Advanced Search

Implements And Trailers Conversion Rules

Original Language Title: Traktortehnikas un tās piekabju pārbūves noteikumi

Subscribe to a Global-Regulation Premium Membership Today!

Key Benefits:

Subscribe Now for only USD$40 per month.
Cabinet of Ministers Regulations No. 245 in Riga, 28 March 2006 (pr. 17. § 36) implements and trailers conversion rules issued under the Highway Traffic Act article 15 of the sixth part i. General questions 1. determines the order in which the implements and rebuilding its trailers, implements and its requirements for the design and equipment of trailers after reassembly and the order in which the receivable on the implements and trailers and rebuilt in conformity with the safety requirements of the technical regulations. 2. The purpose of these provisions is to ensure that human health, life and around Green tea implements and trailers to participate in road traffic. 3. Latvia has the right to offer technical or rebuilt trailer that has been legally produced or released in any of the Member States of the European Union or in Turkey, or which have been lawfully manufactured in one of the countries of the European Free Trade Association on the European economic area agreement of the Contracting Parties. 4. On the technical and the rebuilding of trailers is the technique of tractor and trailer unit, node, system, or equipment installation, modification, replacement or removal, thus changing implements and trailers carrying technical data or the main constructive characteristics. 5. For the technical conversion is not considered: changing the engine 5.1 to the same technical marks, models of the same type (positive-ignition, compression ignition) engines;
5.2. the winch installation or disassembly;
5.3. front or rear axle drive disconnection;
5.4. the coupling devices installation or dismantling of the relevant rules under the technical requirements;
5.5. lighting or light-signalling devices Exchange against other traktorteh Nike brands and model the use of the lighting and light-signalling devices according to the requirements of technical regulations;
5.6. additional lighting and light-signalling devices conform to the technical regulations of the community;
5.7. seat change from other brands and models of seat according to the technical requirements of the regulations, if not changed the seat anchorages;
5.8 double-wheel installation, if it is intended by the manufacturer implements;
5.9. fitting with chains driving wheel in place, if it is intended by the manufacturer;
5.10. the Assembly and the Assembly, if the manufacturer's intended use and Assembly and they are mounted implements or implements intended by the manufacturer of the trailer sites;
5.11. set manufactured fuel additional tank, if diesel is expected to run on pure vegetable oil. 6. in the case of prohibited implements: 6.1 to make changes in design, if it implements changes to dimensions dimensions (length, height, width, and other technical parameters);
6.2. make changes to the design of the steering equipment (except for the same brand in other model power steering Setup, if after such conversion is supplied in the steering equipment, the appropriate action);
6.3. replace cab for another brand of tractor cab;
6.4. to make changes to the braking system (with the exception of the same brand in other models the brake vacuum booster installation together with the main brake cylinder, if the appropriate action);
6.5. to install the original fuel tank improvised tank in place;
6.6. installing the original bridge in place of the other implements make bridge;
6.7. to make changes to the design of the coupling device;
6.8. to make changes to the suspension strukcij Kona. 7. in the case of prohibited implements trailer: 7.1. make changes to the design of the coupling device;
7.2. make changes to the braking system (except for brake shoe of the explosion mechanism and would reg brake shift against the other camera brands and models of relevant components, if after such conversion is provided according to the operation of the braking device);
7.3 making changes to suspension strukcij Kona;
7.4. to install in place of the original bridge other categories implements trailer bridges with inadequate technically permissible maximum load on the axle;
7.5. set other brands frame;
7.6. to increase the number of axles and wheels. 8. Implements or its conversion types of trailers are classified into three general areas: the threshing 8.1. category conversion-implements or trailer indivi dual conversion, which do not require to develop and harmonise the technical or the tractor trailer conversion technical project;
8.2. the second category of alteration-implements or trailer indivi dual conversion that is required to develop and harmonise the technical or the tractor trailer conversion technical project;
8.3. a third category conversion-implements or its serial trailer conversions carried out by the merchant who offers them as market services (hereinafter referred to as the operator). II. Technical or trailer conversion category determination 9. To verify compliance with the selected conversion requirements of these provisions, before the rebuilding pārbūvētāj can match the selected conversion with the State technical supervisory agency (hereinafter the Agency). 10. to coordinate the rebuilding category, shall submit to the Agency all pārbūvētāj shipbuilding application indicating that information referred to in annex 1. 11. the Agency shall evaluate the Inspector that provision referred to in paragraph 10 of the present SBA and give an opinion on the conformity of the selected conversion type requirements of these provisions. In addition to the opinion indicates rebuilding the main technical requirements for pārbūvētāj must be followed when implements or its modification, and the trailer follows specifies the conversion category: 11.1. P1-the first category conversion;
11.2. P2 category conversion;

11.3. P3-category conversion. III. The first category of rebuilding general order 12. category conversion permitted in Latvia registered the trailer or implements (except when the conversion shall take the relevant brands implements or its authorized representative of manufacturer of trailers in Latvia). 13. Technical or trailer conversion is carried out in accordance with the rules referred to in annex 2 of the first category conversion. 14. trailers of category 1 Implements the conversion (except this rule 9, annex 2, paragraph conversion) coordinate with the Agency. After the completion of the rebuilding gets the opinion of the Agency on the compliance of the trailer implements road safety and technical requirements of the regulations. IV. The second category of rebuilding general order 15 category conversion permitted in Latvia registered the trailer or implements (except when the conversion shall take the relevant brands implements or its authorized representative of manufacturer of trailers in Latvia). 16. before the category rebuilding started pārbūvētāj these rules set out in chapter V, in the conversion of technical development projects and coordinate it with the certification body that is accredited by the national agency "Latvian National Accreditation Bureau" to the standard LVS EN 45011:2004 "General requirements for bodies dealing with product certification systems" and for which the Ministry of Economic Affairs has published a notice in the newspaper "journal". 17. The second category conversion line also when altering can be damaged or eliminated implements or the identification number of the trailer. 18. The technical or the trailers category conversion shall be carried out in accordance with the rules referred to in annex 3 of the essential technical requirements for certification authorities and according to the agreed technical conversion project. 19. After rebuilding the pārbūvētāj presented the technical or the rebuilt trailer certification institution, to get technical expertise (hereinafter-opinion). If the conversion is made according to the requirements of these provisions, the certification body shall be issued by the Agency, after consulting with the pārbūvētāj opinion. 20. Within five working days of receipt of the opinion of the technical or the trailer owner (holder) alterations made to the register of the Agency. V. Technical conversion project development and coordination 21. developing the technical conversion of the trailer or the technical project, pārbūvētāj in the following sections: 21.1 descriptive part-includes rebuilding the foundations you need and rebuilding the technical solution;
21.2. the constructive part-includes rebuilding the main constructive in addressing you;
21.3. the calculation of part-includes main constructive solution strength and load calculations;
21.4. implements or the technical description of the trailer-includes those implements or trailer tracking technical data and the main parameters tīvo konstruk before and after conversion. 22. Refit the technical part of the project in a constructive and calculations can be excluded if rebuilding implements used or intended by the manufacturer of the trailer and subsystem assemblies and are installed or trailer manufacturer implements the intended locations, as well as in other justified cases, after coordination with the certification authority. 23. the Pārbūvētāj shall submit a certification body for the refit of the technical harmonisation project (three copies) and a receipt which certifies the payment for the rebuilding project in technical harmonisation. 24. the certification body registers the submitted conversion technical project, evaluate it, and within 15 working days, shall take a decision on the conversion project harmonisation technical harmonisation or denial. Rebuilding the technical design is not consistent, if it does not comply with the rules referred to in annex 3 of the essential technical requirements. 25. If the certification authority is in any doubt as to whether a planned alteration meets the implements or trailer manufacturer's requirements or recommendations, the certification body shall be entitled to request the conversion of the technical design of the previous alignment with the implements or trailer manufacturer or its authorized representative in the European Union. 26. After checking one rebuilding technical draft copies remain in storage in the archives of the certification body, while the other two copies of the certificate of transfer pārbūvētāj cations. Vi. Technical inspection 27. Before its trailer or implements technical expertise in rebuilding their certification, an officer of the institution presented implements or trailer registration certificate, licence or implements identity documents. If the category conversion, shall provide the certification authority pārbūvētāj in the harmonised technical conversion project. 28. the technical expertise to initiate, if: 28.1. eliminated the chassis (identification) number;

28.2. conversion is performed according to the technical renovation project. 29. the Following documents or submit a technical or rebuilt trailer pārbūvētāj passes a certification institution of technical expertise. 30. the technical inspection certification institution compare accounting technical data. If the technical or the trailer VIN number, the registration documents or the registration number of the mark are found signs of fraud, the certification authority shall inform the Agency. 31. the second category of conversion and tracking technical data reconciliation certification authority carry out its trailer or implements technical expertise to assess its compliance with this provision in annex 3 min in Thai substantive technical requirements and technical conversion project. 32. If the technical or rebuilding a trailer frame or carried out important node welding, certification authority is entitled to request to make a weld test laboratory accredited in the field of State Agency "Latvian National Accreditation Bureau" under the standard LVS EN ISO/IEC 17025:2005 requirements and for which the economic Ministry has notified you of a newspaper published in the "journal" of Latvia. 33. After its trailer or implements technical inspection certification body draws up the implements or the technical expertise of the trailer (annex 4). The Act specifies the implements or change the trailer carrying the technical data and the main constructive characteristics and give an opinion on the conformity of the trailer or the technical rules referred to in annex 3 the essential technical requirements. 34. The technical or the technical expertise of the trailer of the Act by a competent examiner's signature and stamp, issued by the certification authority pārbūvētāj. Technical inspection a copy of the Act of certification bodies stored in the archives. 35. If the technical or the technical expertise of the trailer during the certifi cations authority finds non-conformity with the requirements of this regulation, in particular to prevent rebuilding and repeatedly transferred the technical or technological trailer * tīz. 36. If the technical or the technical expertise of the trailer during the certifi cation body finds non-conformity with the conversion of the technical project, pārbūvētāj it prevent or make the relevant changes in technical projects and rebuilding its accordance with the certification body and repeatedly transferred the technical or the trailer technical expertise. VII. The third category of rebuilding general order 37. before implements or trailer serial conversion started a merchant in Chapter VIII of these rules, in the order mentioned in the development, and implements or recorded its technical renovation project of the trailer. 38. Every trailer or implements conversion operator carried out according to the technical renovation project and attested by a series of implements or rebuilt in the trailer of the attestation of conformity (referred to as the Declaration of conformity) (annex 5). 39. the statement of conformity form the merchant receives a certification institution. To get the form of attestation of conformity, the Merchant shall provide a token, which identifies the names of the persons and positions that will be eligible to sign a statement of conformity, as well as their signature samples. 40. acknowledgement of conformity of the operator fills in triplicate. The first copy shall be issued by the technical or the owner of the trailer (in particular there) to the technical conversion of the trailer or a registered agency, the other copy shall be handed to the certification body, while the third remains the operator to store a copy in the archives. 41. Within five working days after receipt of the statement of conformity or technical owner of the trailer (holder) the restructuring agency are recorded. VIII. Conversion technical drafting, matching and logging 42. before rebuilding the launch operator this provision in chapter V on the development agenda mentions and matches the rebuilding project, carried out technical implements or the experimental sample trailer modification and testing. You try to create a merchant during the Commission examines the implements or rebuilt trailer technical data developed for the rebuilding project and the technical rules referred to in annex 3 the essential technical requirements. The test results indicate in the record of the trial. 43. After the test the merchant specifies the conversion specifications. Rebuilding the technical project shall include the following sections: 43.1. introduction-includes implements or the rebuilding of the trailer you need the needed justification;
43.2. the technical requirements-point conversion, operation and quality characteristics in the following subsections: 43.2.1. basic parameters and dimensions-indicate the conversion the main parameters, dimensions and mounting, or provide a reference to the constructor of the conversion documentation;
43.2.2. specifications-indicates the nature of the main operating parameters;
43.2.3. package – includes the component of tījum and document disposal;
43.2.4. the marking-point conversion category (P3);
43.3. acceptance of terms-indicate the operator's technical control service alterations carried out control procedures and conditions;
43.4. control method-indicates the section "technical requirements" of the mentioned parameters, the size, characteristics and control methods of the rules and control instrumentation;
43.5. operating rules-specifies the operating conditions, the maintenance periodicity and materials;

27.1. the merchant-merchant guarantee warranty conditions. 44. The operator shall submit a certification body for the refit of the technical harmonisation project (three copies) and rebuilt the implements or trailer test protocol. 45. The certification body shall assess the submitted technical conversion project, make sure the merchant is willing to take the necessary measures and procedures to ensure efficient conversion process implements or in the control of compliance of trailers, rebuilding the technical project and 15 working days, decide on the conversion project harmonisation technical harmonisation or denial. Rebuilding the technical design is not consistent when the technical regulations specified conversion technical solution does not meet the rules referred to in annex 3 of the essential technical requirements. 46. After rebuilding the technical coordination of the project one conversion technical design copies the merchant passes the certification body storage archive. IX. compliance of production and control 47. Merchant after rebuilding the project technical coordination: 29.3. ensure rebuilt its trailer of implements or compliance with the alterations to the technical project;
47.2. in self-control or trailers implements conversion process;
47.3. the results of the checks carried out provides tracking (set the time, place and identified deficiencies), as well as the availability of certification authority at the request of at least three years. 48. Rebuilt and refit process implements in its trailers conform or alterations to the technical project certification body tested using random selection technique-choosing the samples conformity to the technical renovation project to check the periods specified in the conversion of the monitoring agreement. 49. If the certification body finds rebuilt the implements or its non-compliance with the trailer conversion technical project or these rules require the certification authority in question, depending on the type of non-compliance shall take one of the following: 49.1. determining the time until which the non-compliance must be avoided;
30.6. declare invalid the implements provided or its compliance statements of trailers;
30.6. the harmonized technical rebuilding projects recognized as valid until resolved the discrepancy requirements of this regulation;
49. revoke the agreed conversion technical projects. X. action in the event of a dispute, the decision of the opposition and appeal 50. If the trailer or implements pārbūvētāj implements or disagrees with its technical assessment of trailer or if after rebuilding the technical or the trailer found defects, certifi cations pārbūvētāj submitted the application, giving the institution an assessment challenge. 51. If the application is based, the certification authority within three working days after receipt of the application in writing to the applicant of the nik or its trailer traktorteh repeating technical condition assessment place and time. 52. Until the technical evaluation of the State is forbidden to carry out any repairs or changes that came with specific technical or trailer. 53. If in the technical evaluation of the situation is established that implements or trailer repairs have been carried out, or if the applicant refuses to produce the technical or the trailer for reinvestment in the assessment of the technical or appear to, it remains above the assigned technical or equipment trailer and technical assessment of the situation. 54. The certification authority's decisions on technical assessment of the project or technical harmonisation may be challenged in the Ministry of the economy in the process of tratīv by Admin law. The Ministry of the economy, may appeal to the Court of Justice of the administrative procedure law. 55. the Agency's decisions can be challenged in the Ministry of Agriculture's advisory process administered by the procedure prescribed by law. The Ministry of agriculture, may appeal to the Court of Justice of the administrative procedure law. Prime Minister a. Halloween Minister of Agriculture m. Roze annex 1: Cabinet of Ministers of 28 March 2006, the Regulation No 245 conversion information appearing in the application 1. Rebuilding the application presented in print of the implements and trailers information systems. Rebuilding the application shall state the following information: 1.1. application number;
1.2. the details of the technical or the trailer: 1.2.1 registration number;
1.2.2. the make and model;
1.2.3. type;
1.2.4. the identification number;
1.2.5. type of fuel;
1.3. the selected conversion type;
1.4. conversion given name, surname and personal code;
1.5. the technical inspection of the trailer or the site;
1.6. the opinion;
1.7. application design the place, date and time;
1.8. technical supervision agency of the country in the name of the Inspector.
2. Conversion application state technical supervisory agency Inspector certified by signature and personal stamp. Minister of agriculture m. Roze annex 2 of the Cabinet of Ministers of 28 March 2006, the Regulation No 245 implements or its trailers category conversion types no PO box Alteration type tractor self-propelled agricultural machinery implements trailer 1. Cab change x x 2. Frame or change the pusrāmj x x x 3. Cab installation x x 4. fuel tanks change x x 5. Alteration of a trailer-truck x 6. Alteration of trailer-tank x 7. Alteration of trailer-platform x 8. Hidromanipulator disassembly x 9. Conversion operations If you use node and provided by the manufacturer of the unit and they are mounted or trailer manufacturer implements the intended locations x x x Minister of Agriculture m. Roze annex 3 of the Cabinet of Ministers of 28 March 2006, the Regulation No 245 the essential technical requirements for the technical conversion of trailers or no PO box requirements 1. General requirements 1.1. Rebuilding it is recommended to use the relevant brand and model or manufacturer implements trailers manufactured parts nodes and tackle 1.2. With the full weight of the slogot implements the trailer axle load after conversion shall not exceed the manufacturer's defined technically permissible maximum axle loads 1.3. light devices must be set up under the Cabinet of Ministers on 13 July 2004 No. 602 of the provisions of the "rules on the technical and the State technical inspection of trailers and technical control" (further-the technical inspection rules) of the annex 1 Chapter 2 requirements referred to in 1.4.

Implements or its replacement or installed a trailer Assembly, systems, assemblies and equipment technical condition complies with the technical rules of view 2. installation 2.1. Stall to the original cabin site Implements permitted to install its own brands of other model cab 2.2. Install cab mountings, their number and location match the original cab fastening elements, their number and location. If cab mountings, their number and location do not meet these requirements, the following conversion types are considered category conversion 3. change Engine 3.1. Technical, made up to 1 May 2004, for the first category conversion is considered a change to the engine the same brands and models of other (positive ignition/compression ignition) engines, and only if this type of engine to provide the manufacturer and the technical When making the change of engine, no need to change the engine mount, and the strengthening of the engine does not need to use improvised in the mounting elements.


Implements, made after 1 May 2004, for the first category conversion is considered a change to the engine the same type implements a variant of the engine of another version, and only then, if the engine change, there is no need to change the engine mount and engine building is not required to use improvised fastenings elements. Any other change of engine is considered a category conversion. Changing engine implements, made after 1 May 2004, allowed to set up only the engines, which are certified in accordance with the law of agricultural or forestry tractors, their trailers and component conformity assessment to the requirements of 3.2. engine mounting location number and arrangement of the engine meets the requirements specified by the manufacturer. Strengthening of the engine to the frame of the technical use of the transition that weld the bracket to the frame is prohibited from 3.3 battery ensures the engine needed to run the starting current and voltage 12 V or 24 V 3.4. Generator provides appropriate implements required for electrical power and battery charging voltage of battery 3.5.
If implements the steering system equipped with power steering, oil pump operation power steering provides efficient operation of changing the engine, 3.6 prohibited to extend kardānpārvad. Allowed to use other brands and models of appropriate length and torque of the engine kardānpārvad 3.7. exhaust system is a sealed fuel tank 4 change 4.1 changing the original fuel tank to another fuel tank allowed only if such fuel tank installation provides the manufacturer implements and implements it is included in the type approval 4.2. Fuel tank is securely fastened with the manufacturer for special mounting elements 4.3. fuel tank is positioned in the space provided by the manufacturer. The location is such that the tank with the elements of the design implements may be more protected from external factors (such as stones, ice) of the adverse effects of the technical operation and from direct collision road accident. The fuel tank must not be the technical cabin of 4.4. fuel tank filler neck located outside implements 5. Alteration of the logging truck cargo load logging truck 5.1 the straddle the maximum height is calculated using the following formula: where (B) 0.5-Hmax implements trailer track, Hsc-implements the height of the Centre of gravity of the trailer 8.4. The dismantling of the hidromanipulator, the hidromanipulator is dismantled attachment elements of hydraulic systems, pumps, switches URu.tml.


Minister of agriculture m. Roze annex 4 of the Cabinet of Ministers of 28 March 2006, the Regulation No 245 technical expertise information appearing on Act 1. Technical expertise of legislation presented in print of the implements and trailers information systems. Technical inspection Act specifies the following information: 1.1. technical inspection Act number;
1.2. the details of the technical or the trailer: 1.2.1 registration number;
1.2.2. the make and model;
1.2.3. type;
1.2.4. the identification number;
1.2.5. type of fuel;
1.2.6 release year;
1.3. type of conversion performed;
1.4. conversion application number;
1.5. the technical or trailer tracking technical data and the main constructive characteristics before and after conversion;
1.6. the opinion;
1.7. technical inspection Act of dialing location, date and time;
1.8. the expert's name.
2. technical inspection Act the responsible expert certified by signature and personal stamp. Minister of agriculture m. Roze annex 5 of the Cabinet of Ministers of 28 March 2006, the Regulation No 245 series-converted implements or its trailer form of attestation of conformity are Minister of Agriculture m. rose