Property Classification And Purpose The Real Property And The Purpose Of The Exchange Order

Original Language Title: Nekustamā īpašuma lietošanas mērķu klasifikācija un nekustamā īpašuma lietošanas mērķu noteikšanas un maiņas kārtība

Read the untranslated law here: https://www.vestnesis.lv/ta/id/139503

Cabinet of Ministers Regulations No. 496, Riga, 20 June 2006 (pr. No 33 37) real estate classification the purpose and use of real estate target detection and change order Issued under the real estate Act of national cadastre 9. the third paragraph of article i. General questions 1. determines the real estate classification the purpose and procedure determined and changes in use of real property. 2. use of immovable property (hereinafter referred to as the objective of use) is set in the ground and the current use of the structure or land use planned (allowed) by the cadastral valuation needs determine the ground unit, part of the land according to the detailed, local authorities planning or regulations established for the ground or started construction (further-legal). 3. All State real estate cadastre information system (hereinafter referred to as the cadastral information system) registered low units and land units for the purpose of determining part. The purpose of the register cadastre information system. 4. Ground unit and land units for part of one or more of the objectives of use. The purpose of use determined by the acquiescence of land. 5. in determining or changing the purpose, determine or change the purpose of use of the land. assent 6. purpose of use of land the city nodded down to square metres, but in rural areas-hectares. 7. Land units for part of the established objectives of use must coincide with a ground unit used for. If ground units for part of the specified purpose of use different from Earth the unit purpose and usage purpose while also changes the ground unit. 8. Ground unit or land units part that is fixed and cadastral information system established in the purpose, use, target 17 of these regulations change. in the cases referred to in point. 9. the national land service provides assistance of purpose and the determination of land his assent. II. The property classification of the purposes of use 10. In order to ensure a uniform purpose awareness, detection, tracking and identification procedures, the use of objectives classified in groups. Groups combine classes. 11. each purpose of use granted in accordance with the code of real estate classification the purpose (annex 1). The purpose of the code is composed of group purpose designation and the serial number in the group. 12. Use the target groups, taking into account the value of the underlying factors are classified in the following classes: purpose 12.1. "the land on which the building is the primary land use-building if it accepted the need for the use of the nai will ensure authorised". This class corresponds to the following purpose: 12.1.1.01 "farm land";
12.1.2.02 "forestry land and specially protected natural areas in the jas, which economic activity is banned by law";
12.1.3.03 "water land";
12.1.4.04 "mineral mining areas";
12.1.5.05 "nature and recreation base matter land";
12.2. "building land". This class corresponds to the following purpose: 12.2.1.06 "individual residential building land";
12.2.2.07 "apartment house building land";
12.2.3.08 ' business object building land ";
12.2.4.09 "public interest object building land";
12.2.5.10 "production of building object land";
12.2.6.11 "traffic infrastructure building land";
12.2.7.12 "engineering network and the supply of building land objects". 13. The land on which the building is the primary land use, the meaning of these provisions are agriculture, forestry, water, mineral extraction or natural base and used for recreational areas, including land under buildings and courtyards, where it is associated with the land use. 14. Building ground the meaning of these provisions is to: 14.1. built-up land, which according to the lawful use of land use structures, utilities or facilities maintenance;
14.2. the land not built in accordance with the detailed plan is planned (allowed) to use the premises, utilities or facilities maintenance;
14.3. undeveloped land on which local authorities in planning and building provides a detailed plan is not necessary, and ground the unit by area and infrastructure meet the building regulations requirements building requirements;
14.4. not built on land on which a building permit has been issued. 15. the objectives of use are classified in groups according to the purpose of the European Commission of 19 December 2001 Regulation No. 29/2002/EC on the statistical classification of economic activities in the European Union. Application of the purpose set out in annex 2 of these rules. III. use of immovable property and target detection and the initiation of the procedure of Exchange 16. Purpose determines if: 16.1. creates a new ground unit or land units;
16.2. the land unit or land units are not part of the defined purpose of use. 17. the purpose of the proposed change: 17.1. if ground unit with multiple purposes of use is added to the land unit or part of adjacent land units;
17.2. ground unit with multiple purposes of use, if separated from the new land units;
17.3. If a building permit has been issued, including the reconstruction or the simplified reconstruction, which will change: 17.3.1. building the main route of administration, and it would not be the purpose of use stated above;
17.3.2. groups use structures whose primary use is "Two or more dwelling houses", "hotels and similar buildings," "office building" or "wholesale and retail buildings" (buildings with consideration of space-groups), and it does not meet the purpose of use stated above;
17.4. if entered into force and the detailed land not built for the purpose of use of the unit does not match the specified planned detailed plan (authorized);
17.5. If after the land lease contract of the purpose of use specified above does not correspond to that provided for in the lease or land lease agreement specifies the purpose of use of the area and nodded agreement lease contract does not conflict with a detailed plan. 18. Use goal setting or changing this rule 16 or 17 cases referred to in paragraph month recommends real estate as nothing special or, if not,-the legal possessor, the State or the local government land-the user or, if not,-the lessee (hereinafter person). Use goal setting or change may also be initiated at the national or local institutions. 19. the purpose of the proposed change, but the State land service of the cadastral information system usage objectives articulates nodded in land area in the following cases: If the Earth unit 19.1. with one purpose on the occasion of the land unit or part of adjacent land units with the same purpose;
19.2. If the ground units with a single purpose in separating new land units;
19.3. If the ground unit with one or more of the purposes of use after a border readjustment (instrumental of trying) cadastral information system updates the land units total area. 20. the national land service of this rule 19.3. in the case referred to in subparagraph after boundary clarification (instrumental of trying) the resulting land allocation in proportion to the difference between the cadastral information system in the the purpose of land piekrītošaj. 21. in order to determine the objectives of the proposed use or change, a person shall submit an application to the local municipality in which the land unit. The application shall state: 21.1. land units;
21.2. the land units or parts of units of land cadastre;
21.3. the land units or parts of units of land area;
21.4. land units or parts of units of land use;
21.5. types of use of a group of buildings with a measurable space groups. 22. the Person making the application or by sending it by mail, attach a copy of such documents (by sending a copy by mail, it must be certified) and by the municipal authorities, at the request of the original of the document presented: 22.1. property rights, legal tenure or land use rights certificate;
22.2. the land boundary plan and the unit area distribution representation (for example, the contract of hire, or a graphical attachment, land-use planning plan, building maintenance and functional management area specified graphic material (hereinafter referred to as the ground plan)) by the number of use of the land or premises (further-divisional area), if the land unit or land units part has several uses. IV. use of immovable property and the objectives of those areas determine assent and exchange arrangements 23. land not built unit (land units for the part), located in the territory, which according to the spatial planning Act entered into force in local government planning, goal setting or use change: 23.1. in accordance with the detailed plan for the planned (authorized) away;
23.2. According to the local government planning a whole. threshing on the planned (permitted) use if detailed is not and if necessary: 23.2.1. permit is issued;
23.2.2. undeveloped land unit by area and infrastructure meet the building regulations requirements building requirements;
14.5. If not this rule 23.1 and 23.2. cases referred-according to the lawful use of land (including the use of legally defined purpose) or current use if (including purpose of use) State or local government bodies is not specified in the decision. 24. for land not built unit (land units part) located a whole. threshing, which according to the spatial planning act has entered into force for local government planning, determine the purpose or altered the legal use of land specified in national or local government bodies for decision. 25. Ground unit, located in the territory, which has been approved for you detālplān (which also use real estate goal or target groups), the purpose of use of land determined chime according to the areas identified in the detailed plan or area of distribution. 26. the unit of land on which the building and the ground plan of the area not separated, one purpose determines if: 26.1. ground units or parts of units of land located in one or more of the following shipbuilding the shipbuilding, which main use and space for group use (buildings with measurable space groups) meet one purpose;
26.2. in real estate existing structures, taking into account the economic job at bu, are interrelated and they use the same purpose (for example, manufacturing facilities, hospitals, gas stations, shopping malls with parking lots). 27. the unit of land on which the buildings, setting several usability goals, purpose of use the area his assent shall be determined as follows: 27.1. If the building does not cross the boundaries of land units and ground plan are not divisional area, the entire land area of the units distributed in proportion to the building and the space group the total area for which purpose is based;
16.9. If the building does not cross the boundaries of land units and land unit is separate areas: 27.2.1. each divisional area divided in proportion to the building and the space group the total area for which purpose is based and which is located on the separate areas;
27.2.2. amount of all individual use purpose of assenting-free area;
16.3. If building cross-border land units, the objectives of the use of this area agree set ground plan in the area of distribution, taking into account the building's main use and evaluating the group uses buildings with measurable space groups. 28. If the administrative territory of the town limits of only part of the land used for construction, the units used for the purpose of class "building land" and then nodded to the land shall be determined in accordance with the rules set out building the construction concerned (object) needs of the area. Other land use objectives of the unit determined in accordance with the rules in paragraphs 23 and 24. 29. If local planning or detailed in the relevant area of ground unit allows more flexibility, has the right to propose and 21 of these rules in the application referred to in paragraph specify one, several or all of the territory. Use objectives (purpose) of land his assent shall be determined in proportion to their number. 30. In rural areas the land unit that is only used for agriculture, forestry and water management, the use of single purpose. To identify the purpose of use, the down low in the dominant economic units of work at bu, comparing land use area forest land, land under water and agricultural land. On the ground the unit to an existing residential building and the inadequacy or non residential farm buildings to separate building provides purpose from the purpose of class "building land". 31. where on Earth the unit, which is used for agriculture, the Pygmy or water mežsa, is located in the premises of the main use for other purpose group, land unit determines the number of usability goals. 32. If the land unit or land units for part of the rural area is more used for and what is the purpose of the groups 01 "agricultural land", land and forestry 02 "specially protected natural areas in which economic activity is banned by law" or "water low 03", ground plan, which contains a unit of land boundaries and land use areas, local chapter of būvvald area that does not apply to agriculture, forestry or aquaculture. The State land service according to the submitted land plan for the purpose of calculating the area of distribution of the assent of land use types and register them in the cadastral information system. 33. If the land unit or land units for part of two or more specified purpose, for the purpose of land amount assent must be equal to land units or parts of units of land area. 34. in order to establish or change the purpose and they nodded in land State land service of the cadastral information systems provide the following information: 34.1. once a month for local Government-about this provision in paragraph 16 and 17.1. changes referred to in paragraph 1, bottom of the cadastral information system;
21.3. within five working days after the local authorities or the Ministry of defence, Ministry of Interior, prison administrations or public security authority (including an electronic request)-on the land unit or land units: 34.2.1. address;
34.2.2. cadastral designation;
34.2.3.;
34.2.4. building cadastre;
34.2.5. construction type code;
34.2.6. building floors in the House;
34.2.7. building the main use;
34.2.8. group use buildings with a measurable space groups. 35. The local authority within 15 days of the application and all necessary documents concerning his use of goal setting or change the receipt or change the purpose or prepare a reasoned refusal. 36. Local Government, Ministry of defence, Ministry of Internal Affairs, On the dzījum site administration or national security authority authority within five working days after the determination of the purpose or the Exchange in writing to: the person according to 36.1. The administrative procedure of the procedures laid down by law;
36.2. The State land service and specify: 36.2.1. land units or parts of the land unit;
36.2.2. name, surname, personal code, or the name of the legal person and the registration number;
36.2.3. land units or parts of units of land cadastre;
36.2.4. land units or parts of units of land area in square metres or in hectares;
36.2.5. purpose and its code according to the real estate classification the purpose;
36.2.6. purpose of use of the land; his assent
36.2.7. land units within a copy of the plan (if under this provision described in paragraph 32 it is necessary). 37. a Person has the right to challenge the decision on the specific purpose and then nodded to the land area or a refusal to change the above purpose and then nodded to the land administrative law and timeless. V. concluding questions 38. to property rights to real estate fixed zemesgr hair on national name until the completion of the land reform the State jurisdiction, the land used for the setting and change the Ministry or public body that the person on behalf of the country according to law "About State and local land ownership rights and the consolidation of the land" is recorded in the parcel. 39. The State land service in until November 1, 2006 submitted to the local authorities, the Ministry of Defense, Ministry of Interior, the prisons administration and the national security authorities of the institutions it lists units of land, which to this date of entry into force of the provisions of the cadastral information system is established in the purpose of use 1302 "previously unclassified object building" to change the purpose of use. The said institutions, on the basis of the information at the State land Department and the relevant authorities, during the month of other purpose and shall submit to the State land service, information on change of purpose. Has the right to propose the use of targets and those of land exchange nodded. 40. The State land service by January 2, 2007 to provide cadastral information system in change of purpose according to annex 3 of these rules. 41. Until 1 January 2007 the purpose set out in force according to the real estate for the purpose of the transition table (annex 3). Persons previously issued documents containing the entry on purpose, do not make changes. 42. To 2007 December 31 ground units and land units parts for which you want to determine the purpose and number 0704 "Seventeen-storey apartment house building", the purpose of use "of six to sixteen 0703 storey apartment house building". 43. This provision I, II, III and IV and 1, 2, and 3. the annex shall enter into force by 1 January 2007. 44. Until 1 January 2007 the real estate classification the purpose and use of real estate target detection and exchange arrangements shall be fixed in accordance with these rules 4, 5 and 6. Prime Minister a. Halloween g. Grīnvald the Minister of Justice Ministry of Justice submitted a version of annex 1 of the Cabinet of Ministers of 20 June 2006 regulations no 496 real estate classification the purpose of the code group name NĪLM code name 1 2 3 4 the land on which the building is the primary land use-building if it accepted the need for the use of authorised 01 0101 agricultural land the land on which the main economic activities are agriculture and forestry land 02, specially protected natural areas where the economic activity is prohibited by the laws and 0201 the land on which the main economic activities are forestry 0202 specially protected natural areas in which economic activity is prohibited by law 03 water land 0301 0302 Public waters of the natural and legal persons property or use of the waters of the territory 0303 pond 04 mineral mining areas 0401 mineral mining areas 05 natural and recreational significance of the base land 0501 natural base , parks, green areas and other recreation areas of importance, if they allow economic activity do not fall at any other classification indicates the purpose of the interim authorised 0502 land use vegetable gardens 0503 Sport and recreation areas equipped building land 06 individual residential building land 0601 individual residential building of apartment house building 07 Earth one-story and two-story apartment 0701 homes building three 0702 , four-and five-story apartment house building 0703 six to sixteen storey apartment house building and more steep 0704 seventeen multi-family home building business objects building 08 Earth 0801 business object building 09 public interest object building land 0901 institutions of education and science building 0902 medical, health and social care institutions building 0903 State and local administration building 0904 foreign diplomatic services international social organizations mission building building 0905 religious buildings in the building of national defence 0906 importance, security, police, fire and rescue, border guard and penal institutions in the territory of a cemetery building 0907 and related ceremonial buildings and Crematorium building 0908 general public importance of building 10 production object building land 1001 industrial manufacturing company building the warehouse building 1002 1003 agricultural company building 1004 fisheries and fish farms for building waste management company 1005 building 11 traffic infrastructure building land in 1101
Land land partition the rail infrastructure and the road bar in land partition bar, 1102 1103 airfield building railway station, bus station, civil airport and river port building 1104 vehicle garage building 1105 individual separate open parking 1106 high-rise parking building 1107 sea port and sea port terminal building 12 engineering network and the supply of building land 1201 object With the maģistrālaj power and communications lines and trunk oil , petroleum products, chemicals, gas and water pipelines related structures, water intake and sewage treatment facilities building, 1202 River and channel water storage, water control and coastal structures to strengthen building g. Grīnvald the Minister of Justice Ministry of Justice submitted a version of annex 2 of the Cabinet of Ministers of 20 June 2006 regulations no 496 real estate for the purpose of classification structure with explanation NĪLM code NĪLM name and explanation on the application of the Earth 1 2 that building is the primary land use-building if it accepted the need for the use of authorised 01-0101 for agricultural land, the land on which the main economic activity is agriculture. The purpose of the group classified the land on which the main economic activities are agriculture, the land used for grass mowing volume, cattle grazing, forage grasses, fruit orchards and other perennial plantation cultivation, market gardening, floriculture, sēņkopīb and mineral crops. The purpose of the Group classifies farms, backyard farms, specialized State farms (the national training and experimental farms, as well as other specialised State farms), agricultural business complexes, which are specialised in a specific sector of agriculture and, together with agricultural land use according to the specifics needs of business buildings and premises which serves the specialized company in the production process. Describes the land use-arable land, land under multiannual meadows and pastures, the land set aside for agricultural land, land used for permanent crops, especially high-quality local, State, national interest, agricultural territory land under agricultural buildings and residential backyards. May be included in forest land, where the forest land area occupies the largest land units and the main economic activity in the relevant land unit is classified as forest.

02-forestry land and specially protected natural areas in which economic activity is prohibited by the laws and 0201 the land on which the main economic activities are forestry, natural and legal persons in possession or use existing economic forests, district and local collectible and protected forests, the national forestry areas, meaning land of the Earth forest infrastructure, within the forest and the adjacent pārplūstoš, swamps and clearing the lauc. Can be included in the agricultural area, where agricultural land area occupies the largest land units and the main economic activity in the relevant land unit is classified as agriculture.


0202 specially protected natural areas in which economic activity is prohibited by the laws of the territory specially protected natural areas in which all natural resources are fully excluded from economic and other activities.

03-water land 0301 public waters of the sea coast, as well as land under Lakes and rivers according to annex I of the civil code.

0302 of the natural and legal persons of the possession or use of the waters of the territory of land under natural and legal persons in possession or use existing Lakes, natural and artificial water bodies, including in the areas of water, applūstoš meldrāj, URu.tml., where the main economic activity in the relevant land unit is the land and the water, under the water takes up more land area unit.

0303 pond land, on which the fish breeding artificial body of water and installed it occupies most of the land area of the unit.

04-quarrying areas of mineral extraction 0401 territories peat extraction site, peat mining and processing plant areas, gypsum, limestone, dolomite, clay, sand, gravel and sand-gravel quarries, as well as the extraction (t.sk. left) and primary area. The purpose of the forward required mineral extraction areas, if these areas to meet other economic purpose (e.g. agriculture, forestry, etc.-)

05-natural base and recreational interest land 0501 Natural ground, parks, green areas and other recreation areas of importance, if they allow economic activity do not fall at any other classification indicates the purpose of the parks, squares, Zoological and Botanical Gardens URu.tml. Cities and villages areas-natural ground: forest park, regularly applūstoš meadows, flood plains and other areas, if a value is to be classified as agriculture or forestry. Purpose provides land for residential buildings fitting personal gardens and grassy small areas which are mainly used in this House.

0502 temporary permitted land use in the urban orchard-gardens of roots for a certain period of time (lease) with no building.

0503 Sport and recreation areas equipped for open-air sports area, open swimming pools, ski slalom slopes, car-, bicycle-or horse-race equipped areas URu.tml. Camping, camping URu.tml. outdoor equipped land for sports and recreation. Purpose provides the ground beneath the small playground, equipped or reserved for local residents.

Building land 06-individual residential building land 0601 individual Uptown building individual residential houses, semi-detached houses, row houses and scattered Mansion building, 1-2 floors of one and two dwelling houses, summer cottages, the Horticultural Society (individual fruit garden), Garden House building area, regardless of the number of families living in it, as well as land under residential buildings and the adjacent private gardens or greened areas, parking areas, garages, greenhouses, cellars, awnings and other inadequacy that used inmate needs. No experience building territories in accordance with the legitimate use of the planning set out in the existing or intended use of a detailed target group of this specific building needs. Local utilities and structures, as well as building home improvement item construction land.

07-apartment house building land one-story and two-story apartment 0701 house building one-story and two-story buildings built in the area where the building's main use is for two and more apartment houses, temporary accommodation building of buildings (such as a single-standing kopdzīvojam home students, except hotels and motels building) building and the related building of inadequacy-the ground beneath the home of small adjacent playground, equipped or reserved for local population needs the land beneath the car parking areas, garages, land under residential buildings surrounding the personal gardens and grassy small areas which are mainly used in this House. Purpose determines if the building with the main route of "hotels and similar buildings," "office building" or "wholesale and retail buildings" are the following groups: "living room group" or "artist workshop". No experience building territories in accordance with the legitimate use of the planning set out in the existing or intended use of a detailed target group of this specific building needs. Local utilities and structures, as well as building home improvement item construction land.

0702 three, four and five storey apartment house building three, four and five storey buildings building area where the building's main use is for two and more apartment houses, temporary accommodation building of buildings (such as a single-standing kopdzīvojam home students, except hotels and motels building) building and the related building of inadequacy-the ground beneath the home of small adjacent playground, equipped or reserved for local population needs the land beneath the car parking areas, garages (in the lower floors of the House and scattered in the garage), land under residential buildings surrounding the personal gardens and grassy small areas which are mainly used in this House. Purpose determines if the building with the main route of "hotels and similar buildings," "office building" or "wholesale and retail buildings" are the following groups: "living room group" or "artist workshop". No experience building territories in accordance with the legitimate use of the planning set out in the existing or intended use of a detailed target group of this specific building needs. Local utilities and structures, as well as building home improvement item construction land.

0703 six to sixteen storey apartment house building six stories and more storied building building area where the building's main use is for two and more apartment houses, temporary accommodation building of buildings (such as a single-standing kopdzīvojam home students, except hotels and motels building) building and the related building of inadequacy-the ground beneath the home of small adjacent playground, equipped or reserved for local population needs the land beneath the car parking areas, garages (in the lower floors of the House and scattered in the garage), land under residential buildings surrounding the personal gardens and grassy small areas which are mainly used in this House. Purpose determines if the building with the main route of "hotels and similar buildings," "office building" or "wholesale and retail buildings" are the following groups: "living room group" or "artist workshop". No experience building territories in accordance with the legitimate use of the planning set out in the existing or intended use of a detailed target group of this specific building needs. Local utilities and structures, as well as building home improvement item construction land.

0704 seventeen and more storied apartment house building stands and more seventeen-storey building building building in an area where the main use is for two and more apartment houses, temporary accommodation building of buildings (such as a single-standing kopdzīvojam home students, except hotels and motels building) building and the related building of inadequacy-the ground beneath the home of small adjacent playground, equipped or reserved for local population needs the land beneath the car parking areas, garages (in the lower floors of the House and parking garages scattered), land under residential buildings surrounding the personal gardens and grassy small areas, which mainly uses the occupant needs. Purpose determines if the building with the main route of "hotels and similar buildings," "office building" or "wholesale and retail buildings" are the following groups: "living room group" or "artist workshop". No experience building territories in accordance with the legitimate use of the planning set out in the existing or intended use of a detailed target group of this specific building needs. Local utilities and structures, as well as building home improvement item construction land.

08-the business object building land business 0801 object building building the land on which the building situated in the main usage is wholesale and retail buildings, hotel buildings, Office building (used for transactions, record keeping and administrative purposes, which are not funded from the State budget or local government), the mass of the building and the related building of inadequacy and this area operating internal transport, utilities and maintenance of land-the land below the parking area and garage. Building on existing individual standing in theater, music, dance and other mass measures of building building, theater, koncertzāļ, Club, the people's House and the small stage of the building of the summer building, mass entertainment and recreational activities for building buildings, fitness and Bowling Club buildings, the circus, the Casino building. Conference and exhibition building, a building that is used for fairs, auctions and exhibitions. Shops, shopping centres, Department stores, markets and other trade and consumer services (excluding utilities) building. Hotels, motels and other temporary accommodation buildings (for example: guest houses, youth hostels) building. Restaurant, cafe, bar, bistro and similar companies building crew. Buildings for banks and the business of credit institutions, insurance companies, lottery and gambling business URu.tml. Transport maintenance of the station building. The gas station building. Purpose determines if the building with the main route of "Two or more dwelling houses" are the following groups: "the hotel group", "office space", "trade group", "Mass action group". Not acquired in building areas in accordance with a detailed plan for this purpose in building the group needs. Local utilities and structures, as well as building home improvement item construction land.

09-public interest object building land 0901 institutions of education and science building building the land on which the building situated in the main usage is school, University and scientific research buildings and related to the inadequacy of the building area and the related building of inadequacy and this area operating internal transport, utilities and maintenance of land-the land below the parking area and garage. Pre-school child institutions building building (kindergarten, preschool), education and scientific research building of buildings of the institutions (schools, boarding schools with building the existing internāt, College, high school, music schools, sports schools, children's and youth sports centers, higher education institutions-universities, institutes, the driving school, spiritual workshops URu.tml.). Purpose determines if the building with the main route of "Two or more dwelling houses" "hotels and similar buildings to them", "office building" or "wholesale and retail" is the space group building "space group" of education. Not acquired in building land which, planning to use in the set, or a detailed planned use is educational and scientific purposes. Local utilities and structures, as well as building home improvement item construction land.

0902 medical, health and social care institutions building building the land on which the building situated in the main use is medical or healthcare buildings and related building areas of inadequacy URt.sk., the ground beneath the car parking areas. Building on existing individual-standing medical treatment and health care buildings (hospitals, sanatoriums, profilaktorij, medical clinics, rehabilitation centres, leprozorij and other health authorities). Scattered old people's homes, orphans ' home and shelters, homeless shelters, child internāt, infant houses, care facilities for persons with mental or physical disabilities, including those not and kurlmēmo, drug addicts or alcoholics rehabilitation institutions, institutions that cater for lone mothers and their children in a crisis situation, the authorities reached the persons URu.tml. Purpose determines if the building with the main route of "Two or more dwelling houses" "hotels and similar buildings to them", "office building" or "wholesale and retail" is a group of buildings ' medical or health care group ". Not acquired in building area-land which, in particular in the planning exercise, or a detailed plan to use used in the medical, health and social care needs (with hospitalisation and treatment related General and specialized in the medical field, carried out by primary care doctors and doctors-specialists). Local utilities and structures, as well as building home improvement item construction land.

0903 State and local administration building building the land on which the building situated in the main usage is the Office building-State and local government administrative, judicial, customs, buildings and related to the inadequacy of the building and the area of the internal transport, operating utilities, maintenance of the land-the land below the parking area and garage. The land on which the building or the construction company operated, used or intended to be used in the detailed national and local needs of the construction of buildings. Purpose determines if the building with the main route of "Two or more dwelling houses" "hotels and similar buildings to them", "office building" or "wholesale and retail" separate rooms of the building are used for a group of State and local needs.

0904 foreign diplomatic service, international public organization representation building building building land with foreign-owned real estate that is used by the diplomatic or consular representation, where the Republic of Latvia in accordance with the laws of the relevant foreign State enjoys the same rights in respect of Latvia-owned real estate in a foreign country. State and local government administrative building or complex of buildings associated with the diplomatic service.

0905 religious organizations building building building the land on which the building situated in the main use is the cult's buildings (churches, congregations, monasteries, Sunday school, Chapel, Mosque, synagogue, except spiritual Seminary buildings) and the inadequacy of the building area, URt.sk., the ground beneath the car parking areas. Purpose determines if the building with the main route of "Two or more dwelling houses" "hotels and similar buildings to them", "office building" or "wholesale and retail" is a group of buildings ' cult group ". Not acquired in building areas in accordance with a detailed plan for this purpose in building the group needs. Local utilities and structures, as well as building home improvement item construction land.

0906 importance of national defence, security, police, fire and rescue, border guard and penal institutions building building the land on which the building situated in the main usage of other, previously unclassified buildings and related to the inadequacy of the building area, URt.sk., the ground beneath the car parking areas. National defence building of objects. Fire and rescue items and Depot buildings. Penal institutions, police, fire and rescue, civil defence, border guard and rescue service building in the building. Not acquired in building areas in accordance with a detailed plan for this purpose in building the group needs. Local utilities and structures, as well as building home improvement item construction land.

0907 cemetery areas and related ceremonial buildings and Crematorium building the cemetery territory related structures, mortuary and Crematorium building building areas. Dead animal disposal sites. Not acquired in building areas in accordance with a detailed plan for this purpose in building the group needs. Local utilities and structures, as well as building home improvement item construction land.

0908 general public importance in the building of the land on which the building's proximity to the main use of buildings is the mass of the building and they are used in Museum and library, art gallery and archive needs, sports buildings, building and related to the inadequacy of the building area, URt.sk., the ground beneath the car parking areas. Air, aeroloģisk and seismoloģisk stations. Underground water State monitoring roles. Open and closed sports structures, inflatable hangar-type sports buildings. Mail, communications, radio and television Centre-Studio building, telephone exchange and line amplification point building building. Veterinary authorities, animal shelters. Not acquired in building areas in accordance with a detailed plan for this purpose in building the group needs. Local utilities and structures, as well as building home improvement item construction land.

10-manufacture of building land object 1001 industrial manufacturing company building building the land on which the building situated in the main usage is industrial production and building of buildings related to the inadequacy of the territory, building t.sk. the production complex of existing offices, canteens and cafes, etc., as well as building ground parking areas. Small buildings, which are used for industrial production, factory, factories, workshops and beer brewery. Scattered municipal services building, which is performed solo work, i.e. hairdressers, footwear, ceramic workshop and Glaziers in atelj workshop, sewing, clothing and bag repair, household items, etc., etc., Production company building sites and building complex with the textile, clothing and leather production buildings, wood buildings, pulp and paper production, printing company building production buildings, medical and pharmaceutical, chemical products, building materials and the building of the plant sanitārtehnisk buildings, metal products, machinery and equipment production and repair of buildings, industrial buildings, food-based cheese dairies, dairies, Bread bakery, sausage shop buildings, etc. plants. Not acquired in building areas in accordance with a detailed plan for this purpose in building the group needs. Local utilities and structures, as well as building home improvement item construction land.

warehouse building building 1002 land on which buildings situated main use is a reservoir, silo and storage bunkers, buildings, building and related to the inadequacy of the building area. Areas with separate warehouses, water cisterns and tanks, oil and gas reservoirs, bunkers and silos for grain, cement and other dry beramviel for warehouses, cold stores, customs and other specialized stores. Storage sheds. Not acquired in building areas in accordance with a detailed plan for this purpose in building the group needs. Local utilities and structures, as well as building home improvement item construction land.

1003 agricultural company building building the land on which the building situated in the main route of Administration is not holding residential buildings: the land of the distinction between agricultural service company building and maintenance-mechanical workshop, dryers, warehouses, cellars, stores, slaughterhouses. Of the distinction between agricultural production company building. Not acquired in building areas in accordance with a detailed plan for this purpose in building the group needs. Local utilities and structures, as well as building home improvement construction elements used the Earth.

fishing and fish farms-1004 building fishing enterprises building land. Fish and fisheries building. This group shall be classified in the fisheries building, fish farming basin sheds. Not acquired in building areas in accordance with a detailed plan for this purpose in building the group needs. Local utilities and structures, as well as building home improvement item construction land.

1005 waste management company building waste collection, sorting, handling, storage, treatment, recycling, recovery and disposal, of radioactive waste storage areas, the company building and the land the distinction. Not acquired in building areas in accordance with a detailed plan for this purpose in building the group needs. Local utilities and structures, as well as building home improvement item construction land.

11-traffic infrastructure building 1101 land land land partition the rail infrastructure and the road bar in land partition bar Road and street. Tram, trolleybus road building, t.sk. public transport infrastructure within the building (public transport station, parks and endpoints). The land of the railway infrastructure (except railway station) on the partition of land. The ground beneath the railway tracks. Bridges, tunnels, estakād, national roads, local roads, streets in cities and villages, underground roads, private roads and public road.

1102 airfield building building the land on which the building situated in the main usage is to do buildings, stations, terminals, and related buildings and aircraft hangars-aerodromes, or maneuvering take-off and landing runway and air navigation object building land.

1103 railway station, bus station, civil airport and river port building building the land on which the building situated in the main usage is to do buildings, stations, terminals, and related building-civil airport, railway station, bus station and Terminal autostacij, river port building land and associated farm buildings.

1104 vehicle garage building building the land on which the building situated in the main use is the garage-garage building surface (more than 10 garages), underground garage of cars (except apartment Uptown underground garages and parking lots), automobile and industrial vehicle engineering employed in the garage, boats and other maritime features ēling. Public garage building that garage owners there is a rental building on existing relationships with the land owner.

1105 individually separated open parking vehicles for temporary, regular or not permanently for fenced, in separate areas and nature areas.

1106 high-rise parking building building the land on which the building situated in the main use is the garage building-separately standing vehicles for temporary, regular or not permanently for buildings with multiple floors. Building on existing open parking building and automotive high-rise elevated and underground garage.

1107 sea port and sea port terminal building building the land on which the building situated in the main usage is the communications building. Building land in the territory of, proper, buildings and structures for all types of cargo ships and ferries, and parking service, repair, ship loading, processing, loading, unloading, handling, sorting, temporary storage, customs and border control and the other with bāzēšano related activities. Not acquired in building areas in accordance with a detailed plan for this purpose in building the group needs.

12-engineering network and the supply of building land 1201 object With the maģistrālaj power and communications lines and major petroleum, petroleum products, chemicals, gas and water pipelines related structures, water intake and sewage treatment construction building building the land on which the structure situated main usage is trunk oil and gas pipelines, water pipelines, the trunk line and the loop line in the power lines. The trunk power lines and related construction, trunk oil, petroleum products, chemicals, gas pipeline and related structures (such as the main oil pumping station run by). Technical building, except rail and garage building. Building complex used in the production of electricity and siltumenerģētisk process. Uplink, wastewater, water heating pipeline and related structures in the water pumping station (sewerage and drainage pump station). Water sampling equipment, waste water treatment facilities. Main communication line and related structures. Building on the existing gas supply building, upstream pipeline compressor station, telephone exchange and line amplification point building.

1202 River and channel, water storage, water control and coastal structures to strengthen building of irrigation and reclamation of land for the construction of the system, water storage structures, dams, cofferdams, coastal hidroaizsardzīb construction.


Justice Minister g. Grīnvald of the Ministry of Justice submitted a version of annex 3 of the Cabinet of Ministers of 20 June 2006 regulations no 496 of immovable property used for the transition table of real estate used for detectable until the 2007 01 January real estate used for detectable after 01 January 2007 NĪLM NĪLM the code name code name 1 2 3 4 0101 farms whose main economic activity is agriculture land 0101 where the main economic activity is agriculture backyard farm 0102, that economic activity is agriculture, specialised companies which 0103 main economic activity is agriculture 0104 agricultural company building 1003 agricultural company building 0105 overall agricultural production area 0101 the land on which the main economic activity is agriculture 0106 Pond Pond 0201 0303 physical and legal persons in possession or use of existing forests and the rest of the forestry land land 0201 that the main economic activities are forestry 0301 Public waters 0301 0302 Public waters of the natural and legal persons property or use of the waters of the territory of the natural and legal persons 0302 possession or use of the waters of the river and Canal 0303 territory, water storage, water control areas of the waters of rivers and 1202 channel, water storage, water control and coastal structures to strengthen building 0401 mining and quarrying quarrying 0401 territory 0501 fisheries and fisheries , t.sk. Fisheries and fish nursery grounds of the 1004 building 0601, divģimeņ of single-family residential home building 0601 individual residential building, divģimeņ 0602 single-family residential home building, not used for permanent habitation 0603 Horticultural Society (individual orchards) building building one-story and two-story apartment 0701 and temporary residence house building one-story and two-story apartment 0701 house building 0702 three, four and five storey apartments and temporary residence house building three 0702 , four-and five-story apartment house building and Six more storied 0703 apartment and temporary residence house building 0703 six to sixteen storey apartment house building and more steep 0704 seventeen multi-family home building Business 0801 and commercial building business objects building 0801 0901 institutions of education and science building 0901 institutions of education and science building 0902 medical, health and social care institutions building 0902 treatment , health and social care institutions building 0903 State and local administration building 0903 State and local administration building 0904 foreign diplomatic service, international public organization representation building building 0904 foreign diplomatic service, international public organization representation building building building 0905 religious institutions building 0905 religious buildings in the building of national defence 0906 importance, security, police, fire protection and penal institutions in building national defense interest 0906 object , security, police, fire and rescue, border guard and penal institutions building 0907 specially protected natural areas in which economic activity is prohibited 0202 specially protected natural areas in which economic activity is prohibited by laws or regulations specifically protected 0908 natural areas, parks, Park, forest park, Mall, beaches, waterfront and other sharing and recreational importance, if they allow economic activity do not fall at any other classification contains the 0501 purpose natural ground, parks, green areas and other recreation areas of importance, if they allow economic activity do not fall at any other classification indicates the purpose of the interim authorised 0502 land use vegetable garden for Sport and recreation 0503 outfitted natural areas of the territory of the cemetery and 0909 related ceremonial buildings and Crematorium building 0907 cemetery sites and ceremonial buildings associated with them and the rest of the crematorium building 0910 public importance and the building of other public interest 0908 object building

1001 industrial manufacturing company building 1001 industrial manufacturing company building building 1002 1002 warehouse storage building 1101 land under public roads-streets, highways, tunnels, bridges, etc. for estakād 1101 land land partition the rail infrastructure and the road bar in land partition the ground beneath the 1102 road, which is the property of the person and no sharing status for the use of the ground beneath the railway 1103 tracks 1104 railway station , bus station, civil airports, river ports, the navigable channel building 1103 railway station, bus station, civil airport and river port building 1105 airfield building airfield building 1106 1102 vehicle garage building 1104 vehicle garage building 1107 individually separated open parking 1105 individual separate open parking 1108 high-rise building parking lot 1106 high-rise parking building maģistrālaj of power and 1201 With loops and major petroleum, petroleum products , chemicals, gas and water pipelines related product, gas and water pipelines associated With maģistrālaj of structures for building power and 1201 loops and major petroleum, petroleum products, chemicals, gas and water pipelines related structures, water intake and sewage treatment facilities building 1301 waste dumps, dead animal disposal site areas 1005 waste management company building 1302 Above unclassified object building-1401 seaports and maritime port terminal building 1107 sea port and sea port terminal building by the Minister of Justice of g. Grīnvald The Ministry of Justice submitted in annex 4 of the Cabinet of Ministers of 20 June 2006 regulations no 496 real estate use, target detection and classification order until 1 January 2007 to i. General questions annex 1 defines the procedure for the determination and codified in real property used for.
2. Real estate used to determine real estate tax calculation and cadastral valuation needs.
3. Real estate used for (purpose) requires all existing in the territory of the country real estate and real estate recorded a national cadastre (hereinafter cadastre).
4. the executive body of the municipality in whose territory the relevant real estate, determine and approve the use of targets, with the exception of: 4.1. meaning of national defence national real estate property;
4.2. national real estate property that is placed in service, the State security police, fire protection and penal institutions.
5.4.1 and 4.2 referred real estate objectives of use determined by the national authority that is in possession of the property or the particular real estate.
6. information concerning real estate use objectives is public and available to anyone. This information is provided by the national land service territorial unit. At the personal request of the State land service of the territorial division shall issue a written statement of the specific real estate property and cadastre in specified registered use.
7. the objectives of use States: 7.1 the newly created real estate and real estate, with no set purpose;
7.2. the immovable property, which is defined and registered in the cadastre use aim, if you need a change of purpose.
8. the purpose of the determination of a municipality referred to in paragraph 5 or State institutions to the property owner or legal possessor, or State or local government bodies.
II. Real estate used in the determination of the first purpose of the 9 first proposes to the determination referred to in paragraph 8 of the relevant person, provided that: 9.1 from existing real estate is a new separate real estate law in the order;
9.2. in the absence of registration of new real estate, which has no set purpose;
9.3. the holder of a real estate, the legal possessor, State and local real estate or a tenant in accordance with the law "on real estate tax" logged in as local real estate tax payer and taxable real estate property that is not specified in the the purpose of use.
10. the newly created real estate property, as well as for real estate, which does not have a set purpose, it first determines the appropriate municipal planning in the territory allowed use and approved building regulations, except in the cases referred to in paragraph 11.
11. the real estate property that does not have a set purpose, they shall be determined pursuant to the first legally commenced for the use of land and buildings where: 11.1. real property located in the territory, which has been designed and entered into force on municipal territory planning (planning), in accordance with the spatial planning act;
11.2. the real property is situated in an area which has developed in the planning, but after its entry into force does not take place in real estate transfer and the municipality has not adopted from other legitimate (actual) initiated the use of different, allowed.
12. Real Estate in the land, building or part of a legitimate starting use represents: 12.1. decisions on the implementation of the būvtiesīb area, near the existing building reconstruction, alteration or change of use of buildings;
12.2. a State or local government bodies, or their decision to issue documentation for authorised economic (financial) transaction in real estate, land use, or allowed certain types of land use, as well as the transformation of land use permits;
12.3. the Act on the building (construction) acceptance into service, after the initiation of operation have changed the building (construction) use (types) or started rebuilding;
12.4. in case the technical inventory of buildings (structures), built before 1940, or buildings that have not survived the construction documentation.
13. The building or part of a legitimate use of the start of construction or group of technical inventory file.
14. The apartment property legally initiate use of certifying documents issued pursuant to the law "on housing property" requirement, if flat, the artist's workshop or living room transferred to the property: privatizēj State or 14.1. local Uptown, as well as to the privatization of the dwelling;
14.2. in accordance with the law "On the privatization of the housing cooperative";
14.3. in accordance with the law "On agricultural companies and the fishermen of the privatisation of the labourer";
14.4. other acts prescribed by the Division of housing estate apartment Uptown, at the State or local authorities and joint ownership of another person or property.
15. The apartment property used for first-time is determined by the purpose of the determination of the real estate property that contains the apartment property.
16. the newly created real estate property located in the territory, which has been designed and has not entered into force planning, used for a first-down under the building legally launched the operation and use of the territory of a municipality established specified: 16.1 in different plānojumo and building projects (up to development planning);
16.2. the decisions of the municipal land use non status;
16.3. the decisions of the municipal land use status irrelevant, if you change the owner.
17. when planning and building the developed in regulations or other plānojumo and building projects (up to development planning) in the specified areas allowed is not attributable to a specific immovable property, the owner or legal possessor has the right to propose one, several or all the permitted uses of the territory.
18. in paragraph 17 To the cases specified in the realization of their right to the authorized uses of the territory, as well as paragraph 9 of the cases, but except in paragraph 4.1 and 4.2 above, the property owner or legal possessor shall submit to the municipality in whose territory the property concerned, in writing, the property owner or legal possessor.
19. the local Government not later than one month after the property owner or legal possessor of receipt of their appearance and provide approval or denial that the written reasoned statement of the applicant.
20. Real estate property used for first-time shall be determined according to the 9, 10, 11, 14, 15, 16, 17, 18 and 19 of the procedures laid down in paragraph under real estate classification the purpose (annex 5).
21. Real estate property, including apartment property that contains the Earth, with the purpose of use shall also determine the purpose of the land his assent to each real estate land in the unit. Property rental cases for the purpose of land determined acquiescence also ground the unit.
22. the purpose of use specified for the land or chime identified the objectives of the use of the entire land area of assent amount must be equal to the real estate land area.
23. Real estate property, including apartment property that contains the land use goals of land determined acquiescence in accordance with annex 6.
24.4, 5 and the authorities referred to in paragraph 39.1 written arguments submitted by the territorial State land Service Department (after real estate location) information on real estate, which according to the first specific purpose. This information shall be submitted within one month of use, target detection, including: 24.1. property address and name;
24.2. the real property cadastre number;
24.3. the property of the owner or legal possessor's name, surname and personal code or entity name and the registration number;
15.2. land cadastral designation of the unit (per unit of land);
15.2. land area unit (per unit of land);
24.6. land area;
24.7. building cadastral designation (for each owned buildings);
15.4. the real property and its purpose code according to the classification (for each specific purpose);
15.5. the prescribed use of the immovable property the purpose of land his assent (for each specific purpose and land units).
III. Property change of purpose the purpose of the 25 proposed a change referred to in paragraph 8 of the person concerned where: 25.1. legislation duly registered in cadastre real estate property is separated or other property is added to one or more land units with or without buildings;
25.2. cadastre registered real estate property, you must use two or more goals, a ground unit in the instrumental uzmēr limit is specified, the total area of the land;
25.3. registered in the cadastre of real estate in the building changed the main use;
25.4. the real estate property specified purpose (purpose) does not match the owner or legal possessor for the planned use of the immovable property (well būvtiesīb) and change the purpose does not conflict with the planning and the procedures laid down in these provisions;
25.5. the real estate property to change the defined purpose (purpose), since the entry into force of the new planning or already approved amendments to the existing;
6. real estate property specified purpose (objectives) and then nodded in the land after legal changes in the property does not match the actual situation;
25.7. real estate property specified purpose (objectives) and then nodded in the land area does not match the actual situation, because real estate hurt by natural disasters, fire or other accident.
26. The specific purpose of the proposed change, but clarify the purposes of use of the land, assent if the cadastral records: 26.1. changes in the composition of the estate buildings. Changing only the building's use, but do not change the primary use of the building;
26.2. changes in the real estate in the area that is specified for one purpose and reason for the change is a Earth unit boundary clarification, they are instrumental to the uzmēr.
27. the use of the building are listed buildings (premises), and a group of technical inventory space.
28. the purpose of use specified in land nodded 26.1. in the case referred to in subparagraph clarified according to the procedures laid down in paragraph 23.
29. the purpose of use specified nodded in land area 26.2. in the case referred to in subparagraph specifies the State land service area covered by adding the difference between ground units, or parts of cadastral areas registered in advance and specified areas.
30. paragraph 25 of the cases by a property owner or legal possessor of a motivated written application is received by the executive body of the local government in whose territory the immovable property, or public body specified in paragraph 5 of the month determines the purpose or prepare and five working days shall inform in writing the applicant.
31. Property change of purpose according to be 17, 18, 19, 25 and 30 of the procedures laid down in point.
32. the purpose of the exchange of the real estate property that contains the Earth, take note that changed and previous usage purposes specified amount of land his assent must be equal to the real estate land area.
33. Information on real estate, which changed the purpose of use, 4., 5., and in paragraph 38 of that institution shall submit to the State land service of the territorial Department under paragraph 24.
IV. Real estate used for filing 34. to ensure uniform identification purpose, identification, tracking and identification procedures used are codified by giving each purpose code according to the real estate classification the purpose (annex 5). Real estate code purpose constitutes use of the sign of the target group and the sequence number in the group.
35. Use the target group includes real estate and their components by economic activity, the building uses signs of similarity, as well as the territory of the plānojumo for the given land use and allowed the kind of similarity between the signs.
36. the national land service provides local and national institutions of the necessary methodological assistance for the purpose of discovery and awareness.
V. concluding questions 37. Local authorities and governmental institutions to review the application, determine the objectives of and use month inform the property owner or legal possessor.
38. Real estate objectives State jurisdiction of use of immovable property shall be determined by the Ministry or public body that the person to be registered in the name of the country is the land in accordance with the law "on State and municipal land property rights and the consolidation of the land". Justice Minister g. Grīnvald of the Ministry of Justice submitted a version of annex 5 of the Cabinet of Ministers of 20 June 2006 regulations no 496 real estate classification the purpose of the code group name NĪLM code name 01 0101 agriculture farms, whose main economic activity is agriculture backyard farm 0102, that economic activity is agriculture, specialised companies which 0103 main economic activity is agriculture 0104 agricultural company building 0105 overall agricultural production area 0106 pond 02 forestry 0201 natural and legal persons in possession or use the existing forests and the rest of the forestry area of water management, public waters at 03 0301 0302 for natural and legal persons property or use of the waters of the river and Canal 0303 territory, water storage, water control and coastal structures to strengthen building 04 mining and quarrying 0401 mining and quarrying 05 fisheries and fisheries, t.sk. nursery ground Fisheries and fisheries 0501, t.sk. nursery ground 06 single-family and divģimeņ Uptown building 0601, divģimeņ of single-family residential home building, divģimeņ-0602 single-family residential home building, not used for permanent habitation 0603 Horticultural Society (individual orchards) building an apartment house building 07 building one-story and two-story apartment 0701 and temporary residence house building 0702 three, four and five storey apartments and temporary residence house building and Six more storied 0703 apartment and temporary residence home building Business and 08 commercial building Transaction and 0801 commercial building 09 public importance 0901 institutions of education and science building 0902 medical, health and social care institutions building 0903 State and local administration building 0904 foreign diplomatic service, international public organization representation building building building 0905 religious institutions building 0906 importance of national defence, security, police, fire protection and penal institutions building 0907 specially protected natural areas where the economic activity is prohibited in the specially protected nature-0908 area, park, Park, forest park, Mall, beaches, waterfront and other sharing and recreational importance, if it allowed the economic the operation is not included at any other classifier shows the purpose of the territory of the cemetery and 0909 related ceremonial buildings and Crematorium building 0910 general public importance and is building 10 industrial objects 1001 industrial production company building building 1002 warehouse 11 traffic infrastructure 1101 ground beneath public roads-streets, highways, tunnels, bridges, estakād rooms, etc.

1102 the ground beneath the road, which is the property of the person and no sharing status for the use of the ground beneath 1103 railway tracks, railway station, bus 1104, civil airports, river ports, the navigable channel building 1105 airfield building 1106 vehicle garage building 1107 individually separated open parking 1108 high-rise parking building 12 engineering supply network and objects of power and maģistrālaj 1201 With loops and trunk oil , petroleum products, chemicals, gas and water pipelines related structures, water intake and sewage treatment facilities building 13 Other objects 1301 waste dumps, dead animal disposal site areas not previously classified objects 1302 building 14 seaports and maritime port terminal building 1401 sea port and sea port terminal building by the Minister of Justice g. Grīnvald of the Ministry of Justice submitted a version of annex 6 of the Cabinet of Ministers of 20 June 2006 regulations no 496 real estate (containing Earth) for the purpose of determining the land his assent to 2007 January 1 Annex 1 determines the order in which the calculated nodded in respect of real property for one or more purposes of use (hereinafter referred to as the purpose of use). 2. purpose of use of the land in the area is the assent conditional area square metres or in hectares used for cadastral value and is determined by calculating the real estate specific purpose of land and its proportion in relation to land units (land units) of the total area. 3. land is a separate piece of land boundaries with locality and the graphical image or land reform only during the graphical image, and which is registered in the real property cadastre of the State (hereinafter cadastre). 4. part of the Earth's land units within the separate plot with the boundaries of the unit and the Earth (or only) the graphical image, and which is registered in the cadastre. 5. the real estate property that contains the Earth, simultaneously with the purpose of determination of the purpose of use determined in respect of each assenting real estate land or land units within part 6. purpose of Use of land: chime 6.1 defines a first-time-newly created real estate, real estate as well as those who have not previously defined purpose or purpose of use of the land; his assent 6.2. down again-a change of purpose or objective of the use of the land exchange nodded. 7. the purpose of use specified for the land or chime set objectives using nodded to the amount of land the land unit and part of the land must be equal to the respective land units or parts of units of land area. 8. Real estate property located in the territory, which has been designed and approved the design with precise phonetic transcription level of detail, which certainly also use real estate goals or objectives, the purpose of use of the Group nodded of land determined according to the precise phonetic transcription in the planning area or the area of the reported distribution. 9. The rest of the immovable property to which paragraph 8 does not apply, in the purpose of use of land his assent is determined according to the procedures laid down in this annex, taking into account annex 4, 11, 12, 13, 14, 16, 17, 18 and using: 9.1. cadastral data for land units or parts of units of land area, apartment building or other buildings housing property (referred to as a separate estate) land units supposedly part of a building or part thereof and (housing not habitable space, artists ' workshops, etc.) as a separate property use appropriate areas; 9.2. the property of the owner or legal possessor of the data submitted in the municipal building (building) in the appropriate area distribution according to types of use cases, if not registered in the register referred to in paragraph 9.1 data on real estate within the building or part of it. 10.9.2. data referred to in point real estate owner or legal possessor shall be submitted in writing at the request of local authorities. 11. the real estate property that contains the only undeveloped land, and which is not attributable to that prescribed in point 8, the purpose of use in the area of land is nodded down according to legal land use started, as well as taking into account the land lease agreements, if any, reported. 12. Real estate property, which consists of land and buildings, with the exception of agriculture, forestry and water management of the real estate property, and to which paragraph 8 does not apply, in the purpose of use of the land his assent as follows: 12.1 if on land units or parts of units of land located in one or more buildings or civil engineering works with one or more usage types corresponding to one purpose, the usage purpose nodded down of land equal to all land units or parts of units of land area; 12.2. If the ground units or parts of units of land located in one or more buildings with the different uses that correspond to different usage purposes, each purpose nodded the land as follows: 12.2.1. calculate the relationship between the particular purpose the appropriate use of the busy area of useful building (buildings) and building (building a) total useful area; 12.2.2. the calculated building (building a) multiplied by the area of the land units or parts of units of land area and apply the results to the specific purpose of use (see the example given in paragraph 21); 12.3. if ground units or parts of units of land located in one or more buildings with one or more different types of use and individual use purpose actually separated the land then the other objectives of use of land his assent as follows: 12.3.1. of land units or parts of units of land total area minus the individual use purpose actually separated the land; 12.3.2. the rest of the land, which is part of the building, the use of objectives determined in the land his assent pursuant to 12.1 and 12.2. the conditions referred to in points (see the example given in point 22). 13. Real Estate, in which economic activity is only agriculture, forestry or aquaculture, down one purpose after Earth unit prevailing economic activities and purpose of use of land determined his assent was equal to the land area of the unit. 14. If the agricultural, forestry or aquaculture of immovable property located in the building or civil engineering works to uses that are not attributable to the agricultural, forestry or water use, target group, then the purpose of use of land determined acquiescence by the following principle: 14.1. delineation of the area, which does not apply to agriculture, forestry or aquaculture; 14.2. the land use separate target nodded of land determined in accordance with the procedures specified in point 12. 15. If the ground unit has several objectives and use any of them are agriculture, forestry, water, or specially protected natural areas in which economic activity is prohibited, then the municipality land units in the graphical reference material that is displayed below the unit boundaries and land use types, you must specify for which land is set out in this paragraph the purpose of use. The State land service according to the cartographic material submitted shall be calculated and recorded in the cadastre of land use allocation. 16. Apartment house or other building separate property in the purpose of use of land his assent is determined by observing the following: 16.1. single purpose of use of the property of land determined nodded simultaneously with all other land units to the existing use of the property of the individual goals of land piekrītošaj; 16.2. separate property of fractions multiplied by the numerical value of the land units or parts of units of land area on which the particular individual estate, acquiring individual assets specified purpose of use of the land; his assent 16.3. If individual property is set with two and more purpose, then the calculated in paragraph 16.2 nodded his assent of land distributed among the individual property for the purpose specified for that property in a separate specific purpose appropriate in the area and used all the separate property of the area; 16.4. all land units to the existing individual possessions down the objectives of use the amount of land area of assent should be the same land units or parts of units of land total area. 17. changing the purpose or any purpose nodded of land for real estate in question must be recalculated for the purpose of land according to Zaal 11.-14. 18. local inquiries about the purpose of the use of land to his assent: 18.1. real property cadastre number; 18.2. land cadastral designation of the unit; 18.2.1. ground unit area (M2 or hectares); 18.2.2. each specific purpose code and then nodded in land area (in hectares or in square metres); 18.3. the ground parts of cadastral unit designation; 18.3.1. ground unit part of the area (in hectares or in square metres); 18.3.2. each specific purpose code and then nodded in land area (in hectares or in square metres). 19. If the unit has several land use goals and one of them is the agriculture, forestry, water, or specially protected natural areas in which economic activity to the sa is prohibited, then the certificate referred to in paragraph 18 shall be added the land units of graphic material. 20. If the land unit or land units part instrumental results in trying to clarify the real property (land) area and real estate property is one purpose, the State land Department shall specify the purpose of use of land and nodded recorded their cadastre. 21. Real Estate for the purpose of determining the land his assent in example 12.2. in the case provided for in point: To land units to the area: 4200 m ² located-one 5-storey residential house with a total useful floor area of 1100 m ², which contains two stores with a total useful floor area of 220 m ² and the purpose code 0801; offices with a total useful floor area of 450 m ² and the purpose code 0801; apartments with a total useful floor area of 430 m ² and the purpose code 0702; -one 1-storey residential house in the individual, without the individual separate plot of land, with a total useful floor area of 110 m ² and the purpose code 0601 12.2.1 and 12.2.2..., fixed points between a specific use of lietderīgaj occupied areas and the total net area of buildings and this ratio is multiplied by the unit of land total area:-the purpose of use in the area of land 0801 nodded is 220 + 450 x 4200 = 1100 + 110 2325m2-purpose of use in the area of land 0702 nodded is 430 x 4200 = 1100 + 110 1493m2-purpose of use 0601 the land area is nodding 110 x 4200 = 1100 + 110-382m2 test: 2325 + 1493 + 382 = 22.4200m2 real estate for the purpose of the determination of the land his assent in example 12.3. specific case in point: on the ground units with area 4200 m ² located:-one 5-storey residential house with a total useful floor area of 1100 m ², which contains two stores with a total useful floor area of 220 m ² and the purpose code 0801; offices with a total useful floor area of 450 m ² and the purpose code 0801; apartments with a total useful floor area of 430 m ² and the purpose code 0702. Of the total land area of 4200 m2 shop unit needs actually separated the area 1000 m2 with a purpose of use 0801; -one 1-storey residential house in the individual, without the individual separate plot of land, with a total useful floor area of 110 m ² and the purpose code 0601. According to paragraph 12.3.1 of the land units of the 4200 m2 total area minus the shop needs to actually separate area of 1000 m2 with a purpose for the rest of the land area 0801. where in accordance with paragraph 12.3.2 shall be distributed in accordance with 12.1 and 12.2 points. the specified conditions is 3200 m2 obtained the following: 4200-1000 = 3200 m2 land units rest area of 3200 m2 divided by purpose of use piekrītošaj areas analogous to this example 1 in the annex to that:-the purpose of land 0801 nodded is 220 + 450 x 3200 = 1100 + 110 total 1772m2-purpose of use of land 0801 nodded is: 1000 = 2772m2-1772 + the purpose of use in the area of land 0702 nodded is 430 x 3200 = 1100 + 110 1137m2-purpose of use in the area of land 0601 nodded is 110 x 3200 = 1100 + 110 291m2-check : 1137 291 = 2772 + + 4200m2 Minister of Justice g. Grīnvald in