Cabinet of Ministers Regulations No. 529 in Riga 2014 (September 2. No 46 32 buildings …) issued in accordance with article 5 of the law on construction of the first part of paragraph 2 and the second subparagraph of paragraph 1, ' 1. General questions 1. determines: 1.1. building construction process procedures involved in building institutions and responsible būvspeciālist; 1.2. the construction process the necessary documents and their contents; 1.3. building permits, certification card and include in the explanatory memorandum; 1.4. where the required information for the public about the construction plan, and such information; 1.5. derogations harmonisation; 1.6. construction expertise; 1.7. the control of the construction process and the rule of law, accountable institutions; 1.8. building preservation order; 1.9. building location uzmērījum procedure and a procedure acceptable to the building into operation; 1.10. the works guarantee terms after the adoption of the construction operation. 2. the rules apply to all types of buildings, except the General būvnoteikumo this case. 3. these provisions in certain building construction (building) process control and the rule of law in the administrative territory of the būvvald, but is responsible for the construction of the law of the first paragraph of article 6.1 of the cases referred to in paragraph 1, for the control of the works and the rule of law — in national control Office (hereinafter the Office). 4. A Person is entitled to the documents specified in these provisions to submit būvvald or Office electronic document, if the document has been prepared according to the law on electronic document design. 2. Construction of the origination and required documents 5. Construction intentions for the planned construction of the documents submitted at the būvvald, which is responsible for the administrative area. If the planned construction of several local administrative areas, construction intentions documents submitted by: 5.1 all būvvald the administrative territory of the planned construction and the construction process from conception to adoption into each are separate; 5.2. in the municipalities of būvvald to which it has delegated certain tasks during the construction process. 6. Depending on the planned construction of the intentions laid down in the General būvnoteikumo of the Group of buildings and construction type has the following construction types: application conception 6.1 memorandum (annex 1), which completed this provision 22, 23, 24 and paragraph 35.2.  and 36.2. in the cases referred to in point; 6.2. the reasons for the demolition of the building (annex 2), which fills this rule 27 and 32 in the cases referred to in paragraph; 6.3. the explanatory memorandum of the building or premises for the use of the group changes without rebuilding (annex 3), which populates the rule referred to in paragraph 34; 6.4. the construction of the application (annex 4) which fills in this rules 25, 26, 28, 29, 30, 31 and 33 in the cases referred to in paragraph; 6.5. the acknowledgement card (annex 5), which populates the rule in subparagraph 37.21.8., and 38 in the cases referred to in paragraph; 6.6. building facades for the acknowledgement card (annex 6), which fills this rule 36.1.37 and 38 above, in the cases referred to in paragraph. 7. The construction of the seed document is not needed: 7.1. If the building or premises is in a group of Interior project, which does not affect third parties, the load-bearing constructions and shared inženiertīkl; 7.2. the first group of buildings or parts thereof (except public buildings in cities and villages) renewal – building or part thereof, without changing the building's not making nolietojušo elements or constructs, without prejudice to the facade of the building and sharing inženiertīkl, doing functional or technical improvements (hereinafter referred to as the simplified renewal); 7.3. the first group of building facades decorating restoration, replacement of all Windows on the façade insulation, roof insulation, roof replacement, iesegum the basement insulation, or a aizstiklošan of the Loggia (hereinafter referred to as simplified facade renovation), if the building is not the national protected cultural monument and is located outside towns and villages; 7.4. the first, second or third team building window replacement, subject to compliance with these rules 39, 40 or 41, the conditions referred to in paragraph; 7.5. the second or third group residential buildings of aizstiklošan, if Loggia complied with this provision, the conditions in paragraph 42, except the State protect cultural monuments; 7.6. the one season in the lightweight construction buildings without foundations (such as a greenhouse). 8. the Person suggesting any kind of construction, construction intentions submission adds: 8.1. property, possession or usage rights supporting documents; 8.2. the term of Office of the construction agent, if the application is submitted by an authorised person; 8.3. the reconciliation with third parties and other permissions for these rules and other regulations in the cases. 9. Third party reconciliation presented to the building project master plan (valid topographic plan of the projected areas developed the General construction plan for the structure, the composition of the elements and facilities inženiertīkl attraction parcel) or as a separate document (for example, an agreement, a decision of the general meeting of the owners of the apartments, the voting Protocol), so it would clear this the consent of each person as a certain burden affecting the person concerned. 10. the intention of the planned construction does not require consent by the owner of the land where the building belongs to the other person and is to be carried out of the building or space groups, renewal, restoration, alteration, change or change of use, simplified facade restoration, reconstruction or restoration without the use of a simplified type of Exchange. 2.1. Construction conception development document 11. prosecutors agreed with the construction projects of developers in the field of the corresponding civil design of the intention of the relevant construction documents required. According to planned conception and the intended type of construction completed in one of the construction idea submissions. 12. This rule 6.1 and 6.2 in the cases referred to in the construction of the agent itself can develop the necessary construction documents to your housing plans building, its inadequacy or non-residential farm building and to certify that they comply with the laws governing construction and local municipal territory planning, detailed or lokālplānojum (if one has been developed). 13. before the construction of the conception development to civil design documentation preparation work. The contract for the construction of the conception of the design documentation shall indicate which of the parties undertakes to perform. 14. the contract for the construction of seed development and construction documentation for the minimum stock is an integral part of the design task. The design task to prepare and sign a construction agent and a construction developer. 15. the task of showing the projected Design buildings with the main route of planned space groups, their uses and characteristics, as well as the planning and design of inženiertīkl. If necessary, indicate the specific conditions (for example, the desired constructions and materials, technology). If the building collapses, the design task specifies requirements in demolition work project. 16. If the plan provides for the construction of object commissioning through the construction, the design exercise in each round of the fall. 17. If necessary the construction plans of the documentation below detail those provisions set out in each group of buildings mandatory, it includes a design task (in the contract). 18. Construction documents developed according to plans for the construction of laws and regulations governing the municipal territorial development planning documents. 19. developing conception of the construction documents, if the planned construction in accordance with the relevant regulations, it is necessary for technical or special provisions, construction of the planned construction of the agent's conception can request and receive the necessary technical or specific provisions of State and local institutions, as well as the owners of inženiertīkl. 20. Construction intentions documents (except the construction application) development in three original copies, but the law on construction of the first paragraph of article 6.1 of the cases referred to in paragraph 1, the four original copies. One copy is stored in būvvald, one copy of the initiating projects in construction and developer, as well as the law on construction of the first paragraph of article 6.1 of the cases referred to in paragraph 1, one copy is kept in the Office. If the construction agent even develop construction plans, it shall draw up the documents in two original copies (one copy of būvvald and the construction of the proposed). Conception of construction documents drawn up in a single copy, if the document is prepared and filed electronically. 21. If the second or third group repeated construction of buildings (standard project) to a particular piece of land, a construction developer fields of the corresponding civil design, the development of the General construction plans required documentation according to planned conception and the intended type of construction. 2.2. The first group or part of a building construction intentions documents 22. Proposing a first group of new building construction or placement, the būvvald submitted by: 22.1. fill the explanatory memorandum part I; 22.2. graphic documents: 22.2.1. object of Visual solutions, but the placement of the manufacturer in the case of construction products technical documentation and graphical document with the building's façade; 22.2.2. situation plan in accordance with clearly visible (M 1:250; M 1:500; M 1:1 000) on the land plan, which contains the object of attraction for the parcel and its external dimensions; 22.3. reconciliations of: the plot 22.3.1. owner of land bordering a plot that planned construction if construction intentions location exceeds the distance laid down by legislation and it is allowed to receive the reconciliation; 22.3.2. the owner of the land on which the building of the planned new construction or placement; 22.3.3. the co-owners if the plan touches on shared ownership; 22.3.4. institutions, if it is determined by law; 22.4. the authorization, as determined by the legislation; 22.5. technical or special rules, as determined by the legislation; 22.6. other documents according the local government planning, lokālplānojum or detailed (if one has been developed). 23. proposes that the first group of buildings or parts of buildings, if not a cultural monument and proposed changes affect the building facade or making design elements or by modifying or eliminating the existing elements, or to use the renewal or restoration of the būvvald submitted by: 23.1. fill the explanatory memorandum part I; 23.2. graphic documents that show all or part of the building of the planned changes and/or building or group use of a change; 23.3. the reconciliation with: 23.3.1. plot of land owners, if the planned restoration of the building with the use of the Exchange; 23.3.2. the owner of a building or part thereof; 23.3.3. the co-owners if the plan touches on shared ownership; 23.3.4. institutions, if it is determined by law; 23.4. the authorization, as determined by the legislation; 14.6. If for restoration, the study material program with graphical document that shows the restaurējam of the building or part thereof; 14.7. other documents according the local government planning, lokālplānojum or detailed (if one has been developed). 24. proposes that the first group of the building or part of a conversion up to the General būvnoteikumo volume indicators laid down in the first group, the būvvald submitted by: 24.1. fill the explanatory memorandum part I; 24.2. graphic documents that show all or part of the building of the planned changes and/or building or group use of a change; 24.3. the reconciliation with: 24.3.1. plot of land owners, if rebuilding is changed, the volume of the building, above a certain distance regulations, or use and is allowed to receive the reconciliation; 24.3.2. the owner of a building or part thereof; 24.3.3. the co-owners if the plan touches on shared ownership; 24.3.4. institutions, if it is determined by law; 15.2. If it is determined by law; 15.2. other documents according the local government planning, lokālplānojum or detailed (if one has been developed). 25. proposes the first group of buildings or parts thereof, if the intended conversion exceed the General būvnoteikumo volume indicators laid down in the first group and/or change the use of residential buildings for non-residential or vice versa, shall submit an application for the construction of būvvald and the construction of minimal composition in accordance with the provisions of paragraph 31. 26. proposes that the first group or part of a restoration of the building, if the building is a cultural monument, the construction of the application submitted to the būvvald and the construction of minimal composition in accordance with the provisions of paragraph 30. 27. the Proposed demolition of the first group, the būvvald submitted by: 27.1. completed the demolition of the explanatory memorandum (I); 27.2. situation plan in accordance with clearly visible (M 1:250; M 1:500; M 1:1 000) on the land plan, which contains nojaucam building; 27.3. fotofiksācij buildings over 40 years old; 27.4. other documents, permission or consent, if it is determined by law. 2.3. the second and third groups or part of a building construction intentions documents 28. proposes to the second or third group building a new building, the construction of the application submitted to the būvvald and the construction of minimal composition consisting of: 28.1. explanatory description of planned construction plans, including on environmental accessibility solutions, if the building according to the laws of ensuring accessibility; 28.2. the master plan in accordance with a construction clearly visible (M 1:250; M 1:500; M 1:1 000) to a valid plan for topographic; 28.3. building floor and roof plans with space or group of spaces explication (second group one or two residential buildings and housing inadequacy – without space or space group breakdown); 28.4. building facades with height marks; 28.5. specific cuts with height marks; 28.6. If the intended construction and/or commissioning by the shipbuilding-specific allocation rounds through the construction, specifying the limits and turn order; 28.7. other documents according the local government planning, lokālplānojum or detailed (if one has been developed); 17.9. the reconciliation with 28.8.1. the plot: the owner of land bordering a plot that planned construction intentions location does not match the distance laid down by the legislation, and it is allowed to receive the reconciliation; 28.8.2. If co-owners vision affect shared ownership; 28.8.3. institutions, if it is determined by law; 46.8. additional calculation, if the building of the breakdown in the second group are based on the number of people in the building at a time; 28.10. other documents or authorizations, if required by the regulations; No 28.11. information about a particular Member State of the European Union regulatory framework for the application of a construction development, the application of the Member States of the European Union, the national standards and technical requirements of et seq. 29. proposes that a second or third place of group building, the construction of the application submitted to the būvvald and the construction of minimal composition consisting of: 29.1. the explanatory description of planned construction plans, including on environmental accessibility solutions, if the building according to the laws of ensuring accessibility; 29.2. the master plan of the site in accordance with clearly visible (M 1:250; M 1:500; M 1:1 000) to a valid plan for topographic; 29.3. the manufacturer of the finished construction products technical documentation and graphical documents, with the building's facade and the building floor plans with room or group of rooms explication (second group one or two residential buildings and housing inadequacy – without space or space group breakdown); 29.4. reconciliation with: 29.4.1. the owner of the parcels, which piece of land bordered by the plot, in which the construction, if the construction conception location exceeds the regulations certain distances and it is allowed to receive the reconciliation; 29.4.2. the co-owners if the plan touches on shared ownership; 29.4.3. institutions, if it is determined by law; 29.5. the supplementary estimates, if the building of the breakdown in the second group are based on the number of people in the building at a time; 29.6. other documents according the local government planning, lokālplānojum or detailed (if one has been developed); 18.5. other documents or permits, as determined by the regulations. 30. proposes a second or third group or part of a building restoration or rehabilitation of the būvvald submitted the application and construction of construction minimum composition consisting of: 30.1. an explanatory description of planned changes; 30.2. If restoration, research materials, programs with a graphical document that shows the restaurējam of the building or part thereof; 30.3. If restoration – a graphical document that shows a building or part of the planned changes and/or improvements to the building's facade, the building or part of the floors and rooms; 18.9. the reconciliation with: If the co-owners 30.4.1. vision affect shared ownership; 30.4.2. institutions, if it is determined by law; 5. other documents or permits, as determined by the regulations. 31. proposes that the second or third group or part of a building conversion būvvald the submit application and construction projects in the minimum composition consisting of: 31.1. explanatory description of planned changes; 31.2. in accordance with the construction plan of the master plan clearly visible (M 1:250; M 1:500; M 1:1 000) to a valid plan for topographic; 31.3. graphic documents that show all or part of the building of the planned changes to the building facade, the building or part of the floors and rooms and/or building or space groups use Exchange, 19.5. specific cuts; 31.5. reconciliation with: 31.5.1. plot of land owners, if rebuilding is changed, the volume of the building, above a certain distance regulations, or use, and this is allowed by the relevant agreement; 31.5.2. the co-owners if the plan touches on shared ownership; 31.5.3. institutions, if it is determined by law; 31.6. additional calculation, if rebuilding is changed the building volume and compliance of the building in the second division in the group are based on the number of people in the building at a time; 19.7. other documents or permits, as determined by the regulations. 32. the Proposed demolition of the second group, if it is not connected to an external inženiertīkl or they are disabled, which represent the opinion of the owner of inženiertīkl (), the būvvald submitted by: 32.1. completed the demolition of the explanatory memorandum (I); 32.2. situation plan in accordance with clearly visible (M 1:250; M 1:500; M 1:1 000) on the land plan, which contains nojaucam building; 32.3. fotofiksācij buildings over 40 years old; 32.4. other documents, permission or consent, if it is determined by law. 33. proposes that the second (except in the case referred to in paragraph 32) or the demolition of the third group, the construction of the application submitted to the būvvald and the construction of minimal composition consisting of: 33.1. interpretative description that contains information about the intended demolition of the building, the building of the inženiertīkl construction of dismantled waste management, and recycling or disposal site; 33.2. in accordance with the construction plan of the master plan clearly visible (M 1:250; M 1:500; M 1:1 000) to valid topographic plan, pointing at the building and demontējamo of nojaucam inženiertīkl; 33.3. other documents, permission or consent, if it is determined by law. 2.4. Construction intentions documents building or group use of a change without conversion, the simplified renewal and simplified facade restoration 34. Proposing the first, second or third team building or group use of a shift without conversion, the būvvald submitted by: 34.1. the explanatory memorandum of the building or premises for the use of the group changes without conversion; 21.3. the explanatory description of planned construction plans; 21.3. the graphical document that shows a building or space usage of the Group; 21.4. the reconciliation with the building or space group holder; 34.5. other documents, permission or consent, if it is determined by law. 35. proposes that the first group of public buildings or its part (towns and villages), second or third team building or part of a simplified renewal, the būvvald submitted by: 21.8. fill the receipt card (I), if the second or third for team building or part of a simplified renewal; 35.2. fill in part I of the explanatory memorandum, where the first group of public buildings or its part (towns and villages) simplified; 35.3. the explanatory description of planned construction plans; 35.4. the graphical document showing the building or part of a plan to change and/or planned a building or space groups uses; 22.1. the reconciliation with the owner of the building or part thereof; 35.6. other documents, permission or consent, if it is determined by law. 36. proposes that the first (towns and villages), second or third group to simplify the building facade restoration, the būvvald submitted by: 36.1. fill the building facade receipt card part I if for second or third group building a simplified facade; 36.2. the completed part I of the explanatory memorandum, where the first group of buildings (towns and villages) simplified facade; 36.3. the explanatory description of planned construction plans, including the construction of waste management and the intended territory alignment; 36.4. the facade of color (color of the Passport); 22.7. the main constructive parts; 22.7. the Organization of work of the project; 22.8. the reconciliation with the building owner; 22.9. other documents, permission or consent, if it is determined by law. 37. where the simplified renewal or simplified facade renovation for the building, which is the national protected cultural monument, būvvald in addition to these regulations, paragraph 35 or 36. these documents shall be submitted: 37.1. the national cultural monument protection Inspectorate; 37.2. the space heritage inventory statement. 38. where the simplified renewal or simplified facade restoration for the national protected cultural monuments in the territory or its protection zone in an existing building (except the archaeological monuments), būvvald in addition to these regulations, paragraph 35 or 36. the documents submitted to the national cultural monument protection Inspectorate's permission. National cultural monument protection Inspectorate's permission is not required for the protection of cultural monuments in the area of building construction works, if the national cultural monument protection Inspectorate has established the historic building facade decoration, window replacement, facade and roof insulation, as well as the roof of the iesegum replacement methodology. 39. building façade to the card or proof of reasons is not required if the building, including building, located in the national protected cultural monument protection zone (with the exception of monuments of architecture and urban), the planned replacement of the window only, without other building facade works, and ensuring compliance with building facades koptēl (window, split and the proportions, the frame and from the outdoor space the visible window elements and painted and embossed). 40. acknowledgement of the facade of the building or the explanatory memorandum is not necessary if the buildings that are of architectural and urban monument protection zones, planned only window replacement of all other building facade works, and ensuring compliance with building, architectural solutions and koptēl (window placement in the depth of the façade plane, logail architectural decoration, window, window composition and proportions, the separated according to the original material, the constructive elements of the window from the visible part of the outdoor space dimensions and profilējum in the decorative parts of the window, from the outdoor space visible Windows equipment and coloration). 41. changing the Windows of buildings in the historic centre and its protection zone territory, building facades for the acknowledgement card is not necessary when the information supplied in the būvvald, a sketch or a passport with an explanatory description signed by the būvspeciālist in the field of architecture (certified architect) to ensure compliance with this provision in paragraph 40. Būvvald, if it holds the technical documentation concerning the building of the current window (for example, window replacement passport), within 14 days following receipt of the written notice to the construction proposed the existence of such documentation. 42. building facades for the acknowledgement card is not necessary when the second or third group residential building (excluding the State protect cultural monuments) of the Loggia, the planned aizstiklošan of all other facade works, and filed in the apartment of the būvvald property in accordance with the procedure laid down in the law, a decision on the admissibility of the Loggia aizstiklošan and consistent visual appearance of the building and the facades of the Loggia aizstiklojum sketch or a passport with an explanatory description. 43. Where the simplified renewal and simplified facade restoration, a construction developer fields within the relevant civil design developed a solution that provides all or part of the building design, architectural quality, sustainability, sharing the smooth functioning of the inženiertīkl, installation of a new or existing inženiertīkl conversion to ensure compliance with the regulations of the building requirements, and certifies compliance with the intended use and regulations, as well as third-party property rights. A construction developer can invite other būvspeciālist who sign a memorandum or a receipt card. 2.5. the preservation of the building they forced the marshalling process, 44. If the local authority has taken a decision on the operation of the building's preservation, adopted construction agent shall submit the completed būvvald: 44.1. reasons for building preservation part I (annex 7); 44.2. building conservation works project which consists of: the explanatory description of 44.2.1. preservation and the necessary conservation work list; 44.2.2. solutions, or, if necessary, the graphical part of the loss of stability and structural elements of the building further deterioration; 44.2.3. solutions of the danger to human life and health or the environment; 27.5. heritage inventory statement, if the building is a cultural monument; 27.6. the work of the organisation of the project if the Government decision on building preservation it is indicated; 27.7. other documents which characterise the building and necessary decision. 45. the reasons for building preservation part I and this rule 44. document referred to in paragraph būvvald shall be submitted to the authorities by the deadline set in the decision. 3. Construction plans review 46. when construction plans specified in these provisions the application and documents, būvvald of construction law article 12 the time limits laid down in the fourth paragraph-looking construction plans compliance with laws and regulations and shall take a decision pursuant to article 14 of the law on construction of the third part. 47. Būvvald for taking a decision on the acceptance of the construction plans in accordance with article 14 of the law on construction of the third part, paragraph 1 shall be issued building permits (annex 8). 48. Būvvald for taking a decision on the acceptance of the construction plans in accordance with article 14 of the law on construction of the third subparagraph of paragraph 2 and 3, it shall take the mark of the explanatory memorandum, the memorandum for the demolition of a building or in the explanatory memorandum group use of a change without conversion, the explanatory memorandum building preservation, acknowledgement on a map or building facades for the acknowledgement card. 49. After būvvald marks made in the explanatory memorandum, in the explanatory memorandum to the demolition, in the explanatory memorandum of the building preservation or a receipt card construction agent to submit information on the participants in the works. Information on the work of the analyst can provide at the same time with the construction plans of the būvvald submission for decision. The construction conception for marketing shall be two years, counted from the decision on acceptance of the construction plans. If the building's preservation, explanatory memorandum, the preservation of the building realization period shall be determined in the light of the decision of the local authorities concerned about the preservation of the building. 50. by būvvald marks the building facades carry receipt card submitted būvvald on agent construction works start up the necessary documents. If a simplified facade restoration, conception of sales shall be two years, counted from the decision on acceptance of the construction plans. 51. Būvvald, evaluating the reasons for building or group use of a shift without conversion, shall decide on the acceptance of a building or space groups uses without changing the conversion and take the mark of the explanatory memorandum on building or group use of a shift without conversion. 52. If a building or space groups uses the Exchange without rebuilding can affect any of the essential requirements of the building according to article 9 of the law on construction of the second part or does not match the local municipal territory planning documents or legislative or regulatory requirements, the use of būvvald refuse to accept building or group use of a shift without conversion. 53. After būvvald marks made in the explanatory memorandum on the acceptance of a building or space groups uses the Exchange without rebuilding, construction agent is entitled to start operating the building or space group according to the accepted usage, except if the planned economic activity in other areas of the law are put in the specific requirements for this operation. 4. Building permits, certification card and in the explanatory memorandum, the conditions included 54. Construction permit shall include the following: 54.1. Design conditions, including: the building project to be būvvald 54.1.1. and other requirements of a construction detail, according to the local government building regulations; 54.1.2. construction requirements for the solutions with the building owner or legal possessor, if such right tacitly; 54.1.3. requirements for technical or special terms from State and municipal institutions; 54.1.4. the requirements for the receipt of technical regulations for inženiertīkl connections (atslēgum) and the crossings; 54.1.5. environmental accessibility requirements, if the availability of the building must be provided according to the legislation; 54.1.6. legislation in the cases specified in other documents, permission or consent; 54.1.7. other requirements, including the facade decoration of the construction products used or their equivalents, according to planning, lokālplānojum or detailed (if one has been developed); 54.2. conditions for the commencement of the construction works, including requirements for: 54.2.1. the documentation to be submitted to the responsible būvspeciālist (related articles, autoruzraudzīb); 54.2.2. registration documents to be submitted to the building process for fixation of the works (public works magazine, autoruzraudzīb magazine, building plan); 54.2.3. deliverable documents on civil liability insurance (responsible for the works and būvspeciālist insurance policies); 54.2.4. the national cultural monuments protection inspection permit, if the work provided for in the national protected cultural monument protection zone or, if provided for by law; 54.2.5. other documents if required by laws and regulations; 54.3. deadlines for the construction permit conditions. 55. Būvvald, assessing construction plans and construction documents, the information specified in the application, the design of the building permit conditions may set lower and būvvald in designing projects to be submitted (section) than the other groups in building construction if it is built, restored, rebuilt one or two dwelling residential building and its inadequacy, as well as the holding of non-residential buildings. 56. the conditions in the Building works started to perform two years of carrying out building permits in the markup for design conditions. 57. In the explanatory memorandum, in the explanatory memorandum to the demolition, in the explanatory memorandum of the building preservation, acknowledgement card include the commencement of the construction works, including the requirements of conditions for providing information on the perpetrators of the works. 58. building facades for the acknowledgement card included in the commencement of the construction works, including conditions requirements: 58.1. the documentation to be submitted to the responsible būvspeciālist (related articles); 58.2. registration documents to be submitted to the building process for fixation of the works (public works magazine, building plan); 58.3. deliverable documents on civil liability insurance (responsible for the works and būvspeciālist insurance policies); 58.4. other documents if required by law. 5. Public information 59. Subscriber received planning permission For the construction of the law article 14 within the time limits laid down in the seventh part, inform the public, placing the piece of land where construction is permitted, būvtāfel (format, not least on the A1, from material that is resistant to the environment). Būvtāfel to deploy, if provided: 59.1. second group of buildings new construction or placement, except one or two apartments in a residential building or the inadequacy that is outside of the Baltic Sea and Gulf of Riga coastal dune Strip, heritage monuments in the territory, or a protection zone, or especially protected natural areas; 59.2. the second group of building conversion, except one or two dwelling residential buildings or the inadequacy, if you do not change the usage to one of non-residential buildings use; 59.3. third group buildings new construction, placement, or alteration. 60. Būvtāfel to deploy for a period of not less than building challenge. 61. Būvtāfel in cities and villages located closest to a public place, but outside the cities and villages, pointing to the road, and it indicates the following: 61.1. construction plan (construction type and address); 61.2. subscribers (natural persons first name, last name or legal name, address, registration number); 38.1. a construction Developer (physical person's name, certificate number or the name of the legal person, address, registration number); 61.4. construction conception plan with building a shed, but the third group in addition to public buildings, construction intentions visualization environment; 61.5. information about building permits, the time of entry into force of the decision date and number. 6. Designing of development and construction plan 6.1 the composition receiving planning permission, 62. Subscriber shall arrange for the building design conditions. The necessary technical or specific provisions require the respective institutions, if they are not received, the drafting of minimum building project. 63. the Development Projects in the Latvian language. After the election of the principal construction of the textual part can translate into a foreign language. Foreign language text of the construction plan of the Latvian language to be translated. 64. A construction developer develops projects to the extent set out in these regulations and the necessary construction plans for disposal, as well as specified in the building permit. 65. In coordination with būvvald, you can develop a construction plan, the application of the Member States of the European Union, the national standards and technical requirements of et seq. It is not permissible for a number of Member States of the European Union or the national standard of the application at the same time one et seq of the constructive element or one of the engineering system design in the construction of a single object. 66. Projects whose design and implementation in the territory of Latvia for at least 40% funded by international financial institutions, the European Union or its Member States (if the investment is not repaid), can develop, et seq, of the application of the investor if they do not conflict with the European standardisation organisations. On the construction and implementation of relevant General construction law and the requirements set out in these provisions. The application of the investor et seq, must not lower the national building laws in certain essential requirements. 67. A construction manager on a construction and construction of the cover page of the master plan, which is also the site of the main indicators characterize the signing certificate that is included in the construction plan and developed all required parts under the conditions laid down in the building (annex 9). 68. A construction solution to compliance with technical or special terms and et seq requirements can assure one būvspeciālist the civil design (without attracting other būvspeciālist), if it is built, placed, rebuilt, renovated or torn down that rule 107, paragraph building and it did not put forward specific requirements of land-use and building regulations. Būvspeciālist is responsible for the overall construction plan and compliance with construction laws governing. 69. A construction manager on a construction plan concerned portions of the main drawing page (General) sign a Declaration on the construction of part of the solution to the compliance with the Latvian et seq, and other laws, as well as technical or special regulations (annex 9). If a construction development in the application of the Member States of the European Union the national standards and technical requirements, et seq construction manager on a construction plan concerned portions of the main drawing page (General) sign a Declaration on the construction of part of the solution to the compliance with the Latvian et seq, and other regulatory provisions of the Member States of the European Union, and national standards and tests, as well as et seq of technical or special regulations (annex 9). All part of the General construction plan for the construction of the signature of the head of the page. 70. some of the parts of the construction drawings and tech developer signed each page of the drawing or text section. If the developer does not have relevant certificate, drawing pages, signature or the part in question is also a construction manager, which they tested. 71. the second group of buildings construction (except when the intended demolition) has the following components: 71.1. General: 71.1.1. requires the initiation of civil design documents; 71.1.2. land documents according to engineering studies General provisions; 71.1.3. Description of the interpretative, which contains general information on building technical indicators, the main uses of the building according to the classification of structures, environmental and fire protection measures of availability solutions; 71.2. architecture: 71.2.1. General indicators; 71.2.2. section of the territory: 71.2.2.1 construction in accordance with the master plan. visually perceptible (M 1:250; M 1:500; M 1:1 000) on the topographic plan. 71.2.2.2. joined the design plan of the corresponding inženiertīkl visually perceptible (M 1:250; M 1:500; M 1:1 000) on the topographic plan. 71.2.2.3. the vertical design of the territory; 71.2.2.4. facilities and greenery plan (except one or two dwelling residential buildings and their inadequacy); 71.2.2.5. transportation and pedestrian traffic organization scheme (with the exception of one or two dwelling residential buildings and their inadequacy); 71.2.3.71.2.3.1. architectural section: building the roof and floor plans with room sizes and distribution group and space group usage breakdown, but all space groups with public functions and one or two dwelling residential buildings, if it is a room with a different use according to the classification of structures, in addition to the room names;- 71.2.3.2. building facades with height marks; 71.2.3.3. specific sections with height marks; 71.2.3.4. technical equipment (public buildings); 71.2.3.5. specifications construction products; 71.3. inženierrisinājum: 71.3.1. constructions (floors, roofs, and other load bearing constructions); 71.3.2. building the necessary inženiertīkl (water supply and sewerage, heating, ventilation and air conditioning, electricity, heating, gas supply, electronic communication networks, security systems) and their solutions (connection diagrams, specifications, cuts); 71.3.3. other inženierrisinājum, if necessary; 71.3.4. environmental protection measures; 71.3.5. specifications construction products; the work of organizing project 71.4.; 71.5. assessment of the energy performance of a building calculated efficiency, as determined by the law of the energy performance of buildings. 72. a third group of building construction (except when the intended demolition) has the following components: 72.1. General: 72.1.1. requires the initiation of civil design documents; 72.1.2. land documents according to engineering studies General provisions; 72.1.3. Description of the interpretative, which contains general information on building technical indicators, the main uses of the building according to the structure of the classification and accessibility solutions; 72.2. architecture: 72.2.1. General indicators; 72.2.2. section of the territory: 72.2.2.1 construction in accordance with the master plan. visually perceptible (M 1:250; M 1:500; M 1:1 000) on the topographic plan. 72.2.2.2. joined the design plan of the corresponding inženiertīkl visually perceptible (M 1:250; M 1:500; M 1:1 000) on the topographic plan. 72.2.2.3. the vertical design of the territory; 72.2.2.4. facilities and greenery plan; 72.2.2.5. transportation and pedestrian traffic organization scheme; 72.2.3. architectural section: 72.2.3.1. building roof and floor plans with room sizes and distribution group and space group usage breakdown, but all space groups with public functions and one or two dwelling residential buildings, if it is a room with a different use according to the classification of structures, in addition to the room names;- 72.2.3.2. building facades with essential elements (including decorative) height marks the facade decoration materials, ornamental and konstruktīvaj components, technical equipment and the placement of openings; 72.2.3.3.-specific cut with existing and/or planned relief, the floor and the main būvelement-for example, the outer wall of the box, the parapet, ledge, Ridge, roof, landing-height marks, height sizes from floor to ceiling, including the installation of the ceiling, external and intermediate divisions of delimiting the structure layer; 72.2.3.4. technical equipment (public and production buildings); 72.2.3.5. specifications construction products; 72.2.3.6. main building component assembly solutions (Cap, roof, floors, window, door connection node); 72.3. inženierrisinājum: 72.3.1. constructions (floors, roofs, and other load bearing constructions) with construction of essential detail of the reception node assignment: 72.3.1.1. building a detailed calculation report which contains all loads, loads the schema and the total calculation model; 72.3.1.2. graphic part, which includes the following design plans, cuts, spreads and nodes; 72.3.2. building the necessary inženiertīkl (water supply and sewerage, heating, ventilation and air conditioning, electricity, heating, gas supply, electronic communication networks, security systems), their solution (connection diagrams, specifications, cuts) and inženiertīkl consumption calculations, load and aksonometrisk schemes; 72.3.3. other inženierrisinājum; 72.3.4. environmental protection measures; 72.3.5. specifications construction products; 72.4. organisation of project work; 72.5. fire report: 72.5.1. Description, which includes a building fire safety characteristics, ugunsslodz-production and warehouse buildings; 72.5.2. the master plan of fire protection solutions (building and building placement, external fire inženiertīkl construction, fire fighting and rescue work of assurance); 72.5.3. fire safety requirements for building and planning solutions (for example, forest fire risk assessment and fire zones, building and building ugunsnoturīb, requirements for the construction of load-bearing and delimiting the boundaries of the fire, and the ugunsreakcij class, building decoration, room ugunsslodz, smoke protection solution, claims against the spread of fire and smoke in the event of fire, special fire protection measures, taking into account the specific characteristics of buildings and engineering structures); 72.5.4. evacuation assurance solutions; 72.5.5. explosion protection solutions (facilities with explosive environment); 72.5.6. fire protection system solutions (fire detection and alarm systems, fixed fire-extinguishing system, fire notification system, smoke and heat control systems); 72.5.7. continuous supply providing fire protection systems, emergency and evacuation lighting; 72.5.8. the proposed system of fire protection engineering solutions; 72.5.9. Manual (primary) fire-fighting equipment (room with fire extinguishers (calculation) and other fire control equipment); 72.5.10. specific fire operational stage; 72.6 at energy efficiency assessment. building energy efficiency calculated, as determined by the law of the energy performance of buildings; 72.7. construction expertise. 73. the second or third group of industrial production (including catering), and warehouse buildings, if you know the specific production process, in addition to the construction of the technological parts include: 73.1. technological scheme of production processes; 73.2. equipment locations, descriptions and diagrams, the load on the load-bearing structures, the resulting vibrations and noise; 73.3. the manufacturing process specifications or description. 74. From public law legal persons, policy instruments of the European Union or other foreign financial assistance resources funded second or third group includes the construction of buildings in addition to the economic part: 74.1. equipment, design and construction of the summary; 74.2. volume of construction works; 46.2. the cost calculation (estimate). 75. the second or third group demolition construction has the following components: 75.1. General: the initiation of civil design 75.1.1. necessary documents; 75.1.2. Description of the interpretative, which contains general information on building technical indicators, building off of the inženiertīkl, the organisation of work, environmental protection measures, territory alignment after demolition work is finished; 75.2. architecture: 75.2.1. General indicators; 75.2.2. section of the territory: 75.2.2.1 construction in accordance with the master plan. visually perceptible (M 1:250; M 1:500; M 1:1000 topographic plan with) on the nojaucam of the inženiertīkl of buildings and dismantled; 75.2.2.2. the vertical design of the territory; 75.2.2.3. facilities and greenery plan for the territory, if taking; 75.3. the building dismantled the inženiertīkl (water supply and sewerage, heating, ventilation and air conditioning, electricity, heating, gas supply, electronic communication networks, security systems) and their solutions (atslēgum, specifications, diagrams cut); 75.4.. organisation of work 6.2. the work of organizing project content the project of organizing Work 76. development for the entire amount of the works (construction), and has the following components: 76.1. Works Calendar (if requested by the customer); 76.2. the master plan of the works; 76.3. job protection plan (it can also develop as a standalone document); 76.4. interpretative description; 76.5. Assembly loads during the construction of the scheme and its impact on the load-bearing structures and the adjacent buildings. 77. the master plan of the works developed in the individual stages of construction. The works identified in the notes, the existing and the newly built nojaucam buildings, temporary buildings, permanent and temporary roads, būvmašīn, also the location of the Assembly buildings and paths of movement, rapper and attract sharp fixing point, inženiertīkl (electricity, water, heat and other resource inženiertīkl), indicating the standing and temporary connection to the site, as well as the construction and design of the stowage area. 78. If the structural manufacturing process also provided outside the construction site, it is recommended that you create a situation plan, which contains all of the facilities and palīgražošan facilities. 79. the interpretative description describes the General and special conditions of construction, possible difficulties and peculiarities, justify the total duration of the works, as well as the most important environmental protection measures and suggestions for the quality control assurance in the construction site. 80. the drafting of projects into the existing building or restoration, conversion to be carried out without interrupting the execution of basic work in addition to the organisation of the project specify: 80.1. what works and in what order, to be without losing the basic building, and what works, in what order and within the time limits under-planned execution of basic breaks; 80.2. the works identified – in operation buildings and roads, including inženiertīkl, which at the time of the conversion function is terminated, as well as buildings and inženiertīkl, whose functioning is interrupted temporarily or completely; 49.9. interpretative description – a collaboration between performers and works pārbūvējam or renewable building owners, as well as measures to ensure the smooth implementation of the basic building and conversion or restoration work; 80.4. material of construction and dismantling of temporary stowage location and maximum permissible weight on the hood, roof or other load-bearing structures; 80.5. Assembly loads schema conversion time and their effects on the load-bearing structures and adjacent buildings. 6.3. harmonization of the derogation to 81 Projects. If the connection or inženiertīkl crossing the technical requirements or technical or specific rule requirements cannot be met, a construction of technical solutions that harmonisation of the bodies established by the relevant claim. Inženiertīkl to derogation from or crossing the technical requirements or technical or specific provisions of the proposed building design conditions. The mark made on the construction plan for the reconciliation of the master plan or change the technical solutions. On the inženiertīkl of the connection or the crossing of technical requirements for harmonization of the relevant derogations may charge a fee according to the price list approved. 82. If the law governing the construction of technical requirements cannot be met, article 9 of the law on construction of part three of the cases allowed them to coordinate with the relevant national and local authorities. Harmonisation of building permits to the design conditions. A check mark in the reconciliation is made to construction master plan. 6.4. A construction expertise 83. Third Group's expertise in the construction of the building will be carried out in order to assess the conformity of the building design building mechanical strength and stability, as well as fire safety, use, security, and accessibility requirements: 83.1. architecture; 51.7. building section; 83.3. economic part-construction, the development and implementation of which is financed from public law legal persons or European Union policy instruments or other foreign financial assistance funds-check when assessing the economic justification of construction in accordance with the design of the task, as well as the cost of adequacy of workstations; 83.4. fire safety measures report, as well as the other projects section on fire protection solutions; 83.5. organising the work of the project; energy efficiency assessment 83.6. calculated efficiency, as determined by the law of the energy performance of buildings. 84. If the participants of construction disputes be addressed questions about the compliance of construction laws and regulations on technical or special requirements, construction expertise to those construction parts or sections, of which the construction of the participants is in dispute. 85. the expert opinion of a construction contractor adds a construction documentation. 6.5. the Construction coordination and consideration of the construction of 86. coordinate the client and other persons according to the building design. 87. in the original construction plan drawn up in triplicate (with the Manager and the principal original signatures, reconciliation and seal the prints to the site master plan), but the law on construction of the first paragraph of article 6.1 of the cases referred to in paragraph 1 – four copies, as well as, where necessary, the construction expertise in building permits submitted to the opinion of the būvvald design conditions during the period. If the construction plan is prepared and filed electronically, you will need one copy. 88. Būvvald assesses building projects developed under the conditions required for the design and technical solutions, as well as make sure the statutory requirements. 89. If all the conditions of the būvvald design of construction law article 12, fifth paragraph, the construction permit shall be made within the time limit set in the tag for design conditions. After the town planning grades in one instance stored in būvvald construction. 90. If the būvvald finds that not all design conditions or have not received all the required consent from third parties, it instructs the customer to recycle construction plan or get missing reconciliations. In the construction plan review a single copy is stored in būvvald. 91. by būvvald identified the prevention client repeated evaluation of the construction būvvald building design conditions during the period. 92. After the design conditions covered by building permits for execution of the works submitted to the principal būvvald to initiate the necessary documents. 7. Construction works 93. If a building permit in the commencement of the construction works and the subscriber conditions submitted the necessary documents būvvald, būvvald of construction law article 12, part of the fifth period: 93.1. do check building permit conditions for commencement of the construction works; 93.2. construction permit shall specify the works requested by the Subscriber, corresponding to the works for insurance against civil liability in respect of the time limit; 93.3. building permits, according to the General provisions of the maximum duration of the works, to which a permit may be extended (the works) and to which the building would be a candidate for the operation; 93.4. construction permit shall be accompanied by an annex (annex 10), indicating by whom and the works of būvspeciālist are invited. 94. Būvvald may extend the duration of the works by this provision, or 96. 97. the above conditions. 95. If the building that made environmental impact assessment according to the law "on environmental impact assessment", is not put into operation before the time limit expires, the Subscriber to the law "on environmental impact assessment" should be carried out within the original environmental impact assessment, where there has been a change in the factual and legal circumstances on the basis of which the construction was initiated. If you have changed the factual or legal circumstances, būvvald can take a decision on the municipal territory and building a non-regulation or part of a building demolition. 96. If, in accordance with the provisions of paragraph 95 has made the construction intentions evaluation, planning permission (public works) extended for būvvald's down time, but not more than three years, if it is presented to the relevant būvvald building cadastral trying things and filed izpildmērījum plan for building housing and residential external inženiertīkl, as well as to the extension of the term of works required for a civil liability insurance policy. If the building is not within that period put into operation and have changed the factual or legal circumstances on the basis of which the construction was begun, būvvald can take a decision on the municipal territory and building a non-regulation or part of a building demolition. 97. If a building that has not undergone an environmental impact assessment according to the law "on environmental impact assessment", or (if the building is to be implemented by orders of magnitude) is placed into the deadline, construction permit shall be extended for the time requested by the customer, if the būvvald is presented to the relevant building cadastral trying things and building sites and submitted it to the external inženiertīkl of izpildmērījum built a plan, as well as to the period of extension requested construction Analyst issued a civil liability insurance policy. 98. If during the works it is necessary to provide for different solutions than those projects, their implementation allowed after a construction change, if they relate to article 17 of the law on construction 2.1 or General būvnoteikumo of the situations specified therein. Article 17 of the law on construction of the cases referred to in part 2.1 of the changed parts of the construction plan and the documents justifying the need for the change, as well as national cultural monument protection Inspectorate reconciliation, if the building is a national monument, protected cultural reconciliation submitted būvvald. 99. The construction contractor and guest būvspeciālist may change during the works, the notifying būvvald and submitting new works for compulsory insurance against civil liability in respect of a copy of the insurance policy or the new būvspeciālist related articles and new būvspeciālist a professional indemnity insurance policy. The new operator of the works or new guest būvspeciālist are eligible to begin duties on the construction site of a new building permit annex (annex 10) issue of the moment. 100. the execution of building facades for the acknowledgement card works included the launch conditions, the Subscriber shall be submitted in the specified būvvald. Būvvald of construction law article 12, fifth subparagraph shall mark the period of commencement of the construction works conditions. 7.1. organizing 101 Works. the preparation and Construction works can perform construction works contractor or in the cases specified in these provisions-Builder. 102. The customer and works for mutual commitments determined in accordance with these rules, and the Latvian et seq of the law on the execution of the contract, which also covers the preparation of the construction works. 103. The Subscriber receives with the execution of the associated permissions and before the commencement of the construction works: 103.1. issued building permits with public works analyst Mark the start of construction work on the objective conditions are met (copy) and construction; 103.2. According to legislation in the field of labour protection shall designate one or more of the labour protection coordinators, where the works are performed in more than one works. 104. the participants in the works according to the laws and regulations in the field of the protection of work employs one or more health professionals or to attract competent professionals or institutions. 105. If the works contractor works contracts entered into by individual performers, he works issued building permits for each individual copy of the works of the reviewer. 106. Where the works are performed, the Builder he takes responsibility for the works or works in the Manager's responsibilities. 107. the constructor works do not require the constant practice of architecture or construction law, if: 107.1. builder builds your needs, places, rebuilding, renewing, or break down the first preserved the building or part of a group or second group of one-dwelling residential buildings or part thereof and the inadequacy of the farm, as well as non-residential buildings no higher than two storeys and a building area not greater than 400 m2 and m3 būvtilpum, 2000; 107.2. Builder for your needs make the simplified renewal; 107.3. Builder for your first group or part of a building or other groups one-dwelling residential building or its part and inadequacy, as well as the holding of non-residential building out a simplified facade restoration. 7.2. preparation of the Construction Works of the preparation initiated 108. "only after received the construction permit has become the undisputed and fulfilled the conditions contained in the permit. 109. in the preparation of the works to be carried out the necessary organisational measures, as well as works on the construction site and outside it, to ensure the smooth operation of the works and all works membership in coordinated action. 110. The works receive a construction contractor, make sure that the additional detailed blueprints. If the operator is not the works requested more detailed drawings, he is responsible for the possible consequences. Detailed drawings can develop also during the works, and they agreed with the developer and construction contractor. 111. when the main objective of būvas, but have not yet begun construction, the main contractor of the works takes all the construction conception site protection works against adverse natural and geological phenomena (such as flooding, noslīdeņ), for the provision in paragraph 114 that works on the project. Būvas definition of the customer within seven days after signing it submitted būvvald. 112. before the commencement of the construction works of the existing building conditions, the main operator of the construction marks and delimit danger zones, set the existing underground structures of inženiertīkl and other axes or marks it borders, as well as provide traffic and pedestrian movement and safe access to the existing buildings and infrastructure. This works project agreed with the affected inženiertīkl and building owners. 7.3. The works documentation 113. Construction organisation and outstanding under construction and its work in organizing the project, as well as the work of the project. 114. the work of the project, based on the construction of the main participants in the works, but a separate and dedicated work, the operator of certain works. Work out the components of the project determined in accordance with the regulations on the work of the project, but the project's level of detail is determined by its developer, depending on the nature and extent of the work. 115. Depending on the volume of work and the duration of the planned construction works in all building projects in General, an individual or part of a cycle of works (such as the underground loop, surface, works for the cycle, the cycle of preparation of the section of the building, span, standing). 116. the drafting work of the project to existing buildings, the owners or users of the rules and the situation of the site. 117. If the works projects of the works of the individual investigator, this project is consistent with the main participants in the works. On the basis of the mandate of the head of the company, the work of the project approved by the individual responsible for the works būvspeciālist. Renewal, restoration or conversion work carried out in the project with a construction also matched the developer and contractor. 118. the project shall carry out responsible public works Director before construction work provided. 119. Implementation of the project is available at the construction site workers būvspeciālist and control institutions. 120. The works do not fill in this journal rule 107.1. and 107.3. in the cases referred to in (a), as well as through simplified restoration, the first group of simplified facade restoration and usage change without conversion. 121. entries in the journal works every day to carry out public works Director, and must describe the actual situation on the construction site. Būvuzraug and autoruzraug works in the journal expressed objections or instructions are deemed to be fulfilled if the būvuzraug or autoruzraug carried the tag works in the journal. Entries in the log for their works to the works carried out and certain works of construction managers whom. 7.4. The works and quality control of the work of the 122. protection of the construction site according to competency is the main responsible agent responsible works Manager of the works, but on the individual job types – individual contributor of the works construction managers responsible. Responsible public works Director followed the defensive coordinator job. 123. Road and self-propelled mechanism motion construction site organized in accordance with the work project, et seq, and the rules of the road. 124. On the quality of the works is responsible for the works. The quality of the works may not be lower than būvnormatīvo of Latvia and in the relevant standards, building regulations and other laws or works contracts laid down in the quality of the works. 125. The construction of quality control system of each company develops according to your profile, the type of work performed and amount. Quality control of the works include: 125.1. documentation of the works of construction and design of the delivered equipment, machinery, and equipment similar to the original; 125.2. individual operations or technological processes control; 125.3. completed (candidate) the type of work or construction cycle (design element) closing control. 126. the inspection Work after full completion of construction is not possible, adopted immediately after the execution, creating cover work receipts. 127. Completed the important design elements and works as well as segto built in fire protection for important engineering systems (external and internal fire-fighting water supply system, automatic and non-automatic fire protection system) adopted into drawing up the adoption Act (11, 12 and 13). 128. In the case of the construction of the building, the continuation of the works is not allowed if the customer or the operator būvuzraug and representatives of the works is not compiled, and work site signed by previous cover work receipts. If būvuzraug or autoruzraug finds the work carried out by the non-compliance with construction or construction technology requirements, further work should be stopped, a record of the work or the autoruzraudzīb journal and specifying a due date. Work continues only after all signed the cover work of the adoption Act. 129. If in the course of construction formed a break during which the Act adopted may cover work injuries, before resuming to repeating previously made the cover of the work quality check and drawn up in the Act. 130. a Subscriber in the General būvnoteikumo in the cases set out in the quality control of the works of the būvuzraug call. 131. The principals in the General būvnoteikumo in the cases specified in the call for autoruzraudzīb construction of developers. 132. If the work is held in public buildings, which are also operated at the same time, the works of time consistent with the building owners and building users to be notified. 133. If a public building which is also operated at the same time, is intended for the construction, which increases the calculation or which may increase the load on the floors or the roof structures, which they can lose stability, as well as the organisation of work and work carried out in the draft project States that the relevant work to be conducted only if the bottom of these divisions or roof structures occurs space exploitation, such works are not allowed While the operation of the premises concerned. These works are to be carried out only after agreement on the decommissioning and relevant space owners agreed at the time of construction. 134. Būvvald may request beyond the basics of constructing a basis for izpildmērījum plan to submit, if it reasonably doubt that the planned object is built, exceeding the statutory distance from neighboring land boundary (building) or documentation of the construction plans, as well as harmonized distance in the event of a dispute. 7.5. the environmental conditions the work organisation and 135. taken so that environmental damage would be minimal. Environment and natural resources protection, sanitary and security established in the works and to organize, subject to the statutory restrictions and requirements. The consumption of natural resources must be economically and socially sound. 136. the restoration of the building, reconstruction of such works or demolition, if possible, take the construction waste recycling and recovery. All construction waste materials, which are to be classified as hazardous waste, waste according to the regulations for hazardous waste management requirements. 137. before the ground work, as well as through gliding jobs construction site, soil is removed and stored for future use. 138. If a construction site resulting in the disposal of industrial and domestic sewage pollution degree is greater than the specified regulatory signs before entering the sewer network, it cleans under the conditions laid down in the national environment service regional environmental management category (A) or (B) issued permits for polluting activities or in receipt of the polluting activities of category C, if such authorization is in accordance with laws and treatment plants and other water polluting activities has been issued. 139. water is not allowed (also stripped) discharge from the site itself and not the path of the channels. Water discharge and the open type of novadgrāvj system to provide for the implementation of the project. 140. Drilling work process, reaching the water does not sējhorizont, the measures to be taken underground water useless scattering and sējhorizont water pollution prevention. 141. the soil, underground water and avoided open water pollution. The necessary measures should be provided for work carried out in the project. 142. The construction process can change the natural terrain and hidroģeoloģisko conditions (for example, fill up the ravine and career, dig ponds, installing a drain), if those measures are intended for construction or determined by the Geotechnical Control Office (Geotechnical work as a whole, performed in the course of construction, to establish the conformity of the construction plan of the actual geotechnical data and, if necessary, adjust it). 143. A plot of land in natural terrain elevation or demotion to be carried out according to the construction plan, subject to land-use and building regulations requirements. 7.6. the preservation of the building works in the event of suspension or termination 144. preservation of the building carried out if the termination or suspension of the works could pose a risk to the environment or to human life or health or dangerous defects may occur in structures. 145. the decision on the suspension of the works may accept contractor by giving būvvald. 144. These provisions in the case provided for in point before the termination of the works submitted to the coordination of the būvvald the principal building conservation works project. 146. building conservation works project: 146.1. the necessary transactions to list; 146.2. solutions to building loss of stability and building elements further deterioration; 146.3. solutions of the danger to human life and health or the environment; building preservation 146.4. Works Calendar plan. 147. where appropriate competence is not būvvald authority, stopped the works, it shall immediately inform the būvvald. 148. Būvvald 14 days after that Rule 145.147 referred to and informed about the termination or suspension of the works carried out on-the-spot, except when the works stopped Office, and shall decide on the permission to stop the works, building conservation works project or, if necessary, shall take a decision on the preservation of the building. 149. If after inspection found that the building's preservation required, but the client has not submitted the būvvald building conservation works project, the decision on the būvvald building preservation: 149.1. building conservation reasons; 149.2. building preservation conditions (measures to be taken to ensure that the building and its individual parts and design of the security, stability and integrity, as well as building conservation works project scope, if necessary); the term building preservation 149.3. activities for the project. 150. Būvvald 14 days after building conservation works project evaluated the conformity of receipt of regulatory requirements, or adopt a decision specifying the identified deficiencies and failures. 151. following that Rule 150 decision referred to in paragraph repeatedly executing the client go būvvald. 152. the building conservation works, they apply the works requirements, including the requirement for public works for liability insurance. Works for civil liability to be insured at all times of the implementation of the work of preservation. 153. The work shall end with the moment when the būvvald has taken a decision on the suspension of the work or when the client has finished building preservation work under būvvald of the agreed building conservation works project. 154. If the client fails to fulfil the requirements of this regulation, the building's preservation work is entitled to take the municipality notice to Subscriber. All of the building's preservation-related costs shall be borne by the Subscriber. 155. If, after the termination of the works of the later period of the būvvald finds that the building can cause hazard to the environment or to human life or health or it's dangerous structures damaged, būvvald shall decide on building preservation in accordance with the procedure laid down in this chapter. 156. where, after the suspension of the works of būvvald finds that the necessary preservation of the building, the būvvald shall decide on building preservation in accordance with the procedure laid down in this chapter.
8. Acceptance and completion of individual work 8.1. First Group adopting all or part of the building into operation After completion of the works 157. Subscriber shall submit būvvald: 157.1. fill in part II of the explanatory memorandum; 157.2. izpildmērījum plan (with the buildings shed, built in external inženiertīkl and other built structures at the same time), but in the case of renewal or conversion – if the situation has changed in the area; 157.3. the buildings or groups of cadastral trying – buildings above 25 m2. 158. The explanatory memorandum refers to the Subscriber a harmonised time limit within which a Subscriber may request that the contractor works on its own means, eliminate the construction defects discovered after the transfer of all or part of the building. The minimum guarantee period of construction work after būvvald marks made in the explanatory memorandum shall be two years. 159. If the new construction, būvvald, five working days following this rule 157, paragraph of the receipt of the documents surveyed any object, if the renewal or conversion operations, surveyed the public buildings, but in other cases, surveys may be carried out at the discretion of the būvvald. At the time of the survey of the būvvald make sure that the works are conducted in accordance with the accepted construction plans and the construction of the regulatory laws, and made their mark on the memorandum. 160. The building or part thereof is deemed to have been accepted into the explanatory memorandum is made by būvvald. 161. If būvvald detects that your work does not meet the accepted conception or construction of regulatory legislation, the decision shall specify the Subscriber identified deviations from the accepted conception or construction of regulatory laws, deadlines, as well as other conditions of the deficiencies found. 162. by this provision in paragraph 161 that decision specified deficiencies the customer repeatedly go to būvvald. If the customer has prevented any decision, set out in būvvald of the mark in the explanatory memorandum. 8.2. The second and third groups of acceptance of all or part of the building into operation 163. acceptance of all or part of the building into proposing a Subscriber. Before proposing a service or part of a building: a building or part thereof 163.1., external inženiertīkl, other buildings built at the horizontal and vertical sites izpildmērījum, but in the case of renewal or modification shall be made if the izpildmērījum changed the situation in the region; 163.2. buildings or groups of the cadastral area of trying. 164. The buildings or parts of buildings where there is no national protected cultural monument and it is not the law raised the minimum hygiene requirements, the customer may be put into service even if the sanitārtehnisk room and the kitchen is not equipped with the appropriate equipment and premises (except the escape route) does not have internal decoration, with the exception of those provisions referred to in paragraph 184. 165. at the written request of the principal bodies that have issued technical or special terms, verifying and 14 days after receipt of the corresponding application competency gives its opinion on the building or part of the operation, its readiness for compliance with technical or special provisions and regulatory requirements. National cultural monument protection Inspectorate's opinion is needed, as determined by the real national protected cultural monument conversion permit. The opinion of the health inspection is required if a candidate for all or part of the building regulations have raised minimum hygiene requirements. 166. when commissioning the building of a third group, or part of, the customer's written request the addition of this provision 165. institutions referred to in points 14 days after receipt of the corresponding application competency opinion gives such institutions: 166.1. national fire and rescue service – of compliance with fire safety requirements; health inspection-166.2. compliance with the hygiene requirements. 167. In proposing the adoption of a building or part of the service, the Subscriber būvvald or construction law 6.1 of the first paragraph in the cases referred to in paragraph 1, the Office shall submit the following documents (originals): 167.1. certification of the building or part of a readiness for operation (annex 14); 167.2. construction plan changed parts, which levels during the works to be carried out in accordance with General provisions; 167.3.165. these provisions and institutions referred to in paragraph 166 of the findings. The client for the payment according to the price list approved by the authority may request the opinion of the institution concerned shall be sent to the būvvald; 167.4. izpildmērījum plan, including vertical uzmērījum; 167.5. technical regulations for issuing opinions on the readiness of operation inženiertīkl; 167.6. works as well as significant design and cover the work of adoption legislation; 167.7. būvuzraug report on the implementation of the plan of the building; 167.8. technological equipment provided for construction, special systems and equipment inspection records and receipts and compliance statements, if their need is determined by the laws on the safety of equipment; 167.9. built-in compliance of products supporting documentation; 167.10. autoruzraudzīb journal, where the works are carried out during autoruzraudzīb; a construction developer 167.11. opinion on the building or its part (with the exception of inadequacy) compliance with construction, if not autoruzraudzīb; 167.12. buildings or groups of cadastral trying; 167.13. Provisional buildings certificate issued in accordance with the laws and regulations in the field of energy performance of buildings. 168. If a second group of residential building built according to this provision, paragraph addition to the 107.1 this 167 of the rules referred to in paragraph būvvald shall submit documents: 168.1. electrical inspection documentation; 168.2. Act concerning dūmkanāl and the ventilation channel technical condition. 169. This provision, 167.2, 167.1 167.4.,.,., 167.5 167.8 167.11., 168.1 and 168.2. referred subscriber copies of documents shall be deposited in the archives of the Office or of the būvvald. 170. The building or part of a service būvvald-būvvald accepts the building and architect, in addition to the call of the other officers of the būvvald, if necessary, or the Office. If a building or part of a service assumes the Office, making may invite to participate in būvvald, where būvvald is an official has expressed such a desire. External būvvald official signature on acceptance of all or part of the building. 171. Būvvald or Office after checking with all principal and documents laid down a building or portion of a time limit for the receipt of not more than 14 days from the date of submission of the documents in the būvvald or in the Office. 172. The Subscriber building or part thereof shall be presented to the būvvald or to the Office. The principal investigator of the works consulted or its authorised representative who has carried out the works concerned. 173. Būvvald, or the Office is to assess the readiness of a building or part of the operation, based on the būvvald or in the Office, this provision and paragraph 167.168. documents referred to, as well as compliance with laws and regulations in the field of construction and construction. 174. If a building or part of a building, made of all or part of a building in būvuzraug adoption. Būvvald or the Office may invite to participate in the making of a construction Developer (autoruzraug), if he is not made a autoruzraudzīb and given an opinion. Būvuzraug and the construction of the outside developer signs the Act of adoption or part of a building. 175. Būvvald or office draw up legislation on building acceptance of all or part of the service (hereinafter referred to as the Act) (annex 15) three originals, but the law on construction of the first paragraph of article 6.1 of the cases referred to in paragraph 1, the four original copies and sign it. Two copies shall be given to the customer, one copy stored in the archives of the būvvald law and the construction of the first paragraph of article 6.1 of the cases referred to in paragraph 1, the Office archives. Act shall be drawn up in a single original, if the document is prepared in electronic form. 176. The Act specifies the Subscriber consistent with the time-limits within which the client may require the contractor works on its own means, eliminate the construction defects discovered by or part of the building commissioning. The minimum guarantee period of construction work after the signing of the Act are: 176.1. three years in the second group of buildings; 176.2. five years in the third group of buildings. 177. If, on the basis of a single construction and town planning, commissioning, accepted more buildings, instrument 6. "building a technical economic indicators" fills in each building separately. 178. Būvvald or Office is not entitled to initiate the adoption of a building or part of a service, where one of the institutions in an opinion delivered a negative opinion on building commissioning. 179. where the building or part is not accepted into service, būvvald, or the Office shall issue to the customer a reasonable decision. The decision shall indicate the deviations from established projects or construction of regulatory laws, deadlines, as well as other conditions of the deficiencies found. 180.179. These provisions in the decision referred to in paragraph specified deficiencies the customer repeatedly invited būvvald or Office and presented the building or part of it. 181. The building or part thereof is deemed to have been accepted into service with the signing of the Act of the day. 182. the provisions recorded in the būvvald or in the Office. The number of the Act contains the following characters: 182.1.14 of the first two characters – the year the last two digits; 182.2. next five marks – the registration number of the Act, which is up to five characters with zeros from the left; 182.3. last seven signs-the territorial building code under the administrative and territorial units. 183. the construction sequence can be taken into operation, if the works are completely finished, and all the relevant structures for fire safety, turn work and environmental protection measures, as well as the entire construction made in order to ensure the availability of the environment. 184. The second group one or two dwelling residential buildings are permitted to accept service where: 184.1. you complete the General construction and construction inženiertīkl, made the facade decoration and is landscaped area street side; 184.2. at least one is furnished living room, kitchen and sanitary knot, as well as the sanitary installations are connected to inženiertīkl. 185. New and renewable pārbūvējam, building inženiertīkl, which issued to the construction building permits, allowed a single to add into the existing inženiertīkl and launch it into operation before the building Act received acceptance into the readiness for the inženiertīkl the commissioning according to the construction plan, and izpilddokumentācij has signed this provision 167.5. opinions referred to. 186. If a building or part thereof shall be taken into the winter, the greening of the territory, piebrauktuvj, sidewalks, playgrounds, and sports coverage, as well as the fluid application facade fragment of decoration may take the works mentioned in the season, but they must be completed by June 1 of a given year. 187. Trees and shrubs planted near a suitable time. 188. In accordance with the provisions of paragraph 186 and 187 deferred works and their terms of entry būvvald. 189. Construction performer deferred works are performed within time limits set in the Act and, if not with a subscriber agreement on other arrangements. 190. Any act that delayed the completion of the works within the control of the building. 191. in order to ensure the operation of a public building in compliance with article 9 of the law on construction of the second part of the essential requirements set out in service in the second or third group public building owner is responsible for the technical survey of the building not less than once every 10 years. If during the technical survey finds the visible damage to the building, which may impair the integrity or stability of the building, the owner shall take the necessary measures to prevent it. 8.3. Simplified restoration work completion By the simplified renewal 192. completion of the construction works shall inform the customer about the completion of the work būvvald by submitting a completed part II of the explanatory memorandum or a receipt card, part II. 193. Būvvald is five working days after the rules referred to in paragraph 192 of the receipt of the document made public or part of a building, but you can make a living building or part thereof, as well as holdings in non-residential buildings or parts of the survey and ensure that the works are conducted in accordance with the accepted construction plans and construction of laws framework, as well as on the mark made in the explanatory memorandum or a receipt card. 194. If būvvald, a site survey, finds that the construction works does not conform to the accepted conception or construction of regulatory legislation, the decision shall specify the Subscriber identified deviations from the accepted conception or construction of regulatory laws, deadlines, as well as other conditions of the deficiencies found. 195. by this provision the decision referred to in paragraph 194 of the execution the client repeatedly go to būvvald. If the customer has prevented a decision, specified in būvvald to take the mark of the explanatory memorandum or a receipt card. 8.4. Simplified facade restoration work completion After 196. simplified facade restoration works are completed by the Subscriber shall submit būvvald: 196.1. first group of buildings (towns and villages): fill in the part II of the explanatory memorandum; 196.2. second or third group of buildings: 196.2.1. fill the building facade receipt card, part II; 196.2.2. public works magazine, significant design and cover the work of the adoption Act; 196.2.3. built-in compliance of products supporting documentation; 196.2.4. the copies of the Act; 196.2.5. building temporary certificate in energy efficiency, issued in accordance with the laws and regulations in the field of energy performance of buildings. 197. The explanatory memorandum or building facades for the acknowledgement card indicates to the customer the agreed period of time in which the client may require the contractor works on its own means, eliminate the construction defects discovered after the transfer of all or part of the building. The minimum guarantee period of construction work after būvvald marks made in the explanatory memorandum or building facades for the acknowledgement card of the first group of buildings is two years, but the second and third groups of buildings — three years. 198. Būvvald five working days following this provision, paragraph 196 of document receipt out spot and make sure that the works are conducted in accordance with the accepted construction plans and the construction of the regulatory laws, and made their mark on the explanatory memorandum or a receipt card. 199. If būvvald detects that the construction works does not conform to the accepted conception or construction of regulatory legislation, the decision shall specify the Subscriber identified deviations from the accepted conception or construction of regulatory laws, deadlines, as well as other conditions of the deficiencies found. 200. by this provision the decision referred to in paragraph 199 of the execution the client repeatedly go to būvvald. If the customer has prevented a decision, specified in būvvald of the mark in the explanatory memorandum or a receipt card. 8.5. the first group of buildings and the building of the second group, which is not a member of inženiertīkl, or demolition work is off, making 201. After the first group or second group of the demolition, which has not been connected to a inženiertīkl or has been cut off from them, the Subscriber shall inform the būvvald on completion of the works by submitting a completed the demolition of the explanatory memorandum for part II. 202. Būvvald is five working days after this provision 201. receipt of documents referred to in paragraph 1 are carried out spot checks to verify whether the works are conducted in accordance with the accepted construction plans and the construction of the regulatory laws, or organized territory, and shall issue a certificate concerning the absence of buildings (annex 16). 203. If the būvvald finds that the works do not conform to the accepted conception or construction of regulatory laws, the decision shall specify the Subscriber identified deviations from the accepted conception or construction of regulatory laws, deadlines, as well as other conditions of the deficiencies found. 204. following this rule 203 of the decision referred to in paragraph repeatedly executing the client go to būvvald. If the customer has prevented a decision, specified in the certificate shall be issued for būvvald buildings not being. 8.6. The second and third groups demolition job making 205. Demolition work proposes adoption of the Subscriber. 206. at the written request of the principal bodies that have issued technical or special terms, verifying and 14 days after receipt of the corresponding application competency gives opinion on the demolition of the building project and its compliance with the legislative requirements. 207. In proposing the demolition work, the client shall submit the following documents to būvvald (original): 207.1. proof of demolition (17); 207.2. changed part of the construction plan; 206. these provisions 207.3. point out the opinions of the institutions; the construction log and 207.4. significant design and cover the work of the adoption legislation. 208. Rule 207.1, and referred to 207.3. Subscriber shall be deposited in the archives of būvvald. 209. After all this Būvvald rules referred to in paragraph 207 of the receipt of the document, in agreement with the client determines the deadline for demolition and marshalling areas for viewing the work of not more than 14 days from the date of submission of the document būvvald. 210. The client is presented with a territory torn down buildings site būvvald. Subscriber call works the operator or his authorised representative who has carried out the works concerned. 211. Būvvald task is to assess the building's demolition and marshalling work area based on the būvvald this provision made in paragraph 206 of the documents, as well as compliance with laws and regulations in the field of construction and construction. 212. Būvvald is the certificate of the building being issued in three original copies and sign it. Two copies shall be given to the customer, one copy is stored in the archives of būvvald. The prescribed number of copies of documents is not required if the document is prepared and filed electronically. 213. If the building torn down in winter and in accordance with the construction plan for the regional planning, planting, planting of trees and shrubs, piebrauktuvj, sidewalks paving, laying those fluid you can take them in the season, but they must be completed by June 1 of a given year. 214. In accordance with the provisions of paragraph 213 of the delayed completion of the work within the control of the building. 215. If the būvvald finds that the works do not meet construction or the construction of the regulatory laws, the decision shall specify the Subscriber identified deviations from the construction or the construction of the regulatory laws, deadlines, as well as other conditions of the deficiencies found. 216. following these rules the decision referred to in paragraph 215 of the execution the client repeatedly go to būvvald. If the customer has prevented a decision, specified in the certificate shall be issued for būvvald buildings not being. 8.7. the preservation of the building work completion. After conservation work of 217 complete Subscriber shall inform the būvvald on completion of the works by submitting a completed memorandum of building preservation part II. If you've made the third-team building preservation, būvvald in addition to submit the technical survey of the building. 218. Būvvald is five working days after this provision in paragraph 217 of receipt of documents conducted spot checks to verify whether the works are conducted in accordance with the building conservation works project and the construction of the regulatory laws, and made their mark on the explanatory memorandum, the preservation of the building. 219. If būvvald detects that the works are not made in accordance with the building conservation works project or the construction of the regulatory laws, the decision shall specify the Subscriber identified deviations from the preservation of the building works or construction of a project regulatory laws, deadlines, as well as other conditions of the deficiencies found. 220. by these rules the decision referred to in paragraph 219 of the execution the client repeatedly go to būvvald. If the customer has prevented a decision, specified in būvvald of the mark in the explanatory memorandum, the preservation of the building. 9. the buildings or groups of test use shift without rebuilding case 221. Buildings or groups of Exchange without rebuilding the case may būvvald to carry out on-the-spot checks to verify that the building or group is not operated according to the accepted construction not conception. 222. If būvvald detects that a building or space group is operated not accepted the conception of construction, it instructs the client according to the infringement found to submit a new application and construction of construction intentions documents if a building or space groups use meet the local municipal territory planning, detailed or lokālplānojum (if one has been developed). 223. where a building or space in the group for economic activity, which in addition to the need for the implementation of other institutions (not būvvald) issued to the permit, licence or other document, as well as registration in the appropriate register or the information system, the authority to check the particular building or space groups uses the compliance of economic activity and, in case of discrepancy, notify būvvald. 10. concluding issues 224. provisions shall enter into force on the 1 October 2014. 225. the law on construction of the first paragraph of article 6.1 of the cases referred to in paragraph 1, the control and the building construction works making this rule 8.2. in accordance with the procedure laid down in chapter starting with 1 July 2015 shall be carried out by the Office, but until 30 June 2015 – būvvald. 226. the public building which put into operation before 1 October 2014, but not earlier than October 1, 2004, at the first or a current technical surveys carried out in accordance with the provisions of paragraph 191, but a public building which put into operation before October 1, 2004 and the last 10 years has not been a technical survey, technical survey conducted by 2019. on 30 September. The Prime Minister is the Rapidity of economic Newsletters Minister Vyacheslav dombrovsky annex 1 Cabinet 2014 2. Regulation No 529/būvvald for reasons of construction agent (the client) (physical person's name or the name of a legal person) (natural person or legal person code registration number) (residence or registered office, telephone number) (electronic mail address) please consider submission (object (building or group) name).

The real property cadastre number i. seed documentation 1. Construction type (required mark): new construction work to restore the position simplified facade restoration restore: (facade finishing, façade insulation, roofing, roof insulation, changing, basement insulation, window replacement) simplified restoration: (without a change in the nature of use, with a change of use) 2. News about the object: 1) buildings Group (General provisions) 2) buildings Division (required mark): a residential building in the non-residential building 3) buildings intended for the main use (according to the classification of structures) 4) buildings above ground floor) building 5 the underground floor 6) buildings building area 7) building load-bearing structures, materials and finish: a) the basics b) vertical construction) covers some d c) roof structure roof coverings e) f) facade finish 8) buildings ugunsnoturīb degree 9) inženiertīkl required for the building of 3. details of the plot: 1) land cadastral designation of the unit 2) land unit address 3) ground the unit owner or, if one does not – the legal possessor and/or user (an individual's name, social security number, or the name of the legal person registration No.) 4) If construction for the forest: a forest block number) b) c nogabal number of forests) area atmežojam by forest nogabal 4. details of existing buildings or premises: 1) buildings Group (General provisions) 2) cadastral designation of the building 3) buildings Division (required mark): a residential building in the non-residential building 4) building the current main use (according to the classification of structures) 5) buildings intended for the main use (according to the classification of structures) 6) buildings address 7) or building owner If not, the legal possessor and/or user (an individual's name, social security number, or the name of the legal person registration No.)

8) space group cadastral designation 9) groups current use (according to the classification of structures) 10) groups the intended use (according to the classification of structures) 11) space group address 12) space group holder or, failing that, the legal possessor and/or user (an individual's name, social security number, or the name of the legal person registration No.)
5. details of construction funding sources: private means public law legal persons means European Union policy instrument features other foreign financial help features 6. Authorised person (an individual's name, surname, personal code, place of residence, telephone number, electronic mail address or legal name, registration No., address, telephone number) of the person specified contact person (first name, last name, ID number, phone number, e-mail address) 7. Construction Developer (physical persons first name, last name, certificate number or the name of the legal person, registration No., būvkomersant registration certificate No., address, telephone number) 8.1 Būvspeciālist (s) (first name, last name, certificate No.)
9. A construction developer and būvspeciālist (s) confirmation: 1) solutions comply with the construction of the laws governing local authorities and binding rules.
A construction Developer ('s signature2) (date) Būvspeciālist (s) ('s signature2) (date) 2) changes and alterations do not affect the joint ownership fractions and functional with all buildings related to the inženiertīkl service (fixed gear). Solutions do not affect the load-bearing structures of buildings and will not affect its persistence (simplified facade restoration or renovation of the simplified case).
A construction Developer ('s signature2) (date) Būvspeciālist (s) ('s signature2) (date) 10. Construction agent (client) certificate: 1) declare that the property attached supporting documents (copies) are authentic, truly and completely, for the object is not a burden, prohibition or dispute. Undertake to implement all or part of a building new construction, reconstruction, restructuring, placement, simplified facade restoration or simplified restoration (necessary to underline) according to the plans drawn up documentation.
The construction of the initiator (client) (first name, last name, 's signature2) (date) 2) confirm the validity of the landmark area (in the case of construction outside cities and villages).
The construction of the initiator (client) (first name, last name, 's signature2) (date) 11. – the documents submitted in the annex (according to the situation, the required mark): property, possession or usage rights supporting documents on the ___ ___ lp.  the construction of the power of attorney to the agent ____ ____ ____ ____ ____ ____ lp.  interpretive description on ____ ____ ____ ____ ____ ____ ____ lp.  graphical documents for _____ _____ lp.
____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ completed construction of the manufacturer's technical documentation to ____ ____ lp.  If the construction for forest-land boundary plan with a marked atmežojam for construction in forest land and forest land atmežojam sketch, prepared according to the laws and regulations on tree felling of the forest in the ____ ____ lp.  Studies program with a graphical document that shows the restaurējam of the building or part thereof (restoration), to _____ _____ lp.  building or part of a technical survey opinion on ____ ____ ___ lp.  reconciliation with people to _____ _____ lp.
___ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ reconciliation with institutions to _____ _____ lp.
________________________________________________________________  atļaujas uz ____________ lp.
____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ___ technical or special provisions on _____ lp.  other documents on the ___ ___ ___ lp.
____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ completed būvvald 12. Planning (lokālplānojum, detailed) main (papildizmantošan) 13. Marks for construction intentions acceptance officer of Būvvald (position, name, surname, 's signature2) (date) 14. Seed sales deadline (date) 15. Mark start of construction conditions (date) Construction Contractor/Builder (an individual's name, social security number, residence, phone number, or the name of the legal person, registration No. būvkomersant, licence, registration No., address , telephone number) of the Būvvald Officer (job title, first name, last name, 's signature2) (date) 16. Decision on the refusal to accept the intention of decision number date of Būvvald Officer (job title, first name, last name, 's signature2) (date) (II) the completion of the works. 17. information on the completion of the works, certify that the works are complete and made in accordance with the documentation for the seed accepted. New construction, reconstruction, conversion, placement in the case submitted: building cadastral Affairs determine (buildings over 25 m 2) izpildmērījum plan on building a shed, it had external inženiertīkl and other built structures at the construction of the initiator (client) (first name, last name, 's signature2) (date) 18. expiry date of the guarantee of the construction works or a part thereof after building into the adoption of _____ years works of atklājušo defects investigator will prevent the works at their own expense. 19. the examination of the works surveyed object (date) and found that the works are made/not made (necessary to underline) according to the plans drawn up documentation. 20. Decision on found deviations from the accepted conception or construction of the laws governing the decision number date of the period for implementing the decision of the designated officer Būvvald (position, name, surname, 's signature2) (date) 21. Mark the completion of the work of the responsible officer of Būvvald (position, name, surname and signature of the official veterinarian) (date) 22. Date until which the building can exist, or a time limit for building nojaucam (date) Būvvald the designated officer (job title, first name, last name, 's signature2) (date) notes. 1.1 in accordance with the Cabinet's 2014 2. Regulation No 529/"building …" paragraph 43 in addition to the associated būvspeciālist. 2.2 document property "signature" does not fill in, if the electronic document is drawn up according to the law on electronic document design. 3. Each part of the explanatory memorandum completed separately, developing seed documentation and complete the works. 4. Explanatory note the relative box expandable if necessary to reflect the information in more than one agent, construction of a building or plot of land owners, for while under construction objects or buildings (space groups), on ground units. 5. the buildings or premises conversion or restoration of the Group's case, the explanatory memorandum shall be completed to the extent that characterizes the building or space in the group changes. 6. If construction will develop even proposing the construction of seed documents, explanatory memorandum, paragraph 7 and 8 do not complete, but the signing certificate specified in paragraph 9. 7. If simultaneously with building construction, reconstruction, alteration or placement is realized first group of civil engineering construction, renovation, alteration or placement, explanatory memorandum, with information about the works and documents under construction according to the provisions of Cabinet for another, separate unclassified civil provisions. 8. paragraph 22 of the memorandum shall be completed when the building a certain duration time (for example, temporary use of the building) to exist in real estate. Economic Minister Vyacheslav dombrovsky annex 2 Cabinet 2014 2. Regulation No 529/būvvald to the explanatory note (demolition) of the construction agent (the client) (physical person's name or the name of a legal person) (natural person or legal person code registration number) (residence or registered office, telephone number) (electronic mail address) please consider submission (the name of the building) demolition.

The real property cadastre number i. seed documentation 1. News about the building: 1) buildings Group (General provisions) 2) cadastral designation of the building 3) buildings Division (required mark): a residential building in the non-residential building 4) building the main use (according to the classification of structures) 5 address 6) buildings) the building owner or, failing that, the legal possessor and/or user (an individual's name, social security number, or the name of the legal person , registration No.)

7) surface of the building floor 8) building ground floor) building 9 building area 10) building total area 11 m2) building for removal of inženiertīkl       12) the intended demolition method 13) waste management in the construction of 14) in construction waste volume 15) construction waste processing or disposal site 16) ranking of the territory 2. details of the plot: 1) land cadastral designation of the unit 2) land unit address 3) ground the unit owner or, failing that, the legal possessor and/or user (an individual's name, social security number, or the name of the legal person , registration No.)
3. details of construction funding sources: private means public law legal persons means European Union policy instrument features other foreign financial assistance 4. Authorised person (an individual's name, surname, personal code, place of residence, telephone number, electronic mail address or legal name, registration No., address, telephone number) of the person specified contact person (first name, last name, ID number, phone number, e-mail address) 5. A construction Developer (physical person's name first name, last name, certificate number or the name of the legal person, registration No., būvkomersant registration certificate No., address, telephone number) 6. proof of a construction developer solutions comply with the construction of the laws governing local authorities and binding rules.
A construction Developer (signature of the official veterinarian) (date) 7. Construction agent (client) certificate Certifying that the property attached supporting documents (copies) are authentic, truly and completely, for the building have no burden, prohibition or dispute. Undertake to implement the demolition according to the plans drawn up documentation and construction waste delivered to them in the correct place.
The construction of the initiator (client) (first name, last name, signature of the official veterinarian) (date) in annex 8, the documents produced (according to the situation, the required mark): property, possession or usage rights supporting documents on the ___ ___ lp. the construction of the power of attorney to the agent ____ ____ ____ ____ ____ ____ ___ lp. situation plan at _____ ____ ____ ____ lp. reconciliation with the people at _____ ____ ____ lp.
____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ the reconciliation with the institutions on the _____ ____ ____ lp.
________________________________________________________________ atļaujas uz ________________ lp.
________________________________________________________________ fotofiksācija uz ______________________ lp. other documents on _____ _____ lp.
____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ completed 9. Mark būvvald for the construction of the acceptance of the idea of a responsible officer of the Būvvald (position, name, surname and signature of the official veterinarian) (date) 10. Seed sales deadline (date) 11. Mark start of construction conditions (date) Construction Contractor/Builder (an individual's name, social security number, residence, phone number, or the name of the legal person, registration No. būvkomersant, licence, registration No., address, telephone number) of the Būvvald Officer (position, name, surname , the signature of the official veterinarian) (date) 12. Decision on the refusal to accept the intention of decision number date of Būvvald Officer (position, name, surname and signature of the official veterinarian) (date) (II) the completion of the works. 13. information concerning the completion of the works confirm that the works are completed, the area is sorted and all construction wastes are managed in accordance with regulatory requirements. Informed that the construction of waste management shall be carried out (waste authorities name) Construction agent (the client) (first name, last name, signature of the official veterinarian) (date) 14. checking object Works surveyed (date) and found that the works are made/not made (necessary to underline) according to the accepted conception documentation. 15. Decision on found deviations from the accepted conception or construction of the laws governing the decision number date of the period for implementing the decision of the designated officer Būvvald (position, name, surname and signature of the official veterinarian) (date) 16. Mark on the demolition of the building certificate is issued, the number _____ _____ date _____ ____ ____ Būvvald the designated officer (position, name, surname and signature of the official veterinarian) (date) notes. 1.1 document property "signature" does not fill in, if an electronic document is drawn up according to the law on electronic document design. 2. Each part of the explanatory memorandum completed separately, developing seed documentation and complete the works. 3. the explanatory memorandum the relative box expandable if necessary to reflect the information in more than one agent, construction of a building or plot of land owners, for buildings at nojaucam, on the ground units. 4. If construction will develop even proposing the construction of seed documents, explanatory memorandum, paragraph 5 is not complete, but the signing certificate specified in point 6. 5. If simultaneously with the demolition of the building is realized first group of engineering structures demolition, explanatory memorandum, with information on the structures of nojaucam and documents according to the provisions of Cabinet for another, separate unclassified civil provisions. Economic Minister Vyacheslav dombrovsky annex 3 Cabinet 2014 2. Regulation No 529/būvvald to the explanatory note (a building or space groups uses the Exchange without conversion) of the construction agent (an individual's first name, last name or legal name of the person) (natural person or legal person code registration number) (residence or registered office, telephone number) (electronic mail address) please consider submission (building or group name) use the Exchange without conversion.

The real property cadastre number seed documentation 1. News about the building or space group: 1) buildings Group (General provisions) 2) cadastral designation of the building 3) buildings Division (required mark): a residential building in the non-residential building 4) building the current main use (according to the classification of structures) 5) buildings intended for the main use (according to the classification of structures) 6) buildings address 7) the building owner or, failing that, the legal possessor and/or user (physical person's name first name, last name, social security number, or the name of the legal person registration No.)

8) space group cadastral designation 9) groups current use (according to the classification of structures) 10) groups the intended use (according to the classification of structures) 11) space group address 12) space group holder or, failing that, the legal possessor and/or user (an individual's name, social security number, or the name of the legal person registration No.)

2. the person (an individual's name, surname, personal code, place of residence, telephone number, electronic mail address or legal name, registration No., address, telephone number) of the person specified contact person (first name, last name, ID number, phone number, e-mail address) 3. A construction Developer (physical person's name, certificate number or the name of the legal person, registration No., būvkomersant registration certificate No., address, telephone number) 4. Construction Developer's assurance solution corresponds to the construction of laws and regulations governing local government binding rules.
A construction Developer (signature of the official veterinarian) (date) 5. proposing the construction of the proof Declare that the property attached supporting documents (copies) are authentic, truly and completely, for the object is not a burden, prohibition or dispute. Undertake a building or part of it be operated under the accepted construction plans.
The construction of the proponent (name, surname, signature of the official veterinarian) (date) 6.-the documents submitted in the annex (according to the situation, the required mark): property, possession or usage rights supporting documents to the _____ ____ lp. the construction of the power of attorney to the agent _____ _____ lp. interpretive description on ___ ___ ___ lp. graphical documents for _____ _____ lp.
____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ reconciliation with people on ___ ___ ___ lp.
____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ the reconciliation with the institutions on the ___ ___ ___ lp.
________________________________________________________________ atļaujas uz ___________ lp.
________________________________________________________________ citi dokumenti uz __________ lp.
________________________________________________________________.
Fill out būvvald 7. Planning (lokālplānojum, detailed) main (papildizmantošan) _____ _____ _____ _____ _____ _____ _____ _____ _____ 8. Marks for construction intentions acceptance officer of Būvvald (position, name, surname and signature of the official veterinarian) (date) 9. Decision on the refusal to accept the plan number, date of the decision of the designated officer Būvvald (position, name, surname and signature of the official veterinarian) (date) notes. 1.1 document property "signature" does not fill in, if an electronic document is drawn up according to the law on electronic document design. 2. Explanatory note the relative box expandable if necessary to reflect the information in more than one agent, construction of a building or space is the group owner, the group, which at the same time intended to change usage without conversion. Economic Minister Vyacheslav dombrovsky annex 4 Cabinet 2014 2. Regulation No 529/būvvald construction for construction application agents (natural persons first name, last name or legal name of the person) (natural person or legal person code registration number) (residence or registered office, telephone number) (electronic mail address) please consider submission (object (building or group) name) construction/demolition.

The real property cadastre number 1. Construction type (required mark): new construction work to restore restoration placement of demolition 2. News about the object: 1) buildings Group (General provisions) 2) buildings Division (required mark): a residential building in the non-residential building 3) buildings intended for the main use (according to the classification of structures) 4) buildings for altitude (meters) 5) buildings above ground floor) building underground 6 floors building area 7) building 8) required for the building of the inženiertīkl 3. details of the plot : 1) cadastral land units labeled 2) land unit address 3) ground the unit owner or, failing that, the legal possessor and/or user (an individual's name, social security number, or the name of the legal person registration No.)
4) If construction for the forest: a forest block) number _____ ____ ____ b) number of forest nogabal ____ ___ _____ c) atmežojam area by the forest of nogabal _____ _____ _____ 4. details of existing buildings or premises: 1) buildings Group (General provisions) 2) cadastral designation of the building 3) buildings Division (required mark): a residential building in the non-residential building 4) building the current main use (according to the classification of structures) 5) buildings intended for the main use (according to the classification of structures) 6) buildings address 7) or building owner If not, the legal possessor and/or user (an individual's name, social security number, or the name of the legal person registration No.) 8) building the necessary removal of inženiertīkl 9) the intended demolition method 10) construction waste Volume 11) construction waste processing or disposal site 12) marshalling area type 13) group by cadastral designation 14) groups current use (according to the classification of structures) 15) groups the intended use (according to the classification of structures) 16) address classroom Group 17) space group holder or, in the – the legal possessor and/or user (an individual's name, social security number, or the name of the legal person registration No.)
5. details of construction funding sources: private means public law legal persons means European Union policy instrument features other foreign financial help features 6. Authorised person (an individual's name, surname, personal code, place of residence, telephone number, electronic mail address or legal name, registration No., address, telephone number) of the person specified contact person (first name, last name, ID number, phone number, e-mail address) 7. Construction Developer (physical person's name first name, last name, certificate number or the name of the legal person, registration No., būvkomersant registration certificate No., address, telephone number) 8. Construction Developer's information on the planned construction of the composition, it required, the development section 9. information about a particular Member State of the European Union regulatory framework for the application of a construction development, applying the European Union Member States ' national standards and technical requirements of et seq (Member State of the European Union) 10. Construction Developer's assurance solution corresponds to the construction of laws and regulations governing local government binding rules.
A construction Developer (signature of the official veterinarian) (date) 11. Answer to the application and I would like to receive planning permission (specify one of the ways): by mail to the address indicated in the application electronically to the electronic mail address (in accordance with article 9 of the law on Notification, second paragraph) ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ___ personally būvvald the 12. Request for additional information (documents) and/or a decision on extension to the response to send electronically to the electronic mail address ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ 13. receipts of agent Construction : 1) declare that the property attached supporting documents (copies) are authentic, truly and completely, for the object is not a burden, prohibition or dispute. Undertake to implement a building or group of new construction, reconstruction, alteration, restoration or demolition work placement (necessary to underline) according to the plans drawn up documentation.
The construction of the proponent (name, surname, signature of the official veterinarian) (date) 2) confirm the validity of the landmark area (in the case of construction outside cities and villages).
The construction of the proponent (name, surname, signature of the official veterinarian) (date) 14. — Annex documents submitted (according to the situation, the required mark): property, possession or usage rights supporting documents on the ___ ___ lp. the construction of the power of attorney to the agent _____ _____ _____ lp. construction the minimum composition to _____ _____ lp. If the construction for forest-land boundary plan with a marked atmežojam for construction in forest land and forest land atmežojam sketch, prepared according to the laws and regulations on tree felling of the forest in the ___ ___ ___ lp. a building or group of technical survey opinion on ____ ____ ___ lp. reconciliation with the people on the ____ ____ ____ ____ ___ lp.
____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ reconciliation with institutions to _____ _____ lp.
_____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ technical or special provisions on ______ lp. other documents on _____ _____ lp.
____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ completed 15. būvvald mark on the construction plans of building permit number of the accepted date of Būvvald (position, name, surname and signature of the official veterinarian) (date) 16. Decision on the refusal to issue a construction permit decision number date of Būvvald (position, name, surname and signature of the official veterinarian) (date) notes. 1.1 document property "signature" does not fill in, if an electronic document is drawn up according to the law on electronic document design. 2. the application for the Construction of the box extend, if necessary to reflect the information in more than one agent, construction building (groups) or the owner of the parcel, for while under construction objects or buildings (space groups), on ground units. 3. the buildings or premises conversion, renewal of the group, restoration or demolition case application of construction completed to the extent that characterizes the building or space in the group changes. Economic Minister Vyacheslav dombrovsky annex 5 cabinet 2014 2. Regulation No 529/būvvald of receipt card (a building or space group with the use of the simplified renewal/change without change of use), Construction (subscriber) agent (an individual's first name, last name or legal name of the person) (natural person or legal person code registration No.)       (place of residence or registered office, telephone number)       (electronic mail address)

Please consider submission (building or group name) simplified.

The real property cadastre number i. seed documentation 1. Construction type (required mark): simplified recovery without the use of a simplified renewal with change of shift 2. News about the building or space group: 1) buildings Group (General provisions) 2) cadastral designation of the building 3) buildings Division (required mark): a residential building in the non-residential building 4) building the current main use (according to the classification of structures) 5) buildings intended for the main use (according to the classification of structures) 6) buildings address 7) or building owner If not, the legal possessor and/or user (an individual's name, social security number, or the name of the legal person registration No.) 8) space group cadastral designation 9) groups current use (according to the classification of structures) 10) groups the intended use (according to the classification of structures) 11) space group address 12) space group holder or, failing that, the legal possessor and/or user (an individual's name, social security number, or the name of the legal person registration No.)

3. the authorized person (a natural person's name, surname, personal code, place of residence, telephone number, electronic mail address or legal name, registration No., address, and phone number) of the person specified contact person (first name, last name, ID number, phone number, e-mail address) 4. A construction Developer (physical person's name, certificate number or the name of the legal person, registration No., būvkomersant registration certificate No., address, telephone number) 5 Būvspeciālist (s) (name 1 first name, last name, certificate No.)
6. the developer and Construction būvspeciālist (s) proof solutions comply with the construction of the laws governing local authorities and binding rules. Changes do not affect the joint ownership fractions and functional with all buildings related to the inženiertīkl service (fixed gear). Solutions do not affect the load-bearing structures of buildings and do not affect its stability.
A construction Developer ('s signature2) (date) Būvspeciālist (s) ('s signature2) (date) 7. Construction agent (client) certificate Certifying that the property attached supporting documents (copies) are authentic, truly and completely, for the object is not a burden, prohibition or dispute. Undertake to implement a simplified renewal works according to plans developed for the documentation.
The construction of the initiator (client) (first name, last name, 's signature2) (date) in annex 8, the documents produced (according to the situation, the required mark): property, possession or usage rights supporting documents on the ___ ___ lp. the construction of the power of attorney to the agent ____ ____ lp. interpretive description on ____ ____ lp. graphic documents on the ___ ___ ___ lp.
________________________________________________________________ citi dokumenti uz ___________ lp.
____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ completed 9. Mark būvvald for the construction of the acceptance of the idea of Būvvald the designated officer (job title, first name, last name, 's signature2) (date) 10. Seed sales deadline (date) 11. Mark start of construction conditions (date) Construction Contractor/Builder (an individual's name, surname, personal code, place of residence, phone number, or the name of the legal person, registration No. būvkomersant, licence, registration No., address, telephone number) of the Būvvald Officer (position, name, surname that's signature2) (date) 12. Decision on the refusal to accept the intention of decision number date of Būvvald Officer (position, name, surname and signature of the official veterinarian) (date) (II) the completion of the works. 13. information concerning the completion of the works confirm that the works are complete and made in accordance with the documentation for the seed accepted.
The construction of the initiator (client) (first name, last name, 's signature2) (date) 14. object inspection object surveyed (date) and found that the works are made/not made (necessary to underline) according to the plans drawn up documentation. 15. Decision on found deviations from the accepted conception or construction of the laws governing the decision number date of the period for implementing the decision of the designated officer Būvvald (position, name, surname and signature of the official veterinarian) (date) 16. Mark the completion of the work of the Būvvald Officer (job title, first name, last name, 's signature2) (date) notes. 1.1 in accordance with the Cabinet's 2014 2. Regulation No 529/"building …" paragraph 43 in addition to the associated būvspeciālist. 2.2 document property "signature" does not fill in, if the electronic document is drawn up according to the law on electronic document design. 3. Each receipt card fill out separate parts – designing conception documentation and complete works. 4. in the receipt card aisle of the relevant Extensible if necessary to reflect the information in more than one agent, construction of a building or space is the group owner, the group, which planned to perform at the simplified renewal with/without a change in the nature of use. 5. If simultaneously with the building or space groups simplify the renewal with change of use/non use Exchange is realized internal inženiertīkl construction, renovation, alteration or installation, guarantee card non-exhaustive information about the inženiertīkl and documents under construction according to the provisions of Cabinet for another, separate unclassified civil provisions. Economic Minister Vyacheslav dombrovsky annex 6 Cabinet 2014 2. Regulation No 529/būvvald Building facades for the receipt card Construction agent (the client) (physical person's name or the name of a legal person) (natural person or legal person code registration No.)       (residence or legal address, phone number) (electronic mail address) please consider submission (building name) simplified facade restoration.

The real property cadastre number i. seed documentation 1. The work type (required mark): facade finishing restoring the facade thermal insulation roofing roof insulation to the change of thermal insulation of basement window replacement aizstiklošan of 2 Loggia news on buildings: 1) buildings Group (General provisions) 2) cadastral designation of the building 3) buildings Division (required mark): a residential building in the non-residential building 4) building the current main use (according to the classification of structures) 5 address 6) buildings) the building owner or If not, the legal possessor and/or user (an individual's name, social security number, or the name of the legal person registration No.)
3. details of the plot: 1) land cadastral designation of the Vienîbas _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ 2) land units address _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ __ 3) ground the unit owner or, failing that, the legal possessor and/or user (an individual's name, social security number, or the name of the legal person registration No.)
4. details of construction funding sources: private means public law legal persons means European Union policy instrument features other foreign financial help features 5. Authorised person (an individual's name, surname, personal code, place of residence, telephone number, electronic mail address or legal name, registration No., address, and phone number) of the person specified contact person (first name, last name, ID number, phone number, e-mail address) 6. A construction Developer (physical person's name first name, last name, certificate No.   or legal person name, registration No., būvkomersant registration certificate No., address, and phone number 7.1 Būvspeciālist (s) (first name, last name, certificate No.)
8. A construction developer and būvspeciālist certification (s) solutions meet the construction laws governing local authorities and binding rules. Changes and alterations do not affect the joint ownership fractions and functional with all buildings related to the inženiertīkl service (fixed gear). Solutions do not affect the load-bearing structures of buildings and do not affect its stability.
A construction Developer ('s signature2) (date) Būvspeciālist (s) ('s signature2) (date) 9. Construction agent (client) certificate Certifying that the property attached supporting documents (copies) are authentic, truly and completely, for the object is not a burden, prohibition or dispute. Undertake to implement the building facade finishing restore, building facades, roofing insulation, roof insulation, window replacement and/or Loggia of aizstiklošan (necessary to underline) according to the plans drawn up documentation.
The construction of the initiator (client) (first name, last name, 's signature2) (date) 10.-the documents submitted in the annex (according to the situation, the required mark): property, possession or usage rights supporting documents on the ___ ___ lp. the construction of the power of attorney to the agent ____ ____ ____ lp. interpretive description on _____ _____ lp. graphical documents for _____ _____ lp.
____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ management project to _____ _____ _____ lp. reconciliation with the people at _____ ____ ____ ____ lp.
____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ reconciliation with institutions to _____ _____ lp.
________________________________________________________________ atļaujas uz ______________ lp.
________________________________________________________________ citi dokumenti uz ____________ lp.
____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ completed būvvald 11. Marks for construction intentions acceptance officer of Būvvald (position, name, surname, 's signature2) (date) 12. Intentions realization deadline (date) the commencement of the construction works on the Būvvald conditions 13. documents to be submitted (the required mark): participants in the construction/Builder civil liability compulsory insurance certificate and a copy of the responsible būvspeciālist of professional civil liability compulsory insurance policy public works Director in charge of the copy of the article būvuzraug of the commitment the responsible commitment of article building plan for public works magazine information on the participants of the construction works or other documents of the Builder If the regulations so provide, ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ___ 14. "mark on the commencement of the construction works conditions (date) Construction Contractor/Builder (an individual's name, surname, personal code, place of residence, phone number, or the name of the legal person, registration No. būvkomersant, licence, registration No., address, telephone number) of the Būvvald Officer (job title, first name, last name, 's signature2) (date) 15. waiver decision to accept the intention of decision number date of Būvvald Officer (position, name first name, last name, 's signature2) (date) (II) the completion of the works. 16. information on the completion of the works, certify that the works have been completed and submitted to: Journal of important public works design and cover the work of making acts of construction built in assurance of compliance with the Act, copies of building energy efficiency in the construction of temporary certificate (subscriber) agent (name, 's signature2) (date) 17. expiry date of the guarantee of the construction works or a part thereof, after the adoption of the building into operation ____ ____ years works of atklājušo defects investigator will prevent the works at their own expense. 18. check the works surveyed object (date) and found that the works are made/not made (necessary to underline) the simplified facade restoration developed the plans for the documentation. 19. Decision on found deviations from the accepted conception or construction of the laws governing the decision number date of the period for implementing the decision of the designated officer Būvvald (position, name, surname, 's signature2) (date) 20 marks for the completion of the works of the Būvvald Officer (job title, first name, last name, 's signature2) (date) notes. 1.1 in accordance with the Cabinet's 2014 2. Regulation No 529/"building …" paragraph 43 in addition to the associated būvspeciālist. 2.2 document property "signature" does not fill in, if the electronic document is drawn up according to the law on electronic document design. 3. Each receipt card fill out separate parts – designing conception documentation, launching and completion of the works. 4. building facades for the acknowledgement card aisle of the relevant Extensible if necessary to reflect the information in more than one agent, construction of a building or plot of land owners, land units. Economic Minister Vyacheslav dombrovsky annex 7 Cabinet 2014 2. Regulation No 529/būvvald to the explanatory note (buildings preservation) Construction (subscriber) agent (an individual's first name, last name or legal name of the person) (natural person or legal person code registration number) (residence or registered office, telephone number) (electronic mail address) please consider submission (a building or part thereof) the preservation, submitted on the basis of the (local) decision on building preservation , decision number ___ ___ ___ ___ ___ ___ ___ _______, ____ date _____ _____ _____.
The real property cadastre number i. seed documentation 1. details of existing buildings: 1) buildings group     (General provisions) 2) cadastral designation of the building 3) buildings Division (required mark): a residential building in the non-residential building 4) building the main use (according to the classification of structures) 5 address 6) buildings) the building owner or, failing that, the legal possessor and/or user (an individual's name, social security number, or the name of the legal person registration No.)
2. details of the plot: 1) land cadastral designation of the Vienîbas _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ 2) land units address _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ __ 3) ground the unit owner or, failing that, the legal possessor and/or user (an individual's name, social security number, or the name of the legal person registration No.)

3. the authorized person (a natural person's name, surname, personal code, place of residence, telephone number, electronic mail address or legal name, registration No., address, telephone number) of the person specified contact person (first name, last name, ID number, phone number, e-mail address) 4. A construction Developer (physical person's name, certificate number or the name of the legal person, registration No., būvkomersant registration certificate No., address, telephone number) 5. Construction Developer's assurance solution corresponds to the construction of laws and regulations governing local government binding rules.
A construction Developer (signature of the official veterinarian) (date) 6. Construction agent (client) certificate Certifying that the property attached supporting documents (copies) are authentic, truly and completely, for the object is not a burden, prohibition or dispute. Undertake to implement all or part of a building preservation under the preservation of the works developed in the project.
The construction of the initiator (client) (first name, last name, signature of the official veterinarian) (date) 7.-the documents submitted in the annex (according to the situation, the required mark): property, possession or usage rights supporting documents on the ___ ___ lp. the construction of the power of attorney to the agent ____ ____ ____ ____ lp. building conservation works project to ____ ___ lp. the work of organizing the project if the Government decision on building preservation it is stated on the ___ ___ lp. heritage inventory Act, if the building is a cultural monument to ____ ____ lp. other documents on the ____ ____ lp.
 
Fill in the būvvald 8. Marks for building preservation work on the acceptance of Būvvald Officer (position, name, surname and signature of the official veterinarian) (date) 9. Intentions realization deadline (date) 10. Mark the commencement of the construction works conditions (date) Construction Contractor/Builder (an individual's name, surname, personal code, place of residence, phone number, or the name of the legal person, registration No. būvkomersant, licence, registration No., address, telephone number) of the responsible officer of Būvvald (position, name first name, last name, signature of the official veterinarian) (date) 11. The decision on refusal to accept the building preservation work Decision number date of Būvvald Officer (position, name, surname and signature of the official veterinarian) (date) (II) the completion of the works. 12. information on the completion of the works confirm that the works are complete and made in accordance with the accepted the building conservation works project.
The construction of the initiator (client) (first name, last name, signature of the official veterinarian) (date) 13. checking the object Works surveyed (date) and found that the works are made/not made (necessary to underline) the building conservation works project. 14. Decision concerning the deviations from established accepted conservation works project or the construction of laws Framework Decision number date of the period for implementing the decision of the designated officer Būvvald (position, name, surname and signature of the official veterinarian) (date) 15. Mark the completion of the work of the responsible officer of Būvvald (position, name, surname and signature of the official veterinarian) (date) notes. 1.1 document property "signature" does not fill in, if an electronic document is drawn up according to the law on electronic document design. 2. Each part of the explanatory memorandum completed separately, developing conservation works project and completion of the works. 3. the explanatory memorandum the relative box expandable if necessary to reflect the information in more than one agent, construction of a building or plot of land owners, about the preparation at objects or buildings on land units. Economic Minister Vyacheslav dombrovsky Annex 8 Cabinet 2014 2. Regulation No 529/_____ _____ _____ _____ _____ _____ _____ the construction permit no. būvvald _____ and issued (construction (subscriber) agent-an individual's first name, last name, ID code, place of residence, telephone number, electronic mail address or legal name, registration number, registered address, phone number) for construction/demolition. (object (building or group) name)  
The real property cadastre number _____ _____ _____ _____ _____ _____ _____ 1. Construction type (required mark): new construction work to restore restoration 1. positioning the demolition news on object 1) buildings Group (General provisions) 2) buildings Division (required mark): a residential building in the non-residential building 3) buildings intended for the main use (according to the classification of structures) 4) buildings for altitude (meters) _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 5) buildings above ground floors _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ 6) building the underground floors _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ 7) buildings building area ____ ____ ____ ____ ____ ____ ____ ____ ____ _ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ 3. details of the plot: 1) land cadastral designation of the Vienîbas _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ 2) land units address ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ 3) ground the unit owner or, failing that, the legal possessor and/or user (an individual's name, social security number, or the name of the legal person registration No.)
4) If construction for the forest: a forest block) number ____ _____ _____ (b)), the number of forest nogabal _____ _____ _____ (c)) atmežojam area by the forest of nogabal _____ _____ _____ 4. details of existing buildings or premises: 1) buildings Group (General provisions) 2) cadastral designation of the building 3) buildings Division (required mark): a residential building in the non-residential building 4) building the current main use (according to the classification of structures) 5) buildings intended for the main use (according to the classification of structures) 6) buildings address _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ 7) the building owner or If not, the legal possessor and/or user (an individual's name, social security number, or the name of the legal person registration No.) 8) building the necessary removal of inženiertīkl 9) the intended demolition method ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ___ 10) construction waste volume ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ 11) construction waste processing or disposal site ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ _____ 12) marshalling area type ___ ___ ___ ___ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____) space group of 13 cadastral designation ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ __ 14) groups current use (according to the classification of structures) 15) groups the intended use (according to the classification of structures) 16) address classroom group ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ 17) space group holder or, failing that, the legal possessor and/or user (an individual's name, social security number, or the name of the legal person registration No.)
5. A construction Developer (physical person's name, certificate number or the name of the legal person, registration No., būvkomersant registration certificate No., address, telephone number) 6. Planning (lokālplānojum, detailed) main (papildizmantošan) construction site 7 (survey date) opinion on the building inspection (number and date) the design conditions 8. Design conditions (required mark): 1) reconciliation with the building owner or legal possessor: (physical person's name first name, last name or legal name) of the person (an individual's first name, last name or legal name of the person) (an individual's first name, last name or legal name) 2) reconciliation with adjacent property owners, co-owners: (real estate office, an individual's first name, last name or legal name) (address of real property, an individual's first name, last name or legal name) (address of real property, an individual's name or the name of a legal person) 3) technical or special terms and agreement for publishers : with public authorities: (name, address, contact info) (name, address, contact info) (name, address, contact information) with municipal institutions: (name, address, contact info) (name, address, contact info) (name, address, contact information) by the holders of the inženiertīkl: (name, address, contact info) (name, address, contact info) (name, address, contact info) (name, address, contact information) 4) technical or special provisions, if it is not necessary to the Publisher Agreement: (name, address, contact info) (name, address, contact info) (name, address, contact info) 5) to other institutions or to permit reconciliation : (name, address, contact info) (name, address, contact info) (name, address, contact info) 6) accessibility requirements when building they provide according to the laws of the territory to access facilities: roads, streets, pavements, walkways pedestrian crossing for the chance to move from one height and other, especially persons with functional disabilities handicapped parking number, not less than _____ _____ _____ the building entrance and the possibility to move from one level to another height level , especially for persons with functional disabilities movement between floors of the building for persons with functional disabilities indoor installations (sanitary technical premises to other premises ___ ____ ____ ____ ____ ____) corridors and escape routes in the composition of construction: 7) in the general part of the general architecture of the territory section of the page section of inženierrisinājum architecture: constructions inženiertīkl (water supply and sewerage, heating, ventilation and air conditioning, electricity, heating, gas supply, electronic communication networks, security systems) other inženierrisinājum on environmental protection measures of construction specifications and the Organization of work, the project of building energy efficiency assessment calculated energy efficiency measures review of fire protection engineering part of the economic part of the additional requirements of a construction detail, according to the local government building regulations _____ _____ _____ _____ _____ _____ _____ 8) construction development, applying the (European Union) national standards and technical requirements of 9 et seq) construction expertise 10) the requirements to be a façade decoration construction products or their equivalents ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ 11) requirements in construction waste management ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ 12) other requirements for the planning, lokālplānojum or detailed (if any develop) ____ ____ ____ ____ ____ ____ ____ ____ 13) būvspeciālist professional civil liability insurance construction of the construction plan of the developer: the driver of a construction expert 9. Design conditions (date) the commencement of the construction works conditions 10. Commencement of the construction works, the conditions in Būvvald documents (required mark): participants in the construction/Builder civil liability compulsory insurance certificate and a copy of the responsible būvspeciālist of professional civil liability compulsory insurance policies are developed and aligned copy of the construction of public works Director in charge of the related article būvuzraug the obligation of responsible article building plan for public works magazine autoruzraudzīb magazine autoruzraudzīb information on works contract workers or Builder (name of legal person būvkomersant, registration No., registration certificate number or the physical person's name, surname, personal code, place of residence) for information on defensive coordinator (first name, last name, ID number, phone number), where the works are performed by more than one reviewer of the works of national cultural monuments protection inspection permit, if the work provided for in the national protected cultural monument protection zone or other documents, if the regulations so provide ___ ___ ____ ____ ____ ____ Būvvald marks and decisions 11. Mark for design conditions (date) After completing the design marks the fulfilment of the conditions for the commencement of the construction works must meet two conditions during the year.
Būvvald the designated officer (position, name, surname and signature of the official veterinarian) (date) 12. Mark start of construction conditions (date) Būvvald the designated officer (position, name, surname and signature of the official veterinarian) (date) 13. After carrying out of public works mark the launch conditions, the maximum duration of the works _____ _____ _____ _____ _____ years 1) works to be taken up (date) 2) performing construction works/civil liability compulsory insurance policy the insurance period specified in ____ ____ ____ ____ ____ ____ ____ ____ 3) building commissioning carried out until (date) Būvvald the designated officer (job title , name, surname and signature of the official veterinarian) (date) 14. Construction permit was extended until (date) Būvvald the designated officer (position, name, surname and signature of the official veterinarian) (date) This town planning (administrative) within a month of its entry into force may be challenged in the administrative procedure law. (name, address)
The notes. 1.1 document property "signature" does not fill in, if an electronic document is drawn up according to the law on electronic document design. 2. Building the box extend, if necessary to reflect the information in more than one agent, construction building (groups) or the owner of the parcel, for while under construction objects or buildings (space groups), if specified in the application for the construction of the ground units, the necessary institutions and third party reconciliation. Economic Minister Vyacheslav dombrovsky 9. attachment Cabinet 2014 2. Regulation No 529/receipt samples the Manager of a construction certificate are included in This building project and to develop all the necessary parts according to the conditions laid down in the building.
A construction supervisor (first name, last name, certificate No.)       (date)   (signature of the official veterinarian)
Construction project manager certificate in This construction of ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ part solutions meet the Latvian et seq, and other laws, as well as the provision of technical or special requirements.
Part of a construction supervisor (first name, last name, certificate No.)       (date)   (signature of the official veterinarian)
A construction manager for This building project of apliecinājums2 _____ _____ _____ _____ _____ _____ _____ _____ _____ part solutions meet the Latvian et seq, and other regulatory provisions of the Member States of the European Union, and national standards and tests, as well as et seq of technical or special requirements.
Part of a construction supervisor (first name, last name, certificate No.)       (date)   (signature of the official veterinarian)
The notes.
1 document property "signature" does not fill in, if an electronic document is drawn up according to the law on electronic document design.
(2) If a construction designed by applying to the Member States of the European Union, national standards and technical requirements of et seq. Economic Minister Vyacheslav dombrovsky 10. attachment Cabinet 2014 2. Regulation No 529/____ ____ ____ ____ ____ ____ ____ _ of _ būvvald _____ _____ construction permit no. ____ ___ annex __ _____ (date) 1. Construction performer (legal name, registration No. būvkomersant, licence, registration No., address, telephone number) 2. Guest būvspeciālist: 1) responsible works Manager (an individual's first name, last name, certificate number or the name of the legal person, registration No., registration certificate No būvkomersant.) 2) responsible būvuzraug (an individual's first name, last name, certificate number or the name of the legal person, registration No., registration certificate No būvkomersant.) 3) autoruzraug (an individual's first name, last name, certificate number or the name of the legal person, registration No., registration certificate No būvkomersant.) 4) defensive coordinator (an individual's first name, last name, ID number, phone number) Būvvald the designated officer (position, name, surname and signature of the official veterinarian) (date) notes. 1.1 document property "signature" does not fill in, if an electronic document is drawn up according to the law on electronic document design. 2. the annex building boxes expandable if necessary to reflect more information. Economic Minister Vyacheslav dombrovsky annex 11 of the Cabinet's 2014 2. Regulation No 529/Significant design acceptance Act of _____. year ___. _ _ _ _ _ _ _ _ _ _ _ _ object name and address the name of the structure of the construction agent (the client) (persons name, surname, personal code, place of residence and telephone number or the name of the legal person, registration No., address and phone number) for the Commission: 1. The construction contractor/construction manager responsible (name, title, certificate No.)
2. A construction developer/autoruzraug (name, title, certificate No.)
3. Construction of the initiator (client)/būvuzraug (name, title, certificate No.)
The Commission carried out a review (external test) and the verification of the quality of structure, which stood by _____ _____ _____ _____ _____ the Commission found: 1. the Acceptance of such structures presented to: ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ __ (construction listing and brief description) 2. Work completed under (a construction Developer's name, certificate number or the name of the legal person, registration No., name of a construction and drawing no.)
3. Structures uses the following materials, design and products: (specify the certificates or other documents proving the quality) 4. deviation from the course of construction are no/(delete as appropriate).
Deviations agreed with (institution, drawing no and date of harmonisation) the Commission's decision: the work is undertaken in accordance with the construction plan, et seq, and standards, and they are adopted.
Construction contractor/construction manager responsible (first name, last name, signature of the official veterinarian) building project developer/autoruzraug (first name, last name, signature of the official veterinarian) Construction agent (the client)/būvuzraug (first name, last name, signature of the official veterinarian) Note.
1 document property "signature" does not fill in, if an electronic document is drawn up according to the law on electronic document design. Economic Minister Vyacheslav dombrovsky 12. attachment Cabinet 2014 2. Regulation No 529/Cover work acceptance report ______. year ___. _ _ _ _ _ _ _ _ _ _ _ _ object name and address the name of the construction Work of the agent (the client) (persons name, surname, personal code, place of residence and telephone number or the name of the legal person, registration No., address and phone number) for the Commission: 1. The construction contractor/construction manager responsible (name, title, certificate No.)
2. A construction developer/autoruzraug (name, title, certificate No.)
3. Construction of the initiator (client)/būvuzraug (name, title, certificate No.)
The Commission carried out a review (external test) and quality inspection cover jobs that have run the ____ ____ ____ ____ ____ ____ ____ ____ ____ the Commission found: 1. The adoption of the show (a short job description) 2. Work completed under (a construction Developer's name and last name or the name of a legal person, the name and construction drawing no.)
3. in carrying out the work, use the following materials, design and products: (specify the certificates or other documents proving the quality) 4. deviation from the course of construction are no/(delete as appropriate).
Deviations agreed with (institution, drawing no and date of harmonisation) the Commission's decision: the work is undertaken in accordance with the construction plan, et seq, and standards, and they are adopted.
Construction contractor/construction manager responsible (signature of the official veterinarian and transcript) a construction developer/autoruzraug (signature of the official veterinarian and transcript) Construction agent (the client)/būvuzraug (signature of the official veterinarian and transcript) Note. 1 document property "signature" does not fill in, if an electronic document is drawn up according to the law on electronic document design. Economic Minister Vyacheslav dombrovsky 13. attachment Cabinet 2014/2 Regulation No 529 for significant fire protection engineering systems acceptance report ______. year _____. ____ ____ ____ object name and address Engineering Construction agent system name (subscriber) (persons name, surname, personal code, place of residence and telephone number or the name of the legal person, registration No., address and phone number) for the Commission: 1. The construction contractor/construction manager responsible (name, title, certificate No.)
2. A construction developer/autoruzraug (name, title, certificate No.)
3. Construction of the initiator (client)/būvuzraug (name, title, certificate No.)
The Commission carried out a work of quality and integrity checking system that made (the name of the legal person, no registration and registered office or an individual's first name, last name, and certificate of residence), the Commission found: 1. The adoption of the show (the system as a whole or the Assembly) 2. System installed under the (appropriate section of development projects date, name, number, drawing number) and system equipment, equipment and materials, technical specifications. 3. in the following basic assembled equipment, devices and materials: No. p. k. The name of the type, mark, the number of Units notes 1.           2.           3. Changes to the harmonized system, 4 technical project. No/a (not applicable) the derogations from this project.
Deviations agreed with (institution, drawing no reconciliation date and specify which compensatory measures are taken) 5. Act the following documentation (required mark): a system of technical equipment and devices the passport system plant, equipment and materials, the system of the Declaration of conformity of the operational documentation (instruction) other technical documentation that describe the system and its operational parameters (necessary record) ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ Commission decision: is built according to (the system as a whole or the Assembly) for a construction , et seq, and standards. The system is accepted and ready for operation.
Construction contractor/construction manager responsible (first name, last name, signature of the official veterinarian) building project developer/autoruzraug (first name, last name, signature of the official veterinarian) Construction agent (the client)/būvuzraug (first name, last name, signature of the official veterinarian) Note. 1 document property "signature" does not fill in, if an electronic document is drawn up according to the law on electronic document design. Economic Minister Vyacheslav dombrovsky annex 14 cabinet 2014/2 Regulation No 529 certificate of readiness or part of a building for the operation of the Construction agent (the client) (persons name, surname, personal code, place of residence and telephone number or the name of the legal person, registration No., address and telephone number) 1. Declares that (a building or part thereof) that the works carried out on the basis of the planning permission no _____ _____ _____ _____ issued, is completed. (date)   (būvvald name)  
2. News about the built object (s): 2.1 buildings (residential or non-residential (required mark)): 1) buildings Group (General provisions) 2) buildings intended for the main use (according to the classification of structures) 3) building height (in metres) ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ 4) buildings above ground floors ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ __ 5) building the underground floors _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ 6) buildings building area ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ _____ 7) building total area ____ ____ ____ ____ ____ ____ _____ 8 m2) building _ būvtilpum _____ _____ _____ _____ _____ _____ 9 m3) building mounting konstrukcijas, materiāls un apdare: a) pamati ___________________________________________________________________________________________________________________ b) vertikālā konstrukcija __________________________________________________________________________________________________ c) starpstāvu pārsegumi __________________________________________________________________________________________________ d) jumta konstrukcija _____________________________________________________________________________________________________ e) jumta segums ___________________________________________________________________________________________________________ f) fasādes apdare __________________________________________________________________________________________________________
10) ēkas ugunsnoturības pakāpe _________________ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ 11) building energy efficiency class ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ___ 2.2. external: 1) inženiertīkl inženiertīkl (water, sewage, cable, etc.) _ _ _ _ _ _ _ _ _ _ _ _ _ 2) route length ____ ____ ___ ___ m 3) surface part ____ ____ ___ ___ m 4) underground part of ____ ____ ___ ___ m 5) inženiertīkl technical characteristics: No. p. k. Inženiertīkl-type construction material cross section (mm) (m) 1.         2.         3.        
2.3. Street (road transport): 1) Street (road transport) overall length ____ ___ ____ m 2) total area, which made the job, _____ and _____ m2 3) suspended area ____ ___ ____ m2, sidewalks area ____ ___ ____ m2) of lawn area 4 ___ _____ ___ m2, the outlying area ____ ___ ____ 50 m2) with 5 sides medicine media ___ _____ ___ m2 6) Street (road transport) technical characteristics: No. p. k. Civil engineering technical specifications (m) 1.     2.     3.    
3. details of the plot in which the construction: 1) land cadastral designation of the Vienîbas ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ 2) land units address __ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ 3) ground the unit owner or, failing that, the legal possessor and/or user (an individual's name, social security number, or the name of the legal person registration No.)
4. details of the building or premises in which the group performed construction: 1) buildings Group (General provisions) 2) building cadastral designation ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ 3) building the current main use (according to the classification of structures) 4) buildings intended for the main use (according to the classification of structures) 5) buildings address _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ 6) the building owner or, failing that, the legal possessor and/or user (an individual's name, social security number, or the name of the legal person , registration No.)

7) building total area (which performed work/total) _____ _____/_____ _____ 8 m2) building in the būvtilpum (that works/building together) ___ ___ _____/_____ _____ 9 m3) of space group cadastral designation ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ 10) groups current use (according to the classification of structures) 11) Group of the intended use (according to the classification of structures) 12) space group address 13) space group holder or, failing that, the legal possessor and/or user (physical person's name first name, last name, social security number, or the name of the legal person registration No.)
14) space group total area ____ ___ _____ _____ _____ _____ _____ m2 5. details of construction: 5.1 construction started and completed on (date) to (date) 5.2 building or part thereof complies with building project, developed by (a construction Developer's name, certificate number or the name of the legal person, registration No., būvkomersant registration certificate No., address, telephone number) 5.3 changes and deviations from the agreed construction is/is not (not applicable), they matched and marked in accordance with the procedure laid down in the technical documentation; 5.4. in the implementation of the following projects participated in the construction of the participants: 5.4.1 performer works (legal name, registration No. būvkomersant, licence, registration No., address, telephone number) 5.4.2. responsible public works Director (an individual's first name, last name, certificate No.) 5.4.3. būvuzraug (an individual's first name, last name, certificate No.) 5.4.4. a construction Developer (autoruzraug) (an individual's first name, last name, certificate No.)
5.5. construction waste management take (waste authorities name) 6. Certify that: 6.1., or part of a building is ready for adoption into service; 6.2. construction waste management is carried out in accordance with the laws and requirements of waste management, including construction waste classified as hazardous waste is managed in accordance with the laws and requirements of the management of hazardous waste; 6.3. building project for technological equipment, specialty systems and equipment is installed, checked and adjusted according to project and comply with the laws and regulations in the construction; 6.4. construction in fire safety, hygiene, acoustic, accessibility requirements are met and comply with legislative requirements; 6.5. after the adoption of the building or part thereof into _____ years works of atklājušo defects of the reviewer will prevent work at its own expense; 6.6. the total cost of construction is _____ _____ euro, including public law legal persons, policy instruments of the European Union or other foreign financial assistance funds _____ _____ euro; 6.7. the deferred works (territory greening, a fragment of the facade decoration) will be completed in the following scope and limits: No. p. k. The name of the job Completion date Unit quantity 1.         2.         3.        

The construction of the initiator (client) (first name, last name, signature of the official veterinarian) (date) the performer of the works (first name, last name, signature of the official veterinarian) (date), the public works Director in charge (name, surname, signature of the official veterinarian) (date) Būvuzraug (name, surname, signature of the official veterinarian) (date) a construction Developer (autoruzraug) (first name, last name, signature of the official veterinarian) (date) notes. 1.1 document property "signature" does not fill in, if an electronic document is drawn up according to the law on electronic document design. 2. the relative box Proof expandable if necessary to reflect the information in more than one agent, construction building (groups) or the owner of the parcel, while built on objects or buildings (space groups), if specified in the building permit for land units. 3. If placed in service at the same time a number of buildings, section 2.1 of the attestation completed each building separately. 4. in the receipt and 2.3 2.2 section fill in according to the situation, if at the same time with the construction of the building is built in the external inženiertīkl and the street. Economic Minister Vyacheslav dombrovsky 15. attachment Cabinet 2014 2. Regulation No 529/Act Code of (a building or part of the name, the address, if not, the location, cadastral land units) acceptance into service (the Act of dialing location) on (date) construction type (required mark): new construction work to restore the position of agent Construction restoration (subscriber) (persons name, surname, personal code, place of residence and telephone number or the name of the legal person , registration No., address and telephone number) 1. Making work out būvvald/construction of national control Office (delete where inapplicable): 1.1. building (first name, last name, construction control certificate No.) 1.2. the architect (name, title) 1.3. other official (name, title) 2. Hire guest: 2.1 būvuzraug (an individual's first name, last name, certificate No.) 2.2. a construction Developer (autoruzraug) (an individual's first name, last name, certificate No.) 2.3. the participants in the works (legal name, registration No. būvkomersant, licence, registration No., address, telephone number) 2.4.      (body/specialty, position, name, surname)
3. Būvvald/construction of national control Office (not applicable) met: 3.1.-the transfer of a construction ____ ____ ____ volumes 3.2. execution of works execution and documentation: 3.2.1. public works Journal No ___ ___ ___ ___ 3.2.2. autoruzraudzīb Journal No. _____ _____ ___ 3.2.3. important design and cover the work of making legislation on ____ __ lp. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ the volume (s) 3.2.4. būvuzraug report on the implementation of the plan of the building to the ____ ___ lp. 3.2.5. electrical inspection documentation to _____ and _____ lp. 4. Būvvald/construction of national control Office (not applicable) assessment: 4.1 construction agent certificate or part of a building ready for operation; 4.2. the following State, municipal and other authorities opinions: 4.2.1.          opinion No ___ to ____ lp.   (body)   (date) 4.2.2.          opinion No ___ to ____ lp.   (body)   (date) 4.2.3.          opinion No ___ to ____ lp.   (body)   (date) 4.2.4.          opinion No ___ to ____ lp.   (body)   (date) 4.2.5.          opinion No ___ to ____ lp.   (body)   (date) 4.3 construction Developer's opinion no _____ to ____ lp.   (date) 4.4 for the venting channel dūmkanāl and the technical condition of the ____ lp.   _______________ akta Nr. ________.   (date)  
5. Būvvald/construction of national control Office (not applicable) heard the hiring Executive and outside specialists and found: 5.1 the construction works carried out on the basis of the planning permission no ____ _____, _____ by _____ (date) issued by the (name of būvvald) 5.2 construction started and completed on (date) to (date) 5.3. building or part thereof complies with building project, developed by (a construction Developer's name, certificate number or the name of the legal person, registration No., registration certificate No būvkomersant.)
5.4. changes and deviations from the agreed construction is/is not (not applicable), they matched and marked in accordance with the procedure laid down in the technical documentation. 6. building technical economic indicators: 6.1. building (building cadastral designation ____ ____ ____ ____ ____ ____ ____): 6.1.1.  residential building or residential building (required mark) 6.1.2. number of floors (which made the work of surface/subsurface) _____/_____/_____ 6.1.3. the height of the _____ _____ _____ m 6.1.4. building area (new building) _____ _____ m2 6.1.5. the total area (which performed work/total) ____ _____/_____ ____ m2 6.1.6.  būvtilpum (that works/building together) ____ _____/_____ ____ m3 6.1.7. building load-bearing construction and finishing: No. p. k. Construction and finishing Materials in 1 way. Basics 2. Vertical construction 3. Intermediate covers 4. 5. The roof Roofing 6. Facade decoration 6.1.8. the degree of ugunsnoturīb ____ ____ ____ ____ ____ ____ ___ 6.1.9. the energy efficiency class ____ _____ ____ ____ ____ _____ 6.1.10. building usage Description: 6.1.10.1. building the main use (according to the classification of structures) groups use 6.1.10.2.: no p. k. Uses quantity 1.     2.     3.    
6.1.11. engineering equipment (required mark): 6.1.11.1 power supply: centralised. autonomous (wind water solar other) gas supply 6.1.11.2.: centralized local (the reservoir balloon) 6.1.11.3. water supply: centralized local (artesian wells neighborhood □ from open ūdensavot) external fire-fighting water supply water supply 6.1.11.4 internal fire. heating: Central, Central (boiler) local (oven fireplace stove) 6.1.11.5. fuel: solid liquid gas electricity. 6.1.11.6 hot water supply: centralized local individual (bath, shower) drain 6.1.11.7. : centralised local technological 6.1.11.8 the individual rainwater. mechanical purification: chemical biological 6.1.11.9. ventilation: natural forced 6.1.11.10. the lift: passenger loading other ___ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ 6.1.11.11. electronic communications networks: phone TV internet other ___ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ 6.1.11.12. security systems: fire protection systems for the notification of emergency conditions aizsargsignalizācij 6.2. environmental accessibility solutions (if planning permission for certain accessibility requirements): to access the facilities area roads, streets, pavements, walkways pedestrian crossing for the chance to move from one height and other , especially for persons with functional disabilities handicapped parking number _____ _____ _____ the building entrance and the possibility to move from one level to another height level, especially for persons with functional disabilities movement between floors of the building for persons with functional disabilities indoor installations (sanitary technical rooms, other premises ____ ____ ____ ____) corridors and escape routes 7. external inženiertīkl: 7.1 inženiertīkl (water, sewage, cable, etc.) _ _ _ _ _ _ _ _ _ _ _ _ _ the route overall length 7.2 ____ ____ ___ ___ m 7.3. surface part ____ ____ ___ ___ m 7.4. underground part of ____ ____ ___ ___ m 7.5. technical inženiertīkl Description: No. p. k. Inženiertīkl-type construction material cross section (mm) (m) 1.         2.         3.        
8. Street (road transport): 8.1 Street (road transport) overall length __ ___ ___ ___ m 8.2. total area, which made the job, _____ and _____ m2 8.3. roadway area ____ ___ ____ m2, sidewalks area ____ ___ ____ m2 of lawn area 8.4 ____ ___ ____ m2, the outlying area ____ ___ ____ m2 8.5. hillsides with shore medicine media ___ _____ ___ m2 8.6. Street (road transport) technical characteristics: No. PO box Civil engineering technical specifications (m) 1.     2.     3.    
8.7. functional description: No. p. k. Civil engineering use (m2) 1.     2.     3.    
9. the total cost of construction (by proposing the construction of the proof) is a ____ _____ _____ euro, including public law legal persons, policy instruments of the European Union or other foreign financial assistance – ____ ____ ___ ___ euro. 10. Internal and external inženiertīkl and equipment tested and recognized as valid for operation with the findings, which are annexed to this Act. 11. Technological lines and equipment constructed, assembled, tuned, tried and accepted by the documents annexed to this Act. 12. Outstanding works (territory greening, a fragment of the facade decoration) must be completed and the following time limits: No. p. k. The name of the job Completion date Unit quantity 1.         2.         3.        
13. After the adoption of all or part of the building into operation ____ ____ _____ years atklājušo works the main operator of the construction defects will eliminate at their own expense. 14. Būvvald/construction of national control Office (not applicable) proposes to recognize as valid for operation. (the building or part of a name) 15. For buildings or parts thereof are brought (contested building permits) ____ ____ ____ ____ ____ ____ ____ ____ Court, case number ____ __ _____. 16. Acceptance report drawn up in ___ ___ copies. Izpilddokumentācij is passed to the store ____ ____ ____ ____ ___ _____ ___.
building (first name, last name, signature of the official veterinarian) architect (first name, last name, signature of the official veterinarian) Officer (first name, last name, signature of the official veterinarian) Guest: būvuzraug (name, surname, signature of the official veterinarian) a construction Developer (autoruzraug) (position, name, surname and signature of the official veterinarian) met with the Act: construction of the initiator (client) (first name, last name, signature of the official veterinarian) (date) the performer of the works (first name, last name, signature of the official veterinarian) (date) notes. 1.1 document property "signature" does not fill in, if an electronic document is drawn up according to the law on electronic document design. 2. If making the Office, paragraph 1, of the Act clarified according to the situation, indicating officials make the hire. 3. the Provisions of point 7 and 8 shall be completed according to the situation, if at the same time with the construction of the building is built in the external inženiertīkl and the street. 4. Act to extend the relevant box if necessary to reflect the information in more than one agent, construction building (groups) or the owner of the parcel, while built on objects or buildings (space groups), if specified in the building permit for land units. 5. The building or part of a conversion or restoration Act in the case of paragraph 6 shall be completed to the extent that characterizes the building or room changes made to the group. Economic Minister Vyacheslav dombrovsky 16. attachment Cabinet 2014/2 Regulation No 529 certificate of existence with the building cadastral designation and ________, (building name) located, is demolished.   (address)  
The real property cadastre number _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ 1. details of demolished buildings: 1) the building owner or, failing that, the legal possessor and/or user (an individual's name, social security number, or the name of the legal person registration No.) 2) buildings Group (General provisions) 3) buildings Division (required mark): a residential building in the non-residential building 4) building the main use (according to the classification of structures) 5) buildings above ground floors ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ _____ 6) building the underground floors _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ 7) in the buildings dismantled inženiertīkl ___ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ 2. News of the plot of land where the demolished building: 1) land cadastral designation of the Vienîbas ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ___ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 2) land units address ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ 3) ground the unit owner or, failing that, the legal possessor and/or user (an individual's name, social security number, or the name of the legal person registration No.)
3. details of construction: 1) the construction of the initiator (client) (persons name, surname, personal code, place of residence and telephone number or the name of the legal person, registration No., address, and phone number) 2) construction works carried out on the basis of (the required mark): accepted the intention and the reasons for the demolition on (date) to (date) issued planning permission no _____ 3) object surveyed (date) 4) outstanding works (territory greening and improvement) to complete such scope and limits :
Nr. PO box The name of the job Completion date Unit quantity 1.         2.         3.        
4. A certificate drawn up by the __ _____ copies. Izpilddokumentācij is passed to the store ____ ____ ____ ____ ____ ____ ____ ________.
Būvvald the designated officer (position, name, surname and signature of the official veterinarian) (date) notes. 1.1 document property "signature" does not fill in, if an electronic document is drawn up according to the law on electronic document design. 2. Cognitive relative box extend, if necessary to reflect the information in more than one agent, construction of a building or plot of land owners, land units. Economic Minister Vyacheslav dombrovsky 17. attachment Cabinet 2014 2. Regulation No 529/proof of demolition for the construction of the initiator (client) (persons name, surname, personal code, place of residence and telephone number or the name of the legal person, registration No., address and telephone number) 1. Declares that (name of the building) demolition work carried out on the basis of the planning permission no _____ _____ _____, issued, have been completed.   (date)   (būvvald name)  
2. details of demolished buildings: 1) buildings Group (General provisions) 2) cadastral designation of the building 3) buildings Division (required mark): a residential building in the non-residential building 4) building the main use (according to the classification of structures) 5) buildings address __ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ 6) the building owner or, failing that, the legal possessor and/or user (an individual's name, social security number, or the name of the legal person registration No.)
7) surface of the building floors _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ 8) building the underground floors ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ___ ___ 9) dismantled the building inženiertīkl of ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ___ 3. details of the plot, which carried out the demolition work: 1) land cadastral designation of the Vienîbas ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ 2) land units address _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ 3) ground the unit owner or, failing that, the legal possessor and/or user (an individual's name, social security number, or the name of the legal person registration No.)
4. details of construction: 4.1 construction started and completed on (date) to (date) 4.2 building demolition carried out in accordance with the construction plan, developed by a construction Developer (first name, last name, certificate No.   or legal person name, registration No., registration certificate No būvkomersant.)
4.3. changes and deviations from the agreed construction is/is not (not applicable), they matched and marked in accordance with the procedure laid down in the technical documentation; 4.4. in the implementation of the following projects participated in the construction of the participants: 4.4.1. performer works (legal name, registration No. būvkomersant, licence, registration No., address, telephone number) 4.4.2. responsible public works Director (an individual's first name, last name, certificate No.) 4.4.3. būvuzraug (an individual's first name, last name, certificate No.) 4.4.4. a construction Developer (autoruzraug) (an individual's first name, last name, certificate No.) 4.5. the construction of waste management was carried out (the name of the operator of waste) 5. Certify that: 5.1 a building is torn down; 5.2. construction waste management is carried out in accordance with the laws and requirements of waste management, including construction waste classified as hazardous waste is managed in accordance with the laws and requirements of the management of hazardous waste; 5.3. inženiertīkl, technological equipment, specialty systems and facilities are dismantled according to the construction plan; 5.4. the total cost of construction is _____ _____ euro, including public law legal persons, policy instruments of the European Union or other foreign financial assistance funds _____ _____ euro; 5.5. deferred works (territory greening, utilities) will be completed in the following scope and limits: No. p. k. The name of the job Completion date Unit quantity 1.         2.         3.        

The construction of the initiator (client) (first name, last name, signature of the official veterinarian) (date) the performer of the works (first name, last name, signature of the official veterinarian) (date), the public works Director in charge (name, surname, signature of the official veterinarian) (date) Būvuzraug (name, surname, signature of the official veterinarian) (date) a construction Developer (autoruzraug) (first name, last name, signature of the official veterinarian) (date) notes. 1.1 document property "signature" does not fill in, if an electronic document is drawn up according to the law on electronic document design. 2. in the Confirmation box to extend, if necessary to reflect the information in more than one agent, construction of a building or plot of land owners, land units. Economic Minister Vyacheslav dombrovsky