The Provisions On "operational Programme Infrastructure And Services 3.2.2.2. Appendix" Activity "public Internet Access Points In Evolution"

Original Language Title: Noteikumi par darbības programmas "Infrastruktūra un pakalpojumi" papildinājuma 3.2.2.2.aktivitāti "Publisko interneta pieejas punktu attīstība"

Subscribe to a Global-Regulation Premium Membership Today!

Key Benefits:

Subscribe Now for only USD$40 per month.
Cabinet of Ministers Regulations No. 185 in Riga 2014 (April 1. No 19 38. §) rules on "operational programme infrastructure and Services 3.2.2.2. Appendix" activity "public internet access point development" Issued under the European Union's structural and cohesion funds act 18 paragraph 10 of article i. General questions 1. determines: 1.1. procedures for implementing the action programme ' infrastructure and services ' 3.2. priorities and the availability of the territory "reach" 3.2.2. event "ICT infrastructure and Services 3.2.2.2." activity "public internet access points in development" (hereinafter activity); 1.2. the application of the project evaluation criteria; 1.3. the requirements of the project and the project application to the applicant; 1.4. the responsible institution and liaison body, the distribution of competence between these institutions and cooperation arrangements, as well as the responsible authorities and cooperation agencies functional form of subordination. 2. The purpose of the activity is to increase access to the internet for the widest possible groups in society, providing access to public administrations and companies offered electronic services and information, to promote the social inclusion of citizens in the social, economic and cultural processes and improve their quality of life. 3. the activity exercised limited project application selection. 4. activities within available public funds is eur 4 268 616, including the European regional development fund – 3 628 324 euro and national public funds – 640 292 euros. 5. the European regional development fund shall not exceed 85 per cent of the total eligible project costs, but national public funding is less than 15 percent of the project's total eligible costs. 6. the implementation of the activity provided by the responsible authority and the liaison body. The responsible authority is the protection of the environment and regional development Ministry (hereinafter referred to as the responsible authority), the authority is the National Agency for regional development (hereinafter referred to as cooperation body). 7. the responsible authority shall: 7.1 ensure the monitoring of the activity associated with the information and publicity measures, consistent with the laws of the European Union's structural and cohesion funds publicity and funded projects visual identity requirements; 7.2. ensure the implementation of the activity, monitoring and control activities implementation and application of the evaluation criteria of the project development, analyse problems and provide the implementation of the activity the managing authority and the European Union's structural funds and the Cohesion Fund Monitoring Committee proposals for the improvement of the implementation of the activity; 7.3. ensure, in order not to exceed the available for the implementation of the activity of the European regional development fund financing, and monitors the available European regional development fund, including a learning Council of 11 July 2006, Regulation (EC) No 1083/2006 laying down general provisions on the European regional development fund, the European Social Fund and the Cohesion Fund and repealing Regulation (EC) No 1260/1999, article 93 and in principle referred to in paragraph 2, the performance of the activity level; 7.4. design project application assessment methodology and cost efficiency analysis methodology; 7.5. the monitoring of the activity of the European Union's structural funds and the cohesion fund management information system; 7.6. cooperation bodies assess the information and provide an opinion on the draft changes, which relate to the project objectives, this rule 7.3. the principle referred to in the implementation and monitoring of performance attainable. 8. cooperation authority: 8.1 provides activities related to the implementation of information and publicity measures, consistent with the laws of the European Union's structural and cohesion funds publicity and funded projects visual identity requirements; 8.2. shall publish on its Web site (www.vraa.gov.lv) with the project application selection associated documentation; 8.3. send a limited circle of project calls for project submissions; 5.2. develop draft agreement and the conclusion of an agreement with the European Regional Development Fund beneficiaries; 8.5. develop and coordinate with the responsible authority for the project submission Evaluation Commission (hereinafter referred to as the Evaluation Commission) rules, filling out the submission form for the project methodology, procedures for the submission of projects provides a selection and evaluation, as well as a decision on the approval of the project application, approval or rejection of the condition; 8.6. the draft invitation application selection; 8.7. create Evaluation Commission; 8.8. the project provides the evaluation of applications and shall decide on the approval of the project application, approval or rejection of the condition, as well as monitor conditions; 8.9. the beneficiary's payment request prepared a schedule for the submission; 8.10. the beneficiary's check payment requests submitted, approved, eligible expenditure shall prepare payment orders and receipts of declarations of expenditure; 8.11. evaluate the project progress reports and their compliance with the implementation of the project; 8.12. assess the agreement amendments, 10 business days coordination with the responsible authority, if the changes are related to the project objectives, this rule 7.3. the principle referred to in the implementation or project sample monitoring indicators, and shall take a decision on the amendment of the agreement; 8.13. the monitoring of the projects used the European Union's structural funds and the cohesion fund management information system and the data it collects on projects consistent with the laws of the European Union's structural funds and the cohesion fund management information system; 8.14. ensure not exceeded these provisions referred to in paragraph 4, the activities available for the implementation of the European regional development fund, and monitors the available European regional development fund, including a learning Council of 11 July 2006, Regulation (EC) No 1083/2006 laying down general provisions on the European regional development fund, the European Social Fund and the Cohesion Fund and repealing Regulation (EC) No 1260/1999 Article 93 (1), and in principle referred to in paragraph 2, the performance of the project; 8.15. ensure project monitoring and control, including random checks carried out at project locations; 8.16. the purchasing, financing the appearance the pre-verification recipient's procurement plan and submit it to the procurement monitoring Bureau; 8.17. the preparation of the information to the authority responsible for the implementation of the activity of learning available funding. 9. The Liaison Office has functional authority.
II. Project activities and costs

10. the project will be supported: 10.1. new public internet access points; 10.2. existing public internet access point. 11. Public internet access point is an internet access point with access to machines or wireless internet access. 12. The project is not eligible activities other than those referred to in point 10 of these rules and this provision promotes referred to in paragraph 2 the objective of the activity. 13. The project's eligible direct costs are public internet access point creation and development costs: 13.1. technical equipment you connect to the internet or to an existing internet connection capacity; 13.2. wireless internet access zone creation or expansion; 13.3. computer and office equipment purchase and installation; 13.4. network and computer network communications equipment purchase and installation; 13.5. the acquisition and installation of the software. 14. the project eligible indirect costs are: 14.1 with project activities directly related to the minimum European Union information and publicity costs, does not exceed one percent of the total eligible direct project costs; 14.2. contingencies, which shall not exceed three percent of the total eligible direct project costs. 15. Value added tax payments that are directly tied to a project if the beneficiary cannot recover in the laws on value added tax established, are eligible activities. 16. the costs are eligible if they: 16.1. made pursuant to laws and regulations in the area of public procurement; 16.2. the provisions of paragraph 10 for the implementation of the activities referred to in paragraph 2 of these regulations and in the achievement of safe and meet the financial management, socio-economic benefit and cost effectiveness; 16.3. made a project where at least half of the project support public internet access points, access for persons with disabilities. 17. the project costs not included, other than these regulations 13, 14 and 15. 18. These rules 13, 14 and 15 above cost is eligible from the date of entry into force of the provisions. 19. the project's total eligible cost shall not exceed the amount available in certain local and European regional development funding quota in accordance with the provisions of annex 2. 20. the total eligible costs of the project amount is not less than 2500 euro.
III. Requirements to the applicant, the project applicant Project 21 is the Government. 22. the project the applicant shall undertake to ensure the co-financing of a project under this provision the requirements of paragraph 5. 23. the project applicant be eligible for European regional development fund, the project life cycle is not designed for net revenue. Project applicant project life cycle can plan revenues for this rule 46.4. the services referred to in the application project adding a cost effectiveness analysis. 24. The European regional development fund allocation of the quota not exceeding the planning regions: 24.1. Riga planning region – 698 234 eur; 24.2. the Kurzeme region-735 099 eur; 24.3. Zemgale planning region – 764 660 euro; Vidzeme planning region 15.2. – € 699 282; 15.2. the planning of Latgale region-731 049 euro. 25. the project the applicant chooses the cost efficiency of the best solution. 26. the project applicant may apply for public internet access points or optimization, ensuring that each Government will create at least one new public internet access points to access the hardware.
27. The county municipalities, where there are six or less territorial units, each territorial unit shall provide at least one new public internet access points. County municipalities, with more than six territorial units shall provide at least six new public internet access points in the creation of each territorial unit. 28. Public internet access points deployed locations, free to the final beneficiary of the project. 29. the project, the applicant shall consider providing public internet access point compatibility with electronic communications infrastructure, set up national support programmes and is available in the area. 30. If the applicant is a public internet access point intends to provide access to computer equipment, public internet access point provides the following services: 30.1. wireless internet access around the clock at least 50 meters radius of public internet access points; 30.2. access to computers with certain minimum software (documents, tables, and graphics editing, digitize the documents, e-signature) and an internet connection; 30.3. the ability to digitise documents in A4 and A3 format; 18.9. the option to print in color or black and white documents A4 and A3 format; 5. the opportunity to connect visitors belonging to the media and work with them, as well as media harmful software. 31. If the applicant intends to set up a wireless internet access zones, the following options are provided: 31.1. wireless internet at least 50 meters radius around wireless networking equipment; 31.2. wireless network device management using any internet browser software; 31.3. at least 4 port network switch installation of wireless network equipment; 19.5. a separate port for external connections; 31.5. wireless network equipment in the built-in firewall. 32. the project applicant may apply also to a public internet access point, if the existing public internet access point does not support any of the rules referred to in paragraph 30 of the requirements, or wireless internet access in the area if the current wireless internet access zones do not comply with the rules in paragraph 31. 33. Public internet access point requires the equipment assembled according to this provision, included in annex 4. 34. the project applicant project application form, including the project submission form attachments, prepared and presented in accordance with this provision, 1. the requirements set out in the annex. Project submission form to add forms and cost effectiveness analysis (if applicable) the electronic version electronic not rewritable media.
IV. Project application selection

35. The liaison body within two weeks after the date of entry into force of this provision at the same time be sent to all applicants for the project call for project submissions, determining the project submission deadline, which is not shorter than 40 working days from the date of dispatch of the invitation. 36. the applicant shall provide the cooperation Projects the Authority projects and the application of these provisions 34. documents listed in a single copy in one of the following forms: 36.1. paper form – in person or sent by mail. Documents are presented according to the laws and regulations on the development and design of a document and inserts the sealed container (envelope or box). If the application is sent by mail, at the time the project is considered the day when a project application is transferred to the post office. In the event of a dispute, the applicant demonstrates the fact, when the post passed the post. If the application is submitted in person, at the time the project is considered to be the moment when the representative liaison bodies have done mark to the project application for the project; 36.2. the electronic form of the document, according to the legislation on the circulation of electronic documents. The application of the project time is the time when the project submissions sent by email or through the authorities held a special online form. In the event of a dispute, the applicant demonstrates the fact that the application sent to the project submission deadline. If the cooperation of the authority submits that the application of the project has not been received, so this claim justified. 37. the project submission evaluation panelists included two representatives of the responsible authority and three representatives of the liaison bodies. 38. cooperation may be invited to participate in the project application for the evaluation of the work of the Commission and one representative of the Managing Authority observer status without voting rights. 39. the President of the Commission is collaborating authority leader or head of the liaison bodies designated official. 40. the project submission's compliance with these rules referred to in annex 3 the administrative and eligibility criteria is assessed by the "Yes" (match), "partial match" (provided) or "no" (not match). Project compliance with this provision of the application, 3. the quality criteria referred to in annex scored, giving a certain number of points. 41. If the project application, subject to this provision as referred to in annex 3 of the draft application evaluation criteria, does not meet any of the administrative, or refine the eligibility criteria or not receiving the minimum number of points corresponding to one of the quality criteria, evaluation of the application, the project could not continue. 42. the head of the liaison bodies shall take a decision on the application for approval of a project if: 42.1. the project submission complies with all the rules referred to in annex 3 of the administrative and eligibility criteria; 26.2. the project in the application of this provision are fulfilled 3. quality criteria referred to in the annex to the minimum requirements. 43. cooperation authority supervisor shall take a decision on the application for the approval of the project, if the project application to the need to clarify, according to one of the provisions listed in annex 3 of the administration or eligibility criteria that allows the updating of the project application. 44. This provision, paragraph 43 conditions may include a requirement to provide additional explanation about the project application or requirement to clarify the application of the project to ensure the conformity of the application of the draft provisions referred to in annex 3 to be administrative or compliance criteria. 45. If that rule 43, paragraph conditions affect any other provisions of this annex the conformity of this criterion in the assessment of the liaison body decision on approval of the application, the project on condition accompanied by appropriate instructions. 46. This provision in paragraph 43 that decision conditions contained in a period not exceeding 20 working days from the date of the decision. 47. cooperation authority verifies this provision in paragraph 43 that decision include the conditions and 10 working days after the conditions of receiving the dossier sent to the applicant an opinion on draft conditions. 48. If this provision in paragraph 43 that decision contains the conditions are not met or are not met, this provision of the deadline mentioned in paragraph 46, the application is rejected. 49. cooperation authority supervisor shall take a decision on the project, if the rejection of the application: the application does not project 30.5 match one of these rules not mentioned in annex 3 to be administrative and eligibility criteria; 30.6. the project submission does not comply with the provisions of annex 3 of the quality criteria referred to in the minimum requirements. 50. The liaison body shall ensure that rule 42, 43 and 49 of the decision referred to in paragraph transmission project to the applicant within five working days after the decision. 51. The liaison body shall ensure that the information on the approved design submissions were published cooperation bodies website (URwww.vraa.gov.lv).
V. implementation and monitoring of the project

52. cooperation authority agreement with the beneficiary of the financing switch according to the regulations on the procedures for European Union structural and cohesion funds in the participating institutions provide the planning document preparation and implementation of these funds. 53. at the conclusion of the cooperation agreement, if it is available in the State budget, on the basis of the beneficiary's written request, provide advance funding for the requested advance payment according to the regulations on the procedures foreseen in the State budget to fund the European Union co-financed the project implementation, as well as make payments and expenditure declarations of preparation. 54. cooperation authority, providing advance and interim payments shall comply with the condition that the total may not exceed 90 percent of the project to the European regional development fund co-financing and Government co-financing. 55. The beneficiary within five working days after the conclusion of the agreement shall be submitted to the liaison body of the procurement plan, prepared in accordance with the laws and regulations on the procedures for European Union structural and cohesion funds in the participating institutions provide the planning document preparation and implementation of these funds. 56. the project applicant is purchasing electronic purchasing systems within or outside the system, if the applicant needs the project item cannot be purchased with the central procurement body or if the customer can provide the following goods at a lower price. 57. During project implementation public internet access point or perfecting the equipment purchased for at least five years after the end of the project implementation is the beneficiary of the estate. 58. the project the applicant within five working days after 42 of these rules referred to in paragraph 47 of the decision or the provisions referred to in paragraph shall submit an opinion to the authority of cooperation for the submission of requests for payment schedule. 59. If the payment request submission schedule is required to make changes, the beneficiary shall submit five working days the cooperation institution submitting the request for payment of an updated schedule. 60. The beneficiary shall ensure the first invitation to tender for the purchase of three months after the conclusion of the agreement. 61. The beneficiaries of cooperation institution shall submit the payment request with copies of supporting documents, the expenditure and the progress reports for the project agreement to conditions within the time limits and procedures. 62. in assessing the cooperation institution, interim or final payment request, have the right to invite independent experts in the field of public procurement regulatory laws in order to verify the payment request specified eligible costs in compliance and reasonableness. 63. The project until 30 June 2015. 64. The beneficiary shall ensure that the eligible expenditure, which shall be repaid from the European regional development fund co-financing and national public co-financing, cash flow, as well as the assets and liabilities of accounting records are identifiable, separate and verifiable. 65. in order to provide public internet access points of sustainability and quality of the activities, the project created and perfected in the public internet access points for at least five years after the implementation of the project funding recipient: 65.1. do not charge fees for public internet access point services, except payment for this rule 46.4. printing services referred to, ensuring that the project is not in the net proceeds in accordance with the provisions referred to in paragraph 34 of the cost-effectiveness analysis; 65.2. providing public internet access point continuity (public internet access points to access the machines for at least eight hours a day or according to institution-building at the time, hosted a public internet access point, wireless internet access points – 24 hours); 65.3. the following public internet access points data permanent records: 65.3.1. operating time; 65.3.2. data transmission; 65.3.3. wireless network connection; 65.4. maintain logs of public internet access points of visit. 66. All project-related changes in the beneficiary with liaison body according to the agreed terms. 67. the funding recipient project in acquire all fixed installations and equipment, in which the investment is made, shall be insured against loss or damage that may result from natural disasters, illegal actions of third parties or due to accident, at least five years after the implementation of the project.
68. the competent authority, liaison body and the beneficiary shall keep all the project-related original documents until 2021 December 31, as well as the European Commission and the authorities of the Republic of Latvia access to this documentation. 69. If the activity within a project has been discrepancy or is terminated, the agreement on the implementation of the project, the funding does not match any of the expenses or the amount provided for in the event of termination of the arrangement may not be directed to implement new projects or additional funding for an existing project.
VI. final question 70. Be declared unenforceable in cabinet from 11 October 2011 Regulation No 792 ' rules on "operational programme infrastructure and Services 3.2.2.2. Appendix" activity "public internet access points in evolution" (Latvian journal, 2011, no. 166). The Prime Minister is the Rapidity of the Newsletters of the protection of the environment and regional development Minister in the novel Naudiņš the protection of the environment and regional development Ministry submitted the annex 1 Cabinet 1 April 2014 regulations No 185 of the European regional development fund project application project title: operational programme 2007-2013 title: infrastructure and services priority number and name: 3.2. Regional accessibility and promotion of measures to reach the number and name : 3.2.2. Ict infrastructure and services activity number and name: 3.2.2.2. Public internet access points in the development of the Apakšaktivitāt number and name: applicant: completed Project cooperation institution: project identification no: date of the project: project selection type: limited open 1.  -Basic information about the project title applicant name: 1.1 1.2. Registration number: 1.3. Taxpayer registration number: 1.4. Legal address: Street, House No.  City, County State zip code 1.5. Contact: phone: fax: email: person responsible full name position contact: first name, last name, title of the project applicant 1.6. type (please tick the appropriate) 1: code name 1-28 municipality 1.7. Project applicants in the general classification of economic activities NACE code (Please type the appropriate): code name 1 in accordance with the laws and regulations of the relevant activities of the European Union implementation 2.  Section – project description 2.1.   Summary of European Union funds for project activities to be carried out (the freedom of information law, and the volume will be available after the entry into force of the decision on the Foundation of the European Union project application) (max. 1000 characters): 2.2 project a place please indicate: the project site address (specify if possible): local government: planning (mark): Kurzeme Zemgale Latgale Vidzeme region of Riga Latvia Riga 2.3. Project the entire classification (Please specify the content of the project for the general classification of economic activities NACE codes) : code name 2.4. Specify the reasons for the need of the project or give any problems identified description (maximum of 2000 characters): 2.5. provide a description of the selected solution (up to 2000 characters):
    

* T.sk. describe how you created or improved public internet access points, and the selected location (annex 4) contribute to the identified problems.  2.6. Define project objectives (maximum 500 characters): 2.7 to describe planned project activities (max. 2500 characters): 2.8. results to be achieved within the framework of project: project no project activities/sub-activities name result result of numerical Measure of the number of project activities/sub-activities must coincide with the timing of the implementation of the project (annex 1). One project can have multiple results.  2.9. Specify the project's compliance with the laws and regulations of the European Union on the implementation of the activity of the Foundation purpose (no more than 1000 characters): 2.10. Project milestones supervisory (outcome) indicators: no  Name of the indicator number of unit 1.  Created for public internet access points in public internet access points 2. Upgrade the existing public internet access points in public internet access points 3.  -Section 3.1. Implementation of the project described in project implementation, management and monitoring capacity (max. 1000 characters): 3.2 total planned duration of the project (in months) 3.3. describe how the project will ensure maintenance of the results achieved and public internet access points data (operating time, data volume, wireless network connection, the number of attendance records) compilation of subsequent 5 years after completion of the project (maximum of 1000 characters) Title: 4.-publicity of the project 4.1 the information and publicity measures: plate spaces press releases informing the mass media for large format Billboard on the information plate information website on the internet other (Please specify) 4.2. Describe the measures that will be implemented in order to comply with European Union requirements for publicity of the project: title 5-under the horizontal priorities (complementary to the project submission form, if included in the evaluation criteria of the project) Project provides 5.1 specific actions the principle of equal opportunities for including ensuring service availability for persons with functional disabilities: this project provides for 4 and more specific project activities for the provision of equal opportunities; This project provides for 1-3 specific project activities for the provision of equal opportunities; This project does not provide for specific project activities to ensure equal opportunities. (Please describe the specific project activities are provided for the implementation of the principle of equal opportunities, providing electronic service options for persons with functional impairment (up to 1000 characters) 6.  Title: project costs and funding sources 6.1.   The project financing plan (see. Annex 2). 6.2. The project budget summary, including indicative project cost plan (see. Annex 3). 6.3. analysis of cost effectiveness key findings. To justify that the objective of the project is selected for the cost-effective solution-project planned in the application project is efficient and cost estimates are given of the cost-effective way of solving problems and project objectives, as well as the project does not get on the net revenue (up to 1000 characters): 7-certificate I, the undersigned, the project applicant ___ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ the name of the applicant, the project officer, ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ _____ __, name ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ _____ __, job title, certify that to the moment the application, ____ ____ ____ ____ ____ ____ ____: dd/mm/yyyy • project applicant is not tax or the State social insurance compulsory contribution to the debt; • the project applicant is an appropriate legal status; • the applicant is appropriate for the project activity; • the project applicant has sufficient and stable financial resources; • the project application and its annexes include information true and requested for the implementation of the project of the European regional development fund co-financing will be used in accordance with the submission of the project description;
• There is no known reason why this project could not be implemented or could be delayed its implementation, and confirm that the obligations set out in the project may make laws for the Foundation of the European Union within the implementation of the activity; • the project is not and has not been financed or co-financed from other Union financial sources as well as State and local budgets, and the project planned activities do not overlap with the activities financed by other activities in European Union funds and other financial instruments;
• in case of confirmation of the project this project application will not be submitted for co-financing funding or from other sources of Finance of the European Union, as well as State and local budget resources; • confirm that the applicant's project officer is not penalized for the Latvian Code of administrative offences article 189.2 referred to in the third subparagraph of the administrative offence; • increase project costs in the case of the project applicant is committed to providing financing from its own resources; • project applicants will provide space for the activities envisaged in the draft process, as well as personnel who have the appropriate knowledge and skills of public internet access points in the provision of services, t.sk. advice on working with minimal software, visitor computer connecting to the wireless network and public administration electronic services; • the project applicant will provide to the project assets would be purchased used according to the purpose of the project during project implementation and for at least five years after the final payment to the beneficiary; • project applicants of their budget resources will maintain the infrastructure created as part of the project, purchased the equipment and services provided; • the project activities and progress of the work of the staff of the applicant in the project will create an infrastructure and the necessary equipment is not purchased within the framework of the project; • the project applicant will provide information on the implementation of the project and the European Commission and the European Union fund management institution representatives involved in the approach to ensure all project documents relating to the implementation of the originals, as well as the implementation of the project site. Aware that the project may not approve for co-financing from the European regional development fund or cohesion fund if the project application, including this section, is not fully completed, and of good quality as well, if the legislation of the European Union funds the implementation of the planned activities of the European regional development fund or cohesion fund financing (for the current year or planning period) at the time of approval of the project has been used up. Aware that the false information given on the proof of the necessary administrative and financial penalties may be started against the above legal persons – the project applicant. I certify that the attached copy of the application the project comply with the existing document in my possession of the original and copies of the application and the project electronic version corresponds to the submitted application to the original project. In the case where the application will be supported by the European regional development fund co-financing shall guarantee the project co-financing amounting to-___ ___ euro.
 Signature: date: dd/mm/yyyy stamp location annex 1 project time schedule: project no and name the project time schedule (quarters) 2014 2015  1.2.  3.4.  1.2.                                                               
2. financing plan

Year total costs are not eligible costs total eligible costs total eligible costs public Public costs eligible costs eligible costs private ERDF/CF funding Other funding the State budget funding to apply the national budget allocation to local authorities, the local government Deal funding other public funds 1 = 2 + 3 2 3 = 4 + 5 = 4 + 6 + 8 + 12 + 14% 5 6 10 7 = 6/3 = 8/3 9 8% 10% 12% 11 = 10/3 = 12/13 3 14% 15 = 14/3 total 20XX 20XX 20XX                              
Annex 3 Summary of the budget of the project, including the indicative project cost plan, euro: No. PO box Cost item name quantity total cost Euro% eligible not eligible 1. Eligible direct costs x 1.1.           x 1.2.           x 1.3.           x 1.4.           x 1.5.           x 2. Eligible indirect costs x 2.1. Information and publicity costs total x 2.1.1.           x 2.2. Contingencies total 100% x x annex 4 Summary of public internet access points in Local territorial unit in a public internet access point address public internet access point planned to create or improve the number of PCs in public internet access point Internet connection type the public internet access point Internet connection speed public internet access points in the multifunction machine/printer/scanner, the number of public internet access points in the application of the project results in a moment to the moment of the application on the project results to the application of the project results in a moment On the application of the project while the project results in environmental protection and regional development Minister novel Naudiņš annex 2 Cabinet 2014 1 April regulations No 185 municipalities in certain European regional development fund, the quota for the purposes of the project

Nr. PO box The municipality of territorial units for the population of a specific quota for the ERDF (eur) i. Kurzeme region 1. Aizpute municipality municipality 6 9 137 41 764 2. Alsunga municipality municipality 1 1 462 6 902 3. Brocēni municipality municipality 5 6 130 33 376 4. Dundaga municipality municipality 2 4 195 15 027 5. Durbe municipality municipality 5 2 998 30 364 6. Grobiņa municipality municipality 5 9 205 36 333 7. Kuldīga district municipality 14 24 529 100 535 8. Mērsrags Government 1 1 609 7 043 9. Nīca municipality municipality 2 3 547 14 403 10. Pāvilosta municipality municipality 3 2 839 19 218 11. Priekule municipality municipality 6 5 768 38 524 12. Rojas municipality municipality 1 3 936 9 281 13. Rucava municipality municipality 2 1 765 12 690 14. Sweet 16 25 232 112 203 15 Government. Skrunda municipality municipality 5 5 243 32 523 16. Talsi district municipality 18 30 755 128 507 17. Vaiņode municipality municipality 2 2 577 13 471 18. Ventspils Government 13 11 946 82 937 total Kurzeme region 107 152 873 735 099 II. Latgale planning region 19. Aglona municipality municipality 4 3 856 18 914 20. Baltinava municipality municipality 1 1 148 4 882 21. Award Government 11 13 868 54 733 22. Cibla municipality municipality 5 2 839 21 991 23. Dagda municipality municipality 11 8 134 49 954 24. Daugavpils municipality municipality 19 24 701 95 161 25. Ilūkste municipality municipality 8 7 877 37 965 26. Kārsava municipality municipality 6 6 146 28 672 27. Krāslava municipality municipality 12 17 175 61 414 28. Līvāni municipality municipality 6 12 306 33 806 29. Ludza municipality municipality 10 13 948 50 874 30. Preiļi municipality municipality 5 10 479 28 358 31. Rēzekne district municipality 25 27 952 121 421 32. Riebiņi municipality municipality 6 5 445 28 088 33. Rugāji municipality municipality 2 2 350 9 809 34. Vārkava municipality municipality 3 2 087 13 514 35. Viļaka municipality municipality 7 5 557 32 107 36. Viļāni municipality municipality 4 6 290 20 942 37. Zilupe municipality municipality 4 3 292 18 444 total 149 175 450 731 049 Latgale planning region III. 38, Riga planning region. Aloja Government 6 5 228 39 129 39. Ādaži municipality municipality 1 9 972 10 523 40. Babīte municipality municipality 2 9 402 16 411 41. Baldone municipality municipality 2 5 429 14 664 42. Carnikava municipality municipality 1 6 745 9 104 43. Engure municipality municipality 3 7 437 21 685 44. Garkalne municipality municipality 1 7 804 9 570 45. Ikšķile municipality municipality 2 8 821 16 156 46. Inčukalns municipality municipality 2 7 832 15 721 47. Jaunpils municipality municipality 2 2 455 13 356 48. Kandava municipality municipality 7 8 744 46 813 49. Krimulda municipality municipality 2 5 218 14 571 50. Ķegums municipality municipality 4 5 614 27 022 51. Ķekava Government 3 21 832 28 015 52. Lielvārde municipality municipality 4 10 212 29 044 53. Limbaži municipality municipality 8 17 564 56 830 54. Mālpils Government 1 3 546 7 698 55. Mārupe municipality municipality 1 16 110 13 222 56. OGRE municipality 10 35 712 77 087 57. Olaine municipality 2 19 839 21 001 58. Ropaži municipality municipality 1 6 790 9 124 59. Salacgrīva municipality municipality 5 8 188 34 292 60. Salaspils municipality municipality 2 22 179 22 030 61. Saulkrasti municipality municipality 2 5 802 14 828 62. The Government media 1 2 263 7 133 63. Sigulda municipality municipality 4 16 718 31 905 64. Stopiņi municipality municipality 1 10 020 10 545 65. Tukums District Municipality 11 30 087 80 752 total Riga planning region IV 91 317 563 698 234. Vidzeme planning region 66. Alūksne municipality municipality 16 16 859 81 708 67. The position of the Government 5 5 647 25 822 68. Around the Government 5 3 775 24 395 69. Beverīna municipality municipality 3 3 248 15 387 70. Burtnieki municipality municipality 6 8 110 32 004 71. Cesvaine municipality municipality 2 2 758 10 710 72. Cēsis municipality municipality 2 17 937 22 284 73. Ērgļi municipality municipality 3 3 146 15 309 74. Gulbene district municipality 14 22 463 77 375 75. Jaunpiebalga municipality municipality 2 2 342 10 392 76. Kocēni municipality municipality 5 6 240 26 275 77. Līgatne municipality municipality 2 3 632 11 376 78. Lubāna municipality municipality 2 2 504 10 516 79. Madona municipality municipality 15 24 843 83 493 80. Mazsalaca municipality municipality 5 3 430 24 132 81. Naukšēni municipality municipality 2 1 940 10 086 82. Pārgauja municipality municipality 3 3 893 15 878 83. Priekuļi municipality municipality 4 8 290 23 535 84. Rauna municipality municipality 2 3 510 11 283 85. Vietnam's Government 5 5 479 25 694 86. Smiltene district municipality 9 12 884 48 554 87. Strenči Government 4 3 734 20 060 88. Valka municipality municipality 6 9 150 32 797 89. Varakļāni municipality municipality 3 3 508 15 585 90. Vecpiebalga municipality municipality in Vidzeme planning 5 4 085 24 631 TOTAL area 130 183 407 699 282 v. Zemgale planning region 91. Aizkraukle municipality municipality 2 8 826 20 154 92. Aknīste municipality municipality 4 2 909 26 877 93. Auce municipality municipality 7 7 223 48 977 94. Bauska municipality municipality 9 25 062 77 341 95. Dobele district municipality 11 21 848 86 526 96. Iecava municipality 1 8 947 14 207 97. Jaunjelgava municipality municipality 7 5 693 47 583 98. Jelgava district municipality 13 24 331 100 902 99. Jēkabpils municipality municipality 7 5 024 46 974 100. Koknese municipality municipality 3 5 390 23 080 101. Krustpils municipality municipality 6 6 036 41 839 102. Without rare Government 4 3 815 27 702 103. Ozolnieki municipality municipality 3 9 849 27 142 104. Pļaviņas municipality municipality 4 5 585 29 315 105. Rundāle municipality municipality 3 3 646 21 491 106. The island's Government 2 3 798 15 573 107. Skrīveri municipality municipality 1 3 619 9 353 108. Tērvete municipality municipality 3 3 612 21 461 109. Vecumnieki municipality municipality 6 8 629 44 201 110. Viesīte municipality municipality 5 4 038 33 962 Zemgale planning region in total 101 167 880 764 660 in environmental protection and regional development Minister novel Naudiņš annex 3 Cabinet 1 April 2014 regulations No 185 project submission evaluation criteria action program name and number 3. Infrastructure and services priority name and number 3.2. Regional accessibility and reach of promotion name and number of the measure 3.2.2. ICT infrastructure and services activity name and number 3.2.2.2. Public internet access point development project selection way limited project application selection responsible authority for environmental protection and regional development Ministry

Administrative criteria scoring system – yes/no Noraidāms1 or precizējams2 1. Project submission is prepared in paper form and submitted personally or sent by mail in a sealed container (envelope or box) or in the electronic form of the document prepared and filed electronically, signed with a secure electronic signature and confirm with the time stamp of the N 2. The project application has been submitted to the authorities of cooperation within the time limit set in the invitation N 3. The project applicant is invited to submit a project application to the N 4. The project application has been submitted in one original N 5. The submitted application is the project cauršūt (caurauklot), where the application is submitted in paper form P 6. All project submissions page is numbered P 7. The project application has been drawn up according to the provisions of the Cabinet of Ministers on the implementation of the activity for the specified project submission form, and all form sections are completed, P 8. Project submission prepared into P 9. Project application form is accompanied by all the Cabinet regulations on the implementation of the activity and the corresponding set of the accompanying documents issued at 10 P. The project is not specified in the application for correction, deletion, addition, deletion, or aizkrāsojum, where the application is submitted in paper form P eligibility criteria scoring system – yes/no eligibility criteria of the project Noraidāms1 or precizējams2 11. The project submission complies with the activity objective to increase access to the internet for the widest possible groups in society, providing access to public administrations and companies offered electronic services and information, to promote the social inclusion of citizens in the social, economic and cultural processes and improve their quality of life N 12. Included in the application of the project activities meet the provisions of the Cabinet of Ministers on the implementation of the activity of the eligible actions provided P 13. As a result of the implementation of the project the population will have access to the public electronic services N 14. Application of the project included in the eligible costs and their extent corresponds to the Cabinet of Ministers regulations on the implementation of the activity of the eligible costs and identified it for about 15 P. Application of the project financial statement is accurately and correctly arithmetic developed P 16. Project application of the European regional development fund co-financing shall not exceed the applicable percentage specified in the Cabinet of Ministers regulations on the implementation of the activity P 17. Contingencies do not exceed the terms of the Cabinet of Ministers on the implementation of the activity specified percentage (if applicable) P 18. Application of the project results and the planned values are clearly defined, measurable and contribute to the achievement of the objective of the activity, P 19. The project application is justified, as it will ensure the implementation and monitoring of the project P 20. The project is set in the application, as it will ensure the maintenance of the results achieved in the project for at least five years after completion of the project, P 21. Project application of the European regional development fund co-financing shall not exceed the provisions of the Cabinet of Ministers on the implementation of the activity of the local quota financing about P 22. Project applicant intends to implement publicity and information measures, consistent with the laws that determine the order in which the European Union structural and cohesion funds publicity and visual identity requirements P 23. The project applicant is committed to providing funding for the project from its own funds in the event of cost increases to 24 P. The project specified in the application project implementation duration not exceeding 18 months from the agreement on the implementation of the project, and the project is expected to be completed until 2015 June 30 P 25. Project applicant has stated that the project is not and has not been financed or co-financed from other financial sources of the European Union or the State and local budgets, as well as project planned activities do not overlap with activities financed from other funds of the European Union activities and of other financial instruments within the P 26. Project applicant has stated that it has sufficient and stable financial resources to ensure national public co-financing for the implementation of the project the PROJECT the applicant P eligibility criteria Scoring System-Yes/No Noraidāms1 or precizējams2 27. The project the applicant complies with the provisions of the Cabinet of Ministers on the implementation of the activity requirements N 28. The project was not punished for the Latvian Code of administrative offences 189.2 referred to in the third subparagraph of article administrative infringement N quality criteria ranking system-point scale 29. Application in the project activities shall be implemented: to receive at least Criteria 1 paragraph 29.1. at least 80 percent of all the County's territorial units 29.2 3. at least 40 percent of all the County's territorial units 2 29.3. at least 20 percent of all the County's territorial units 1 29.4. do not meet at least 3. the requirements set out in 0 apakškritērij 30. As a result of the implementation of the project will be created and developed public internet access points: the criteria to receive at least 1 paragraph 30.1. the newly created internet access points share a project exceed 70 per cent of all projects planned in the internet access points in 30.2 2. the newly created internet access points share project is from 50 to 70 percent of all projects planned in the internet access points 1 30.3. do not meet at least 30.2. the requirements set out in apakškritērij 0 31. The project is intended to implement the Criteria should be: get at least 1 paragraph 31.1. up to 6 months from the agreement on the implementation of the project 3 the conclusion of 31.2. from 7 to 12 months from the agreement on the conclusion of the project 2 31.3. from 13 to 18 months from the agreement on the conclusion of the project 1 19.5. do not meet at least 31.3. the requirements set out in 0 apakškritērij criteria for HORIZONTAL priorities 32. The project is designed for specific activities for the provision of equal opportunities, including ensuring the availability of services to persons with functional disabilities: not exclusive Criteria 32.1. the project provides for four or more specific actions for equal opportunities 2 20.0. the project provides for from one to three specific activities to ensure equal opportunities 1 32.3. the project does not foresee specific actions for equal opportunities 0 explanation the ratings total 10J granted less than 3 points, the application is rejected for the project notes. 1 if you receive a negative rating, the application is rejected. 2 If you received a negative assessment, decide on approval of the draft provided that a project shall ensure compliance with the criteria laid down in that decision. Environmental protection and regional development Minister novel Naudiņš annex 4 Cabinet 1 April 2014 regulations No 185 requirements the project planned for the acquisition of equipment table 1 requirements for computer sets.

No PO box Position specification and notes the minimum maximum 1. Processor capacity by PassMark CPU Benchmark (http://www.cpubenchmark.net/cpu_list.php) tests are at least 800 point capacity by PassMark CPU Benchmark (http://www.cpubenchmark.net/cpu_list.php) tests not more than 2800 points 2. RAM 1 GB DDR2 4 GB DDR3 3. Drive at least 60 GB S-ATA SSD (solid state drive) not greater than 128 GB S-ATA SSD (solid state disk) 4. Screen 18.5 ' TFT WXGA with a resolution of 1366 x 768 points at least 19.5 "TFT WXGA with a resolution of 1600 x 900 points at least 5. Network card built-in fast Ethernet 10/100BASE-TX integrated fast Ethernet 10/100/1000 Base-TX (full duplex) 6. Communication features at least two available USB connection USB connection available seats 12 places 7. Sound the built-in sound card built-in sound card 8. Input and pointing device keyboard with integrated smart card reader, with a joystick mousepad keyboard with integrated smart card reader, with a joystick 9 mousepad. Operating system and additional software • operating system: o o graphical user interface supports auto connect equipment recognition and usability (Plug-N-Play) o ability to make full use of hardware resources supplied • Office software: o text editor o spreadsheet editor o presentation browser o Office software allows you to work with documents: • simple text format • open document format for Office applications (ODF) • open Office XML (Office Open XML) file format • portable document format (PDF) or portable document format for long-term archiving (PDF/A) • compressed and encoded digital images (JPEG , TIFF and PNG) format • Internet browser • multimedia files (audio, video) Player • Latviskošan software • antivirus protection software • text to speech software (the ability to play all the texts that appear on the computer screen) 10. Compatibility of the proposed computer model must be compatible with the table 2 and 3 facilities in 11. Warranty 2 years 5 years 2. table II. requirements for the installation of a wireless network no PO box Position specification and notes the minimum maximum 12. Supported standards 802 .11b/g, 802.11 b/g/n 13. Broadcast diameter (open field) 50 m 50 m 14. Security WPAMAC address filters at least WPA2 (AES or TKIP) MAC address filter 15. Management control is possible via any internet browser software control is possible via any internet browser software and the command line tools (Telnet, SSH, SNMPv3, CLI, HTTP management) 16. Network switch machine integrated 4 port 10/100/1000 Base-TX network switch machine integrated 8 port 10/100/1000 Base-TX network switch 17. Connection to a separate port for external connector for connection to a separate port for connection to external connector 18. Firewall machine built-in firewall in a firewall built in 19 Equipment. Flow priorities could be established in the machine data traffic priority facility data flow can be determined priorities 20. The functionality of the auto-Crossover (MDI/MDI-X) class-Based Traffic Shaping (CBT) auto-Crossover (MDI/MDI-X) class-Based Traffic Shaping (CBT) class-Based Traffic Policing (CBTP) IPv6 support 21. WiFi certified certificate (http://www.wi-fi.org/) WiFi certified (http://www.wi-fi.org/) 22. Warranty 2 years 5 years 23. Other requirements for event log building power with the send event log Syslog server table 3 III. Requirements for Multipurpose iekārtai1 no PO box Position specification and minimum maximum Note 24. Multifunction equipment type digital (digital technology), black and white digital (digital technology), 25. A copy of format A3 A3 26. Quality painter maximum resolution 600 x 600 dpiPrinter at least the maximum resolution 600 x 600 dpi at least 2 scanner's maximum resolution of at least 300 x 300 dpi3 Painter's maximum resolution of 600 x 600 minimum dpiPrinter maximum resolution 600 x 600 dpi2 Scanner at least the maximum resolution 600 x 600 dpi3 of at least 27. RAM 1 GB 64 MB2 2 28. Network connection equipment built-in 10/100BASE-TX connection facility built-in 10/100BASE-TX connection 29. Connection to a USB 2.0 connection, USB 2.0 connection 3 vieta2 vieta2, 3 30. Speed of not less than 10 black and white A4 copies or prints for less than 8 scanned minūtē2N page minūtē3 not less than 40 black and white A4 copies or prints for less than 15 scanned minūtē2N pages minūtē3 31. The first prints (copies) of the exit time Not longer than a maximum of 20 sekundēm3 20 sekundēm3 32. Paper cartridge manual paper padeve2Papīr cartridge with 100 page manual padeve2Papīr ietilpību2 paper cartridge with at least 500 page 33 ietilpību2. The original feeder – double-sided original pitcher with at least 20 page 34 ietilpību3. The printer's duplex, built-in Copier and printer duplekss2 35. Functionality, ensure that: • the network from any workstation on the network browser, you can remotely check the condition of the equipment and make the konfigurēšanu2 parameter; • You can send scanned documents to any network connected to the workstation; • from the workstations you can print text documents and pictures (to ensure compliance with the print driver installation the supplied operētājsistēmai2), ensure that: • the network from any workstation on the network browser, you can remotely check the condition of the equipment and make the konfigurēšanu2 parameter; • You can send scanned documents to any network connected to the workstation by using the control panel only; • from the workstations you can print text documents and pictures (to ensure compliance with the print driver installation the supplied operētājsistēmai2) 36. Warranty 2 years 5 years notes. 1 one public internet access point can buy no more than one multifunctional machine. 2 requirements to be complied with, if the equipment is purchased in print. One public internet access point can buy no more than one print device. 3 requirements to be met, if you purchased the scanner. One public internet access point can buy no more than one scanner. 4. table IV. Requirements internet connection county municipalities no PO box Position specification and notes the minimum maximum 37. Upload speed (Kbps/s) 512 5120 38. Download speed (Kbps/s) 1024 10240 39. Availability 99.5% 99.9% of environmental protection and regional development Minister novel Naudiņš