Cabinet of Ministers Regulations No. 551 Riga 2014 (16 September. 5. § 49) port, the waterworks, heat, gas, and other unclassified separately, engineering structures are Issued in accordance with the provisions of the construction Act article 5, paragraph 2, first subparagraph and second subparagraph, 5, 7 and 10, paragraph 1. General questions 1. determines: 1.1., heat port waterworks, gas, and other unclassified separately, engineering structures construction process procedures involved in building institutions and responsible būvspeciālist; 1.2. the construction process the necessary documents and their contents; 1.3. building permits, certification card and include in the explanatory memorandum; 1.4. where the required information for the public about the construction plan, and such information; 1.5. derogations harmonisation; 1.6. construction expertise; 1.7. the control of the construction process and the rule of law, accountable institutions; 1.8. building preservation order; 1.9. building location uzmērījum procedure and a procedure acceptable to the building into operation; 1.10. the works guarantee terms after the adoption of the construction operation. 2. Rules: 2.1 shall not apply to buildings, railroad structures, electronic structures, electricity generation, transmission and distribution structures, hidrotehniskaj (except port of waterworks engineering structures) and drainage structures with radiation safety related structures, roads, streets and buildings of the Republic of Latvia's territorial waters and exclusive economic zone; 2.2. apply to engineering structures that have not been specified in paragraph 2.1 of these rules. 3. these provisions that civil construction (construction) process control and the rule of law in the administrative territory of the būvvald, but is responsible for the control of the works and the construction of law rule 6.1 of the first paragraph in the cases referred to in paragraph 1 – construction of the national control Office (hereinafter the Office). 4. A Person is entitled to the documents referred to in these provisions to submit to būvvald or in the Office, in the form of an electronic document if the relevant documents prepared under the regulations on electronic document design. 5. The construction conception for the planned construction of the documentation submitted to the būvvald, which is responsible for the administrative area. If the planned construction of several local administrative areas, construction intentions: 5.1 all submitted documentation būvvald the responsibility in the administrative territory of the planned construction, and the construction process from conception to adoption into each are separate; 5.2. in the municipalities of būvvald to which it has delegated certain tasks during the construction process. 6. the explanatory note (annex 1), explanatory note preservation engineering structures (annex 2), the card works for attestation (annex 3) or construction application (annex 4) (the total submission of construction plans) are not required if the client performs an accident prevention or relief work for the object that has the specified operation or security cordon, or, subject to prior written notification to the būvvald, the first group of civil engineering (except inženiertīkl).
2. Construction of the origination and necessary documents 2.1. Construction plans preparation of documentation 7. prosecutors agreed with the construction projects of developers in the field of the corresponding civil design of the construction concerned the intention of the documentation required for development. According to the planned construction of the conception and the intended type of construction completed in one of the construction idea submissions. 8. A construction developer the construction conception for the development of documentation may invite other būvspeciālist. Guest būvspeciālist to sign their construction plans developed by the documentation and, if also developed documentation, explanatory memorandum to proof of compliance of the explanatory memorandum of law, and received technical and special requirements of the rules. 9. Construction intentions in drafting the dossier according to the construction of laws and regulations governing the municipal development planning of the territory, in accordance with the construction of statutory construction principles. 10. the drafting of construction plans, if the documentation for the construction in accordance with the relevant regulations, it is necessary for technical or special provisions, construction of the planned construction of the agent's conception can request and receive the necessary technical or specific provisions of State and local institutions, as well as the owners of inženiertīkl. 11. The construction conception documentation (construction plans, construction of the minimum application) developed in triplicate, but construction of the law of the first paragraph of article 6.1 of the cases referred to in paragraph 1, the four original copies. One copy is stored in būvvald, one copy to the construction projects of the sponsor and developer and construction law 6.1 of the first paragraph in the cases referred to in paragraph 1, the Office. Construction intentions in drafting the documentation in a single copy, if the document is prepared and filed electronically. 12. Depending on the General laid civil būvnoteikumo groups and construction type, pursuant to this rule of 6 and 18, prosecutors submitted to the construction būvvald the construction conception documentation: 12.1 explanatory memorandum part I and these rules 13 and 15 documents mentioned in paragraph – the first group of civil engineering construction (except this rule 12.2. in the cases referred to in paragraph); 12.2. the receipt card works (hereinafter referred to as the receipt card) part I and 13 and 16 of these regulations referred to in paragraph 12.2.1. documents: inženiertīkl (except electrical or electronic communications network) transmission for new construction, renovations, installing, dismantling or conversion of an existing building; 12.2.2. the internal inženiertīkl of the building (except electrical or electronic communications network), installing, dismantling or conversion, if the renewal of the internal inženiertīkl, installing, dismantling or conversion is for the European Union, national or local level; 12.2.3. a new internal inženiertīkl (except electrical or electronic communications network) installing or dismantling of existing multi-family residential house; 12.3. the construction of the application and construction of minimal composition in the second or third group civil engineering construction. 13. internal inženiertīkl (except electrical or electronic communications network) the restoration or conversion of apartment living in the House for the acknowledgement card is not required (except when restoring or rebuilding may affect service availability). 2.2. Construction intentions 14. the documentation suggesting any kind of construction, construction intentions the application shall be accompanied by the following documents: 14.1. property, tenure or use rights supporting documents; 14.2. the term of Office of the construction agent, if the application is lodged by the authorised representative; 14.3. the reconciliation according to the construction plans: 14.3.1. the explanatory memorandum shall be coordinated with the owner of the parcel, if construction is not the agent of the owner of the parcel, port authorities, and – from the point of view of maritime safety, the port captain and the State joint stock company "Latvian maritime administration" If construction is for the port area, and third parties whose property or usage rights are affected; 14.3.2. receipt of the card aligned with: 14.3.2.1. the owner of the real property, if the construction is not the agent of the owner of the immovable property; 14.3.2.2. building manager, if the inženiertīkl is installed in a building; 14.3.2.3. service provider, which the building's internal inženiertīkl is used for the provision of the service; 14.3.2.4. respective owners and inženiertīkl other inženiertīkl affected owners; 14.3.2.5. port authorities, when construction for the port area; 14.3.2.6. third parties whose property or usage rights are affected; 14.3.3. in addition to the construction law in article 15 paragraph 2, first subparagraph, the minimum composition projects aligned with the port authorities, and – from the point of view of maritime safety, the port captain and the State joint stock company "Latvian maritime administration" If construction is for the port area, and third parties whose property or usage rights are affected; 14.4. other documents, permission or consent, if it is determined by law. 15. the reconciliation presented to furnish a general plan of the territory with the attraction of the building plot (hereinafter construction master plan), guarantee card placement plan, explanatory memorandum, in the location plan or as an individual arrangement so that it comes from the unequivocal consent to the construction plans. 16. proposes that the first group of civil engineering, installation of new construction, demolition, conversion or restoration placement, construction of the proponent to part I of the explanatory memorandum shall be accompanied by the following documents: 16.1. technical or special rules, if it determined by law; 16.2. the intended place of fotofiksācij works; 16.3. the graphical documents with Visual solution for civil engineering works (does not apply to civil engineering demolition); 16.4. a valid plot plan or instrumental in topographical land boundary plan uzmērīt; 16.5. location plan in accordance with clearly visible (M 1:250; M 1:500; M 1:1 000), which shows the position of civil engineering for the parcel and its external dimensions, the valid topographic plan of the cities and villages, but outside the cities and villages of the uzmērīt of the instrumental land plan (does not apply to civil engineering demolition); 16.6. the manufacturer's developed technical documentation (for ready civil engineering placement). 17. In proposing this rule 12.2. section inženiertīkl specified in the new construction, reconstruction, demolition, installation, construction or conversion agent certification cards, part I shall be accompanied by the following documents: 17.1. valid plot topographical plan, if the structures are built on plots of land; 17.2. the building's floor space or group plan, if inženiertīkl is installed in a building; 17.3. technical or special rules, as determined by the legislation; 17.4. documents in accordance with technical or special terms; 17.5. the explanatory description, which, if necessary, add calculations; 10.9. the developer signed a construction inženiertīkl RAM location plan to a valid plan appropriate topographic visually perceptible (M 1:250; M 1:500; M 1:1 000) or, if inženiertīkl is installed in a building, a construction developer signed internal placement plan inženiertīkl to the building floor plan or group plan. 18. proposes that the second or third group of civil engineering construction, building construction proposing to add the application to the construction of minimal composition. Construction of minimum composition includes the following documents: 18.1. an explanatory description, which contains information about the construction of the place seed (ground unit or building) cadastral designation and the owner, for the construction, the works to be provided and the method of carrying out the construction, waste management, and recycling or disposal site for environmental accessibility solutions, if the engineering structures under the legislation is enforceable environmental accessibility and the intended protected cultural monuments and heritage environmental modifications, if the construction plan is intended to implement the cultural monument protection zone; 18.2. construction master plan in accordance with clearly visible (M 1:250; M 1:500; M 1:1 000) to a valid plan for topographic; 18.3. the characteristic cuts with height marks (does not apply to the renewal or the demolition of civil engineering); 18.4. the graphical documents with civil engineering Visual solutions and marks the height if the structures are designed for surface (does not apply to the demolition and the construction of the installation, the tram road, airfield runway, inženiertīkl (hereinafter referred to as the linear structures), construction); 18.5. the home improvement plan if solution is designed for facilities; 18.6. the transport and pedestrian movements in the Organization Description, if the construction plan or part thereof is intended to implement a road or street land partition bar; 11.6. the manufacturer of the finished product, if technical documentation is intended for the placement of the structures; 12.8. drawings indicating the boundaries of the structures and order, and additional explanatory description if the construction or commissioning is designed by building lots; 11.7. information about a particular Member State of the European Union regulatory framework for the application of a construction development, the application of the Member States of the European Union, the national standards and technical requirements of et seq. 19. If the local Government has taken a decision on the operation of civil engineering works on preservation, adopted during the construction of the būvvald agent shall submit the following documents: 19.1. fill the explanatory memorandum part I preservation engineering structures; 19.2. engineering structures conservation works project which includes: 19.2.1. an explanatory description of conservation; 19.2.2. the necessary conservation work list; 19.2.3. solutions for the building and civil engineering works on loss of stability elements further deterioration; 19.2.4. solution of the danger to human life and health or the environment; 19.3. heritage inventory statement, if the structures is a cultural monument; 19.4. the work of the organisation of the project if the Government decision on the preservation of the civil engineering works has pointed out; 19.5. other documents that describe the structures and necessary decision.
3. The construction plans review 20. Reasons engineering structures preservation part I and paragraph 18 of these rules mentioned in the documents submitted to the municipal decision on būvvald engineering structures preservation within the time limit. 21. when construction intentions application, būvvald of construction law article 12 the time limits laid down in the fourth paragraph-looking construction plans compliance with laws and regulations and shall take a decision pursuant to article 14 of the law on construction of the third part. 22. Būvvald for taking a decision on the acceptance of the construction plans in accordance with article 14 of the law on construction of the third part (1) of the issued building permits (annex 5). 23. Būvvald for taking a decision on the acceptance of the construction plan, in accordance with article 14 of the law on construction of the third subparagraph of paragraph 2 and 3 of the check mark in the explanatory memorandum, memorandum or certificate of engineering structures preservation map. 24. when būvvald is made a mark in the explanatory memorandum, memorandum or certificate of engineering structures preservation map construction agent provides information about construction workers. Information on the work of the analyst can provide in submitting construction plans in the būvvald decision. 25. the explanatory note and receipt card, the period of validity of acceptance is determined in the General būvnoteikumo and the myriad of decisions about the construction plans of the date of acceptance, but for reasons of engineering structures civil engineering conservation preservation implementing date determined in accordance with the decision of the local government for the preservation of civil engineering.
4. In the explanatory memorandum, the memorandum civil engineering preservation, acknowledgement card and building conditions to be included in the 26. Explanatory Memorandum, memorandum or certificate of preservation of the structures on the map included in the commencement of the construction works, including the requirements of the conditions for the provision of information on the work of the analyst. 27. Construction permit shall include the following: 27.1. Design conditions, including: the building project to be būvvald 27.1.1. and other requirements of a construction detail, according to the local government building regulations; 27.1.2. requirements for technical or special terms from State and municipal institutions; 27.1.3. requirements for reception of technical rules of inženiertīkl connections (atslēgum) and the crossings; 27.1.4. requirements for accessibility, if the structures they provide according to laws and regulations; 27.1.5. requirements for the protection of cultural monuments; 27.1.6. requirements on a construction project in the solutions with the plot owner or legal possessor, if such right tacitly; 27.1.7. law cases-requirements for other documents, permission or consent; 27.1.8. other requirements under planning, lokālplānojum or detailed (if one has been developed); 27.2. the conditions for the commencement of the construction works, including requirements for: 27.2.1. deliverable on the responsible būvspeciālist (related articles, autoruzraudzīb); 27.2.2. registration documents to be submitted to the civil engineering works for fixation of the process (public works magazine, autoruzraudzīb magazine, building plan); 27.2.3. deliverable documents on civil liability insurance (responsible for the works and būvspeciālist insurance policies); 27.2.4. other deliverable documents legal cases; 27.3. the deadlines for the fulfilment of the conditions of the building permit. 28. conditions in the building permit to start construction works enforceable within two years after the date of the building checked for design conditions.
5. Public information 29. Subscriber completions received construction law article 14 within the time limits laid down in the seventh part, inform the public, placing būvtāfel (format, not the least of (A) 1, of a material that is resistant to the environment) plot, which allowed the construction of, in the following cases: 29.1. the second group of civil engineering, installation of new construction, demolition or alteration, position (does not apply to linear structures); 29.2. a third group of civil engineering construction (does not apply to linear structures). 30. Būvtāfel to deploy for a period of not less than building challenge. 31. in the cities and villages of the Būvtāfel placed facing against a public place, but outside the cities and villages, directed against the road. Būvtāfel indicates the following: 19.3. construction plan (construction type and address); 31.2. the client (an individual's first name, last name or legal name, address, registration number); 31.3. a construction Developer (physical person's name, certificate number or the name of the legal person, address, registration number); 19.5. the intention of the plan with the construction of civil engineering position; 31.5. building permit information for entry into force, the date of adoption of the decision and the number.
6. Designing of Development Projects 6.1 and its composition 32. Receiving planning permission, the customer arranges the building design conditions. The necessary technical or specific provisions require the relevant authorities if they are not received, the drafting of minimum building project. 33. Construction in the development of Latvian language. After the election of the principal construction of the textual part can translate into a foreign language. Foreign language text of the construction plan of the Latvian language to be translated. 34. A construction developer develops projects to the extent laid down in these regulations and is required for the construction plans as well as specified in the building permit. 35. In coordination with būvvald, you can develop a construction plan, the application of the Member States of the European Union, the national standards and technical requirements of et seq. Not allowed while several Member States of the European Union or national standards, the application of a single constructive et seq element or one of the engineering system design in the construction of a single object. 36. Projects whose design and implementation in the territory of Latvia for at least 40% funded by international financial institutions, the European Union or its Member States (if the investment is not repaid), can develop, et seq, of the application of the investor if they do not conflict with the European standardisation organisations. On the construction and implementation of relevant General construction law and the requirements set out in these provisions. The application of the investor et seq, must not downgrade national laws and structures laid down in the essential requirements. 37. A construction manager on a construction project and the construction of the cover page of the master plan, which is also the site of the main indicators characterize the signing certificate that is included in the construction plan and develop all the necessary parts according to the conditions laid down in the building (annex 6). 38. A construction manager on a construction plan concerned portions of the main drawing page (the General index page) sign a Declaration on the construction of part of the solution to the compliance with the Latvian et seq, and other laws, as well as the provision of technical or special requirements (annex 6). If a construction development in the application of the Member States of the European Union the national standards and technical requirements, et seq construction manager on a construction plan concerned portions of the main drawing page (the General index page) sign a Declaration on the construction of part of the solution to the compliance with the Latvian et seq, and the other, the laws of the Member States of the European Union and national standards et seq of the technical requirements as well as technical or specific requirements (annex 6). All part of the General construction plan for the construction of the signature of the head of the page. 39. The individual parts of the construction drawings or text technical developer sign each page of the drawing or text section. If the developer does not have relevant certificate, signature page, also drawing a part or a construction manager, which they tested. 40. the second group of civil engineering construction (except civil engineering construction demolition) has the following components: 24.9. General: 40.1.1. the initiation of the necessary civil design documents; 40.1.2. plot engineering studies documents the General būvnoteikumo of the cases; 40.1.3. interpretative description, which contains general information about civil engineering technical specifications and usage according to the classification of the structure (including the four-digit classification code), as well as for general information about accessibility of public engineering structures; 40.1.4. technical or special provisions; 40.1.5. authorization and reconciliation; 40.1.6. General index page; 40.1.7. construction master plan in accordance with clearly visible (M 1:250; M 1:500; M 1:1 000) on the topographic plan. 40.1.8. the inženiertīkl of the projected plan incorporated in the appropriate scale clearly visible (M 1:250; M 1:500; M 1:1 000) on the topographic plan. 40.2. the architectural part works (except the linear structures): vertical planning of the territory 40.2.1.; 40.2.2. facilities and greenery plan; 40.2.3. architecture: section 40.2.3.1. graphic documents with civil engineering Visual solutions and marks the height if the structures are designed for surface; 40.2.3.2. specific sections with height marks; 40.2.3.3. specifications construction products; 40.3. inženierrisinājum: 40.3.1. constructions; 40.3.2. inženiertīkl required for structures (such as gravity drainage, power supply, the electronic communication networks); 40.3.3. the technical diagrams and calculations; 40.3.4. the specifications for construction products; 40.3.5. the installation and fixing of construction drawings and descriptions; 40.3.6. other inženierrisinājum; 40.3.7. environmental protection measures; 25.1. to organize work on the project. 41. a third group of civil engineering construction (except civil engineering construction demolition) the following: 41.1. General 41.1.1. initiation of civil design: required documents; 41.1.2. plot engineering studies documents the General būvnoteikumo of the cases; 41.1.3. interpretative description, which contains general information about civil engineering technical specifications and usage according to the classification of the structure (including the four-digit classification code), as well as for general information about accessibility of public engineering structures; 41.1.4. technical or special provisions; 41.1.5. permission and consent; 41.1.6. General index page; 41.1.7. construction master plan in accordance with clearly visible (M 1:250; M 1:500; M 1:1 000) on the topographic plan. 41.1.8. the inženiertīkl of the projected plan incorporated in the appropriate scale clearly visible (M 1:250; M 1:500; M 1:1 000) on the topographic plan. 41.2. the architectural part works (except the linear structures): 41.2.1. vertical design of the territory; 41.2.2. facilities and greenery plan; 41.2.3. the architecture section: 41.2.3.1. graphic documents with civil engineering Visual solutions and marks the height if the structures are designed for surface; 41.2.3.2. specific sections with height marks; 41.2.3.3. specifications construction products; 41.3. inženierrisinājum: 41.3.1. building; 41.3.2. the structures required for inženiertīkl (such as gravity drainage, power supply, the electronic communication networks); 41.3.3. technical diagrams and calculations; 41.3.4. specification of construction; 41.3.5. installation and fixing of construction drawings and descriptions; 41.3.6. other inženierrisinājum; 41.3.7. environmental protection measures; 25.7. working for the organisation of the project; 25.8. fire report: 41.5.1. Description, which includes civil engineering fire safety characteristics; 41.5.2. the master plan of fire protection solutions (building, construction of external inženiertīkl, fire, and rescue job security); 41.5.3. fire protection requirements for structures and solutions (for example, forest fire risk assessment and fire zone, engineering structures ugunsnoturīb description, requirements and defining of load-bearing structures, the fire resistance limits and ugunsreakcij classes, building decoration, ugunsslodz, smoke protection solution, claims against the spread of fire and smoke in the event of fire, special fire protection measures, taking into account the particularities of the building); 41.5.4. evacuation of the engineering structures (except the linear structures); 41.5.5. explosion protection solution, if the structures intended for the transport of explosive substances, the production, processing or production; 41.5.6. fire protection system (fire detection and alarm systems, fixed fire-extinguishing system, fire notification system, smoke and heat control systems); 41.5.7. engineering system of fire protection solutions; 41.5.8. continuous supply providing fire protection systems; 41.5.9. specific fire during operation; 25.8. construction expertise. 42. a third group of industrial projects in the works include technological: 42.1. production process technological schemes; 26.2. the position, equipment diagrams and descriptions; 26.3. the production process of technical provisions or descriptions. 43. Public law legal persons, policy instruments of the European Union or other foreign financial assistance fund of funds in the second or third group to the construction plan, in addition to the structures include the economic part: 43.1 equipment, and construction. a summary of the material; 43.2. the volume of construction work; 43.3. the cost calculation (estimate). 44. the second or third group civil engineering construction plan for demolition the following: 44.1. General: 44.1.1. requires the initiation of civil design documents; 44.1.2. plot engineering studies documents the General būvnoteikumo of the cases; 44.1.3. interpretative description, which contains general information about civil engineering technical specifications and usage according to the classification of structures; 44.1.4. technical or special provisions; 44.1.5. authorization and reconciliation; 44.1.6. General index page; 44.1.7. section of the territory: 44.1.7.1 construction in accordance with the master plan. visually perceptible (M 1:250; M 1:500; M 1:1 000) on the topographic plan. 44.1.7.2. joined the dismantled inženiertīkl plan in accordance with clearly visible (M 1:250; M 1:500; M 1:1 000) on the topographic plan. 44.1.7.3. the vertical design of the territory; 44.1.7.4. facilities and greenery plan for the territory, if taking; 44.2. the organisation of project work. 6.2. the work of organizing the content of the project 45. organisation of Work in drafting the entire amount of the works (construction). The organisation of work, the project has the following components: 45.1. interpretative description; 45.2. the master plan of the works; 45.3. situation plan, if the construction process is also provided outside the building site; 28.2. the transport and pedestrian movement, organization chart, if the construction plan or part thereof is intended to implement a road or street land partition bar; 28.3. the protection plan; 45.6. the Works Calendar plan at the request of the Subscriber. 46. the interpretative description describes the General and special conditions of construction, possible difficulties and peculiarities, as well as the reasons for the total duration of the construction works and the most important environmental measures and recommendations to ensure quality control and the Organization of the construction site. 47. the development of a master plan in the works for individual construction stages. It noted that existing and newly built nojaucam in engineering structures, temporary structures, permanent and temporary roads, būvmašīn, also the location of the Assembly buildings and paths of movement, rapper and attract sharp fixing point, inženiertīkl (electricity, water, heat and other resource inženiertīkl), giving them permanent and temporary connection to the site, as well as the material and design of the stowage area. 48. the drafting work projects into existing conversion or restoration of works to be carried out without interrupting the execution of basic civil engineering work in addition to the organisation of the project specify: 29.9. what works and in what order, to be without losing the basic execution of civil engineering works, and what works, in what order and within the time limits to be laid down under which the basic execution breaks; 48.2. works-shipbuilding, which identified the functioning is interrupted temporarily or completely; 48.3. the interpretative description – measures which potentially will ensure smooth implementation and basic civil engineering works. 49. If the construction process is also provided outside the construction site, draw up a plan for a situation in which all the supply and logistics palīgražošan objects, atbērtn and building materials supply routes, rental contracts with the owners of the land, the atbērtn will be eliminated, and reconciliation with the local government for the supply of building materials. 6.3. the Construction of the derogation from harmonisation of the technical requirements of 50. If a technical or specific rule requirements cannot be met, a construction of technical solutions consistent with the institutions established by the corresponding requirements. Departures from the technical provisions or the specific time harmonized design. The mark made on the construction plan for the reconciliation of the master plan or technical changes or specific provisions. About inženiertīkl to derogation from or crossing the requirements of technical regulations of the institutions concerned harmonisation may require payment according to the price list approved by the authority. 51. If the law governing the construction of technical requirements cannot be met, article 9 of the law on construction of the third part of the cases allowed them to coordinate with the relevant national and local authorities. Harmonisation of building design to the conditions during the period. A check mark in the reconciliation is made to construction master plan. 6.4. A construction expertise. a third group of 52 civil engineering construction (except for the demolition of a construction) expertise: 52.1. architecture; 52.2. the share of inženierrisinājum; 52.3. the organisation of project work; 52.4. projects whose design and implementation is financed from public law legal persons, policy instruments of the European Union or other foreign financial assistance funds for economic assessment of the economic feasibility of choice of materials in accordance with the design of the task, as well as the cost of adequacy of workstations; 52.5. fire, as well as the other projects section on fire protection solutions. 53. when facing disputes between participants on the construction plan of the construction of the compliance with the laws and regulations on technical or special requirements, the inspection carried out construction projects or those parts of the sections for which members of the construction is in dispute. 54. the expert opinion of a construction contractor adds a construction documentation. 6.5. the Construction coordination and consideration of the construction of 55. coordinate the client and other persons according to the building design. 56. the original of the construction plan (with the responsible building project developer and the principal original signatures and consent to the site's master plan drawing pages) in triplicate (the law on construction of the first paragraph of article 6.1 of the cases referred to in paragraph 1 – four copies), if necessary, adding a construction inspection of the opinion submitted by the building design of the būvvald conditions during the period. One copy is stored in būvvald, one copy to the principals and construction of the developer or the responsible būvspeciālist in the field of design and construction law-6.1 of the first paragraph in the cases referred to in paragraph 1, the Office. Projects shall be submitted in one copy, where the document is prepared and filed electronically. 57. Būvvald assesses the adequacy of the construction building design contained in the conditions and regulations. 58. If all the conditions of the būvvald design of construction law article 12, fifth paragraph, the construction permit shall be made within the time limit set in the tag for design conditions. After the building of the construction marks one copy to keep būvvald. 59. If the Office finds that the būvvald do not fulfil all the conditions of the design or have received all necessary consent or permission, it instructs the customer to recycle construction plan or get the missing consent or permission. Examine the construction of one copy is stored in būvvald. 60. After būvvald found deficiencies of Subscriber building design conditions during repeated evaluation of construction project būvvald. 61. by building design in terms of execution of works submitted to the Subscriber būvvald to start the necessary documents.
7. Construction 7.1. Building permits in the commencement of the construction works of the conditions and the period of the works executed in building 62. after the commencement of the construction works and the subscriber conditions submitted in documents būvvald listed in article 12 of the law on construction of the time-limits laid down in the fifth subparagraph: 62.1. construction permit shall be made in the conditions of the commencement of the construction works; 62.2. construction permit shall specify the works requested by the Subscriber, but not beyond the participants in the work of the civil liability compulsory insurance period (except in the case where the works for insurance contracts are concluded for a year for all of it to the site); 38.7. construction permit shall specify the maximum length of the works according to the General provisions, which may extend the planning permission (the duration of the works) and to which the candidate into the structures; 38.8. construction permit shall be accompanied by an annex (annex 7), which indicates the reviewer and the works of būvspeciālist are invited. 63. Būvvald may extend the duration of the works after 65. these provisions or paragraph 66 conditions. 64. If the structures, which carried out an environmental impact assessment according to the law "on environmental impact assessment", is not put into operation before the time limit expires, the Subscriber to the law "on environmental impact assessment" should be carried out within the original environmental impact assessment, where there has been a change in the factual and legal circumstances on the basis of which began construction. If you have changed the factual or legal circumstances, būvvald can take a decision on the municipal territory planning of engineering structures that do not match the demolition. 65. where, in accordance with paragraph 64 of these rules is made repeated construction intentions evaluation, planning permission (the works duration) extended for būvvald's down time, but not more than three years, if the būvvald is presented to the relevant cadastral engineering structures determine the thing (the structures for which legislation is intended to determine the cadastre) and submitted to izpildmērījum plan for civil engineering, as well as the location of the būvvald is appropriate in the works submitted for compulsory insurance against civil liability in respect of a copy of the insurance policy. If the time limit referred to in the structures is not put into operation and have changed the factual or legal circumstances on the basis of which the construction was begun, būvvald can take a decision on the municipal territory planning of engineering structures that do not match the demolition. 66. If the structures, which has not undergone an environmental impact assessment according to the law "on environmental impact assessment", or (if the structures are intended to be implemented by orders of magnitude) is put into operation, the time-limit set in the building (the works duration) extended for the time requested by the customer, if būvvald has shown up trying things cadastral engineering structures (structures, which legislation is intended to determine the cadastre) and submitted to izpildmērījum plan for civil engineering position check as well as the būvvald is appropriate in the works submitted for compulsory insurance against civil liability in respect of a copy of the insurance policy. 67. during the work of construction workers can change or external būvspeciālist, if shall inform the būvvald and submit new works for compulsory insurance against civil liability in respect of a copy of the insurance policy or the new būvspeciālist article and the context of the professional liability insurance policy copy. The new operator of the construction works or the new būvspeciālist the guest is entitled to initiate the duties on the construction site of a new building permit annex (annex 7) issue. 7.2. preparation of the Construction works preparing It 68., which requires planning permission, starts only when the building has received irrefutable and fulfilled the conditions contained in the permit. 69. the preparation of the construction works and the construction works are performed. 70. the internal renewal of the inženiertīkl, installation, demolition or conversion, or the explanatory memorandum the proposed works can be performed without independent practice Builder the right architectural or construction field. The constructor does not need public works magazine, and he takes responsibility for the construction works and the construction manager's responsibilities. 71. The customer and works for mutual commitments determined in accordance with these rules, the Latvian et seq, and other laws and regulations of the public works contract, which also covers the preparation of the construction works. 72. The Subscriber receives with the execution of the associated permissions and before the commencement of the construction works: 72.1. works issued the operator būvvald accepted, the explanatory memorandum explanatory memorandum civil engineering certification card or preservation copy, or a copy of the building permit for the construction of the launching of the proposed conditions and construction; 72.2. in accordance with the laws and regulations in the field of labour protection shall designate one or more of the labour protection coordinators, where the works are performed in more than one works. 73. The construction contractor employing one or more health professionals or to attract competent professionals or institutions according to the laws and regulations in the field of labour protection. 74. If the contractor entered into construction works contracts with individual participants in the works, he works for each individual reviewer, the explanatory memorandum shall be issued a receipt card or a copy of the building permit. 75. the process of preparation of the works take the necessary organisational measures, as well as work on the construction site and outside it, to ensure the smooth operation of the works and all works membership in coordinated action. 76. The works receive a construction contractor, make sure that the additional detailed blueprints. If the operator is not the works requested more detailed drawings or even is not developed by them, the works contractor is responsible for the possible consequences. Detailed drawings may develop in the course of the works, and also coordinate with the developer and construction contractor. 77. when the main objective of būvas, but have not yet begun construction, the main contractor of the works takes all the construction conception site protection works against adverse natural and geological phenomena (such as flooding, noslīdeņ) that are specified in this rule referred to in paragraph 81 works project. Act as the main setting of the client submit būvaš būvvald in seven days, counting from the date of signing of the Act. 78. prior to the commencement of the construction works, the existing building conditions, the main operator of the construction marks and delimit danger zones, set the existing underground structures of inženiertīkl and other axes or marks it borders, as well as provide traffic and pedestrian movement and safe access to the existing buildings and infrastructure. These measures work carried out in line with the draft inženiertīkl and affected building owners. 7.3. the documentation of the 79 works. If during the works it is necessary to provide for solutions that are different from those provided for in a construction solutions, their implementation is permitted after the construction of the changes in the law, and the construction of the General būvnoteikumo of the cases and order. 80. The works are organized and carried out in accordance with the memorandum, receipt card or a construction and its work in organizing the project, as well as the work of the project. 81. Work carried out on the basis of project construction plan, developed in the works of professional development (main performer of the works), but a separate and dedicated work, the operator of certain works. Work out the components of the project determined in accordance with the laws and regulations on the work of the project, but the project's level of detail is determined by its developer, depending on the nature and extent of the work. 82. the works, depending on the volume and duration of the proposed construction work took place in the entire project development cycle of the works or structures (such as the underground cycle, surface preparation works of the cycle, the cycle, the civil engineering section, span, standing). 83. developing works project for the existing structures, abide by its owner, or, if not, the legal possessor and the situation of the site. 84. If the works projects of the works of the individual investigator, this project shall be coordinated with the main purchasers of the works. On the basis of a mandate issued by the heads of būvkomersant, works in the project approved by the individual performing the works būvspeciālist (Officer). Engineering structures, restoration or conversion work carried out in accordance with the construction plan also projects a developer and contractor. 85. the work of the project shall be referred to the responsible manager before the construction of the works provided for in the commencement of the construction works. 86. the work of the project is available at the construction site workers būvspeciālist and controlling bodies. 87. Public Works Director every working day shall make entries in the log of the works, and they must be representative of the actual situation on the construction site. The works proposed in the journal būvuzraug and autoruzraug the opposition or guidance is considered fulfilled if the būvuzraug or autoruzraug had done the tag works in the journal. Entries in the journal also performs the works of the individual by whom the works construction managers perform their jobs. 7.4. The works and quality control 88. On the protection of health at the construction site according to competence is responsible for construction work (the main operator of the works), the public works Director in charge, but on individual job types – individual person works construction managers. Construction managers followed the defensive coordinator job. 89. the road and self-propelled mechanism motion construction site organized in accordance with the work project, et seq, and the rules of the road. 90. On the quality of the works is responsible for the works. The quality of the works may not be lower than būvnormatīvo of Latvia and in the relevant standards, building regulations and other laws or works contracts laid down in the quality of the works. 91. The construction of quality control system for each investigator works develop according to your profile, the type of work performed and amount. Quality control of the works include: 91.1. works dossier, material, product, supply and construction equipment, machinery and equipment similar to the original; 91.2. individual operations or technological processes control; 91.3. completed (the) kind of work or work cycle (design element) closing control. 92. the work of the inspection after the completion of the complete work is not possible, acceptable to cover the work of legislation immediately after their execution. 93. The completed major construction and jobs, as well as segto built in fire protection for important engineering systems (external and internal fire-fighting water supply system, automatic and non-automatic fire protection system) adopted into service with the adoption Act (8, 9 and 10.). 94. the continuation of the works is not allowed if the customer or būvuzraug (if construction is performed in the building) and representatives of the performers of the works is not compiled, and work site signed acceptance report of the work covered. If būvuzraug or autoruzraug finds the work carried out by the non-compliance with construction or construction technology requirements, further work should be stopped and the record of the work or the autoruzraudzīb journal, specifying the deadline. Only when all persons referred to in this paragraph have signed the cover work, work continued. 95. If in the course of construction work in the break, during which the Act adopted may cover work injuries before the resumption of construction work carried out repeated previous cover verification of the quality of the work and shall draw up a report. 96. the construction contractor quality control general būvnoteikumo of the būvuzraug in the cases specified in the call. 97. The client autoruzraudzīb General būvnoteikumo for the cases brought by the construction of developers. 98. If the works are performed in the company working in line with the company's management. 7.5. the environmental conditions 99. organizes and carries out the works so that environmental damage would be minimal. Environment and natural resources protection, sanitary and security established in the works are organized and conducted in compliance with the law, within the limits and requirements. The consumption of natural resources must be economically and socially sound. 100. Restoring, remodeling or demolition works are carried out, if possible, construction waste recycling and recovery. All construction waste materials, which are to be classified as hazardous waste, managed according to the regulations on the management of hazardous waste. 101. before the ground work, as well as through gliding jobs construction site, soil is removed and stored for future use. 102. If a construction site resulting from industrial and municipal wastewater pollution degree is greater than the specified regulatory signs before entering the sewer network, it cleans up according to laws and regulations in the field of prevention of pollution. 103. It is not permissible for water (also stripped) discharge from the site itself and not the path of the channels. Water discharge and the open nature of the system of novadgrāvj provides for works projects. 104. the process of drilling work, reaching the water sējhorizont not, take steps to prevent the unnecessary use of ground water outflow and water pollution of sējhorizont. 105. Reinforcing the soil, prevents ground water and open water pollution. The necessary measures shall carry out the work project. 106. The construction process can change the natural terrain and hidroģeoloģisko conditions (for example, fill up the ravine and career, dig ponds, installing a drain), if those measures are intended for construction or as determined by the Geotechnical Control Office (Geotechnical work carried out in the course of construction, to establish the conformity of the construction plan of the actual geotechnical data and, if necessary, adjust the construction). 4.7. Engineering structures preservation works in case of interruption or suspension 107. Civil engineering works carried out where the preservation of termination or suspension may result in danger to the environment or to human life and health or dangerous defects may occur in structures. 108. the decision on the suspension of the works may accept contractor by giving būvvald. 107. These provisions in the case referred to in paragraph 1 before the termination of the works submitted to the coordination of the būvvald the principal civil engineering activities in the preservation project. 109. Civil engineering work of preservation project: 109.1. the necessary transactions to list; 109.2. solutions to building loss of stability and civil engineering element further deterioration; 109.3. solutions to prevent hazards to human life and health or the environment; 109.4. civil engineering works calendar preservation plan. 110. If the authority which is not būvvald, according to the competency has stopped the works, the authority shall immediately notify the būvvald. 111. Būvvald 14 days after this provision and paragraph 108.110 of receipt of the information referred to in the surveyed object (except when the works stopped) and adopt a decision on the authorisation to suspend the civil engineering works, conservation works project or, if necessary, shall take a decision on the civil engineering works on preservation. 112. If after the survey found engineering structures and the need to preserve the client has not submitted the būvvald civil engineering conservation works project, the decision on the civil engineering būvvald preservation: 112.1. engineering structures conservation reasons; 112.2. engineering structures preservation conditions (measures to be taken to ensure the safety of the civil engineering construction stability and integrity, as well as, if necessary, the civil engineering works of the preservation project); 112.3. term civil engineering activities in the preservation project. 113. Būvvald 14 days after civil engineering works of preservation projects, the assessment of its conformity with the requirements of the laws under it or adopt a decision specifying the identified deficiencies and their prevention. 114. following these rules the decision referred to in paragraph 113 of the implementing the client repeatedly go to būvvald. 115. the civil engineering work, these conservation deal in the works requirements, including the requirement for public works for liability insurance. Works for civil liability to be insured to the entire work period of preservation. 116. The work shall end with the moment when the būvvald has taken a decision on the authorisation to suspend the works or when the client has completed a civil engineering work under the conservation būvvald preservation of agreed civil engineering works of the project. 117. If the client fails to fulfil the requirements of this regulation, the municipality shall be entitled upon notice to the Subscriber, to carry out civil engineering works on preservation. All civil engineering works associated with the preservation costs shall be borne by the Subscriber. 118. If, after the termination of the works of the later period of the būvvald finds that the structures can cause hazard to the environment or human life and health, or that it is dangerously defective design, the būvvald shall decide on civil engineering works referred to in this chapter for preservation. 119. where, after the suspension of the works of būvvald finds that require engineering structures preservation, būvvald shall decide on civil engineering works on preservation this section in that order.
8. Acceptance and adoption of individual work 8.1. engineering structures making the first group into 120. First Group of works accepted into service, if the works are conducted in accordance with explanatory note or receipt card. 121. Inženiertīkl or, if not, the legal possessor within 14 days of receipt of the customer's application for an opinion according to competence, shall issue an opinion on the inženiertīkl of RAM for running or the opinion ready for internal readiness of operation inženiertīkl. 122. After completion of the construction works shall provide the Subscriber būvvald: 122.1. fill the explanatory memorandum or a receipt card, part II; 122.2. engineering structures on the location of the izpildmērījum plan (does not apply to internal inženiertīkl construction); 122.3. the distribution of the inženiertīkl owner or, failing that, in the opinion of the legal possessor of inženiertīkl transmission ready for operation if the inženiertīkl was carried out of the RAM upgrade, installation or alteration; 122.4. the holder inženiertīkl or, in the opinion of the legal possessor of the internal readiness of operation inženiertīkl, where was the restoration of the internal inženiertīkl, installation or alteration; 122.5. topical cadastral Affairs, determine if the works in accordance with the laws and regulations are cadastral uzmērīt. 123. The explanatory memorandum or a receipt card indicates to the customer the agreed period of time in which the client may require the contractor works on its own means, eliminate the construction defects discovered by civil engineering construction. The minimum guarantee period of construction work after būvvald marks made in the explanatory memorandum or a receipt card is two years. 124. Būvvald is five working days after the rules referred to in paragraph 122 of the receipt of the documents surveyed site, make sure that the works are conducted in accordance with the accepted construction plans and the construction of the regulatory laws, and make the relevant tag in the explanatory memorandum or a receipt card. 125. The structures shall be regarded as accepted into service with the day when the būvvald has made a mark in the explanatory memorandum or a receipt card. 126. If the works carried out do not meet the accepted conception of construction or the construction of laws framework, būvvald shall decide on derogations identified. That decision indicates deviations from the accepted found conception of construction or the construction of the regulatory laws and resign. 127. by this provision in paragraph 126 that decision contains derogations of the prevention client repeatedly go to būvvald. If the customer has prevented a decision contains derogations for the būvvald tag in the explanatory memorandum or a receipt card. 8.2. The second and third groups of acceptance into civil engineering civil engineering acceptance into 128. proposes to the Subscriber. Before the adoption of the civil engineering works are carried out in the initiating service izpildmērījum and determine if the cadastral works in accordance with the relevant laws and regulations are cadastral uzmērīt. 129. at the written request of the principal institutions, issued by technical or special terms, verifying and 14 days after receipt of the corresponding application competency gives opinion on civil engineering readiness for operation, its compliance with technical or special provisions and regulatory requirements. National cultural monument protection Inspectorate's opinion is needed, as determined by the real national protected cultural monument conversion permit. The opinion of the health inspection is required if a candidate works for legislation to have certain minimum hygiene requirements. 130. If brought into the structures of the third group, in addition to this provision 129. institutions referred to in points 14 days after customer's receipt of a written request the State fire and rescue service provides an opinion on the compliance of the fire safety works requirements, but if this works is located in the port area, within 14 days after receipt of the application, the State joint stock company "Latvian maritime administration" advising on the operation of this civil engineering readiness from the viewpoint of maritime safety. 131. In proposing the adoption of civil engineering in service, the Subscriber būvvald (construction law 6.1 of the first paragraph in the cases referred to in paragraph 1, the Office) shall submit the following documents (originals): 131.1. proof of civil engineering readiness operation (annex 11); 131.2. construction plan changed parts, which levels during the works carried out in accordance with the General būvnoteikumo; 131.3. civil engineering position izpildmērījum plan; 131.4. up-to-date cadastral Affairs, determine if the works in accordance with the laws and regulations are cadastral uzmērīt; 129. these provisions 131.5. and institutions referred to in paragraph 130 of the findings; 131.6. Journal and major public works design and cover the work of the adoption Act; construction technology under 131.7. equipment, specialty systems and equipment inspection records and receipts and compliance statements, if their need is determined by the laws on the safety of equipment; 131.8. built-in compliance of products supporting documentation; 131.9. autoruzraudzīb journal, if the work is carried out in the laws of the autoruzraudzīb in the order; a construction developer 131.10. opinion on the conformity of the construction of civil engineering works, if not autoruzraudzīb; 131.11. būvuzraug report on the implementation of the plan of the building, where the works are carried out of the building regulations. 132. This provision, 131.2 131.1..,.,., 131.3 131.4 131.5.,.,., and 131.7 131.10 131.11. referred subscriber copies of documents shall be deposited in the archives of the Office or of the būvvald. 133. The structures are taken into būvvald or Office. The Office shall call upon the decision-making officials if būvvald būvvald is expressed willingness to take part in it. External būvvald official signature for acceptance into civil engineering. 134. The principal investigator of the works by or its authorized representative, presented to the Office structures or būvvald. 135. Būvvald or Office is to assess readiness for operation of engineering structures based on būvvald or the Office that rule 131. documents referred to, as well as compliance with laws and regulations in the field of construction. 136. the Office of the civil engineering Būvvald or making a būvuzraug call, if carried out, the building and construction developer, if he is not made a autoruzraudzīb and given an opinion. Būvuzraug and the construction of the outside developer signs the acceptance of engineering structures. 137. Būvvald or Office is not entitled to accept the structures in service, if any of these rules or 129.130. institutions referred to in points is not given a favourable opinion on civil engineering readiness for commissioning. 138. in civil engineering can take a turn into its works are completely finished and all relevant engineering structures for fire safety, turn work and environmental protection measures, as well as the entire project done in order to ensure the availability of the environment. 139. Horizon, pārbūvējam and renewable engineering structures for which construction inženiertīkl issued with the relevant structures of the single permit, allowed to add into the existing inženiertīkl and launch it into operation before you have received a civil engineering Act of adoption into the readiness for the inženiertīkl the commissioning according to the construction plan, and izpilddokumentācij has signed this provision in paragraph 129 above. 140. Būvvald or Office within 14 days after receipt of the civil engineering readiness for operation, in coordination with the civil engineering contractor reporting deadline, with the Act adopted the structures in service (hereinafter the Act), (12.) or take a decision on the known deviations. 141. If the structures are taken into the winter, utilities jobs (for example, piebrauktuvj, sidewalks, landscaping, farm, playground and sports area coverage of applied fluid) and a fragment of the facade decoration may take the works mentioned in the season, but they must be completed by June 1 of the current year. 142. In accordance with the provisions of paragraph 141 deferred works and their terms of entry. The Act that delayed the completion of the works within the control of the building. 143. If, on the basis of a single planning permission, construction and commissioning of several civil engineering works are accepted by the sixth section of the Act "civil engineering technical economic indicators" fills in each building separately. 144. The Act specifies the Subscriber and the operator of a harmonised construction period, a Subscriber may request that the contractor works on its own means, eliminate the construction defects discovered after acceptance into civil engineering. That period, counting from the date of signing of the Act, must not be less than: 144.1. three years of group structures; 144.2. five years third group works. 145. The Act shall be recorded in the būvvald or in the Office. The number of the Act contains the following 14:145.1. the first two characters – the year the last two digits; 145.2. following five signs – the registration number of the Act, up to five characters with zeros from the left; 145.3. the last seven signs-construction of the territorial code under the administrative and territorial units. 146. The Act shall be drawn up in triplicate. If the structures are taken into the Office, draw up legislation in four copies. Two copies shall be given to the customer, one copy kept in the archives of the būvvald and the Office. Act shall be drawn up in a single original, if the document is prepared in electronic form. 147. The structures shall be regarded as accepted into service with the signing of the Act of the day. 148. If the structures are not accepted into service, it shall decide on būvvald known deviations. That decision indicates the detected deviations from the accepted construction plans or construction of regulatory laws and resign. 149. by this provision in paragraph 148 that decision contains derogations of the prevention client repeatedly turn to būvvald or in the Office. If the customer has prevented a decision contains derogations, būvvald or Office with the Act adopted the structures in service. 8.3. the first group of civil engineering work of making demolition 150. First Group of engineering structures demolition works are accepted if made in accordance with the explanatory note or receipt card. 151. Inženiertīkl or, failing that, by the legal possessor within 14 days of receipt of the customer's application for an opinion according to competence, shall issue an opinion on the inženiertīkl transmission demolition or opinion on the internal inženiertīkl of the demolition. 152. After completion of the principal civil engineering demolition submits būvvald: 152.1. fill the explanatory note or receipt card, part II; izpildmērījum. building site plan 152.2 (does not apply to internal inženiertīkl demolition); 152.3. the distribution of the inženiertīkl owner or, failing that, in the opinion of the legal possessor of the inženiertīkl demolition if the transmission was inženiertīkl transmission demolition; 152.4. the holder inženiertīkl or, in the opinion of the legal possessor of the internal inženiertīkl demolition, if internal inženiertīkl was carried out of the demolition. 153. Būvvald, five working days following this provision, paragraph 152 of the receipt of the documents surveyed site, make sure that the works are conducted in accordance with the accepted construction plans and the construction of the regulatory laws, the question mark in the memorandum or the receipt issued for the map and the absence of civil engineering (annex 13) (does not apply to internal inženiertīkl demolition) or taken a decision on the known deviations. 154. If the works carried out do not meet the accepted conception of construction or the construction of laws framework, būvvald shall decide on derogations identified. That decision indicates the detected deviations from the accepted construction plans or construction of regulatory laws and resign. 155. by this provision in paragraph 154 that decision contains derogations of the prevention client repeatedly go to būvvald. If the customer has prevented a decision contains derogations for the būvvald tag in the explanatory memorandum or a receipt card. 8.4. the second and third group of civil engineering work of making demolition 156. Second or third group civil engineering demolition works are accepted if made in accordance with the conditions set out in the permit. 157. at the written request of the principal bodies that have issued technical or special terms, verifying and 14 days after receipt of the corresponding application competency gives opinion on civil engineering demolition, its compliance with the agreed projects and legislative requirements. 158. the civil engineering proposes adoption of the demolition contractor. The site izpildmērījum is carried out, before the adoption of the proposed demolition of the structures. 159. In proposing the adoption of civil engineering demolition būvvald the Subscriber shall submit the following documents (originals): 159.1. proof of civil engineering demolition (annex 14); 159.2. construction plan changed parts, which levels during the works carried out in accordance with the General būvnoteikumo; 159.3. building site izpildmērījum plan; 159.4. this rule 157, paragraph of the opinion of the institution; 159.5. public works magazine. 160. This provision, 159.1 and 159.2., 159.3 159.4. referred subscriber copies of documents shall be deposited in the archives of būvvald. 161. Engineering structures demolition of adopted būvvald. 162. Būvvald 14 days following receipt of the demolition of the structures, in coordination with the principal building site reporting deadline issued for lack of engineering structures (annex 13) or taken a decision on the known deviations. 163. The client, by the participants in the works or its authorized representative, presented in the būvvald building. 164. Būvvald, assuming engineering structures demolition, evaluate engineering structures demolition and marshalling work area based on these rules provided in būvvald 159. documents referred to, as well as compliance with laws and regulations in the field of construction. 165. If the structures demolished in the winter and in accordance with the construction plan for landscaping of the territory, the territory greening, tree and shrub planting, piebrauktuvj, sidewalks paving the fluid application can perform the works mentioned in the season, but they must be completed by June 1 of a given year. 166. In accordance with the provisions of paragraph 165 of the deferred works and their terms on the record about the absence of civil engineering. Inquiries about the absence of the above civil engineering works postponed the completion of the works within the control of the building. 167. If the works carried out do not meet the accepted conception or construction of regulatory laws, būvvald shall decide on derogations identified. That decision indicates deviations from established plans or construction of accepted regulatory laws and resign. 168.167. These provisions in the decision referred to in paragraph indents in the prevention client repeatedly go to būvvald. If the customer has prevented a decision contains derogations, to issue a certificate of būvvald civil engineering not being. 8.5. Civil engineering work, the adoption of conservation at the conservation work of the 169. the Subscriber shall inform the būvvald completion of the construction work is completed by submitting a completed memorandum of engineering structures preservation part II. If you've made a third group of civil engineering in addition to preservation, būvvald submitted a civil engineering technical opinion survey. 170. Būvvald within five working days of the surveyed object, make sure that the works are conducted in accordance with civil engineering conservation works project and the construction of the regulatory laws, and make the relevant tag in the explanatory memorandum preservation engineering structures. 171. If būvvald detects that the works are not made in accordance with the civil engineering conservation works project or the construction of laws framework, it shall take a decision on the known deviations. That decision indicates the indent from the civil engineering works established conservation works project or the construction of the regulatory laws, terms and other conditions of the derogations identified. 172. by this provision in paragraph 171 that decision contains derogations of the prevention client repeatedly go to būvvald. If the customer has prevented a decision contains derogations, būvvald of the mark in the explanatory memorandum, the preservation of the structures.
9. concluding issues 173. provisions shall enter into force on the 1 October 2014. 174. the law on construction of the first paragraph of article 6.1 of the cases referred to in paragraph 1, the control and civil construction works making this rule 8.2. chapter in that order until 30 June 2015 to make būvvald, but starting with 1 July 2015 – Office. The Prime Minister is the Rapidity of economic Newsletters Minister Vyacheslav dombrovsky annex 1 Cabinet 2014/16 Regulation No 551 ____ ___ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ būvvald explanatory note for the construction of the initiator (client) (physical person's name or the name of a legal person) (natural person or legal person code registration number) (residence or registered office, telephone number) (electronic mail address) please consider submission (civil engineering) for construction/demolition of i. conception documentation 1. Construction type (required mark) : new construction installation operation decommissioning in rebuilding restoration 2. details of construction intentions object: 1) civil engineering group (General provisions) 2)/provided for the existing civil engineering use (code) (according to the classification of structures) 3) civil engineering building area (does not apply to linear structures) (m2) 4) height of the structures (does not apply to linear structures) (m) 5) line length (m) civil engineering 6) cadastral designation of engineering structures (existing) 7) method of demolition (demolition) 8) waste management in construction (demolition) 9) construction waste volumes (demolition) 10) construction waste recycling and disposal site (demolition) 11) getting the type of territory (demolition) 12) civil engineering works owner or, if not, the legal possessor or user (an individual's name, surname, personal code or entity name, registration number) 3. details of the affected real property: 1) the real property cadastre number 2) under the unit or building address 3) land cadastral designation of the unit 4) where construction for forest (if not planned demolition) : a number of forest blocks) _____ ____ ____ b) forest nogabal number ___ _____ _____ (c)) atmežojam the area by forest nogabal 5) real property owner or, if not, the legal possessor or user (an individual's name, surname, personal code or entity name, registration number) 4. details of construction funding sources: private means public law legal persons means European Union policy instrument features other foreign financial help features 5. Authorised person (natural person name first name, last name, ID code, place of residence, telephone number, electronic mail address or legal name, registration number, legal address, phone number) for legal persons specified contact person (first name, last name, ID number, phone number, e-mail address) 6. A construction Developer (an individual's first name, last name, ID number, certificate number or the name of the legal person, registration number būvkomersant registration certificate number) 7. Būvspeciālist (s) (first name, last name, certificate number) 8. developer and Construction būvspeciālist (s) proof: solutions appropriate to the intended use, legislation, local authority binding rules , received technical or special terms and will not affect other structures or parts of structures of sustainability, inženiertīkl. Third-party property rights are respected.
A construction Developer (signature) (date) Būvspeciālist (s) (signature) (date) 9. Construction agent (client) certificates and signatures: 1) certify that the attached property rights supporting documents (copies) are authentic, truly and completely, for the object is not a burden, prohibition or dispute. Undertake to implement civil engineering construction, demolition, or alteration of placement (necessary to underline) according to the plans drawn up documentation.
The construction of the initiator (client) (first name, last name, signature) (date) 2) confirm the validity of the landmark area.
The construction of the initiator (client) (first name, last name, signature) (date) 10.-the documents submitted in the annex (according to the situation, the required mark): property, tenure or use rights documents on ____ lp.  technical or special provisions on ____ lp.  the works provided for places on ____ fotofiksācij lp.  graphical document with civil engineering Visual solutions (does not apply to the demolition of civil engineering) to ____ lp.  a valid plot plan or instrument in topographic uzmērīt the land boundary plan to ____ lp.  location plan on an appropriate scale, showing the positions of civil engineering for the parcel and its external dimensions, the valid topographic plan of the cities and villages, but outside the cities and villages of the uzmērīt of the instrumental land plan (does not apply to the demolition of civil engineering) to ____ lp.  technical documentation established by the manufacturer (for ready civil engineering placement) to ____ lp.  reconciliation with the plot owner (if construction agent (the client) is not the owner of the land) and third parties on ____ lp.  If the construction is for the forest, the ground plan with a marked building in the atmežojam forest land and forest land atmežojam sketch, prepared according to the laws and regulations on tree felling of the forest in the ____ lp.  another person the authorisation or consent to ____ lp.  the laws and the documents in the cases on the ____ lp.  the construction of the agent (the client) power of Attorney (if the application is submitted by an authorised person) to ____ lp.  other documents _ _____ _____ _____ _____ _____ to ____ lp. Fill out būvvald 11. Planning (detailed in lokālplānojum,) the intended primary use (papildizmantošan) (if not planned demolition) 12. Būvvald marker for the construction of the acceptance of the idea of Būvvald the designated officer (title) (name, surname, signature) (date) 13. period of implementation of the conception (date) 14. Mark start of construction conditions (date) Construction Contractor/Builder (an individual's name, surname, personal code, place of residence, phone number, or the name of the legal person, the registration number būvkomersant licence, registration number, registered office, telephone number) of the Būvvald Officer (title) (name, surname, signature) (date) 15. waiver decision to accept the intention of Decision number _____ and _____, _____ date _____ ____ ____ Būvvald the designated officer (title) (name, surname, signature) (date) (II) the completion of the works. 16. information on the completion of the works, certify that the construction works are completed and submitted (installation, placement or conversion): the position of the izpildmērījum civil engineering plan;  current cadastral Affairs determine (if the works in accordance with the laws and regulations are cadastral uzmērīt). Certify that the works are completed, the area is sorted and all construction wastes are managed in accordance with the laws and requirements and submit a site plan izpildmērījum (demolition). Informed that the construction of the management of waste produced by (name of operator of the waste), Construction (subscriber) agent (name, surname, signature) (date) 17. expiry date of the guarantee of the construction works of the defects found in the _____ years after adoption into civil engineering, public works contractor will remove at their own expense. 18. check the works surveyed object (date) found that construction work is/is not made (necessary to underline) according to the accepted conception documentation. 19. Decision on the known deviations from the accepted construction plans or construction of the laws governing the decision number _____ and _____, _____ date ____ ___ ___ ___ Decision due date (date) Būvvald the designated officer (title) (name, surname, signature) (date) 20 marks for the completion of the construction works issued a statement about the lack of civil engineering works (demolition) (specify number and date) Būvvald the designated officer (title) (name, surname, signature) (date) notes. 1. the būvspeciālist shall be Invited in paragraph 7, and paragraph 8 contained in the signed receipt. 2. the document property "signature" does not fill in, if an electronic document is drawn up according to the law on electronic document design. 3. Each part of the explanatory memorandum completed separately, developing seed documentation and complete the works. 4. Explanatory note the relative box will expand if necessary to reflect the more information. 5. If simultaneously with the civil engineering construction or demolition is implemented other groups building construction or demolition, explanatory memorandum, supplemented with information on the different centres or nojaucam structure and documents according to the other special provisions. Economic Minister Vyacheslav dombrovsky annex 2 Cabinet 2014/16 Regulation No 551 ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ for būvvald reasons (preservation engineering structures), Construction (subscriber) agent (an individual's first name, last name or legal name of the person) (natural person or legal person code registration number) (residence or registered office, telephone number) (electronic mail address) please consider submission (civil engineering) preservation, submitted on the basis of the (local) decision on engineering structures (decision number preservation ____ ____ ____ ____ _ , date ____ ____ ____ ____) real property cadastre number i. seed documentation 1. details of the structures: 1) civil engineering group (General provisions) 2)/provided for the existing civil engineering use (code) (according to the classification of structures) 3) civil engineering building area (does not apply to linear structures) (m2) 4) height of the structures (does not apply to linear structures) (m) 5) line length (m) civil engineering 6) cadastral designation of the 7 civil engineering) engineering structures or, if the owner is not , the legal possessor or user (an individual's name, surname, personal code or entity name, registration number) 2. details of the affected real property: 1) the real property cadastre number 2) under the unit or building address 3) land cadastral designation of the unit       4) real property owner or, if not, the legal possessor or user (an individual's name, surname, personal code or entity name, registration number) 3. Authorised person (an individual's name, surname, personal code, place of residence, telephone number, electronic mail address or legal name, registration number, registered office, telephone number) of the person specified contact person (first name, last name, ID number, phone number, e-mail address) 4. A construction Developer (physical person's name the name, identity number, certificate number or legal name, registration number, registration certificate number būvkomersant) 5 Būvspeciālist (s) (first name, last name, certificate number) 6. developer and Construction būvspeciālist (s) proof: solutions appropriate to the intended use, legislation, local authority, binding provisions received technical or special terms and will not affect other structures or parts of structures of sustainability, inženiertīkl. Third-party property rights are respected.
A construction Developer (signature) (date) Būvspeciālist (s) (signature) (date) 7. Construction agent (client) certificates and signatures: 1) declare that the property attached supporting documents (copies) are authentic, truly and completely, for the object is not a burden, prohibition or dispute.
The construction of the initiator (client) (first name, last name, signature) (date) 2) confirm the validity of the landmark area.
The construction of the initiator (client) (first name, last name, signature) (date) in annex 8, the documents produced (according to the situation, the required mark): property, tenure or use rights documents on ____ lp.  the construction of the power of attorney to the agent ____ lp.  building conservation works project to ____ lp.
 the work of organizing the project if the Government decision on the preservation of the civil engineering works has indicated, to ____ lp.  heritage inventory Act, if the structures is a cultural monument to ____ lp.  other documents ____ ____ ____ ____ ____ ____ ___ ____ to ____ lp.
9. būvvald fills in mark for civil engineering work of the acceptance of the preservation of Būvvald Officer (title) (name, surname, signature) (date) 10. Conception of the implementation deadline (date) 11. Mark start of construction conditions (date) Construction Contractor/Builder (legal name, registration number, registration certificate number būvkomersant, registered office, telephone number) of the Būvvald Officer (title) (name, surname, signature) (date) 12. Decision on the refusal to accept civil engineering work for the preservation of the decision number ___ _____ ___ , date ___ ___ ___ ___ ___ ___ Būvvald's Officer (title) (name, surname, signature) (date) (II) the completion of the works. 13. information concerning the completion of the works confirm that the works are complete and made in accordance with the accepted civil engineering activities in the preservation project.
The construction of the initiator (client) (first name, last name, signature) (date) 14. checking object Works surveyed (date) found that construction work is/is not made (necessary to underline) accepted engineering structures under the conservation works project. 15. Decision on the known deviations from the accepted conservation works project or the construction of laws Framework Decision number _____ and _____, _____ date ____ ___ ___ ___ Decision due date (date) Būvvald the designated officer (title) (name, surname, signature) (date) 16. Mark the completion of the work of the Būvvald Officer (title) (name, surname, signature) (date) notes. 1. the būvspeciālist shall be Invited in paragraph 5 and shall sign the certificate contained in paragraph 6. 2. the document property "signature" does not fill in, if an electronic document is drawn up according to the law on electronic document design. 3. Each part of the explanatory memorandum completed separately, developing seed documentation and complete the works. 4. Explanatory note the relative box will expand if necessary to reflect the more information. Economic Minister Vyacheslav dombrovsky annex 3 Cabinet 2014/16 Regulation No 551 ____ ____ ____ ____ ____ ____ ____ ___ receipt card (engineering structures), Construction (subscriber) agent (an individual's first name, last name or legal name of the person) (natural person or legal person code registration number) (residence or registered office, telephone number) (electronic mail address) please consider submission (civil engineering) for construction/demolition of i. conception documentation 1. Construction type (required mark): new construction installation operation demolition work to restore 2. details of construction intentions object : 1) civil engineering group (General provisions) 2) civil engineering (required mark): RAM internal inženiertīkl 3), civil engineering (m) 4) civil engineering material 5) method of demolition (demolition) 6) waste management in construction (demolition) 7) construction waste volumes (demolition) 8) construction waste recycling and disposal site (demolition) 9) getting the type of territory (demolition) 10) civil engineering works owner or, if one does not , the legal possessor or user (an individual's name, surname, personal code or entity name, registration number) 3. details of the affected real property or part thereof: 1) the real property cadastre number 2) under the unit or building address 3) ground units, buildings and parts of cadastral designation 4) where construction for forest (if not planned demolition): (a) the number of forest blocks) _____ ____ ____ b) forest nogabal number ___ _____ _____ (c)) atmežojam the area by forest nogabal 5) real property owner or If not, the legal possessor or user (an individual's name, surname, personal code or entity name, registration number) 4. details of construction funding sources: private means public law legal persons means European Union policy instrument features other foreign financial help features 5. Authorised person (an individual's name, surname, personal code, place of residence, phone number, e-mail address, or the name of the legal person , registration number, registered office, telephone number) of the person specified contact person (first name, last name, ID number, phone number, e-mail address) 6. A construction Developer (an individual's first name, last name, ID number, certificate number or the name of the legal person, registration number būvkomersant registration certificate number) 7. Būvspeciālist (s) (first name, last name, certificate number) 8. developer and Construction būvspeciālist (s) proof: solutions appropriate to the intended use, regulations local authorities, binding rules and received technical or special terms. Changes do not affect the joint ownership fractions, functional with all shipbuilding operation related inženiertīkl (gear), and structures support structures and will not affect the stability of the construction.
A construction Developer (signature) (date) Būvspeciālist (s) (signature) (date) 9. Construction proof of whom undertake to carry out civil engineering construction, demolition, restoration or conversion (necessary to underline) according to the plans drawn up documentation.
Public works contractor (name, surname, signature) (date) 10. Construction agent (client) certificates and signatures: 1) declare that the property attached supporting documents (copies) are authentic, truly and completely, for the object is not a burden, prohibition or dispute.
The construction of the initiator (client) (first name, last name, signature) (date) 2) confirm the validity of the landmark area.
The construction of the initiator (client) (first name, last name, signature) (date) 11. – the documents submitted in the annex (according to the situation, the required mark): ownership, use, or possession of formal rights to ____ lp.  a valid plot plan, if topographic structures are built on the plot, ____ lp.  the building's floor space or group plan, if inženiertīkl is installed in a building, to ____ lp.  technical or special provisions on ____ lp.  documents in accordance with technical or special terms to ____ lp.  explanatory description, which, if necessary, add calculations to ____ lp.  a developer signed a construction inženiertīkl RAM location plan on valid topographic plan appropriate scale or, if inženiertīkl is installed in a building, a construction developer signed internal placement plan inženiertīkl to buildings inventory plan for ____ lp.  reconciliation with the owner of the property (if the construction agent (the client) is not the owner of the immovable property), the building's Manager (if the works are installed in the building), the inženiertīkl and other owners of the affected building owners and third parties on ____ lp.  If the construction for forest-land boundary plan with a marked atmežojam for construction in forest land and forest land atmežojam sketch, prepared according to the laws and regulations on tree felling of the forest in the ____ lp.  another person the authorisation or consent to ____ lp.  the laws and the documents in the cases on the ____ lp.  the construction of the agent (the client) power of Attorney (if the application is submitted by an authorised person) for _____ _____ pages;  other documents _ _____ _____ _____ _____ _____ to ____ lp. 12. Būvvald būvvald fill in the marks for construction intentions acceptance of Būvvald Officer (title) (name, surname, signature) (date) 13. period of implementation of the conception (date) 14. Mark start of construction conditions (date) Construction Contractor/Builder (an individual's name, surname, personal code, place of residence, phone number, or name of the legal person, the registration number, the registration number of the certificate būvkomersant, legal address, phone number) Būvvald the designated officer (title) (name first name, last name, signature) (date) 15. waiver decision to accept the intention of Decision number _____ and _____, _____ date _____ ____ ____ Būvvald the designated officer (title) (name, surname, signature) (date) (II) the completion of the works. 16. information on the completion of the works, certify that the works are completed, and submitted to (restore, installation or conversion): the position of the izpildmērījum civil engineering plan (does not apply to internal inženiertīkl construction);  the distribution of the owner or possessor of the inženiertīkl its opinion on inženiertīkl transmission of readiness if inženiertīkl was made for the renewal of the transmission, installation or alteration;  the owner or possessor of a inženiertīkl opinion on the internal operation of the readiness inženiertīkl, where was the internal reconstruction of the inženiertīkl, installation or alteration;  current cadastral Affairs determine (if the works in accordance with the laws and regulations are cadastral uzmērīt). Certify (demolition) that the works are completed, the area is sorted and all construction wastes are managed in accordance with the laws and requirements and submit to: site izpildmērījum, where was the demolition of the RAM inženiertīkl;  the distribution of the owner or possessor of a inženiertīkl opinion on the inženiertīkl transmission demolition;  the owner or possessor of a inženiertīkl opinion on the internal demolition, if inženiertīkl was the demolition of the internal inženiertīkl. Informed that the construction of the management of waste produced by (name of operator of the waste), Construction (subscriber) agent (name, surname, signature) (date) 17. expiry date of the guarantee of the construction works of the defects found in the _____ years after adoption into civil engineering, public works contractor will remove at their own expense. 18. check the works surveyed object (date) found that construction work is/is not made (necessary to underline) according to the accepted conception documentation. 19. Decision on the known deviations from the accepted construction plans or construction of the laws governing the decision number _____ _____ _____ _____ date ____ ____ ____ ____ ___ ___ Decision due date (date) Būvvald the designated officer (title) (name, surname, signature) (date) 20 marks for the completion of the works of the Būvvald Officer (title) (name, surname, signature) (date) notes. 1. the būvspeciālist shall be Invited in paragraph 7, and paragraph 8 contained in the signed receipt. 2. the document property "signature" does not fill in, if an electronic document is drawn up according to the law on electronic document design. 3. Each receipt card engineering structures part completed separately, developing seed documentation and complete the works. 4. in the receipt card works the fields extend, if necessary to reflect more information. 5. If at the same time with the other not classified, civil engineering or construction or demolition of inženiertīkl implemented the first group of other building construction or demolition, the receipt card works to complement the information on the other under construction or nojaucam structure and documents according to the other special provisions. Economic Minister Vyacheslav dombrovsky annex 4 Cabinet 2014/16 Regulation No 551 ___ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ būvvald construction for Construction application (subscriber) agent (an individual's first name, last name or legal name of the person) (natural person or legal person code registration number) (residence or registered office, telephone number) (electronic mail address) please consider submission (civil engineering) for construction/dismantling 1. Construction type (required mark): new construction work to restore the installation restoration demolition placement 2. details of construction intentions object : 1) civil engineering group (General provisions) 2)/provided for the existing civil engineering use (code) (according to the classification of structures) 3) civil engineering building area (does not apply to linear structures) (m2) 4) height of the structures (does not apply to linear structures) (m) 5) line length (m) civil engineering 6) civil engineering material 7) civil engineering cadastral designation (existing) 8) method of demolition (demolition) 9) waste management in construction (demolition) 10) construction waste volumes (demolition) 11) construction waste recycling and disposal site (demolition) 12) marshalling area (nojaukš in the case of the United Nations)       13) civil engineering works owner or, if not, the legal possessor or user (an individual's name, surname, personal code or entity name, registration number) 3. details of the affected real property or part thereof: 1) the real property cadastre number 2) under the unit or building address 3) constructions, land units or parts of units of land cadastral designation 4) where construction for forest (if not planned demolition) : a number of forest blocks) _____ ____ ____ b) forest nogabal number ___ _____ _____ (c)) atmežojam the area by forest nogabal 5) real property owner or, if not, the legal possessor or user (an individual's name, surname, personal code or entity name, registration number) 4. details of construction funding sources: private means public law legal persons means European Union policy instrument features other foreign financial help features 5. Authorised person (natural person name first name, last name, ID code, place of residence, telephone number, electronic mail address or legal name, registration number, registered office, telephone number) of the person specified contact person (first name, last name, ID number, phone number, e-mail address) 6. minimum composition Construction Developer (an individual's first name, last name, ID number, certificate number or the number or name of the legal person, registration number būvkomersant registration certificate number) 7. Construction Developer's information about the composition of the planned building project It requires the development of section 8. information about a particular Member State of the European Union regulatory framework for the application of a construction development, applying the European Union Member States ' national standards and technical requirements of et seq (Member State of the European Union) 9. receipt: a construction developer solutions comply with the construction of the laws governing local authorities and binding rules.
A construction Developer (signature) (date) 10. Answer to the application and I would like to receive planning permission (specify one of the ways): by mail to the address indicated in the application electronically to the electronic mail address (in accordance with article 9 of the law on Notification, second paragraph) ____ ____ ____ ____ personally the 11 būvvald. Request for additional information (documents) and/or a decision on extension to the response to send electronically to the electronic mail address of the construction agent 12 (subscriber) certificate : Declare that the property attached supporting documents (copies) are authentic, truly and completely, for the object is not a burden, prohibition or dispute.
The construction of the initiator (client) (first name, last name, signature) (date) 13. – the documents submitted in the annex (according to the situation, the required mark): the minimum composition to a construction ____ lp.  the construction of the powers of the agent (if the application is submitted by an authorised person) to ____ lp.  other documents _ _____ _____ _____ _____ _____ to ____ lp.
The construction of the initiator (client) (first name, last name, signature) (date) 14 būvvald fill in the marks for construction plans. acceptance of construction permit number _____ _____ _____ _____ date ____ ____ ____ ____ ____ __ Būvvald Officer (title) (name, surname, signature) (date) 15. the decision to issue the construction permit waiver decision number _____ _____ _____ _____ date ____ ____ ____ ____ ____ __ Būvvald Officer (title) (name, surname, signature) (date) notes. 1. the document property "signature" does not fill in, if an electronic document is drawn up according to the law on electronic document design. 2. the application for the Construction of the box extend, if necessary to reflect more information. Economic Minister Vyacheslav dombrovsky annex 5 cabinet 2014/16 Regulation No 551 _____ _____ _____ _____ _____ _____ _____ the construction permit no. būvvald _____ and issued (construction agent (the client's) name, surname, personal code, place of residence, telephone number, electronic mail address (physical person) or the name, registration number, registered office, telephone number (legal person)) construction/demolition (object (civil engineering) name) 1. Construction type (required mark): new construction work to restore the installation restoration demolition placement 2. details of construction object : 1) civil engineering group (General provisions) 2)/provided for the existing civil engineering use (according to the classification of structures) 3) civil engineering building area (does not apply to linear structures) (m2) 4) height of the structures (does not apply to linear structures) (m) 5) line length (m) civil engineering 6) civil engineering material 7) civil engineering cadastral designation (existing) 8) method of demolition (demolition) 9) waste management in construction (demolition) 10) construction waste volumes (demolition) 11) construction waste recycling and disposal site (demolition) 12) getting the type of territory (demolition s case) 13) civil engineering works owner or, if not, the legal possessor or user (an individual's name, surname, personal code or entity name, registration number) 3. details of the affected real property or part thereof: 1) the real property cadastre number 2) under the unit or building address 3) constructions, land units or parts of units of land cadastral designation 4) where construction for forest (if not planned demolition) : a number of forest blocks) _____ ____ ____ b) forest nogabal number ___ _____ _____ (c)) atmežojam the area by forest nogabal 5) real property owner or, if not, the legal possessor or user (an individual's name, surname, personal code or entity name, registration number) 4. A construction Developer (an individual's first name, last name, ID number, certificate number or the name of the legal person, registration number būvkomersant registration certificate number) 5. Planning (in lokālplānojum , a detailed main intended use) (papildizmantošan) Works 6 site (survey date) opinion on the building inspection (number and date) the design conditions 7. Design conditions (required mark): 1) reconciliation with the plot owner or legal possessor: (land units or building address) (land units or building address) (land units or building address) 2) reconciliation with third parties: with adjacent property owners , the co-owners: (land units or building address) (land units or building address) (land units or building address) 3) technical or special provisions and their Publisher: reconciliation with the national authorities: (name, address, contact info) (name, address, contact info) (name, address, contact information) with municipal institutions: (name, address, contact info) (name, address, contact information)           (name, address, contact information) by the holders of the inženiertīkl: (name, address, contact info) (name, address, contact info) (name, address, contact information) 4) technical or special provisions, if it is not necessary for the reconciliation of the issuer: (Publisher's name, address, contact info) (Publisher's name, address, contact info) (Publisher's name, address, contact info) 5) other institutions reconciliation: (name, address, contact info) (name, address, contact info) (name, address, contact info) 6) accessibility requirements: area labiekārtoj UM, access roads, streets, pavements, walkways and pedestrian crossing for the chance to move from one height to another level and other requirements for the affected area 7) formulation of projects: general architecture: design of vertical territory facilities and greenery plan section of the inženierrisinājum architecture: constructions works necessary for the inženiertīkl of technical diagrams and calculations of construction of construction specifications for the installation and reinforcement drawings and descriptions by other inženierrisinājum in environmental protection measures for the organisation of project work fire p the IASB is the technological part of the economic part of the additional requirements of a construction detail, according to the municipal planning 8) construction development, applying the (European Union) national standards and technical requirements of 9 et seq) construction expertise 10) the requirements for the management of waste in construction 11) other requirements for the planning, lokālplānojum or detailed (if one has been developed) 12) būvspeciālist of professional liability insurance for construction projects of the developer: the driver of a construction expert 8. Design conditions (date) the commencement of the construction works of the works started in conditions 9. as conditions Būvvald the documents to be submitted (the required mark): developed and coordinated projects information on projects the total cost of the implementation of the information about the participants in the works (legal name, registration number, registration certificate number būvkomersant) works for civil liability compulsory insurance certificate and a copy of the works magazine public works Director in charge and public works Director related articles būvuzraug and būvuzraug of the responsible commitment of the article būvspeciālist of the professional liability insurance policy copy building plan autoruzraudzīb contract autoruzraudzīb journal information on defensive coordinator (name first name, last name, ID number, phone number), where the works are performed by more than one reviewer of the works of national cultural monuments protection inspection permit, if the work provided for in the national protected cultural monument protection zone or other documents if required by regulations and decisions Būvvald marks 10. Mark for design conditions (date) the commencement of the construction works, the conditions must be met within two years after the date of the check mark on the design conditions.
Būvvald the designated officer (title) (name, surname, signature) (date) 11. Mark the commencement of the construction works conditions (date) Būvvald the designated officer (title) (name, surname, signature) (date) 12. the maximum duration of the works is ___ _ years after mark the commencement of the construction works on the conditions: 1) works to be taken up (date) 2) works for civil liability compulsory insurance policy the insurance period specified in 3) civil engineering commissioning to be carried out until (date) Būvvald the designated officer (title) (name first name, last name, signature) (date) This town planning (administrative) within a month of the date of its entry into force may be challenged in the administrative process law (name, address) 13. Permit extended until (date) Būvvald the designated officer (title) (name, surname, signature) (date) notes. 1. the document property "signature" does not fill in, if an electronic document is drawn up according to the law on electronic document design. 2. Building the box extend, if necessary to reflect more information. Economic Minister Vyacheslav dombrovsky annex 6 Cabinet 2014/16 Regulation No 551 receipt samples the Manager of a construction certificate are included in This building project and to develop all the necessary parts according to the conditions laid down in the building.
A construction supervisor (first name, last name, certificate number) (date) (signature) a construction manager construction and this statement from the _____ _____ _____ _____ _____ _____ _____ _____ _____ part solutions meet the Latvian et seq, and other laws, as well as the provision of technical or special requirements.
A construction supervisor (first name, last name, certificate number) (date) (signature) a construction manager certification by This construction, the _____ _____ _____ _____ _____ _____ _____ _____ _____ part solutions meet the Latvian et seq, and other regulatory provisions of the Member States of the European Union, and national standards and technical requirements, et seq and the provision of technical or special requirements.
Part of a construction supervisor (first name, last name, certificate number) (date) (signature) Note. 1. the document property "signature" does not fill in, if an electronic document is drawn up according to the law on electronic document design. 2. If a construction designed by applying to the Member States of the European Union, national standards and technical requirements of et seq. Economic Minister Vyacheslav dombrovsky annex 7 Cabinet 2014/16 Regulation No 551 ____ ____ ____ ____ ____ ____ __ būvvald's construction permit No.   Annex No.   (date)   (number)   (serial number)

1. the participants in the works (legal name, registration number, the registration number of the certificate būvkomersant, legal address, phone number) 2. Guest būvspeciālist: 1) responsible works Manager (an individual's first name, last name, certificate number) 2) public works Director (an individual's first name, last name, certificate number or legal name, registration number, registration certificate number būvkomersant) 3) būvuzraug (the responsible natural person name, certificate number or the name of the legal person būvkomersant, registration number, registration certificate number), 4) būvuzraug (an individual's first name, last name, certificate number or the name of the legal person, the registration number, the registration number of the certificate būvkomersant), autoruzraug (5) the responsible natural person name, certificate number or the name of the legal person, registration number būvkomersant registration certificate number) 6), autoruzraug (natural persons first name, last name, certificate number or legal name, registration number, registration certificate number būvkomersant) 7) labour protection Coordinator (an individual's first name, last name, ID number, phone number) Būvvald the designated officer (title) (name, surname, signature) (date) notes. 1. the document property "signature" does not fill in, if an electronic document is drawn up according to the law on electronic document design. 2. the annex to the relevant building permit column extends, if necessary to reflect more information. Economic Minister Vyacheslav dombrovsky Annex 8 Cabinet 2014/16 Regulation No 551 Significant design acceptance Act of _____ and _____. year ___ ____. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ object name and address the name of the structure of the construction agent (the client) (persons name, surname, personal code, place of residence, telephone number of the person name, registration number, registered address, phone number) for the Commission: 1) the reviewer of the works/public works Director in charge (name, title, certificate number) 2) a construction developer/autoruzraug (name, title, certificate number) 3) construction of the initiator (client)/būvuzraug (name, title, certificate number) the Commission carried out a review (external test) and quality test of structure that followed (legal name, registration number, registered office or an individual's name, certificate number, residence), the Commission found: 1) making the following presented to design (design of the listing and brief description) 2) work completed under (a construction Developer's name or) the name of the legal person, the name of a construction drawing number) 3) structures used the following materials, design and product (specify certificates or other documents proving the quality) 4) work is allowed no/(delete where inapplicable) deviations from the construction plan.

The deviations permitted are consistent with (the institution concerned, the drawing number, date of harmonisation) the Commission's decision: the work is undertaken in accordance with the construction plan, et seq, and standards, and they are adopted.
The Analyst works representative (name, surname, signature) a construction Developer's representative (name, surname, signature) Construction agent (the principal) (būvuzraug) (first name, last name, signature) Note. the document property "signature" does not fill in, if an electronic document is drawn up according to the law on electronic document design. Economic Minister Vyacheslav dombrovsky 9. attachment Cabinet 2014/16 Regulation No 551 Cover work acceptance report ______. the year ____. _ _ _ _ _ _ _ _ _ _ _ _ _ object name and address the name of the construction Work of the agent (the client) (persons name, surname, personal code, place of residence, telephone number of the person name, registration number, registered address, phone number) for the Commission: 1) the reviewer of the works/public works Director in charge (name, title, certificate number) 2) a construction developer/autoruzraug (name, title, certificate number) 3) construction of the initiator (client)/būvuzraug (name, title, certificate number) the Commission carried out a review (external test) and quality test of structure that followed (legal name, registration number, registered office or an individual's name, certificate number, residence), the Commission found: 1) presentation for adoption (a short description of the work) 2) work completed under (a construction Developer's name or) the name of the legal person, the name of a construction drawing number) 3) doing the job, the following materials, design and product (specify certificates or other documents proving the quality) 4) work is allowed no/(delete where inapplicable) deviations from the construction plan.

The deviations permitted are consistent with (the institution concerned, the drawing number, date of harmonisation) the Commission's decision: the work is undertaken in accordance with the construction plan, et seq, and standards, and they are adopted.
The Analyst works representative (name, surname, signature) a construction Developer's representative (name, surname, signature) Construction agent (the principal) (būvuzraug) (first name, last name, signature) Note. the document property "signature" does not fill in, if an electronic document is drawn up according to the law on electronic document design. Economic Minister Vyacheslav dombrovsky 10. attachment Cabinet 2014/16 Regulation No 551 to important fire protection engineering systems acceptance report ______. the year ____. _ _ _ _ _ _ _ _ _ _ _ _ _ object name and address Engineering Construction agent system name (subscriber) (persons name, surname, personal code, place of residence, telephone number of the person name, registration number, registered address, phone number) for the Commission: 1) the reviewer of the works/public works Director in charge (name, title, certificate number) 2) a construction developer/autoruzraug (name, title, certificate number) 3) construction of the initiator (client)/būvuzraug (name, title, certificate number) the Commission carried out work quality and uptime verification system that made (legal name, registration number, registered office or an individual's name, certificate number, residence), the Commission found: 1) presented to the adoption (in general or the Assembly) 2) system installed in accordance with (the appropriate section of the development projects date, name, number, drawing number) and system equipment, equipment and materials, technical specifications 3) system assembled the following basic equipment, devices and materials No. p. k. The name of the type, mark, the number of Units notes 1.           2.           3.          

4) does not work/is allowed (not applicable) derogations from the harmonised system technical design.

The deviations permitted are consistent with (the institution concerned, the drawing number, matching date) define what compensatory measures taken) 5) Act the following documentation (required mark): a system of technical equipment and devices of the Passport;    system, device and material declaration of conformity;    operating system documentation (instruction);    other technical documentation that describe the system and its operating characteristics (specify) Commission decision: is built according to the construction plan, (System or system in General Assembly) et seq and standards. The system is accepted and ready for operation.

The Analyst works representative (name, surname, signature) a construction Developer's representative (name, surname, signature) Construction agent (the principal) (būvuzraug) (first name, last name, signature) Note. the document property "signature" does not fill in, if an electronic document is drawn up according to the law on electronic document design. Economic Minister Vyacheslav dombrovsky annex 11 of the Cabinet's 2014 16. Regulation No 551/proof of civil engineering readiness for operation of the construction agent (the client) (an individual's first name, last name, personal code, place of residence, telephone number of the person name, registration number, registered office, telephone number) 1. Declare that the (civil engineering) construction works carried out on the basis of the planning permission no ____ _____, issued by (date), are completed. (būvvald name)        
2. News about the built object: 1) civil engineering group (General provisions) 2)/provided for the existing civil engineering use (code) (according to the classification of structures) 3) civil engineering building area (does not apply to linear structures) (m2) 4) height of the structures (does not apply to linear structures) (m) 5) line length (m) civil engineering 6) civil engineering material 7) civil engineering cadastral designation 8) civil engineering works owner or, if not, the legal possessor or user (a physical person's name first name, last name, ID number or name of the legal person, registration number) 3. details of the affected real property or part thereof: 1) the real property cadastre number 2) under the unit or building address 3) ground units or building cadastral designation 4) real property owner or, if not, the legal possessor or user (an individual's name, surname, personal code or entity name, registration number) 4. details of construction : 4.1 construction started and completed on (date) to (date) 4.2 works with the building project, developed by (an individual's first name, last name, certificate number or legal name, registration number, registration certificate number būvkomersant) 4.3 yes/no (delete as appropriate) changes and deviations from the agreed projects. If it is, then they are matched and marked in accordance with the procedure laid down in the technical documentation in the implementation of the construction plan 4.4 participated in the following construction works: 4.4.1. reviewer (legal name, registration number, registration certificate number būvkomersant, registered office, telephone number) 4.4.2. responsible public works Director (an individual's first name, last name, certificate number) 4.4.3. būvuzraug (an individual's first name, last name, certificate number) 4.4.4. a construction Developer (physical person's name, certificate number) 4.5 construction waste management take (waste authorities name) certify 5. that: 5.1 works is ready for adoption into service; 5.2. all construction wastes are managed in accordance with legislation on waste management; 5.3. construction plan for technological equipment, specialty systems and equipment is installed, checked and adjusted according to project and comply with the laws and regulations in the construction; 5.4. the construction defects that are found in the _____ years after adoption into civil engineering, public works contractor will remove, at its own expense;  5.5. the total cost of construction is _____ _____ euro, including public law legal persons, policy instruments of the European Union or other foreign financial help features-_____ _____ euro; 5.6. outstanding works (territory greening, a fragment of the facade decoration) will be completed in the following scope and limits: No. p. k. The name of the job Completion date Unit quantity 1.         2.         3.        
 
The construction of the initiator (client) (first name, last name, signature) (date) Construction Contractor (name, surname, signature) (date), the public works Director in charge (name, surname, signature) (date) Būvuzraug (name, surname, signature) (date) a construction Developer (name, surname, signature) (date) notes. 1. the document property "signature" does not fill in, if an electronic document is drawn up according to the law on electronic document design. 2. in the receipt column concerned extends, if necessary to reflect more information. Economic Minister Vyacheslav dombrovsky 12. attachment Cabinet 2014/16 Regulation No 551 (code) for _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ (name, address, civil engineering (if not, location) and the building cadastre) ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ _ acceptance into service (the Act of dialing location) on (date) construction type (required mark): installation work to restore restoration in new construction the construction of the initiator (client) (persons name, surname, personal code, place of residence, phone number, or the name of the legal person , registration number, registered office, telephone number) 1. Making work out būvvald/construction of national control Office (delete where inapplicable): 1.1. building (first name, last name, construction control certificate number) 1.2. municipal architect (first name, last name, certificate number) 1.3. other official (name, title) 2. Hire guest: 2.1 būvuzraug (an individual's first name, last name, certificate number) 2.2 a construction Developer (physical person's name, certificate number) 2.3. construction performer (name of legal person būvkomersant, registration number, the registration number of the certificate, the legal address, phone number) 2.4.         (specialty, position, name, surname)
3. Būvvald/construction of national control Office (not applicable) met: 3.1.-the transfer of construction plan ___ ___ ___ volumes; 3.2. execution of works execution and documentation: 3.2.1. public works Journal No. _____ _____; 3.2.2. autoruzraudzīb Journal No. _____ _____; 3.2.3. important design and cover work acceptance report on the ___ ___ lp. _____ the volume (s); 3.2.4. būvuzraug report on the implementation of the plan of building the ___ ___ lp. 4. Būvvald/construction of national control Office (not applicable) assessment: 4.1 construction of agents (principals) proof of civil engineering readiness for operation; 4.2. the following State, municipal and other authorities opinions: 4.2.1.        no opinion ___ ___ to lp. ____ ___ (the institution) (date) 4.2.2.        no opinion ___ ___ to lp. ____ ___ (the institution) (date) 4.2.3.        no opinion ___ ___ to lp. ____ ___ (the institution) (date) 4.2.4.        no opinion ___ ___ to lp. ____ ___ (the institution) (date) 4.2.5.        no opinion ___ ___ to lp. ____ ___ (the institution) (body) 4.3 construction Developer's opinion no ____ ____ ____ to ____ ____ ____ lp.     (date)    
5. Būvvald/construction of national control Office (not applicable) heard the hiring Executive and outside specialists and found: 5.1 the construction works carried out on the basis of No construction permit. ___ ___ ___ ___ _____, issued by (date) (name of būvvald) 5.2 construction started and completed on (date) to (date) 5.3. works with the building project, developed by (first name, last name, certificate number or legal name, registration number, registration certificate number būvkomersant) 5.4 Yes/No (delete as appropriate) changes and deviations from the agreed projects. If it is, then they are matched and marked in accordance with the procedure laid down in the technical documentation; 6. Civil engineering technical economic indicators: 6.1 6.1.1. civil engineering structures: use ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ 6.1.2. engineering structures height (not applicable to linear structures) ___ ___ ___ m 6.1.3. civil engineering building area (does not apply to linear structures) ___ ___ ___ m2 6.1.4. the total area (that works/works together) (does not apply to linear structures) ___ _____/_____ ___ m2 6.1.5. civil engineering its structural and finish (not applicable to linear structures): No. p. k. Construction and finishing Materials in 1 way. basics 2. design 3. divisions 4. finish 6.1.6. the degree of ugunsnoturīb ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ 6.1.7. civil engineering use (does not apply to linear structures): No. p. k. Civil engineering uses characteristics of the quantity 1.     2.     3.    
6.1.8. the length of the linear structures _____ ____ m 6.1.9 line engineering structures above ground part ___ ___ ___ m 6.1.10. line engineering structures underground part of ___ ___ ___ m 6.1.11. line engineering structures technical characteristics: No. p. k. Line engineering structures use (code according to the classification of structures), construction material cross section (mm) (m) 6.1.12. engineering equipment (required mark or indicate): 6.1.12.1 power supply: centralised. autonomous (wind water solar other) 6.1.12.2. security systems: fire protection system of exceptional circumstances aizsargsignalizācij Messaging 6.1.12.3. other equipment (specify the appropriate): 1) 2) 6.2 external inženiertīkl: 6.2.1. inženiertīkl type (water, sewage, cable) ____ ____ ____ ____ ____ ____ __ 6.2.2. route length ___ ___ ___ m 6.2.3. surface part ___ ___ ___ m 6.2.4. underground part of ___ ___ ___ m 6.2.5. inženiertīkl technical characteristics : No. p. k. Inženiertīkl-type construction material cross section (mm) (m) 3.9. Street (road transport): 6.3.1 Street (road transport) overall length ____ _____ m 6.3.2. an area in which the works of _____ ____ suspended area m2 6.3.3. ___ ___ ___ m2, sidewalks in area _____ ____ m2 of lawn area 6.3.4. ___ ___ ___ m2, the outlying area ____ _____ 6.3.5.50 m2 with lawn slopes media ____ _____ 6.3.6 m2 Street (road transport) technical characteristics: No. p. k. Construction technical indicators (m) 1.     2.     3.    
6.3.7. the package description: No. p. k. Building usage quantity (m2) 1.     2.     3.    
6.4. environmental accessibility (if planning permission for certain accessibility requirements): area facilities, access roads, streets, pavements, walkways and pedestrian crossing for the chance to move from one level to another height of other requirements for the affected 7. Construction total cost (after the construction of the agent (client) certificate) is a ____ _____ euro. 8. Inženiertīkl and equipment tested and recognized as valid for operation with the findings, which are annexed to this Act. 9. the technological lines and equipment constructed, assembled, tuned, tried and accepted by the documents annexed to this Act. 10. Deferred works (territory greening, a fragment of the facade decoration) must be completed and the following time limits: No. p. k. The name of the job Completion date Unit quantity 1.         2.         3.        
11. Construction defects revealed in ____ years after adoption into civil engineering, the main contractor will remove the works at their own expense.
12. Būvvald/construction of national control Office (not applicable) proposes to recognize (civil engineering) for valid operation. 13. On the structures are brought (contested building permits) ___ ___ ___ ___ ___ court case number ____ __ _____. 14. the adoption Act drawn up _ _ _ _ _ _ copies. Izpilddokumentācij is passed to the storage building (first name, last name, signature) architect (first name, last name, signature) official (name, surname, signature) Guest: būvuzraug (name, surname, signature) (date) autoruzraug (name, surname, signature) (date) (specialty, position, name, surname, signature) (date) to the Act met: construction (subscriber) agent (name, surname, signature) (date) construction contractor (name, surname, signature) (date) notes. 1. the document property "signature" does not fill in, if an electronic document is drawn up according to the law on electronic document design. 2. the Provisions of point 6.2. and 6.3 shall be completed according to the situation, if at the same time with the civil engineering construction is built in external inženiertīkl and the street. 3. Civil Engineering conversion or restoration Act in the case of paragraph 6 shall be completed to the extent that characterized the changes in the structures. 4. the relative box the Act extends if necessary to reflect the more information. Economic Minister Vyacheslav dombrovsky 13. attachment Cabinet 2014 16. Regulation No 551/statement of absence of Civil Engineering Works (name) (cadastral designation) (address) is demolished.           1. details of the works to be demolished: 1) civil engineering works owner or, if not, the legal possessor or user (an individual's name, surname, personal code or entity name, registration number) 2) civil engineering group (General provisions) 3) civil engineering use (code) (according to the structure of the classification) 2. News about real estate, which demolished the structures: 1) the real property cadastre number 2) under the unit or building address 3) land cadastral designation of the unit 4) real property owner or If not, the legal possessor or user (an individual's name, surname, personal code or entity name, registration number) 3. details of construction: 1) the construction of the initiator (client) (persons name, surname, personal code, place of residence, telephone number of the person name, registration number, registered address, phone number) 2) construction works carried out on the basis of (the required mark): explanatory memorandum No. ____ ____ _____ (date) confirmation card for the structures no ____ ____ _____ (date) construction permit no. ____ ____ _____ (date) 3) object surveyed (date) 4) outstanding works (territory greening and improvement) the following must be completed and time limits: No. p. k. The name of the job Completion date Unit quantity 1.         2.         3.        
4. A certificate drawn up by the _____ ____ ____ ____ copies. Izpilddokumentācij is passed to the store ____ ____ ____ ____ ____ ____ ___ Būvvald's Officer (title) (name, surname, signature) (date) notes. 1. the document property "signature" does not fill in, if an electronic document is drawn up according to the law on electronic document design. 2. the Statement of the relative box will expand if necessary to reflect more information. Economic Minister Vyacheslav dombrovsky annex 14 cabinet 2014 16. Regulation No 551/proof of civil engineering construction demolition agent (the client) (persons name, surname, personal code, place of residence, telephone number of the person name, registration number, registered office, telephone number) 1. Declare that the (civil engineering) demolition work carried out on the basis of the planning permission no _____ _____ _____ _____, issued by (date), are completed. (būvvald name)        
2. details of demolished structures: 1) of the civil engineering group (General provisions) 2) civil engineering use (code) (according to the classification of structures) 3) civil engineering building area (does not apply to linear structures) (m2) 4) height of the structures (does not apply to the linear structures) (m) 5) line length (m) civil engineering 6) cadastral designation of the 7 civil engineering civil engineering) the owner or, if not, the legal possessor or user (an individual's name, surname, personal code or entity name, registration number) 3. details of the affected real property or part thereof: 1) the real property cadastre number 2) under the unit or building address 3) ground units, buildings and parts of cadastral designation 4) real property owner or If not, the legal possessor or user (an individual's name, surname, personal code or entity name, registration number) 4. details of construction: 4.1 construction started and completed on (date) to (date) 4.2. civil engineering demolition carried out in accordance with the construction plan, developed by (an individual's first name, last name, certificate number or legal name, registration number, registration certificate number būvkomersant) 4.3 yes/no (delete as appropriate) changes and deviations from the agreed projects. If it is, then they are matched and marked in accordance with the procedure laid down in the technical documentation in the implementation of the construction plan 4.4 participated in the following construction works: 4.4.1. reviewer (legal name, registration number, registration certificate number būvkomersant, registered office, telephone number) 4.4.2. responsible public works Director (an individual's first name, last name, certificate number) 4.4.3. būvuzraug (an individual's first name, last name, certificate number) 4.4.4. a construction Developer (physical person's name, certificate number) 4.5 construction waste management take (waste authorities name) certify 5. that: 5.1 the structures are torn down; 5.2. all construction wastes are managed in accordance with legislation on waste management; 5.3. inženiertīkl, technological equipment, specialty systems and facilities are dismantled according to the construction plan; 5.4. the total cost of construction is _____ _____ euro, including public law legal persons, policy instruments of the European Union or other foreign financial help features-_____ _____ euro; 5.5. deferred works (territory greening, utilities) will be completed in the following scope and limits: No. p. k. The name of the job Completion date Unit quantity 1.         2.         3.        
 
The construction of the initiator (client) (first name, last name, signature) (date) Construction Contractor (name, surname, signature) (date), the public works Director in charge (name, surname, signature) (date) Būvuzraug (name, surname, signature) (date) a construction Developer (name, surname, signature) (date) notes. 1. the document property "signature" does not fill in, if an electronic document is drawn up according to the law on electronic document design. 2. in the receipt column concerned extends, if necessary to reflect more information. Economic Minister Vyacheslav dombrovsky