Cabinet of Ministers Regulations No. 330 in 2015 (30 June. No 30 49) provisions for Latvian et seq of the LBN 501-15 "Būvizmaks" of procedure Issued in accordance with article 5 of the law on construction of the first part of paragraph 3 and the public procurement law, art. 9, fifth subparagraph 1. approve the Latvian et seq of the LBN 501-15 Būvizmaks "discovery procedure". 2. the rules apply to the structure būvizmaks defining the customers covered by the public procurement law.  3. Projects which provide tailored and harmonised to the provisions for the entry into force of the corresponding period in the normative requirements need not be processed according to the Latvian et seq LBN 501-15 "Būvizmaks discovery order. Projects that are designed based on the planning and architectural tasks, issued up to 2014 October 1, may not be processed according to the requirements of this regulation. The Prime Minister is the Rapidity of the Newsletters instead of Minister of Economics, Minister of health of the Ministry of economy Guntis Belēvič submitted version of the approved by the Cabinet of Ministers of 30 June 2015 by Regulation No 330 Latvian et seq of the LBN 501-15 "Būvizmaks procedures for determining" 1. General questions 1 et seq applies to all types of buildings to which Subscribers apply laws on public procurement. Transport būvizmaks structure shall be determined in accordance with Chapter 4 et seq. 2. the terms used in the et seq: 2.1. volume of construction works – works to the quantitatively defined for project documentation and by the works of uzmērījum or calculations can be established; 2.2. the wage rate on an employee's work hours for one income (gross), including governmental workers ' taxes and fees; 2.3. labour-specific unit of execution works under public works description time expressed in man-hours; 2.4. machinery cost – machine, accessories, tool rental or operation and depreciation (amortisation) charge for the execution of the relevant job description; materials transport (ferry) expenditure within the limits of the construction site; 2.5. estimate-construction industry (normative procedures specified) drafted for the implementation of the planned building project construction cost calculation. 2.6. the estimate cost elements – building materials, of construction, work, consumption, wage rates and wage, construction and cost mašīnlaik, based on the production units and the construction of the expressed natural (physical) or relative terms (interest rates); 2.7. direct costs – the costs associated with the job description contains the implementation of the measures; 2.8. the construction of transport-road, street and railway structures; 2.9. virsizdevum – additional administrative costs associated with building maintenance, construction, management, labour protection and insurance. 3. Et SEQ: 3.1 determines the expected discovery of the works contract prices; 3.2. procedures for all types of structures to be calculated or set (with regard to the construction sites, palīgbūv, technological equipment and utilities), individual works, including the mechanism of rental and specialized work, construction costs design and construction contract price determination of stages; 3.3. the estimate form. 4. the Būvizmaks includes materials (building materials, building) costs, labor costs, and the mechanism of būvmašīn rental and operating costs, the depreciation (amortisation) or rental costs, as well as virsizdevum and profits. 5. apply construction et seq cost calculations and construction stage construction contract price determination in the following situations: 5.1 5.1.1 determining the customer: the purchase contract price; 5.1.2. preparing specifications for a procurement procedure; 5.1.3. the planning of financial and other resources; 5.1.4. assessment of construction project economic efficiency; 5.1.5. realization of construction supervision; 5.2. the applicants and the participants in the works: 5.2.1. calculation of necessary materials, labor and other resources the construction tender; 5.2.2. the contractual relationship between the principal contractor and the contractor; 5.3. the experts and public authorities — in the evaluation of tenders; 5.4. the designer – the volume of the works of izcenošan. 6. Et SEQ apply the construction contract price forecast of planned construction projects for stage and throwing the minimum, if the client has prepared a detailed enough information on the construction plans. 7. not following et seq with the construction plans and building operation costs: 7.1. land and buildings acquisition costs; 7.2. the maintenance costs after their commissioning. 8. in applying the unit of measure used, et seq, and abbreviations that are prescribed by the laws of the physical size of the unit, their English names and spellings. In addition, the following units and their abbreviations 8.1. number of units of the product – gb.; 8.2. the products or equipment Kit-kpl.; 8.3. measurement of work shifts (8 hours); 8.4. time measurement-dnn 24.; 8.5.-c/h man-hours; 8.6. the mechanism of hours of work or Exchange (mašīnmaiņ)-h or m/m; 8.7. wage-rate-Euro/h. 9. Works tāmēšan works būvspeciālist allowed to drive, who have received the certificate of būvpraks the construction of article 13 of the law.
2. Construction projects consisting of them 10 volumes of the works of construction drawings are laid, volumes and materials specifications lists, which is a construction. 11. Construction cost by construction group (annex 1) or work and the constructive elements (annex 2). 12. The estimates include the following: 12.1 the direct costs of the works; 12.2. virsizdevum; 12.3. the profit; 12.4. the other Subscriber costs related to construction, but not in the works. These expenses include as separate items in the customer only the construction of the koptām (annex 3). 13. the estimate includes a construction kit (annex 4). The estimate set may consist of: separate housing 13.1. local estimates (annex 5); 13.2. the summary calculations by job types or elements (annex 6); 13.3. the construction of the koptām (annex 7). 14. the estimates shall be accompanied by explanatory note with the following information: the execution of the works and 14.1. all conditions (t.sk. cumbersome) description or reference to technical specifications; 14.2. a brief description of the Organization of the works (the performance of the works, the main resource required characteristics and other information), if this information is not included in the construction plan; 14.3. the construction labour. 15. Estimates of creator and verifier is responsible for the construction of technically based information projects for economic inclusion of descriptions and calculations, as well as the construction of the objective assessment of economic conditions and the fulfilment of the conditions determining the cost elements. The creator and verifier estimate a construction documentation drawn up in accordance with the requirements of the design and certify it with a signature. 16. the estimates in the creator and the examiner is not responsible for the technical specifications of the works in compliance with the construction of the scale drawings.
3. Drawing up estimates of amounts receivable

17. The estimate is based on the dial: 17.1., a construction attached to the volume of construction work and construction specifications; 17.2. information on the works, būvmašīn, mechanisms, tools and instruments, which correspond to the nature of the works, volumes and quality conditions; 17.3. the estimate of the cost elements relevant work. 18. the direct costs of the works include: 18.1. construction products (construction materials, building, tools) and with performance related materials acquisition cost, including transportation costs, bringing them to the site, the procurement cost of building materials, wholesale prices of imports, taxes, cost of packaging (including disposal costs or take-back revenue), as well as the process of būvražošan loss and predetermined use; 18.2. the execution of the required labour costs; 18.3. the contractor's governmental taxes and fees associated with the job description, specified measures, excluding value added tax; 18.4. būvmašīn, equipment, machinery and auxiliary equipment lease or operating expenses as well as depreciation (depreciation costs). 19. Estimates include gross labour costs-wages, including governmental workers ' taxes and fees. 20. Virsizdevum and profit summary calculation indicates the percentage as well as for direct costs. 21. The principal construction contract price expected housing construction plan for the stage and threw the minimum composition, developing a feasibility study and draw up a Subscriber in the construction koptām (annex 3). 22. The customer shall include the principal koptām the construction of the financial reserve for unexpected expenses-works and during the execution of the works reveal additional work to be done and incidence. 23. If the customer fails to dial koptām, financial reserve for unexpected jobs includes a summary statement (annex 6). 24. Designer draws up a list of the volume of work (annex 7). 25. The tenderer shall quote (estimate Kit) includes the full cost of the works with all risks, including the possible incidence (annex 8), with a separate indication of the value added tax. 26. The estimate of the amount of items in the specified quantitative indicators with an accuracy of not less than: 26.1. five significant digits – costs; 26.2. four significant digits for other elements.
4. determination of Būvizmaks transport structures 27. This applies in determining et seq project technical economic feasibility, planning, assessing financial resources construction plan, tax or other impact of the changes to the contract price of the works, as well as assessing the tenderer financial offers and purchase the estimated contract price. 28. at the time of the būvizmaks of the design shall be determined taking into account the prices of similar works agreements concluded by the national development of the macro-economic indicators, the structure of transportation construction market changes and development prospects, the proposed works contract conditions and other information as specified in the contract, the construction of the Subscriber. A construction indicates the sources of information used and assumptions, which are based on the cost calculation. 29. If the construction plan was approved less than one year, then, in determining the economic feasibility of the project technical planning financial resources or determining the estimated contract price works, construction of the information used in the review and adjust the assumptions on which is based the cost calculation, according to the last transport engineering construction market changes. 30. The applicant purchases the financial tenders for construction works shall submit the work to be done and the price list (hereinafter list). The minimum amount of the list set out in annex 9 et seq. The subscriber list is added to the procurement regulations (if necessary, supplement the list with other information). 31. The applicant individually izcenojam work price includes all the costs necessary for the job according to the works contract rules of the project, including the virsizdevum and profits. Their work and the related costs for which the Treaty does not provide a separate charge (not included in the list as separate izcenojam lines) including the izcenojam price in proportion to the relation with the job (position). 32. If the proposed contract price exceeds the estimated contract price or it's more than about 20% less than the estimated contract price, the customer's request, the applicant shall submit a calculation of the costs of certain subscriber list positions (annex 10). 33. In the case of works contracts the necessary construction plan, tax or other impact of the changes to the contract price, works the artist shall prepare and submit within the time limit set by the Subscriber to the Subscriber the cost calculation (annex 10). The client may require the contractor to submit justification of costs specified in the calculation, including contracts with suppliers and subcontractors, material delivery note, information relating to persons involved in salary and social taxes employers pay. In place of the Minister of Economics, Minister of health of the Ministry of economy Guntis Belēvič submitted version of annex 1 to the Latvian et seq LBN 501-15 "Būvizmaks discovery order (approved by Cabinet of Ministers of 30 June 2015 by Regulation No 330) types of Works No. PO box Code type of work 1. General building work 1. 01-00000 rental machinery and mechanisms 2. 02-00000 dismantling works 3. 03-00000 building site preparation and land a job 4. 04-00000 pile works 5. 05-00000 concrete and precast reinforced concrete Works 6. 06-00000 stone, bricks, blocks, fireplace and furnace specification 7. 07-00000 metal construction Assembly 8. 08-00000 Carpenter works 9. 09-10 00000 roofing. 10-00000 internal finishing works 11. 11-12 00000 restoration work. 12-00000 Glazed systems and Glaziers works 13. 13-00000 isolation 2. Internal specialised working 14. 14-00000 internal tap and equipment 15. 15-00000 internal gas pipelines and equipment 16. 16-00000 internal drain wires and equipment 17. 17-00000 heating, ventilation and air conditioning 18. 18-00000 internal electrical works 19. 19-00000 internal vājstrāv work 20. 20-00000, escalators and elevators shafts 3. external finishing works and inženiertīkl 21. 21-00000 external finishing works 22. 22-00000 external electricity network 23. 23-00000 external networks vājstrāv 24. 24-25 00000 external district heating. 25-00000 external gas networks in 26. 26-00000 oil networks in 27. 27-00000 external water pipes and sewage works in 28 Different 4. 28-00000 pools and facilities 29. 29-00000 environmental projects-urban waste dumps, water purification installations and atdzelžošan stations 30. 30-00000 technological equipment Assembly 31. 31-32 00000 home improvement jobs. 32-00000 fences and gate 5. Special works and housing 33. 33-00000 blasting areas 34. 34-35 00000 bridges and culverts. 35-36 00000 roads and areas. 36-37 00000 tracks. 37-00000 Waterworks and drainage structures 38. 38-00000 Spiedtrauk and tanks in place of Minister of Economics, Minister of health of the Ministry of economy Guntis Belēvič submitted version of annex 2 to the Latvian et seq LBN 501-15 "Būvizmaks discovery order (approved by Cabinet of Ministers of 30 June 2015 by Regulation No 330) work and the constructive element types

Nr. PO box Type of work or constructive element name 1. General works 1. Building site preparation activities 1.1. the dismantling work in 1.2. temporary buildings and structures 2. Earth works 2.1. lower water level and draining 2.2. drainage system construction of 2.3. soil development 3. The basics and the base 3.1. pile foundation of 3.2. concrete basics 3.3. dip in uk, caissons 3.4. support wall 3.5. insulation works 4. Walls, buildings and premises the carcass construction 4.1. stone 4.2. wooden 4.3. reinforced concrete 4.4. metal 4.5. the wall frame insulation works 5. Bulkhead 5.1. Wall 5.2. wooden 5.3. reinforced concrete 5.4. facilitate the design of 5.5. bulkhead insulation works 6. Covers 6.1. wooden 6.2. reinforced concrete 6.3. metal 6.4. mix thermal insulation 7. The design of the stairs, landing in a 7.1. wooden 7.2. reinforced concrete 7.3. metal 7.4. mixed construction 8. The base of the floor coverings, 8.1. wooden 8.2. concrete, reinforced concrete 8.3. facilitate the design of 8.4. Special coverage for 8.5. the design of the insulated floor 8.6. under-floor channels 9. Roofs, coverings 9.1. construction of load-bearing construction of 9.2. the roof deck, the base of 9.3. cover of soft roll material 9.4. cover of bitumenizēt materials, 9.5. metal coverings plānlokšņ 9.6. tile roof coverings 9.7. insulation installation work 10. Boxes fill elements, special construction facade 10.1. window box of 10.2. doorway 10.3. facade construction 11. Fireplaces, stoves, other heating device 12. Chimneys, the base 13. Finishing work in 13.1. internal finishing work in 13.1.1. surface preparation for painting, plastering, 13.1.2. surface painting 13.1.3. tiling works, surface finishing with stone 13.1.4. wallpaper works 13.1.5. formations, their processing 13.1.6. hammered, plānlokšņ wall finishing 13.1.7. special surface treatment 13.2. external finishing work in 13.2.1. surface preparation for painting, plastering, 13.2.2. surface painting 13.2.3. tiling works, surface finish with stone 13.2.4. the finish on the metal materials 13.2.5 plānlokšņ. formations, their processing 13.2.6. hammered, plānlokšņ facade decoration 13.2.7. special surface treatment 14. Entrance porch, stairs, terraces, uzjumteņ, 14.1. the porch in 14.2. ladder 14.3. terraces 8.9. uzjumteņ 15. Fencing, fencing; Gates and gate 15.1. fencing, fencing 15.2. Gates and gate 16. Roads and area 17. Greening work 18. Different works in 19. Restoration work at 19.1. constructive elements of the restoration 19.2. the constructive elements in surface restoration 19.3. surface decorative trim 19.4. formations, it updated the 19.5. special surface treatments 2. Specialized jobs-internal network, system, 20. Internal grids, lighting, RAM 20.1 in. cables, wires 20.2. distribution of 20.3. lighting fixtures 20.4. automatic control system of control, 21. Internal heating systems 21.1. pipelines, 21.2. heating boilers, measuring equipment 21.3. siltummezgl, spiedtrauk, 21.4. sildķermeņ, 21.5. isolation, tests, 22. Ventilation, air conditioning 22.1. overhead, output of 22.2 caret. air flow dividers, equipment for regulating 22.3. facilities, equipment, 22.4. automatic control system of 22.5. isolation, tests, 23. Internal water network, equipment 23.1. pipelines, 23.2. sprinkler system 23.3. technical equipment 23.4. isolation, tests, 24. Internal sewerage networks, equipment, 24.1. risers and leads 15.0. technical equipment 24.3. isolation, tests, 25. Internal gas pipelines 25.1. pipelines, 25.2. equipment, equipment 26. Vājstrāv networks 26.1. burglar alarm was 26.2. security system 26.3. fire alarm 26.4. video surveillance, including 26.5 territory. a computer network, including data transfer 16.5. the telephone network, including Exchange 26.7. television system 16.7. unified management system of control, 26.9. notification apskaņošan system 27. The elevator, the elevator shaft 27.1. elevator equipment, lifters 27.2. shaft 28. 3. Specialized technological equipment jobs-external network, system, 29. External grids, lighting. Trunk lines in 29.1. the transformer substation, power cable, 29.2. overhead power lines, 29.3. external lighting of building facades, including 30. External district heating 31. External tap networks 32. External sewerage network. Treatment of 33 rigs. Rainwater sewage network at 34. External gas input wires, 35. Oil product pipeline in 36. Technological equipment 4. special structures 37. Borehole in 37.1. blasting works 38. Tracks 39. Bridges, culverts. The coast of anchorage construction 24.3. reinforced concrete, concrete bridge design-24.4. the metal bridge design 39.3. 40 culverts. Waterworks and drainage structures. Divers working at 24.9. water runoff control structures and levels (reservoir, pond, dam, novadbūv) 40.2. water resources facilities (hydro, watermill, pumping stations), 25.0. the sources of the water level connect the shipbuilding (straujtek, kritņ) 40.4. the surrounding area of protection structures (aizsargdambj) 25.2. the sources of transmission structures (zemtek, aqueducts) 40.6. the Bank of the stream and control structures (dams, Boone, viļņlauž, coast, shore, beach) 40.7. fish migration and protection structures (fish, fish protection devises) 25.4. berths 25.4. divers working at 40.10. drainage system 41. Tunnels, reservoirs 42. Equipment. Equipment in place of the Minister of Economics, Minister of health of the Ministry of economy Guntis Belēvič submitted version of annex 3 to the Latvian et seq LBN 501-15 "Būvizmaks discovery order (approved by Cabinet of Ministers of 30 June 2015 by Regulation No 330) APPROVED (customer signature and transcript) Z.V. ____ ___ of ___. _ _ _ _ _ _ _ _ _ _ _ _ _ koptām of the construction of the Principal shipbuilding the shipbuilding address name order No.  
Those drawn to the _____ of ___. ___________
Nr. PO box Object name object cost (euro) total financial reserves for jobs not VAT (%)   Total construction costs associated with the construction of other projects of the autoruzraudzīb of the building: research and design work in construction expertise together dialed (signature and transcript, date) certificate No.      
Verified (signature and transcript, date) certificate No.      
Project Manager (signature and transcript, date) in place of the Minister of Economics, Minister of health of the Ministry of economy Guntis Belēvič submitted version of the annex 4 to 501 et seq of Latvia LBN-15 "Būvizmaks discovery order (approved by Cabinet of Ministers of 30 June 2015 by Regulation No 330) estimate set composition

Nr. PO box Projected estimates of the size of the name būvizmaks design notes 1 2 3 4 5 1. Less than eur 71 150 local (annex 5) the local end of the virsizdevum is added to them. Estimates of the amount of work added to the list of documentation composition Estimates may include koptām 2. From eur 142 290 Euro 71 150 1. Local estimates (annex 5) 2. The construction of the koptām (annex 8) local estimate at the end of subparagraph virsizdevum is added, except for the cases provided in the notes. The amount of work you can add a list in electronic form without printing If a construction of several types of construction work involves performance, the estimate should include summary calculations by work or the constructive elements (annex 6), by adding the cost of the part 3. More than 142 290 Euro 1. Local estimates (annex 5) 2. Summary calculations by work or the constructive elements (annex 6). construction of koptām 3 (annex 8) according to the rules. The amount of work you can add a list in electronic form without printing-4. The complex includes a number of individual site 1. Local estimates (annex 5) 2. Summary calculations by work or the constructive elements (annex 6). construction of koptām 3 (annex 8) for each separate site for the relevant types of estimates (column 3) and the Levels of the complex koptām combine to form a koptām for each individual object and combine in a complex koptām in place of the Minister of Economics, Minister of health of the Ministry of economy Guntis Belēvič submitted version of annex 5 to the Latvian et seq LBN 501-15 "Būvizmaks discovery order (approved by Cabinet of Ministers of 30 June 2015 by Regulation No 330) local estimate no ____ (kind of work or constructive element name), the name of the Building : name of the object: the object's address: order No.: Those drawn to the _____. annual market prices based on ____ ___ part drawings. Estimates costs ____ ____ ____ euro estimate made: _____ year _____. ____ ____ ____ no PO box The code name of the Work unit quantity unit cost total amount for the entire time the norm (c/h). wage rate (€/h) salary (euro) materials (euro) mechanisms (in euros) total (euro) labour (c/h) salary (euro) materials (euro) facility (€) amount (€) total _____% of the material, debris transport costs direct costs total total note. the dismantling and the bottom of the Exchange works was drawn up: (signature and transcript, date) verified: (signature and transcript, date) certificate No.      
In place of the Minister of Economics, Minister of health of the Ministry of economy Guntis Belēvič submitted version of annex 6 to the Latvian et seq LBN 501-15 "Būvizmaks discovery order (approved by Cabinet of Ministers of 30 June 2015 by Regulation No 330) Summary of calculation about working or constructive element types (type of work, or constructive element name), the name of the Construction object name object address order No.     For a total amount of eur _____ _____ _____ total labour, c/h _____ _____ _____ Them drawn in the _____ of ___. _ _ _ _ _ _ _ _ _ _ _ _ No. PO box Code, no. Tar or constructive element name estimated cost (euro) including work-capacity (c/h) salary (euro) materials (euro) mechanisms (euro) together over the costs (_____%). t.sk protection of profit (_____%)   Soc of the employer. tax (____%)   Total dialed (signature and transcript, date) examined (signature and transcript, date) certificate No.      
In place of the Minister of Economics, Minister of health of the Ministry of economy Guntis Belēvič submitted version of annex 7 to the Latvian et seq LBN 501-15 "Būvizmaks discovery order (approved by Cabinet of Ministers of 30 June 2015 by Regulation No 330) APPROVED (customer signature and transcript) Z.v. ____ ___ of ___. _ _ _ _ _ _ _ _ _ _ _ _ _ koptām of the construction of the building housing the address name order No.  
Those drawn to the ____ of ___. _ ___ ___ ___ No. PO box Object name object cost (euro) total VAT (____%)  
 
Put the (signature and transcript, date) certificate No.      
  In place of the Minister of Economics, Minister of health of the Ministry of economy Guntis Belēvič submitted version of Annex 8 to the Latvian et seq LBN 501-15 "Būvizmaks discovery order (approved by Cabinet of Ministers of 30 June 2015 by Regulation No 330) APPROVED (customer signature and transcript) Z.v. ____ ___ of ___. _ _ _ _ _ _ _ _ _ _ _ _ _ koptām of the construction of the building housing the address name order No.  
Those drawn to the ____ of ___. _ ___ ___ ___ No. PO box Object name object cost (euro) total VAT (____%)  
 
Put the (signature and transcript, date) certificate No.      
In place of the Minister of Economics, Minister of health of the Ministry of economy Guntis Belēvič submitted version of Annex 9 to the Latvian et seq LBN 501-15 "Būvizmaks discovery order (approved by Cabinet of Ministers of 30 June 2015 by Regulation No 330) to do list for object name: no PO box (heading) Unit of measure unit price amount (€) total price (in euros) total VAT (__%)     Total economic Minister, the Health Minister of economy Ministry Guntis Belēvič submitted version of the annex 10 to 501 et seq of Latvia LBN-15 "Būvizmaks discovery order (approved by Cabinet of Ministers of 30 June 2015 by Regulation No 330) Cost calculations within a form

To do list item number name quantity unit of measure for the material in the Material name, unit of measure unit price quantity position in one unit in one position the unit cost (euro) all items cost (euro) together Transport transportation way, the amount of Material goods (t or m3) unit price (euro/km or euro/h) Flight length (km) or duration (h) one position unit cost (euro) all items cost (euro) total mechanisms name unit price (euro/h) consumption per unit (h) heading one position unit cost (euro) all items cost (euro) Total workforce employee category pay rate (euro/h) One unit of labour heading (h) one position unit cost (euro) all items cost (euro) total direct cost total cost description% of direct costs one position unit cost (euro) all items cost (euro) overhead costs other (financial cost of insurance), the target profit for the other costs included in the price of the work description: all work together instead of Minister of Economics, Minister of health of Guntis Belēvič