. From 75% to 95% (not including) 9 3.11. More than 95% 10 environmental protection and regional development Minister ad interim, Justice Minister Bernadette Brok annex 7 Cabinet 18 March 2014 regulations No 149 of carbon dioxide emission reduction calculation 1. Carbon dioxide (CO2) emission reduction represents the difference between the CO2 emission savings, which can be attained in implementing the project and the existing situation. 2. CO2 emissions savings of Cabinet of Ministers of 18 March 2014 No 149 of the provisions "of the European economic area financial instruments in 2009-2014 period," national climate policy "project submission open competition" sustainable building, renewable energy technology and emissions-reducing technology, innovative development "rules" (hereinafter referred to as the rules) and 8.1 8.2. the aid referred to in respect of renewable energy technologies is calculated as follows: 2.1 the emission factors with prescribed in the Act, regulations on the calculation of the energy performance of the building; 2.2. If the building heating and hot water central heating system ensures that the actual emissions shall be calculated using the following formula: E = ECO2 × where E-Qp CO2 emission reductions per year (kgCO2/year); ECO2 – emission factor (kgCO2/kWh), established in accordance with the legislation on the calculation of the energy performance of the building method. Heat pump emissions factors calculated according to point 2.4 of this annex; QP are, the amount of heat consumed in buildings (kWh/year). When implementing the project, it is planned to replace all of the amount of heat consumed in buildings with heat produced from renewable energy sources, calculate the heat consumed for at least the last two years in average. If the project is planned to partially replace the amount of heat consumed the building with heat produced from renewable energy sources, indicates the amount of heat the planned position; 2.3. If the building heating and hot water provided in the (local) autonomous heating or central heating system operator performs heat technology replacement, moving from a fossil-based energy technologies based on renewable energy technologies, the project, the applicant shall use the appropriate fuel CO2 emission factors according to the legislation on building energy efficiency calculation method. Actual emissions shall be calculated using the following formula: E = ECO2 × which E-Qsar ɳ CO2 emission reductions per year (kCO2/year); ECO2 – CO2 emission factor (kgCO2/kWh), established in accordance with the legislation on the calculation of the energy performance of the building method. Heat pump emissions factors calculated according to point 2.4 of this annex; Qsar-heat production (kWh/year). When implementing the project, it is planned to replace all of the amount of heat produced in the building with heat produced from renewable energy sources, calculate the heat produced at least the last two years in average. If the project is planned to partially replace the amount of heat produced in the building with heat produced from renewable energy sources, indicates the amount of heat the planned position; ɳ-kind combustion (burning) efficiency, that is, if you use natural gas 0.9 or diesel, and if other 0.85 fuel types. The project, the applicant may use a lower efficiency value, if it is the documentary evidence; 2.4. the emission factor for the heat pump is calculated using the following formula: ECO2 = (k × ECO2sil-ECO2e)/k which ECO2 – CO2 emission factor for a heat pump (kgCO2/kWh); ECO2sil-emission factor (kgCO2/kWh) heating, determined in accordance with the legislation on the calculation of the energy performance of the building; ECO2e-emission factor (kgCO2/kWh) electricity, determined in accordance with the legislation on the calculation of the energy performance of the building; k-factor of the transformation of heat pump; 2.5. If heat is provided using equipment (e.g., electric boilers, electric radiators), for which the electricity is produced from fossil energy resources, reduction of CO2 emissions is calculated using the following formula: E = ECO2 × Qe, where E-CO2 emission reductions per year (kgCO2/year); ECO2 – emission factor (kgCO2/kWh) electricity, determined in accordance with the legislation on the calculation of the energy performance of the building; QE-machine electricity consumed (kWh/year). When implementing the project, it is planned to replace all of the amount of electricity consumed, calculate the electricity consumed at least two last concluded calendar year average. If the project is planned to partially replace the amount of electricity consumed, indicate the planned replacement of electricity; 2.6. If the project is wind farms or solar power plants construction or installation and the planned amount of the electricity produced is sold, the amount of the reduction of CO2 emissions are also calculated on the planned sales amount of electricity. Putting into service wind farms or solar power plants, you must have a contract with a buyer of electricity and equipment must be connected to the electrical network; 2.7. The CO2 emission reductions obtained from fossil energy by replacing electricity produced with electricity, which is scheduled to be produced from renewable energy sources, is calculated using the following formula: E = ECO2 × Qe, where E-CO2 emission reductions per year (kgCO2/year); ECO2 – emission factor (kgCO2/kWh) electricity, determined in accordance with the legislation on the calculation of the energy performance of the building; QE – the planned amount of electricity from renewable energy position (kWh/year). 3. CO2 emissions savings rule 8.3. referred to the nave is calculated using the emission factor (kgCO2/kWh), laid down in the Act of building regulations energy efficiency calculation method, as a new technology or product launch results in carbon dioxide savings achieved in comparison with the equivalent capacity available on the market and use of the technology or product. 4. the reduction of CO2 emissions must not exceed the original amount of CO2 emissions. Environmental protection and regional development Minister ad interim, Justice Minister Bernadette Brok