Labour Protection Requirements By Doing The Works

Original Language Title: Darba aizsardzības prasības, veicot būvdarbus

Subscribe to a Global-Regulation Premium Membership Today!

Key Benefits:

Subscribe Now for only USD$40 per month.
 
Cabinet of Ministers Regulations No. 92 in Riga 2003 25 February (pr. No. 11, § 1) labour protection requirements, making the works released under the Labour Protection Act article 25, paragraph 6 of the i. General questions 1. labour protection requirements, carrying out the works.
2. the following provisions apply to works (except the works related to mineral exploration and extraction): 2.1 the underground work;
2.2. the ground work (including installation of artificial ground structures);
2.3. external construction inženiertīkl;
2.4. concreting;
2.5. the specification;
2.6. the isolation and roofing;
2.7. the carpenters and būvgaldniek works;
2.8. folding (iepriekšizgatavot) Assembly and dismantling of buildings;
2.9. finishing work (such as plastering, tiling, painting, papering, Glazer's works);
2.10. internal sanitārtehnisk buildings and facilities network installation and Assembly;
2.11. the structure demolition and degradation;
2.12. būvremont;
2.13. reconstruction of buildings, renovation and restoration;
2.14. the maintenance, if it related to any of the work referred to in this paragraph;
2.15. drilling;
2.16. dredging and underwater work.
3. Works, which leads to increased risks to the safety and health of employees are: 3.1 work in which workers are exposed to the following risks: 3.1.1. apbēršan Earth nogruvumo with soil;
3.1.2. the flooding with water;
3.1.3. stall in water and drowning;
3.1.4. falling from 1.5 m and greater height;
3.2. work in which workers come into contact with harmful chemical or biological substances that pose a risk to the safety and health of workers or in accordance with the laws and regulations are subject to special surveillance;
3.3. where workers are exposed to the risk of exposure to ionizing radiation, and which shall be governed by the laws and regulations on the protection against radiation;
3.4. the high voltage Powerline protection zone;
3.5. the underground (such as wells, tunnels) to do;
3.6. work in which workers need the air delivery system;
3.7. the work that workers exposed to elevated atmospheric pressure (such as kesono);
3.8. blasting works;
3.9. the jobs associated with the building, būvelement or Assembly or disassembly of equipment, which are heavier than two tonnes.
4. Compliance with these rules is controlled by the State Labour Inspectorate and the national būvinspekcij.
 
II. Project Manager, labour protection coordinators, prior notice 5. The project is construction-related process consisting of coordinated and controlled set of developments, that is definitely a start and end time and goals reached, within the prescribed time and cost and resource framework.
6. the project manager is for project preparation, implementation and monitoring of compliance with the responsible person or entity acting on behalf of the client.
7. the defensive coordinator at the project preparation stage means any natural or legal person to whom the principal or supervisor has entrusted the rule referred to in paragraph 15, the exercise of responsibilities at the project preparation stage (referred to as the Coordinator of the draft).
8. the defensive coordinator during the execution of the project is a natural or legal person to whom the client or project supervisor has entrusted the rule referred to in paragraph 16 of the performance of his duties during the execution of the project (project coordinator).
9. If the works are performed on site by several contractors, contractor or the project supervisor shall appoint one or more coordinators for project preparation and project coordinators.
10. the preparation of the project coordinator and project coordinator appointment shall not relieve the contractor and project manager in respect of labour protection requirements.
11. The client or the project supervisor shall ensure that before the commencement of the construction works is job protection plan in accordance with the provisions of chapter IV.
12. The client or project supervisor is obliged before commencement of the construction works to send the State Labour Inspectorate for prior notification of the execution of work (annex) in one of the following cases: 12.1 if the intended duration of the works more than 30 working days and works at the same time employs more than 20 workers;
12.2. If the planned construction works exceeding 500 person-days (one or more of the total employed working days worked).
13. The prior notice of the execution of the information provided by the client or the project supervisor is placed on the construction site in a prominent position and, if necessary, to keep updated.
 
III. Project preparation and execution phases, the Coordinator duties 14. Project Manager or the client who shall perform the duties of the supervisor, the different project preparation and execution stages followed labour protection laws for the protection laid down in the General principles, in particular in the following cases: for 14.1. deciding on the architecture, the technical and organizational aspects, planning work or work stages that will take place simultaneously or in sequence;
8.8. calculation of the volume of the works to be carried out at the same time, and each stage requires time and taking into account the health plan and all the documents drawn up or updated in accordance with this rule 15.2., 15.3 and 16.3.
15. Project preparation the Coordinator has the following responsibilities: 15.1 coordinate with project managers, contractors and self-employed this provision set out in point 14 requirements;
15.2. in accordance with the provisions of chapter IV, to develop a work plan of protection, including measures relating to the provisions referred to in paragraph 3 of the works;
15.3. to prepare appropriate documentation, including information about job protection requirements.
16. Project Coordinator has the following responsibilities: coordinate employment 16.1. protection the General principles, on a technical or organisational measures, planning of different works simultaneously or sequentially and calculate the time required for their implementation;
16.2. to coordinate and monitor the work of the protection plan and project works to ensure that contractors and self-employed follow that rule 26 requirements set out in paragraph and job protection plan;
16.3. to make the necessary amendments to the plan for the protection and the rule 15.3. the documentation referred to, taking into account the work and a little luck at the construction site and the construction plan for a change (if any have been made);
16.4. to organize the contractor (the contractor, which is also the same construction site work in succession), subject to their action to protect workers and prevent accidents at work and occupational diseases, to ensure the exchange of information in accordance with the Labour Protection Act requirements and, if necessary, engage a self-employed;
16.5. subject to contractor operating measures and examine them;
16.6. to take the necessary measures to prevent unauthorised persons stay at the construction site.
 
IV. Labour protection plan 17. Labour protection plans, to ensure that all members of the construction with the necessary health information.
18. Labour protection plan shall include specific information, which is necessary to ensure the protection by the works.
19. Employment protection plans to start construction work. If a change in circumstances, the project plan review. Project Coordinator familiar with job protection plan, before the contractor concerned is attached.
20. the work plan for the development of protection has two stages: the first stage-20.1. project preparation stage include measures from the beginning to the development of the project contractor selection;
20.2. the second stage — the stage of implementation of the project includes measures during the works.
21. Labour protection plans at the project preparation stage may develop as a separate document or incorporate as a separate chapter in the technical construction works in the part of the Organization, including the following information: 21.1. building site in the area for the adjacent land use: 21.1.1. buildings and factories, which restricts the execution of work;
21.1.2. surface and underground utilities;
21.1.3. traffic routes and related limitations (for example, accessing a fire features, material delivery and vehicle parking time restrictions);
21.1.4. construction with materials harmful to health or fragile and unstable structures and demolition or conversion to require specific protection measures;
21.1.5. bottom characteristics (indicate the composition, contamination, stability, old shafts or other underground obstacles);
21.1.6. nojaucam structure of the existence of the technical documentation (can be customer information submitted);
21.2. the projects contained in the risk factors, of which it is not possible to avoid, as well as the relevant labour protection measures;
21.3. detailed recommendations on measures for the protection of the explanation of the contractor is entitled to request it;
21.4. the possible risks that may arise during the construction process of material harmful to health and the necessary information on the laws and other regulatory requirements;
13.4. information on the proposed building site area: 21.5.1. access to construction sites and evacuation routes;
21.5.2. the temporary structure and disposition of individual work stations;

21.5.3. the building materials area of loading and unloading, warehouse;
21.5.4. transport and pedestrian paths;
21.5.5. the driveway and the passage of fire-fighting vehicles;
21.6. the construction site work to be undertaken the harmonisation of measures and the exchange of relevant information between the client, project managers, contractors and self-employed workers;
21.7. measures in accordance with the provisions referred to in paragraph 3 of the works.
22. the work plan for the protection of the project completion stage may be integrated in the works on the project, supported by the following: 22.1 the Organisation for the protection of the General arrangements on the construction site;
22.2. changes that occur during the execution of the works: 22.2.1. work plans and schedules;
22.2.2. materials, building materials, technological machinery and equipment nomenclature and delivery schedules;
22.2.3. the labour movement and the main būvmašīn working schedules.
23. If the required information is included in other documents or construction plan of construction drawings, work protection plan may be the only indication of the place where you can find the information.
24. significant Public or technically complex constructions projects job protection plan may be incomplete. In the case referred to in the plan of implementation of the project include: 24.1. the order in which work is organised by the General management of protection;
24.2. General safety requirements for construction site;
24.3. for an explanation of the relevant information available at the project preparation stage, as well as the further use and control;
15.2. the order in which changes made to the project include and incorporate the protection plan, a separate phase of the project, in the works or other works in the technological performance of the document.
 
V. obligations of Contractor 25. In order to preserve employee safety and health, contractor: 25.1. According to the construction site and the nature of the work, working conditions and risk factors take measures to ensure compliance with the employment provisions of the VI, VII and VIII to the requirements of the Department;
25.2. comply with the project preparation and execution of the project coordinator, the Coordinator's instructions.
26. in carrying out the works, the contractor shall take account of the work set out in the law on protection of the General principles of protection, also in relation to the delimitation of the construction site: 26.1. and cleanliness and order it;
26.2. the workplace of choice. Defining the movement and movement routes and areas for, take into account the need for free access to every place of work;
26.3. using various materials;
26.4. machinery, equipment and installation of the technical crew and checks entering into service, as well as regular checks during operation to prevent the defects that pose a risk to the safety and health of employees;
26.5. areas for the storage of various materials and marking of installation (especially hazardous materials and substances);
16.5. the use of hazardous materials and substances collection and transfers;
16.6. waste and debris storage, collection, transfer and disposal;
16.7. the various types of work or work stages in Exchange for the due date based on the progress of work on the construction site;
26.9. cooperation with self-employment;
26.10. cooperation and coordination of work with other industrial plants in or near the construction site.
27. The contractor shall provide employees or their fiduciaries understand information about all measures under the Labour Protection Act requirements will be carried out in a construction site worker safety and health.
28. The contractor shall consult workers or their confidence and to ensure the participation of all the employees occupational safety and health issues, especially if they are related to the protection of health, through the works.
 
Vi. Labour protection requirements in job placements for construction sites 29. Stability and solidity: 29.1. material, equipment and any component which, when moving in, present a risk to workers ' safety and health, is stable and secure;
29.2. access to surfaces that are made from flimsy materials is not permitted without proper equipment or AIDS that allow you to safely perform the job.
30. Energy distribution installations (installations, equipment and networks) be so arranged as to: 30.1. avoid the risk of fire or explosion;
30.2. any risk of getting electric shock caused by direct or indirect contact with energy distribution installations;
30.3. equipment and protection devices in construction and choice to take into account the type and power of the energy distributed, working conditions and the competence of persons having access to energy distribution installations.
31. Evacuation paths, routes and exits shall be provided subject to the following requirements: 31.1. escape routes, routes and exits are free and provide the fastest into the safe and secure as possible evacuation from all active jobs, if there is a serious and immediate danger;
31.2. escape route, routes and exits the number, location and size are determined, taking into account the construction sites, buildings, structures and premises (including the construction of temporary structures, shelters), they use the existing equipment and sizes, as well as the maximum potential number of persons present;
31.3. escape routes, routes and exits are marked according to the laws and requirements of the safety of use of the marks;
19.5. escape routes, routes and exits requiring illumination provides enough power for emergency lighting where the light would be damaged.
32. the notification of Fire, fire control systems and fire-extinguishing means shall meet the following requirements: 32.1. in view of the construction site, buildings and premises, room sizes, and use of, any equipment, material used in physical and chemical properties, as well as the maximum number of persons present, jobs provided with appropriate fire-fighting equipment in sufficient quantity and, if necessary, with fire detection equipment and alarm systems;
32.2. the fire-fighting equipment, fire alarm devices and alarm systems regularly checked and maintained;
32.3. periodic checks and appropriate training employed in accordance with the legislation on fire safety requirements;
32.4. extinguishing media are easy and simple to use, and its location is indicated by signs that are placed according to the laws and regulations on the use of safety signs at places of work and fire safety.
33. The ventilation complies with the following requirements: 33.1. workplaces provide sufficient fresh air supply, taking into account the nature of the work and the workers ' physical load;
33.2. the ventilation system is maintained, regularly cleaned and tested for their effectiveness;
33.3. the mechanical ventilation system and air conditioning equipment must not cause draughts that pose a risk to the safety and health of workers;
33.4. If the employer or employee trustee determines that it is necessary to protect the health of employees, equipment ventilation control system, which detects distortions in the operation of the ventilation system;
33.5. are removed without delay work process wastes that pollute the air, causing serious and immediate danger.
34. protection against noise or to harmful external influences: 34.1. employees must not be exposed to harmful levels of noise, vibration or harmful external influences (e.g. gases, vapours, dust);
21.3. where workers are required to enter an area that contains flammable material or where the air can be toxic, harmful substances, or not have enough oxygen, the area is being monitored so as to prevent a serious and immediate danger;
21.3. workers must not be increased danger in the area is not closed ensure the oxygen or air supply.
35. The temperature in the workplace is an appropriate working methods and employed the physical load.
36. Natural and artificial jobs, space and traffic routes shall meet the following illumination requirements: 36.1. jobs, rooms and traffic routes are sufficiently provided with natural light and equipped with artificial lighting, so that the total lighting would be adequate to the safety and health of employees;
36.2. If necessary, portable light sources that are protected against impact must be used;
36.3. artificial lighting may not change or affect the tone or indications;
36.4. lighting installations for rooms, workstations and traffic routes are placed so that workers are not exposed to the risk of accidents;
22.7. workstations, rooms and traffic routes with artificial lighting, if damaged due to artificial lighting can have serious and direct danger shall be provided with emergency lighting of adequate intensity.
37. doors and gates shall be subject to the following requirements: 37.1. sliding door fitted with a safety device to prevent them from being derailed and falling over;
37.2. doors and gates opening upwards, be equipped with a mechanism that prevents it from falling down;
37.3. doors and gates along escape routes, routes and exits, represents the appropriate laws and regulations for the use of safety signs at places of work;

23.2. If it is not possible to provide a pedestrian flow through the gate, the door is installed in the vehicle for pedestrians in the vicinity of the gate;
37.5. mechanical doors and Gates does not pose a risk to the safety and health of workers, and the doors and gates are equipped with easily visible and accessible emergency devices that allow them to be opened by hand, if energy supplies due to the lack of doors and gates do not open automatically.
38. traffic routes and areas where you may be at risk to the life or health of employees (danger zone) shall, subject to the following requirements: 38.1. traffic routes, including stairs, fixed catwalks as well as loading and unloading platforms and ramps can be accessed easily, safely and in an appropriate way, without risk to workers who work near them;
38.2. the pedestrian and traffic routes and size matches the number of users and the intended operations;
38.3. If traffic routes used by vehicles and pedestrians, is equipped with a wide enough safety zone or all pedestrians are provided with appropriate protective devices;
23.9. traffic routes clearly marked and labeled, as well as monitor and regularly groomed;
38.5. traffic routes situated at a sufficient distance from doors, gates, passage rooms, walkways, hallways and landing;
24.0. traffic routes and at the door, and no obstacles are used without delay at any time;
If the site is dangerous in 36.6. areas where access is limited, they confined or be equipped with appropriate devices to prevent unauthorised persons from entering dangerous areas;
24.1. danger areas workers workers are provided with protective equipment;
24.2. danger areas are clearly indicated and labelled according to the laws and regulations on the use of safety signs at places of work.
39. Loading and unloading platform and ramp shall be subject to the following requirements: 24.3. they meet size and transported cargo load;
24.4. they shall have one or more egress;
39.3. loading and unloading ramp is equipped so as to protect employees from falling.
40. The employment is broad enough to require the placement of equipment or devices employed by doing the work, to move freely.
41. First aid: 41.1. the contractor shall provide first aid and the opportunity at any time to call a staff that is trained in first aid;
41.2. the contractor shall provide the capability to accident victims or suddenly saslimušo repairing delivered where they are being given emergency medical aid;
41.3. depending on the nature of the activity, the amount of work and working environment risk equipment one or more first aid rooms, equipped with first aid equipment and devices and provides easy access to is with the stretcher;
25.7. first-aid rooms are clearly labeled under the laws and regulations on the use of safety signs at places of work;
25.8. all work places where working conditions require it, are available in the first aid kit, and their location is clearly indicated;
25.8. emergency medical and rescue services addresses and telephone numbers are indicated in a clearly visible location.
42. Changing rooms and lockers lockers shall be arranged, subject to the following requirements: 42.1. changing rooms shall be provided if the work process for a special wearing work clothes and health or decency reasons cannot require that the workers cannot in another place;
26.2. changing facilities are readily available, sufficiently spacious, equipped with a lockable cupboards, seats and devices that let workers, if necessary, to dry his working and personal clothing and accessories;
26.3. men and women shall be provided with separate changing rooms or, if this is not possible, ensure the use of separate changing rooms for men and women;
26.3. If working conditions are associated with harmful influences (such as harmful substances, humidity, dirt), employed a personal and working clothing shall be provided for individual cabinets;
26.4. If installation of the workstations is not required, each employee provided with a lockable place to store personal clothing and belongings.
43. The shower, sink and toilet shall be provided subject to the following requirements: 43.1. shower room shall be provided, if necessary, due to the work to be carried out, as well as determined by the employer or the employee trust. If possible, shower rooms shall be provided separately for men and women. If this is not possible, ensure the use of the shower room separately for men and women;
43.2. the shower room is wide enough for workers to be washed according to the hygiene requirements and without disrupting each other;
43.3. the showers have hot and cold water;
43.4. If working conditions shower room is not required, working space shall be provided in the vicinity of the workstations and the adequate number of washbasins with running water (if necessary, also with hot water);
43.5. separate wash basin shall be provided for men and women, or, if this is not possible, ensure the use of separate washbasins for men and women;
27.1. where showers or washbasins are installed separately from the changing rooms, provides easy to navigate from one premises in others;
27.2. in view of the number of people employed, shall be provided with sufficient number of lavatories and washbasins with personal hygiene products (toilet paper, SOAP, towel or other hand draining devices);
43.8. toilet and sinks shall be provided close to the work and rest rooms, changing rooms and shower rooms;
43.9. separate toilets shall be provided for men and women, or, if this is not possible, ensure the use of separate toilets for men and women.
44. in rest rooms and accommodation shall be provided, subject to the following requirements: 44.1. when it is necessary to the safety and health of employees for protection, taking into account the nature of the work performed and the number of persons employed at the construction site, as well as if the site is located far away from the populated areas of residence, employed or underemployed provides a convenient, accessible rest rooms that have adequate number of tables and chairs, and (or) with living quarters;
44.2. If it is not possible to get adequate rest room, employees provided with other spaces where they can stay during breaks;
27.5. If living space be used constantly, rest room and enough lavatories, wash basins and shower room. Living space fitted with beds, cupboards, tables and seats with backs for the number of employees, as well as, if necessary, be distributed separately for men and women.
45. pregnant women employees, women who have recently given birth to one year, and women who are breastfeeding throughout the lactation period provides the opportunity to lie down and rest in appropriate conditions.
46. Additional requirements: 46.1. building site and the surrounding area on the border or fence placed in a clearly visible and identifiable reference for carrying out the works;
46.2. the construction site employees provided with drinking water and, if possible, with one non-alcoholic drink in work rooms and work space in the vicinity;
46.3. the workers are likely to eat and, if necessary, Cook the food in suitable conditions.
 
VII. additional requirements for the protection of working places for indoor Rooms and 47. structure of stability corresponds to the nature of their use.
48. The escape door shall be provided subject to the following requirements: 29.9. evacuation doors open outwards;
48.2. escape doors must not be locked or secure. Ensure that any person who needs to use them in an emergency, can be opened easily and without delay;
48.3. the sliding doors and revolving doors the use of escape door.
49. The temperature in rest rooms, supervising the staff rooms, sanitary facilities, canteens and first aid rooms must correspond to the nature of use.
50. Windows, skylights and glass partitions equipped to prevent excessive of sunlight, having regard to the nature of the work and the use of the room.
51. Space the floor, walls and ceiling meets the following requirements: 51.1. floors must not be dangerous bumps, holes or slopes, they are stable and not slippery;
51.2. floors, walls and ceilings indoors is easy to clean or maintain appropriate hygiene requirements;
51.3. the transparent or transparent walls, also continuous glass partitions in work rooms and traffic routes in the vicinity are clearly marked, made of safety material or enclosed so as to prevent the possibility of workers uzgrūst to walls or be injured when the wall breaks down into.
52. Windows, skylights and ventilation hatches shall, subject to the following requirements: 52.1. employees have the option of safe to open, close, adjust or secure Windows, skylights and ventilation hatches;
52.2. open Windows, skylights or ventilation hatches do not present a risk to the safety and health of workers;
52.3. Windows and skylights are equipped with equipment that allows them to be cleaned without risk to the workers who clean the Windows or nearby.
53. doors and gates shall be subject to the following requirements: door and gate 53.1. the position, number and dimensions, as well as material from as they produced, the nature and use of the premises;
53.2. revolving doors and gate are transparent or have a transparent elements;

53.3. transparent doors are marked in such a height that the marking should be visible;
53.4. doors and gates transparent or transparent parts, made of durable material and therefore not present a risk to workers ' safety and health are protected from breaking.
54. traffic routes are clearly marked, given the space and the use of the existing equipment.
55. The escalator and running to work safely, they are fitted with safety devices and easily visible and accessible emergency devices.
56. Working space is wide enough for workers to perform the work and avoid risk.
 
VIII. additional requirements for the protection of working places for outdoor mobile or stationary 57. job located in height or depth, creates a stable and sustainable, taking into account: the number of people employed in 57.1.;
57.2. maximum load, what they have to endure, as well as the load distribution;
57.3. external environmental factors to which they may be subjected.
58. If the rules referred to in paragraph 57 of job design, support or other elements of the device is not stable, it probably strengthened by appropriate means, in order to avoid any unexpected or sudden all the jobs or part of the motion.
59. the job stability and persistence of regular checks even after the change of place of work location height or depth.
60. The construction site on-site energy distribution installations are regularly inspected and maintained, paying extra attention to for installations subject to external influences.
61. before the installation of the respective construction site area on-site energy distribution installations, check and be clearly marked.
62. Above-ground power lines move outside the building site or disconnected from voltage, or, if this is not possible, shall be aizsargnožogojum with the indications outlined them from vehicles and other mechanisms.
63. where a construction site vehicles move under power lines, put the warning signs and hanging guard.
64. Employees are protected from adverse atmospheric influences.
65. protection against falling objects: 65.1. if technically possible, employees from falling objects protected by the detection methods (such as aizsargtīkl, covered pedestrian routes);
65.2. materials and equipment placed or located so as to prevent collapsing or overturning;
65.3. where necessary, the construction sites shall be provided with a roof covered passageways or prevent access to danger zones.
66. protection against falls from a height: 66.1. fall from height prevents with suitable equipment, using durable mobile platforms with high enough up and side aizsargnožogojum, which consists of a main handrail and an intermediate handrail or an equivalent equipment;
66.2. working height must be carried out only with appropriate equipment or using collective protection features (such as scaffolding, platforms, safety nets). If the equipment is not possible due to the nature of the work, workers ensure safe access to the working place and provided with personal protective equipment (safety ropes, belts or other anchoring safety devices).
67. requirements for scaffolding, ladders, stairs and working platforms: 67.1. scaffolds shall be installed and maintained to prevent decay and random moving;
67.2. work platforms, gangways and scaffolding stairways fitted, they choose, they provide and used in such a way as to prevent persons falling opportunities and protect them from falling objects;
67.3. employer posted employee who has the necessary knowledge and experience in the relevant field, check the scaffolding: 67.3.1. before commissioning;
67.3.2. during operation, periodically, in accordance with the instructions of the manufacturer of the scaffolding attached;
67.3.3. after the transfer, conversion, storm, earthquake, or other circumstances that could affect the strength or stability of the scaffolding, and if they are not used for a longer period of time;
41.9. staircase is strong enough and maintained in working order;
67.5. stairs at suitable locations and used only for the intended purpose.
68. the requirements for lifting equipment: 68.1. all lifting appliances and equipment, components, fasteners and supports are: properly made, 68.1.1. correctly installed, sufficient strength and used only for the intended purpose;
68.1.2. maintained in working order;
68.1.3. regularly tested and inspected in accordance with the law;
68.2. with lifting equipment and the equipment may work only by qualified workers who are trained in the use of the equipment;
68.3. hoisting equipment and equipment clearly indicates the maximum load values;
68.4. lifting equipment and equipment only allowed to use it for its intended purpose.
69. requirements for excavation and ground movement: 69.1. vehicles material handling and ground work for mechanisms: 69.1.1. constructed according to safety requirements, as well as builds and be equipped, taking into account the requirements of ergonomics;
69.1.2. maintain in working order;
69.1.3. used only for work for which they are intended;
EB 69.2. drivers and machine operators are specially trained in;
69.3. is taken security measures to prevent the falling of vehicles and mechanisms būvbedr, trench excavation or water;
69.4. If necessary, the vehicles and machinery shall be fitted with special structures that protect them, overturning the operating staff of the compression, as well as from falling objects.
70. in its installations, equipment and tools: 70.1. installations, equipment and tools, including hand tools (powered with or without wire): 70.1.1. designed and manufactured taking into account the requirements of ergonomics;
70.1.2. maintain in working order;
70.1.3. used only for its intended purpose;
70.2. workers who use installations, equipment and tools, including hand tools (powered and with or without wire), is specially trained;
70.3. installation and equipment operating in high pressure conditions, regularly checks according to the normative requirements.
71. requirements for ground and underground work, as well as jobs in the UK and in tunnels: 71.1. Wells, tunnels or underground, take appropriate protective measures: 71.1.1. use appropriate props or reinforce edges, walls or slopes;
71.1.2. eliminate risks associated with employment, materials or objects, as well as with the fall of the flooding;
71.1.3. ensure adequate ventilation in all work places, to air in the working environment would not be dangerous and harmful to the health of employees;
71.1.4. provides opportunities for workers to reach safety in the fire or water leaks in the case, and in other dangerous situations;
71.2. before the beginning of the excavation shall take measures to identify and reduce to a minimum the risks associated with underground cables and other distribution systems;
71.3. the safe paths to be excavated sites and from them;
71.4. excavated soil, building materials and vehicles located at a safe distance from the būvbedr and, if necessary, of workers ' safety and health, with the appropriate aizsargnožogojum.
72. If construction or dismantling construction (demolition) is dangerous: 72.1. take necessary safety precautions and use appropriate work practices;
72.2. work plan and perform only the work Manager or other designated employees of the employer in the surveillance, which has the necessary knowledge and experience in the relevant field.
73. Requirements for working with metal or concrete frameworks, shutterings and heavy prefabricated components: 73.1. metal or concrete frameworks and their components, shutterings, finished components or temporary support, and support structures set up and break down the only working driver or other designated employees of the employer in the surveillance, which has the necessary knowledge and experience in the field in question;
73.2. take appropriate security measures to protect employees from the risk posed by the instability of the structure or insufficient strength;
73.3. template, temporary support and support structures are manufactured, installed and maintained so as to safely withstand the work process for stresses and strains.
74. the requirements for the use of caissons: 74.1. all the caissons are: 74.1.1. made of appropriate and sufficient strength of materials;
74.1.2. equipped to shelter workers who could, if the water flow to the caissons or material;
74.2. caissons are manufactured, installed, rebuilding and demolition the only supervisor or other designated employees of the employer in the surveillance, which has the necessary knowledge and experience in the field in question;
46.2. the caissons are periodically checks all the employer's designated employee who has the necessary knowledge and experience in the relevant field.
75. in its work on the roof: 75.1. If roof height or the slope exceed regulations set out the rules, use the collective means of protection to prevent employees, materials, tools or other objects from falling;

75.2. If workers work on the roof (or near it) or any other surface made of fragile materials that may fall through, take precautions to avoid falling or accidental ascent to izturīgaj surfaces.
 
IX. obligations of others 76. other persons (self-employed, supervisory and control bodies) have the following responsibilities: 76.1. before start-up or construction site to inform the project coordinator or other person responsible for the activity, as well as to coordinate their activities in the field of labour protection;
76.2. to comply with the laws and regulations on work equipment and personal protection products.
77. the self-employed, carrying out the works, observe: 77.1. project preparation Coordinator, project coordinator and contractor's instructions;
77.2. This provision, paragraph 26.
 
Informative reference to European Union directive rules included provisions resulting from Directive 92/57/EEC.
Prime Minister e. Repše Welfare Minister d. Staķ is the Editorial Note: rules shall enter into force on March 1, 2003.