Cabinet of Ministers Regulations No. 573 Riga 2014 (30 September. No 51) electricity generation, transmission and distribution structures are Issued in accordance with the provisions of the energy law, the second subparagraph of article 76 and article 5 of the law on construction of the first part of paragraph 2 and the second subparagraph of paragraph 5, and article 14, the seventh subparagraph 1. General questions 1. determines: 1.1. structure of electricity generation, electricity transmission and distribution facilities (hereinafter referred to as the power supply object) order of the construction process involved in building institutions and responsible būvspeciālist; 1.2. the construction process the necessary documents and their contents; 1.3. building permits, certification card and include in the explanatory memorandum; 1.4. derogations harmonisation; 1.5. construction expertise; 1.6. the control of the construction process and the rule of law, accountable institutions; 1.7. the preservation of energy objects; 1.8. the power supply object uzmērījum procedure and a procedure acceptable to the operation of the power supply object; 1.9. guarantee terms of construction work after the adoption of the object of supply in operation; 1.10. the information content of the būvtāfel. 2. The terms used in the following terms: 2.1 power supply object-building, civil engineering, equipment, rigs, lines, nets, intended for electricity production, transmission or distribution; 2.2. electrical equipment: any equipment for the production of electricity, conversion, transmission, distribution, or consumption; 2.3. implementation – several interconnected electrical equipment and constructions intended for common functions; 2.4. participants of the power supply object works-būvpraks received the certificate of a person or lawfully registered legal person who carries out the task of proposing the construction works of the object of supply; 2.5. energy – the energy of the object designer object būvspeciālist, which acquired the rights to design, or construction of regulatory laws in the order būvkomersant, which is registered in the construction of the proposing tasks under the contract shall be made the object of civil design of energy supply; 2.6. power supply – the power supply object būvuzraug object būvspeciālist or validly registered būvkomersant, who has entered into an agreement with a construction agent or agents had ordered the construction of the construction of the energoietaiš supervision; 2.7. energy conversion-object works, connected with the site, or change the location of the function (move) or adding new components, including the power supply object in full or partial dismantling; 2.8. power supply the object repair – measures taken to maintain the integrity of the object and the work resources, without changing the volume of the object (line length); 2.9. restore the power supply object-works to restore the power supply object, replacing the (dismantling) nolietojušo not making elements, electrical equipment or structural, functional or technical improvements, the wire or cable cross section of the Exchange, without changing the function of the building site and volume (line length) or load-bearing element of the expected performance; 2.10. in-electrical part which carries and distributes electricity and consists of interconnected powerlines, electrical substations and sadalietais; 2.11. the mains supply-distribution of electricity from the power line or sadaln to the user in the input sadaln; 2.12. provisional implementation – execution of the required implementation, built for operation on a specific date, not more than four years, and to be demolished before the site was adopted into service; 2.13. the construction of waterworks, hydroelectric hydroelectricity requires complex structures, including the dam, hydroelectric dams, buildings, water novadbūv, channels, tunnels, pipelines, pumping stations, drainage, protection of fish and the transmission housing, aizsargdambj, shore, shore support walls and other buildings, which exposed the water pressure; 2.14. power supply – the power supply by means of the object owner of the object, the legal possessor, keeper: the natural or legal person who uses or builds, maintains and with your actions or omissions may affect their condition; 2.15. Class A hydroelectric waterworks construction, hydroelectric power stations, waterworks in the premises of the crash results in a threat to an individual's life and health, will suffer material loss of physical and legal persons and the significant damage to the environment; 2.16. the implementation of the installation – construction, carried out the implementation of the Assembly – the implementation of component electrical Assembly, as well as setting up the use of the site in accordance with certain plans, projects and drawings-or placing the base or building; 2.17. the implementation of connection-system users and applicants of the guideline the connection to energy transmission, distribution and production systems; 2.18. the power line, cable, wire, insulators and a set of load-bearing structures for the transmission of electricity from one point to another in the network; 2.19. overhead power line-the power line cord or piekarkabeļ which are fixed in a certain balsto above ground; 2.20. the power line cables-power line, made up of one or more cables and laid on the ground or mounted on the walls of buildings, the cable channels contain, tubes or otherwise; 2.21. the users of the system, natural or legal person who uses electricity transmission or distribution system; 2.22. situation plan-scale reduced the area of the image in the horizontal projection plane with structures and utilities placement site; 2.23. the technical provisions – the construction of the bodies involved issued technical conditions for the construction of the power supply object; 2.24. the task of the design – a document before the construction plans drawn up for the construction of the development plans and the agent showing the projected construction of the main functions and characteristics, type of construction, section, be a construction development documents and applicable standards, the construction of the execution order, if the site is a candidate for the shipbuilding operation, as well as autoruzraudzīb. 3. The following provisions of the proposed būvvald information about the works, construction intentions in the application (acceptance of the memorandum or a receipt card) and building permits issued for būvvald is required energy merchant sites: 3.1 emergency and damage effects (damage resulting from natural disasters, theft and other unforeseen circumstances); 3.2. individual damaged or worn, replacement of equipment or structures; 3.3. energy operating and maintenance of objects of repair; 3.4. the accounting of electricity equipment conversion or restoration; 3.5. the restoration of the power supply object, if the object is a building and the first group will not change the route, in principle Powerline technical solution or building (structures) facade; 3.6. renewal and rebuilding works continuously confined and outsiders in closed areas of energy objects (such as electricity and heat plants, substations, distribution point, switching point and similar enclosed areas); 3.7. the implementation of the temporary connection for a period of up to three months and seasonal energy objects outside of the protected cultural monuments and their protection zones (zones of protection); 3.8. the decommissioning of small functional inadequacy that is continuously confined and outsiders in closed areas of energy objects. 4. Energy merchants to guideline of the objects for which the works should inform the būvvald according to point 8 of these regulations, but those rules provide in building permits issued, būvvald acceptance to the explanatory note or receipt card, as well as the construction plans do not need application are the following: 4.1 installation of the power supply object inženiertīkl, restoring or rebuilding the Strip or the red line; 4.2. inženiertīkl transmission installation, restoring or rebuilding the power supply object; 4.3. the power line work to overhead Powerline which established the cable is laid in the power line. 5. These regulations 3.4, 3.5, 3.6, 3.7 and 3.8 and 4 applicable to licensed or in accordance with the rules on public service timed modes registered energy traders who guideline for running constantly employs at least five qualified according to elektroinženier rules on the compulsory applicable energostandart, which defines the object of the power supply for the operation of organisational and technical safety requirements. 6. The provisions of points 3 and 4 of the works referred to in the technical requirements, the organisation of the work, conducting and control procedures determined by the energy trader. 7. Article 19 of the Energy Act and in part 1.1 1.2 the cases or projects of construction intentions in the conciliation procedure concerning the energy merchant energy objects can be replaced with ground unit owner or, if none, by the legal possessor. In all other cases, construction intentions in writing consistent with persons whose property rights are affected. 8. the law on construction of the first paragraph of article 6.1 (1) in the cases specified in the control of the works and the rule of law, as well as acceptance of the construction service is responsible for the construction of national control Office, and that in this case to fulfil these rules laid down for the būvvald functions. If the works shall be carried out and the rule of law, ensure State control Office Construction, a construction of one copy in addition to its local būvvald submitted that the administrative territory of the planned construction. 2. Construction process necessary documents and their contents 9. Statement on the construction of local Government will submit electronically to būvvald. The construction conception the application together with the documents provided for in these rules may be submitted electronically, if it's prepared according to laws and regulations on electronic document design. Documents shall be submitted to the initiation of the construction process būvvald or if the power supply object construction intended to put more local administrative areas, būvvald of all the relevant authorities. 10. to carry out this provision in paragraph 4 above shall provide notice of the works, construction in accordance with the provisions of annex 1. 11. Power supply for construction of objects, which is the first group of buildings, except for this provision in paragraph 3 and 4 above works, submitted by: 11.1 energy construction conception of the object of the application in accordance with the provisions of annex 2; 11.2. the explanatory memorandum in accordance with the provisions of annex 3; 11.3. technical diagram including the situation plan, and a description of the site; 11.4. the current situation of fotofiksācij (does not apply to line objects). 12. to rebuilt or restore the existing energy facilities that are second-and third-team building, or rebuilt or restored the power supply object outside the energy merchants designated areas, as well as in class A, the construction of a hydroelectric waterworks: 12.1 the construction conception of application in accordance with the provisions of annex 2; 12.2. receipt of the card in accordance with the provisions of annex 4. 13. A new power supply for the construction, which is the object in the second or third group structures, except when intended to make these rules 3 and 4 of the works referred to in paragraph 1 shall be submitted to: 13.1 the construction conception of application; 13.2. the minimum construction. 14. The power supply object construction minimum composition include: 14.1. explanatory memorandum, a construction which shows the land cadastral designation of the unit, which is intended to implement the construction plans, as well as information about the owner of the land unit or, if not, the legal possessor of the cadastre, construction signs, if any, granted by the main use (four-character code) in accordance with the classification of structures, construction type, amount and execution of the works, the expected construction of the amount and type of waste and the list of documents which are supported by the State, municipalities and other institutions that apply to construction; 14.2. the construction agent design task; 14.3. the technical solution to the situation of the representation of the construction plan set by the agent; 14.4. the projected energy supply utilities object; 14.5. the planned place of fotofiksācij works (does not apply to the construction of power lines). 15. Construction intentions documentation (explanatory memorandum, technical rules, the design task, the minimum, a construction certificate map) draw up in triplicate. One copy is stored in būvvald, one copy-construction and building plans proposing developer. Construction intentions in drafting the documentation in a single copy, if it is developed and submitted electronically. 16. The construction conception documentation is entitled to draw up the energy trader's būvspeciālist or posted by a skilled operator. 17. Projects need all the power supply object works, except those referred to in paragraph 3 of the rules of the work. Energy merchant internal regulations may prescribe cases where development projects also in these rules referred to in paragraph 3, the works. 18. If the power supply for the construction of the object for several rounds, including construction work in separate parts, the object of the design of construction agent task indicates the need for the project identify the energy part of the sequence of construction objects and other organisational measures. 19. The construction of the agent is entitled to the design conditions before submission of construction plans at būvvald. Būvvald designing conditions shall be issued within seven working days of receipt of the request. 3. The construction plans, building permits and public information 20. when construction intentions application, būvvald of construction law article 12 the time limits laid down in the fourth paragraph-looking construction plans compliance with laws and regulations, and municipal planning and adopt a decision on the issue of the building permit or refusal to issue building permit or tag to the explanatory memorandum or a receipt card. If the power supply object construction intended to land units, or current builds, which do not belong to the construction building permits issued, the agent before the construction of the law article 15, first subparagraph, point 2 of the requirements. The claim for the need to match or information that the procedure laid down in paragraph 7 shall include the design of the building. 21. in the following building permits that the information contained in annex 5: būvvald of the local governments 21.1 the technical provisions for the design (the design conditions) and works with administrative territory of intended construction or a statement that it has no objection to the construction; 21.2. other institutions of technical regulations; 21.3. the period of validity of the building permit for the development projects; 21.4. the commencement of the construction works; 21.5. the period of execution of the construction permit. 22. These provisions referred to in point 5 energy merchants building is issued free of charge. 23. the received planning permission for new buildings, a suit or a tower construction or reconstruction of the existing building construction agent to inform the public of the construction law, the time limit set in the deploying būvtāfel (format, not the least of the A1) the ground unit, which allowed the building, the construction of the tower or mast or restore. Būvtāfel to deploy for a period of not less than building challenge. 24. Būvtāfel in the inženiertīkl object and the rules referred to in paragraph 3 of the working places, if required by the construction: 24.1. agent; 24.2. the need for a specific work project; 24.3. work time exceed 30 days; 15.2. for wind farm construction. 25. place the Būvtāfel, directing them to a public place, and it indicates the following: 25.1. construction plan (construction type and address); 25.2. the construction agent (an individual's first name, last name or legal name, address, registration number and phone number); 25.3. the power supply Object Designer (an individual's first name, last name or legal name, address, registration number and phone number); 25.4. the construction intentions or visualizations situation plan; 25.5. information on building permits entry into force; 15.9. the planned construction start and end dates. 4. Power supply design 26. object the object of the development of the power supply for the construction of one of the following types of projects: 26.1. technical scheme; 26.2. a simplified technical project; 26.3. the technical design; 16.4. a two-stage technical project that consists of a sketch design and technical design. 27. The power supply object depending on the shipbuilding group, established in accordance with the General provisions in civil design in this volume: 27.1. energy objects, which is the first group of buildings, the design of technical scheme; 27.2. energy objects, which is the second or third group structures, developing a simplified technical project; 27.3. energy objects, which is the third group of constructions, development of technical design or the design task in the cases – two-stage technical project (with a sketch of the project). 28. The construction agent on behalf of the design may provide a higher granularity civil design (such as the nature of the project or the project content) than required by the energy of the corresponding group object construction. 29. A new power supply for the construction or placement of objects, as well as the existing energy conversion of objects, or restoration projects (technical scheme of simplified technical project or technical project) in one stage. 30. If the power supply object construction associated with State, city, or district energy and is technically complex, or choose the technically and economically advantageous option, object construction of the power supply can be developed in two stages, stage of the project and design technical design stage. Sketch of the project drawn up in accordance with the design requirements of the task. 31. the technical diagram has the following components: 31.1. the cover page; 31.2. the task of the design and technical regulations; 31.3. construction of the explanatory memorandum, which contains information on land cadastral designation of the unit, building cadastral designation, if granted, the main use (four-character code) in accordance with the classification of the structure and information about the power supply object technical indicators; 19.5. the document in accordance with the technical regulations or the design task, which can include the following additional documents: non standard construction 31.4.1. drawings; 31.4.2. grid calculation scheme; 31.4.3. arrangement and description of the equipment; 31.4.4. equipment, design and material list; 31.4.5. the amount of the works; 31.4.6. the regulations set out the necessary reconciliation; 31.4.7. energy the object designer signed in the RAM position represented by the scale of certainty from the 1:250 to 1:500 plan of the situation. Places with dense and complex deployment utilities constructive solutions for display uses scale to the scale of 1:50 and certainty of the 1:250; 31.4.8. transition over obstacles and crossings with utilities, scale 1:50 of certainty; 31.4.9. the outline of the guideline of the earthing arrangement of the displayed plans with scale 1:250 certainty out to 1:500, but in places with dense geometry and complex utilities constructive solution applied to represent wide certainty from 1:50 to 1:250; 31.4.10. evaluation or use of the construction works to be permitted, and the terms of use; 31.4.11. other technical rules or design documents set tasks. 32. A simplified technical project has the following components: 32.1. This provision, paragraph 31, of the technical components of the scheme; 32.2. the rules referred to in paragraph 37 of the specific components of the energy, if provided for in the design; 32.3. the organisation of section work, if it is intended to be a design task. 33. Technical project has the following components: 33.1. the cover page; 33.2. the construction of the explanatory memorandum in accordance with the provisions of subparagraph; 31.3. 33.3. the technical provisions and the design task; 20.8. General: 33.4.1. the initiation of civil design necessary documents and materials; 33.4.2. the Earth's topographic studies unit and, if the design task, the geodetic research materials; information on the implementation of 33.4.3. technical indicators; 33.4.4. location plan with all the necessary reconciliation; 20.8. inženierrisinājum: not standard design 33.5.1. drawings; 33.5.2. environmental protection measures; 20.9. technological part: the implementation of the scheme and 33.6.1. necessary technical calculations; 33.6.2. location and description of the equipment; 20.9. economy: 33.7.1. equipment, design and material list; 33.7.2. volume of construction work; 33.7.3. cost calculation (estimate) if provided for in the design; 33.8. regulations set out the necessary reconciliation; 21.1. the switchyard – overhead power line route plans valid in the topographic plan cities and villages with certainty from the scale 1:250 to 1:2000, rural areas with certainty from the scale of 1:1000 to 1:10000, crossings with the inženiertīkl and structures – the route plan and longitudinal horizontal with the scale 1:500, certainty of vertical incisions crossings with underground and above ground utilities and other obstacles to the crossing point with the certainty of the scale 1:50; 33.10. the switchyard, power line cable route plan valid topographic plan cities and villages with certainty from the scale 1:250 to 1:2000, rural areas with certainty from the scale of 1:1000 to 1:10000, crossings with the inženiertīkl and structures – the route plan and longitudinal with the horizontal scale of the certainty of the 1:500 scale, vertical with certainty 1:50, but if you use the no-cable-laying method (method of piercing), the vertical bevel scale 1:50 with the same certainty or adjacent to underground utilities technical data and it marks the height; 33.11. places with dense and complex deployment utilities constructive solutions for display uses scale to the scale of 1:50 and certainty of the 1:250; 33.12. that rule 34, 35, 36 and 37 in particular paragraph. sections for the construction of the group concerned; 33.13. for the construction of a hydroelectric waterworks: 33.13.1 construction master plan drawing. page M 1:500 on a topographic plan with valid land units; 33.13.2. the projected plan of inženiertīkl aligned M 1:500 topographical plan of the valid, vertical layout and facilities solutions plan; 33.13.3. the vertical design of the territory and facilities solutions plan. 34.110 kilovolt kilovolt power line 330 or a technical project in addition to the provisions referred to in paragraph 33 the technical components of the project include the following specific elements: 34.1. the power line route crossing utilities list that contains the technical data, the necessary reconciliation and work to ensure compliance with the utilities sector crossings, regulatory laws; 21.3. wired, aizsargtroš, optical aizsargkabeļ and optical piekarkabeļ of drops the table containing the control nostiepum; 21.3. insulators virteņ for packing list; 21.4. based on drawings or standartrisinājum; 34.5. founded and built the Foundation for the installation and reinforcement drawings; 21.5. connecting cables and cable sleeve end cap installation drawings; 21.6. the required electrical and mechanical calculations (for example, wired and support calculation, optical cables and check calculations of aizsargtros); 21.6. the work of organizing the project, if it is intended to be a design task. 35. Substation or sadalietais and A class of hydroelectric waterworks control the technical project, with the exception of the transformer substation of standardised brīvgais and distribution points with the voltage to the 20 kilovolt, in addition to the provisions referred to in paragraph 33 the technical components of the project include the following specific elements: 21.8. the territory's general plan (including fences, roads), environmental protection, land and home improvement solutions meliorēšan; 35.2. land units inženierģeoloģisk facilities; 35.3. architecture: 35.3.1. General index page; 35.3.2. section of the territory; 35.3.3. construction drawing of the master page to the appropriate scale of topographic plans valid; 35.3.4. joined the inženiertīkl of the projected plan appropriate scale to fit the topographical plan. 35.3.5. the vertical design of the territory and facilities and greenery plan; 35.3.6. building construction facade with height marks; 35.3.7. specific sections with height marks; 35.3.8. building materials of construction and specification; 35.4. constructions; 22.1. the water supply, sewerage, heating and ventilation; 35.6. lighting, lightning protection, earthing; 22.2. primary circuit scheme; 22.2. the primary switching equipment disposition plan and cuts; 22.3. the relay protection, automation, the secondary switching and power accounting; 35.10. communication and remote control, protection alarm; 35.11. electrical equipment management system; 35.12. electric substation or power supply of sadalietais (undifferentiated), and direct current electrical equipment; 35.13. cables and cable magazine, which contains the address of the connecting cable, cable length, cross-section and number of strands. Power cables also indicate the nominal voltage; 69.35. solutions for consumer energy to ensure the electric substation or conversion or renovation of sadalietais; 35.15. required electrical and mechanical calculations; 35.16. fire protection technical solutions. 36. transformer substation and standardize the distribution point with a voltage up to 20 kilovolt technical project in addition to the provisions referred to in paragraph 33 the technical components of the project include the following specific elements: 36.1. mains connection the constructive solution; 36.2. transformer substation schemes; 36.3. transformer substation of constructive solutions; 36.4. the alarm and remote control. 37. If the mains rated voltage is less than 110 kilovolt, technical project in addition to the provisions referred to in paragraph 33 the technical components of the project include the following specific elements: 37.1. transition over the hurdles and crossings with utilities, scale 1:50; 37.2. the Powerline constructive solutions; 37.3. the required electrical and mechanical calculations; 37.4. protection against surges and ground; 37.5. protection against short circuits, overloads; 23.4. electricity accounting solution; 37.7. Design task specific calculations and solutions. 38. If a construction project is designed to use A class in the construction of hydroelectric waterworks conversion or restoration, carried out without losing the basic functions of the object in question: 38.1. identified the works indicates the operating structures, the inženiertīkl function conversion or renovation is not interrupted, as well as the construction and functioning of which inženiertīkl is interrupted temporarily or completely; 38.2. establish transport and pedestrian movement organizations; 38.3. the organisation of project work in the explanatory memorandum specifies the measures to be taken in order not to disrupt the basic functions of the relevant structures, as well as the contractor's professional activities. 39. A class in the construction of hydroelectric waterworks reconstruction and rebuilding the technical project has the following components: 24.3. the cover page; 24.4. the task of the design; 39.3. the documents and materials in accordance with the design task; 24.5. the explanatory note with the construction of a hydroelectric waterworks technical indicators; 24.5. design drawings; 24.6. the organisation of project work; 24.7. environmental protection measures and ground units home improvement solutions; 24.7. location and description of the equipment; 24.8. economy: 39.9.1. equipment, design and material list; 39.9.2. Hydro waterworks construction volume of construction works; 39.10. required reconciliation as laid down in laws and regulations. 40. the composition of the Construction work and the work of the organization provides for protective measures, which provide during the works. 41. the Development Projects under the design task, respecting the institutions and organisations succeed in technical regulations and requirements in these rules. 42. The power supply Object Designer coordinated projects with agents and with the construction of the institutions and organizations that issued by the technical regulations. Construction of the line with the person whose property rights are affected, or where legislation shall inform the person concerned. Reconciliations are presented on the construction plan of the master plan, or in accordance with the provisions of annex 6, if the master plan is not possible to deploy all reconciliations. If the agreed changes to the construction plan, which changes the energy in the construction object location, building or building facades būvapjom solution, a construction developer will recalculate the coordination of projects. 43. A construction inspection of General būvnoteikumo in accordance with the procedure laid down by the power supply made objects, which is the third group of buildings. Construction expertise required to object to the demolition of the power supply, which can directly affect or influence the increased dangers of industrial buildings. 44. the Construction expertise to carry out construction of objects of the power supply the following sections: 44.1. a construction building; 44.2. technological part; 27.5. buildings and structures the main utilities section; 27.6. the general part; 27.7. other construction projects set out in the section of the agent. 45. If a design task or technical regulation requirements cannot be met, a construction of technical solutions consistent with the institutions established by the corresponding requirements. In justified cases the institution may change the technical rules. Mark on the construction plan of reconciliation (also the reconciliation of changes in technical regulations) made to a construction drawing of the master page. 5. The power supply object construction 46. Energy supply installations, where the works are carried out by more than one investigator, in the works before the commencement of the construction works of the construction agent under the law on labour protection requirements shall designate one or more of the labour protection coordinators. 47. the conditions in the Building works started to perform and the construction works must be launched within two years after building permits checked in for design conditions. 48. The works, except for this provision, paragraph 3 and 4 above, launched only after receiving a check for būvvald reasons or a receipt card or receive all the necessary building permits issued for the būvvald tags, as well as receive other relevant administrative territory the necessary permissions. 49. The power supply object constructed in accordance with the construction plan and organize the work of the project, if developed, as well as in accordance with the work of the project, at the request of the construction agent. 50. If during the work due to unforeseen circumstances the works it is not possible to realize the projects developed, appropriate construction performer shall immediately inform agents and the construction of the building project developer. A construction developer specifies the parts of a construction which require changes, and matches them accordingly 42. these provisions. Specify the projects or part thereof shall be submitted to the būvvald. 51. a third group of building structures on the basis of the Treaty, may take the būvkomersant registered in the register of būvkomersant and who is entitled to provide services in the field of building, or one or more būvspeciālist that are appropriate to the būvpraks certificate and employed in construction, by designating the agent on energy būvuzraug of the object. Other energy object construction quality control in the construction agent provides and to the extent prescribed. Energy trader may appoint a qualified expert in service or a guideline of spriegumaktīv conversion or restoration work performance monitoring (Technical Supervisor). 52. If the construction agent considers it necessary to make autoruzraudzīb also supply objects, which are the first and second group of buildings, or if it is justified to require būvvald, autoruzraudzīb is determined at the design task. 53. If one of the power supply object project works to more local administrative areas, the site's documentation – construction magazine and autoruzraudzīb journal-submit one būvvald and recorded the rest of the municipalities. 54. in its use of energy objects equipment and materials determines the object's construction and its agents are included in the design and construction plan. The power supply Object Designer is in the calculations and construction equipment and materials in compliance with the legislative requirements. The power supply object for the works is to install the equipment and the quality of the materials used in the construction plan for compliance. If the agent delivers the construction equipment and materials, it is incumbent to choose the appropriate quality of construction equipment and materials. 55. the energy used in measuring objects are checked according to the supplementary regulations of measurement unity. 56. Requirements for the execution of the object of supply and inspection, as well as the necessary measurements determine the power supply object construction agent. The level of technical requirements must not be less than that laid down in the laws, and must comply with the requirements of the applicable standards, which list shall be published in the society with limited liability "the standardization, accreditation and Metrology Centre '. 57. The minimum warranty period electricity works, construction works of the building site, the equipment used and the materials shall be two years. The construction of the proponent and the power supply object construction performer or equipment and material suppliers may agree on a different, longer term. The warranty period of the operator works resolves all defects, if any, incurred or discovered. Būvspeciālist professional liability insurance is in force throughout the building during construction and warranty period. 58. The power supply object works is the duty of the offender to prevent construction resulting in road, street, construction of sidewalks and the surface of Earth damage. Roads, streets, sidewalks and green zone owners or, in the absence thereof, by the legal possessor shall not have the right to apply for such a conversion object or the object restore more than damage. 59. some of the felling of trees and shrubs in the application shall be submitted to the būvvald according to annex 7 of these rules. 5.1. The works and quality control Of labour protection 60. requirements for energy-supply object in power supply construction site object for construction works (the main operator of the works) a responsible public works Director. 61. The power supply object construction site, where the objects are the third group of constructions, road transport and self-propelled mechanism movement organized in accordance with the work project, et seq, and the rules of the road. Another group of construction works of the project development, if requested by the initiator or the construction of the object of supply the main works. 62. the Superintendence of the guideline For time tracking grounds serve the construction of the information system of electronic documentation for the Superintendence of the accumulated content. 63. The construction quality control includes: 39.2. the works of construction of the documentation and control of compliance; 39.3. individual operations or technological processes control; 63.3. completed (a candidate), the amount of work or the construction cycle (design element) closing control; 63.4. General duties of the būvnoteikumo būvuzraug; 63.5. building plan for the execution of the requirements. 64. Energy objects, which is the third group will develop the shipbuilding, būvuzraug construction quality control plan. The production of electricity in buildings and 110 kilovolt kilovolt and 330 of the implementation of the works during the construction of the log fills, in other cases public works magazine fill out the request of construction agent. 65. the object of supply quality control of the works, if the objects are the first and second groups, ensure the supply of the construction object's possessor and the amount set under the law. 66. Major construction work, cover and fire protection for important engineering system acceptance the laws confirm the power supply object responsible works Manager (General representative), the power supply object būvuzraug, object autoruzraug, the power supply if they are linked to a specific object. 5.2. The works suspension, termination, building preservation agents and 67. The construction of authority associated with the construction, but not būvvald, according to competency is entitled to stop the works, by giving būvvald. Such notification does not need this provision to the works referred to in paragraph 3. If the termination of the works can be dangerous to human life and health, as well as the environment, or it may cause dangerous damage to structures, the construction works before the termination of the agent shall submit the housing preservation būvvald alignment of the activities of the project, stating: 67.1. construction of works and conservation reasons; 67.2. the necessary transactions to list; 67.3. the power supply object project solutions building loss of stability and structure of the elements of the subsequent deterioration; 41.9. solutions for the prevention of danger to human life and health or the environment; 67.5. shipbuilding activities calendar in the preservation plan. 68. If a decision on suspension or termination of the works in the existing energy facilities, the power supply of the system implementation that was added to these energy objects before construction started, ensure power supply, connected to the mains. 69. Būvvald 14 days after this provision in paragraph 67 of the said information, the suspension of the works surveyed site, adopt a decision concerning the suspension of the work and, where appropriate, the decision concerning the construction and the preservation preservation activities the project submitted by the proponent during the construction. Būvvald a decision on the suspension of the works: 69.1. termination or suspension of the works and energy conservation of the object; EB 69.2. measures taken to ensure the safety of the power supply object design, stability and integrity; 69.3. energy the object status after the construction and preservation of the shipbuilding of the person responsible; 69.4. period within which the power supply object conservation works project to be submitted. 70. the works are regarded as continuous with the moment when the construction agent has announced it has completed a būvvald or energy conservation work of the object according to the conservation works project. If the construction is stopped, the agent works, does not fulfil the requirements of this regulation, the municipality shall be entitled upon notice to the construction agent, take conservation jobs civil engineering. All construction costs related to the preservation of the construction agent. 6. adoption of energy objects into 71. accepts the power supply object into operation if it is built according to the construction plan. Construction changes must be consistent law. 72. Power supply the power supply object of traders use energy supply before the whole site into adoption permissible, if it provides for the design and construction or the construction of the law have been complied with article 21, third paragraph. 73. in compliance with the technical regulations for construction and design tasks to the special requirements listed in controls the construction agent and autoruzraug, if one is attached. 74. proposing to the supply of construction object for acceptance into service may submit a written request to the body which issued the technical provisions, take and appropriate inspection competence to give an opinion on the energy supply of technical readiness of object operations, compliance with the accepted construction plan, the Latvian et seq, applicable standards and conditions of the contract. The institution concerned within 10 working days of the receipt of the application, provided the said opinion. 75. If the power supply object is received a building permit for the construction, operation of the power supply object acceptance after completion of their construction suggests the construction agent, submitting būvvald the following documents (originals): 75.1. proof of energy ready for the operation of the object in accordance with the provisions of Annex 8; 75.2. the change; 75.3. the power supply or part of an object's position in digital form izpildmērījum FAS 92 coordinate system. Making utilities location uzmērījum (digital form FAS 92 coordinate system), built in the bottom position of the communications admissible deviation +/-0.3 m from the power supply object in the project; 75.4. in accordance with the provisions of paragraph 74 of the opinions issued; 75.5. measurement results provided for construction, electrical equipment and other special equipment inspection records and receipts and compliance statements where necessary in accordance with the laws and regulations on safety of equipment; 75.6. Journal and major public works design and cover the work of making the Act production structures and 110 kilovolt and 330-kilovolt implementation; 47.0. log, autoruzraudzīb if the work is performed in the autoruzraudzīb; 75.8. energy supply buildings and premises of objects included in the classification of engineering structures-national land service of buildings and engineering structures prepared cadastral trying things; 75.9. built-in compliance statements of construction if it need determined by law for the assessment of conformity of construction products; building on the review of 75.10. building plan for the execution. 76. On completion of the construction of the power supply object, if the object is a building, the first group of būvvald submitted by: 76.1. explanatory memorandum; 76.2. the national land service of buildings and engineering structures prepared cadastral trying things; 76.3. energy the object or its parts location izpildmērījum in digital form FAS 92 coordinate system. Making utilities location uzmērījum (digital form FAS 92 coordinate system), built at the bottom of the position of the tolerance of +/-0.3 m from the power supply object in the project. 77. The power supply object that is building the first group, be deemed to have been accepted into service with the day when the būvvald of the explanatory memorandum for the completion of construction work done. 78. The power supply object, which is the second-and third-team building, be deemed to have been accepted into service after the conversion or restoration as of the date of receipt of the card būvvald for the completion of construction work done. 79. If the order is re-established, civil engineering energy into acceptance of the object determines the energy trader. 80. The power supply object into accepting būvvald, except this rule 79 and 89 cases referred to in the paragraph. 81. After all this Būvvald rules referred to in paragraph 75 of document receipt, in coordination with the construction agent, set a time limit for the adoption of the object of supply, of not more than 10 working days from the date of submission of the document būvvald. 82. Būvvald-construction recruitment external power supply būvuzraug power supply the object, the object's construction plan (autoruzraug) developers, energy analyst, the object works as well as national cultural monument protection Inspectorate (or competent local authorities or officials), if the power supply object is a national protected monument of culture or its protection zone (protection zone). 83. the use of energy in the operation object displays the power supply object construction agent. 84. Būvvald energy evaluates the readiness of operation, object basis in the būvvald these rules referred to in paragraph 74 of document, as well as compliance with the construction and legislation in the field of construction. 85. Būvvald under these rules shall be drawn up in annex 9 of the Act on energy acceptance into service of the object (hereinafter referred to as the Act). 86. the object of supply shall be deemed to have been accepted into service with the approval of the acts of the day. 87. the Act is registered with būvvald. 88. Any act that delayed the completion of the works within the control of the būvvald. 89. The power supply construction objects, which does not require a building permit, into law and draw up the energy trader's designated Commission. The order of these rules 3 and 4 of the works referred to in paragraph 1 for the adoption of service determines the energy trader. 90. Būvvald, when drawing up the legislation, it indicates the construction works or construction works specified in the contract guarantee terms after the adoption of the building site. 91. The in-service energy object modification, renewal and repairs must be performed by instalments (sectors, stages) of the power supply object in the order, approved by the holder pursuant to article 21 of the law on construction of the third part. Each part of the object of supply separately unplugged for a certain period of time required for the works executed pursuant to labour protection requirements. If the implementation of in-service rebuilding, renewed, or it does not disconnect the voltage (without interrupting power supply system users), the works executed as spriegumaktīvo works according to the rules of the applicable mandatory energostandart, which defines the object of the power supply for the operation of organisational and technical safety requirements. 92. The power supply or disconnect disconnected object parts ready for work after the power supply work object construction performer shall certify in writing to the holder of the power supply object as prescribed under the labour protection requirements and rules on the mandatory energostandart, which defines the object of the power supply for the operation of organisational and technical safety requirements. All the power supply object accepts into service in accordance with the procedure laid down in this chapter. 7. Closing questions 93. Be declared unenforceable for Cabinet 3 April 2012 rules no. 243 "electricity transmission and distribution structure construction procedures" (Latvian journal, 2012, 57. no). 94. the rules shall enter into force on the 1 October 2014. 95. The power supply object construction process that started to the date of entry into force of the provisions to be finalised in accordance with these terms pursuant to the General procedure provided for by the būvnoteikumo with regard to the issue of the building permit for the construction of the building site, which proposed or initiated before the entry into force of these regulations. The Prime Minister is the Rapidity of economic Newsletters Minister Vyacheslav dombrovsky annex 1 Cabinet 30 September 2014 regulations no 573 _____ _____ _____ _____ _____ _____ _____ ___ City/District būvvald notification of CONSTRUCTION the construction for agent (an individual's first name, last name, social security number, home address and telephone number, electronic mail address or legal name, registration number, registered office, telephone number, e-mail address) of the authorized person (a natural person's name, surname, personal code , home address and telephone number, electronic mail address or legal name, registration number, registered office, telephone number, e-mail address), we inform that the works will be launched in (site address) according to the plan of the situation with the object of the proposed placement of the power supply.

          (Date1)   (signature of the official veterinarian)   (title, first name and last name)
Contact phone _____ _____ _____ _____ _____ _____ _____ _____ note. 1 document properties in the "signature" and "date" does not fill in, if an electronic document is drawn up according to the law on electronic document design. Economic Minister Vyacheslav dombrovsky annex 2 Cabinet 30 September 2014 regulations no 573 _____ _____ _____ _____ _____ _____ _____ ___ City/County construction plans for the būvvald the application of construction agent 1 (natural persons first name, last name, social security number, home address and telephone number, electronic mail address or legal name, registration number, registered office, telephone number, e-mail address) 2. Authorised person (an individual's first name, last name, social security number, home address, and phone number , electronic mail address or legal name, registration number, registered office, telephone number, e-mail address) 3. Construction type (required mark) the new building work to restore the placement of 4 construction demolition group _____ ____ 5. Site (name of each building) 6. Site address or, if not, the location of the land units of the 7 cadastral designation 8. cadastral designation of the building (completed in the case of renewal or modification, decommissioning) 9. Parcel owner or If not, the legal possessor (an individual's name, social security number, or the name of the legal person registration No.)

10. the owner of the Building or, failing that, the legal possessor and/or user (rebuilding, reconstruction or demolition) (an individual's name, social security number, or the name of the legal person registration No.)

11. the documents submitted in annex 1) 2) 3) 4) 5) 12 Construction agent (or authorized person) (Date1) (signature of the official veterinarian) (position, name and surname) Note. 1 document properties in the "signature" and "date" does not fill in, if an electronic document is drawn up according to the law on electronic document design. Economic Minister Vyacheslav dombrovsky annex 3 Cabinet 30 September 2014 regulations no 573 _____ _____ _____ _____ _____ _____ _____ ___ City/District būvvald the explanatory memorandum 1. Construction agent (an individual's first name, last name, social security number, home address and telephone number, electronic mail address or legal name, registration number, registered office, telephone number, e-mail address) 2. Authorised person (an individual's first name, last name, social security number, home address, and phone number , electronic mail address or legal name, registration number, registered office, telephone number, e-mail address) I part. Construction intentions for submitting documentation 3. Construction type (required mark) the new building work to restore the placement of 4 construction demolition group _____ ____ 5. Building site (site name) 6. Site address or, failing that, the location, cadastral designation of the construction, if one is assigned to, the main use of type (four-character code) in accordance with the classification of buildings 7. documents submitted in Annex: proposing the construction of a power of Attorney (if the application is lodged by the authorised representative of energy traders) the power supply object technical solution scheme of other documents _ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ to ____ lp. 8. Construction of the agent (or authorized person) (Date1) (signature of the official veterinarian) (position, name and surname) 9. Contact phone _____ _____ _____ _____ _____ _____ _____ _____ fills the būvvald 10. Planning (lokālplānojum, detailed) main (papildizmantošan) 11. Būvvald marker for the construction of the acceptance of the idea 12. būvvald City/municipality's Executive (Date1) (signature of the official veterinarian) (position, name and surname) 13. Seed sales deadline (date) 14. Decision on the refusal to accept the plan, the number and date of decision 15. City/District Officer of būvvald (Date1) (signature of the official veterinarian) (position first name and last name), part II. Construction completion 16. information on the completion of the works 17. Site (name of each building) 18. Site address or, in its absence, the location and the building cadastre designation, if any, granted 19. Land units cadastral designation 20. Certify that the works are completed, and submitted to: the power supply object of the izpildmērījum determine a cadastral plan for energy storage and/or object the energy objects built 21. Construction agent (or authorized person) (Date1) (signature of the official veterinarian) (position , first name and last name) 22. examination of the works surveyed object (date) and found that the works are made/not made (not applicable) the appropriate documentation for the seed to develop.

23. the decision on Būvvald found deviations from the accepted construction plans or regulatory laws, the number and date of decision 24. Būvvald marker for the completion of the works the City/District Officer of būvvald (Date1) (signature of the official veterinarian) (position, name and surname) notes. 1.1 document properties in the "signature" and "date" does not fill in, if an electronic document is drawn up according to the law on electronic document design. 2. Each part of the explanatory memorandum submitted separately – developing seed documentation and complete the works. Economic Minister Vyacheslav dombrovsky annex 4 Cabinet 30 September 2014 regulations no 573 _____ _____ _____ _____ _____ _____ _____ ___ City/District būvvald of receipt card 1. Construction agent (an individual's first name, last name, social security number, home address and telephone number, electronic mail address or legal name, registration number, registered office, telephone number, e-mail address) 2. Authorised person (an individual's first name, last name, social security number, home address, and phone number , electronic mail address or legal name, registration number, registered office, telephone number, e-mail address) (I). Construction intentions for submitting documentation 3. Construction type (required mark) restoration work to the shipbuilding Group 4 _ _ _ _ _ _ _ _ _ 5. Site (name of each building) 6. Site address or, failing that, the location, the construction of cadastral designation, if any, assigned to the 7th power supply the object's owner or legal possessor and/or user (an individual's name, social security number, or the name of the legal person registration No.)

8. The power supply current of the object use the power supply object 9. the intended use of the object of supply 10 Designer solutions comply with the construction of the laws governing local authorities and binding rules. Changes do not affect the joint ownership fractions and functional with all buildings related to the inženiertīkl service (fixed gear). Solutions do not affect the load-bearing structures of buildings and do not affect its stability. The object of the power supply project developer (Date1) (signature of the official veterinarian) (title, first name and last name) 11. proposing the construction of a testament to certify that the attached property rights supporting documents (copies) are authentic, true and complete. Undertake to implement a simplified renewal works according to plans developed for the documentation. 12. Construction of the agent (or authorized person) (Date1) (signature of the official veterinarian) (position, name and surname) 13. documents submitted in Annex: proposing the construction of a power of Attorney (if the application is lodged by the authorised representative of energy traders) the power supply object technical solution scheme of other documents ___ ____ ____ ____ ____ ____ ____ ____ ____ ____ to ____ lp. 14. Construction agent (or authorized person) (Date1) (signature of the official veterinarian) (position, name and surname) 15. Contact phone _____ _____ _____ _____ _____ _____ _____ _____ fills the būvvald 16. Būvvald marker for the construction of the acceptance of the idea of the City/District Officer of būvvald (Date1) (signature of the official veterinarian) (position, name and surname) 17. Seed sales deadline (date) 18. Decision on the refusal to accept the plan, the number and date of decision 19 City/District Officer of būvvald (Date1) (signature of the official veterinarian) (name and title, last name) part II. Construction completion 20. information on the completion of the works 21. Proof of completion of the works, certify that the works are complete and they are made in accordance with the documentation for the seed accepted. 22. The construction of the agent (or authorized person) (Date1) (signature of the official veterinarian) (position, name and surname) 23. Būvvald marker for the completion of the works the City/District Officer of būvvald (Date1) (signature of the official veterinarian) (position, name and surname) Notes: 1. a 1 document properties in the "signature" and "date" does not fill in, if an electronic document is drawn up according to the law on electronic document design. 2. Each receipt card fill out separate parts: part I, developing plans, but the documentation part II, upon completion of the works. Economic Minister Vyacheslav dombrovsky annex 5 cabinet 30 September 2014 regulations no 573 _____ _____ _____ _____ _____ _____ _____ ___ City/municipality permit No. būvvald-_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 1. Construction of agents (natural persons first name, last name, social security number, home address and telephone number, electronic mail address or legal name, registration number, registered office, telephone number, e-mail address) 2. Authorised person (an individual's first name, last name, social security number, home address, and phone number , electronic mail address or legal name, registration number, registered office, telephone number, e-mail address) 3. Construction type (required mark) the new building work to restore the placement of 4 construction demolition group _____ ____ 5. Site (name of each building) 6. Site address or, if not, the location of the land units of the 7 cadastral designation 8. Building cadastral designation 9. the owner of the land or, failing that, by the legal possessor (physical person's name first name, last name, ID number or name of the legal person, registration number) 10. Energy the object owner or legal possessor and/or user (an individual's name, social security number, or the name of the legal person registration No.)
11. The design conditions of design conditions (required mark): 1) reconciliation with third parties (if you changed the agreed position of the object of supply or technical solution): with adjacent property owners, co-owners or, failing that, by the legal possessor: (property address) (property address) (property address) 2) reconciliation (technical provisions): with public authorities: (name, address, contact info) (name, address, contact info) (name, address, contact information) with the municipal institutions : (name, address, contact info) (name, address, contact info) (name, address, contact information) by the holders of the inženiertīkl: (name, address, contact info) (name, address, contact info) (name, address, contact info) (name, address, contact info) 3) additional requirements for the construction of the detail, according to the local government building regulations 4) construction expertise (3. structure construction group) 5) other requirements for the planning, lokālplānojum or detailed (if there is) 12. Design conditions (date) the commencement of the construction works conditions 13. conditions for the commencement of the construction works in the Būvvald documents (required mark) : construction of the developer of the professional liability insurance policy copy works Manager of the professional liability insurance policy in the būvuzraug a copy of the professional liability insurance policy copy constructor for the works/compulsory insurance against civil liability in respect of a copy of the insurance policy and a coherent public works Director in charge of the construction and public works Director related articles būvuzraug related article building plan (third group guideline for construction) construction magazine (third guideline of group structures) autoruzraudzīb journal autoruzraudzīb the contract of building contract or order, information about the participants of construction or Builder (name of legal person būvkomersant, registration No., registration certificate number or the physical person's name, surname, personal code, place of residence) for information on defensive coordinator (first name, last name, ID number, phone number) the national cultural monuments protection inspection permit, if the work provided for in the national protected cultural monument protection zone or other documents, if provided for by law __ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ Būvvald marks and decisions 14. Mark for design conditions (date) After completing the design marks the fulfilment of the conditions for the commencement of the construction works, the conditions must be met within two years. 15. City/District Officer of būvvald (Date1) (signature of the official veterinarian) (position, name and surname) 16. Mark start of construction conditions (date) 17 City/District Officer of būvvald (Date1) (signature of the official veterinarian) (position, name and surname) After taking 18 marks the commencement of the construction works conditions the maximum duration of the works is ___ ___ ___ ___ ___ ___ years works made before (date) 19. Construction should begin operation until (date) 20. City/District Officer of būvvald (Date1) (signature of the official veterinarian) (position , first name and last name) 21. This permits (administrative) within a month of its entry into force can to challenge the administrative procedure law (name, address) Note. 1 document properties in the "signature" and "date" does not fill in, if an electronic document is drawn up according to the law on electronic document design. Economic Minister Vyacheslav dombrovsky annex 6 Cabinet 2014 30. Regulation No. 573 of September PROJECT reconciliation form (project name) (address) (1). Building agent (an individual's first name, last name, social security number, home address and telephone number, electronic mail address or legal name, registration number, registered office, telephone number, e-mail address) 2. person in charge of the project (name, surname, phone) project 3 (physical person's name first name, last name or legal name, registration No., address, phone, fax) 4. Fills in the issuing of technical regulations or other persons/institutions/organisations/companies that match 4.1 that does the matching person (legal name, registration No., address) 4.2 technical regulations issued (No., date of issue) is not issued 4.3. before carrying out the works required the excavation permission yes no contact person granting authorization (name, surname, phone number) (reception times , address) 4.4. the documents necessary to submit an excavation permit: (the name of the document, an outline of the contents) before excavating 4.5 launch invite representative yes no Pieaicinām (first name, last name, phone number) With signature on this form of matching the graphical (no graphic material, lp.) see the solution and project as a whole.

          (Date1)   (signature of the official veterinarian)   (name, surname)
Note the. 1 document properties in the "signature" and "date" does not fill in, if an electronic document is drawn up according to the law on electronic document design. Economic Minister Vyacheslav dombrovsky annex 7 Cabinet 30 September 2014 regulations no 573 ____ ____ ____ ____ ____ ____ ____ ____ ____ ___ Hall/municipality (an individual's first name, last name, social security number, home address and telephone number, electronic mail address or legal name, registration number, registered office, telephone number, e-mail address) application for individual tree felling 1. Please match (tree species, number) or property (address, cadastral designation) 2. Digging grounds need : tree (s) building area occupies tree (s) due to a dangerous situation for the building of the tree (s) due to a dangerous situation for communications (other) 3. Digging work done (company name, registration No., address, telephone) 4. digging works, the responsible person (position, name, surname, phone) in annex 5: land a copy of the plan with the cērtam tree (s) (s) location to ____ ___ lp. 6. Tree felling permission I would like to receive personal mail (Date1) (signature of the official veterinarian) (position, name and surname) 7. ownership of the applicant: the applicant is verified in the specified application to the property owner or, failing that, the legal possessor of the applicant is not specified in the application to the property owner or, failing that, the legal possessor of which: is the owner or, if one does not exist, the legal possessor is entitled to receive a tree felling permit (application attached power of attorney) is not the owner or If not, the legal possessor is entitled to receive a tree felling licence (date of receipt) (application recipient's first name, last name) (signature) Note. 1 document properties in the "signature" and "date" does not fill in, if an electronic document is drawn up according to the law on electronic document design. Economic Minister Vyacheslav dombrovsky Annex 8 Cabinet 30 September 2014 regulations no 573 _____ _____ _____ _____ _____ _____ _____ ___ City/District būvvald for proof of energy site readiness for the operation of the Construction agent 1 (natural persons first name, last name, social security number, home address and telephone number, electronic mail address or legal name, registration number, registered office, telephone number, e-mail address) 2. Declare that the (building name, location and cadastral designation If one is assigned) 2.1. land (land cadastral designation of the Vienîbas ____ ____ ____ ____ ____ ____ ___), where the owner or, if not, the legal possessor is _____ _____ _____ _____ _____ _____ _____, works carried out on the basis of the planning permission no _____ ____ ____ ____ 20. ____ year. ___ _____ _____ _____ issued by _____ _____ _____ _____ _____ _____ _____ būvvald, have completed the construction works started 2.2 20 ____. the year ____. _ _ _ ___ _ _ _ _ _ _ _ _ _ _ _ _ and completed 20 ____. the year ____. _____ _____ _____ ___ 2.3. construction construction plan to meet by (designer, būvkomersant certificates or registration certificate number) 2.4. changes and deviations from the construction is/is not (not applicable), its order is agreed and marked technical documentation 2.5. implementation of projects participated in the following construction: 2.5.1 works. the Chief Investigator (legal name, registration number, registered office, registration certificate number būvkomersant, the authorized official name) 2.5.2. responsible public works Director (physical person's name first name, last name, certificate number) 2.5.3. būvuzraug (first name, last name, certificate number būvpraks) 2.5.4. autoruzraug (first name, last name, certificate number) 3. Certify that: 3.1 build ready for acceptance into operation 3.2. all debris that classified as hazardous waste, is buried under the legislation requirements for hazardous waste disposal of the object of supply 3.3 in electrical construction and technological equipment is installed, checked and tuned according to the power supply object project and comply with the laws and regulations in the construction after the housing making 3.4 service ___ ___ ___ years atklājušo the works contractor will remove the defects at its own expense, 3.5. the total cost of construction is a ____ _____ euro, including State and local government funds-_____ ___ _ euro; 3.6. outstanding works will be completed in the following amounts and time limits: No. PO box The name of the unit of work completion date Quantity 3.7 decision-making structures construction agent will represent the (legal name, registration number, registered office, authorised officials name, surname or person's name, surname, personal code) construction of the proponent (name, surname, signature of the official veterinarian) (Date1) the main performer of the works (first name, last name, signature of the official veterinarian) (Date1) public works Director responsible (first name, last name, signature of the official veterinarian) (Date1) Būvuzraug (name, surname, signature of the official veterinarian) (Date1) Autoruzraug (name, surname, signature of the official veterinarian) (Date1) Note: 1 document properties in the "signature" and "date" does not fill in the If an electronic document is drawn up according to the law on electronic document design. Economic Minister Vyacheslav dombrovsky 9. attachment Cabinet 2014 30. Regulation No. 573 of September confirm (local name) (title of officer) (the responsible name) (signature) ________. ____ year. ___ _____ _____ _____ the Act on energy acceptance into object code ________. the year ____. _ _ _ ___ _ _ _ _ _ _ _ _ _ _ _ _ (dial) 1. details of the power supply object (name of each building, location, land cadastral designation of the unit, building cadastre) 2. Construction type (required mark) building renovation conversion demolition 3. placement of the shipbuilding group _____ ____ 4. Construction agent (an individual's first name, last name, social security number, home address and telephone number, electronic mail address or legal name, registration number, registered office, telephone number, e-mail address) 5. Construction in the name of the authorized agent of the person (natural person name first name, last name, ID code, place of residence, telephone number, electronic mail address or legal name, registration number, registered address, phone number) 6. Energy the object affiliation 7. Making work out (administrative territory of the būvvald name) 7.1 municipal building (first name, last name, construction control certificate No.) 7.2. local architect or Engineering Department (first name, last name, certificate No.) 7.3. other official (name, position) outside of the Būvvald: 8 8.1. būvuzraug (first name, last name, certificate No.) 8.2. a construction Developer (name, certificate No.) 8.3. the main contractor (construction contractor) (company name, registration No., and officials in the position, name, surname or name, surname and personal code) 9. Būvvald is met: 9.1 transfer of its disposal projects. the ___ ___ volumes 9.2. execution of the execution of the works and documentation: 9.2.1. public works Journal No ____ ____ ____ 9.2.2. autoruzraudzīb Journal No. ____ ____ ____ 9.2.3. significant design and cover the work of making legislation on ____ __ lp. _ _ _ _ _ _ the volume (s) of assessment: 10 Būvvald 10.1 construction proposing construction proof of readiness for operation; 10.2. the State, local governments and other institutions the implementation of findings on the site's technical readiness and compliance with the accepted construction: 10.2.1. ___ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ___ opinion no ____ ____ ____ to ____ __ lp. 10.2.2. __________________________________________________________ atzinums Nr. ____________uz ______ lp. 10.2.3. __________________________________________________________ atzinums Nr. ____________uz ______ lp. 10.2.4. __________________________________________________________ atzinums Nr. ____________uz ______ lp. 10.2.5. __________________________________________________________ atzinums Nr. ____________uz ______ lp. 10.2.6. __________________________________________________________ atzinums Nr. ____________uz ______ lp. 10.2.7. __________________________________________________________ atzinums Nr. ____________uz ______ lp. 10.2.8. __________________________________________________________ atzinums Nr. ____________uz ______ lp. 10.2.9. __________________________________________________________ atzinums Nr. ____________uz ______ lp. 10.2.10. the opinions of the other institutions ___ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ___ on ___ ___ lp. 11. Būvvald is heard in the work of the officials and outside experts and found that: 11.1. work carried out on the basis of the planning permission no ___ ___ ___ ___ ___ ___ ___ that ________. ____ year. ___ _____ _____ _____ issued by (name of būvvald) 11.2. construction start of ________. ____ year. ___ _____ _____ _____ 11.3. construction construction plan to meet by (the designer's name, certificate number and the name of the design, the registration number and the registration number būvkomersant) and by the ________. ____ year. ___ _____ _____ _____ no _____ ____ accepted (būvvald name) 11.4. changes and deviations from the accepted construction plan is/is not (not applicable), its order is agreed and marked the construction technical file 12. Building technical indicators: 12.1. the energy use of the object (function according to the classification of structures) ___ ____ ____ ____ ____ ____ ____ 12.2 power supply object area (new construction) _____ _____ _____ ___ m2 12.3. attachment site (substation, power line, sadaln) __ ____ ____ ____ ____ 12.4. power supply voltage level of the object in which the work carried out in the _____ ____ ____ _____ 12.5. transformer rated power __ ____ ____ ____ ____ kVA transformer nominal 12.6 voltages _____ _____ _____ ___ kV 12.7. generator rated power __ ____ ____ ____ ____ kVA power line voltage 12.8 ___ _____ _____ _____ the nominal thermal GOK 12.9. power _____ _____ _____ ___. nominal thermal 12.10 MW capacity ____ ____ _____ _____ bar nominal yield 12.11. _____ _____ _____ ___ m3/h 12.12. working temperature _____ ____ ____ _____ oC 12.13. volume ____ ____ ____ ___ ___ m3 power line overall length 12.14. ___ _____ _____ _____ ____ m 12.15. part electrical surface _____ _____ _____ _____ m 12.16. powerlines underground part of ____ ____ ____ ___ ___ m 12.17. the power line crossings with ____ ____ ____ ____ ____ ____ ___ m _____ _____ _____ _____ _____ __ m __ _____ _____ _____ _____ _____ m 12.18. kabeļlīnij under asphalt pavement ____ ____ ____ ___ ___ m kabeļlīnij in the green zone _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ m kabeļlīnij under the cobblestones ____ ____ ____ ___ ___ m 12.19. power supply design: the design of an object No. PO box The material of the object of supply, the line features technical specifications 13. Construction: 13.1. built in new buildings; 13.2. rebuilt buildings; 13.3. restore buildings. 14. the total cost of construction (by proposing the construction of the proof) is a ____ _____ euro. 15. The power supply object is verified as being valid for operation with the findings, which are annexed to this Act. 16. installations built, assembled, tuned, tried and accepted by the documents annexed to this Act. 17. Deferred work (clean-up of the territory, a fragment of the facade decoration, etc.) must complete the following scope and term: No. PO box The name of the unit of work completion date Quantity 18. After the adoption of the energy an object lifetime (after the approval of this Act) ___ ____ years atklājušo main defects of construction works contractor will remove at their own expense.
19. the Office proposes to recognize the Būvvald (the name of the object of supply) of a valid operation. 20. the adoption Act drawn up _____ ____ copies. Izpilddokumentācij placed in storage: 20.1. municipal building (first name, last name, signature of the official veterinarian) 20.2. local architect or Engineering Department (first name, last name, signature of the official veterinarian) 20.3. other official (position, name, surname and signature of the official veterinarian) 21. Guest: 21.1. būvuzraug (first name, last name, certificate No.) 21.2. a construction Developer (name, certificate No.)
22. With the Act read: 22.1. construction agent (name, surname, signature of the official veterinarian) (date) 22.2. construction performer (first name, last name, signature of the official veterinarian) (date) Note. 1 document property "signature" does not fill in, if an electronic document is drawn up according to the law on electronic document design. Economic Minister Vyacheslav dombrovsky