Advanced Search

Rules For Public Review Of The Railway Infrastructure (Network) The Contents And Publication Procedures

Original Language Title: Noteikumi par publiskās lietošanas dzelzceļa infrastruktūras pārskata (tīkla pārskata) saturu un publicēšanas kārtību

Subscribe to a Global-Regulation Premium Membership Today!

Key Benefits:

Subscribe Now for only USD$40 per month.
Cabinet of Ministers Regulations No. 461 Riga, June 6, 2006 (pr. 31 § 22) the rules on the public-use railway infrastructure report (network) the contents and publication procedures Issued pursuant to article 28 of the law on Railways of i. General questions 1. determines the public rail infrastructure over the view (network overview) (hereinafter report) the contents and publication procedures. 2. public use of the rail infrastructure (hereinafter Manager) prepare a report on the planned services the next train timetable period to enable the carrier to prepare the power demand in the relevant period. II. Review the content 3. the report shall specify: 3.1 General information for the reporting period, the territory, the structure of the document;
3.2. the carrier must use the public rail infrastructure availability requirements that the carrier can use public-use railway infrastructure: 3.2.1. national carrier requirements;
3.2.2. the infrastructure requirements of the carrier;
3.3. public-use railway infrastructure Description: 3.3.1. infrastructure network scheme, railway district capacity, motion intensity conditions, technical equipment with alarm and lock systems, communication station, wagon maintenance points, security roles, and train control placement list, State border control and customs inspection stations and at border crossing points;
3.3.2. the infrastructure and technical operating conditions the consumer passenger;
3.4. arrangements are divided into public rail infra structure power (as well as the infrastructure manager's action, if the infrastructure is overloaded), the operation of the application, it will add the contents of kument, consideration of the application, as well as action at the capacity allocation;
3.5. carrier services that: 3.5.1 the carrier of that public. use rail infra structure of availability of the services included in the cost of the infrastructure;
3.5.2. services not included in the fee for the use of infrastructure and transport, but are necessary for the organisation of the transport process;
3.5.3. the carrier that a public rail infra-structure availability of additional services;
3.6 management information on the payments of these provisions 3.5.1. services referred to information on the duties and the principles of the settlement order, information about the infrastructure in the event of congestion charges applicable, collection of environmental costs and the collection of payments for the power that is used for the maintenance of the infrastructure, as well as information about the changes to the charges already have been decided or what is expected. III. Review of agenda 4. The manager shall prepare a report for the train schedule for the following period, specifying the provisions of the information referred to in paragraph 3. 5. Manager each year up to June 15, published the Report Manager home page on the internet. If you don't have a home page, Report Manager at least two weeks before its publication date, submit the traffic Ministry. The Ministry of transport report published on the Ministry's website. Informative reference to European Union Directive provisions included in the law arising from the European Parliament and of the Council of 26 February 2001, Directive 2001/14/EC on the allocation of railway infrastructure capacity and the levying of charges for the use of railway infrastructure and safety certification. Prime Minister a. Halloween traffic Minister k. Peters