Cabinet of Ministers Regulations No. 550 in Riga 2014 (16 September. No. 49) Waterworks and drainage structure … released under the construction law in article 5 paragraph 2 of the first subparagraph and the second subparagraph of paragraph 6 1. General questions 1. determines: 1.1. waterworks and drainage structures (with the exception of port, maritime and energy production capacity of waterworks construction with over 2 MW) (construction) construction process procedures involved in building institutions and responsible būvspeciālist; 1.2. the construction process the necessary documents and their contents; 1.3. the building permits and the conditions to be included in the explanatory memorandum; 1.4. where the required information for the public about the construction plan, and such information; 1.5. derogations harmonisation; 1.6. construction expertise; 1.7. the control of the construction process and the rule of law, accountable institutions; 1.8. building preservation order; 1.9. building location uzmērījum procedure and a procedure acceptable to the building into operation; 1.10. the works guarantee terms after the adoption of the construction operation. 2. the Waterworks and drainage design and construction of buildings, the provisions shall apply to the General būvnoteikumo. 3. The terms used in the following terms: 3.1 renewal of construction – waterworks and drainage structures or parts of it, without changing the design parameters above to improve the land drained or surrounding areas of water treatment, waterworks and drainage structures or parts thereof; 3.2. building alteration-waterworks and drainage structures or portions of alteration associated with the design parameters, drained or change the affected land, another reclamation system addition or waterworks and drainage structures or part of the function. 4. the following provisions of the civil construction (construction) process control and the rule of law in the administrative territory of the būvvald, but is responsible for the construction of the law of the first paragraph of article 6.1 of the cases referred to in paragraph 1, for the control of public works and the rule of law — in national control Office (hereinafter the Office). 5. A Person is entitled to the documents specified in these provisions to submit būvvald or Office electronic document, if the document is prepared pursuant to the regulations on electronic document design. 6. The construction conception for the planned construction of the documentation presented at the būvvald in whose territory the planned construction. If the planned construction of several local administrative areas, construction intentions: 6.1. all submitted documentation būvvald the areas planned for construction and building process from conception to adoption into each are separate; 6.2. the authorities delegated to the būvvald, in which the individual tasks of the construction process. 7. Structure construction in specially protected natural areas of special protected natural territories and laws regulating the use of limits. 8. If the drainage system reclamation projects planned for the renewal of the system of individual structures (e.g., culverts, small footbridges (pedestrian footbridges), tailings ponds) alteration, damaging water mode change, drainage system restoration project not be recognised for all drainage system conversion. 9. An explanatory memorandum (annex 1) or construction application (annex 2) (the total submission of the construction conception) is not required if the client performs an accident prevention or relief work for the object that has the specified operation or security cordon. 10. If the first group housing construction are wholly or partially financed by the international financial institutions, the European Union and the national construction with the construction of the second group of construction procedures. 2. Construction of the origination and necessary documents 2.1. Construction plans preparation of documentation 11. Construction projects of developers proposing to appropriate civil design field concerned agreed the construction plan requires the development and documentation according to the intention of the planned construction and the intended type of construction completed in one of the construction idea submissions. 12. Construction intentions in drafting the dossier according to the laws and the municipal development planning of the territory, in accordance with the construction of statutory construction principles. 13. A construction developer, būvspeciālist or būvkomersant construction intentions in drafting the dossier may invite other būvspeciālist. Guest būvspeciālist signature designed construction plans and, if the documentation developed for the documentation of the explanatory memorandum, the proof of compliance of the explanatory memorandum of law, as well as technical and specific requirements of the rules. 14. Construction intentions in the development documentation in triplicate, but construction of the law of the first paragraph of article 6.1 of the cases referred to in paragraph 1, the four original copies. One copy is stored in būvvald, one copy-construction and construction agent developer and construction law 6.1 of the first paragraph in the cases referred to in paragraph 1 shall keep one copy in the Office. Construction scheme design in one piece, if the document is prepared and filed in accordance with the laws and regulations on electronic document design. 2.2. Construction intentions documentation 15. Depending on the general structure of the būvnoteikumo group and the type of construction, as well as adhering to this rule 9 and 20 in these conditions, the proponent shall present the construction of the būvvald in the following construction intentions documentation: 15.1. part I of the explanatory memorandum and the 16 and 18 of the provisions referred to in the documents of the first group housing construction; 15.2. the construction and application of these provisions in paragraph 16 mentioned documents, as well as the rules referred to in paragraph 19 of the document as a whole (hereinafter referred to as the construction of minimal composition), second or third team building for construction. 16. Person proposing any kind of construction, construction intentions submission adds: 16.1. property, tenure or use rights supporting documents; 16.2. the term of Office of the construction agent, if the application is lodged by the authorised representative; 16.3. the reconciliation according to the construction plans: 16.3.1. explanatory memorandum is consistent with the owner of the parcel, if construction is not the agent of the owner of the land or, failing that, by the legal possessor and third parties whose property or usage rights are affected; 16.3.2. in addition to the construction law in article 15, first subparagraph, point 2 of the projects specified in the minimum composition is consistent with third parties whose property or usage rights are affected; 16.4. other documents, permission or consent, if it is determined by law. 17. the reconciliation presented to the minimum composition construction situation plan, holding explanatory memorandum plan or as an individual arrangement so that it comes from the unequivocal consent to the construction plans. 18. In proposing the construction of the first group of new construction, reconstruction, demolition, or alteration of the position, proposing the construction of the explanatory memorandum part I added: 18.1. technical or special rules, as determined by the legislation; 18.2. intended place of fotofiksācij works; 18.3. land boundary plan or a valid topographical plan scale 1:500; 18.4. the land property drainage or reclamation cadastre of the passport data izkopējum with marked location of the structure and main parameters (length, width, depth and other characteristics) if the construction plan intended to realize the land drained; 18.5. the housing plan in accordance with clearly visible (M 1:500; M 1:1 000; M 1:2000; M 1:5000), which indicates the location of the nojaucam building or piece of land and its basic characteristics (length, width, depth and other characteristics), the valid topographic plan of the cities and villages, but outside the cities and villages, on the ground the boundary plan. 18.6. the demolition case explanatory description of construction waste management, volume and the planned processing or disposal site. 19. proposes that the second or third group housing new construction, reconstruction, demolition, or alteration of the position, proposing the construction of the building adds a construction application of minimum composition consisting of: 19.1. interpretative description, which contains information about: 19.1.1. real estate in which to realize the vision of construction: 19.1.1.1. land cadastral designation of the unit; 19.1.1.2. building cadastral designation, if any, allocated to it; 19.1.1.3. owner; 19.1.2. planned construction; 19.1.3. planned construction scale and method of execution; 19.1.4. the planned construction of the amount and type of waste; 19.1.5. planned environmental accessibility solutions, if the type of structures according to the laws and regulations are enforceable environmental accessibility; 19.1.6. planned protected cultural monuments and heritage environmental modifications, if the construction plan intended to realize the cultural monument protection zone; 19.2. technical or special terms, as determined by the laws and they are received before the construction of the application; 19.3. in accordance with technical or special terms; 19.4. the shipbuilding technical opinion survey (annex 3), if the intended drainage system restoration or alteration; 19.5. the land boundary plan or a valid topographic plan scale 1:500; 12.2. in accordance with the plan of the situation clearly visible (M 1:500; M 1:1 000; M 1:2000; M 1:5000), which indicates the location of the nojaucam building or piece of land and its basic characteristics (length, width, depth), the valid topographic plan of the cities and villages, but outside the cities and villages, on the ground the boundary plan. 19.7. the land property reclamation passports or reclamation cadastre data izkopējum with marked location of the structure and main parameters (length, width, depth), if the construction plan intended to realize the land drained; 19.8. the common structures with a height of cut marks, or longitudinal, except when intended for restoration of the construction or demolition; 12.4. home improvement plan if solution is designed for facilities; 19.10. transport and pedestrian movement organizing the description if construction plan or part thereof is intended to realise the way land partition bar or street red line; 19.11. construction products technical documentation, if provided for the placement of construction; 19.12. drawings indicating the boundaries of the construction and the order, and in addition to the explanatory description if the acceptance into service is provided by building lots; 19.13. information about a particular Member State of the European Union regulatory framework for the application of a construction development, the application of the Member States of the European Union, the national standards and technical requirements of et seq. 20. If the local Government has taken a decision on the operation of construction adopted in preservation, construction agent shall submit the completed būvvald to: 20.1. explanatory memorandum part I housing preservation (annex 4); 20.2. the preservation of the construction works of the project, which consists of: 20.2.1. an explanatory description of conservation; 20.2.2. the necessary conservation work list; 20.2.3. solutions for loss of stability and structural elements of the building further deterioration; 20.2.4. solutions for the prevention of danger to human life and health or the environment; 20.3. heritage inventory statement, if the building is a cultural monument; 20.4. the work of the organisation of the project if the Government decision on building preservation it is indicated; 20.5. other documents that describe the structure and necessary decision. 3. Construction plans review 21. Explanatory Memorandum part I housing preservation and this provision 20. documents referred to in paragraph būvvald shall be submitted to the authorities by the deadline set in the decision. 22. when construction intentions application and documents referred to in these provisions, the būvvald of construction law article 12 the time limits laid down in the fourth paragraph-looking construction plans compliance with laws and regulations and shall take a decision pursuant to article 14 of the law on construction of the third part. 23. Būvvald for taking a decision on the acceptance of the construction plans in accordance with article 14 of the law on construction of the third part, paragraph 1 shall be issued building permits (annex 5). 24. Būvvald for taking a decision on the acceptance of the construction plans in accordance with article 14 of the law on construction of the third subparagraph of paragraph 3, it shall mark or the explanatory memorandum explanatory memorandum, the preservation of the building. 25. After būvvald marks made in the explanatory memorandum or memorandum proposing the construction of the housing preservation provides information on construction workers. Information on the work of the analyst can provide at the same time with the construction plans of the būvvald submission. 4. The explanatory memorandum and the conditions to be included in building 26. Memorandum or memorandum housing preservation include the commencement of the construction works, including the requirements of conditions for providing information on the perpetrators of the works. 27. Construction permit shall include the following: 27.1. Design conditions, including: the building project to be būvvald 27.1.1. and other requirements of a construction detail, according to the local government building regulations; 27.1.2. requirements for technical or special terms from State and municipal institutions; 27.1.3. requirements for reception of technical rules of inženiertīkl connections (atslēgum) and the crossings; 27.1.4. requirements for accessibility, if the structures it is necessary to ensure the appropriate laws and regulations; 27.1.5. requirements for the protection of cultural monuments; 27.1.6. requirements on a construction project in the solutions with the owner of the land or, failing that, the legal possessor, if such right tacitly; 27.1.7. legislation in the cases specified in the requirements for other documents, permission or consent; 27.1.8. other requirements under planning, lokālplānojum or detailed (if one has been developed); 27.2. the conditions for the commencement of the construction works, including requirements for: 27.2.1. the documentation to be submitted to the responsible būvspeciālist (related articles, autoruzraudzīb); 27.2.2. registration documents to be submitted to the civil engineering works for fixation of the process (public works magazine, autoruzraudzīb magazine, building plan); 27.2.3. deliverable documents on civil liability insurance (responsible for the works and būvspeciālist insurance policies); 27.3. the deadlines for the fulfilment of the conditions of the building permit. 28. conditions in the building permit to start construction works enforceable within two years after the building of the markup for design conditions. 5. Public information 29. The principal laws on construction of article 14 in the seventh paragraph, the deadline for planning permission received, inform the public, placing būvtāfel (format, not least on the A1, from durable material) piece of land where construction is allowed if for the construction of the third group of construction. 30. Būvtāfel over time that is not less than the time of contestation of the building. 31. in the cities and villages of the Būvtāfel placed facing against a public place, but outside the cities and villages, pointing to the road, and it indicates the following: 19.3. construction plan (construction type and address); 31.2. the client (an individual's first name, last name or legal name, address, registration number); 31.3. the minimum composition construction Developer (physical person's name, certificate number or the name of the legal person, address, registration number); 19.5. the intention of the plan with the construction of civil engineering works housing; 31.5. building permit information for entry into force, the date of adoption of the decision and the number. 6. Designing of development and construction plan 6.1 the content receiving planning permission, 32. Subscriber shall arrange for the building design conditions. The necessary technical or specific provisions require the respective institutions, if they are not received, the drafting of minimum building project. 33. before construction projects developing customer and developer shall draw up and sign the design task that adds a construction documentation. Design task: 33.1. intended use of the building, planning and inženiertīkl connection requirements; 33.2. the special projects-construction detail into making by sequence, the desired constructions or technology, detail drawings, drawing up estimates of amounts receivable, if necessary; 33.3. the requirements of construction demolition construction if the intended demolition. 34. Construction in the development of Latvian language. After the election of the principal construction of the textual part can translate into a foreign language. Foreign language text of the construction plan of the Latvian language to be translated. 35. A construction developer develops projects to the extent set out in these regulations and the necessary construction plans for disposal, as well as town planning and the design of the specified task. 36. In coordination with būvvald, you can develop a construction plan, the application of the Member States of the European Union, the national standards and technical requirements of et seq. Not allowed while several Member States of the European Union or national standards, the application of a single constructive et seq element or one of the engineering system design in the construction of a single object. 37. the Construction, development and implementation of which the territory of the Republic of Latvia for at least 40% funded by international financial institutions, the European Union or its Member States (if the investment is not repaid), can develop, et seq, of the application of the investor if they do not conflict with the European standardisation organisations. On the construction and implementation of relevant General construction law and the requirements set out in these provisions. The application of the investor et seq, must not downgrade the construction of national legislation in certain essential requirements. 38. Construction, except the construction of linear structures, renewal or conversion of the topographic plan elaboration. Linear constructions or renovation projects to restore development to the shipbuilding plan uzmērījum. 39. the Construction, except for demolition projects, develop the following scale: 24.3. agricultural land drainage to ditches or drainage or irrigation – M 1:2000; 24.4. forest ditches draining the land with-M 1:5000; 39.3. the regulation of watercourses, ūdensnotek or novadgrāvj, aizsargdambj, digging M 1:2000 or 1:5000 M; 24.5. dug ponds – M 1:500, 1:1000 M or M 1:2000; 24.5., novadbūv, pumping stations and other structures hidrotehniskaj – M 1:500.40. Projects in support of technical solutions collects information about earlier-conducted engineering studies and, if necessary, carry out geotechnical, hidromelioratīv and air research and uzmērījum of existing structures. 41. the Construction, except building demolition projects, the following: 41.1. Design task; 41.2. building permits; 41.3. reconciliation of the list; 25.7. indicators; 25.8. the text part: 41.5.1. General News (previously executed jobs construction engineering studies and works, information about building cadastral designation and classification); 41.5.2. engineering studies carried out, the findings; 41.5.3. hidromelioratīv characteristics (excess moisture causes the need for irrigation, ūdensnotek, existing drainage or irrigation network, water sources, soil type and soil mechanical composition of the laboratory analysis results); 41.5.4. inženierrisinājum (description and the results of the calculations for the choice); 41.5.5. architectural solutions (design, facilities, greenery); 41.5.6. environmental protection measures; 41.5.7. the maintenance and operation; 41.5.8. Organization of the work; 25.8. scope (the scope statement, a summary of the scope of work); 25.9. specification of construction products; 41.8. correspondence and documentation (technical rules, reconciliation); 41.9. drawings and graphical part: review of plan 41.9.1. (M 1:10 000-50 000); 41.9.2. construction plan (according to this provision, paragraph 39 above); 41.9.3. longitudinal; 41.9.4. šķērsprofil; 41.9.5. drawings of the structure (plan, cuts, detaļzīmējum); 41.9.6. the inženiertīkl of the projected plan aligned to the topographic plan scale 1:500, if it is designed inženiertīkl; 41.9.7. construction organization plan, if not the Organization of the work of the development project; 41.10. the organisation of project work, if for the construction of a third group, or the construction of the second group, if so requested by būvvald. 42. Demolition construction has the following content: 42.1. General: 42.1.1. initiation of the necessary civil design documents and materials; 42.1.2. land units engineering studies materials in the General būvnoteikumo of the cases; 42.1.3. an explanatory description indicating the construction signs, if cadastre is assigned, General information about the shipbuilding technical indicators and usage according to the classification of structures (including classification four-digit code), as well as information on the construction of waste management, the planned volumes and recycling or disposal site; 42.1.4. technical or special provisions; 42.1.5. permission and consent; 42.1.6. section of the territory: 42.1.6.1. construction plan in accordance with clearly visible (M 1:1 000; M 1:2000; M 1:5000); 42.1.6.2. joined the dismantled inženiertīkl plan to the topographic plan scale 1:500, if dismantled inženiertīkl; 26.2. the organisation of the work plan. 43. From the public law legal persons, policy instruments of the European Union or other foreign financial assistance financed from the resources of the second or third group building or, if the design tasks that develop economic construction projects, in addition to a portion of the construction cost estimate includes. 44. A construction manager on a construction and construction plan of the cover page of a signature confirmation that is included in the construction plan and develop all the necessary parts according to the conditions laid down in the building (annex 6). 45. A construction manager on a construction plan concerned portions of the main drawing page (the General index page) sign a Declaration on the construction of part of the solution to the compliance with the Latvian et seq, and other laws, as well as the provision of technical or special requirements (annex 6). If a construction development in the application of the Member States of the European Union the national standards and technical requirements, et seq construction manager on a construction plan concerned portions of the main drawing page (General) sign a Declaration on the construction of part of the solution to the compliance with the Latvian et seq, and other regulatory provisions of the Member States of the European Union, and national standards and tests, as well as et seq of technical or special requirements (annex 6). All part of the General construction plan for the construction of the signature of the head of the page. 46. some sections of text, drawings and technical solutions for the graphic Part developer signature of each page or section of text. If the developer does not have relevant certificate, drawing or graphic pages the signature or a construction manager, who has tested. 6.2. the work of organizing the content of 47 projects. projects on the organisation of Work in the entire volume of the works (construction), and it has the following recommended content: 29.3. interpretative description; 47.2. a Works Calendar plans, if the customer requests it; 47.3. the work plan; 47.4. the transport and pedestrian movement, organization chart, if the construction plan or part thereof is intended to realise the way land partition bar or street red line; 29.5. the protection plan. 48. If the construction process is also provided outside the construction site, draw up a plan of the situation. Situation plan indicates all facilities of supply and palīgražošan objects, atbērtn and building materials supply routes, by the production of rental agreements with landlords and when atbērtn will be eliminated, and reconciliation with the local government for the supply of building materials. 49. the interpretative description describes the General and special conditions of construction, possible difficulties and characteristics, shall state the grounds for the duration of the works total, as well as the most important environmental measures and recommendations to ensure quality control and the Organization of the construction site. 50. The construction plans of the individual stages of construction, and it noted the existing and newly built, the construction of nojaucam, temporary structures, permanent and temporary roads, būvmašīn, also the Assembly buildings, location and movement paths, rapper and attract sharp fixing point, inženiertīkl (electricity and other resources inženiertīkl), showing their permanent and temporary connection to the site, as well as the material and design of the stowage area. 51. developing the projects of construction of in-service conversion or restoration, which must be carried out without interrupting the execution of its functions: 51.1. the organisation of project work in addition to indicate what works and in what order, to be without losing the basic structures, and what works, in what order and within the time limits to be laid down under which the basic execution breaks; 51.2. the construction plans in addition to shipbuilding, which indicate the function is interrupted temporarily or completely; 51.3. in addition to interpretive description specifies measures that will ensure the smooth potential construction and basic works. 6.3. the Construction of the derogation from harmonisation of the technical requirements of the 52. If a technical or specific rule requirements cannot be met, a construction of technical solutions consistent with the institutions established by the corresponding requirements. Deviations from the technical or special terms of design compliance. A check mark in the reconciliation is made to a construction plan or technical changes or specific provisions. 53. If the law governing the construction of technical requirements cannot be met, article 9 of the law on construction of part three of the cases allowed them to coordinate with the relevant national and local authorities. Harmonisation of the conditions for the design of the building to be carried out. The mark made on the construction plan of the reconciliation plan. 6.4. the Construction inspection 54. Expertise to all construction shall be carried out if it is a third group of construction projects, with the exception of construction demolition construction. 55. If, between the participants of construction disputes on construction issues compliance with laws and regulations on technical or special requirements of construction expertise make them part of the construction plan or section for which members of the construction is in dispute. 56. the expert opinion of a construction contractor adds a construction documentation. 6.5. the Construction coordination and consideration of the construction of 57. match the client and other persons according to the design conditions. 58. in the original construction plan drawn up in triplicate (with the responsible building project developer and original signatures and customer consent to the site's master plan drawing of the page), but the law on construction of the first paragraph of article 6.1 of the cases referred to in paragraph 1 – four copies and, if necessary, adding a construction expertise, submit the opinion to the būvvald building design conditions during the period. One copy is stored in būvvald, one copy for the client and a construction developer or responsible būvspeciālist in the field of the design and construction of the law of the first paragraph of article 6.1 of the cases referred to in paragraph 1 shall keep one copy in the Office. Development projects in one instance, if the document is prepared and filed in accordance with the laws and regulations on electronic document design. 59. Būvvald assesses the adequacy of the construction building design contained in the conditions and regulations. 60. If all the conditions of the būvvald design of construction of article 12 of the law in the fifth subparagraph shall be made within the time limit set in the building of the design mark of the conditions. After the building of the construction marks a single copy is stored in būvvald. 61. If būvvald detects that not all design conditions or have received all necessary consent or permission, it instructs the customer to recycle construction plan or get the missing consent or permission. In the construction plan review a single copy is stored in būvvald. 62. by būvvald identified the prevention client repeated evaluation of the construction būvvald building design conditions during the period. 63. on the design conditions covered by building permits for execution of the works submitted to the client būvvald to initiate the necessary documents. 7. Construction 7.1. Construction permit conditions for the commencement of the construction works and the construction time run in 64. construction permit for the commencement of the construction works and the subscriber conditions by submitting the following documents, būvvald of construction law article 12 in the fifth subparagraph, the time limit specified in the building permit shall: 64.1. mark the commencement of the construction works of the conditions; 64.2. building permits shall specify the works requested by the Subscriber, but not beyond the participants in the work of the civil liability compulsory insurance period, except where the operator works in the insurance contract for all of its site is to be concluded for the year; 64.3. construction permit shall specify the maximum length of the works under General būvnoteikumo in the stipulated time limit, to which a permit may be extended (the works) and to which building transferable into operation; 64.4. building permits added to building annex (annex 7), which indicates the reviewer and the works of būvspeciālist are invited. 65. the reviewer or outside the works būvspeciālist works may change over time, if shall inform the būvvald and submit new works for civil liability compulsory insurance certificate or copy of the article and of the professional liability insurance policy copy. The new operator of the construction works or the new būvspeciālist the guest is entitled to initiate the duties on the construction site of a new building permit annex (annex 7) issue. 66. Būvvald may extend the duration of the works by this provision or 68.69. compliance with the conditions referred to in paragraph 1. 67. If a construction for which carried out an environmental impact assessment according to the law "on environmental impact assessment", is not put into operation before the time limit expires, the Subscriber to the law "on environmental impact assessment" should be carried out within the original environmental impact assessment, where there has been a change in the factual and legal circumstances on the basis of which the construction was initiated. If you have changed the factual or legal circumstances, būvvald can make a decision about the inadequate housing demolition. 68. If, in accordance with paragraph 67 of these regulations has made the construction intentions evaluation, planning permission (public works) extended for būvvald's down time, but not more than three years, if on the izpildmērījum plan būvvald filed for a construction site inspection and appropriate for the work concerned the civil liability compulsory insurance policies. If building within that time-limit is not put into operation and have changed the factual or legal circumstances on the basis of which the construction was begun, būvvald can make a decision about the inadequate housing demolition. 69. If the building, which has not undergone an environmental impact assessment according to the law "on environmental impact assessment", or (if the building is expected to implement by building rounds) is not put into operation before the time limit expires, the building (construction) extended for the time requested by the customer, but no longer works for civil liability compulsory insurance (except when performing the works of all the insurance contract is concluded for a site) If the būvvald filed izpildmērījum plan for construction sites to check. 70. The explanatory memorandum, the period of validity of acceptance is determined in the General būvnoteikumo and the myriad of decisions about the construction plans of the date of acceptance, but for reasons of engineering structures civil engineering conservation preservation implementing date determined in accordance with the decision of the local government for the preservation of civil engineering. 7.2. preparation of the Construction works, of which 71. requires a building permit, to prepare the launch only after receiving the construction permit has become the undisputed and fulfilled the conditions contained in the permit. 72. the preparation of the construction works and the construction works are performed. 73. In the explanatory memorandum to the proposed works can be performed without the constant practice of the Builder the right architectural or construction field. The constructor does not need public works magazine, and he takes responsibility for the construction works and the construction manager's responsibilities. 74. The customer and works for mutual commitments determined in accordance with these rules, the Latvian et seq, and other laws and regulations in the works contract concluded, in which the preparatory work of the works as well. 75. The Subscriber receives with the execution of the associated permissions and before the commencement of the construction works: būvvald of 75.1. issue the memorandum accepted a copy or a copy of the building permit for the construction of the launching of the proposed conditions and construction works of the requester; 75.2. According to legislation in the field of labour protection shall designate one or more of the labour protection coordinators, where the works are performed in more than one works. 76. the reviewer of the works according to the laws and regulations in the field of the protection of work employs one or more health professionals or to attract competent professionals or institutions. 77. If the works contractor works contracts entered into by individual performers, he works issued building permits for each individual copy of the works of the reviewer. 78. in the preparation of the works carried out the necessary organisational measures to ensure the smooth operation of the works and all works membership in coordinated action. 79. The works receive a construction contractor, make sure that the additional detailed blueprints. Detailed drawings can develop also during the works, and they agreed with the developer and construction contractor. 80. the main setting of the būvas without works, public works contractor take all the construction conception site protection works against adverse natural and geological phenomena (such as flooding, noslīdeņ), for this provision in paragraph 84 works project. 81. prior to the commencement of the construction works, the existing building conditions construction analyst highlights and delimit danger zones, set the existing underground structures of inženiertīkl and other axes or marks it borders, as well as provide traffic and pedestrian movement and safe access to the existing buildings and infrastructure. This works in a construction consistent with inženiertīkl and affected building owners. 7.3. the documentation of the 82 works. If during the works it is necessary to provide for different solutions than those projects, their implementation by construction allowed for changes in the law and the construction of the General būvnoteikumo of the cases. 83. Work organisation and to be taken in accordance with the explanatory notes or a construction and its work in organizing the project, as well as the work of the project. 84. the work of the project, based on the development of the construction plan, the reviewer, but the works for individual and special types of work – the operator of certain works. Construction of the third group of works projects, but in the second group – construction, if requested by the Subscriber or būvvald. Work out the composition of the project determined in accordance with the laws and regulations on the work of the project, but the project's level of detail is determined by its developer, depending on the nature and extent of the work. 85. Depending on the volume of work and the duration of the proposed construction work out of project development for the building or works in the whole cycle (for example, the underground, the surface for the cycle cycle cycle of preparation of construction, section, span structures, standing). 86. the drafting work of the project to existing structures, the requirements and the owner of the site situation. 87. If the works projects of the works of the individual investigator, this project shall be coordinated with the main purchasers of the works. On the basis of a mandate issued by the heads of būvkomersant, works in the project approved by the individual works Reviewer's būvspeciālist (Officer). Works also with the project developer and construction contractor. 88. the work carried out in a construction project before commencement of the construction works shall pass to responsible public works Director. 89. Implementation of the project is available at the construction site workers būvspeciālist and control institutions. 90. the public works Director every working day of the works carried out in the journal entries, and they describe the actual situation on the construction site. Būvuzraug and autoruzraug expressed objections or instructions are to be considered as fulfilled if the būvuzraug or autoruzraug had done the tag works in the journal. Entries in the journal also performs the works of the individual by whom the works construction managers of work carried out. 7.4. The works and quality control 91. On the protection of health at the construction site within their competence, are responsible for the construction works for the responsible manager, but for certain types of work, some of whom a public works construction managers. Construction managers followed the defensive coordinator job. 92. Road transport and self-propelled mechanism motion construction site organized in accordance with the work project, et seq, and the rules of the road. 93. On the quality of the works is responsible for the works. The quality of the works may not be lower than the laws or works contracts laid down in the quality of the works. 94. The construction quality control system each investigator works develop according to the profile, the type of work performed and amount. Quality control of the works include: 94.1. documentation of works and materials (materials, products and structures, devices, mechanisms and similar equipment) of the original control; 94.2. individual operations or technological processes control; 58.6. completed (a candidate) the type of work or construction cycle (design element) closing control. 95. The completed design and important jobs assumed segto creating acceptance Act (8 and 9). The continuation of the works is not allowed if the customer or būvuzraug (if construction is performed in the building) and the participants are not representative of the works compiled and work site signed cover work receipts. 96. If the works you create over the break, during which possible with legislation adopted cover important construction work or damage, before the resumption of construction work to repeat previous cover work or significant construction quality check and Inspection Act drawn up showing the information of the audited the works or important cover structures, as well as examiners, test time and location, and give its opinion on the audited cover jobs. 97. in order to ensure the quality control of the works, the contractor General būvnoteikumo of the būvuzraug in the cases specified in the call. 98. in the General būvnoteikumo of the principal cases call for a construction autoruzraudzīb of developers. 7.5. the environmental conditions and organize the works 99. taken so that environmental damage would be minimal. Environment and natural resources protection, sanitary and security established in the works and to organize, subject to the statutory restrictions and requirements. The consumption of natural resources must be economically and socially sound. 100. the recovery of the construction or demolition of the reconstruction of such works, if possible, take the construction waste recycling and recovery. All construction waste materials, which are to be classified as hazardous waste, waste according to the regulations for hazardous waste management requirements. 101. before the ground work of good soil is removed and stored for future use, if you set the aizsargdambj polder, pumping station and ponds. 102. in the process of the works construction is not allowed under the unexpected defeat, as well as damaging trees to be retained. Tree protection measures are expected to work out a project. 103. If a building site in the industrial and municipal sewage pollution degree is greater than the specified regulatory signs before entering the sewer network, it cleans up according to laws and regulations in the field of prevention of pollution. 104. It is not permissible for water (also stripped) organized from the construction site. Water discharge and capture the way work should be provided for the project. 105. Drilling jobs in the process, reaching a water horizon, taken measures not appropriate for ground water discharge, water contamination and mixing in the horizon. 106. the soil, underground water and avoided open water pollution. The necessary measures should be provided for work carried out in the project. 107. the Waterworks structures and regulated ūdensnotek restoration or rebuilding the resultant spoil material may be used in the construction of these structures. 7.6. Housing Preservation works termination or suspension in the case of the housing preservation made 108. If the termination or suspension of the works could pose a risk to the environment or to human life or health or dangerous defects may occur in structures. 109.108. These provisions in the case referred to in paragraph before the termination of the works submitted to the coordination of the būvvald the principal building conservation works project. 110. Building conservation works project: 110.1. the necessary transactions to list; 110.2. the solutions to building stability in loss prevention and construction elements further deterioration; 110.3. solutions for the prevention of danger to human life and health or the environment; 110.4. shipbuilding activities calendar in the preservation plan. 111. If the authority which is not būvvald, according to the competency has stopped the works, it shall forthwith notify the būvvald. 112. Būvvald 14 days after this provision and paragraph 109.111 of receipt of the information referred to in the survey carried out on the site, except in the case where the works are stopped, and the Office shall take a decision on the authorisation to suspend the construction work, conservation works project or, if necessary, shall take a decision on the housing preservation. 113. If after survey finds that the necessary structures, but the principal preservation has not submitted the building conservation būvvald works project, the decision on the construction of the būvvald preservation: 113.1. shipbuilding conservation reasons; 113.2. shipbuilding preservation conditions (measures to be taken to ensure the safety of construction and design, stability and integrity, as well as the preservation of the construction works of the project scope, if necessary); 113.3. building conservation works project submission. 114. Būvvald 14 days of building conservation works project, the assessment of its conformity with the requirements of the laws under it or adopt a decision specifying the identified deficiencies and failures. 115. following these rules the decision referred to in paragraph 114 of the execution the client repeatedly go to būvvald. 116. the housing preservation work, they apply the works requirements, including the requirement for public works for liability insurance. Works for civil liability to be insured at all times of the implementation of the work of preservation. 117. The work shall end with the moment when the būvvald has taken a decision on the authorisation to suspend the works or the customer has finished the construction works under the conservation būvvald preservation of the harmonised construction works project. 118. If the client fails to fulfil the requirements of this regulation, the municipality shall be entitled upon notice to the Subscriber, to carry out conservation works of construction. All structures associated with preservation costs shall be borne by the Subscriber. 119. If, after the termination of the works of the later period of the būvvald finds that the construction can cause hazard to the environment or to human life or health or it's dangerous structures damaged, būvvald shall decide on building preservation in accordance with the procedure laid down in this chapter. 120. where, after the suspension of the works of būvvald finds that the required building preservation, būvvald shall decide on building preservation in accordance with the procedure laid down in this chapter. 8. acceptance into operation and demolition work making 8.1. First Group of construction and commissioning and acceptance of the demolition job making 121. Būvvald takes the first group housing works completion or its demolition, if the works are conducted in accordance with the explanatory memorandum and the legislation. 122. On completion of the works, the customer shall submit the completed būvvald of part II of the explanatory memorandum and the construction plan of izpildmērījum or izpildmērījum, the site where the building is torn down. 123. The explanatory memorandum refers to the Subscriber a harmonised time limit within which a Subscriber may request that the contractor works on its own means, eliminate the construction defects discovered after construction of the transfer. The minimum guarantee period of construction work after būvvald marks made in the explanatory memorandum shall be two years. 124. Būvvald is five working days after the rules referred to in paragraph 123 of document receipt surveyed site and ensure that the works are carried out according to the explanatory memorandum and laws and regulations, and make their mark on the memorandum, but if the building torn down, shall issue a certificate on the premises not being (annex 10). 125. The Subscriber within 30 days after the making of the tags in the explanatory memorandum on the construction of seed sales completion sends public corporations with limited liability "the Ministry of agriculture in real estate" regional drainage Department 122 these rules referred to in paragraph izpildmērījum a copy of the plan. 126. If the works carried out do not meet the accepted conception or construction of regulatory laws, the būvvald identified in the decision on derogations indicates deviations from the established reasons or construction of regulatory laws and deadlines for the correction of these derogations. 127. by this provision in paragraph 126 that decision contains derogations of the prevention client repeatedly go to būvvald. If the customer has prevented a decision contains derogations for the būvvald tag in the explanatory memorandum. 8.2. The second and third groups of acceptance into the construction and demolition work, making 128. before the adoption of the construction or demolition work in service of making the works carried out or the construction contractor building site izpildmērījum. 129. at the written request of the principal bodies which are issued by technical rules, checks and 14 days after receipt of the corresponding application to deliver an opinion on the competence construction readiness for operation, its compliance with the technical regulations and the requirements of the laws or building demolition. 130. the national cultural monument protection Inspectorate's opinion is needed, as determined by the real state-protected cultural monuments, but in the transformation of health inspection is required if a candidate for the construction of the law is a certain minimum hygiene requirements. 131. the adoption of the Proposed construction or demolition work in service, Subscriber or būvvald-law on construction of the first paragraph of article 6.1 of the cases referred to in paragraph 1, the Office shall submit the following documents: 131.1. proof of readiness for operation of the construction or demolition of buildings (annex 11); documentation of the construction of the 131.2. the affected parts if the changes at the time of the works be allowed to perform in accordance with General provisions; construction site izpildmērījum 131.3. plan with the terrain and the structure height marks, except where the building torn down; 131.4. building site izpildmērījum plan, if the building torn down; 131.5. up-to-date cadastral Affairs, determine if the structure is consistent with the laws and cadastral uzmērīt; 129. these provisions 131.6. and institutions referred to in paragraph 130 of the findings; 131.7. significant design and cover the adoption of legislation work, except where the building torn down; 131.8. construction journal. construction technology under 131.9. equipment, specialty systems and equipment inspection records and receipts, as well as compliance with the supporting documentation, except where the building torn down; 131.10. built-in compliance of products supporting documentation; 131.11. autoruzraudzīb journal, if the work is carried out in the laws of the autoruzraudzīb in the order; 131.12. construction Developer's opinion on the conformity of the construction works, if not autoruzraudzīb; būvuzraug 131.13. report on the implementation of the plan of the building, where the works are carried out on the building regulations in the order; 131.14. certified surveyor opinion on water level measuring equipment (mērlat) Association of Baltic 1977 height system if the building with water-level adjustment related to the construction of the waterworks. 132. This provision, 131.2 131.1..,.,., 131.3 131.4, 131.12, 131.13 131.6.. and 131.14. referred subscriber copies of documents shall be deposited in the archives of the Office or of the būvvald. 133. This provision, 131.2 131.3., 131.4. and 131.9. referred to copy the client 30 days shall be deposited in the national society with limited liability "the Ministry of agriculture in real estate" regional drainage Department, if you have drainage system construction of the building. 134. The work shall be adopted by the būvvald, or the Office. Call the Office to participate in the making of the officers of the būvvald, if būvvald is made such a desire. External būvvald official signature for acceptance of the construction operation. 135. The client, by the participants in the works or its authorized representative, presented to the Office or būvvald construction or building site. 136. Būvvald or Office is to assess the operational readiness of the construction or building demolition and marshalling areas work, based on būvvald or the Office that rule 131. documents referred to, as well as compliance with laws and regulations in the field of construction and construction. 137. Būvvald, or the Office is right in making the construction of construction or demolition, to call būvuzraug and adoption projects developer. The būvuzraug or external projects developer signature on acceptance of the construction or demolition. 138. Būvvald or Office is not entitled to adopt a construction or demolition operations in shipbuilding, if any of these rules or 129.130. institutions referred to in points is not given a favourable opinion on the adoption of the operational readiness of the construction or demolition of buildings. 139. Construction may take a turn into its works are completely finished, and all the relevant structures for fire safety, turn work and environmental protection measures, as well as the entire project done in order to ensure the availability of the environment. 140. Stackable, pārbūvējam and renewable facilities, for which construction inženiertīkl issued to the construction of a single building permit, allowed to add into the existing inženiertīkl and launch it into operation before the construction Act received acceptance into service (hereinafter referred to as the Act) (annex 12), if on the readiness for acceptance into the inženiertīkl according to the construction plan, and izpilddokumentācij has signed this provision in paragraph 129 above. 141. new construction, conversion or construction use in the event of renewal before acceptance into operation is permitted if the work of the Organization in the project included the evaluation of the acceptability of the use of the construction works and the use conditions. 142. Būvvald or Office within 14 days after receipt of the proofs of the shipbuilding operations or readiness, in conjunction with the demolition of the construction or building site subscriber reporting period, adopt the performance works, drawing up the Act, or, if the building torn down, shall issue a certificate on the premises not being identified or decide on derogations. 143. the number of the Act contains the following characters: 143.1.14 of the first two characters – the year the last two digits; 143.2. next five marks – the registration number of the Act, which is up to five characters with zeros from the left; 143.3. last seven signs-construction of the territorial code under the administrative and territorial units. 144. The Act specifies the Subscriber and the operator of a harmonised construction period, a Subscriber may request that the contractor works on its own means, eliminate the construction defects (gaps), which discovered after acceptance of the works. That period, counting from the date of signing of the Act, must not be less than: 144.1. two years ago for the construction of the second group; 144.2. three years for the construction of the third group. 145. The Act shall be made four copies. If the structures are taken into the Office, draw up legislation in five copies. Two copies shall be given to the customer, one copy stored in the archives of the būvvald and the Office. One copy to būvvald or Office within 30 days of submitting the national society with limited liability "the Ministry of agriculture in real estate" regional reclamation Division. Act shall be drawn up in a single original, if the document is prepared in electronic form. 146. If, on the basis of a single construction and town planning, commissioning, accepted a number of constructions, the sixth section of the Act "the shipbuilding technical economic indicators" fills in each building separately. 147. If a construction for landscaping of the territory and it is not done, the būvvald can take the construction or demolition of the construction works, the regional planning work completion delayed for up to 10 months, but not longer than 1 June of the following year. 148. in accordance with paragraph 147 of these provisions pending the completion of the works and their deadlines in the Act or statement in the record about the lack of housing. Act or certificate on absence of construction that delayed completion of the works within the control of the building. 149. the building is deemed to be accepted into the signing of the Act. 150. the building considered to be demolished with the construction of the absence of the signature. 151. If the works carried out do not meet the accepted conception or construction of regulatory laws, the būvvald identified in the decision on derogations specify indents and established deadlines for the correction of these derogations. 152. following that rule 151. the decision referred to in paragraph indents in the prevention client repeatedly turn to būvvald or in the Office. If the customer has prevented a decision contains derogations, būvvald or Office shall take construction service, creating legislation, shall issue a certificate for civil engineering works or not. 8.3. the preservation of the shipbuilding work completion 153. After conservation work is finished inform the Subscriber būvvald for the completion of the construction works shall submit a completed construction of the explanatory memorandum of the preservation of part II. If you've made the third-team building preservation, būvvald in addition to the construction technical survey presented opinion. 154. Būvvald within five working days of the surveyed object and verify that the works are conducted in accordance with the shipbuilding activities of preservation project and the construction of the regulatory laws, and made their mark on the explanatory memorandum, the preservation of the building. 155. If būvvald detects that the works are not made in accordance with the building conservation works project or the construction of the regulatory laws, the decision shall specify the Subscriber identified deviations from the construction work of the conservation project or construction of regulatory laws, deadlines, as well as other conditions of the deficiencies found. 156. by this provision in paragraph 155 of decision execution in the client repeatedly go to būvvald. If the customer has prevented a decision, specified in būvvald of the mark in the explanatory memorandum, the preservation of the building. 9. Closing questions 157. provisions shall enter into force on the 1 October 2014. 158. In construction law 6.1 of the first paragraph in the cases referred to in paragraph 1 and the construction works making this rule 8.2. in accordance with the procedure laid down in chapter starting with 1 July 2015 shall be carried out by the Office, but until 30 June 2015 – būvvald. The Prime Minister is the Rapidity of economic Newsletters Minister Vyacheslav dombrovsky annex 1 Cabinet of 16 September 2014 regulations No 550 _____ ____ ____ ____ ____ ____ ____ ____ for būvvald reasons (1. Group construction) construction of the initiator (client) (physical person's name or the name of a legal person) (natural person or legal person code registration number) (residence or registered office, telephone number) (electronic mail address) please consider submission (construction) construction/demolition.
I. conception documentation 1. Construction type (required mark): new construction renovation demolition work to position 2. details of construction intentions object: 1) shipbuilding/provided the existing use (according to the structure of the classification) 2) construction characteristics ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ 3) building cadastral designation (existing buildings) ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ 4) shipbuilding reclamation cadastre number (existing buildings) ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ _____ 5) demolition method (if the intended demolition) _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ 6) construction waste management (if the intended demolition) __ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ __ 7) construction waste volume (if the intended demolition) ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ __ 8) construction waste recycling and disposal sites (if the intended demolition) ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ___ ___ 9) ranking of the territory (if the intended demolition) ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ___ 10) drainage system owner or, failing that, the legal possessor ___ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ _____ _____ _____ (an individual's name, social security number, or ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ __ legal name, registration No.) 3. The particulars of the affected real property: 1) the real property cadastre number ___ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ 2) land unit or building address _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ ___ 3) land cadastral designation of the Vienîbas ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ___ 4) where construction for forest (if not planned demolition): (a) the number of forest blocks) _____ ____ ____ b) forest nogabal number ____ _____ _____ (c)) atmežojam area by the forest of nogabal ____ ___ ____ ___ 5) real property owner or, failing that, the legal possessor or user _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ (natural persons name, surname, personal code, or ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ __ legal name, registration No.) 6) If construction for especially protected natural territory: a) the specially protected natural areas name __ ____ ____ ____ ____ b) specially protected natural areas functional area ____ _____ _____ 4. details of construction funding sources: private means public law legal persons means European Union policy instrument features other foreign financial help features 5. Authorised person (an individual's name, surname, personal code, place of residence, phone number, e-mail address, or the name of the legal person , registration No., address, telephone number) of the person specified contact person (first name, last name, ID number, phone number, e-mail address) 6. Explanatory Note Developer (physical person's name, surname, personal code, no certificate or legal person name, registration No., registration certificate No būvkomersant.)

7. Būvspeciālist (s) (first name, last name, certificate No.)
8. the explanatory memorandum and the developer (s) receipt būvspeciālist solutions appropriate to the intended use, legislation, local authority, binding provisions received technical or special terms, and they do not affect other structures or parts of structures of sustainability, inženiertīkl functioning, as well as third-party property rights are respected.
Explanatory memorandum article Developer (signature) (date) Būvspeciālist (s) (signature) (date) 9. Construction agent (client) certificate and signature 9.1. Declare that the property attached supporting documents (copies) are authentic, truly and completely, for the object is not a burden, prohibition or dispute. Undertake to implement civil engineering construction, demolition, or alteration of placement (necessary to underline) according to the plans drawn up documentation.
The construction of the initiator (client) (first name, last name, signature) (date) 9.2. Certify the validity of the landmark area.
The construction of the initiator (client) (first name, last name, signature) (date) 10.-the documents submitted in the annex (according to the situation, the required mark): property, tenure or use rights certificates to _____ lp. technical or special provisions on _____ _____ lp. the works provided for in the site fotofiksācij to the _____ _____ lp. the land boundary plan or a valid plan for topographic _____ _____ lp. land property reclamation passports or reclamation cadastre data izkopējum with marked location of the structure and to sign up for the main parameters (length, width, depth), if the construction plans expected to be realised in the ground, on drained _____ _____ lp. housing plan in accordance with clearly visible (M 1:1 000; M 1:2000; M 1:5000), which indicates the location of the nojaucam building or piece of land and its basic characteristics (length, width, depth), the valid topographic plan of the cities and villages, but outside the cities and villages, to land, to _____ _____ lp. agreement with the property owner, if the construction of the initiator (client) is not the property owner, or, if not, the legal possessor and third parties to _____ _____ lp. the explanatory description of construction waste management, volume and the planned processing or disposal site to the _____ _____ lp. another proof of outside būvspeciālist for reasons of compliance regulations and technical rules received requirements to _____ lp. another person the authorisation or consent to the _____ _____ lp. the laws and the documents in the cases specified in the _____ _____ lp. construction agents (principals) power of Attorney (if the application is lodged by the authorised representative) to _____ _____ lp. other documents _ _____ _____ _____ _____ _____ to _____ _____ lp.
Fill out būvvald 11. Planning (lokālplānojum, detailed) main (papildizmantošan) (if not planned demolition) ____ ___ ____ 12. Būvvald marker for the construction of the acceptance of the idea of a responsible officer of the Būvvald (position, name, surname, signature) (date) 13. Seed sales deadline (date) 14. Mark start of construction conditions (date) Construction Contractor/Builder (an individual's name, surname, personal code, place of residence, phone number, or the name of the legal person, registration No. būvkomersant, licence, registration No. legal address, phone number) Būvvald the designated officer (position, name, surname, signature) (date) 15. waiver decision to accept the intention of Decision number ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ _____ date _____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ Būvvald the designated officer (position, name, surname, signature) (date) (II) the completion of the works. 16. information on the completion of the works, certify that the construction works are completed and submitted (installation, placement or rebuilding) shipbuilding izpildmērījum plan. Certify that the works are completed, the area is sorted and all debris is disposed of according to the laws and requirements and submit a site plan for izpildmērījum (if the building torn down).
The construction of the initiator (client) (first name, last name, signature) (date) 17. expiry date of the guarantee of the construction works at the civil engineering acceptance into _____ years atklājušo defects of construction works contractor will remove at their own expense. 18. check the object Works surveyed and found that the works are made/not made on (date) (necessary to underline) according to the accepted conception documentation.
19. Decision on found deviations from the accepted construction plans or construction of the laws governing the decision number ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ _____ date _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ the period for implementing the decision ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ Būvvald the designated officer (position, name, surname, signature) (date) 20 marks for the completion of the construction works issued a statement about the lack of civil engineering works (if the construction demolished). The certificate number and date ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ___ Būvvald's Executive (position, name, surname, signature) (date) notes. 1. the guest shall būvspeciālist in point 7, and paragraph 8 contained in the signed receipt. 2. the document property "signature" does not fill in, if an electronic document is drawn up according to the law on electronic document design. 3. Each part of the explanatory memorandum completed separately, developing seed documentation and complete the works. 4. Explanatory note the relative box expandable if necessary to reflect more information. 5. If at the same time with the construction or demolition of structures are realized in the other first-team building construction or demolition, explanatory memorandum, with information about the different centres or nojaucam documents according to the building and other special provisions. Economic Minister Vyacheslav dombrovsky annex 2 Cabinet of 16 September 2014 regulations No 550 _____ _____ _____ _____ _____ _____ _____ būvvald construction for construction application agents (natural persons first name, last name or legal name of the person) (natural person or legal person code registration number) (residence or registered office, telephone number) (electronic mail address) please consider submission (construction) construction/demolition.
1. type of Construction (required mark): new construction work to restore the placement of demolition 2. details of construction intentions object: 1) shipbuilding Group (General provisions) 2)/existing housing intended use (according to the classification of structures) 3) construction characteristics ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ 4) shipbuilding cadastral designation (existing buildings) ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ _____ 5) shipbuilding reclamation cadastre number (existing buildings) ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ _____ 6) demolition method (if the intended demolition) _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ 7) construction waste management (if the intended demolition) and ___ ___ ___ ___ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ 8) construction waste volume (if the intended demolition) ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ___ ___ 9) construction waste recycling and disposal sites (if the intended demolition) and ___ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ___ ___ 10) ranking of the territory (if the intended demolition) _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ 11) drainage system owner or, failing that, the legal possessor and _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ (an individual's name, social security number, or ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ __ legal name, registration No.) 3. The particulars of the affected real property or part thereof: 1) the real property cadastre number ___ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ 2) land unit or building address _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ __ 3) constructions, land units or parts of units of land cadastral designation ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ __ 4) where construction for forest (if not planned demolition): (a) the number of forest blocks) ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ b) forest nogabal number ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ___ c) area atmežojam by the forest of nogabal _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ 5) real property owner or, failing that, the legal possessor or user _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ (an individual's name, social security number, or ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ __ legal name, registration No.) 6) If construction for especially protected natural territory: a) the specially protected natural areas name _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ (b)) the specially protected natural areas the functional area ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 7) construction agent declares ____ ____ ____ landmark (number) being the locality. 4. details of construction funding sources: private means public law legal persons means European Union policy instrument features other foreign financial help features 5. Authorised person (an individual's name, surname, personal code, place of residence, telephone number, electronic mail address or legal name, registration No., address, telephone number) of the person specified contact person (first name, last name, ID number, phone number, e-mail address) 6. the minimum composition Construction developer ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ __ (name of natural person first name, last name, or the certificate No ___ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ___ legal name, registration No., registration certificate No būvkomersant.) 7. A construction developer provided information about the planned construction of the composition, it required, the development section ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ 8. information about a particular Member State of the European Union regulatory framework for the application of a construction development, applying the European Union Member States ' national standards and technical requirements of et seq _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ (Member State of the European Union) 9. Construction Developer's assurance solution corresponds to the construction of the regulatory legislation and local government binding rules.
A construction Developer (signature) (date) 10. Construction proposing receipts Certifying that the property attached supporting documents (copies) are authentic, true and complete, and the object is not a burden, prohibition or dispute.
The construction of the proponent (name, surname, signature) (date) confirm the validity of the landmark area.
The construction of the proponent (name, surname, signature) (date) 11. Answer to the application and I would like to receive planning permission (specify one of the ways): by mail to the address indicated in the application electronically to the electronic mail address (in accordance with article 9 of the law on Notification, second paragraph) ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ___ personally būvvald the 12. Request for additional information (documents) and/or a decision on extension to the response to send electronically to the electronic mail address ___ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ 13. – the documents submitted in the annex (according to the situation the required mark): a construction of minimum composition to _____ _____ lp. the construction of the powers of the agent (if the application is submitted by an authorised person) for _____ _____ lp. other documents _____ _____ _____ _____ _____ _____ to _____ and _____ lp. 14. signature of agent Construction Construction agent (name, surname, signature) (date) fills in the būvvald 15 marks for construction plans. acceptance of construction permit number ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ _____ date _____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ Būvvald worker (position, name, surname, signature) (date) 16. Decision on the refusal to issue a construction permit for the building permits number ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ _____ date _____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ Būvvald worker (position, name, surname, signature) (date) notes. 1. the document property "signature" does not fill in, if an electronic document is drawn up according to the law on electronic document design. 2. Construction of the relative box the application Extensible if necessary to reflect more information. Economic Minister Vyacheslav dombrovsky annex 3 Cabinet of 16 September 2014 regulations No 550 construction technical survey opinion 1. Building the name and location of the _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ 2. Construction the owner or legal possessor (an individual's first name, last name, ID number, address, telephone number or legal name, registration number, address, telephone number) 3. Inspectors (an individual's first name, last name, certificate of būvpraks number, phone number, or the name of the legal person būvkomersant, ID number, address, telephone number) 4. General information on the construction: 1) one property/sharing/municipal/State drainage system (necessary to underline) 2) construction name, with which the building put into operation ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ___ ___ 3) year in which the building put into operation _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 4) land cadastral designation of the Vienîbas ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ __ 5) construction drainage cadastral number ____ ____ ____ ____ ____ ____ ____ _____ 6) information on the construction plan of izpilddokumentācij ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ __ (name, the storage location) 5. Construction the main technical indicators (drained area, housing length etc.) ___ ___ ___ ___ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ __ 6. Separate structures technical assessment of the situation and compliance with legislative requirements, the survey found the damage and the causal description _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ ______________________________________________________________________________
______________________________________________________________________________________________________________________________________ 7. Ieteikumi:
1) veikt turpmāku detalizētu (instrumentālu) izpēti 2)   3)  
8. Paredzamie būvdarbi
______________________________________________________________________________________________________________________________________
______________________________________________________________________________________________________________________________________
______________________________________________________________________________________________________________________________________ 9. Būves atjaunošanas vai pārbūves būvdarbu izmaksas ___________________________ Pielikumā: 1) Būvobjekta pārskata the plan is to _____ and _____ ___ lp. 2) __________________________________________________________________________________________________________________________________ 3) __________________________________________________________________________________________________________________________________ Tehniskā apsekošana veikta ________. the year ____. _ ___ ____ ____ ____ ____ ____ Būvspeciālist (who carried out a technical survey) ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ __ (name, būvpraks, the certificate of no signature) got: construction agent to ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ __ (an individual's name, social security number, or the name of the legal person, registration No., position, name, surname and signature) coherent: public corporations with limited liability "the Ministry of agriculture real estate "____ ____ ____ ____ ____ ____ ____ ___ regional drainage Department official (name, surname, signature) Note. 1. the document property "signature" does not fill in, if an electronic document is drawn up according to the law on electronic document design. 2. The structure of technical opinion survey the relative box expandable if necessary to reflect more information. Economic Minister Vyacheslav dombrovsky annex 4 Cabinet of 16 September 2014 regulations No 550 _____ ____ ____ ____ ____ ____ ____ ____ for būvvald reasons (preservation of construction) construction of the initiator (client) (physical person's name or the name of a legal person) (natural person or legal person code registration number) (residence or registered office, telephone number) (electronic mail address) please consider submission (building name) preservation, submitted on the basis of the (local) decision on building preservation , decision number _____ _____ _____ _____ _____ _____ date ____ ____ ____ ____ ____ ________.
The real property cadastre number ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ _____ i. seed documentation 1. details of construction intentions object construction characteristics: 1) ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ 2) shipbuilding cadastral designation ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ 3) construction drainage cadastral number _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 4) drainage system owner or, failing that, the legal possessor of ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ __ (an individual's name, social security number, or the name of the legal person registration No.) 2. The particulars of the affected real property: 1) the real property cadastre number ___ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ 2) land unit or building address _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ ___ 3) land cadastral designation of the Vienîbas ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ___ 4) real property owner or, failing that, the legal possessor or user _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ (an individual's name, social security number, or ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ __ legal persons name, registration No.) 5) If construction for especially protected natural territory: a) the specially protected natural areas name _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ (b)) the specially protected natural areas functional area ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ 3. details of construction funding sources: private means public law legal persons means European Union policy instrument features other foreign financial assistance 4. Authorised person (an individual's name, surname, personal code, place of residence, phone number, e-mail address, or the name of the legal person , registration No., address, telephone number) of the person specified contact person (first name, last name, ID number, phone number, e-mail address) 5. Explanatory Memorandum Developer (physical person's name, surname, personal code, no certificate or legal person name, registration No., registration certificate No būvkomersant.)

6. Būvspeciālist (s) (first name, last name, certificate No.)
7. the explanatory memorandum and the developer (s) receipt būvspeciālist solutions comply with laws and regulations, and they do not affect other structures or parts of structures of sustainability, inženiertīkl functioning, as well as third-party property rights are respected.
Explanatory memorandum article Developer (signature) (date) Būvspeciālist (s) (signature) (date) 8. Construction agent (client) certificates and signatures 8.1. Declare that the property attached supporting documents (copies) are authentic, truly and completely, for the object is not a burden, prohibition or dispute.
The construction of the initiator (client) (first name, last name, signature) (date) 8.2. Certify the validity of the landmark area.
The construction of the initiator (client) (first name, last name, signature) (date) 9. – the documents produced (according to the situation, the required mark): property, possession or usage rights supporting documents on the ___ ___ lp. the construction of the power of attorney to the agent ____ ____ ____ ____ ____ ____ lp. building conservation works project to ____ ____ ____ ____ lp. the work of organizing the project if the Government decision on building preservation it is stated to ____ ____ ____ ____ lp. heritage inventory Act, if the building is a cultural monument, the _____ and _____ ___ lp. other documents _ _____ _____ _____ _____ _____ _____ to _____ and _____ lp.
Fill in the būvvald 10. Mark on housing preservation work acceptance officer of Būvvald (position, name, surname and signature of the official veterinarian) (date) 11. Seed sales deadline (date) 12. Mark start of construction conditions (date) the participants in the works (legal name, registration No. būvkomersant, licence, registration No., address, telephone number) of the responsible officer of Būvvald (position, name, surname and signature of the official veterinarian) (date) 13. the decision on refusal to accept the decision of the housing preservation jobs number ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ _____ date _____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ Būvvald the designated officer (job title , name, surname and signature of the official veterinarian) (date) (II) the completion of the works. 14. information on the completion of the works, certify that the works are complete and made in accordance with the accepted construction activities in the preservation project.
The construction of the initiator (client) (first name, last name, signature of the official veterinarian) (date) 15. checking object Works surveyed and found (date) that works made/not made (necessary to underline) the preservation of the construction works of the project.
16. Decision on found deviations from the accepted conservation works project or the construction of laws Framework Decision number ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ _____ date _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ the period for implementing the decision ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ Būvvald the designated officer (position, name, surname and signature of the official veterinarian) (date) 17. Marks for the completion of the works of the Būvvald Officer (position, name, surname and signature of the official veterinarian) (date) notes. 1. the guest shall būvspeciālist in paragraph 6 and paragraph 7 contains a signature receipt. 2. the document property "signature" does not fill in, if an electronic document is drawn up according to the law on electronic document design. 3. Each part of the explanatory memorandum completed separately, developing seed documentation and complete the works. 4. Explanatory note the relative box expandable if necessary to reflect more information. Economic Minister Vyacheslav dombrovsky annex 5 Cabinet of 16 September 2014 regulations No 550 _____ ____ ____ ____ ____ ____ ____ ____ būvvald to permit no ___ ___ issued (construction agent (client) – natural persons name, surname, personal code, place of residence, telephone number, electronic mail address or legal name, registration number, registered address, phone number) for construction/demolition. (the name of the object (building))  
1. type of Construction (required mark): new construction work to restore the placement of demolition 2. details of the construction of the object: 1) shipbuilding Group (General provisions) 2)/existing housing intended use (according to the classification of structures) 3) construction characteristics ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ 4) shipbuilding cadastral designation (existing buildings) ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ _____ 5) shipbuilding reclamation cadastre number (existing buildings) ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ _____ 6) demolition method (if the intended demolition) _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ 7) construction waste management (if the intended demolition) _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ 8) construction waste volume (if the intended demolition) ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ___ ___ 9) construction waste recycling and disposal sites (if the intended demolition) and ___ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ___ ___ 10) ranking of the territory (if the intended demolition) _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ 11) the owner of the building or, failing that, the legal possessor of ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ (an individual's name, social security number, or the name of the legal person registration No.) 3. The particulars of the affected real property or part thereof: 1) the real property cadastre number _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ 2) land unit or building address _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ __ 3) constructions, land units or parts of units of land cadastral designation ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ __ 4) where construction for forest (if not planned demolition): (a) the number of forest blocks) ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ b) forest nogabal number ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ___ c) atmežojam area by the forest of nogabal _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ 5) real property owner or, failing that, the legal possessor or user ____ ____ ____ ____ ____ ____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ (an individual's name, social security number, or ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ __ legal name, registration No.) 6) If construction for especially protected natural territory: a) the specially protected natural areas name _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ (b)) the specially protected natural areas functional area ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ 4. A construction Developer (physical person's name, surname, personal code, no certificate or legal person name, registration No., registration certificate būvkomersant No.)
5. Planning (lokālplānojum, detailed) main (papildizmantošan) ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ __ 6. Construction site inspection (survey date) opinion on the building inspection (number and date) the design conditions 7. Design conditions (required mark): 1) reconciliation with the plot owner or legal possessor: _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ (land units or building address) ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ __ (land units or building address) ____ ____ ____ ____ ____ ____ ____ ____ _ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ (land units or building address) 2) reconciliation with third parties: with adjacent property owners, co-owners: _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ (land units or building address) ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ __ (land units or building address) ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ __ (land units or building address) 3) technical and specific rules and their Publisher: reconciliation with public authorities: _____ _____ _____ _____ __________________________________________________________________________________________________________________ (nosaukums, adrese, kontaktinformācija)
______________________________________________________________________________________________________________________________________ (nosaukums, adrese, kontaktinformācija)
______________________________________________________________________________________________________________________________________ (nosaukums, adrese, kontaktinformācija) ar pašvaldības institūcijām:
______________________________________________________________________________________________________________________________________ (nosaukums, adrese, kontaktinformācija)
______________________________________________________________________________________________________________ ____ ____ ____ ____ ____ ____ (name, address, contact info) ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ __ (name, address, contact information) with the inženiertīkl holders: _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ (name, address, contact info) ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ __ (name, address, contact info) ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ __ (name, address, contact info) ____ ____ ____ ____ ____ ____ ____ _ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ (name, address, contact info) ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ __ (name, address, contact information) 4) technical and specific rules, if the publishers do not need reconciliation: _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ (name, address, contact info) ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ __ (name, address, contact info) ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ _ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ __ (name, address, contact info) 5) other institutions: the national reconciliation in the society with limited liability "the Ministry of agriculture in real estate" regional chapter ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ __ (name, address, contact info) ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ __ (name, address, contact info) ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ __ (name, address, contact info) 6) accessibility requirements: facilities, access to the territory roads, streets, pavements, walkways and pedestrian crossing for the chance to move from one height to another level and other requirements for the affected area ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ _____ 7) formulation of projects: General (Design task, building permits, list of fundamentals of reconciliation) text of the work volumes of correspondence and of construction specifications documentation, drawings and graphic work of organizing project, part of the economic part of the additional requirements of a construction detail, according to the municipal territory planning ____ ____ ____ ____ ____ ____ _____ 8) construction development applying the (European Union) national standards and technical requirements of 9 et seq) construction expertise 10) the requirements of the construction waste management ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ __ 11) other requirements for the planning, lokālplānojum or detailed (if one has been developed) 12) būvspeciālist of professional liability insurance for construction projects of the developer: the driver of a construction expert 8. Design conditions (date) the commencement of the construction works conditions 9. Commencement of the construction works, the conditions in Būvvald documents (required mark) : designed and coordinated projects information on projects the total cost of the implementation of the information about the participants in the works (legal name, registration No., registration certificate No būvkomersant.) works for civil liability compulsory insurance certificate and a copy of the works magazine public works Director in charge and public works Director related articles būvuzraug and būvuzraug of the responsible commitment of the article būvspeciālist of the professional liability insurance policy copy building plan autoruzraudzīb contract autoruzraudzīb journal information on defensive coordinator (name first name, last name, ID number, phone number), where the works are performed more than one performer of the works of national cultural monuments protection inspection permit, if the work provided for in the national protected cultural monument protection zone or other documents if required by regulations ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ __ Būvvald marks and decisions 10. A check mark on the design conditions (date) After completing the design marks the fulfilment of the conditions for the commencement of the construction works, the conditions must be met within two years.
Būvvald the designated officer (position, name, surname, signature) (date) 11. Mark the commencement of the construction works conditions (date) Būvvald the designated officer (position, name, surname, signature) (date) 12. After making the tag on the commencement of the construction works conditions the maximum duration of the works is ___ ____ ____ ____ ____ _____ years 1) works to be taken up (date) 2) works for civil liability compulsory insurance policy the insurance period specified in the _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 3) civil engineering commissioning to be carried out until (date) Būvvald the designated officer (job title , name, surname, signature) (date) This town planning (administrative) within a month of its entry into force may be referred to the administrative procedure law in the ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ __ (name, address) 13. Permit extended until (date) Būvvald the designated officer (position, name, surname, signature) (date) notes. 1. the document property "signature" does not fill in, if an electronic document is drawn up according to the law on electronic document design. 2. Building the relative box expandable if necessary to reflect more information. Economic Minister Vyacheslav dombrovsky annex 6 Cabinet of 16 September 2014 regulations No 550 samples of Construction Proof of receipt in this driver is included in the construction plan and develop all the necessary parts according to the conditions laid down in the building.
A construction supervisor (first name, last name, certificate No.)

      (date)   (signature)
A construction manager construction plan of the proof This ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ part solutions meet the Latvian et seq, and other laws, as well as the provision of technical or special requirements.
Part of a construction supervisor (first name, last name, certificate No.)

      (date)   (signature)
A construction manager for This building project of apliecinājums1 _____ _____ _____ _____ _____ _____ _____ _____ _____ part solutions meet the Latvian et seq, and other regulatory provisions of the Member States of the European Union, and national standards and tests, as well as et seq of technical or special requirements.
Part of a construction supervisor (first name, last name, certificate No.)

      (date)   (signature)
The notes. 1.1 filled in if projects developed by applying the Member States of the European Union and the national standards et seq technical requirements. 2. the document property "signature" does not fill in, if an electronic document is drawn up according to the law on electronic document design. Economic Minister Vyacheslav dombrovsky annex 7 Cabinet of 16 September 2014 regulations No 550 __ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ būvvald's No building permit annex (date) (number) (number) 1. Construction performer (legal name, registration No. būvkomersant, licence, registration No., address, telephone number) 2. Guest būvspeciālist: 1) responsible works Manager (an individual's first name, last name, certificate No.) 2) public works Director (an individual's first name, last name, certificate number, legal name, registration No., registration certificate No būvkomersant.) 3) responsible būvuzraug (an individual's first name, last name, certificate number or the name of the legal person, registration No., registration certificate No būvkomersant.) 4) būvuzraug (an individual's first name, last name, certificate number or the name of the legal person, registration No., registration certificate No būvkomersant.) 5) responsible autoruzraug (an individual's first name, last name, certificate number or the name of the legal person, registration No., registration certificate No būvkomersant.) 6) autoruzraug (an individual's first name, last name, certificate number or the name of the legal person, registration No., registration certificate No būvkomersant.) 7) labour protection Coordinator (an individual's first name, last name, ID number, phone number) Būvvald the designated officer (position, name, surname, signature) (date) notes. 1. the document property "signature" does not fill in, if an electronic document is drawn up according to the law on electronic document design. 2. the annex building boxes to extend if necessary to reflect the more information. Economic Minister Vyacheslav dombrovsky Annex 8 Cabinet of 16 September 2014 regulations No 550 important construction acceptance Act of ________. gada ____.________________________ Objekta nosaukums un adrese ___________________________________________________________________________________________________
______________________________________________________________________________________________________________________________________ Konstrukcijas nosaukums ________________________________________________________________________________________________________ Būvniecības ierosinātājs (pasūtītājs)
______________________________________________________________________________________________________________________________________ (fiziskās personas vārds, uzvārds, personas kods, dzīvesvieta un tālruņa numurs
______________________________________________________________________________________________________________________________________ vai name of the legal person, registration No., address and phone number) for the Commission: 1. the participants in the work of the representative (name and title) 2. Construction Developer (if autoruzraudzīb) __ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ (name and title) 3. Construction (subscriber) agent (būvuzraug) ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ __ (name and title) the Commission carried out a review (external test) and the verification of the quality of structure, which fulfilled ___ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ___ Commission found: 1. the Acceptance of such structures presented to: ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ (construction listing and brief description) 2. Work completed under (a construction Developer's name and last name or ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ _ _ the name of the legal person, the name and construction drawing no.) 3. Structures uses the following materials, design and products: _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ ____ (indicate the certificates or other documents proving the quality) __ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ 4. deviations from the work projects have allowed no/(delete as appropriate).
The deviations permitted are consistent with (the institution ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ _ _ drawing no reconciliation and date) the Commission decision to work is undertaken in accordance with the construction plan, et seq, and standards, and they are adopted.
The operator's representative works (first name, last name, signature of the official veterinarian) a construction Developer (if autoruzraudzīb) __ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ (name, surname, signature of the official veterinarian) Construction (subscriber) agent representative (būvuzraug) ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ __ (name, surname, signature of the official veterinarian) Note. 1 document property "signature" does not fill in, if an electronic document is drawn up according to the law on electronic document design. Economic Minister Vyacheslav dombrovsky Annex 9 in the Cabinet of 16 September 2014 regulations No 550 Cover work acceptance Act of ________. gada ____.________________________ Objekta nosaukums un adrese ___________________________________________________________________________________________________
______________________________________________________________________________________________________________________________________ Darba nosaukums ________________________________________________________________________________________________________________
______________________________________________________________________________________________________________________________________ Būvniecības ierosinātājs (pasūtītājs)
______________________________________________________________________________________________________________________________________ (fiziskās personas vārds, uzvārds, personas kods, dzīvesvieta un tālruņa numurs vai
________ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ __ legal name, registration No., address and phone number) for the Commission: 1. the participants in the work of the representative (name and title) 2. Construction Developer (if autoruzraudzīb) __ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ (name and title) 3. Construction (subscriber) agent (būvuzraug) ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ __ (name and title) the Commission carried out a review (external test) and quality inspection cover jobs that have run the _____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ _____ Commission found: 1. The adoption of the show (a short job description) 2. Work completed under (a construction Developer's name and last name or the name of a legal person, the name and construction drawing no.)
3. in carrying out the work, use the following materials, design and products: _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ ____ (indicate the certificates or other documents proving the quality) __ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ 4. deviations from the work projects have allowed no/(delete as appropriate).
The deviations permitted are consistent with (the body, drawing no and date of harmonisation) the Commission decision to work is undertaken in accordance with the construction plan, et seq, and standards, and they are adopted.
The operator's representative works (first name, last name, signature of the official veterinarian) a construction Developer (customer) (if autoruzraudzīb) __ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ (name, surname, signature of the official veterinarian) Construction agent representative (būvuzraug) (first name, last name, signature of the official veterinarian) Note. 1 document property "signature" does not fill in, if an electronic document is drawn up according to the law on electronic document design. Economic Minister Vyacheslav dombrovsky annex 10 of the Cabinet of Ministers on 16 September 2014 regulations No 550 statement of construction not being ___ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ___ (the name of the building) with the cadastral designation of __ ____ ____ ____ ____ ____ and reclamation cadastre number __ ____ ____ ____ ____ ____ (if one is assigned), (address) is demolished.
1. details of the demolished structure: 1) the owner of the building or, failing that, the legal possessor or user _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ (an individual's name, social security number, or the name of the legal person registration No.)
2) shipbuilding Group (General provisions) 3) construction usage (according to the structure of the classification) 2. News about real estate, which demolished the building: 1) the real property cadastre number ___ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ 2) land unit or building address _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ ___ 3) land cadastral designation of the Vienîbas ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ 4) real property owner or, failing that, the legal possessor or user _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ (an individual's name, social security number, or the name of the legal person, Registration No.) 3. details of construction: 1) the construction of the initiator (client) ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ __ (persons name, surname, personal code, place of residence and telephone number _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ or legal name, registration No., address, and phone number) 2) construction works carried out on the basis of (the required mark): explanatory memorandum No.         (date) construction permit no.           (date) 3) object surveyed (date) 4) outstanding works to be completed the following scope and limits: No. PO box The name of the job Completion date Unit quantity 1.         2.         3.        

Būvvald the designated officer (position, name, surname, signature) (date) Note. Document property "signature" does not fill in, if an electronic document is drawn up according to the law on electronic document design. Economic Minister Vyacheslav dombrovsky annex 11 of the Cabinet's 16 September 2014 rules no proof of construction readiness 550 operating or building demolition (not applicable) construction of the initiator (client) (persons name, surname, personal code, place of residence and telephone number or the name of the legal person, registration No., address and telephone number) 1. Announces that (construction) construction or demolition work (not applicable) made on the basis of No construction permit.   issued by (date) (name of būvvald) are complete.
2. News about the built object: 1) shipbuilding Group (General provisions) 2)/existing housing intended use (code) (according to the classification of structures) 3) construction characteristics ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ___ 4) construction materials (except where the building demolished) ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ _____ 5) cadastral designation of construction ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ___ 6) shipbuilding reclamation cadastre number ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ _____ 7) the owner of the building or, failing that, the legal possessor of ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ _____ _____ _____ _____ _____ _____ (an individual's name, social security number, or the name of the legal person registration No.) 3. The particulars of the affected real property or part thereof: 1) the real property cadastre number ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ 2) land unit or building address _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ 3) ground units, building cadastral designation ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ 4) real property owner or, failing that, the legal possessor or user _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ (an individual's name, surname, personal code or ___ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ___ legal name, registration No.) 4. details of construction: 4.1 construction started and completed on (date) to (date) 4.2 construction meet the works undertaken, developed by ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ __ (a construction Developer's name, certificate No ___ ___ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ or legal name, registration No., registration certificate No būvkomersant.) 4.3. changes and deviations from the agreed construction is/is not (not applicable), its duly agreed and marked technical documentation in the implementation of the construction plan 4.4 participated in the following construction works: 4.4.1. reviewer (legal name, registration No. būvkomersant, licence, registration No., address, telephone number) 4.4.2. responsible public works Director (an individual's first name, last name, certificate No.)
4.4.3. būvuzraug (if the building is carried out) ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ __ (an individual's first name, last name, certificate No.) 4.4.4. a construction Developer (if autoruzraudzīb) ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ __ (an individual's first name, last name, certificate No.) 4.5. construction waste management made a ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ __ (name of operator of the waste) 5. Certify that: 5.1 build is ready for operation or structure is demolished (not applicable) 5.2. all construction waste generated is managed in accordance with the laws and requirements of the waste management 5.3. construction in technological equipment, specialty systems and equipment is installed, checked and tuned according to the construction plan and comply with the laws and regulations in the construction (except in the case of If the building demolished) 5.4 inženiertīkl, special systems and facilities are dismantled according to the construction plan, if the building torn down after construction making 5.5 into _____ years works of atklājušo defects of the reviewer will prevent work at its own expense, 5.6 construction total cost is _____ _____ euro, including public law legal persons, policy instruments of the European Union or other foreign financial assistance funds _____ _____ Euro 5.7 outstanding works will be completed in the following scope and limits :
Nr. PO box The name of the job Completion date Unit quantity 1.         2.         3.        

The construction of the initiator (client) (first name, last name, signature) (date) Construction Contractor (name, surname, signature) (date), the public works Director in charge (name, surname, signature) (date) Būvuzraug (if the building is carried out) (first name, last name, signature) (date) a construction Developer (name, surname, signature) (date) notes. 1. the document property "signature" does not fill in, if an electronic document is drawn up according to the law on electronic document design. 2. the relative box Proof expandable if necessary to reflect more information. Economic Minister Vyacheslav dombrovsky 12. attachment Cabinet of 16 September 2014 regulations no act code of 550 _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ (name, address of the construction, if not, the location, and the building cadastre) acceptance into service (the Act of dialing location) on (date) the construction of the smart (required mark): new construction work to restore the placement of Construction agent (the client) (persons name, surname, personal code, place of residence and telephone number or the name of the legal person, registration No. legal address and telephone number) 1. Making work out būvvald/construction of national control Office (delete where inapplicable): 1.1. building (first name, last name, construction control certificate No.) 1.2. the municipal architect (first name, last name, certificate No.) 1.3. other official (name, title) 2. Hire co-opted (by būvvald/construction of national control Office (not applicable) the invitation): 2.1. būvuzraug (an individual's first name, last name, certificate No.) 2.2. a construction Developer (physical person's name, certificate No.) 2.3. the participants in the works (legal name, registration No. būvkomersant, licence, registration No., address, telephone number) 2.4.     (specialty, position, name, surname)
3. Būvvald/construction of national control Office (not applicable) met: 3.1.-the transfer of construction plan ___ ___ ___ volumes 3.2. execution of works execution and documentation: 3.2.1. public works Journal No. _____ _____ 3.2.2. autoruzraudzīb Journal No. _____ _____ 3.2.3. important design and cover the work of making legislation on ____ __ lp. _____ the volume (s) 3.2.4. būvuzraug report on the implementation of the plan of the building to the ____ ___ lp. 4. Būvvald/construction of national control Office (not applicable) assessment: 4.1 construction of agents (principals) proof of the shipbuilding operation readiness 4.2. such a State, municipal and other authorities opinions: 4.2.1.       opinion No ___ ____ to ____ __ lp.   (body)   (date) 4.2.2.       opinion No ___ ____ to ____ __ lp.   (body)   (date) 4.2.3.       opinion No ___ ____ to ____ __ lp.   (body)   (date) 4.2.4.       opinion No ___ ____ to ____ __ lp.   (body)   (date) 4.2.5.       opinion No ___ ____ to ____ __ lp.   (body)   (date) 4.3 construction Developer's opinion No ___ ____ to ____ __ lp.   (date)  
5. Būvvald/construction of national control Office (not applicable) heard the hiring Executive and outside specialists and found: 5.1 the construction works carried out on the basis of No construction permit.   issued by (date) to (name of būvvald) 5.2 construction started and completed on (date) to (date) 5.3 construction meets the construction, developed by ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ __ (a construction Developer's name, certificate No ___ ___ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ or legal name, registration No., registration certificate No būvkomersant.) 5.4. changes and deviations from the agreed construction is/is not (not applicable), they established a coherent and indicated in the technical documentation. 6. Building technical economic indicators: construction: 6.1 6.1.1. shipbuilding use _ _____ _____ _____ _____ _____ 6.1.2 construction length _____ _____ _____ m building height 6.1.3 ____ ____ ____ ____ m 6.1.4. construction surface part ____ ____ ___ m 6.1.5. building underground part of _____ and _____ m 6.1.6. other parameters ____ ____ ____ ____ _____ 6.1.7. building technical characteristics: No. PO box Building use (code according to the classification of structures), construction material cross section (mm) (m) 6.1.8. engineering equipment (required mark or indicate): power supply: centralised 6.1.8.1. autonomous (wind water solar other) 6.1.8.2. security system: aizsargsignalizācij warning of extreme conditions 6.1.8.3. other equipment: 1) ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ (indicate the corresponding) 2) ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ (indicate the corresponding) 3) ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ (indicate applicable) 6.2 external inženiertīkl: 6.2.1. inženiertīkl use of (water, sewage, cable) ____ ____ 6.2.2. route length __ ___ ___ ___ m 6.2.3. surface part ____ ____ ___ m 6.2.4. underground part of _____ and _____ m 6.2.5. inženiertīkl technical characteristics: No. PO box Use Inženiertīkl (code according to the classification of structures), construction material cross section (mm) (m) 3.9. Street (road transport): 6.3.1 Street (road transport) overall length __ ___ ___ ___ m 6.3.2. the total area of the works, ____ ____ ___ m2 6.3.3. area roadway ____ ___ ____ m2, sidewalks area ____ ___ ____ m2 of lawn area 6.3.4. ___ _____ ___ m2, the outlying area ____ ___ ____ 6.3.5.50 m2 hillsides with medicine media ____ __ _____ 6.3.6 m2 Street (road transport) technical characteristics: No. PO box Construction technical indicators (m) 1.     2. the use of characteristics: 6.3.7. No. PO box Civil engineering uses (code according to the classification of structures) (m2) 1.     2.     3.    
6.4. environmental accessibility (if planning permission for certain accessibility requirements): area facilities, access roads, streets, pavements, walkways and other pedestrian traffic and the possibility to move from one level to another height level to the other requirements for the affected area. 7. the total cost of construction (after the construction of the agent (client) certificate) is a ____ _____ euro, including the works of ____ ____ ____ ____ euro.
8. Inženiertīkl and equipment tested and recognized as valid for operation with the findings, which are annexed to this Act. 9. installations built, assembled, tuned, tried and accepted by the documents annexed to this Act. 10. Deferred construction to be completed in the following scope and limits: No. PO box The name of the job Completion date Unit quantity 1.         2.         3.        
11. After the adoption of the construction into _____ years atklājušo works the main operator of the construction defects will eliminate at their own expense.
12. Būvvald/construction of national control Office (not applicable) proposes to recognize as valid for operation. (building name) for the construction of 13 are brought (contested building permits) ____ ____ ____ ____ Court, case number _____ __________. 14. Acceptance report drawn up in _____ copies. Izpilddokumentācij is passed to the store ____ ____ ____ ____ ____ ________.
Building (name, surname, signature) architect (name, surname, signature) official (name, surname, signature) Guest: būvuzraug (name, surname, signature) (date) autoruzraug (name, surname, signature) (date) (specialty, position, name, surname, signature) to the Act met: construction agent (the client) (first name, last name, signature) (date) construction contractor (name, surname, signature) (date) notes. 1. the document property "signature" does not fill in, if an electronic document is drawn up according to the law on electronic document design. 2. the Provisions of point 6.2. and 6.3 shall be completed according to the situation, if the construction is built with the construction of external inženiertīkl and the street. 3. Housing renovation or renewal, in paragraph 6 of the Act shall be completed to the extent that characterizes the building changes. 4. the relevant Provisions of the box extend, if necessary to reflect more information. Economic Minister Vyacheslav dombrovsky