Advanced Search

Rules For The Latvian Et Seq Of The Lbn 310-05 "project Implementation"

Original Language Title: Noteikumi par Latvijas būvnormatīvu LBN 310-05 "Darbu veikšanas projekts"

Subscribe to a Global-Regulation Premium Membership Today!

Key Benefits:

Subscribe Now for only USD$40 per month.
Cabinet of Ministers Regulations No. 395, Riga, 7 June 2005 (pr. No 34 10. §) rules on the Latvian et seq of the LBN 310-05 "work project" Issued in accordance with article 2 of the law on construction of the fourth part 1. approve the Latvian et seq of the LBN 310-05 "project implementation". 2. Work out projects that a validly accepted or submitted for acceptance to the 2005 31 October according to the period in question the application of the requirements of the law, not to be processed, according to the Latvian et seq of the LBN 310-05 "project implementation". 3. Be declared unenforceable in the Cabinet of Ministers of 25 June 1997, Regulation No 221 "rules for the implementation of the project and the conditions for development (LBN of the Latvian et seq 310-97)" (Latvian journal, 1997, nr. 167). 4. the rules shall enter into force on the 1 November 2005. Prime Minister a. Halloween economic Minister A.r. Kariņš approved by Cabinet of Ministers of 7 June 2005 Regulation No. 395 of the Latvian et seq LBN310-05 "project work" 1. Et SEQ works determines the composition and development of the project in accordance with the conditions of the construction law and Cabinet 1 April 1997 No. 112 provisions of "General provisions" (General provisions) 5.4 subdivision. 2. the work of the project development, based on the work of organizing the project. It is necessary, if the building or construction meets at least one of the following criteria: 2.1 is higher than two floors above ground or about 7 m; 2.2. its building area is greater than 1000 m2; 2.3. the būvapjom is greater than 5000 m3; 2.4. If the works during the construction of the building or the expected effect on traffic and utilities at the site or in the adjacent terrain area (in this case, the būvvald in accordance with the laws governing the construction to determine and record the task for planning and architectural requirements for the performance of the works); 2.5. building or construction is suitable for national cultural monument status, whether it is in the specially protected area (law "on specially protected natural areas") or mikroliegum (species and habitats protection law); 2.6. the building or building works have been interrupted and it has been preserved for more than five years; 2.7. initiated the restoration works following construction of a building or of a partial ruin; 2.8. the opinion about the construction of a building or the condition specifies that it is an emergency situation; 2.9. is designed for the construction of a building or demolition; 2.10. develop work projects requested by the Subscriber, the Builder or the main contractor. 3. The need to develop projects and carrying out the work in accordance with this section 2.4. et seq requirements of entry permit būvvald. 4. Work out projects developed after the construction permit and before the commencement of the construction works. Work out the project complies with the organisation of the work project, which is part of the accepted projects, and the requirements of building permits in the recorded būvvald. 5. the work of the project presented under General būvnoteikumo and Latvian et seq of the LBN 201-01 "Construction and design" (approved by Cabinet of Ministers of 14 august 2001, regulations No 370). 6. the works projects, and accepts the General conditions prescribed by the būvnoteikumo, but those structures, which the Cabinet of Ministers, in accordance with article 6 of the law on construction of the first part has determined a specific construction procedure — construction of regulatory legislation. 7. Work out the project of construction of regulatory compliance laws and requirements of the project by stating general provisions of paragraph 67. 8. the work of the project include: 8.1 works calendar schedule; 8.2. the master plan of the works; 8.3. the preparatory work and description of work; 8.4. non-traditional and complex works the way technological schemes and an indication of the execution; 8.5. main būvmašīn working schedule; 8.6. list of professionals required for the performance of the work site; 8.7. the structure of the definition of necessary work; 5.5. temporary technological responsible design-based solutions; 8.9. the labour protection, safety, production and fire safety measures of hygiene technical solutions; 8.10. būvmašīn, technological and Assembly equipment list; 8.11. the explanatory memorandum; 8.12. the labour motion graphics. 9. Work out the composition of a particular project for the construction, taking into account the planning and architectural task requirements in būvvald, the construction manager shall determine the organisation of the work in the project.
Economic Minister A.r. Kariņš