Cabinet of Ministers Regulations No. 666 in 2015 (24 November. No 62 26) amendments to the Cabinet of Ministers on 30 September 2014 regulations No. 600 "procedures for granting state aid in the European Union and an open design competition for the measure in the form of" investment in tangible assets "Issued under the agricultural and rural development Act article 5, fourth paragraph do cabinet 30 September 2014 regulations No. 600" procedures for granting state aid in the European Union and an open design competition for the measure in the form of "investment in tangible assets" (Latvian journal by 2014, 215. no; 103. in 2015, no.) the following amendments: 1. Express 5.7. subparagraph by the following: "5.7 years young farmer is a natural or legal person corresponding to Regulation (EU) no 1305/13 article 2, paragraph 1 of the" n "in the above definition (in the case of a legal person, these conditions apply to a natural person, the owner or the person in the company is owned 51 per cent of shares not less than): 5.7.1. the project at the date of application is not older than 40 years; 5.7.2. has acquired higher or professional education or the average agricultural learned agriculture courses at least 160 hours or it will get through to project implementation; 5.7.3. six months after the rural support service of the decision on the approval of the project application, the entry into force of the first setting up or taking over the farm in a managerial capacity with more than 51 percent of the shares, or farm founded no earlier than five years before the application for the project. Support to the applicant within 18 months from the date of the decision approving the project submission must meet the active status of the farmer in accordance with the European Parliament and of the Council of 17 December 2013 Regulation (EU) no 1307/2013, establishing rules on farmers for direct payments made under the common agricultural policy support schemes, and repealing Council Regulation (EC) No 637/2008 and Council Regulation (EC) No 73/2009 (hereinafter Regulation No 1307/2013) , article 9; ". 2. Supplement 5.8. subparagraph after the word "definition" with the words "when implementing the project, retrieves the provision referred to in the final paragraph 16.9". 3. Supplement with 5.10. subparagraph by the following: "5.10. the project activities implementation of the means for the acquisition of goods, if the applicant is using financial leasing." 4. To supplement the provisions under point 5.1 by the following: "5.1 aid for building energy efficiency grant if energy is used in buildings, indoor climate control, heating and cooling of the space." 5. Add to 9.1.2.1. subparagraph after the word "conversion" with the words "on the basis of contracts with third parties". 6. Express section 9.3.2. as follows: "9.3.2. agricultural infrastructure development: 9.3.2.1. area for construction or conversion of production (excluding production objects which produce energy from agricultural or forestry origin of biomass in order to generate revenue); 9.3.2.2. production object (except objects of production, producing energy from agricultural or forestry origin of biomass in order to generate revenue) for the construction and conversion of siding (no hard pavement); ". 7. Make the following paragraph 11.2.1.: "constructing this provision 11.2.1.15. structures referred to in the annex: 11.2.1.1. restoring or altering existing structures, achieved at least a 20 percent energy savings for heating and cooling of the space, and it proves a building energy audit or energy efficiency calculation, which includes information about the energy consumption of the building before and after the renovation of a building or rebuilding; 11.2.1.2. the building of new premises for the energy consumption for heating and cooling of space is at least 20 percent lower than those in the annex to these provisions, and 15 show the building energy audit energy efficiency or calculation, including year of construction energy consumption; ". 8. Delete the third sentence of paragraph 13, the words "compared to the first year after the conclusion of the implementation of the project". 9. Express 18.2. subparagraph by the following: "according to this rule 18.2 5. projects listed in the annex, selection criteria, priority to get public funding is the applicant who is less a factor. Factor is calculated using the following formula: where

K-factor, which describes the amount of public funding to one under construction in agricultural infrastructure, pārbūvējam or renewable reclamation system meters (Euro/m) or manufacturing object siding meters (EUR/m2), or an object area square metre (EUR/m2); (F) the amount of the aid (euro); G – under construction, agricultural infrastructure or renewable pārbūvējam reclamation system length (m) or the length of the siding of the object (m), or manufacturing object area (m2) area. " 10. To supplement the provisions of the following paragraph 17 with 27.2: "27.2 17. the acquisition of goods through financial lease, respected Commission Regulation No 651/2014 6 article 14, point" b "section, and the financial leasing contract concluded in the beneficiary of the aid provided after the end of the project related to the purchase of the assets." 11. Express 28.1 28.2. section and by the following: "28.1.  40 percent (meat) meat processing sector; 28.2.30 percent (fruit, vegetables and potatoes), fruit and vegetable processing sector; ". 12. Express the following subparagraphs 32.1.3.: "municipality 32.1.3. (including the municipal corporation) to make the municipal owned systems and waterworks, drainage structures or restoring agricultural conversion or forest land and the importance of sharing municipal drainage system conversion or rehabilitation of agricultural or forest land;". 13. Delete paragraph 32.1 "32.1.4.". 14. Make the following paragraph 21.8., "21.8. construction drainage system made more than 15 years from the date of submission of the project;". 15. Make 40 as follows: "40.39. These provisions referred to in paragraph 1, the amount of costs per project shall not exceed: 24.9.  10 000 euro 22.1. these provisions, 22.2., 26.2, 26.3, 32.1.1..,.,., and 32.1.2 32.1.3 32.1.5. applicants referred to projects submitted; 40.2.30 000 euros this rule 22.3., 26.1 and 32.2. applicants referred projects. " 16. To supplement the provisions of this subparagraph with 48.12.: "the cost of the fixed assets 48.12. for the production of raw materials or transportation, for the production of energy from agricultural and forestry biomass origin." 17. Replace the words "in paragraph 53.1 total project" with the words "public works" project. 18. Make 55.3. subparagraph by the following: "55.3. together with the project submission, or within six months following the adoption of the decision on the application for the approval of the project – credit institutions, leasing companies or cooperative credit society credit granting decision, where the project will take credit, or documents that prove the availability of funds for the project, if the applicant intends to invest private (except credit) money – for projects with a total eligible cost amount exceeds 500 000 euro. The project provides for the construction, credit or credit consortia's decision on granting or documents proving the availability of funds, investing in private funds, within nine months from the decision on approval of the application the project; ". 19. Replace 55.4.1. in subparagraph the number "12" with the word "seven". 20. the express section 56.4. by the following: "certified specialists completed 56.4. building energy audit report (annex 16) with the calculation of the energy performance calculation for the planned or BLANKET or ammonia emissions reduction (13 and 14), where the application contains this provision 11.2.1 or 11.2.2. subparagraph. purpose;". 21. Supplement with 56.9. subparagraph by the following: "this provision 5.7 56.9. referred to tenderers – formal education copy or certificate of training institutions that the learner learns from the training program, according to the legislation on the national and European aid, administration and monitoring of the development of the rural and fisheries-2014 – 2020 programming period. If you get a number of higher or vocational training or learn more agricultural courses, all the documents certifying education specified agricultural items amount number of hours. If the document does not show the number of hours, accompanied by educational institutions teaching or learning the course. " 22. section 57.1. To express the following: 57.1. drainage system "and the waterworks structures technical inspection a copy of the opinion (the original show), or the opinion of the technical survey of the construction of the copies (the original show), if the application is not added to the project construction. The opinion noted that rule 9.3.1., 21.8. and 35.2. information referred to in point. If the planned eco-friendly drainage system construction of the elements, the opinion indicates the relevant elements and measurement criteria in accordance with the provisions of annex 12; ". 23. Add to paragraph 62 of the second sentence as follows: "If the item is purchased through financial leasing means monitoring period is five years after the lease contract of all beneficiary obligations, leasing object to payment of the value of the leasing company, and purchased the property in the goods takeover." 24. Make 65. paragraph by the following: "65. If the project is intended to become a registered or recognized organization, last payment, which shall not be less than 20 percent of the approved amount of public funding, this provision 1.2. aid referred to in the framework of the cost after the food company registration or recognition. " 25. Make a cover page of annex 1 by the following: 26. Express 5, 6 and 7 of the annex as follows: "annex 5 cabinet 30 September 2014 regulations no 600 project selection criteria of the measure" investment in tangible assets "Sub" aid for investment in agricultural and forestry infrastructure development "

Nr. p. k. A group of Criteria criteria score criteria maximum points in Group 1. The project provides for the construction Projects with planning permission for the design conditions are filed together with the application for the building permit for the project with būvvald 30 30 mark on the construction plan has been submitted to the acceptance of the application, together with project 10 2. Implementation of joint projects, in which the alteration or renovation of a reclamation project concerns more than five owners of the drainage systems 20 20 project concerns five owners of the drainage systems 10 3. The project used eco-friendly drainage system elements in the project stage to project involves 30 30 with meandr sedimentation ponds, drainage ditches or two pile of rocks, the controlled drainage and artificial wetlands 20 4. The aim of the project (in accordance with the provisions of paragraph 11) is implemented in one Project the objective of the project is being implemented in 20 25 at least two objectives 25 5. Project to the application project application submitted to the rural support service Electronic login system or electronic document under the electronic Act 5 5 total 110 the minimum number of points to qualify for the aid, has 30 points in annex 6 of the Cabinet of Ministers on 30 September 2014 regulations no 600 one programming period available to the applicant the maximum amount of eligible costs N. p. k. Sub-measures and their activities the applicant eligible cost about (euro) i. Sub-measure "aid for investment in agricultural holdings" 1. Acquisition of premises construction and pārbūve1 of the farm including 2 000 000 asset iegāde2 700 000 2. Acquisition of fixed assets, construction and alteration of buildings, acquisition of new holdings and young farmers who intend to establish a farm or acquire merchant status 150 000 3. Acquisition of fixed assets, construction and alteration of buildings, asset iegāde3 young farmers 400 000 4. Acquisition of fixed assets, construction and alteration of buildings (including primary agricultural products and machinery) 4 II 8 000 000 cooperative societies under "investment aid for processing" 5. Acquisition of premises and construction pārbūve5 processing company, 3 000 000 producers cooperative society, which produced 100 000 home manufacturer, producing in the home, if the project company become the herbal product registered companies or products of animal origin recognized 300 000 new companies processing plants to create 200 000 III. the Sub-measure "aid for investment in agricultural and forestry infrastructure development" 6. Drainage system rebuilding and restoring (and one owner and sharing), drainage of the road adjacent to the conversion object and restoring farms, natural person – economic performer – that is in the possession of the forest, a legal person, which is more than 50% of the share capital in private equity, municipal (municipal corporation, which also will take the role of municipal drainage system of sharing conversion or restoration) 300 000 national reclamation system operator shall, without limitation, 7. Agricultural infrastructure (area at the production facilities, links) – construction, alteration, farmers cooperative society 50 000 300 000 notes. 1 for the construction of up to applicant's average revenue from agricultural production and processing in the past two years, concluded before the application of the project more than five times (this condition does not apply to the applicant, if the total amount of eligible costs supported programming period is less than 150 000 euros). 2 up to the tenderer's average revenue from agricultural production and processing in the past two years, concluded before the application of the project more than three times (this condition does not apply to the applicant, if the total amount of eligible costs supported programming period is less than 150 000 euros). 3 the maximum funding Available, including this annex, paragraph 7. For the construction of up to applicant's average revenue from agricultural production and processing in the past two years, concluded before the application of the project more than five times (this condition does not apply to the applicant, if the total amount of eligible costs supported programming period is less than 150 000 euros). With regard to the acquisition of fixed assets – up to the tenderer's average revenue from agricultural production and processing in the past two years, concluded before the application of the project more than three times (this condition does not apply to the applicant, if the total amount of eligible costs supported programming period is less than 150 000 euros). The applicant has the opportunity to apply for the funding referred to in paragraph 1 (the maximum funding available, including this annex, paragraph 3), not applying the annex 7 additional support effort for young farmers. 4 the maximum funding Available, including 5 and 7 of this annex, paragraph. 5 do not exceed the applicant's net sales of agricultural products processing and production last year concluded before the application of the project more than five times (this condition does not apply to the applicant, the purpose of which is to create a new processing plant). 7. the annex to Cabinet of 30 September 2014 regulations no 600 aid intensity (as a percentage of the eligible expenditure of the project)

Nr. p. k. Type of eligible costs aid applicants (including cooperatives) the total turnover (euro) 70 000 70 001 – 50 000 000 1 000 000 1 000 001-01 to more than 50 000 001 i. Sub-measure "aid for investment in agricultural holdings" 2 1. Structure construction, conversion, acquisition of fixed installations with construction or conversion of permanent installation under 40% 40% 40% 40% aid intensity, the additional young farmers through construction, modification or acquisition of fixed installations with construction or conversion 20% 20% 10% – – additional aid intensity, if the project is implemented in the livestock sector in which cultivated herbivores – 10% 10% 10% aid intensity, the additional construction if the project is implemented this provision in paragraph 11.2.1. this objective (as a result of the project will increase energy efficiency by at least 20%) – 10% 10% 10% 2. Further, the intensity of the aid for young farmers, if invested in an investment project for the purchase of fixed assets, construction or rebuilding 10% 10% 10% – – 3. Agricultural tractors (the first farm purchased, if everyone else is older than 10 years) 40% 40% 40% 40% 4. Agricultural tractors (each subsequent) 30% 30% 20% 20% – 5. Trailers, implements, implements (excluding agricultural tractors) 40% 40% 40% 30% 6. Structure construction, conversion, acquisition of fixed installations with construction or conversion and specialised transportation cooperatives – 40% 40% 40% 40% 7. Trailers, implements, implements (excluding agricultural tractors) cooperatives-25% 25% 25% 25% II. the Sub-measure "aid for investment in the processing of" 3 8. Building and equipment 30% 30% 30% 20% 20% 9. Additional aid intensity the processing undertaking which manufactures food quality scheme products-10% 10% 10% 10% 10. Additional aid intensity, if an applicant produces at least five foods that meet recommended food selection criteria (under this provision 10. Annex) – 10% 10% 10% 10% 11. Additional support for the restructuring of the company, the intensity if it affected other countries imposed import restrictions (export to the country made by at least 10%) – 10% 10% 10% 10% 12. Additional aid intensity, if the project is implemented this provision in paragraph 11.2.1. this objective (as a result of the project will increase energy efficiency by at least 20%) 4-10% 10% 10% 10% 13. Additional aid intensity, if the project is implemented in the inovācija4 results – 10% 10% 10% 10% 14. Manufacturers who produce home apstākļos5-40% 30% 6 – – (II). The Sub-measure "aid for investment in agricultural and forestry infrastructure development" 15. Drainage system rebuilding and restoring 60% 60% 60% 60% 60% 16. Environmentally friendly drainage system (12. Annex) 80% 80% vegetable 80% 80% 80% 17. Drainage system rebuilding or renovation activities 70% 70% 70% 70% 70% 18. The importance of sharing the municipal drainage system 90% 90% 90% 90% 90% 19. Drainage system rebuilding and restoring national 100% 100% systems 100% 100% 100% 20. Area, siding, etc. infrastructure cooperatives 40% 40% 40% 40% 40% 21. Area, siding, etc. infrastructure holdings, young farmers 40% 40% 40% 40% 40% notes. 1 new processing plant or farm. 2 the maximum aid intensity will not exceed 50% of the Sub, except support for young farmers. 3 the maximum aid intensity does not exceed 40% of the Sub. The great merchants, a project which the finished product is not included in the Treaty on the functioning of the European Union annex I, does not exceed 35%. 4 higher aid intensity cannot get aid applicants, which the project implementation, the resulting final product is mentioned in these rules 27.2. 5 are not subject to the higher aid intensity. 6 companies with turnover of up to eur 200 000. " 27. Express 9. in paragraphs 22 and 23 by the following: "22. Heated garage euro/m2 269.78 148.60 23. Executive rooms euro/m2 354.85 204.40 "28. To supplement annex 9 to 24 the following: 24. Concrete slab pavement path euro/m2 56.17 41.69 "29. Express the annex as follows:" Annex 11 of the Cabinet's 30 September 2014 regulations no overview of the 600 beneficiary economic indicators after the implementation of the project the European agricultural fund for rural development (EAFRD) under "investment in tangible assets" 1. General information the project number, the name of the beneficiary of the \u2012 the name LADA customer number 2. Workforce average number of employees during the period total new jobs created places of work the number of men working men t.sk. younger than 40 years t.sk. younger than 40 years women women t.sk. younger than 40 years t.sk. the age of 40 years, the total contribution of the labour force \u2012 the number of hours worked during the period of hours together t.sk. the agricultural hours together t.sk. the processing of agricultural products ACHIEVED 3 hours together objectives performance indicators

Description of the unit of measure indicators year value 4.1, 4.2 and 4.3.  Sub-measure (all projects) in the Production of agricultural products last year concluded the EURO prior to the submission of the project/the first year after the implementation of the project 20 ___. annual operating costs for agricultural production last year concluded the EURO prior to the submission of the project/the first year after the implementation of the project 20 ___. year of the project, if the goal is to increase economic efficiency of production in agriculture or food production (2A; 3A) 4.1 Sub-measure last year concluded before the submission of the project/the first year after the implementation of the project 20 ___. 4.2. the Sub-measure Last year concluded in the year preceding the submission of the project/the first year after the implementation of the project 20 ___. year note. * Applies to new entrepreneurs who start economic activity indicators Projects 4.2. Sub processing sector/sectors of the main way 20 ____. year tonnes of processing capacity of the main EURO x purchased the essential t. see. from local producers 4. information on the indicators Project indicators if objective (one goal) is to improve energy efficiency in farming or processing of agricultural products (5B) (completed in the second year after the implementation of the project) primary energy consumption in the year following the implementation of the project, t.sk. A measure of the value coefficient for the transition to the kWh energy consumption, kWh electricity kWh 1 0 0 wood 9.6 m3 natural gas ciešm. M3 1860 0 ber Chips. 0 945 M3 wood briquettes ber. m3 of wood pellets 0 4793 ber. 5000 M3 0 liquid fuel oil t 12000 0 t 0 t 0 11280 coal 6667 another _____ _____ _____ ____ ___ (specify) x x production (output) a year after the implementation of the project in standard units (s. v.) or in tonnes (t) s. v. t x x ' 30. Replace annex 12. in paragraph 1, the words and figures "creating a 1.5-1.0 m recesses of" with the words and figures "creating a 1.5-1.0 m recesses (agricultural high Moss in bogs in peat bog or developed 0.5-4 m)". 31. To supplement the provisions under articles 15 and 16 of the annex by the following: ' Annex 15. Cabinet of Ministers of 30 September 2014 regulations no 600 starting the heating energy consumption calculation used in delimiting structural heat permeability coefficient values, W/(m2K) No. p. k. Building type design wall delimiting the roof and attic floor to the bottom and the basement Windows and glazed and translucent design door 1. Heated greenhouses 0.25 0.25 0.3 3.6 2.2 2. Agricultural and processing enterprises of the freezer (0 to + 8 ° c) 0.4 0.4 0.4 1.8 2.4 3. Agricultural and processing enterprises of the freezer (0 to-8 ° c) 0.35 0.35 0.35 1.6 2.2 4. Agricultural and processing plant chillers (from-8 to-25 c) 0.3 0.3 0.3 1.6 2.2 5. The chicken coop, pig housing and industrial buildings for processing agricultural products 0.25 0.3 k k k k 0.25 2.2 1.6 k notes. k-factor of the temperature, which is calculated using the following formula:, where t-space room average temperature heating season; t out-legislative outdoor air temperature in accordance with the Latvian et seq of LBN 002-15.16. attachment Cabinet 30 September 2014 regulations no 600 building energy audit report building address i. General description 1. building identification 1.1. address 1.2. building cadastre number 1.3. Part of a building (explains, if estimates of a building part) 1.4 type of Buildings 2. Authorized person name 2.1 2.2 2.3 registration number, registered office 2.4. Contact phone number 2.5 3. The independent expert (energoauditor) in the field of energy performance of buildings 3.1. name 3.2. the name certificate number or certificate authority decision number 3.3. contact information (phone, email, address) 4. Energy Audit 4.1. building the survey date 4.2. Energy audit report number 4.3 building energy audit preparation date 4.4. building energy audit objective (renovation) alteration (reconstruction) building 5 building calculations made assumption description II. Basic information on building 1. building constructive solution 2. Putting in year 3. Stand 3.1. cellar ____ ____ ____ (yes/no) 3.2 a model stand _____ ____ ___ (number) 3.3. technical stand _____ ____ ___ (number) 3.4. attic floor ____ ____ ____ (yes/no) 3.5 penthouse in ____ ____ ____ (yes/no) 4. the calculation of the total area (m2) 5 total area (m2) 6. external dimensions of the building (where the irregular shape of the building, in the annex, accompanied by sketch) length (m) width (m) height (m) building sketch 7. other information 8. building survey or termogramm-fotodokumentācij in Annex _____ pages. III. Building containment structures (information on each type of external structures delimiting, covering a total area of calculation in the heated space)

No p. k. Defining construction material (s) and thickness (mm) Before the implementation of the project After the implementation of the project area (thermal bridges – length, m) Būvelement heat transmission coefficient (U) (thermal bridges – W/(mK)) temperature difference between the warm and cold construction parties heat loss coefficient (thermal bridges – length) Būvelement heat transmission coefficient (U) (thermal bridges – W/(mK)) temperature difference between the warm and cold construction parties heat loss coefficient (m2 K) W/m2 ° C W/m2 K W/(m2K) c W/K 1. The outer wall of the 2. Jumts 3. The floor on the bottom 4. Logi 5. Front door 6. Thermal bridges. 7. the buildings delimiting the design heat loss factor HT 7.1. prior to the implementation of the project after project implementation 7.2 7.3 regulatory * note. * Calculated in accordance with the provisions of annex 15. IV. Building technical systems and power distribution 1. Ventilation systems in the building before the project after project implementation 1.1. Rooms with natural ventilation 1.1.1. calculation of area, volume, m3 m2 1.1.2 1.1.3. air exchange used in the calculation of the aid intensity, including infiltration, 1/h 1.2. Rooms with mechanical ventilation 1.2.1. calculation area, m2 volume, m3 1.2.2 1.2.3 air used in the calculation of the exchange rate, 1/h 1.2.4. calculation used in infiltration , 1/h heat recovery 1.2.5 (recuperation) efficiency,% 1.3. building ventilation heat loss coefficient of HVE (natural ventilation) W/K 1.4. building ventilation heat loss coefficient of HVE (mechanical ventilation) W/K 1.5. building ventilation heat loss coefficient of HVE (total) W/K 1.6. Indoor temperature ºc 1.7. calculation of ventilation heat loss (natural ventilation) in kWh per year in heating season 1.8. Ventilation heat loss (mechanical ventilation) heating season 1.9 kWh per year. The total ventilation heat loss for heating season 2 kWh per year in air conditioning and ventilation systems-data for equipment no p. k. Machine name, model year of manufacture Aukstumenerģij quantity (kWh/year) inspection was added (yes/no) date 3. calculated the benefits of heat in buildings 3.1. Calculation parameters parameters of heating period by internal heat gains in solar heat gain coefficient of use benefits total heat benefits (taking into account the benefits of the use of the coefficient) kWh/m2/m2 kWh/m2/kWh Before implementation of the project After project implementation parameters of cooling period internal heat gains in solar heat gain Loss factor of using total heat benefits (taking into account the loss of the use of the coefficient) kWh/m2 per kWh/kWh/m2 Before project implementation at the M2 project implementation 3.2. other information V. A building's energy balance 1. Fuel consumption * — show all kinds of fuel (energy) that is consumed in heating or other processes.
The year of the distribution by energy January February March April May June July August September October November December total fuel emission factor units the lower calorific value of 2012 2013 2014 note. The calculation used to specify the lower calorific value (kWh/unit). 2. Heat consumption data 2.1. total heat consumption year January February March April May June July August September October November December total 2012 total energy consumption, kWh 2013 total energy consumption, kWh 2014 total energy consumption, kWh, the total average (kWh/year) energy consumption for heating 2.2 provision of the year January February March April May June July August September October November December total 2012 total power consumption by 2013 the total energy consumption in kWh, kWh 2014 total energy consumption, kWh, the total average (kWh) 2.3. consumption of Heating hot water preparation (including hot water circulation) year January February March April May June July August September October November December total 2012 total energy consumption, kWh 2013 total energy consumption, kWh 2014 total energy consumption, kWh, the total average (kWh/year) 3. Water consumption data 3.1. Hot water consumption year January February March April May June July August September October November December total Hot water consumption in 2012, 2013 hot water consumption m3, m3 2014 hot water consumption, m3 total average (m3gad) 3.2. Cold water consumption

Year January February March April May June July August September October November December total 2012 cold water consumption, m3 2013 cold water consumption, m3 2014 cold water consumption, m3 total average (m3gad) 4. Electricity consumption in buildings year January February March April May June July August September October November December total 2012 total energy consumption, kWh 2013 total energy consumption, kWh total energy consumption by 2014 the total average, kWh (kWh/year) energy efficiency improvement proposal VI. 1. building containment structures No. p. c. Energy efficiency measures for energy savings in year 1 MWh.     Description of energy efficiency measures, schemes, etc. (indicate the buildings delimiting the structure transmission of heat coefficient U (W/m 2 K) and thermal bridges thermal transmittance coefficient ψ (W/m K)) 2. Description of energy efficiency measures, schemes, etc. (indicate the buildings delimiting the structure transmission of heat coefficient U (W/m 2 K) and thermal bridges thermal transmittance coefficient ψ (W/m K)) 3. Description of energy efficiency measures, schemes, etc. (indicate the buildings delimiting the structure transmission of heat coefficient U (W/m 2 K) and thermal bridges thermal transmittance coefficient ψ (W/m K))
2. the heating system of the building No. p. k. Energy efficiency measures for energy savings in year 1 MWh.     Description of energy efficiency measures, schemes, etc. 2. Description of energy efficiency measures, schemes, etc. 3. Description of energy efficiency measures, schemes, etc.
3. building hot water supply system No. p. k. Energy efficiency measures for energy savings in year 1 MWh.     Description of energy efficiency measures, schemes, etc. 2. Description of energy efficiency measures, schemes, etc. 3. Description of energy efficiency measures, schemes, etc.
VII. Estimated energy efficiency indicators and changes forecast by the energy efficiency of the implementation of the proposal for the distribution of energy consumption Before the implementation of the project After the implementation of the project the total consumption (MWh/year) specific (kWh/m2/year) total consumption (MWh/year) specific (kWh/m2/year) 1 heating 2. preparing hot water for cooling 3 4. Mechanical ventilation 5. Illumination 6. other consumers along the independent expert (name) (signature) date ___ ___ ___ ___ ___ ___ annex : 1. building survey photo documentation, or termogramm. " Prime Minister, Minister of the Prime Minister's duties, traffic Executive Richard Kozlovsk the Minister of agriculture John Dūklav