Cabinet of Ministers Regulations No. 413 (No. 51, 11. ¤) Riga 1996 October 22, electricity supply and use Issued under Cabinet installations article 14 of the law 3 (I). General questions 1. terms used in the rules: 1. User: any legal or natural person who has concluded the contract for the supply of electricity to electricity consuming equipment or devices (hereinafter referred to as "the agreement"), which consume electricity, turning them into other forms of energy;
1.2. the supplier – legal or physical person in accordance with the Treaty, the supply of electricity to users;
1.3. Apakšlietotāj: a legal or natural person, the implementation of which is connected to a user in and which use electricity settled with this user;
1.4. Reseller: power user, which owns the power grid and who purchased electricity distributes other users;
1.5. the allowed load: the maximum load allowed for that users may be used in accordance with the Treaty;
1.6. the allowed maximum load: load size (half an hour, the average load) power system load peak time, which the user can enter in accordance with the contract;
1.7. the implementation of the home — home of the border line between suppliers and users;
1.8. the implementation of the service limit — the limit of the service between the supplier and the user;
1.9. electric load, user device, or the operation of the representative size equal to all in the capacity of the connected sum of the guideline, including the loss of the user's implementation capacity;
1.10. grid load peak time — the time interval in which the expected peak load energy a day;
1.11. the grid-power grid and district heating which act in concert and produced, transported, transform, distribute and consume electricity and heat energy;
1.12. the implementation — a number of interrelated electrical single tasks;
1.13. electrical equipment: any equipment for electricity generation, transformation, transmission, distribution, or consumption;
1.14. in-grid, which distributes electricity and transmission and consists of interconnected for power lines and electrical substations;
1.15. mains connection: vendor installed in part to supply electricity user implementation;
1.16. wiring: the low voltage wires, cables, elements of the strengthening, protection and construction that consists of the installation of a network or network;
1.17. the operational work, including equipment, maintenance, servicing and repair work;
1.18. komercuzskait measuring apparatus of electricity-measuring apparatus or apparatus of accounting system of electricity consumption in order to komercnorēķin;
1.19. kontroluzskait measuring apparatus of electric power — electricity consumption control meter or meter records system that users set up their own needs;
1.20. the final settlement: the settlement of the current period of electricity consumed and the allowed load;
1.21. the payment document: a document based on which the user shall be made;
1.22. the settlement periods, the period for which the user is making a settlement with the supplier;
1.23. connection fee: the fee for the requested User capacity and the user supply the required installation of the electricity grid, as well as for the modernisation of the existing electricity grid;
1.24 slēgpulksten-switch with a clock mechanism in the circuit to turn on and off for a specific time.
1.25. starpnorēķin — partial payment for the planned power consumption and load settlement period;
1.26. installed capacity: user-installed elektropatērētāj summary nominal capacity.
2. These rules shall be determined by the supplier and user relations, supply and use of electricity, as well as the right to settle on it.
3. Conditional on the supply and use of electricity is the Treaty and the Act on the service of the home and the guideline limits.
4. If the user enters into a contract with Apakšlietotāj, a user on Apakšlietotāj is the supplier's duties and responsibilities, but the Apakšlietotāj-user obligations and responsibilities.
5. The supplier's service guideline, repair, modernization and renewal of the supplier shall be made.
6. user guideline service, repair, modernization and renewal of the user made.
II. deployment Guideline 7. Vendor has the right to use the natural or legal person property (buildings, land), as well as rooms above and below the guideline for deployment, maintenance, and protection in accordance with the provisions of the Cabinet of Ministers on the use of immovable property rights aprobežojum with energy company external objects.
8. If the user or the supplier wants to deploy in the user property of the implementation move, to upgrade or extend, mutually agreed works. Costs shall be borne by the party that proposed changes to the existing implementation, unless otherwise agreed by the parties.
9. user using your property, which contains the implementation of the supplier must comply with the rules on the protection of the electricity grid.
III. User's guideline to supplier in 10. it is the responsibility of the supplier to supply electricity to all the users that are in the license area.
11. To install the new implementation, extend an existing implementation, or increase the capacity of existing or next user should contact the vendor to indicate the required electrical load size (also grid load peak time), the largest electric motor starting current and the place where electricity need fed.
12. the supplier in accordance with the Energy Regulatory Board approved methodology for calculating connection fees (tariff) size and the contract concluded with the user.
13. When installing the joint power grid connection, the implementation of several users who have submitted requests, the connection fee by mutual agreement in proportion to the requested capacity and the planned power consumption.

14. If a period of five years from the mains connection installation the day it is in use by another user or the implementation of connection capacity, this user requested power proportionately to compensate existing users to the expenditure related to the expansion and upgrading of the electricity grid.
15. the supplier, you receive a connection fee, guarantee the supply of electricity within the prescribed period after the conclusion of the contract and of the Act on the service of the home and the guideline borders signing.
16. If the supplier does not provide for the supply of electricity within the time specified in the agreement, the user has the right to demand from the supplier the contract penalty.
17. the newly installed, upgraded, or remontētaj user must comply with the implementation of the provisions of the guideline and technical norms.
18. The Assembly work in user guideline of installing new or the expansion of existing guideline, guideline as well as the modernisation, repair and inspections permitted: 18.1. legal entities established in the legislation have received license for such work;
18.2. the natural persons whose legal order have received a certificate of such work.
19. the work of the artist before the implementation of the connection of the user to submit the supplier: 19.1. object diagram of power supply;
19.2. the implementation of the inspection and measurement protocols;
19.3. the proof that the implementation is built according to the guideline in the regulations and technical norms and that voltage can be switched on. The acknowledgement must specify the work of artist license (certificate) data (number, date of issue, expiration date).
20. the supplier shall have the right to look at the implementation, the user had to verify its compliance with the guideline in the requirements of the rules.
21. the implementation of the user viewing the supplier imposes the responsibility for its operation.
22. user guideline to the supplier is allowed to make only electricity supplier.
23. Mains supplier by the connection fee is made by the user of the supplier of electricity to the property.
24. The supplier after upgrading or repair guideline should ensure the implementation of all the corresponding connected user before adding a guideline in.
25. At the supplier's request to permit the user to connect to his in the implementation of other users, as well as to modernize the power grid of the guideline the connection of other users or the capacity, if it is technically possible, without compromising the security of electricity supply. In this case, the user consents to the use of his/her implementation guideline of other users, the connection is right in line with the Energy Regulatory Board approved methodology to get part of the connection fees.
26. At the user's request, the supplier must inform and advise the user of the installation guideline, technical maintenance and safety and electricity use, accounting, billing and quality issues.
IV. Electricity supply and usage conditions 27. Electricity user in accordance with these terms and the contract between the supplier and the user. The conclusion of the contract without power supply and is not tolerated.
28. the Treaty by agreement of the parties can be certain additional conditions, which are not mentioned in these rules.
29. the supplier is responsible for the contractual quantity of electricity supply continuous load provision allowed the implementation of the user and possible prevention of damage, except in the following cases: 29.1. damage due to natural disasters;
29.2. these tasks cannot be performed by personnel of the User or third parties or unintentional actions identified;
3. power supply is limited or stopped according to the restriction or atslēgum's schedule due to the shortage of fuel or electricity, or vendor is found unacceptable overpressure guideline. In this case, the above should be warned that rule 43, paragraph users;
18.3. the vendor is carried out in a planned repair or upgrading. For the repair and modernisation of the electricity cut off in accordance with the provisions of paragraph 124.
30. If circumstances prevent damage and the nature of their rapid prevention, damage control time should not exceed 24 hours. In these cases a supplier using local means of communication as soon as possible, inform users about damage control and recovery utilities.
31. If the damage incurred as a result of natural disasters, covering a large number of users (more than 5000), the supplier shall inform users, using public information tools.
32. The user has the right to receive, upon request, full information about the prevention of damage and time.
33. In all cases the first utilities to restore that rule 43, paragraph users.
34. Electricity supply interruption or restriction of time and reasons determined by record in the supplier's operative log tracking and measuring of the power komercuzskait readings.
35. the supplier is not responsible for material inappropriate quality of electricity during the period in which the user does not meet the contractual power consumption mode or the user's power equipment or device changes power quality.
36. The supplier's obligations: the implementation of the home to 36.1 boundaries provide power quality, corresponding to the standard in force. If this requirement is not provided, the supplier must exercise the user electricity at a reduced rate in accordance with the Energy Regulatory Board approved methodology;
36.2.10 days to examine the user's application for the undelivered electricity or substandard, but that rule 43, paragraph User submissions — three days. If the application is warranted, the supplier until the next billing period must pay compensation to the user in accordance with the provisions of paragraph 128 and wrongly charged amount for substandard electrical power in accordance with the provisions of section 36.1.;
22.6. to take measures to optimise the use of electricity and reduce losses of power grids.

37. user responsibilities: 37.1. use electricity more efficiently, may use electricity-saving equipment, hardware, lighting techniques and schemes, and production technologies;
23.1. to comply with the permitted loads and power conditions of use;
37.3. at the supplier's request to develop and carry out control measures to reduce electrical load fuel, electricity deficit in his tolerable overload not guideline cases and to immediately meet the requirements of Suppliers to reduce electrical load or power consumption;
37.4. submit to the supplier within 10 days of the submission of the undelivered electricity or substandard supply of electricity.
38. The user has the right to request explanations from the vendor about the limit, atslēgum or other regulatory measures, impeding their performance in emergency situations.
39. The user is prohibited to use electricity in such a mode, which may cause unacceptable voltage quality changes.
40. the authorised load and power consumption limits for non-compliance with the Supplier shall have the right to disable a user's implementation to the extent necessary to determine the mode of consumption, but systematic irregularities, as well as when the user logs off to disable the restrictions necessary for electrical equipment, the supplier has the right to terminate a user's implementation of the grid.
41. A user without checking with the vendor of the implementation is allowed to connect to your network load limits allowed, provided this is not contrary to the provisions of paragraph 39.
V. special category users 42. Users that are not allowed in the electricity supply breaks, damage, disaster and repair time, i.e., that require enhanced security, be autonomous electricity supply emergency power sources or request the supplier in accordance with the provisions of the 11-14 the conditions listed in the installation of a spare power supply via the mains.
43. For users who want increased security of electricity supply, the meaning of these provisions demonstrate that the implementation of User installed in public administrations, national and public security institutions, banks, high-rise, city and village water supply and sewage equipment, boilers, district communications nodes, radio and television stations, all-electric transport, airports, hospitals, large animal and avian complex, incubators, freezers and greenhouse complex. The interruption of electricity supply may cause accidents with people, products of massive destruction, complex technological process, equipment for prolonged suspension damage, fire or destruction of animals and birds, and also cause harm to national and public security.
44. The supplier in accordance with the provisions of paragraph 42 should ensure that rule 43, paragraph users over a bilateral utilities two independent mutually reserved powerlines from independent power sources and, if required, to an autonomous equipment for emergency power.
45. The user internal grids must be created to ensure that particularly important utilities electricity consumers (fire-fighting devices, security alarm, emergency lighting), in the case of an emergency or during repair, atslēdzot to one of the input.
46. the renewal of the power supply must not exceed the switch hardware. If the user's guideline for the provision of power supply from two independent mutually reserved for power sources not installed automation utilities for switching, user the appropriate qualification personnel should provide utilities with the hand switch hardware.
47. If the power goes, this provision mentioned in paragraph 43 users takes place through two or more Suppliers belonging to the powerlines, then because of the planned repairs, no more than one power line disconnection and to warn the User about it beforehand.
48. If the contract is not fulfilled, the provisions referred to in paragraph 43 of the implementation of the user is disabled in accordance with the provisions of paragraph 123 and 125.
Vi. 49. Guideline Guideline Service service boundary between the user and the supplier determines the Act annexed to the Treaty, excluding this provision in paragraph 50, the limit can be determined in the contract.
50. The implementation of above 1000 V voltage of the implementation of the service boundary sets: 50.1. closed installations on overhead distribution lines — add to the caurvad of the isolator, but brīvgais distribution transformers in substations and installation on site piekarizolator or divider line terminals;
50.2. nourishing the cable and overhead line transmission on the connection contacts of the user the implementation side.
51. For this rule 50, paragraph contact position is responsible for the possessor or owner. Lines with voltage above 1000 V, which is a feeder lines, border down the line built from which branches off other possessor or owner of the line. On the realm of Terminal attachment position is responsible of the possessor or owner base.
52. The implementation of 1000 V voltage to the implementation of the service boundary sets: 52.1. overhead pipes — the first insulator at the building wall or roof racks (insulators are in the possession of the user or owner);
52.2. cable entry on the ievadkabeļ connector, contact the user side of the implementation;
52.3. user-owned cable input from the overhead lines on the cable attachment for overhead contact line, but if it is based on fuse, a cable connector on the fuse contacts;
52.4. piekarkabeļlīnij input connector of the ievadkabeļ-on contacts.
53. about this rule referred to in paragraph 52, the contact of the implementation situation on the border is the responsibility of service supplier. If there is a guideline on service boundaries, the State is responsible for the contact specified in the acts of the party.
54. the user in accordance with the provisions of Chapter VIII is responsible for the implementation of its technical condition and qualified service, according to a Cabinet guideline of technical operating and safety rules.

55. The user must establish a power supply circuit, to unload in accordance with atslēgum its schedule, the implementation of which is not permitted in the blackout, would not be turned off.
56. user — legal person — to ensure unfettered access to the supplier's authorized personnel of the user of the implementation work, presenting the service card, which contains the rights agreement and the control of electricity komercuzskait.
57. The supplier's authorized employees, presenting the service card, at any time of the day to access user's territory or premises-based implementation of the supplier, drive up the road and others the technical means to carry out repairs, inspections or operational shifting.
58. the user must immediately notify the supplier of Powerline stoppages, people and livestock, fire electric shock resulting from a defect, the guideline as well as the implementation of the supplier will be found to damage or real hazards.
59. the implementation of The user, which is made in transit (power supply user or reseller through another user's or company's supply mains) other users who have a contract with the supplier, and the key can only be connected with the permission of the Supplier.
60. the supplier is obliged to ensure the user's premises located in the territory of the supplier according to the guideline into a Cabinet guideline of technical operating and safety rules.
61. the supplier shall have the right at any time, in writing or verbally informing the users (the possessor or owner), accident prevention and emergency relief work to be placed on the implementation of the user area or premises.
62. the territory or premises accommodate supplier guideline planned repair and maintenance work, the supplier must be carried out at a time, in order not to disturb the user's economic activity and respect for real estate. About the supplier's planned work time to notify the user. After completing the work, the supplier must arrange the user area and the rooms located in the vendor's implementation, according to their previous condition.
63. If necessary, the supplier shall give the user information about licensed or certified individuals, which may conclude contracts for the service, the guideline and the guideline provides advice service, safety and use of electricity.
VII. 64. Electricity accounts to settle with the supplier of electricity, used in the implementation of the user must be set up in the vendor's registered komercuzskait of electricity measuring apparatus.
65. komercuzskait measuring apparatus of electricity on the housing mounting screws must be Latvian National standardisation and Metrology Center seals or seals of a izgatavotājrūpnīc, which is in the Republic of Latvia declared the document of compliance, but to the Terminal Board cover, seal of the supplier.
66. the Activities of the existing electricity meters permissible error must not exceed ± 5%, but it slēgpulksteņ, ± 15 min. 67. komercuzskait measuring apparatus of electricity on their own expense purchased and installed by the supplier, and they remain the property of the supplier. Mērmaiņ of their products purchased and installed by the user, and they remain the property of the User.
68. Daudztarif measuring apparatus of power komercuzskait and slēgpulksteņ are purchased and installed by the supplier, but the user of their service charge in rent.
69. The automated system of accounting for and control of its own resources can be purchased and installed by the user and by mutual agreement, put them in the supplier service.
70. komercuzskait measuring apparatus of electricity connection is correct and check the seal. The supplier also seals pirmsuzskait chain attachment, rindspail, spriegummaiņ separator drive socket handles and doors or barricades. The user must enable the technical capabilities of the sealing equipment.
71. If the fault of the user is missing or corrupted komercuzskait of electricity measuring apparatus, the user pays above the actual value of the measuring apparatus and the replacement costs and the supplier installed new instruments instead.
72. the supplier is responsible for the komercuzskait of the electricity meter verification and attestation of periodic deadlines set by the Latvian National Centre for standardisation and metrology. For timely inspection mērmaiņ is the responsibility of the user.
73. the supplier is obliged to harmonize with the user voltage disconnection of electricity measuring apparatus of komercuzskait replacement or chains. If no agreement can be reached, the power failure shall be made in accordance with the provisions of paragraph 124.
74. kontroluzskait measuring apparatus of electricity installation and service the user at their own expense.
75. Apakšlietotāj power komercuzskait's installation of the measuring apparatus by the user.
76. the user is responsible for the material on its premises and territory of the electricity meter of the komercuzskait, the pirmsuzskait chain and 65. these provisions and referred to in paragraph 70 of the seal. The user is also responsible for their premises and territory of the existing circuit elements, mērmaiņ, secondary circuit, the automated inventory system and the loop counter and their technical condition.
77. the supplier's transformer substation-electricity meter of the komercuzskait activities and conservation is the responsibility of the user, if the supplier has to give a user the right to make the appropriate transformer substation service.
78. The work related to the electricity meter of the komercuzskait to change the scheme, meter replacement or relocation, the user must obtain a vendor permit.
79. The repair time can be komercuzskait in electricity at a temporary scheme agreed with the supplier, or the amount of energy to determine the calculation.
80. komercuzskait electricity meter for damage, loose seals and potential meter measurements errors the user should immediately notify the supplier, but the supplier must carry out the necessary examination and resolve defects found.

VIII. monitoring of the supplier on the use of electricity users will be notified of the supplier implementation 81. employees have the right to request the user of the conditions laid down in the Treaty, operational discipline, as well as to make such changes to its service, the implementation and to facilitate the implementation of the activities of the safe.
82. If the user is an important implementation guideline of violations that may result in accidents or crashes, the supplier shall have the right, upon notice to the user, to act in accordance with the provisions of paragraph 123.
83. The user has the right month, except when the deadline is shorter, to submit objections against the supplier supplier's authorized personnel requirements in the field of electricity use.
84. the supplier of electricity usage monitoring does not release the user from the responsibility for the implementation of the belonging technical condition and operation.
IX. Billing for electricity spent 85. Supplier distributes electricity user in accordance with the law "on business regulation in energy" in the form prescribed in the approved tariffs.
86. For the correct application of electricity tariff and settlement arrangements is responsible the supplier.
87. the changes in the electricity tariff should inform the user not later than 30 days in advance.
88. the settlement of individual object of electricity consumed, which is not a common grid with the main business of the user shall be made after the electricity tariff is set in the corresponding user group.
89. The user shall determine the amount of electricity supplied to the electricity meter of the komercuzskait.
90. In certain cases (temporary or temporary additions) the amount of electricity supplied by agreement of both parties can determine the calculation. If the electricity meter of the komercuzskait is set to the implementation-home boundaries, then calculate the path loss of electricity power grids determined from the border to the implementation of the home electricity meter installation of komercuzskait site and added to their electricity supplied to the user quantity, or deducted from it.
91. If the electricity meter is installed in the komercuzskait user transformer secondary voltage side, then calculate the path down the losses in transformers and adds them to the user quantity of electricity delivered.
92. Power user in the grid, which supplies electricity to Apakšlietotāj, calculated in proportion to the consumption of electricity.
93. If the user is not at fault for the damage to the electricity meter in komercuzskait, the amount of electricity consumed is calculated, taking into account the average daily consumption of the previous billing period or the average daily consumption by tracking the recovery.
94. If objective reasons it is not possible to komercuzskait electricity immediately restored, the supplier and the user agree to a settlement order and komercuzskait of the renewal term.
95. If the user's electric load exceed the permitted load, the difference between the user pays for the entire billing period in accordance with the provisions of article 129.
96. If the user's actual electrical load is less than the allowed load, settlement shall be made after the permitted load.
97. Most of the actual user's allowed maximum load power system load peak time controls in accordance with the procedure laid down in the Treaty. Grid load peak time determined by the Latvian central control of energy systems. The permitted maximum load shall be carried out with the power of komercuzskait instruments, which is the peak catch or if the meter is not, the user of accounting specialty in the stamped or sealed by the supplier log every 30 minutes record the existing electricity meter readings of the komercuzskait grid load peak time.
98. If there are two or more komercuzskait of electricity meters, the maximum total permitted load the user control after checking with the vendor to install Adder or automated system of control and accountability. If a user power supply scheme does not allow to determine the actual total largest half-hour average load calculations and the permitted maximum load shall be carried out by the individual user's lines.
99. The user, within the time limit laid down in the Treaty and in order to notify the komercuzskait of electricity meter readings.
100. If the user does not notify the komercuzskait of electricity meter readings, the supplier is entitled to invoice a month after the previous month's consumption but future electricity consumption is calculated by the permitted load 24 hours working mode and conversion is not done.
101. The settlement of electricity should be supplied after payment documents shall supplier, or, in the case the self-service user.
102. The billing period, the amount of starpnorēķin and payments determined in the agreement and indicates the payment document.
103. the supplier shall have the right, in agreement with the user checkout starprēķin (advance invoice) for billing period for the planned spending amount of electricity and the allowed load.
104. If the supplier finds the use of electricity without the conclusion of the contract or without a registered Supplier of the measuring apparatus electricity measuring apparatus komercuzskait, damage or other irregularities, which have reduced the power consumption of the display size or create the possibility to use the free electricity, the supplier shall draw up the instrument. The Act shall be made if it is loose or damaged the electricity meter of the pirmsuzskait of electrical komercuzskait, spriegummaiņ camera or another 65 and 70 of these rules referred to in paragraph seals. The Act is in force, even if the user refuses to sign it.
105. In accordance with the provisions of the Act referred to in paragraph 104 of the conversion shall be made on the amount of electricity consumed in the light of the implementation in the installed power supply (input) capacity and use of time.
106. If it is not possible to determine precisely the illegal use of electricity, for the start of the last meter accepts checks or setup time, but no longer on the limitation period.
107. the illegal amount of electricity used for lighting, elektrosildierīc, apparatus and machines, to take into account the nominal capacity and the possible use of the time up to 24 hours per day.

108. illegal use of electricity, as well as in cases when a user repeatedly hindered access to the electricity meter of the komercuzskait, the vendor has the right to require the user to make changes to its implementation (installing a new drive, move the pirmsskaitītāj fuses, transfer komercuzskait counter in another location).
109. If the user fails to pay for the electricity consumption of the payment document within the time limit specified in the vendor charged penalties for late payment.
110. If the power supply is interrupted, it is renewed after the user has paid the debt, penalties for late payments and covered the expenses related to the disconnection and connection.
111. If the user repeatedly delays the payment for the amount of electricity consumed, the supplier is entitled to demand advance payment of the settlement period the average electricity consumption or the permanent deposit contributions.
112. If the user has the debt for electricity spent, it included the current payment amount as debt (penalty for late payment).
113. If the user has concluded with the supplier more contracts for various addresses hosted objects and if the user does not comply with the contract, the Supplier shall have the right to bring sanctions against the user of any other mutual agreements.
114. the supplier shall, not later than 10 days after receipt of the application, the user must check the starpnorēķin, or the final settlement of the accuracy of the measuring error of electrical komercuzskait display nolasījumo. If necessary, you should also check the counter. The inspection results must be communicated to the user. The application of error in a document or the payment of the electricity meter test komercuzskait need not release the user from the obligation to make payment within the prescribed period.
115. If found komercuzskait of electricity measuring apparatus malfunction or error in the settlement, used to adjust the power consumption of the entire billing period until the start of the electricity meter of the komercuzskait to operate properly, do not exceed the limitation period.
116. If power deficit due to the supplier under the contract the user unilaterally reduced the contract permitted maximum load size, then about this time should be reduced accordingly.
117. If you change taxes and tariffs, the supplier and the user regardless of the conditions of the contract must observe the laws and other regulations, later adjusting and supplementing existing agreements, or concluding new contracts.
118. electricity tariff changes, users must be recorded and notified to the supplier of electricity meter readings of the komercuzskait tariff changes daily.
119. If the user does not notify the komercuzskait of electricity meter readings, the supplier is entitled to invoice payment documents by the new electricity tariff for the period for which these figures are not announced.
120. If the electricity tariffs are designed for more options a user has rights according to load size allowed to choose his action appropriate. The supplier shall be obliged to advise the user of electricity tariffs.
121. If a user wants to terminate the contract, about seven days in advance, must notify the vendor must release the room and settled on the electricity used.
122. If the user, freeing up space, is not informed by the supplier, he is responsible for the payment of electricity consumed up to the conclusion of a new agreement with another user.
X. suspension of electricity supply to the supplier's rights 123. notice to all or part of the implementation of the user key in the following cases: If the implementation of 123.1. in is connected or not contract arbitrarily;
If the implementation is 123.2. connected without the supplier's registered komercuzskait of the electricity meter or they are arbitrarily removed, damaged or found other violations which have reduced consumption of electricity actually used display size or create the possibility to use electricity free of charge;
123.3. If the user within 10 days after the time limit laid down in the contract is not paid for electricity used or not done in accordance with the legislation, payments of illegal use of electricity on the electricity meter of the komercuzskait sound and their replacement or the renewal of the seals off the electricity meter of the komercuzskait and pirmsuzskait machines;
the implementation of 123.4. If condition or its unsatisfactory operation may result in a fire, accidents with people and livestock or interfere with other users ' power and have not taken the measures proposed by the supplier issue;
123.5. If the user takes place for reasons attributable to the decrease in the quality of electricity that interferes with other users ' or supplier's normal work elekroietaiš;
123.6. If the user prevents access to the supplier's authorized employees at the electricity meter of the komercuzskait to make the replacement, and user reviews, as well as guideline supplier guideline and repair;
123.7. damage control time if it is necessary to take emergency measures in the prevention of damage or accident consequences liquidation, giving the user off of the reasons;
123.8. If a user does not comply with the specific electricity consumption or the permitted load limits;
123.9. If the user does not comply with the conditions of the contract.
124. the electricity supply interruption due to its failure to the time to perform the scheduled jobs in the supplier, must warn the user not later than five days before. Three days after warning fails to reconcile the time off with the user, then the supplier independently determined this time by choosing it as outside of the user's work, and notify the user.
125. before the provisions referred to in paragraph 43 of the off-line user guideline (if contract conditions are met) for an upcoming trip to inform users.
126. the unfounded interruption of electricity supply, the supplier is responsible for the user in accordance with the provisions of paragraph 134.
XI. Indemnification 127. Supplier, in agreement with the user shall indemnify the user for direct material losses resulting from construction and operation of the guideline.

128. the supplier's fault not the user supplied electricity Supplier pays a user after triple tariff, but this provision 43 referred to in paragraph 6, by the users of the tariff. If it exceeds the damage prevention regulations, the time the supplier shall indemnify the user for damages caused to the user for the appropriate property for impairment, if they are higher than the established multiple tariffs. If the user has the option of switching the power supply on the reserve source of electrical power for their part that the user was able to ensure that the additional charge does not apply.
129. If the user does not comply with the rules laid down in the Treaty and the terms of use of electricity for peak exceeded the allowed size of user charge fees after a triple tariff for the entire billing period.
130. the fault of the supplier, the user does not supply the amount of electricity a day is calculated as the difference between the average daily consumption of the last settlement period but not exceeding the contractual and actual consumption of daily consumption. By mutual agreement is acceptable to the other does not calculate the amount of energy delivered. The supplier is not responsible for interruption of the electricity supply regulations 29 and referred 123 cases.
131. On the fault of the supplier, reseller not delivered electricity Supplier pays for Resellers to the extent that the reseller has paid the relevant users, but not more than the rules specified in paragraph 128.
132. If the fault of the Users there have been disturbances in electricity supply to other users, user is not guilty delivered electricity to the payment of an amount that the supplier paid to other users.
133. If a specific power consumption mode failure or internal implementation of the user failures caused by the implementation of the supplier's damage or malfunction caused by the supplier or material damage, the user shall indemnify the damages law.
134. If the supplier does not supply electricity to the staff user fault, the supplier pays after the 6 or the tariff losses caused to the user under the user created for the reduction of property if they are higher than the 6.
XII. User generating installations to the vendor in and use it without the vendor's user 135. permission forbidden to connect the device vendor generates in. The supplier shall issue the authorisation by mutual written agreement of the power plants business and pay the electricity grid.
136. The user generates the guards personnel, acting directly or through user-in parallel with the supplier's network, under contract to the supplier's controller operational management.
137. If a user has its own power plant, they are repaired by the supplier must be harmonised and the contract should be increased electricity consumption quantity and size of the load.
138. the surplus of electricity power stations (balance) that meet national standards for electricity quality, delivered to purchase in accordance with the Energy Regulatory Board established tariffs.
XIII. Relationship with resellers 139. Contract supplier with a reseller as with the user switch specifies a contract for Apakšlietotāj. Reseller contracts with their users, which in relation to the supplier's Apakšlietotāj.
140. Reseller is responsible for your technical guideline status, qualified service and continuous power supply Apakšlietotāj over their grids. Reseller and Apakšlietotāj and the guideline of the home service contract determines the boundaries of the Act added.
141. To connect their grids for the implementation of new Apakšlietotāj or increase the load of the reseller can only be authorised within the limits of the load prescribed in these provisions.
142. Apakšlietotāj of electricity reseller pays after the user group defined in the tariff.
XIV. Electricity supply and the conditions for the residents of this chapter 143. conditions apply to the use of electricity in residential buildings, apartments, cottage, garage, Garden House and farm buildings. The following applies to all of the previous sections these conditions if they are in accordance with the conditions laid down in this chapter.
144. Electricity is allowed after the conclusion of the contract, the power of the komercuzskait meter (the meter) installation, or after an agreement on the other conditions of payment (by installed capacity and the use of time).
145. Electricity use permitted load, do not exceed the electricity meter of the komercuzskait rated current (electricity measuring apparatus of komercuzskait current is indicated on the specifications plate. If the two numbers are given, then the nominal current size represents the first number, and the second indicates the maximum power value).
146. Increase the load to be allowed only at the supplier's authorization and connection fees.
147. the user without the permission of the supplier must not be connected to your implementation to the implementation of other users and the addition of electricity outside of your property.
148. komercuzskait measuring apparatus of electricity other than strāvmaiņ, at its own expense, procure and install the vendor, and they remain the property of the supplier.
149. Daudztarif electricity meter of the komercuzskait (day, night, peak-hour electricity consumption records) purchased and installed by the supplier, but the user on how to use them to pay the rent. If the user after coordination with the supplier has acquired the requirements of grid electricity meter of the daudztarif kamercuzskait, the supplier shall reimburse the value of measuring up to the vendor to purchase the measuring value.
150. If the fault of the user is missing or corrupted komercuzskait of electricity measuring apparatus, the user pays above the actual value of the measuring apparatus and the replacement costs and the supplier installed new instruments instead.

151. If the user does not commit these rules referred to in paragraph 150, the spent electricity consumption calculated taking into account the implementation of the lamps installed on the User, machine and machine power, and use the grid capacity, or supply of electricity to the end User.
152. komercuzskait measuring apparatus of electricity and electrical apparatus installed in priekšuzskait chains to komercuzskait of electricity measuring apparatus must be the vendor's seals.
153. Multi-family home, if home possessor or owner wants it, with the permission of the Vendor, you can set up a common electricity measuring apparatus of komercuzskait.
154. Multi-family apartments, which is one of the common komercuzskait of electricity measuring apparatus, the amount of electricity used between tenants on tenants ' mutual agreement.
155. Each tenant can have its own electricity meter of the kontroluzskait. It is supervised by the apartment owner.
156. On residential home sharing room guideline (enter and stand allocation, risers, stairs, yard, basement, attic, lifts, pumps, lighting and electric motor wiring) and technical service is responsible to its possessor or holder.
157. the wiring and electrical equipment properly and safely service the rules referred to in paragraph 143 facilities is the responsibility of the user and must have knowledge of safe service guideline. On the technical guideline, the examination and the inspection service you can conclude the contract with legal entities established in the legislation have received license for such work, and natural persons whose legal order have received appropriate certificate.
158. user responsibilities: 158.1. According to the electricity meter readings of the komercuzskait to pay bills for electricity used;
158.2. self-service case prescribed by the supplier to invoice issued by the supplier of the notebooks in the settlement. Invoice sample form imposed by the supplier;
158.3. to pay the Bill on the settlement of electricity consumed during the month following the billing period ends. Residential buildings, cottages, garages, garden sheds and outbuildings, the settlement period is the calendar month. Seasonal users and users whose consumption of electricity is low, with the permission of the Vendor may have specific time limits for payment, and the payment must be indicated in documents;
immediately notify 158.4 supplier for the electricity meter of the komercuzskait found the damage and loose or damaged the electricity meter of the komercuzskait and the pirmsuzskait chain seals;
158.5. If the user is changed or damaged the accounting scheme, electricity meter or seal of komercuzskait, to cover expenditure relating to the reconstruction and the attestation;
158.6. provide free access to the electricity meter of the komercuzskait. They may not be the blockage with belongings or furniture, they are not allowed to place any items;
158.7. If the user wants to terminate the contract, about seven days in advance should be notified to the supplier and must be settled on a used electricity;
158.8. before the busy apartment or room should show the liberation home possessor or owner the slip on the final settlement with a supplier. Home possessor or owner must make sure that the final settlement with the supplier and the billing records for electricity meter. If this is not done, the possessor or owner of the House is responsible for the material in the debt of the former User and billing tracking apparatus;
158.9. execute supplier authorised employee guidance on changes and the implementation of service Users in order to facilitate the safe operation of the rigs and contract commitments.
159. User rights: 159.1. to request information about the supplier of electricity, used in the course of payment, electricity tariffs and their use, as well as check and compare the komercuzskait of electricity meter readings;
to request a vendor 159.2. guideline from the user's territory or premises. This requirement to vendor technical capabilities must satisfy. Moving expenses shall be borne by the user;
to request a change 159.3. planned maintenance and operational guideline works, so that they do not interfere with the operation of the user and does not cause the material injury. Supplier capabilities, this requirement should be met;
request from the supplier 159.4. information about unexpected supply disruptions in electricity and its renewal.
160. The supplier's responsibilities: to deliver existing 160.1. the standard electricity to the guideline of the home;
160.2. as soon as possible — no longer than 24 hours (except in the case of natural disasters of nature lead to large-scale emergencies, for which the supplier shall inform the users using the company's information resources) — to prevent the disruption of electricity supply due to damage to the user vendor implementation;
160.3. ensure user and premises located in the territory of guideline maintenance Supplier under the Cabinet of Ministers of the guideline technical operating and safety rules;
160.4. the work of the user (the possessor or owner) on the territory or in rooms that accommodate the implementation of supplier-owned, tidy and the rooms and pay the direct material losses incurred in constructing or operating the implementation. On the extent of damage the parties agree. If the parties cannot agree, the dispute is settled in court;
160.5. provision of information and advice on the use of electricity, electricity tariff changes, their application and settlement arrangements;
160.6. not later than 10 days after a user submission on the error in the settlement or on the wrong komercuzskait of electricity meter readings or reading the receipt to verify the calculations and, if necessary, the power meter of komercuzskait. The inspection results must be communicated to the user. Application for verification of the meter or an error in the payment document shall not relieve the user from the obligation to make payment within the time limit laid down;

160.7. If you plan to make repairs, five days before the launch of the warn user about the disconnection of electricity.
161. the right of the supplier: 161.1. If the user does not follow the prescribed procedure for payment, require an advance payment of the settlement period the average pay scale or permanent deposit contributions;
161.2. calculate the penalty of 0.15% per day of delay;
161.3. use other physical or legal person property (buildings, land), as well as rooms above and below the guideline for deployment, maintenance, and protection in accordance with the provisions of the Cabinet of Ministers on the use of immovable property rights aprobežojum with energy company external objects;
161.4. prompt user for making changes to a given implementation (installing a new drive, move the pirmsskaitītāj fuses komercuzskait counter, transfer to another location), if the electricity used illegally, as well as if the user repeatedly to free access to the electricity meter of the komercuzskait;
161.5. notice to, the key from the user's supply voltage, if the implementation: 161.5.1. a month after the settlement period has not been paid for the used electricity;
161.5.2. implementation of arbitrarily connected to the electricity grid;
161.5.3. User has not paid the Bills for electricity used, damaged electricity measuring apparatus of komercuzskait and its replacement, the electricity meter of the komercuzskait or pirmsuzskait chain pulled the seal of electrical restoration;
161.5.4. the implementation of the condition can cause a crash, fire or accident;
161.5.5. User with your actions deliberately impede repeatedly notified employees of the supplier and access to electricity and the implementation of the instruments of komercuzskait, to control the use of electricity, as well as the guideline for Suppliers and repair;
161.5.6. exceeding the authorised load;
161.6. If a supplier has concluded several agreements on different addresses hosted objects and if the user does not comply with the contract, the supplier may bring sanctions against the user of any other mutual agreements.
162. The supplier's authorized employees have the right to komercuzskait of electricity measuring apparatus for control and display for reading access to the implementation from the user at. 7.00 to 23.00, presenting the service card, which outlines the following rights. If during this time, access to them is not possible, at the request of the supplier shall notify the meter control possible. Arbitrary use of electricity, for which the responsibility is laid down in accordance with the Latvian Criminal Code article 144.1 of the supplier's authorized employees have the right to apply to the law enforcement agencies to enter the User's premises at any time of day in the procedure prescribed by law.
163. If the electricity meter of the komercuzskait or the wrong error calculation and limitation period is not exceeded, the power consumption should be adjusted for all the settlement period from the time when the electricity meter of the komercuzskait started to work incorrectly.
164. If the supplier establishes that the User is using electricity without electricity meter of the komercuzskait or you have changed the power meter of schema komercuzskait or komercuzskait of the electricity meter is faulty or is damaged or missing komercuzskait of electricity measuring apparatus or electrical seals of pirmsuzskait or have committed other violations which have reduced power consumption display size or create the possibility to use the free electricity, the supplier shall be drawn up in two copies of the legislation one of which is issued to the user. The Act is in force, even if the user refuses to sign it. The supplier on the basis of the Act, made the conversion for the period from the last inspection carried out by the supplier.
165. If illegal use of electricity for purposes of wiring is installed where the supplier is an authorized employee of the previous visits was not able to detect, and not exceed the limitation period, the conversion shall be made to the user: 165.1. lighting devices, in accordance with this provision of the annex, taking into account their total installed capacity and service life;
165.2. the wall contacts — in the light of the actual situation of illegal use of electricity disclosure at the moment, but not less than one wall contact with the power of 600 W and use the time to 24 hours a day;
165.3. heating systems and electric motor — at their nominal capacity and the possible use of the time to 24 hours a day.
XV. concluding issues 166. adjustment of energy supply to the Council two months to approve the standard contracts for the supply of electricity. A model contract is drafted, pursuant to the law "On protection of consumer rights", articles 7 and 8 and the regulations.
167. If a user wants to connect to a vendor in the implementation, which started to mount up to the entry into force of these regulations, and if these jobs not done electroinstallation works of the artist, the licensed user the transitional period up to 1996 31 December should contact a licensed organization that is entitled to verify the compliance of the implementation guideline assembled the installation requirements of the rules and to issue that rule 19.3. the proof referred to in subparagraph.
The Prime Minister A. Economic Minister slice g. Coast Annex electric lighting duration residential home stairwells and corridors (hours a day) and those assimilated apartments rooms (24-hour) no PO box month 1 January February March 11 9 4 15 13 2 13 11 3 April 7 5 5.5 5 6 8.5 May June July 4 4 7 7 6 9 10 8 10 5 4 8 August September October November December 11 9 11 12 12 14 14.5 16.5 economic Minister G. Krasts