Cabinet of Ministers Regulation No 871 Riga 2004 (19 October. No 60 45. §) rules on State and local road maintenance requirements and control their execution Issued pursuant to the Highway Traffic Act 6. the third paragraph of article 1 General provisions 1 the issues determined by the State and local Highway (road) daily maintenance requirements and procedures for the control of their execution. 2. Road maintenance requirements 2. the travel manager of road routine maintenance to ensure that the work referred to in annex 1, subject to the requirements in accordance with the provisions of annex 2 to determine the relevant road maintenance class. 3. Road maintenance class (A, A1, B, C) and (D) shall be determined taking into account the classification of road and vehicle traffic, road surface, its technical condition, road maintenance funding for planned (available) and the road to economic and social importance. 4. the period of road or lists of specific maintenance classes for the winter season (from 1 November to 31 March) and summer season (1 April to 31 October) no later than one month before the start of the season concerned: 4.1 national road — Ministry of transportation;
4.2. the municipal road, where the municipality. 5. The provisions set out in annex 2 of the highway maintenance class does not apply when: 5.1 the respective road sections in the road construction or reconstruction;
5.2. the motorway or part thereof is used in vehicle traffic redirected to road construction and reconstruction;
5.3. road maintenance (available) for funding is not sufficient to ensure the appropriate maintenance of the class requirements. 2.1. Road maintenance and weather variables standing 6. to ensure smooth traffic by road vehicles standing and weather variables, road Manager provides a road maintenance work, subject to the requirements and due dates, the relevant class of road maintenance under these rules 3, 4, 5, 6 and 7 of the annex. 7. Permanent weather meaning of these provisions are the weather conditions, when the temperature is constant, there is no precipitation and wind speed does not exceed 10 metres per second. 8. Changing weather events within the meaning of these provisions are the weather conditions when the humidity of the ambient air condenses on the motorway carriageways, creating the icing, precipitation (rain or snow) creates a suspended road icing and wind speed exceeding 10 meters per second. 2.2. Road maintenance in extreme weather conditions and the State of emergency existing road maintenance 9. Roads for emergency maintenance is urgent maintenance work carried out to ensure vehicle traffic by road in extreme weather conditions and to the emergency situation existing roads, and it will take priority, taking into account the particular road to economic and social importance. 10. If the emergency situation existing in the road or it is possible to ensure traffic safety in the appropriate driving conditions, it shall be equipped with road signs that warn road users about the potential dangers, and carrying out emergency maintenance work. 11. If the road traffic situation is dangerous, vehicle traffic is restricted or closed to the agenda set by the Cabinet of Ministers of 15 December 1998 regulations No. 456 "provisions for the protection of the country and motorway procedures introduced on vehicle traffic bans and restrictions". 12. Exceptional circumstances the winter season the meaning of these provisions if there's fallout will continue longer than six hours or longer than 12 hours break of day, when the wind speed exceeds 20 meters per second with storm and sniegvilksn when the rainfall creates road carriageways icing for two or more times a day or if the rainfall washes away from the motorway carriageways anti-slip material. 13. extreme weather events during the summer season within the meaning of these provisions if precipitation occurs on the motorway carriageways comprise icing, causing flooding or otherwise killed in the road or when wind speed exceeds 20 meters per second. 14. Motorway or it is an emergency, if its construction due to wear can not ensure adequate maintenance of the class requirements. 3. Road maintenance conditions 15. Road Manager no later than one month prior to the summer and winter season beginning informs road users of road maintenance established classes. Information published: 15.1. State the main and first class road, the newspaper "Gazette";
15.2. for national secondary roads and municipal roads — the administrative area newspaper, which is the largest print run. 16. the travel manager a month before the summer and winter seasons make up the beginning of the list of emergency existing road and information published: 16.1. State the main and first class road, the newspaper "Gazette";
16.2. the State second class roads and municipal roads — the administrative area newspaper, which is the largest print run. 17. in order to maintain the roads, you need the following documents: 17.1. If the road Manager for the maintenance of the road upon merchant — contract for road maintenance, concluded in accordance with the laws and regulations on procurement for State or municipal needs;
17.2. road maintenance technical specifications;
17.3. the technical survey of the situation of the road log showing the date of the survey, the road in the name of the road and surveyed mileage, outstanding deficiencies, the lack of appropriate measures and deadlines for the correction of deficiencies;
17.4. the transfer and acceptance of the work log that indicates the name of the road and mileage, the work carried out by name (with the exception of the reduction and better snow cleanup State autoceļo), units of measure, quantity (including the resources consumed by man-hours or mašīnstund), the mechanisms used, the materials used and the date of performance of the work;
17.5. the national road-winter service log indicating the responsible person for the Organization of winter service, the name of the road and mileage, meteorological conditions, the performance reduction and/or better cleaning, start of work and completion time, the mechanisms used, the materials used and quantities. 4. Road maintenance requirements, controls 18. Permanent and variable weather the road Manager provides road maintenance enforcement control: 18.1. National Road: 18.1.1. maintenance A and A1 class roads — once a week;
18.1.2. maintenance class B road — every two weeks;
18.1.3. class C maintenance roads — once a month;
18.1.4. the maintenance of the class D road — quarterly;
18.2. to municipal roads: 18.2.1. maintenance A and A1 class road — every two weeks;
18.2.2. class B maintenance roads — once a month;
18.2.3. class C maintenance roads — once a quarter;
18.2.4. class D maintenance road — every six months. 19. Extreme weather the road Manager provides road maintenance enforcement control: 19.1 (A), A1 and B to stay in class national road — once a day;
19.2. to maintain A, A1 and B class roads, local time in two 24-hour. 20. If road maintenance on the basis of the Treaty trader, road Manager carrying out the inspection, shall prepare a report on road maintenance requirements, control results and within three calendar days to submit it to the merchant. The report shall state the date in the control, the name of the road and surveyed mileage, outstanding deficiencies, lack of the necessary steps and deadlines. 5. final question 21. Regulations shall enter into force by 1 November 2004. Prime Minister i. Emsis traffic acting Ministers, members of the Prime Minister, the Interior Minister in place of ER ivry annex 1 Cabinet of 19 October 2004, the Regulation No 871 road routine maintenance

I. Road, bridge traffic carried, culverts, walkways and bicycle maintenance in winter 1. are you supposed to put the direction of installation, harvesting and storage. 2. treatment of Road snow and snow removal: 2.1 road treatment of loose snow, using cars and mechanisms, equipped with snow shovels; 2.2. treatment of road snow angle relative to the road axis; 2.3. provide moving outside the cloisters in the grade of the road; 2.4. autopaviljon, bus stops and the rest of the treatment of snow; 2.5. harvesting of snow from the bridge and traffic transmission vehicle parts and sidewalks; 2.6. the ramparts and trenches in the snow. 3. Snow shield installation and removal. 4. reduction of the Soleplate: 4.1 with sand and salt mixture; 4.2. with sand or šķembiņ; 4.3. with a wet salt; 4.4 with saline solution; 4.5. creating a wrinkle in the icing. 5. boats and Culverts defrosting or reveal. 6. The stakes release from ice. 7. Road survey. 8. Road operational care. 9. Winter service on-call. 10. Walkways and bicycle maintenance: 10.1. decontamination of the snow; 10.2. the better, shedding the sand or šķembiņ. II. The bridge traffic carried, pedestrian tunnels, culverts and maintenance 11. Bridge pavement treatment from banks and washing. 12. Bridge drainage system cleaning. 13. the deformation joint care: 13.1 steel seam treatment from banks and adjustment; 13.2. mastic joint cleaning and filling. 14. The bridge railing and damaged a barrier in the replacement, repair, cleaning and painting. 15. Bridge Cone, water level and discharge the regulatory structure of the system of inspection and support wall maintenance: 15.1 the washed up the mound; 15.2. the corrupted and shore support structure; 15.3. the damaged water into troughs of replacement; 9.6. viewing the ladder care and replacement of the damaged item. 16. The bridge surface defects: 16.1. asphalt concrete or cementbeton surface damage prevention; 16.2. a wooden deck pavement damage. 17. the river bearing and flush culverts from banks. 18. Tiny defects in the construction of bridges and culverts. 19. Culverts damaged stage and the end wall replacement. 20. The pedestrian tunnels. III. Traffic organization 21. Bus stop, autopaviljon and recreation site maintenance: 21.1. area and territory cleaning; 21.2. the installation of the new bench, bench painting and surface late replacement; 21.3. the platform edging stones replacement; 21.4. separate autopaviljon corrupted structures replacement and autopaviljon painting. 22. Traffic sign maintenance: 22.1. road sign pole replacement; 22.2. road signs post painting; 22.3. the road sign replacement; 22.4. traffic sign washing. 23. the designation of restoring Suspended 24. Signālstabiņ washing, painting and replacement, installation of reflector. 25. metal barrier washing, painting, replacement of the damaged barrier, barrier and getting dumped reflector installation. 26. Concrete barrier washing and painting. 27. the rope barrier. 28. Traffic light maintenance, repair and replacement (also for shipping routes off the bridge). 29. Road, bridge, road transport and pedestrian tunnel lighting equipment management, maintenance, repair and replacement. IV. Coverage of maintenance 30. Black cover maintenance: 18.7. crack aizliešan with bitumen or bitumen emulsion or fill with bitumen mastic; 30.2. the hole filling: with hot asphalt concrete 30.2.1. using full or part-time technology; 30.2.2. with black fragment and bitumen, using part-time technology; 30.2.3. with rubble and bitumen emulsion using part-time technology; 30.2.4. with the cold asphalt concrete or black flakes using part-time technology; 30.3.-hole continuous repair, in some locations the failing travel blankets; 18.9. cover cleaning; 5. Dawn's place; 30.6. the space settlement with kūkumojoš sand and sand harvesting from kūkumojoš sites; 19.1. iesēdum correction; 19.1. surface roughness. 31. Gravel and crushed rock pavement maintenance, improved soil maintenance: 31.1. klātņ gliding and the road of profiling; 31.2. resurfacing if uzvedam material volume (quantity) is not greater than 500 m3 per kilometre; 31.3. cover atputekļošan with bitumen emulsion or calcium chloride (CaCl2) solution; 19.5. iesēdum and pit gravel pavements repaired and improved soil the knees; 31.5. the improved soil cover of nošļūkšan. V. road care 32. removal of Leachate. 33. The ditch cleaning and restoring the profile. 34. Cover the rain water discharge system (drainage, kontrolak, rain water collectors) cleaning and care. 35. A quiet gliding, profiling, and repair. 36. Brush cutting grāvjo, slopes and road bars, shoot bushes mowing. 37. Grass mowing. 38. Greenery care: 38.1. soil care; 38.2. the destruction of pests; 23.8. greenery and snow aizsargstādījum replenishment; 23.9. hedge trimming; 38.5. the dry branch sawing other than those; 24.0. separate tree, harvesting. 39. the operational Road care and cleaning up the bin path bar. Vi. Road 40 road survey survey. 41. vehicle traffic Visual records. 42. the inventory of road complex. VII. Road weather information system maintenance 43. Road meteorological station and communications systems maintenance. VIII. Walkways and bicycle maintenance 44. Coverage of the cleaning. 45. the coverage of maintenance: 45.1. hole repair black blankets; 45.2. the cobblestone and plātnīš coverage for maintenance; 45.3. gravel and shingle coverage of gliding. 46. The border stone replacement.
Traffic acting Ministers, members of the Prime Minister, in place of the Minister of the ER ivry annex 2 Cabinet of 19 October 2004, the Regulation No 871 road maintenance procedures for the determination of class 1 national road maintenance class shall be determined taking into account road and vehicle class cations traffic intensity (table 1). table 1 average vehicle traffic (car 24 hours) the main road first class roads secondary roads over A 1000 to 5000 of 5000 A-A1 A1 A1 A1 B from 1000 to 500 from 100 to 500 B-C C-D 100 low notes. 1. National road that winter season down the A1 maintenance class, summer season are maintained in accordance with A maintenance class. 2. (D) the maintenance of a class determined by national road, by which no regular carriage of passengers by coach and bus. 2. local road maintenance class is determined, taking into account the transport means traffic intensity (table 2). table 2 average vehicle traffic (cars a day) Municipal Road over 5000 A from 1000 up to 5000 from 500 up to 1000 A1 (B) from below 100 C, 100 D, up to 500 notes. 1. Municipal roads that winter season down the A1 maintenance class, summer season are maintained in accordance with A maintenance class. 2. (D) the maintenance of a class determined by the municipal road, by which no regular carriage of passengers by coach and bus.
Traffic acting Ministers, members of the Prime Minister, in place of the Minister of the ER ivry annex 3 of the Cabinet of Ministers on 19 October 2004, the Regulation No 871 requirements of State and local highway maintenance in winter, no PO box maintenance requirements (A) (B) (C) (D) A1 class allowable indicators 1 2 3 4 5 6 7 1.
 Frozen or piebraukt the thickness of the snow on the road carriageways permanent weather without snow without snow 4 cm 10 cm 2 is not predetermined.
 Snow depth on the road 2/3 of the width of the edge of the edge of the carriageway permanent weather 3 cm 3 cm 4 cm 10 cm 3 is not predetermined.
 Motorway carriageways plain regular weather surface practically without ice ice individual bumps bumps ice rise up to 20 mm to 40 mm of ice rise is not predetermined 4.
 Time road carriageways for the treatment of snow 3 hours 4 hours 7 hours 18 hours is not predetermined 5.
 Time road carriageways with anti-slip material sanding 3 hours 4 hours 6 hours is not predetermined is not predetermined 6.
 Time slots for creating frozen or piebraukt snow on the motorway carriageways – – 6 hours is not predetermined is not predetermined 7.
 Fresh snow thickness on the motorway carriageways variables weather 6 cm 6 cm, 8 cm 10 cm are not predetermined 8.
 The thickness of the snow banks on the motorway carriageways in some places snowfall, if wind speed is greater than 10 meters per second 12 cm 12 cm 16 cm 20 cm 9 is not predetermined.
 Wet snow thickness or with salt and sand mix snow thickness on the motorway carriageways variables weather 3 cm 3 cm 5 cm 6 cm is not predetermined 10.
 The motorway carriageways plain variables weather ice rise up to 10 mm to 20 mm ris ice ice rise up to 20 mm to 40 mm of ice rise is not predetermined 11.
 Maximum snow height on the ramparts of the edges of the road grade 40 cm 60 cm 80 cm 100 cm are not predetermined 12.
 On the roadway and the suburbs may not accumulate water. Deficiencies noted must be rectified within a Yes Yes Yes Yes Yes 13.

 Rest area should be cleaned, if the snow cover reaches a thickness greater than 10 cm in 24 hours 24 hours are not predetermined predetermined predetermined is not is not 14.
 Bus stops should be cleaned if the platform snow cover reaches a thickness of greater than 10 cm in 24 hours 24 hours 24 hours are not predetermined is not predetermined 15.
 Bridges, overpasses and pedestrian road tunnels should be cleaned from the snow Yes Yes Yes Yes Yes 16.
 Bridge and road transport in the ūdensatvad system maintained Yes Yes Yes Yes Yes 17.
 If the winter after snowfall the road sign symbols are not clearly visible, road signs must be cleaned of adhering to snow day 1 day 1 is not predetermined predetermined requirements is not 18.
 Road meteorological stations must be in working order yes yes no requirement requirement requirement 19.
 Road users must be provided with information about driving conditions Yes Yes no requirement requirement requirement of 20.
 Maintenance class the following daily 6.00-22.00 hours 6.00 6.00-18.00 – 20.00 6.00-18.00 is not predetermined notes. 1. carriageway Bridge, road extensions and two-tier nodes exit the same set of requirements, as defined in the parent path suspended. 2. Time road to clear snow from carriageways from the moment when the snow finished falling, until the road carriageway cleaned of snow. 3. Road maintenance, D class, cleans snow from up to four times a season. 4. Time suspended road sanding with anti-slip material and grooves to create frozen or piebraukt snow on the motorway carriageways from the moment of icing, until the jobs are executed. 5. Roads, maintenance A and A1 class is not intended to create a frozen or grooves in the snow piebraukt. 6. requirements for walkways and bicycle maintenance down the road. 7. Beyond this point 20 of the table contains the permissible period for road maintenance reduction on one of class class.
Traffic acting Ministers, members of the Prime Minister, in place of the Minister of the ER ivry annex 4 of the Cabinet of Ministers on 19 October 2004, the Regulation No 871 requirements of State and local highway bridges, roads, tunnels and culverts are transported, for the maintenance of the no Maintenance requirements of the BC class A B C D acceptable indicators 1 2 3 4 5 6 1 bridge and road transport. carriageway, water discharge pipes, troughs , security bars and sidewalks must be clean. The bridge deck must be washed every spring and autumn every spring are not predetermined is not predetermined 2. reinforced concrete or other material parts, which jeopardises road safety, must be removed immediately from the bridge or road transport Yes Yes Yes Yes 3. Bridge and road transport of mastic deformation seams should be filled to the brim, and there are no cracks allowed. Deficiencies noted must be rectified within outside the winter season 2 weeks 1 month 1 month 1 month 4. Bridge and road transporting steel deformation seams must be clean Yes Yes Yes Yes 5. Bridge and road transporting steel deformation seams must be set. Deficiencies noted must be rectified within 1 day 1 day 1 day 1 day 6. Bridge, the road carriageway, transmission security sidewalks will not be allowed in the bar and in the pit, which is deeper than 25 mm. Hole to be filled in after the discovery of 24-hour 7 day 7 3 will will will will be day 7 day 7. Bridge, the road carriageway, transmission security and will not be permitted in the band pavement cracks that Aperture is greater than 5 mm. Cracks in the summer season to aizlej or fill in the Yes Yes Yes Yes 8. Bridge wooden deck is not permissible in broken or rotten elements. Deficiencies noted must be rectified within 24 hours 7 day 3 in 7 day 7 day in bridge and road 9 in the transmission of the railing must be fixed. Deficiencies noted must be rectified within 24 hours 7 day 3 in 2 weeks 2 weeks 10. Bridge and road-rail transport must be painted or coated with a protective cover. Deficiencies noted must be rectified during the summer season Yes Yes Yes Yes 11. Bridge and road transport is not allowed in the design of concrete izdrupum locally, which reveal the reinforcement. Deficiencies noted must be rectified during the summer season Yes Yes Yes Yes 12. Bridge and road transport in the zemtilt area not exceeding 50 cm changes, banks or the subject matter of the case. Deficiencies noted must be rectified within a Yes Yes Yes Yes 13. Bridges, road transport is not allowed konuso of scour, which is deeper than 50 cm, or damaged by the shore. Deficiencies noted must be rectified within 1 month 2 months 2 months 1.5 months Of 14 culverts cross-sectional area must not be obstructed more than 20% 35% 50% 50% 15.
If the banks are bigger than this paragraph 14 of the annex to the quantity referred to in the summer season, culverts cleaned Yes Yes Yes Yes 16. Over culverts and tunnels allowed the emptiness. Open the hole need to be confined or eliminated Yes Yes Yes Yes 17. stages of Culverts, warheads, the bearing and the hillsides are not allowed stiffeners deficiencies that interfere with the drainage of water can cause the embankment instability. Deficiencies noted must be rectified within a Yes Yes Yes Yes 18. source of flow into Culverts and ditches must be clean lands roads partition the bandwidth. They and the overgrown ditches during the summer season to cleanse Yes Yes Yes Yes 19. Tunnels must be clean, they are not permitted in the standing water. Coverage is not allowed in the pit. Through the tunnel of saduršuv may not trickle water or stock to the bottom. Deficiencies noted must be rectified within a Yes Yes Yes Yes not allowed 20 tunnels not fixed in concrete or other material. Deficiencies noted must be bounded or eliminated Yes Yes Yes Yes notes. 1. Bridge, the road transport and tunnel roadway in winter diet in accordance with the provisions of annex 3. 2. On the bridge, the road transport and tunnel carriageway are subject to the provisions of annex 6, 3., 4., 5., 6., 7. the requirements referred to in paragraph 1. 3. This annex 6., 7., 10., and in paragraph 11, the above requirements shall not apply to emergency situation existing bridges and highway overpasses. 4. in the case of drain culverts, which outside the path bar is not ensured the water discharge, derogation from paragraph 14 of the annex to the above requirements. 5. the following annexes 19 and 20 of the requirements do not apply to emergency for existing tunnels. 6. the time-limits laid down in this annex, failures or path mark for installation from the lack of disclosure.
Traffic acting Ministers, members of the Prime Minister, in place of the Minister of the ER ivry annex 5 Cabinet of 19 October 2004, the Regulation No 871 requirements for State and local road traffic organization of technical requirements for the maintenance of the no PO box maintenance class A B C D acceptable indicators 1 2 3 4 5 6 1. Bus stops should be 534. mark the path of the tank waste and bench mark path only Yes just the way the mark is not a requirement of 2. Traffic sign posts or supports must be dyed gray in color, or covered with a gray protective cover. Defects of which the area is greater than 30% of the total area, the summer season to prevent Yes Yes Yes Yes 3. Road signs, poles or pylons may not be broken, deformed or toppled. Deficiencies noted must be rectified within 24 hours in day 1 10 3 month is not predetermined 4. road signs must conform to standard EN 71-1, EN 71-2 and EN 71-3 requirements Yes Yes Yes Yes warning damaged or stolen, or the benefits of the ban road signs to be replaced 1 day 3 day 3 day 3 in 24 States in the rest of the road signs, other than direction indicator lamps and the information tags, change the 1 week 3 day 1 month is not predetermined 5. Damaged or stolen information signs and direction indicators from damage or loss detection to be replaced 3 months is not is not predetermined predetermined predetermined is not 6. Road signs in the spring to wash and 1 May is not predetermined requirements requirement 7. Black travel cover must be horizontal label that meets the requirements of the standard EN 85. Previous the legend traces the visibility is not permissible. If the word for 30 m long horizontal stage goes out more than 50% of its area, horizontal designation be renewed until 31 august Yes only dangerous places no requirement is not a requirement of 8. Road to the edges of the compartments must be labeled with the signālstabiņ which corresponds to the requirements of the standard EN 93 Yes only dangerous places only dangerous places are not damaged or missing requirements signālstabiņ the spring must be renewed to 31 May to 30 June are not predetermined Later to the island of signālstabiņ after the accession date of discovery of the loss or damage must be renewed 2 weeks
1 month 9. Barriers should be aligned, with no damaged elements. To the low edge barriers must be noplanēt Yes Yes Yes Yes for road metal security barrier must comply with the requirements of the standard EN 94 Yes Yes Yes Yes light-reflectors shall be fitted not requirement is not a requirement of Yes is not a requirement in the spring to wash up to 1 of the barrier may not be predetermined is not predetermined is not predetermined deficiencies noted must be rectified within 2 weeks 1 month summer season summer season 10. Fences must be painted or coated with a protective cover and without the corrupted elements. Deficiencies noted must be rectified during the summer season there is no requirement there are no Yes Yes requirements 11.

Road traffic traffic lights during operation the light returns shall be no less than 80% of the original certified values. Light signals must work according to the approved specific traffic light traffic organization scheme Yes Yes Yes Yes damaged light sources to be replaced 1 day 1 day 1 day 1 day 12. Highway Traffic traffic light elements, components, as well as fastening elements must be free of damage Yes Yes Yes Yes open malfunctions must be rectified, defective components or elements to be replaced 3 24-hour a day 3 day 3 will will will will. 3 day 13 road lights turn on the 24-hour period in the dark is not the requirement is not a requirement of Yes is not a requirement of the damaged light replace 1 week

14. Lighting columns, as well as their attachment to the elements must be free from defects. Traffic dangerous defects must be rectified immediately after their launch, Yes Yes Yes Yes other deficiencies noted must be rectified within 1 month is not predetermined predetermined predetermined is not is not 15. Pedestrian tunnels must be lit yes no requirement requirement requirement If the backlight is broken, it must be renewed 1 day damaged light elements replaced 1 week notes. 1. in paragraph 9 of this annex, the above requirements shall not apply to emergency situation existing barriers. 2. the time-limits laid down in this annex, failures or path mark for installation from the lack of disclosure. 3. The annex referred to in paragraph 13 of the requirements do not apply to emergency situation existing lighting lines.
Traffic acting Ministers, members of the Prime Minister, in place of the Minister of the ER ivry annex 6 Cabinet of 19 October 2004, the Regulation No 871 requirements of State and local highway maintenance no PO box cover
 Requirements for Maintenance of class A B C D acceptable indicators 1 2 3 4 5 6 1.
 Dangerous traffic cases objects from the road asphalt pavement to be harvested immediately after their launch, Yes Yes Yes Yes 2.
 Mud or dirt from the road asphalt pavement to be harvested 1 day 5 will not be predetermined daily is not predetermined 3.
 Asphalt pavements pit must not be deeper than 25 mm. Deficiencies noted must be rectified within a Yes Yes Yes Yes the following pits Cleanly, the spring must be completed by 1 June to 15 June and 1 July to 1 July Later formed the pit to be filled to 30 September for Yes Yes Yes Yes 4.
 Traffic dangerous pit fill 1 day 5 in 1 day a week 2 weeks 5.
 Road sections with the emergency situation existing screed should be denoted by 112 road sign "the rugged path" and other relevant road signs Yes Yes Yes Yes 6.
 Asphalt pavements, which are transverse higher than 30 mm, or ris that deeper than 25 mm, denoted by 112 road sign "the rugged path" and other relevant road signs or deficiencies to be rectified within 24 hours a day, 5 1 1 week 2 weeks 7.
 Asphalt pavements for stage with extreme surface levels (iesēdum and elevation) identified with 112 road sign "the rugged path" and other relevant road signs or deficiencies to be rectified within 1 day 5 in 1 day a week no requirement 8.
 Asphalt paver, the coefficient of adhesion (except winter season and exceptional weather) must not be less than 0.3. If the coefficient of adhesion is smaller, the following road stage marked with 115 road sign "Slippery road" and other relevant road signs or to take measures to restore the surface roughness 1 day 5 in 1 day a week is not a requirement of the 9.
 Cracks in the asphalt pavement in Aperture is greater than 10 mm, must be completed by 31 august is not requirement requirement requirement 10.
 Asphalt pavements kūkumojoš places marked with the appropriate road signs and must be covered with a load of dividing the material Yes Yes Yes Yes After drying of the surface of the road grade should be arranged in 5 10 3 24-hour day will not be predetermined in the day 11.
 During the summer season to replace broken and crushed the concrete border stones Yes Yes Yes not claim 12.
 Right road stages and large radius curves gravel cover the šķērskritum must be 3-5%, virāž-it can be up to 6%. The edges of the cover must not be a rampart. On the cover must not be loose turf or loose stones larger than 70 mm. Deficiencies noted must be rectified – Yes Yes Yes gravel cover profile in the spring, the land grade by apžūst thaw days, but no later than 1 May to 10 may not be predetermined in gravel cover profile in the autumn before the island's accession to the Yes Yes Yes 13.
 Gravel pavement surface must be level, so as not to cause discomfort to the driver – Yes Yes Yes if the time period from the spring thaw days until the island joining the time gravel cover 30% of the area under consideration in the formation of transverse, ris or pit that is deeper than 60 mm gravel cover should be noplan the 20 day 1 month in 1.5 months 14.
 Gravel cover is not allowed in the iesēdum and that of deeper hole for 100 mm. Deficiencies noted must be rectified within 24 hours – 5 2 weeks 1 month 15.
 Pavement surface encountered in the pit in the spring should repair pārbruģēj to 1 June to 15 June and 1 July to 1 July Later formed the pit should repair to 30 September for Yes Yes Yes Yes transport of dangerous pit must be avoided (can edit with other materials) 1/5 in 1 day a week for 2 weeks. 1. this annex 3 and in paragraph 9, the above requirements shall not apply to emergency situation existing asphalt screed. 2. traffic dangerous pits as asphalt pavements, holes that area greater than 0.1 m2 and are deeper than 50 mm. 3. during which Road is a dangerous pothole, traffic within three hours of their detection should be denoted by 112 road sign "the rugged path" and other relevant road signs. 4. in paragraph 11 of this annex, the above requirements shall not apply to emergency situation existing road surfaces. 5. Rock and soil cover to put the same requirements as those laid down by the gravel cover. 6.13 and 14 of this annex the requirements referred to in paragraph does not apply to emergency situation existing gravel surfaces. 7. On the Cobbles coverage also applies to this annex 1, 2 and 7 of the type referred to in paragraph 1. 8. the time-limits laid down in this annex, failures or path mark for installation from the lack of disclosure. 9. Roads with gravel cover is not designed to maintain A residence in accordance with the requirements of the class.
Traffic acting Ministers, members of the Prime Minister, in place of the Minister of the ER ivry annex 7 Cabinet of 19 October 2004, the Regulation No 871 requirements for State and local road care no PO box
 Requirements for Maintenance of class A B C D acceptable indicators 1 2 3 4 5 6 1.
 Road land partition bar, bus stops and rest areas in the spring for the first time to purify up to 1 May to 15 May and 1 June is not predetermined Later to the island joining the moment that the site must be cleaned at least 2 times a week once a month, once a quarter 2.
 The grade of the road suddenly traffic resulting from the delay or traffic safety of dangerous obstacles (such as scour, landslides, fallen trees, Poles, accommodating vehicles) and the required road sign or enclosure installation should start immediately after their launch, Yes Yes Yes Yes 3.
 Road on the outskirts and the slopes are not tolerated sustained various traffic features parking, cargo and the subject matter of the event location, which may pose a threat to traffic safety. Discovering such cases, dangerous location must be marked with the appropriate road signs and barriers Yes Yes Yes Yes suburbs should be exempt from those 12 hours 1 day 3 day 2 weeks will be exempted from the slopes are not predetermined predetermined predetermined is not is not is not predetermined 4.
 The grade of the land road are not allowed to scour and landslides. Deficiencies noted must be rectified within a Yes Yes Yes Yes scour and landslides that are deeper than 50 cm, to be refilled or added 1 week, 2 weeks, 1 month, 6 weeks 5.
 Sāngrāvjo is not allowed on the road continued collecting higher water about 20 cm below the road pavement construction. Deficiencies noted must be rectified within a Yes Yes Yes Yes Sāngrāvj to clean it from clogging 1 week, 2 weeks, 1 month, 2 months, 6.
 The ditch bottom and sides shoring must be in order. Deficiencies noted must be rectified within 1 week, 2 weeks, 1 month, 7 is not predetermined.
 Gūlij and sumps must be clean, without banks. In the spring, they first must be cleared before 1 June and 15 June will not be predetermined is not predetermined Later to the island joining the moment they must be cleaned every 6 weeks every 2 months until the winter season until the winter season 8.
 Drain or drains clogging, is not permitted. Pipes that clogging is greater than the percentage of 20% must be cleaned; 6 weeks 35%; 2 months 50%; until the winter season 50%; until the winter season 9.

 Gūlij, sewerage, drainage, water wells and manhole must be free from damage, and scour. They must be covered with covers or slats. Thaw days ago from the mouth, Oh and the slats must be cleared of snow and ice, Yes Yes Yes Yes 10.
 The edge of the road with gravel cover must be šķērskritum of 3-5%. Virāž šķērskritum of the suburbs can be up to 6% Yes Yes Yes Yes suburbs with gravel cover profile in the spring, when the ground thaw days apžuvus grade with up to 1 May and 1 June until 1 may not be predetermined in the profile fall before the outlying island joining Yes Yes Yes Yes 11.
 Road asphalt pavement and slab connection height difference must not be greater than 3 cm 5 cm 5 cm 5 cm if the period from spring thaw days until the island joining the moment is found the largest height difference, a period marked with 119 road sign "Path with dangerous suburbs" and other relevant road signs or deficiencies noted must be rectified within 24 hours 7 day 3 in 2 weeks is not predetermined 12.
 Suburbs to a gravel surface must be flat. If during the period of the spring thaw days until the island joining the moment on the outskirts of cover 30% of the area under consideration in the formation of transverse, ris or pit that is deeper than 60 mm, gravel should be noplan in the outskirts of cover 2 weeks, 3 weeks, 2 months is not predetermined 13.
 With an asphalt pavement on the edge of the pit, which is not permitted on 25 mm. If built, the spring of the pit to be filled up to 1 June to 15 June and 1 July to 1 July Later formed the pit to be filled to 30 September for Yes Yes Yes Yes 14.
 Land grade road, growing shrubs to izpļauj once a year once a year is not a requirement is not a requirement of 15.
 The normative documents down the road, road signs, or intersection visibility ensure that cutting down the bushes the distractions or tree branches. Deficiencies noted must be rectified immediately 1 week 1 month 1.5 months 16.
 To the suburbs and the fitting of road slope 1.0 – 1.5 m in width, as well as on the split bar that is narrower than 12 m, growing grass vegetation period to mow 2 times 1 times 1 time is not a requirement of 17.
 Hedges trimmed and dry or damaged branches should be cut to 30 April is not requirement is not a requirement of the 18 requirements.
 Dry or damaged tree branches must be cut and dead trees to the izzāģ to 30 April is not requirement requirement requirement 19.
 Rest areas require a waste tank Yes Yes – – waste from waste containers must be removed once a week once a month 1 20.
 Rest areas not broken or damaged equipment. To repair the damaged equipment or harvested 2 weeks 1 month – – 21.
 Ladder rest areas must have a fixed railing. Stairs must be persistent and without damage. After discovery of the defect immediately to impose warning labels and ladders must be delimited by Yes Yes – – Corrupt elements must be replaced within 2 weeks 1 month 22.
 Autopaviljon and lavatories must be watertight roof, walls without damage and deficiencies which may threaten the sustainability of the wall Yes Yes Yes – 23.
 Bus stops or rest areas set up in the toilet to be cleaned Yes Yes – – notes. 1. If damaged or missing covers or gūlij of the UK pound signs may not be replaced immediately, dangerous place marked with the required road sign. 2. Rock and soil cover on the outskirts raised the same requirements as those laid down by the gravel cover the suburbs. 3. This annex 10, paragraphs 12 and 13 of the above requirements shall not apply to emergency situation existing coverings. 4. The symbol "-" means that the construction or road element for the maintenance of the class are expected. 5. the time-limits laid down in this annex, failures or path mark for installation from the lack of disclosure.
Traffic acting Ministers, members of the Prime Minister, in place of the Minister of the ER ivry