Cabinet of Ministers Regulations No. 590 in 2016 (September 6. No. 44 2) operational programmes for the "growth and jobs" 4.1.1. specific aid objectives "to promote efficient use of energy, reducing energy consumption and the transition to AER manufacturing sector ' implementing provisions Issued under the European Union's structural funds and the cohesion fund the 2014 – 2020 programming period management law article 20 paragraph 13 i. General questions 1. determines: 1.1. procedures for implementing the action programme" growth and employment "4.1.1. specific objectives of aid" to promote efficient use of energy by reducing energy consumption and the transition to AER manufacturing sector "(hereinafter referred to as the specific support); 1.2. specific aid objectives; 1.3. specific support available funding; 1.4. requirements for the project under the Cohesion Fund (hereinafter the project) to the applicant; 1.5. the activities supported, cost incidence conditions; 1.6. the agreement for the implementation of a project of cooling-off conditions unilaterally. 2. Specific implementation of support aims at contributing to the efficient use of energy, reducing energy consumption and the transition to renewable energy manufacturing sector. 3. Specific aid target group is small (micro), small, medium and large business operators that perform economic activity in the manufacturing sector. 4. Specific implementation of aid is open for project submissions. 5. Specific support for the implementation of the planned total attributable funds is eur 38 300 036, including funding from the Cohesion Fund, eur 32 555 030 and private funds – at least 5 745 006 euro. Specific support available for the implementation of the Cohesion Fund total eligible funding until 2018 31 December to close the contracts for the implementation of the projects is 30 539 874 euro. 6. support for specific aid is provided in the form of grants. 7. One project submission is available for minimum public funding is 50 000 euros, the maximum amount of public funding is 600 000 euros. 8. One project the maximum eligible cost of eur 2 000 000 is about. 9. the maximum allowable aid intensity of the project total eligible costs at 30 percent. 10. The specific aid can leverage the following monitoring indicators and their values to be achieved: 10.1 to 2023 December 31 can leverage the following result indicators: 10.1.1. energy intensity in manufacturing-263.9 kg oil equivalent per 1000 Euro; 10.1.2. the renewable energy share in manufacturing energy consumption – 51%; 10.2. until 2023 December 31 can leverage the following outcome indicators: 10.2.1. number of traders who have received aid,-65; 10.2.2. energy saving businesses aided-4 395 MWh/year; 10.2.3. from renewable energy produced papildjaud-5.4 MW; 10.2.4. the calculated reduction of greenhouse gases per year – 6 757 tonnes CO2 equivalent; 10.3. until 2018 31 December the following financial ratios to be achieved – certified expenditure of eur 5 745 006. 11. Specific support within the responsible authority for the Ministry of Economic Affairs (hereinafter referred to as the responsible authority). II. the project applicant and project submission requirements 12. Specific support within the project applicant is established in the Republic of Latvia, the tiny (micro), small, medium and large merchants, and its main activity is the manufacturing industry (NACE Rev. 2 section C). 13. The project site within the meaning of these rules shall be the particular functional zoning of the territory of the municipality in which the permissible objects of industrial production and that the applicant carried out the project (and after the final payment is made continues) economic activity in the manufacturing sector. 14. the project application in the production building for at least a year before the submission of the project cooperation institution have set up production facilities and at least a year are made in a continuous manufacturing process. 15. within the framework of the project the applicant selection may submit one project submission. One project submission may include investments in several production buildings, which is one of the real property cadastre number. 16. Specific support within the industrial manufacturing of the building classification is determined according to the regulations on the classification of the structures. Specific support for the production premises and facilities considered to be located in buildings of industrial production and the production is necessary for the purposes of the production process, including premises which are specified in the Regulations Act, which sets the protection requirements. 17. the project is long-term rental of property or rights to property, including the land that made the investment. Property rights signify land registry entry on the project the applicant's property rights registered in the land registry or in the project the applicant entered into a real estate purchase agreement with rights or wait in the land registered in the project the applicant's right to a lease term that is not less than 10 years after the final payment is made. 18. If the applicant is a tiny (micro), small or medium-sized merchants, project adds the application to the building and the dissemination of copies of the report on the dissemination of the building used in the calculation of input values and the evaluation of the production process (annex 1) or a copy of the industrial energy audit, carried out in accordance with article 9 of the law on energy efficiency, first and second part. 19. If the applicant is a great trader, a project application shall be accompanied by a copy of the industrial energy audits, which are carried out in accordance with article 10 of the law on energy efficiency. 20. If the operator has implemented a certified energy management or complement the environmental management system, it shall submit to the institution of cooperation a copy of the certificate and fill in the report form on the dissemination of the building used in the calculation of input values and the evaluation of the production process (annex 1) or a copy of the industrial energy audits. 21. the project applicant is not eligible for funding: 21.1. it meets European Union structural funds and the cohesion fund the 2014 – 2020 programming period management rules set out in article 23 of the draft conditions of exclusion of applicants; 21.2. the project is intended for the European Commission of 17 June 2014 to Regulation (EU) No 651/2014, by which certain categories of aid compatible with the internal market, applying the contract article 107 and 108 (Journal of the European Union, 2014 26 June, no L 187) (hereinafter referred to as Commission Regulation No 651/2014), article 1, paragraph 2, "c" and "d" referred to actions; 21.3. it corresponds to Commission Regulation No 651/2014 article 1, point 4, "a" and "b" referred to the conditions; 21.4. subject to any of the Commission Regulation No 651/2014 article 1 paragraph 4 "c": the conditions referred to in 21.4.1. support the applicant (except for the small and medium-sized enterprises, which has existed for less than three years or, if the venture funding support – less than seven years from the first commercial sales) accrued loss has lost more than half of its subscribed capital If the accumulated losses, the report from the reserves (and all the other positions, which are assumed to be considered as part of the company's equity), a negative result occurs that exceeds half of the subscribed capital and capital case involves such a mark-up; 21.4.2. the applicant, in which some members have unlimited liability for the company's indebtedness (excluding small and medium-sized enterprises, which has existed for less than three years or, if the venture funding support – less than seven years from the first commercial sales), accumulated losses have lost more than half of the capital, indicated the company's accounting statements; 21.4.3. supports the decision of the Court the applicant has been declared bankrupt, including the judgment of the Court of Justice has declared insolvency proceedings or the judgment of the Court is the legal protection process, or by a decision of the Court of Justice is an out-of-court redress process, has a previous bankruptcy, reorganisation or appropriate composition, its economic activity is terminated if it meets the national criteria laid down for the application of the creditor, at the request of the insolvency proceedings; 21.4.4. support the applicant has received rescue aid and still not pay off the loan or the guarantee or reference has received restructuring aid and is still subject to the restructuring plan; 21.4.5. the applicant (that is not a small or medium-sized enterprise) in the last two years the company's debt and equity book value ratio is exceeded, as well as undertaking 7.5 percent coverage ratio, calculated by the operator's revenue before interest, taxes, depreciation and amortisation (EBITDA), deductions have been less than 1.0.22. Specific aid shall not provide support activities and sectors identified in the European Parliament and of the Council of 17 December 2013 Regulation (EU) no 1300/2013 for the Cohesion Fund and repealing Regulation (EC) No 1080/2006, article 2, paragraph 2, of Commission Regulation No 651/2014 article 1 paragraph 3 and the European Commission on 18 December 2013 Regulation (EU) no of 1407/2013 for the Treaty on the functioning of the European Union and article 107.108. application of the de minimis aid (Official Journal of the European Union, 2013 December 24, no. L 352/1) (hereinafter referred to as Commission Regulation No 1407/2013) article 1, paragraph 1. III. eligible activities funding 23:23.1. energy performance of buildings-enhancing alterations or renovations; 23.2. energy efficiency in existing production technological equipment; 23.3. the production of more energy-efficient technological equipment, which replaced the existing technological equipment; 23.4. building restoration, conversion of inženiersistēm or; 14.6. the use of energy from renewable sources; 14.7. the project for the preparation of technical documentation; 23.7. project management and monitoring. 24. funding shall be granted if the improvements carried out to ensure compliance with European Union authorised economic operator standards which have been adopted, even if they have not yet entered into force pursuant to Commission Regulation No 651/2014 to article 38. IV. Eligible and ineligible costs eligible costs 25 specific aid is additional investment costs necessary to achieve a higher energy level and are determined in accordance with Commission Regulation No 651/2014 article 3, paragraph 38. 26. The specific aid is attributable to direct eligible costs the following positions: 26.1. the preparation of the technical documentation costs: 26.1.1. building the dissemination, dissemination of the report on the building used in the calculation of the values of the inputs to the production process and the preparation of the assessment (small (micro), small and medium-sized business operators); 26.1.2. the technical survey findings; 26.1.3. construction cost estimate preparation; 26.1.4. development projects; 26.1.5. building facades receipt card; 26.1.6. receipt card or a receipt card engineering structures; 26.1.7. construction expertise; 26.2. the project autoruzraudzīb and building costs; 26.3. the project management personnel remuneration costs arising from the contract of employment or business (service) contracts, including State social security payments from taxable eligible costs, taking into account that: 26.3.1. they shall not exceed 24 426 euros per year plus 0.64% of the direct eligible costs, but not including direct project management staff costs, if the direct eligible costs are less than the five million euro; 26.3.2. eligible is not less than 30% capacity, the staff involved in the project by providing, in accordance with the principle of relevance of part-time (apply, if the costs incurred on the basis of the contract of employment); 26.4. the energy performance of buildings of step-up conversion or simplified reconstruction costs: the cost of the works 26.4.1. delimited in a building construction; 26.4.2. inženiersistēm building restoration, conversion or creation costs; 26.5. energy efficient lighting indoor installation costs; 16.5. energy efficiency enhancing additional investment costs in existing production technological facilities, which directly supports the production process; 16.6. energy-efficient technological equipment of the production cost of the acquisition, which replaced the existing technological equipment; 16.7. the renewable energy-based electricity generation and heating of source, purchase and installation of undifferentiated; 26.9. installation and connection costs; 26.10. energy management system and implementation of the industrial energy audit development costs small (micro), small and medium-sized merchants. 27. Specific aid deal is the project eligible costs applied to value added tax, where the applicant cannot recover it according to the regulations of the tax policy. 28. This rule 26.1 26.2 26.3.,., and 26.10. the costs referred to in count, if they make the project assets. 29. This rule 26.1., 26.2. and 26.10. the eligible cost referred to in total not exceeding five percent of the total eligible project costs, as well as does not exceed 10 percent of the contract amount for the works. 30. This provision cost referred to in paragraph 26.8. attributable when given a high-efficiency system use estimation, which States that the implementation of such a system is technically and economically justified, and reduce the total cost of energy consumers of energy. The use of high-efficiency system of assessment is an explanatory description prepared in accordance with the law of the energy performance of buildings and included in article 5 in accordance with the construction plan of the building … or a receipt card port engineering structures under the waterworks, heat, gas, and other unclassified civil provisions. 31. Specific aid cost is eligible from the date on which the Office has received the cooperation of project submissions, with the exception of this rule 26.1. referred to costs that are eligible from 1 June 2016. If eligible, the applicant initiated the project in action before the conclusion of the contract with the authority, the cooperation project, the applicant assumes all risks for the commitments it has undertaken and expenses that do not meet the applicable costs. 32. Specific aid not eligible are the following items: 32.1. the cost of this provision in paragraph 26 as eligible or exceed this rules set out in paragraph 29 of the cost constraints; 32.2. the payment of duties and taxes, except for this provision, paragraph 27; 32.3. the project costs that are not directly related to the project activities are not measurable, proportionate, justified by supporting documents and expenses which do not comply with the principles of economy, efficiency and effectiveness; 20.1. this rule 26.1. the costs referred to in (a), if they are incurred before June 1, 2016; 32.5. the implementation of the energy management system, the industrial energy audit development costs and this provision cost referred to in 26.1.1. large economic operators. V. implementation of the project and funding conditions 33. Project activities can be implemented with the cooperation of the day, when the authority has received an application for the project. 34. the project activities referred to in the application must be implemented within a period of 24 months from the date of the institution of cooperation contract for the implementation of a project, but not later than December 31, 2020. 35. in implementing the project, the beneficiary shall ensure that: 21.8. the planned energy savings by implementing energy efficiency measures is not less than 15 percent per year from the report on the dissemination of the building used in the calculation of input values and the evaluation of the production process or industrial energy audit energy consumption calculated prior to the implementation of energy efficiency measures in a particular production process or building heat consumption; 35.2. the planned consumption of thermal energy for heating buildings by implementing energy efficiency measures are not greater than 110 kWh/m2 per year, except during the implementation of the project intend to implement technological replacement of production equipment; 35.3. production building for at least five years after the final payment is made using the production needs of the manufacturing sector; 35.4. the installed electricity and heat meters, in order to ensure the monitoring of the results of the project; 22.1. five years after the final payment is made each year to 31 January the responsible body shall be submitted to the review of the energy consumption of a building or a particular manufacturing process review (annex 2); 35.6. the implementation of the project within the required procurement procedures are done in accordance with the laws and regulations in the field of procurement, supporting the integration of environmental requirements in public procurement. 36. Cooperation authority may decide on the unilateral termination of the agreement for the implementation of a project, as well as the cases: 36.1. where the beneficiary of the project, the implementation of the activity is not started within 12 months of the agreement for the implementation of a project; 36.2. If the beneficiary during project implementation deliberately provided the cooperation body of false information; 22.6. by implementing energy efficiency measures and renewable energy, the beneficiary has not fulfilled any of the rules referred to in paragraph 35; 36.4. If the beneficiary does not comply with the time limits set in the project or other circumstances joined adversely affecting or likely to affect the implementation or support specific monitoring indicator. 37. The beneficiary shall ensure information and publicity measures, the European Parliament and of the Council of 17 December 2013 Regulation No 1303/2013 laying down common provisions on the European regional development fund, the European Social Fund, the Cohesion Fund, the European agricultural fund for rural development and the European Maritime Affairs and fisheries the Foundation and the General provisions on the European regional development fund, the European Social Fund, the Cohesion Fund and the European Fund for Maritime Affairs and fisheries, and repealing Council Regulation (EC) No 1083/2006, and regulations on the procedures for European Union structural funds and the Cohesion Fund in the implementation of the 2014-2020 programming period provide a communications and visual identity requirements. 38. after the conclusion of the contract for the project implementation, cooperation, on the basis of the beneficiary's written request the advance under the legislative act on the State budget planning the European Union's structural and cohesion funds for the implementation of the project and execution of payments in 2014 – 2020 programming period, provides funding for the requested advance payments, the total amount of which does not exceed 30 percent of public funding granted to the project. The advance may be paid in several instalments. 39. If the project occurs during non-eligible expenditure or pushes up costs, the beneficiary undertakes to cover it from his possession in funds not associated with public support. Vi. The receipt of State aid related conditions 40. financing rules referred to in paragraph 26 the costs incurred by the application of authority and cooperation form the project generated assets, provided in accordance with Commission Regulation No 651/2014 article 38. 41. financing rules 26.1 and 26.10. referred to expenses incurred after the filing of the cooperation, but does not create the project generated assets or were incurred prior to the filing of the cooperation, but not earlier than 1 June 2016, provided in accordance with Commission Regulation (EC) No 1407/2013.42. Tiny (micro), small and medium-sized merchants is merchants who comply with Commission Regulation No 651/2014 as specified in annex 1. 43. The big merchants is merchants who comply with Commission Regulation No 651/2014 article 2, paragraph 24. 44. de minimis aid per beneficiary in one single merchant level amount of de minimis aid, together with the fiscal year concerned and the two previous fiscal years of de minimis aid granted does not exceed the Commission Regulation No 1407/2013 article 3 (2) the maximum amount of de minimis aid. Business merger, acquisition or Division, as necessary to take account of Commission Regulation No 1407/13 Article 3, paragraph 8 and 9 of these conditions. 45. within the framework of these rules is not provided support these referred to in paragraph 22 of the rules of the merchants. If the beneficiary is working in those sectors, aid may be granted only if there is a clear distinction between eligible transactions and financial flows, ensuring that the sectors of activity that are not supported, do not benefit from the aid measure. 46. If the project actually acquired by the amount of financing statutory approval is less than the original project submitted in the application, it must be ensured that actually achieved figures not less than initially planned in the application project. 47. The specific aid may be combined with aid for the same eligible costs provided in another State aid programme or project, including de minimis aid under Regulation No 1407/2013, without exceeding the maximum permissible aid intensity laid down in Commission Regulation No 651/2014 38 article 5 and 6. 48. measures within the eligible costs that are quantifiable and can be combined with other State aid eligible costs identified pursuant to Commission Regulation No 651/2014 article 8, paragraph 4, and without exceeding the maximum permissible aid intensity laid down in Commission Regulation No 651/2014 38 article 5 and 6. 49. cooperation authority, the responsible authority and the beneficiary shall ensure access to information for 10 years from the last date of granting of the aid in accordance with Commission Regulation No 651/2014 12. 50. The liaison authority shall ensure the publication of information under Commission Regulation No 651/2014 article 9(1) and (4). Prime Minister Māris kučinskis member of the Prime Minister, the Minister of the economy, education and Science Minister Karlis Šadursk of annex 1 Cabinet 2016 6. Regulation No 590/report on the dissemination of the building used in the calculation of input values and the evaluation of the production process ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ (name) building address _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ the building cadastre number XXXX XXX XXXX building cadastral designation XXXX XXX XXXX XXX building classification (according to Cabinet 22 December 2009 No. 1620 rules "rules for the structure of the classification" in the Annex ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ _ ____ ____ ____ ____ ____ ____ ____ building facade photo tolerated deviations in the report if the information is available in another form or configuration data (such as from calculation software), or more precisely to meet the energy-efficiency rating of the building. Information on the development and approval of the report-a report is drawn up and signed by an independent expert in the field of energy efficiency and the approved economic operator (hereinafter referred to as project applicant) officer to certify that the information provided by the experts, meet the actual situation of the applicant and the project is correct. -If the applicant is a project initiated by the energy management system certified (ISO 50001:2012) or updated environmental management system (ISO 14001:2015) and building/building is granted by an independent expert, the dissemination of the building signed the report can develop a project the applicant responsible for energy management. Prepared statements confirm the applicant's project officer. 1. General information about the merchant information about merchant 1.1 1.1.1. The name 1.1.2. Registration number 1.1.3. Registered office 1.1.4. Core business sector (NACE Rev. 2).   1.1.5. Contact 1.1.6. Contact information (phone, e-mail) 1.1.7. The responsible official, confirming a merchant review (first name, last name, position in the company) 1.2 Overview 1.2.1. information about. The object of the survey date 1.2.2. The dissemination of the building number 2. Energy efficiency assessment boundaries 2.1. assessment of energy efficiency within the unit name (building, its part or zone, etc.) ** unit parameters (m, m2, m3, etc.) Energonesēj distribution and a brief description (energy, energy, thermal energy for heating, hot water, electricity, energy records, number of meters, etc.) Energonesēj the estimated output/energy consumed (kWh) of Electricity for Heating (kWh) kWh per year% of total building (factory floor 1) building (factory floor 2) building (factory floor ...) the company's Firing of the territory (the territory of the district heating, lighting, transport, other production process requires energy consumption that occurs in the building or structures) of the dissemination of the estimated building/manufacturing process 100% together independent experts on energy distribution notes. 1. Do not fill if energy efficiency evaluation carried out within the limits of energonesēj. 2. the allocation of items of the Experts according to the specific nature of the production process and logical allocation. 3. Assessment boundaries established only buildings and equipment in which the project is planned to implement energy efficiency measures. 4. fill in the table, if the listed energy balance consists of several buildings, energy loss and heat transmission losses outside the building. The table is created on the basis of energy listed, which correctly divided by buildings and engineering systems. table 5 indicates the energy balance, including the value that lies within the boundaries of energy accounting and characterized, which consumes energy. 6. fill in the table: • buildings with separate energonesēj for all energy flows; • more buildings with one energonesēj; • buildings with multiple energonesēj; • in other cases. 2.2. Other conditions that affect energy efficiency assessment * note. * Fill in when the building is turned off in the area of heating, areas with uneven energy consumption and with different power supply systems, specifying parameters (for example, m2, temperature) that affect energy efficiency assessment. 2.3. installations for the production of Heating equipment, model year of manufacture fuel fuel consumption annual average (also specify units of measure) seasonal efficiency (determined at the lower calorific value) kW nominal power, the weighted average power, kW hours of work, annual energy kWh/year of electricity consumed, with which the machine is operated, the kWh/year inspection was added (yes/no) dates 2.4. Installations for the production of electricity equipment name, model year of manufacture fuel fuel consumption annual average (also specify units of measure) seasonal efficiency (determined by lower heating value) rated power weighted average capacity, kW, kW hours of work, annual energy kWh/year of electricity consumed, with which the machine is operated, the kWh/year 3. Energy consumption metering and distribution for the energy consumption of 3.1 records Energonesēj records which do not take place regularly every month, you can only specify the annual consumption. 3.1.1. the heat from the heat supplier MWh year I II III IV V VI VII VIII IX X XI XII total average – the Other expert indicate how the values were obtained, or contains the measured or calculated values.
____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ 3.1.2. Fuels fuel type _____ _____ _____ _____ _____ _____, lower calorific value of fuel _____ ____ kWh/kg average boiler efficiency, established by a lower calorific value of the fuel in the _____ ____ transmission heat loss in the _____ ____ (% where the boiler is located outside the building air-conditioned zone) consumption units listed _____ ____ (kg, m3, l) II III IV year I V VI VII VIII IX X XI XII total average                          
Conversion factor from m3 to kg or l ___ ___ ___ other information-expert will indicate how the values were obtained, or contains the measured or calculated values.
____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ Fuel consumption, recalculated MWh year I II III IV V VI VII VIII IX X XI XII total average If using multiple fuel types, the information provided for each individual separately, as well as summary tables for fuel consumption, convert MWh. other information-expert will indicate how the values were obtained, or contains the measured or calculated values.
________________________________________________________________________________________________________________________________________________ 3.1.3. Elektroenerģija, MWh
Gads I II III IV V VI VII VIII IX X XI XII Kopā                                                                                                                                             Vidēji                          
Cita informācija – eksperts norāda, kā ir iegūtas vērtības, vai ir norādītas izmērītās vai aprēķinātās vērtības.
____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ 3.1.4. other data listed separately fill out, if you have separate accounts 3.3.1-3.3.6. systems referred to in paragraph ____ ____ ____ ____ ____ ____ ____ ____ ____ (name and unit of measurement), the year I II III IV V VI VII VIII IX X XI XII total average – the Other expert indicate how the values were obtained, or contains the measured or calculated values.
____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ 3.2. production of energy consumption distribution 3.2.1 average Energy consumption., month by month and year together, the average consumption in MWh in use data for at least the last two years. Show all energonesēj, their distribution by systems and objectives Energonesēj year System or purpose * I II III IV V VI VII VIII IX X XI XII total note. 3.3.7. the distribution of point records other information-expert will indicate how the values were obtained, or contains the measured or calculated values.
____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ The explanation for the values derived on the basis of the listed consumption distribution systems, or calculated or assumed in the standards.

3.3. breakdown of energy consumption energy consumption distribution * 3 measured assessment 1 heating indicator to measure the climate correction (kWh) heating indicator to measure the climate correction (kWh/m2/year) estimated rating, 4 heat 2, average (kWh) electricity (kWh), the average total, average (kWh per year) specific (kWh/m2 per year), the average thermal energy (kWh) of electricity, the average total (kWh), average (kWh per year) specific (kWh/m2/year) 1 2 1 + 2 = 3 4 = 3/total area 7 + 8 = 5 6 7 8 9 10 = 9/total area Building energy consumption for heating 3.3.1 3.3.2 3.3.3 for the preparation of hot water. For cooling (and air sausināšan) 3.3.4. Mechanical ventilation (and air humidification) 3.3.5 3.3.6. Additional lighting energy consumption 3 3.3.7 production 3.3.7.1. Technological water system 3.3.7.2. Steam system 3.3.7.3. Compressed air/air system 3.3.7.4. Hydraulic System 3.3.7.5. Cooling System electromechanical 3.3.7.6. 3.3.7.7. the system other systems 3.3.8. Total 3.3.9. Explanation of power notes. 1.1 indicates average consumption data for at least the last two years from Chapter 6 tables (if not the measured data, indicates the calculated). Where is the total records, data point in one column, and the table in 3.3.9. If the measured energy exceeds 10% adjustment to the measured average data submitted detailed explanatory statement specified in 3.3.9. 2. the calculation shall be made by 2 positions, even if the records are not shared. 3. paragraph 3 specifies the general consumers, not separately detalizējam. Do not fill in the details, if not applicable. 4. * 4 measured results of the evaluation of the energy efficiency and energy efficiency calculated the outcome of the assessment to the items, if you have the same indoor temperature conditions (other than for less than 10% and not more than 10 kWh/m2 per year). 4. Basic information on building 4.1. information on the production of climatic data, the building of meteorological data place _____ _____ _____ _____ _____ _____ _____ _____ _____ heating period length __ ____ ____ ____ ____ day Ārgais calculates the temperature of heating period ____ _____ ° C solar radiation heating period the sky party W/m2: North ____ _____, East _____ ____, South and ________, West _____ ____ horizontal surface: ___ ___ _____ _______, W/m2 4.1.1. Constructive solution of 4.1.2. The year when the building was put into operation in 4.1.3. Total calculated area (m2) 4.1.4. 4.1.4.1. the basement floors (yes/no) 4.1.4.2. standard stand (yes/no) 4.1.4.3. technical stand (yes/no), 4.1.4.4. penthouse (yes/no) 4.1.5. Production space area (m2) 4.1.6. Office space area (m2) 4.1.7. Warehouse area (m2) 4.1.8. External dimensions of the building (if the building is of irregular shape, add sketch) length (m) width (m) height (m) 4.1.9. Advance energy efficiency measures undertaken in the No. PO box Annual measure energy savings from a particular event, year% 4.1.10 kWh. Other information 4.2. information on the calculation areas and space groups information must appear on every building in the area if necessary, dividing the sub-areas No. PO box Area designation (and name) Included space/space group name calculates area area area calculated average height average height of the zone zone calculation of indoor temperature calculation parameters temperature of heating period the duration of the period of actual exchange area the actual exchange of air between the weighted average ** outdoor air m2 m3 m2 m m ° C ° C ° C day 1/h 1/h 1.                                               2.                                               3.                                               Kopā           Vidēji            
Piezīmes. 1. indicates the determination of the calculated energy used period parameters. 2. ** calculated by volume, m3 indoor. 4.3. information on the areas and groups of buildings with rooms built in cooling system No. PO box Area designation (and name) Included space/space group name calculates area area area calculated average height average height of the zone zone calculation of indoor temperature calculation parameters of temperature during cooling period, the duration of the actual exchange area the actual exchange of air between the weighted average *** outdoor air m2 m3 m2 m m ° C ° C ° C day 1/h 1/h 1.                                               2.                                               3.                                               Kopā           Vidēji            
Piezīmes. 1. indicates the determination of the calculated energy used period parameters. 2. ** calculated by volume, m3 indoor. 5. building containment structures 5.1. Information about each type of external structures delimiting, covering a total area of calculation in the heated room No. PO box Area designation (and name) Containment structure (s) the material thickness (mm) square (m2) Būvelement heat transmission coefficient (U), w/(m2 K) temperature difference between the warm and cold construction sides (K) building heat loss coefficient (W/K), No. PO box Area designation (and name) Thermal bridges length or name (or pieces) Thermal bridges thermal transmittance coefficient (ψ or χ), w/(m K) or W/K temperature difference between warm and cool buildings (K) building heat loss coefficient (W/K) building containment design heat loss coefficient of the HTA and regulatory heat loss coefficient of HTR HT (actual) (W/K), HTR (normative) * (W/K), the independent expert notes the additional information note. * Calculated in accordance with the Cabinet's June 30 2015 regulations No 339 "rules for the Latvian et seq of LBN 002-15" building construction siltumtehnik "delimiting". 6. building technical systems and power distribution for building ventilation systems 6.1 zones * 6.1.1. Calculation parameters Specify the calculation, if necessary, a separate division of the ventilation modes and subareas, taking account of the actual operation of ventilation equipment.
Nr. PO box Area designation (and name) the ventilation system type (natural, mechanical) calculates the volume, m3 air exchange rate (including infiltration), 1/(h) energy recovery, the average for the period,% air supply temperature, ° C ** duration of period h ventilation heat loss coefficient, W/K ** other information notes. * If the building, area or a part of the zone is operated at different temperature and ventilation modes, each mode separately, indicating the mode parameters. ** Subject to recovery. 6.1.2. the air conditioning and ventilation system (s) No. PO box Machine name, model production year weighted average electric power, kW operating time per year, h electricity consumed in kWh annual energy produced, kWh per year added air conditioning and/or ventilator system checks the inspection law draftsman ____ ____ ____ ____ ____ ____ ____ ____ ____ inspection date __ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ other information-expert will indicate how the values were obtained, or contains the measured or calculated values.

6.2. The calculated heat gains in heating period of the building Indicate the zones, if necessary by separating the sub-areas.
Nr. PO box Area designation (and name) the internal heat gains, kWh/m2 solar heat gains, Benefits of use kWh/m2 ratio total heat gain ** Metabolic heat from residents Allayed warmth of the devices Of lighting devices From hot water systems from/to the air conditioning and ventilation systems From/to the processes and objects kWh/m2, kWh per year total heat benefits other information note. * Total calculated heat gains during the period. 6.3. Heat transmission building 6.3.1. Heat supply system of central heating depends on the connection diagram connection diagram independent of local heating of heating individual 6.3.2. Information about building energy audits of existing siltumpārvad networks 6.3.3. Heating system pipes, one pipe of two different type (specify) 6.3.4. Heat supply control, control and accounting areas 6.3.5. Pipeline length in the air-conditioned areas 6.3.6. Pipe fittings and pipe condition 6.3.7. Loss of heat pipelines,% 6.3.8. Loss of heat pipelines, kWh 6.3.9. Heat accumulation (are not technical parameters) 6.3.10. Heat loss, heat accumulation of% 6.3.11. Heat loss, heat accumulation of kWh 6.3.12. Other information URPiezīme.* If your system differs in different areas of the building, you can specify a separate table for each zone. 6.4. The hot water distribution system 6.4.1. Hot water supply the average temperature (° C) 6.4.2. Cold water inlet temperature (° C) 6.4.3. Hot water preparation preparation siltummezgl centralized supply individual 6.4.4. Hot water distribution system of the type without the circulation with circulation 6.4.5. Pipeline length __ ____ ____ ____ ____ conditioned areas _____ _____ _____ ___ outside the conditioned area is identifiable. 6.4.7 pipe condition. Heat accumulation (are not technical parameters) 6.4.8. Other information 7. Energy efficiency improvement measures planned to implement the project of building external 7.1 containment structures, engineering systems, other energy efficiency improvement measures No. PO box Energy efficiency measures and target (s) indicator (s) energy savings per year of primary energy savings of% of the total estimated energy consumption kWh MWh kWh/m2% rate of annual Heat, MWh total 1.                 2.                 3.                 Elektroenerģija, kopā                                                   Kopā              
Piezīmes. 1. achieve energy efficiency measures (design of thermal transmittance delimiting factor U and thermal bridges thermal transmittance coefficient values, changes in ventilation systems, etc.). 2. Factor in accordance with the Cabinet of Ministers of 25 June 2013 the Regulation No 348 "building energy efficiency calculation method". Other information indicate the factor used in the calculation method, where the energy substitution, etc.

7.2. information on the results achieved under the project indicators of renewable energy production energy MWh/year total energy savings MWh/year of primary energy savings MWh/year of renewable energy produced papildjaud MW of calculated greenhouse gas reduction in t/year year note. * According to the rules laid down in paragraph 10. 8. building containment structures and technical systems by energy efficiency measures 8.1. Information about each type of external structures delimiting, covering a total area of calculation in the heated room No. PO box Area designation (and name) Containment structure (s) the material thickness in mm area, m2 Būvelement heat transmission coefficient (U), w/(m2 K) temperature difference between the warm and cold construction sides (K) building heat loss coefficient, W/K No. PO box Area designation (and name) Thermal bridges length or name number, m, or PCs. Thermal bridges thermal transmittance coefficient (ψ or χ), w/(m K) or W/K temperature difference between warm and cool buildings (K) building heat loss coefficient, W/K building delimiting the design heat loss coefficient of the HTA and regulatory heat loss coefficient of HTR HT (actual) (W/K), HTR (normative) * (W/K) Note: * Calculated in accordance with the Cabinet's June 30 2015 regulations No 339 "rules for the Latvian et seq of LBN 002-15" building construction siltumtehnik "delimiting". 8.2. the ventilation areas of the building – achievable indicators after energy efficiency improvement measures 8.2.1. Calculation parameters no. PO box Area designation (and name) the ventilation system type (natural, mechanical) calculates the volume, m3 air exchange rate (including infiltration), 1/(h) air supply temperature, ° C ** duration period (h) energy recovery, the average for the period,% ventilation heat loss coefficient, W/K ** other information notes. 1. If the building, area or a part of the zone is operated at different temperature and ventilation modes, each mode separately, indicating the mode parameters. 2. Subject to the recovery. 8.2.2. Ventilation and air conditioning-equipment Nr. of uzstādāmaj PO box Machine name, model weighted average electric power, kW equipment productivity, m3/h of heat recovery efficiency,% estimated number of work hours, h/year estimated the amount of energy consumed in kWh/year estimated the amount of energy produced, kWh/year 8.3. calculated heat gains in building No. PO box Area designation (and name) the internal heat gains, kWh/m2 solar heat gains, Benefits of use kWh/m2 of total heat gain coefficient of Metabolic heat from residents Allayed warmth of the devices Of lighting devices From hot water systems from/to the air conditioning and ventilation systems From/to the processes and objects kWh/m2, kWh per year total heat benefits other information note. The total estimated heat gains during the period. 9. technical information and light power No. PO box Room or space group the situation forecast difference luminaries ** rooms or groups of rooms area luminaire power W total power, W/m2, h hours per year of electricity consumption in kWh per year, the total capacity of the luminaries, W/m2, h hours per year of electricity consumption, kWh of electricity consumption, kWh together notes. 1. If the project is not planned activities related to the lighting replacement, the data points to the area. 2. Indicate the type of light bulbs, the total number of light bulbs. Identifies the details when building a planned light replacement. 10. Energy efficiency indicators and changes forecast by implementing energy efficiency improvement proposal No. PO box Breakdown of energy consumption situation (calculated data from Chapter 6) forecast by implementing energy-efficiency measures (under Chapter 7) difference – energy reduction * (year) the difference – CO2 emissions reduction **, (kgCO2/year) total consumption (kWh/year) specific (kWh/m2/year) CO2 emissions (kgCO2/year) total consumption (kWh/year) specific (kWh/m2/year) CO2 emissions (kgCO2/year) kWh MWh,% 10.1. Apkurei                     10.2. 10.3 for preparation of hot water. Cooling (and air sausināšan) 10.4. Mechanical ventilation (and air humidification) 10.5. Lighting 10.6. The additional energy of 10.7. General Paterinš *** other information-expert indicates what factors are used in the calculation of the CO2 savings Replace fossil energy energy Replace energy (kWh/year) specific (kWh/m2 per year) of primary energy factor of primary energy (kWh/year) CO2 factor reduction in primary energy MWh per year reduction in CO2 emissions t/year, 10.8. CO2 savings by replacing fossil energy with energy produced to energy produced from renewable energy total – Other expert indicate what factors are used in primary energy and CO2 savings calculation notes. 1. Data must match exactly with the calculated data for these positions, as shown in other chapters in this report. 2. The total amount of energy saved and CO2 emissions reduction may not exceed the originally calculated indicators before the energy efficiency proposals. 3. Indicate other consumers that are not separately detalizējam. 11. adjustment of energy efficiency indicators for heating (where buildings average room height greater than 3.5 m), the average heated area of the building height estimated energy consumption for heating the permissible level of energy consumption for heating kWh/m2 year m kWh/m2 year note. * Calculated in accordance with the Cabinet of Ministers of 9 July 2013 the Regulation No 383 "rules for building energosertifikācij" 15.3 points. 12. Basic information on the production process the production process 12.1 12.2. information about the annotation in the manufacturing process of the workload running hours per day number of forty-eight hours of operation week activities a week per year number of months of operation in the year note: You can specify a different time for different production processes. 13. Description of the production equipment and energy consumption data production technological 13.1 equipment (data on the machine power consumption). PO box Machine name, type (type shares) production year in nominal power, kW, the weighted power **, kW hours per year, (h) energy consumption, kWh per share of the total electricity consumption, measured energy consumption in kWh per year, 1.                 2.                 KOPĀ      
Piezīmes. 1. List all equipment is produced and consumed energy. 2. Specify the power absorbed by the machine. 13.2. the technological equipment (data on plants are consumed by other energonesēj) No. PO box Machine name, type, energonesēj used in the production of the annual consumption of Energonesēj year (specify the amount and the unit of measure) rated power, kW, the weighted power **, kW hours per year, h equipment efficiency part of the total consumption,% Energonesēj energonesēj consumption, kWh per year 1 total 13.3. Production quantity product unit year I II III IV V ** (VI) (VII) (VIII) (IX) (XI) (XII) total 201 X _ _ _ _ an average of 201                              
The notes. 1. Fill out, if measures are taken to improve energy efficiency in production processes. 2. If there is no tracking by month, indicates annual production quantity. 13.4 other conditions affecting production efficiency assessment 14. Energy consumption metering and distribution for industrial process heat consumption in 14.1. production process for year I II III IV V VI VII VIII IX X XI XII total total energy consumption, kWh total energy consumption, kWh, the total average (kWh) calculated data (fill in if there are no counters), total energy consumption, kWh expert description of the method used is the requirement to add a description of the method used by the expert as an expert gets calculated data.
14.2. The heat consumption of hot water preparation year I II III IV V VI VII VIII IX X XI XII total total energy consumption, kWh total energy consumption, kWh, the total average (kWh) calculated data (fill in if there are no counters), total energy consumption, kWh expert description of the method used is the requirement to add a description of the method used by the expert as an expert gets calculated data.
14.3. electricity consumption in the production process for the year I II III IV V VI VII VIII IX X XI XII total total energy consumption, kWh total energy consumption, kWh, the total average (kWh) calculated data (fill in if there are no counters), total energy consumption, kWh expert method description 15. Technological equipment before and after the energy efficiency improvement measures no. PO box Machine name, type before the energy efficiency measures By energy efficiency measures starpiba-weighted energy power, kW efficiency of working hours per year energy consumption, kWh unit name, type of weighted average power, kW hours per year, consuming energy efficiency kWh per kWh% total note. * Does not specify equipment performance and energy consumption does not affect implementation of the project.
Other information in determining the measures to be taken, the dissemination of the report of the building by cooperating with the project applicant, certified architect or civil engineer, thereby providing for equal measures of both documents.
An independent expert in the field of energy performance of buildings/the project the applicant responsible for energy management (name) (signature) (date) (registration number of independent experts in the field of energy performance of buildings on the register or the certificate authority of the applicant in the decision/project position responsible *) (contact information – phone, email, address) (company, company registration number (do not indicate if an independent expert in the field of energy performance of buildings buildings prepared for dissemination as a self-employed person *) (project responsible officer of the applicant, attesting to the accuracy of the information provided in the report) notes. 1. where reference is made to the applicant of the project, running the energy management system or updated environmental management system. 2. Do not fill in, if the report is made of the applicant for the project, which is running the energy management system or updated environmental management system. 16. in addition to the information you want to add 1. building and (or) production equipment (s) sketch. 2. building and (or) production equipment (s) survey photo documentation, or termogramm. 3. ...
Deputy Prime Minister, Minister of economy, Minister of education and science Charles Šadursk a annex 2 Cabinet 2016 6. Regulation No 590/overview of energy consumption by energy efficiency measures in buildings in a particular production or the production process of 20 ____. year 1. Information about the project and the funding recipient project name project contract number in the completion of the project in the year the beneficiary name 2. information on the buildings and technologies that made the project summary of the project the implementation of energy efficiency measures (the beneficiary fills only the sections that correspond to the project activities implemented during) 2.1. Building (information on production of building project made energy efficiency measures). PO box Address of the building cadastre number classification of building Buildings put into operation (year) restore completed (date) the total heated area (m2) 1.             2.             3.            
2.2. Production of technological equipment (information on the project improved equipment or on equipment that was used to replace an existing facility) No. PO box Machine name, type (type part separately) address capacity, MW Nominal weighted average power, MW production year the number of hours of work in the year under review the number of work-hours per year (planned) of the output quantity tonnes/year * heat consumption electricity consumption per year ** year ** MWh/year% *** MWh/year% *** 1.                         2.                         …
                       
The notes. 1. If applicable-allowed to use other production units representative of their showing here _____ _____ _____. 2. Indicate the consumption contained in the report on the dissemination of buildings used in the calculation of the input values and the assessment of the production processes or industrial energy audits. 3. Must specify, as part of the total heat/electricity consumption. 3. information on heat consumption of buildings and equipment in which project activities (specified by the building actually set up counters, such as heating, hot water. If the buildings heat meter records both the heating and the hot water, the data must be calculated. If the project is carried out in several production buildings, the data must be provided for each building individually, in separate tables. The information must match the information provided in table 2.1) 3.1. Energy consumption in MWh/year summary *** kWh/m2 per year in CO2 emissions, heating the hot water operation of electricity consumption heat consumption production technology equipment power consumption Total production technological equipment notes. 1. do not fill in the table, if the results of the project monitoring report is submitted on the part of the year. 2. Indicate only if they are adjusted according to the climate of the weather. 3. Total energy consumption includes heating, thermal energy, heat energy, hot water, electricity consumption and consumption of production facilities. 3.2. consumption of thermal energy for heating and hot water heating using fuel of ____ ____ ____ ____ ____ ____ ____ ____ ____ CO2 emission factor of ____ ____ ____ ____ ____ ____ ___ January February March April May June July August September October November December total Average monthly total adjusted averages 20 ___.-20 ___. the total annual energy consumption, MWh specific energy consumption, kWh/m2 of CO2 emission volume, t * Pointer in the reporting year, the total energy consumption, MWh specific energy consumption, kWh/m2 of CO2 emission volume, t * difference (decrease or increase) the total energy consumption, MWh specific energy consumption, kWh/m2 of CO2 emission volume, t * note. * Calculated by multiplying the total heat consumption with CO2 emission factor. 3.3. the consumption of Heating hot water operation of the CO2 emission factor of ____ ____ ____ ____ ____ ____ ___ January February March April May June July August September October November December total Average monthly averages 20 __. -20 __. the total annual energy consumption, MWh specific energy consumption, kWh/m2 of CO2 emission volume, t * Pointer in the reporting year, the total energy consumption, MWh specific energy consumption, kWh/m2 of CO2 emission volume, t * difference (decrease or increase) the total energy consumption, MWh specific energy consumption, kWh/m2 of CO2 emission volume, t * note. * Calculated by multiplying the total heat consumption with CO2 emission factor. 3.4. Electrical consumption January February March April May June July August September October November December total Average monthly averages 20 __. -20 __. the total annual energy consumption, MWh specific energy consumption, kWh/m2 of CO2 emission volume, t * Pointer in the reporting year, the total energy consumption, MWh specific energy consumption, kWh/m2 of CO2 emission volume, t * difference (decrease or increase) the total energy consumption, MWh specific energy consumption, kWh/m2 of CO2 emission volume, t * note. * Calculated by multiplying the total heat consumption with CO2 emission factor. 3.5. energy consumption in the manufacturing technology facility 3.5.1. consumption of thermal energy production technologies that project activities carried out emissions of CO2 factor ____ ____ ____ ____ ____ ____ ___ January February March April May June July August September October November December total Average monthly averages 20 __. -20 __. the total annual energy consumption, CO2 emissions, MWh t * Pointer in the reporting year, the total energy consumption, CO2 emissions, MWh t * difference (decrease or increase) the total energy consumption, CO2 emissions, MWh t                            
Note the. * Calculated by multiplying the total heat consumption with CO2 emission factor. 3.5.2. the consumption of electricity production technologies that perform project activities January February March April May June July August September October November December total Average monthly averages 20 __. -20 __. the total annual energy consumption, CO2 emissions, MWh t * Pointer in the reporting year, the total energy consumption, CO2 emissions, MWh t * difference (decrease or increase) the total energy consumption, CO2 emissions, MWh t * note. * Calculated by multiplying the total heat consumption with CO2 emission factor. 3.5.3. the quantity of output January February March April May June July August September October November December total Average monthly averages 20 __. -20 __. year total production quantities (unit of measure) in the reporting year total production quantities (specify units) difference (decrease or increase) the total production quantity (State unit) 4. renewable energy investment (AER) (information about the renewable energy used in the production process or in the building. Fill in only if the project has made the transition to renewable energy) in the papildjaud have set up a way to PEEK, MW% of total energy consumption *......... "
   
Note the. The total energy consumption includes heat and power consumption. 5. Summary of the project outcome indicators achieved from renewable energy produced energy MWh/year ** total energy savings MWh/year of primary energy savings MWh/year of renewable energy produced papildjaud MW of calculated greenhouse gas reduction year t/year notes. 1. Pursuant to paragraph 10 of these rules. 2. Fill in when the project was implemented in the transition to renewable energy. 6. additional information (information that is useful to assess the progress of the project) 7. report prepared by first name, last name, position in the company or certificate number * * contact information (phone, email, address) date on which the report notes. 1. If the review report shall be completed by the applicant of the project staff responsible for the accounting and energy data management. 2. If the review report shall be completed by an independent expert in the field of energy efficiency. 8. the report was endorsed by the first name, last name, position in the company contact information (phone, email, address) date Signature Deputy Prime Minister, Minister of economy, education and Science Minister Karlis Šadursk a