The Republic of Latvia Cabinet of Ministers of 13 January 1998 on the regulation. 7 Riga (2.4. ¤) … works in the road network in accordance with article 2 of the law on construction of the fourth part i. General questions 1. terms used in the rules: 1.1. road construction — construction of new roads or new road connections will a new route or partially using the existing route;
1.2. road maintenance, continuous technical and road traffic safety data to ensure compliance with the road maintenance standards;
1.3. the periodic maintenance of roads, regular road coverage, lands and klātņ drainage system design element, to maintain the quality of the driving and prevent traffic loads caused by wear and traffic loads and weather damage;
1.4. road būvprojektēš Ana — road construction feasibility of the development and construction of the development, coordination and approval;
1.5. the reconstruction of the road — highway construction package (with the previous structure demolition structure demolition or no prior), repair or replacement in order to restore the quality of the design, as well as road improvement and the profile parameter of bearing capacity of road elevation, for the application of the road traffic loads and adult increase the traffic's safety and comfort;
1.6. the road network — road civil design, construction and reconstruction, as well as the day-to-day maintenance and periodic maintenance;
1.7. Project Manager-customer's authorized representative on behalf of the Subscriber accepts the contractor performed and adopt decisions binding on the contractor for this work;
1.8. the national road service-authorised by the Ministry of transport's national company (the company), which manages state-owned road network, as well as municipal enterprises (companies), and home design, construction of roads, maintenance and other road related work overall supervision and guidance of the leadership.
2. These provisions are established in the job network, requirements for the production of road civil design, civil design, construction and acceptance into service, as well as requirements for national, municipal, company (companies) and domestic road maintenance.
3. These provisions shall not apply to the streets and roads in urban areas, except streets and roads that are included in the national road in the list.
II. the road network to do 4. Road network has carried out the following work: 4.1. road design;
4.2. road construction;
4.3. the road reconstruction;
4.4. maintenance of fo autoc;
4.5. the periodic maintenance of roads.
5. Road construction and reconstruction are carried out in accordance with the road construction plan, drawn up according to the rules laid down in chapters III and IV. Road construction feasibility and determine the composition of a construction contractor, depending on the complexity of the work and expected volume.
6. the national road maintenance is carried out in accordance with this annex and the provisions of the specified subscriber lists, regulations, following the close of the long term (up to five years) contracts for darbuzņēmum tolls region service. The size of the service region by the national road service proposal defines the traffic Ministry State Secretary.
7. responsible for periodic maintenance Autoc is carried out in accordance with the conditions of subscriber lists and specifications.
III. Road construction feasibility study 8. To identify the individual highway or motorway stage construction or reconstruction of economic utility, the Subscriber asks to develop road construction feasibility study (hereinafter reasons).
9. the rationale for determining the optimum variant of the route, the technical characteristics, the basic construction, construction or reconstruction of the main technical-economic indicators, road construction and capital efficiency and order.
10. grounds contains the following parts: 10.1 if the reasoning developed in the road: 10.1.1. road and estimated settlements between location and transport links analysis;
10.1.2. the motion and intensity expected prospects highways matter;
10.1.3. the road of feasibility assessment;
10.1.4. main technical parameters (road category, number of carriageways bar width and road pavement types) and justification (all variants);
10.1.5. major artificial structures and solutions;
10.1.6. seizures of land and reconciliation;
10.1.7. construction or reconstruction costs and the sequence and description;
10.1.8. calculation of economic efficiency of capital investment;
10.1.9. most effective road construction or reconstruction options choice;
10.1.10. the recommendation of the upstream design stage;
10.1.11. environmental assessment projects;
10.2. If the grounds developed man-made structures: 10.2.1. motion intensity and the foreseeable perspective structure meanings;
10.2.2. the structure of the technical-economic evaluation option;
10.2.3. the vj and have access to the main technical parameters and grounds (all variants);
10.2.4. the main volume of work;
10.2.5. seizures of land and reconciliation;
10.2.6. the calculation of economic efficiency of capital investment;
10.2.7. the most effective artificial housing construction or reconstruction options choice;
10.2.8. the ecological assessment projects;
10.2.9. the recommendation of the upstream design stage.
IV. the road of 11 civil design. the following road projects and their corresponding drawings: 11.1 General 11.1.1. start of civil design: the necessary documents and materials;
11.1.2. the explanatory memorandum;
11.2. feasibility of: 11.2.1. Description (if it is not designed for individual project);
11.2.2. technical economic indicators;
11.3. the route of the road: 11.3.1. preliminary work;
11.3.2. to dispose of land;
11.3.3. route reinforcements;
11.3.4. plan and longitudinal road;
11.3.5. inženierģeoloģisk research data;
11.4. the ground up ātn and road cover: 11.4.1. šķērsprofil construction;
11.4.2. cover design;
11.4.3. the drainage system;
11.5. artificial construction: 11.5.1. bridges and culverts;
11.5.2. wall support;
11.5.3. sound fences;
11.5.4. tunnels;
11.6. exit, junction, connection and crossings;
7.3. road equipment: 11.7.1. service objects;
11.7.2. bus stop;
11.7.3. road signs and horizontal and vertical signs;
11.7.4. crash barriers and signālstabiņ;
11.7.5. a pedestrian and velobraucēj paths;
11.8. building materials production site and specification;
7.4. the rebuilding of communications;
11.10. environmental protection measures: off road. environmental impact (current and the design situation);
11.10.2. conditioning of land;
11.11. list of works and their cost.
12. the road protection zone in those site connection project developed under the road owner or his authorised person issued the requirements of technical regulations.
13. the construction of the motorway technical solutions aligned with those national institutions legislation duly carry out monitoring and control, as well as with institutions, issued by the technical provisions for the design of the road.
14. The harmonized road construction and inspection (if you have road construction expertise) a construction developer Subscriber shall be submitted for review and approval.
15. If the works are not launched one year after the approval of the construction plan, the Subscriber of the review and approval of the project.
16. If the projected highway construction costs of more than four million dollars, the Minister shall submit a construction traffic for the approval of the Cabinet of Ministers.
17. Road route braces represents a schema that is: strengthening inām point 17.1. specification;
17.2. strengthening point of attraction for the route;
17.3. the legend of the shore.
18. the provisional list included rapper: rapper 18.1 of the route diagrams and descriptions;
18.2. rapper;
18.3. recognize the mess at the height of the rapper.
19. route shore Road scheme and temporary rapper list after checking the nature of the designer adds to the Act concerning the route highlights, and temporary storage and transfer of the rapper puts customer.
V. road construction 20. before commencement of the construction works, the contractor is authorized by the Ministry of transport of the body receives planning permission for the construction of the road and register it in the būvvald in the municipality in whose territory the road works. Road construction started without planning permission is prohibited.
21. in order to obtain a building permit for the construction of roads, reconstruction or periodic maintenance, contractor shall submit the following documents: 21.1. Requests;
21.2. a copy of the contract the construction works;
21.3. the legislation established a coherent movement organization scheme and construction organization design;
21.4. the contractor's order for certified public works Director in charge of adoption;
21.5. autoruzraudzīb journal, if the intended public works autoruzraudzīb.

22. in order to obtain a building permit for road maintenance, the contractor shall submit the following documents: 22.1;
22.2. a copy of the contract works.
23. Construction permit issuing building permits have the right to withdraw, if: 23.1. failure to comply with the regulatory requirements;
23.2. the contractor works out with deviations from the work list, construction, business contracts, standards or technical requirements and these derogations are not in tune with the Subscriber.
24. Standards and technical requirements in accordance with the works carried out, as well as inspection and measurement need down Subscriber. National road network in the works to be carried out of the standards and technical requirements determined by the national road service.
25. The works may also be carried out in accordance with the national road, or other customer service related technical requirements, if they are issued in writing and the national road service or other Subscriber ensure updates and registration laws.
26. prior to the commencement of the construction works shall provide to the customer and the contractor accepts the site. From the transfer and acceptance the laws that date to the building site in a commissioning date specified in the Act, the contractor shall be responsible for the site.
27. prior to the receipt of a building permit, if the customer requests it, the contractor shall submit the work in the project that contains the work schedule (calendar and network), carry out the work required technological operation list, technological operations required resources and cash flow schedule.
28. Work organisation and to be taken in accordance with the State Road service of the motion approved organization scheme.
29. prior to the receipt of a building permit, the contractor is insured for all risks to the customer provided.
30. If the works are interrupted, a contractor building site of the conservation measures taken and to the transfer and acceptance report shall be handed to the customer site.
31. Road construction, reconstruction and maintenance of the required periodic following of the works: 31.1. public works journal;
31.2. the special jobs magazine, which darbuzņēmum in the contract specified by the Subscriber;
31.3. autoruzraudzīb journal, if you autoruzraudzīb.
32. The road daily maintenance requires the following documents of the works: 32.1. technical condition of road survey journal;
32.2. winter service journal;
32.3. the work of the naming and acceptance.
33. A contractor uses a quality system to meet the customer's specific quality requirements.
34. the quality assurance system in accordance with the principals of the contractor before the conclusion of the Treaty of darbuzņēmum.
35. Construction materials to be used must be provided with the national road service recognized certificates.
36. Cover work types and their design samples of the customer determines contract darbuzņēmum.
37. If the customer and the contractor's representatives have not signed the previous cover work receipts, the next job started.
38. Road construction monitoring and State control traffic Ministry and other State institutions in accordance with the specific legislation that mandates and competence.
39. If the contract provides for darbuzņēmum for building site for more than a month, but pay for the works to be performed each month, work completed shall be adopted for each calendar month, in view of the quantity and quality of work. The accuracy of completed work amounts with your signature confirms būvuzraug.
40. upon contractor's quality of the submitted supporting documents, the project manager accepts the job runs and confirm payment documents submitted. Payment documents in the development of the national road service and approved by the Secretary of the Ministry of transport.
41. If any of the works carried out by contractors do not meet quality requirements, the contractor is entitled to suspend the works and require the contractor shall take the necessary measures for ensuring quality.
Vi. adoption of the Service Road 42. Site has been accepted into service with the date on which the Act has been approved for site acceptance.
43. the complete site (except the road routine maintenance objects), the Commission shall refer to the main contractor (General contractor).
44. the completed national road network site (except the road routine maintenance objects) adopted into the national road service created the Commission, which is made up of: 44.1. country road representative — the President of the Commission;
44.2. the municipal representative of the Union;
44.3. the construction of the author;
27.6. the national building;
27.7. the contractor.
45. in recent years, the finished * company (companies) and road objects (with the exception of road routine maintenance objects) adopted into the local government created the Commission that owns or within the territory of which the motorway. Making k from the Cabinet of Ministers of 29 July 1997, no. 258 of the provisions of the "regulations on the acceptance into service of the structure (the Latvian et seq of the LBN 301-97)" the person referred to in paragraph 11.
46. the Chairman of the Commission of the adoption by the Commission of the work start date and inform the contractor, the Commission's members and invited experts.
47. No later than five working days before the adoption of the Commission's work and to start building contractor būvuzraug shall be made available to the Commission the works, building and preparation of forms for site acceptance. These documents establish the national road service and approved by the Secretary of the Ministry of transport.
48. not later than two working days prior to the start of the work of the Commission invited the experts to transmit to the President of the Commission of the adoption of an opinion on the conformity of laws, site and closed darbuzņēmum of the requirements of the contract.
49. If the site does not comply with regulations, darbuzņēmum contract and the requirements set out in the documents, the site is in operation and will not be accepted after the specified deficiencies are recreated in the Commission. The corresponding expenditure shall be borne by the contractor.
50. If weather or other circumstances independent of the contractor does not complete the part of the works provided for in the contract, the site can be taken into operation: 50.1. If the vehicle is motion according to the category of roads;
50.2. If national road or road users can be injury or additional costs because the object is not complete.
51. the adoption of the legislation on the operation of the site the client confirms that fact within 10 working days after signing it. With the next day after the approval of the measure in question goes to the customer site, and responsibility.
52. the Site of the warranty period begins with the adoption of the Act on site commissioning date of acceptance.
53. The contractor shall issue the customer a guarantee Passport site. The guarantee pass samples develop a national road service and approved by the Secretary of the Ministry of transport.
54. The Act on the national road network site and acceptance of guarantee Passport stored in the national road service and has the right to become acquainted with them, as well as receive copies of them or extracts them to municipalities and būvvald whose administrative area the route passes through.
55. The legislation on local government, companies House (companies) and the adoption of the road into storage under the Cabinet of Ministers of 29 July 1997, no. 258 of the provisions of the "regulations on the acceptance into service of the structure (the Latvian et seq of the LBN 301-97)" in paragraph 18.
Prime Minister g. shore traffic Minister v. krištopans annex to the Cabinet of Ministers of 13 January 1998, regulations No 7 road routine maintenance i. Road, bridge, traffic carried and daily maintenance of culverts winter conditions make the installation direction 1, harvesting and storage.
2. treatment of the Road of snow and its removal: 2.1 road treatment of loose snow with cars and machines equipped with snow shovels;
2.2. treatment of road snow angle relative to the road axis;
2.3. provide moving outside the cloisters in the grade of the road;
2.4. autopaviljon, bus stops and the rest of the treatment of snow;
2.5. harvesting of snow from the bridge and traffic transmission vehicle parts and sidewalks;
2.6. the ramparts and trenches in the snow.
3. Snow shield installation and removal.
4. Better prevention of: 4.1 with sand and salt mixture;
4.2. with sand or šķembiņ;
4.3. with a wet salt;
4.4 with saline solution;
4.5. creating a rise in icing.
5. boats and Culverts defrosting.
6. Road survey.
7. the operational Road since.
II. The bridge traffic carried and the maintenance of culverts 8. Bridge pavement treatment from banks and washing.
9. Bridge drainage system cleaning.
10. the deformation joint care: 10.1 steel seam treatment of banks and regulēš na;
10.2. mastic joint cleaning and filling.
11. the bridge railing and damaged a barrier in the replacement, repair, cleaning and painting.

12. Bridge Cone, water regulatory structures and support wall maintenance: 12.1. washed up the mound;
12.2. the broken shore.
13. Bridge asphalt concrete pavement damage and prevention of cementbeton.
14. River bearing and flush culverts from banks.
15. Tiny defects in structures, culverts and bridges.
16. Culverts damaged stage and the end wall replacement.
III. Traffic organization 17. Bus stop, autopaviljon and recreation site maintenance: 17.1. treatment area;
17.2. installing new benches, bench painting and surface late replacement;
17.3. the platform edge painting.
18. Traffic sign maintenance: 18.1. road sign pole replacement (except for the replacement of the package);
18.2. the road marks the column and the base of the painting;
18.3. road signs and replacement on the pillar (except for the replacement of the package).
19. Roadway sign painting (other than a continuous complex painting).
20. Signālstabiņ washing, painting and replacement (except for the replacement of the package).
21. metal barrier washing, painting and replacement of the damaged barrier (except for the replacement of the package).
22. Concrete barrier washing and painting.
23. the rope barrier.
IV. Coverage of maintenance 24. Black cover maintenance: 24.1. aizliešan gap with bitumen or bitumen emulsion or fill with bitumen mastic;
24.2. hole: 24.2.1. fill with hot asphalt concrete using full o technology;
24.2.2. with hot asphalt concrete using part-time technology;
24.2.3. with black fragment and bitumen, using part-time technology;
24.2.4. to rubble and bitumen emulsion using part-time technology;
24.2.5. with bitumak or gray to Black Rock, st using part-time technology;
24.3. continuous repair hole in some locations of the failing blankets;
15.2. cover cleaning;
15.2. dawn eliminations;
24.6. the place of settlement kūkumojoš with sand and sand harvesting from kūkumojoš sites;
15.3. the surface roughness, if the surface of the aggregate area of not more than 1000 square metres to one kilometre;
15.4. iesēdum correction.
25. Gravel and crushed rock pavement maintenance: road klātņ 25.1. the gliding and profiling;
25.2. resurfacing, if uzvedam new material does not contain more than 500 cubic metres to one kilometre;
25.3. cover atputekļošan with bitumen emulsion or calcium chloride (CaCl2) solution.
V. road care 26. Elimination of Leachate.
27. The ditch cleaning and restoring the profile.
28. A quiet gliding, profiling, and repair.
29. Brush cutting grāvjo, slopes and road bars.
30. Grass mowing.
31. Greenery care: 31.1. soil care;
31.2. the destruction of pests;
31.3. adding greenery;
19.5. hedge trimming;
31.5. dry sawing other than those of the branch.
32. The Highway operational care.
Vi. monitoring of Road 33. Road survey.
34. Visual traffic records.
35. Road complex technical inventarizāc ij.