Advanced Search

Amendments To The Cabinet Of Ministers On 30 September 2014 Regulations No. 600 "procedures For Granting State Aid In The European Union And An Open Design Competition For The Measure In The Form Of" Investment In Tangible Assets "

Original Language Title: Grozījumi Ministru kabineta 2014.gada 30.septembra noteikumos Nr.600 "Kārtība, kādā piešķir valsts un Eiropas Savienības atbalstu atklātu projektu konkursu veidā pasākumam "Ieguldījumi materiālajos aktīvos""

Subscribe to a Global-Regulation Premium Membership Today!

Key Benefits:

Subscribe Now for only USD$40 per month.
Cabinet of Ministers Regulations No. 228 in 2015 (12 May. No 24 37) amendments to the Cabinet of Ministers on 30 September 2014 regulations No. 600 "procedures for granting state aid in the European Union and an open design competition for the measure in the form of" investment in tangible assets "Issued under the agricultural development Act unlauk article 5, fourth paragraph do cabinet 30 September 2014 regulations No. 600" procedures for granting state aid in the European Union and an open design competition for the measure in the form of "investment in tangible assets" (Latvian journal by 2014, nr. 215.) the following amendments: 1. Complement 5.2. subparagraph after the word "products" with the words "and making revenue from sales of agricultural products". 2. Express 5.3. subparagraph by the following: "5. the processing of agricultural products in line with the Commission's June 17, 2014 Regulation (EU) No 651/2014, by which certain categories of aid compatible with the internal market, applying the contract article 107 and 108 (Official Journal of the European Union, 2014 26 June, no L 187), paragraph 10 of article 2 definition to include any action with agricultural products including heating smoking, curing, maturing, drying, marinating, extraction, extrusion, grinding, freezing, or several at the same time these processes that change the original product. For the processing of agricultural products is also considered to be animal slaughter and cutting. " 3. Express 5.6. subparagraph by the following: "the local basic is 5.6 agricultural products purchased from legal or natural persons (primary producers, agricultural products processing enterprises, cooperatives or cooperative societies), located 300 kilometres away from the processing of agricultural products company;". 4. Supplement with 5.7, 5.8 and 5.9 of the subparagraph as follows: "young farmer is 5.7:5.7.1. a natural person who logged on direct aid that complies with the regulations on the procedure for granting direct payments for young farmers, to the requirements and has the highest average agricultural or professional education, including learning agricultural course at least 160 hours; 5.7.2. a natural person who, in the project at the date of application is not older than 40 years and has the highest average agricultural or professional education, including learning agricultural course at least 320 hours, or who undertake to get 36 months after the lodging of an application project, which for the first time the housekeeper found in the holdings status (six months after the date of entry into force of the rural support service of the decision on the application for the approval of the project) and before more than 51 percent have not belonged to the shareholders of the company active in the production of agricultural products; 5.7.3. legal person engaged in the production of agricultural products and that no earlier than 12 months prior to the application of the project start or take over this provision in paragraph 5.7.2. requirements according to the individual, and in which it owns more than 51 percent of the shares (if taking over 100 percent stake-); 5.8. tangible assets and intangible assets correspond to Commission Regulation No 651/2014 article 2, paragraphs 29 and 30 and article 2 article 49) (definition of "a"; 5.9. the meaning of these rules of innovation is the introduction of a new product generation, promoting new market niches, Latvia achieved so far will not begin production of products produced, scientific, technical or other areas of ideas for the design and implementation of technology in the production process of the market required a competitive product for production. " 5. Put the following section 9.1.2. "unprocessed 9.1.2. agricultural products, packaging and related primary: 9.1.2.1. for new construction and existing buildings for conversion of structures; 9.1.2.2. for the installation of the structures (construction civil engineering Assembly, or to hold the base-or design); 9.1.2.3. placement of structures (construction of prefabricated constructions Assembly of ready elements intended to shed, not constructing foundations or foundations deeper than 30 centimeters); 9.1.2.4. structure, if the construction is technically or functionally enhanced (for example, the building's energy efficiency, space, transformation and adaptation to the needs of production, without changing the size of the construction or performance of load-bearing elements). After the construction of the project restoration costs include the value of the fixed asset (capitalised); ". 6. Express 9.2.2. and 9.3. subparagraph by the following: "9.2.2. basis with third parties responsible for carrying out the works, agricultural product processing, packaging and related primary: 9.2.2.1. for new buildings construction and rebuilding existing structures; 9.2.2.2. the structure installation (construction civil engineering Assembly, or to hold the base-or design); 9.2.2.3. for placement of structures (construction of prefabricated constructions Assembly of ready elements intended to shed, not constructing foundations or foundations deeper than 30 centimeters); 9.2.2.4. structure, if the construction is technically or functionally enhanced (for example, the building's energy efficiency, space, transformation and adaptation to the needs of production, without changing the size of the construction or performance of load-bearing elements). After the construction of the project restoration costs include the value of the fixed asset (capitalized); 9.3. the rules referred to in subparagraph sub-action 1.3 based on contracts with third persons responsible for carrying out the works: 9.3.1. drainage system conversion and renewal, including the rebuilt or repopulated drainage adjacent to the carriageway klātņ objects for conversion or restoration (without the cover); 9.3.2. the agricultural infrastructure development – for the construction or conversion of the square at the production sites and production of road construction and object conversion (without hard cover); 9.3.3.9.3.1 and 9.3.2. these provisions. the road referred to concrete slab covering agricultural high Moss in bogs or swamps of the turf. " 7. Make 10 and 11 of the following paragraph: "10. substitutions not considered fixed assets: 10.1. additional investments in existing fixed assets of more than 10 years. Adding existing fixed assets of less than 10 years, they must be retained for at least five years from the submission of the project or up to 10 years for depreciation of the fixed asset; 10.2. the acquisition of fixed assets, power, productivity, capacity is at least 25 percent larger than the farm or company existing fixed asset in production capacity; 10.3. the acquisition of fixed assets, which significantly changes the nature of the production or technology; 10.4. new construction, conversion and shipbuilding, shipbuilding is a restore if technically improved; 10.5. the drainage system and restore, refit if reclamation system is older than 15 years or when a project in the drainage system reconstruction works of the soil volume, izrokam invoice only the open drainage system construction of excavated soil volume (in cubic metres), is at least 30 percent of the renewable system construction of drainage of the soil excavated volume (in cubic metres). 11. After the implementation of the project the applicant (except for cooperative societies) to at least one of the following economic indicators or targets: 11.1. compared to last year, concluded before the submission of the project at least a 10 percent increase in net sales of 11.1.1: agricultural production or processing (or increase it at least for half of the investment amount invested), or the physical volume of production; 11.1.2. production efficiency (the pointer must be verifiable, and the value of audited); 11.2. investing in climate change reduction activities: 11.2.1. constructing energy efficient buildings: 11.2.1.1. restoring or altering existing structures, achieved at least a 20 percent energy savings, and it proves a building energy audit or energy efficiency calculation, which includes information about the energy consumption of the building before and after the renovation of a building or rebuilding; 11.2.1.2. the premises of the construction energy consumption at least 20 percent less than the specified regulations on the jaunbūvj of minimum performance requirements, and it proves a building energy audit energy efficiency or calculation that includes the year of construction and energy legislation specified target buildings energy consumption; 11.2.2. constructing buildings and introduction of technology for reducing greenhouse gas emissions (GHGs) or the reduction of ammonia emissions: 11.2.2.1. through the construction or conversion to environmental requirements applied to manure storage; 11.2.2.2. introducing a technology alternative energy (renewables, biofuels, hydropower, solar or wind energy); 11.2.2.3. crop husbandry in introducing technology for precise control of the implementation, which is differentiated depending on the agrotehnoloģisk and ecological conditions and allows you to respond to the previously found and analyzed in the land of the qualitative characteristics of nogabal; 11.2.2.4. livestock production by introducing technology to collect information about the identification and the livestock productivity and reproduction capabilities using accurate data tracking, analysis and control; 11.3. ensure effective respect for the environment, from the processing of agricultural products by introducing air or water pollution control technology; 11.4. improving infrastructure, agricultural development, forest productivity, growth and wood quality of health promotion, as well as the agriculture and forestry sector for increasing competitiveness: 11.4.1. restoring or altering drainage system; 11.4.2. through the construction or conversion to production areas and for the road. " 8. Supplement with 11.1 points as follows: "support the applicants which 11.1 total turnover last year concluded more than 50 000 001 euro, in addition to the provisions referred to in paragraph 11 targets fulfils one of the following conditions: 1. the 11.1 project investment is invested at least three times the amount of the eligible costs in the project; 11.1 2. as a result of the implementation of the project, the number of jobs will increase by at least 10 percent compared with last year concluded the total number of employees. " 9. Express 12 and 13 the following paragraph: "the implementation of the project 12 cooperative society in comparison with the last year concluded before the submission of the project increases one of the following operating parameters: 12.1-turnover by 10 percent with the cooperative society members or on the side-invested investment; 12.2. about 10 per cent, the number of members; 12.3. about 10 per cent, production efficiency (the pointer must be verifiable and value audited); 12.4.10 percent – net sales of processing of products (or to be raised by at least half of the investment amount invested), or the physical volume of production, if the cooperative projects implemented this provision 1.2. bottom under referred to in paragraph 1. 13. in paragraph 11.1 of these rules and paragraph 12 referred to the indicators of economic activity the applicant reached the third year following the conclusion of the project and not lower them throughout the subsequent commitment period. If the project is implemented for meat cattle or cultivation of permanent crops sector, the indicator must be reached in the sixth year after the conclusion of the project. New businesses compared to the first year following the conclusion of the project's net sales during the third year following the implementation of the project and all project monitoring period is at least 20 percent of the project investment. " 10. Add to paragraph 15.2.1., after the word "costs" by the words "last year" concluded. 11. the express section 16.2.3. by the following: "adding the net profit 16.2.3. and depreciation, multiplied by 50 percent, the amount is at least zero." 12. Express 18.1. subparagraph by the following: "18.1. According to these rules 2, 3 and 4 projects listed in the annex, selection criteria, priority to get public funding is that the applicant has a higher rate of project selection criteria "received public funding". If both have the same number of points, though, preferred to receive public funding is supporting the applicant having average revenue the past two years concluded from agricultural production and processing are larger than the paid public funds 2007-2013 programming period measures in agricultural products, "added value" and "modernisation of agricultural holdings"; ". 13. To complement the 20. the second sentence of the paragraph with the following wording: "If these provisions 9.1.1 the project and referred to in 9.2.1 sub-measures implemented with 9.1.2. these provisions, 9.2.2. and 9.3 sub-measures referred to, the project started to implement nine months after the entry into force of the decision on the application for the approval of the project. This requirement does not apply to national reclamation system legal possessor. " 14. To supplement the provisions of the following paragraph 20.1: "20.1 national drainage system the legal possessor of the rules referred to in point 9.3 of the Sub-measure put 18 months of the entry into force of the decision on the application for the approval of the project." 15. Replace paragraph 21.2. the number "20" with the number "10". 16. Make the following paragraph 27:27. used in the implementation of the project is the main agricultural product. The project resulting in the final product are: 27.1. product, included in the Treaty on the functioning of the European Union annex I; 27.2. a product that is not included in the Treaty on the functioning of the European Union annex I, but meet the following the European Union's combined nomenclature codes 04031051 to 04031099, 04039071--: 04039099, 04052010, 0405 20 30, 1704, 1805, 1806, 1518, 1901-1905, 20041091, 2103, 2104, 2105, 20052010, 2106, 2202 (only naturally fermented kvass with an alcohol content of up to 0.5% vol), 2203, 3501, 3502. " 17. Supplement with 27.1, 27.2 and 27.3 points as follows: "Support of 27.1 project expected end product is mentioned in the Treaty on the functioning of the European Union annex I, may be combined with other aid, up to a maximum of Council Regulation No 1305/2013 the aid intensity laid down in the annex. 27.2 If a project expected in the final product is not mentioned in the Treaty on the functioning of the European Union annex I: 27.2 1. support is provided in accordance with the Commission on 17 March 2014. June Regulation (EU) No 651/2014, by which certain categories of aid compatible with the internal market, applying the contract article 107 and 108 (Official Journal of the European Union, 2014 26 June, no L 187), according to article 5 of regulation 2 "a"; 27.2 2. small (micro), small and medium-sized business operators believe the operators corresponding to Commission Regulation No 651/2014 the definition set out in annex 1; 27.2 3. large believes merchants merchants who comply with Commission Regulation No 651/2014 article 2 the definition set out in paragraph 24; 16.9 4. related parties consider persons who comply with Commission Regulation No 651/2014 1. body related to the definition of economic operators and the regulations on the European agricultural guarantee fund, the European agricultural fund for rural development, European Fund for Maritime Affairs and fisheries, as well as on the national and European aid for agriculture and rural development and fisheries Financing Administration 2014 – 2020 programming period; 27.2 5. Commission Regulation No 651/2014 article 14 paragraph 13, if the project is considered to be a single investment project according to Commission Regulation No 651/2014 paragraph 13 of article 14; 6. these provisions within 16.9 of the funds can be combined with other aid for the same eligible costs, if such combination is not exceeded as a result of the largest funding intensity or the maximum amount of public funding in accordance with these rules or Commission Regulation No 651/2014, or a decision of the European Commission; 27.2 7. aid granted under these rules, may be combined with other State aid, which is not detectable in the eligible costs, shall not exceed the higher of the total funding, the limit values laid down in Commission Regulation No 651/2014, another Commission block exemption regulation, de minimis regulation or the EC decision; 8. the project applicant 16.9 operating and Commission Regulation No 651/2014 article 1 point 3 "a", "b" or "c" in the sectors referred to in point and the other sectors covered by the Commission Regulation No 651/2014, the distinction between the scope of eligible activities or financial flow from other activities of financial flows, thereby ensuring that actions excluded sectors do not benefit from the aid granted in conformity with Commission Regulation No 651/2014; 27.2 9. aid shall be granted to the Commission Regulation No 651/2014 article 1, paragraph 4 under "a" and "d" of article 13 in the cases referred to in point; 27.2 10. aid shall not be granted if the rural support service project at the time of approval of the application, found one of the ailing company signs according to Commission Regulation No 651/2014 article 2 paragraph 18 and the regulations on the European agricultural guarantee fund, the European agricultural fund for rural development and the European Fund for Maritime Affairs and fisheries, as well as national and European Union aid for agriculture and rural development and fisheries Financing Administration 2014 – 2020 programming period; 27.2. the support shall be granted to 11 of Commission Regulation No 651/2014 6. in paragraph 2 of article in those cases; 27.2. the granting of aid 12 essential changes in the production process, the Commission Regulation No 651/2014 article 14 requirements; 16.9 13. Field support services in accordance with Commission Regulation No 651/2014 article 9(1) and (4) and article 12 of the publishing and information availability; 27.2 14. receive funding for risk capital investment in the form of this provision within the allowable amount of the aid shall be reduced by 20 percent, exceeding the amount received venture capital investment. These conditions shall apply for three years from the granting of risk capital; 27.2 15. in accordance with Commission Regulation No 651/2014 article 23, paragraph 2, of the initiation of the project considered contribution related to either the start of construction work or the first legally binding commitment to order equipment, or other obligations that make irreversible investments, – whichever comes first. Preparatory work such as licences or feasibility studies are not considered for the job. If the project is launched before the application of the project, the project submission must be rejected. Support combined with other aid for the initial investment, the project may be initiated only after all the participating institutions have decided to provide support for the investment project. 27.2 16. maximum aid intensity does not exceed 40 percent, but large economic operators-35 percent. 17.0 getting this 27.2. the provisions referred to in the final product, the beneficiary shall ensure that the financial contribution of at least 25 per cent of eligible costs, with the same features or external funding, which has received public support. " 18. the introductory part of paragraph 28, replace the words "purchased by the applicant" with the words "merchant purchased". 19. Put 29 the following: "29. This provision, paragraph 28 sectors of local extent of the main applicant is raised by at least 10 percent in the third year following the conclusion of the project (except if the local share of the main already exceeds 70 percent) and does not reduce it throughout the subsequent commitment period." 20. Express 31 the following: "31. Aid shall be granted to producers who produce home and whose total turnover is greater than 200 000 euros." 21. Put the following section 32.1. "this rule 32.1.9.3.1. the activities referred to in: 32.1.1. holdings, which plans to implement the project of agricultural or forest land; 32.1.2. legal person whose share capital is more than 50 percent of private capital and intends to implement the project of agricultural or forest land; 32.1.3. local (municipal corporation) to make the municipal drainage system of sharing the meaning of conversion or rehabilitation of agricultural or forest land; 32.1.4. National reclamation system operator or legal possessor; 32.1.5. a person whose property is in the forest and which intends to implement the project of forest land; ". 22. Supplement 32.2. subparagraph after the word "public" with the words "and holding." 23. To supplement the rules with 32.1 point as follows: "this provision, 32.1.1 32.1 32.1.2.,.,., and 32.1.3 32.1.4 32.1.5. bottom referred applicants can implement one joint project (hereinafter referred to as joint ventures) these rules referred to in paragraph 9.3.1., if the Sub between members of the joint venture contract has been concluded and after the implementation of the joint projects being rebuilt or refurbished one shared drainage system which regulates the water mode at least in lands with a common border. The joint venture agreement and the support received one of the drainage system owners or legal possessor. This condition does not apply to the national society with limited liability "the Ministry of agriculture in real estate", which is not participating in the joint venture. " 24. To supplement the provisions of this paragraph 33.3: ' 33.3. the land on which the planned reclamation system conversion or restoration. " 25. the introductory part of paragraph 35 be expressed as follows: "35. aid drainage system renovation and conversion of award if it meets at least one of the following conditions:". 26. To complement the rules with 21.8 points in the following wording: "the laws of 21.8 risk ūdensobjekt risk ūdensobjekt a set of catchment areas for the Betterment of the system of aid for restructuring and renewal receives only about environmentally friendly drainage systems in accordance with the provisions of annex 12." 27. Express 36.1. subparagraph by the following: "36.1. Natura 2000 areas, especially protected natural areas in strict mode, the behavior of nature and natural park in the area (except where the drainage system or restore conversion made for Natura 2000 territory or specially protected natural areas conservation plans) and mikroliegumo or few valuable organic lawns are excluded;". 28. Replace paragraph 37, the word "applicant" with the words "the applicant (in the case of the implementation of the joint venture, each Member of the joint venture). 29. Make the following introductory paragraph 39:39. "this provision referred to in paragraph 1 is to apply sub-measures General costs (including architects, engineers and consultation fees, expenditure on works prior to determine reclamation cadastre of inclusion, expertise, building and autoruzraudzīb services, legal services and technical-economic justification, patents and licences, as well as energy efficiency audit preparation costs) which are directly connected with the preparation or implementation of a project and not more than seven percent of the total cost referred to this provision, 50.3 50.1, 50.2..., 52.1, 52.2 and 53 in, including: ". 30. Add to subparagraph behind number 24.4. and the word "52.2. in words and in" number "and" in paragraph 53. 31. Supplement with 24.3 points as follows: 39.1 39. These rules "referred to the receipt of patents and licences the costs are eligible, provided that they fulfil the Commission Regulation No 651/2014 point 8 of article 14. The other 39 referred to General costs this rule 27.2 2. applicants referred is eligible if they comply with Commission Regulation No 651/2014 contained in article 18 conditions, while 27.2 3. applicants referred to it not eligible. " 32. Replace paragraph 44, the number and the word "in" Annex 8 with the number and the word "" in annex 9. 33. in paragraph 45 of the following expressions: "45. If the project for the new construction, conversion or restoration costs specific to the type of construction exceeds the maximum eligible costs and they are necessary for the attainment of the objectives of the project, the project application will not be rejected if the applicant fully bear the cost. "
34. Replace 50.2 in number and the word "in" Annex 8 with the number and the word "" in annex 9. 35. paragraph 53 be expressed as follows: "53. the Sub-measure eligible costs is the drainage system rebuilding and reconstruction cost of the works, drainage of the roadway adjacent to the object of the rebuilding and restoration of the compartments (without cover), environmentally friendly drainage system installation costs, as well as Board and siding construction and rebuilding cost based on contracts with third persons responsible for carrying out the work, but not exceeding the provisions in annex 8." 36. To supplement the rules by 53.1 points as follows: "the State and 53.1 national drainage system reconstruction and renewal, shall be subject to the financial contingency reserve – no more than five percent of total project eligible costs. The financial reserve of the project uses this rule 53 paragraph to cover eligible costs before it in coordination with Field support. " 37. Add to subparagraph after the word 55.4.1. "rebuild" with the word "restore". 38. To replace the word "55.5 in documents" with the words "documents (if submitted joint ventures-one procurement procedure for all participants in the joint venture). 39. The deletion of 56.1. section. 40. Put 56.3 56.4. subparagraph and the following: 56.3. in implementing the project "in the livestock sector, a Natura 2000 area (building and equipment) and product processing sector, submitted to the national environment service regional environmental management technical regulations issued or opinion that the activities envisaged in the draft does not require technical rules, or environmental monitoring country office's decision on the environmental impact assessment, if the project has undergone an environmental impact assessment of the initial environmental monitoring public opinion on the Office's final report, if carried out an environmental impact assessment. If the intended construction, these documents may be submitted within six months after the entry into force of the decision on the application for approval of a project or with the technical project. If these documents are not submitted, the rural support service from the administrative procedure law; 56.4. certified professional energy audits of buildings issued the statement and calculation of the energy performance calculation for the planned or BLANKET or ammonia emissions reductions (these rules 13 and 14 of the annex), if the application contains this provision 11.2.1 or 11.2.2. subparagraph. purpose; ". 41. To complement the 56.5. subparagraph after the word "members" with the words "for the last two years," concluded. 42. Replace subparagraph 56.8.3., the word "the" with the word "local". 43. Supplement with 56.8.4. section as follows: "56.8.4. process description, drawings and equipment layout diagrams, if the project is intended to be installed on the machine." 44. section 57.1. To express the following: 57.1. drainage system "and the waterworks structures technical inspection a copy of the opinion (the original show), or the opinion of the technical survey of the construction of the copies (the original show), if the application is not added to the project construction. The opinion noted that rule 9.3.1., and in 21.9 21.8 and 21.8 information referred to in paragraph 1; ". 45. Add to subparagraph 57.1.1 of the rules with the following: "national 57.1.1 and national reclamation system rebuilding and recovery in the case of drainage systems and waterworks structures technical inspection technical opinion or the opinion of constructing survey copy (showing original) together with a building project;". 46. To supplement the provisions under paragraph 57.3.1 as follows: "If the project is carried out 57.3.1 on environmental impact assessment, submitted initial national environmental service, technical rules, but, if the project has an environmental impact assessment was not initially required – national environmental service technical rules or opinion that the project is not necessary for the implementation of technical regulations. Documents shall be submitted within six months after the entry into force of the decision on the application for approval of a project or with the technical project; ". 47. To supplement the provisions of this subparagraph with 57.8.: "If the joint venture is 57.8., notarized contract between the joint venture participants who: 57.8.1. showing support the applicant's right to represent the party in the joint venture, to submit a project application, to implement the project and to receive aid; 57.8.2. declares that the members of the joint venture after five years of implementation of the project will respect the laws and regulations of the State and European Union aid for rural and fishery development and implement the commitments they have entered into a period of supervision; 57.8.3. provides cost sharing, settlement arrangements between members of the joint venture and the obligations arising from the implementation of the project. " 48. paragraph 58 be expressed as follows: "58. funding for the Claiming to new construction, conversion, acquisition or building fixed installations and their equipment, specified in a construction or engineering, 57.5. these provisions referred to in the document, as well as the construction of the purchase documents (excluding 55.6.3. documents referred to) related to the construction costs, submitted together with the application for the project or within six months after the entry into force of the decision on the approval of the project application but no later than five working days after the completion of the procurement procedure. " 49. Supplement with 58.1 points in the following wording: "this rule 58.1 32.1.4. aid referred to by the applicant country and the Betterment of the system of national importance in rebuilding and restoring the rule and 57.5 55.5. referred to in documents as well as purchase documents related to construction costs, submitted together with the application for the project or within 12 months after the entry into force of the decision on the approval of the project application, but not later than 10 working days after the final completion of the procurement procedure." 50. Make 39.2 39.3. subparagraph and the following wording: "39.2. livestock farms in the construction and installation of fixed equipment appropriate in the case of category (A) or (B) authorization of a pollutant or pollutant activities in category C, a copy of the proof (the original show), if the applicant's organization after you change the project implementation activities polluting category. If the applicant fails to submit this information, field support service of the administrative procedure law and the term it is obtained from the national environmental guard; 39.3. after the implementation of the project together with the final payment request-certified specialists issued repeated calculation of the energy performance of the building, which is the technical design data and built or rebuilt buildings (building a temporary dissemination), if the application contains these rules referred to in paragraph 11.2.1. objective; " 51. Delete paragraph 66, the number "28". 52. To complement the chapter 7 with 66.1 points as follows: "After the implementation of the joint venture, 66.1 beneficiary simultaneously with the payment request service Field report on overall distribution between the eligible cost of the joint venture participants (all members of the joint venture, confirms), and documents showing the implementation of joint ventures." 53. Delete paragraph 68. 54. To supplement the provisions under paragraph 69 as follows: "69. This provision of the aid referred to in subparagraph 1.3 sub grants under the Commission of 25 June 2014 Regulation No 702/2014, by which certain categories of aid in the agricultural and forestry sectors and rural areas recognised as compatible with the internal market, the application of the Treaty on the functioning of the European Union and article 107.108 (OJ L193, 01.07.2014.). " 55. Make annex 1 as follows: "1. pielikumsMinistr of the kabineta2014 30 septembranoteikum No 56.600" Express 2 (2) of the annex by the following: "2. the received public funding supports the applicant's average revenue the past two years concluded from agricultural production and processing in comparison with the public funding 2007-2013 PAGE under" agricultural added value "and" modernisation of agricultural holdings "2 (if the last two years has been concluded, the turnover but in the previous programming period is not received, even if there was no turnover, no support, the applicant received the maximum number of points assigned criteria) according to the calculated coefficient of 30 ' 57. Express 5. point 3 of the annex by the following: "3. The project used eco-friendly drainage system elements (criteria calculated taking into account environmentally friendly elements of the proportion of the total būvapjom būvapjom) project phase with 30 30" project for meandr sedimentation ponds , two-stage drainage ditches or pile of rocks, the controlled drainage and artificial wetlands to make 20 58.6, 7 and 8 of the annex by the following: "6. the pielikumsMinistr of the kabineta2014 30 septembranoteikum no 600 one programming period available to the applicant the maximum amount of eligible costs N. p. c. Sub-measures and their activities the applicant eligible cost about (euro) i. Sub-measure "aid for investment in agricultural holdings" 1. Acquisition of premises construction and pārbūve1 of the farm including 2 000 000 asset iegāde2 700 000 2. Acquisition of fixed assets, construction and alteration of buildings, acquisition of new farm's 150 000 3. Acquisition of fixed assets, construction and alteration of buildings, asset iegāde3 young farmers 400 000 4. Acquisition of fixed assets, construction and alteration of buildings (see. primary agricultural products and machinery) 4 II 8 000 000 cooperative societies under "investment aid for processing" 5. Acquisition of premises and construction pārbūve5 processing company, 3 000 000 producers cooperative society, which produced 100 000 home manufacturer, producing in the home, if the project has resulted in the company becoming the herbal product registered companies or products of animal origin recognized 300 000 new companies processing plants to create 200 000 III. the Sub-measure "aid for investment in agricultural and forestry infrastructure development" 6. Drainage system rebuilding and restoring (and one owner and sharing), drainage of the road adjacent to the conversion object and restoring farms, natural person operating the property of the operator that is a forest, a legal person, which is more than 50% of the share capital in private equity, municipal (municipal corporation, which also will take the role of municipal drainage system of sharing conversion or restoration) 300 000 national reclamation system operator shall, without limitation, 7. Agricultural infrastructure (area at the production facilities, road) – construction, rebuilding and restoring farmers cooperative society 50 000 300 000 notes. 1 for the construction of up to applicant's average revenue from agricultural production and processing in the past two years, concluded before the application of the project more than five times (this condition does not apply to the applicant, if the total amount of eligible costs supported programming period is less than 150 000 euros). 2 up to the tenderer's average revenue from agricultural production and processing in the past two years, concluded before the application of the project more than three times (this condition does not apply to the applicant, if the total amount of eligible costs supported programming period is less than 150 000 euros). 3 the maximum funding Available, including this annex, paragraph 7. 4 the maximum funding Available, including 5 and 7 of this annex, paragraph. 5 do not exceed the applicant's net sales of agricultural products processing and production last year concluded before the application of the project more than five times (this condition does not apply to the applicant, the purpose of which is to create a new processing plant). 7. pielikumsMinistr of the kabineta2014 30 septembranoteikum no 600 aid intensity (as a percentage of the eligible expenditure of the project) no p. k. Type of eligible costs aid applicants (t. see cooperative society) the total turnover (euro) 70 000 70 001 – 001 – 01 to 50 000 000 1 000 000 1 000 more than 50 000 001 i. Sub-measure "aid for investment in agricultural holdings" 2 1. Structure construction, conversion, acquisition of fixed installations with construction or conversion of permanent installation under 40% 40% 40% 40% aid intensity, the additional young farmers through the structure construction, modification or acquisition of fixed installations with construction or conversion 20% 20% 10% – – additional aid intensity, if the project is implemented in the livestock sector in which cultivated herbivores – 10% 10% 10% aid intensity, the additional, if the project is implemented this provision 11.2.1. bottom point that objective (as a result of the project will increase energy efficiency by at least 20%) – 10% 10% 10% 2. Additional aid intensity the new field hosts, if invested in an investment project for the purchase of fixed assets, construction or rebuilding 10% 10% 10% – – 3. Agricultural tractors (the first farm purchased, if everyone else is older than 10 years) 40% 40% 40% 40% 4. Agricultural tractors (each subsequent) 30% 30% 20% 20% – 5. Trailers, implements, implements (excluding agricultural tractors) 40% 40% 40% 30% 6. Structure construction, alteration and specialised transportation cooperatives – 40% 40% 40% 40% 7. Trailers, implements, implements (excluding agricultural tractors) cooperatives-25% 25% 25% 25% II. the Sub-measure "aid for investment in the processing of" 3 8. Building and equipment 30% 30% 30% 20% 20% 9. Additional aid intensity processing plants that produce food products are assured in the test schema – 10% 10% 10% 10% 10. Additional aid intensity, if an applicant produces at least five foods that meet recommended food selection criteria (in accordance with the provisions of annex 10) – 10% 10% 10% 10% 11. Additional support for the restructuring of the company, the intensity if it affected other countries imposed import restrictions (export to the country made by at least 10%) – 10% 10% 10% 10% 12. Additional aid intensity, if the project is implemented this provision in paragraph 11.2.1. that objective (project results in energy efficiency score reduced by at least 20%) 4-10% 10% 10% 10% 13. Additional aid intensity, if the project is implemented in the inovācija4 results – 10% 10% 10% 10% 14. Manufacturers who produce home apstākļos5-40% 30% 6 – – (II). The Sub-measure "aid for investment in agricultural and forestry infrastructure development" 15. Drainage system rebuilding and restoring 60% 60% 60% 60% 60% 16. Environmentally friendly drainage system (annex 12) installing 80% 80% 80% 80% 80% 17. Drainage system rebuilding or renovation activities 70% 70% 70% 70% 70% 18 Municipalities sharing the importance of drainage system 90% 90% 90% 90% 90% 19. Drainage system rebuilding and restoring national 100% 100% systems 100% 100% 100% 20. Area, road, etc. infrastructure cooperatives 40% 40% 40% 40% 40% 21. Area, road, etc. infrastructure holdings, young farmers 40% 40% 40% 40% 40% notes. 1 new processing plant or farm. 2 the maximum aid intensity will not exceed 50% of the Sub, except support for young farmers. 3 the maximum aid intensity does not exceed 40% of the Sub. The great merchants, a project which the finished product is not included in the Treaty on the functioning of the European Union annex I, does not exceed 35%. 4 higher aid intensity cannot get aid applicants, which the project implementation, the resulting final product is mentioned in these rules 27.2. 5 are not subject to the higher aid intensity. 6 companies with turnover up to 200 000 euro. 8. pielikumsMinistr of the kabineta2014 30 septembranoteikum no drainage system 600 building, rebuilding and restoration works the maximum eligible costs N. p. c. The nature of the measure of per-unit costs (excluding VAT) 1. Drainage system work to restore: 1.1. bottom (izrokam of the soil volume) 4.00 euro/m3 1.2. bottom (quantity izrokam forest land) 5.00 euro/m3 1.3. drain system 8.00 Euro/m 1.4. up to 0.6 m diameter culverts (inclusive)/m 1.5 euro 430.00 diameter culverts over 0.6 to 1 m (including) 750.00 Euro/m 1.6. culverts in diameter above 1 m 1000.00 Euro/m 2. National ūdensnotek slope and bottom reinforcements, according to the procurement procedure (assessment of grounds) 3. Drain aka Euro/piece. 750.00 4. Drain spout Euro/piece. 200.00 ' 59. Supplement to annex 9, paragraph 22 and 23 by the following: "22. Heated garage Euro/m 148.60 269.78 23. Executive rooms Euro/m 204.40 354.85 "60. Replace annex 10, the words" dried vegetables "with the words" dried vegetables (except for dried legumes) ". 61. Express the annex as follows: "pielikumsMinistr of kabineta2014 11 of 30 to 600 septembranoteikum overview of the beneficiary of the economic indicators after the implementation of the project the European agricultural fund for rural development (EAFRD) under" investment in tangible assets "" 62. Supplement with 12, 13 and 14 of the annex as follows: "pielikumsMinistr of kabineta2014 12 of 30 to 600 septembranoteikum environmentally friendly drainage system elements and their criteria No. p. k. Environmentally friendly drainage system elements the measurable criteria 1. Sedimentary basin: agricultural and forest land drainage system ūdensnotek (water courses, novadgrāvj) bearing extensions and rinse well with water and sedimentation of the products for biological accumulation (nostādinātājbasein) • Pārtīrām ūdensnotek of novadgrāvj or in the length must be at least 500 m • construction sites-as close as possible to natural or regulated flow into the watercourse or body of water • Nostādinātājbasein must be built 30-50 m long section, you create a 0.5 – 1.0 m into 2. Two drainage ditches – two-stage compound ūdensnotek seabed šķērsprofil when you create or save a developed artificial floodplains with or without shore a • Put the šķērsprofil shelf width: not less than 1.0 m • two-stage compound šķērsprofil-stage project, the overall length of not less than 10% of renewable/pārbūvējam ūdensnotek or novadgrāvj in length 3. Pile of rocks – designing renewable or pārbūvējam ūdensnotek or novadgrāvj of the route, the garenslīpum and šķērsprofil, the bottom left small stones or pile of stones krācīt • bottom diameter of stones left – not less than 30 cm • pile of stones-volume not less than 1 m3 rock diameter of not less than 0.2 m • pile of stones height not exceeding the average summer water level 4. Meandrēšan-sīklīkumainīb-ūdensnotek-bed building, restoring the old floor stages or creating new curves of the compared solutions in the project and in nature 5. Controlled drainage, moisture regulating bilateral construction of drainage channels to drain the kontrolak or collector sources verifying the existence and functionality of design (summer mazūden period) 6. Artificial wetlands-artificially created wetlands for water pollution in fundraising with the surface or subsurface flow wetlands were created artificially • who created the project, and which have not previously been • water flow filtration using natural plant filters (cane u. c.) "  13. pielikumsMinistr-30 septembranoteikum kabineta2014 no pielikumsMinistr of 14 600 kabineta2014 30 septembranoteikum no 600 "Prime Minister of the Rashness of the farming Minister Newsletters site-Welfare Minister Uldis Augul States