The Provisions On The Special Connection Of The Electricity Transmission System In Conditions Of Limited Company "liepājas Metalurgs"

Original Language Title: Noteikumi par speciālā pieslēguma elektroenerģijas pārvades sistēmai nosacījumiem akciju sabiedrībai "Liepājas metalurgs"

Subscribe to a Global-Regulation Premium Membership Today!

Key Benefits:

Subscribe Now for only USD$40 per month.
Cabinet of Ministers Regulations No. 877 in 2006 (October 24. No 55 55 §) rules on the special connection of the electricity transmission system in conditions of limited company "liepājas metalurgs" Issued in accordance with the electricity market Act, 9. the third paragraph of article 1 defines the special terms of the electricity transmission system connection (hereinafter connection) conditions applied to the joint stock company "liepājas metalurgs" connection installation operation. 2. Connection shall be provided to ensure the equipment power supply company "liepājas metalurgs" (TRK. No 40003014197) in Liepaja, freedom Street 94.3. Connection nominal capacity of 96 megawatts (MW). 4. electricity consumption not later than two years after the installation of connection must be at least megavatstund 320000 (MWh) per year. 5. Limited liability company "liepājas metalurgs" and electricity transmission system operator implementation of home is 110 kilovolt (kV) power cable input Substation "liepājas metalurgs". 6. any special connection to the actual costs of installation of the joint stock company "liepājas metalurgs" home of the implementation of the border shall be borne by the transmission system operators for electricity. Joint stock company "liepājas metalurgs" shall be borne by the passenger at 0% of the connection setting (design and construction) of the actual costs. Prime Minister a. Halloween economic Minister a. Štokenberg in