Advanced Search

Amendments To The Cabinet Of Ministers On 30 September 2014 Regulations No. 600 "procedures For Granting State Aid In The European Union And An Open Design Competition For The Measure In The Form Of" Investment In Tangible Assets "

Original Language Title: Grozījumi Ministru kabineta 2014. gada 30. septembra noteikumos Nr. 600 "Kārtība, kādā piešķir valsts un Eiropas Savienības atbalstu atklātu projektu konkursu veidā pasākumam "Ieguldījumi materiālajos aktīvos""

Subscribe to a Global-Regulation Premium Membership Today!

Key Benefits:

Subscribe Now for only USD$40 per month.
Cabinet of Ministers Regulations No. 646 in 2016 (27 September. No 48 48) amendments to the Cabinet of Ministers on 30 September 2014 regulations No. 600 "procedures for granting state aid in the European Union and an open design competition for the measure in the form of" investment in tangible assets "Issued under the agricultural and rural development Act article 5, fourth paragraph do cabinet 30 September 2014 regulations No. 600" procedures for granting state aid in the European Union and an open design competition for the measure in the form of "investment in tangible assets" (Latvian journal by 2014, 215. no; 237.103, 2015, no.) the following amendments: 1. Add to subparagraph 5.7 behind the numbers and the words "51 percent stake" with the words "and company register individual signing rights". 2. Add to paragraph 5.7.3 behind the numbers and the words "51 percent stake" with the words "and company register individual signing rights". 3. Replace the words "in paragraph 9.1.1 technical equipment" with the words "technical," its equipment. 4. Express 11.1. subparagraph by the following: "in comparison with the last 11.1 concluded the year before the submission of the project by at least 10 percent if the project provides for the acquisition of, and at least five percent, if the project is construction, increased: net turnover of 11.1.1. agricultural production or processing (or at least on the side of the investment amount invested), or the physical volume of production. The requirement to increase the physical volume of production does not apply to the applicant, which is implementing a project in the dairy farming sector; 11.1.2. production efficiency (the figures are verifiable and the value of audited); ". 5. To supplement the provisions under point 11.1.1 and 11.1.2 as follows: "If the project this 11.1.1 the provisions referred to in subparagraph sub-action 1.1, this provision is referred to in 11.1 scores, which must not be lower than the previous project application deadlines planned for approved projects, compared to reach: 11.1.1 1. during the last three years, concluded the averages before the submission of the project; 11.1.1 2. over the past two years concluded averages before the submission of the project if the operating time is less than three years and have only two years concluded; 11.1.1. the last 3 closed the annual averages, if the farm founded in the year preceding the submission of the draft and has only one year concluded; 11.1.2 If the tenderer after the project implementation of the provisions referred to in paragraph 11.1 scores can not be achieved as a result of force majeure, from the independent global market changes or the general price changes, such as the national economic crisis, applicant, giving reasons, is entitled to ask for Field support services: 1. review the planned 11.1.2 scores increase, but not less than the provisions prescribed in paragraph 11.1., if the project originally planned indicators are higher; 11.1.2 2. project monitoring be extended period to achieve the planned indicators of these provisions referred to in subparagraph 11.1 level; ". 6. To express the following paragraph 13: "13. This provision in paragraph 11.1 and 12 referred to the indicators of economic activity the applicant reached the third year following the conclusion of the project and not lower them throughout the subsequent commitment period. New companies in net sales during the third year following the implementation of the project and all project monitoring period is at least 20 percent of the project investment. If the project is implemented for meat cattle breeding industry or outdoor cultivation culture be plantings, the pointer reaches the sixth year following the conclusion of the project. " 7. Make the following point 15.1.: "15.1. simplified business plan, which includes production and costs, for the last year concluded, the subsequent years up to the end of the project, and a year after the implementation of the project, as well as the cash flow statement over the years to the application of the draft year, in subsequent years up to the end of the project, and a year after the implementation of the project. 22.2. These provisions and 26.2. tenderers referred to in addition to submit cash flow statements for two years following the implementation of the project; ". 8. Express 15.2.1 point as follows: "this rule 22.1.15.2.1, 22.3., 26.1 and 26.3. applicants referred to production and costs for last year concluded, the subsequent years up to the end of the project, and a year after the implementation of the project, as well as the cash flow statement over the years to the application of the draft year, in subsequent years up to the end of the project, and a year after the implementation of the project reflects the possibility of implementing project and achieving project goals;" 9. Replace paragraph 17.2., the words "one year after the implementation of the project, the cash flow statement for the two subsequent years" with the words "three years after the implementation of the project". 10. Replace paragraph 18.1., the words and figures "with average revenue the past two years concluded from agricultural production and processing are larger than the paid public funds 2007-2013 programming period measures in agricultural products," added value "and" upgrading "of the farm" with the words "which have a greater ratio criteria in the Group tax contribution made". 11. Add to subparagraph 18.2. beyond words "at one" with the words "Agriculture and forestry". 12. To complement the 22 with 22.4. subparagraph by the following: "22.4. the agricultural sector a scientific authority of the State, which corresponds to Regulation No 1305/13 paragraph 2 of article 17." 13. To supplement 23 points behind the number "50" with words and number "but the organic scheme operators at least 30". 14. To complement the 2.2. subheading with 25.1 points as follows: "the 25.1 the fruit and vegetable sector support shall not be granted for costs attributable pursuant to European Parliament and Council (EU) 17 December 2013 Regulation No 1308/2013, establishing an agricultural product common organisation of the market and repealing Council Regulation (EEC) no 922/72, (EEC) No 234/79, (EC) no 1037/2001 and (EC) No 1234/2007." 15. Supplement 32.1.4. subparagraph after the word "holder" with the words "which intends to implement the project of agricultural or forest land". 16. Replace the paragraph numbers and 24.9. the word "32.1.3. and with numbers and 32.1.5." the word ", and 32.2 32.1.3.32.1.5..." 17. Replace 40.2 in numbers and the word "22.3., 26.1 and 32.2." with the figures and word "22.3. and 26.1." 18. To supplement the rules by 24.9 points to the following: "these rules and 24.9 24.9 25.0 in one project specific costs are not consistent." 19. Make the following section 30.3.: 30.3. taxes and charges (excluding value added tax, if it is not recoverable from the national budget); ". 20. Add to 48.12. subparagraph after the word "biomass" with the words "and excavation equipment (excavator) and stump cutters acquisition cost". 21. Express 50.1.20.50.1.21. subparagraph following and: "transport semi-trailer 50.1.20. this rule 22.1 and 22.2. applicants referred and trucks, trailers and semi-trailers, if they purchase a cooperative society. These rules 22.1 and 22.2.. applicants referred to transport semi-trailers acquisition cost is relevant, if the applicant holds the certificate of domestic goods of own-account transport and possession or use of it is appropriate for towing a semi-trailer, a motor vehicle; 50.1.21. drain ditches of skalotāj, mowers and other machinery and equipment needed in the project objectives, including renewable energy production equipment (other than equipment designed for the production of energy from agricultural and forestry biomass originating); ". 22. Delete paragraph 56.2. 23. Delete words in 56.3 "If these documents are not submitted, the rural support service from the administrative procedure in the procedure prescribed by law". 24. Express 56.7.1. subparagraph as follows: "56.7.1. National Environment Services issued a statement of the minimum environmental requirements for livestock farms. If the applicant does not submit the said document, the rural support service it is obtained from the national environmental service of the administrative procedure law; ". 25. Supplement with 56.7.3. section as follows: "56.7.3." this rule 22.1 and 22.2. tenderers referred to in conjunction with the submission of the project or to submit a request for payment for the purchase of the semi-trailer, if the project is to transport semi-trailers,-the certificate of domestic cargo operations, which valid throughout the period of supervision of the project; ". 26. To complement the rules by 56.8.5. and 56.8.6. subparagraph as follows: "56.8.5. scientific institutions dealing with knowledge and technology transfer support and promotion of the activities, the opinion on the compliance of the proposed innovation rules referred to in paragraph 5.9. definition of innovation, to get additional aid intensity; 56.8.6. a declaration of conformity of the small companies (undersized) or the average of the company according to the legislation on company reporting procedures under the small (tiny), or the average company; ". 27. Express 56.9. subparagraph by the following: "this provision 5.7 56.9. referred to tenderers – formal education copy or certificate of training institutions that the learner has mastered or learn a subject or any of the training program, according to the legislation on the national and European aid, administration and monitoring of the development of the rural and fisheries-2014 – 2020 programming period. If you get a number of higher or vocational training or learn more agricultural courses or subjects in all formal education documents specified agricultural items amount number of hours. If the document does not specify the number of hours or training institution training is interrupted, accompanied by education authorities issued a document on the experience of a training course, or the subject of a number of hours. " 28. Replace paragraph number and name 58.1 "10 working days" with the words "of one month". 29. Express in paragraph 61 the first sentence by the following: "beneficiary (except this rule 1.3. beneficiary referred), starting with the next year after the implementation of the project, the first full year and concluded further throughout the monitoring period in the project every year until June 1 to submit a support service in the field report on the beneficiary of economic indicators for the previous calendar year (Appendix 11)." 30. Make the new version of annex 1 (annex 1). 31. To make the new version of annex 2 (annex 2). 32. To make the new version of annex 3 (annex 3). 33. Make new annex (annex 4). 34. Make a new annex 5 (annex 5). 35. To make the new version of annex 6 (annex 6). 36. To make the new version of annex 7 (annex 7). 37. Make new annex 8 (annex 8). 38. To express new version 9 of the annex (annex 9). 39. Replace annex table 10 under "Basic Group" the words "meat and meat products" with the words "meat products". 40. Replace paragraph 3 of annex 11 to the table "attainable objectives performance indicators" and the word "4.1, 4.2 and 4.3." with the figures and word "" 4.1 and 4.2. 41. Make 12. new annex (annex 10). Prime Minister Māris kučinskis Agriculture Minister John Dūklav of the Ministry of Agriculture presented version of annex 1 of the Cabinet of Ministers on 27 September 2016. Regulations No 646 "annex 1 Cabinet 2014 30. Regulation No. 600 of September the European Union the European agricultural fund for rural development (EAFRD) unveiled the project submission contest Latvian rural development programme 2014-2020 event 4." investment in tangible assets "4.1" under aid for investment in agricultural holdings "4.2" under processing "investment aid" Sub-measure 4.3 aid for investment in agricultural and forestry infrastructure "project application
Support the customer number the applicant registration No./personas (natural persons) address correspondence (address, postal code) of the project's location (address) project manager Contact number, email address project title project No.
A. information on the support application to the project the APPLICANT lodged the first date (A). 1. Description of the action of the current transaction description main partners (suppliers of raw materials and finished products for buyers) the current farm/company's production scheme (from the acquisition of raw materials to the finished product marketing) company produced farm/product description a. 2. Support the applicant representative indicators of the last year the average number of employees during the last year concluded the total contribution of the labour force, the number of hours worked last year concluded hours together including. hours together in agriculture including. the processing of agricultural products hours together in agricultural products Produced in the last year, EUR operating costs for the production of agricultural products last year, concluded last year concluded the EURO carry out State social security contributions (for the farm – the owner shall make contributions), EUR support the applicant or the owner of the farm is a self-employed person (yes/no) support – the applicant natural person-gender and age (if the applicant is a legal person the age of its members, who own more than 51% holding in the share capital of) a woman 40 years later ○ ○ ○ and man older than 40 years ○ supports the applicant's status for sub: 4.2 legal person that agricultural products processing enterprise engaged in processing of agricultural products (refineries) legal person who intends to initiate the processing of agricultural products, if it is proven the viability of the project and the provision of raw materials (new refineries) legal person dealing with the processing of agricultural products in the home (domestic producer) (A). 3. Support the education of Sub-measure 4.1 higher education or vocational secondary (Special) education in agriculture ○ agriculture sector for professional skills and competence of agricultural education ○ No (indicate what training and specialty is) a. 4. Information about production 4.2 Sub-measure processing sector/sectors/types of Essential Basic processing capacity (t/year) last year concluded tons bought in the main EURO last year including concluded. from the local producers of the main processed last year concluded the processing production last year including concluded. production of organic products last year concluded the processing of production marketed last year including concluded. organic produce marketed last year including concluded. processing products exported to European Union Member States last year including concluded. processing products exported to third countries last year concluded A. 5. Support the applicant (Sub-measure 4.1) agriculture is the main activity of the farm ○ overall economic activity ○ plans to launch the production of agricultural products ○ a. 6. The beneficiary participates in any of the schemes, the scheme certificate No Yes/No (if any of the schemas) organic production/processing of horticultural products Integrated national food quality scheme (A). 7. Support the production buildings and structures, machinery and equipment under 4.1 and 4.2 of the production buildings and structures, machinery and equipment, no PO box Name, machinery and equipment make or model number in the lease property, existing or creation of output, the number of annual capacity, capacity/unit of measure if the technique, or equipment will be updated or replaced, check off the specific production buildings and structures machinery and equipment if the applicant's property or lease existing assets are very large, in the annex to the application project, you can add atsvišķ to the fixed assets list a. 8. Support the Earth supports the applicant's land together owned permanent ha use Leased agricultural area (LISA) in permanent use in the property rented LIZ use arable land under permanent grassland and pasture other land forests forests where cultivated blueberries or cranberries Bog in which cultivated blueberries or cranberries (other land under buildings roads, etc.)  
A. 9. Support the applicant's drainage system 4.3. Support the Sub-measure drainage system along KM: property of CFR in legal possession of the lease including the reclamation system of agricultural land, the property of the legal: possession of the lease including the drainage system of forest land, in the legal possession of the property: rental assistance in the area of the applicant's drained, ha ha: BETH property legal possession of the lease (A). 10. Support the applicant received public funds and/or projects submitted submissions in other institutions outside the LADIES European Union funds (ERDF, etc.) and public investment financed measures up to this moment the application supports the applicant has received public funding and/or has filed a submission of the project to other funds of the European Union and national and local investment measures financed Yes ○ No ○ a. 10.1. If you answer "Yes", please provide information on the projects: no p. k. The name of the Fund, the institution name project title and project number. The stage of project implementation (funding; the project is currently being implemented; the project submitted for marking) project implementation time (mm/yyyy) (mm/yyyy) of the eligible cost amount (in euros) public funds (EUR) or the application is associated with the evaluation of project applications (Yes; No content in the related project) connection and design application that you want to combine the position of eligible costs the European Union funded projects other projects (financed by the State and local government projects, etc.)                                    
(B) information on project B. 1. As a result of the investment objective and investment PAGE destination directions and horizontal priorities individual goal target direction and horizontal priority explanations after the implementation of the project is increased or holding company net sales of agricultural industry by at least 10% (in the case of construction by at least 5%) or at least half of the project investment or about 10% (in the case of construction by at least 5%) increase in physical production or production efficiency in comparison with the last year entered into or concluded in the last three years preceding submission of the application (of the project point (B). 2. in the table, one of the indicators to be achieved such as: 2A) net turnover; LIZ managed area ha; the number of livestock; production; cost reduction per 1 ha managed or to output 1 LIZ unit; New businesses from the net change in the agricultural sector the third or sixth year after the conclusion of the project and all project monitoring period is at least 20% of the project investment about 2A net change to improve the infrastructure, agricultural development, forest productivity, growth and wood quality of health promotion, as well as the agriculture and forestry sectors to increase the competitiveness of the Sub-action 4.3 goal 2A (drainage system and work to restore the area and pievadcel construction and alteration) of the project were to increase the company's net sales of processing of agricultural products processing at least about 10% or at least on the side of the investment project or a 10% increase in physical production or production efficiency in comparison with the last year before the conclusion of the project application (point (B). in table 2, one of the indicators to be achieved) 3A, for example: net turnover; production; cost reduction per unit of output produced; production increase to 1 company employed provides effective environmental compliance – introduced in air or water pollution-reducing technologies for processing agricultural products process 3A (HP-V) this objective may contribute to sewage and treatment plants and dūmgāž technique. If the investment is intended for environmental purposes, not subject to the detailed description of the objectives pursued and the planned indicators (B). 2. Promote climate change reduction — built a new or renewed or rebuilt existing structures, achieving a 20% energy savings for heating and cooling of space (provable with an energy audit or energy efficiency calculation) 5B (HP-K) this objective may contribute to energy-efficient buildings construction, restoration and conversion of agricultural and processing is promoted climate change reduction – introduce technologies COVER and/or reduction in ammonia emissions the 5 d (HP-K) this objective may contribute to : • accurate technology and crop husbandry; • environmental requirements applied to manure storage construction and conversion; • equipment that fossil fuel is replaced with renewable energy cooperative society after the implementation of the project will increase the turnover of the members of the cooperative society at least 10%, or about half of the investment or a 10% increase in production efficiency or the number of members in comparison with the last year before the conclusion of the project to the application (point (B). in table 2, one of the indicators to be achieved) the aim of the 2A if the project 4.1 sub cooperative society after the implementation of the project will increase the net sales of the product recycling by 10%, or about half of the investment or invested about 10% increase in the physical volume of production compared last year before the conclusion of the project application (point (B). in table 2, one of the indicators to be achieved) 3A when a project is implemented under the (B). 4.2 12. table must be specified for each expenditure heading matches the selected objective (such as tractor-2A, manure storage-5 d, construction-2A) * sixth year reached scores, if the project is implemented for meat cattle breeding industry, or outdoor plantings shall be provided.
If the project is implemented under 4.2, support for applicants whose total turnover last year concluded is more than EUR 50 000 001, in addition to the above objectives, meet at least one of the following conditions: additional condition (yes/no) invested in the project investment is at least three times the amount of the eligible costs in the project after the implementation of the project the number of jobs will increase by at least 10 percent compared to last year concluded the total number of employees (B). 2. After project implementation indicators to be achieved (does not apply to sub-action 4.3 and 4.2 sub if investments made to ensure effective respect for the environment (HP-V)): a description of the Indicators the indicators measure the year value 4.1. Sub-measure last year concluded before the submission of the project 1 2 3 4 5 6 7 4.2. Sub-measure last year concluded before the submission of the project 1 2 3 4 5 6 7 B 2.1. Project indicators if objective (or one of the objectives) is energy efficiency in farming or processing of agricultural products (5B): primary energy consumption last year, concluded before the submission of the project, including: a measure of the value coefficient for the transition to the kWh energy consumption kWh electricity kWh natural gas m3 wood ciešm. M3 ber Chips. M3 wood briquettes ber. M3 wood pellets of ber. M3 liquid fuel t t t fuel oil coal other ____ ____ ____ ____ ____ ____ ___ (specify) x x production (output) last year concluded before the submission of the project (the standard unit – s.v.) produced by processing or production (t) s. v.; t x x fill out, if the project is to increase energy efficiency in existing buildings B 2.2. indicators of the project, if the project (or one of the objectives) is the cover and/or ammonia emission reduction (5 d): projected emissions reduction in the farm year after implementation of the project GHG emissions ammonia t CO2 eq./year% on% t/year manure storage a precise technology precision technologies in crop husbandry animal husbandry technology renewable energy B. 3. B. project description 3.1. Manufacturing process and process description (B). 3.2. Of the eligible cost of each position description, indicating its function and importance of the project B. 3.3. Financing of the project description (B). 4. The project location the project site of cadastre number: X ground (if the construction, alteration, construction of permanent plantings, installation of stationary equipment) of buildings installed in fixed installations or structures or construction work to restore if you purchased mobile technique, indicates the location, cadastral number after the completion of construction in the building, after the installation of permanent plantations plantations are located or acquired technique, technology will be used in areas with natural limits (ADI) (at least 51% of the territory of the farm is located in the territory of the ADI) (Yes , No) after completion of the construction in the building, after the installation of permanent plantations plantations are located or acquired technique, technology will be used in areas with specific limitations (sharp) (at least 51% of the territory of the farm is situated in the axis area) (Yes, no) (B). 5. The project will be implemented in this Sub-measure 4.1: industry conventional agriculture organic agriculture arable crops cereals ○ ○ ○ ○ potatoes rape ○ ○ ○ ○ other flax ○ ○ ○ ○ orcharding vegetable gardening in the decorative gardening ○ ○ (plant breeding) ○ ○ ○ ○ viticulture plantings Permanent ○ ○ dairy livestock dairy cattle ○ ○ ○ ○ grazing goats, animals are fattening cattle ○ ○ sheep ○ ○ ○ ○ the horses pigs ○ ○ ○ ○ birds mixed (crop husbandry/livestock) ○ ○ Citi   ○ ○
B.6. The project will be implemented in this Sub-measure 4.2: industry conventional agriculture organic farming dairy ○ ○ ○ ○ in the meat processing grain processing fruit processing and ○ ○ ○ ○ ○ ○ Other vegetable processing sectors: ○ ○ ___ ____ ____ ____ ____ ____ ____ recycling ○ ○ B. 7. The project 4.2. Sub: b. 7.1. The basic elements used in the project and the project's intended end product 4.2. Sub: product type (s) name (s) of the CN Group and CN code up to the basic level of detail possible final B. 7.2. If the project resulting in the final product is not included in the Treaty on the functioning of the European Union annex I implementation of the project is planned for major changes in the production process Yes ○ No ○ B. 7.2.1. If the answer is "Yes", please provide information on the applicant's assets (fixed assets and intangible investments) that are used in the production process and the project planned to significantly change the name of the Active application of the depreciable value of the EUR in the previous 3 fiscal years Before the project by project year 1 year 2 year 3 of the project, is planned for the existing business activities ○ ○ B Yes No diversification. 7.2.2. If the answer is "Yes", please provide information on the applicant's assets (fixed assets and intangible investments), in whole or in part will be used repeatedly for the production of the final product or create technologies with reduced environmental impact: the name of the Active application of the residual value of the assets in the accounts of EURO in the previous fiscal year end (the last closed year) before the draft After draft b. 8. Support the drainage system or pārbūvēšan (one of the owner of the drainage system, a system of municipal drainage reclamation system, national drainage system) and/or infrastructure of the type and parameters of the Sub-measure 4.3 drainage system drainage system drainage system type conversion system restore drainage Reclamation system fitting carriageway conversion klātņ, km infrastructure length (km), surface area (m2) Area on the road to producing producing b. 9. Pārbūvējam or renewable reclamation system 4.3. Sub B. 9.1. Support the Betterment of pārbūvējam or renewable systems (km, ha,%)
Drainage system together, km (ha) including. *% of agricultural land, including. Woodland, the drainage system Pārbūvējam% length in km systems renewable drainage length, km total: t. see pārbūvējam or renewable system of drainage areas with natural limits (AD) refer to the T. pārbūvējam or renewable system of drainage areas with specific limitations (s) including. pārbūvējam or renewable reclamation system of Natura 2000 site Pārbūvējam or renewable system affected the drainage area, ha B. 9.2. Members of the joint venture, the pārbūvējam or renewable reclamation system (km, ha,%) (to be completed only in joint ventures for each joint venture member (excluding support of applicants))
A member of the joint venture/drainage system together, km (ha) including. *% of agricultural land, including. forest land *,% overall (a natural person – given name, surname, legal person-name) Pārbūvējam-drainage systems, drainage systems for renewable km length in km total: a member of the joint venture (a natural person – given name, surname, legal person-name) Pārbūvējam-drainage systems, drainage systems for renewable km length in km total: a member of the joint venture (a natural person – given name, surname, legal person-name) Pārbūvējam-drainage systems, drainage systems for renewable km length in km total : total, km (ha) including. *% of agricultural land, including. forest land *,% total: including JOINT VENTURES pārbūvējam or renewable system of drainage areas with natural limits (ADI) (including b. table 9.1) including. pārbūvējam or renewable system of drainage areas with specific limitations (s) (including b. table 9.1) including. pārbūvējam or renewable reclamation system of the Natura 2000 area (including b. table 9.1) including. Green drainage system (sedimentation basins, wetlands, meandr) Pārbūvējam or renewable systems affected in the drainage area, ha land with other uses, if it supports the achievement of the objective of the measure, apportioned between the agricultural and forest land.
B. 10. Project period planned to buy such assets under 4.1 and 4.2: production techniques and equipment No. Name, model number or mark If technical or equipment to complement or replace existing fixed assets, fixed assets indicate the unit no of (B). 5. table (if applies) the capacity, capacity/unit power unit replaced% against/units (if applicable) or the technical units added to the existing park, preserving the existing units/equipment purchased in addition to the existing fixed asset capacity, productivity, capacity is about 25% greater than the holding capacity of the existing fixed asset, yield or payload The acquisition of the fixed asset will change substantially the nature of the technology of the production or Other (see permanent plantings, hives) b. 11. The project will take place following new construction, rebuilding, restoring 4.3. Sub B 11.1. New construction, conversion or renovation the total cost of the new construction, rebuilding, restoring No. Construction (drainage system, environmentally friendly system of drainage, drainage system, the compartments adjacent to the roadway culverts, square, road access) volume m3/m, km, cost per m2 m3/m, km, total costs EUR m2, 1 2 3 4 5 = 3 x 4 new construction costs for new construction, rebuilding together, the cost of rebuilding, Rebuilding together, the cost of rebuilding together, the cost of new construction, conversion, restoration, total b. 11.2. New construction, conversion or renovation eligible costs new construction, rebuilding, restoring No. Construction (drainage system, environmentally friendly system of drainage, drainage system, the compartments adjacent to the roadway culverts, square, road access) volume m3/m, km, cost per m2 m3/m, km, m2 the eligible costs, EUR 1 2 3 4 5 = 3 x 4 new construction eligible costs for new construction, rebuilding together, the eligible costs for the conversion, restore total eligible costs for renewal, the total eligible costs for new construction , conversion, restoration, total b. 11.3. Rebuilding and renewal distribution joint ventures eligible cost (to be completed only for joint ventures, both for the overall aid applicants and for each Member of the joint venture) supports the joint venture, the applicant (a natural person – given name, surname; a legal person – name) work to restore No. Construction (drainage system, environmentally friendly system of drainage, drainage system, the compartments adjacent to the roadway culverts) volume m3/m costs per m3/m eligible costs, EUR 1 2 3 4 5 = 3 x 4 conversion "eligible costs of rebuilding, restoring total eligible costs for renewal, total rebuilding, restoration costs total general costs overall position costs the cost per unit in EUR number of units total general costs venture member (natural person-name first name, last name, a legal entity-name alteration, renewal) No. Construction (drainage system, environmentally friendly system of drainage, drainage system, the compartments adjacent to the roadway culverts) volume m3/m costs per m3/m eligible costs, EUR 1 2 3 4 5 = 3 x 4 conversion "eligible costs of shipbuilding restructuring, total restoration of eligible costs for renewal, rebuilding together, the restoration costs total general costs overall position costs the cost per unit in EUR number of units total general costs (B). 12. Application of the project's total eligible cost and position by planned project activities and phases of the project unit (m3/m2/unit) Number of units in the total cost of the eligible costs, EUR EURO aid intensity% public funding, private funding, EUR EURO implementation time (DD. mM. yyyy.) The cost of compliance with the target direction (2A, 3A, 3A (HP-V), 5B, 5 d) sub code with VAT Excl. VAT 1 2 3 4 5 6 7 8 9 10 11 12 1. New production acquisition of fixed assets acquisition cost, the total X 2. new building construction, building renovation, housing reconstruction, new construction cost construction, shipbuilding conversion costs X 3. acquisition cost of the building materials building materials i egād, X 4 total general costs, general costs total X X B 13 in total. The project will be implemented: a young farmer, doing construction, modification of structures or stationary equipment together with the construction or conversion of additional aid intensity (%) a young farmer, if investment in the project will be invested in the acquisition of fixed assets without construction or rebuilding the livestock sector in which cultivated herbivores reaching objective 5B, the results of the project will increase energy efficiency by at least 20% of the processing undertaking which manufactures food quality schemes, products processing company that produces at least five foods that meet the recommended food processing the selection criteria for the restructuring of the company, if it affected other countries imposed import restrictions (export to the country made by at least 10%)   If the results of the project are introduced to innovation b. 14. Project funding 4.3 Sub-measure (filling in the table, the proportion of other lands, in proportion to the dividing point between the forest and agricultural land) project the total amount of the eligible costs of the project the EURO amount, EUR invested project in the amount of agricultural land, the project's eligible cost amount% agricultural land, invested in the project the amount of forest land, the project's eligible cost amount% of forest land, b. 15. Other non-eligible costs eligible costs amount to EUR positions together (B). 16. Project funding project, the total amount of eligible costs of the project the EURO amount, EUR b. 17. Impact of the project on the environment and climate change, a description of the impact of the project on the surrounding environment description in accordance with the European Union and the Republic of Latvia laws (B). 18. Project selection criteria (B) 18.1. The selection criteria for the Sub-measure "aid for investment in agricultural holdings" Nr. PO box A group of Criteria criteria score criteria the maximum number of points in support of the applicant Group score criteria 1. Readiness for the implementation of the project (number of points multiplied by the proportion of the expenditure on construction of the total eligible costs of the project) with a construction permit in 1 make a mark on the design conditions or planned permanent cultivation crop plantation sketch project or explanatory note/receipt card with a būvvald mark on acceptance of the construction plan filed with the application for the project. 15 15 2. The received public funding supports the applicant's average revenue the past two years concluded from agricultural production and processing in comparison with the public funding 2007-2013 PAGE under "farm modernization" and the Cabinet of Ministers on 30 September 2014 rule no. 600 "procedures for granting state aid in the European Union and an open design competition for the measure in the form of" investment in tangible assets "" 1.1. Sub referred to in subparagraph 2 (if the last two years has been concluded, but the aid is received, even if he had no turnover not received the aid, granted to the applicant the maximum number of points in the criteria) according to the calculated factor 20 3. The aim of the project (in accordance with the Cabinet of Ministers on 30 September 2014 rule no. 600 "procedures for granting state aid in the European Union and an open design competition for the measure in the form of" investment in tangible assets "" 11 ") is implemented in one Project the objective of the project is being implemented in 20 25 two or more objectives 25 4. Tax contributions made to support applicants last year concluded the State social insurance contributions on average per year in the last conclusion employed (including self-employed persons), divided by the estimated coefficient according 1003 15 5. Support the applicant meets one of the following schemes of organic farming scheme operator; 15 15 integrated production of horticultural products and the covered areas-participation in food quality schemes 10 6. Project to the application project application submitted to the rural support service Electronic login system in 5 5 7. Area development index support the construction of the applicant (including equipment installation in existing construction) implementing area development index country (if it is negative) 4 according to the calculated factor 15 8. Support the applicant owner or holding a person in a company owned by shareholders not less than 51 percent and the company register individual power, and not older than 40 years 10 10 9. The project applied for the amount of the eligible project submission round Sub "aid for investment in agricultural holdings" (sums all the relevant sub-measure projects submitted in the corresponding round) to 150 000 EUR EUR 500 000 to EUR 10 15 15 150 001 – more than 500 001 € 5 in total 135 minimum number of points to qualify for the aid, has 40 points in the notes. 1 criterion is calculated using the following formula: A = B x C where A D-number of points, calculated, taking into account the proportion of construction against the total eligible project costs; B-number of points, following criteria documents submitted; C-project in construction costs (euro); D – total eligible project costs (euro). Points are awarded on a single criteria group. 2 criterion is calculated using the following formula: A = (B + C)/2 x 10, where D – 70 000 A-score calculated taking into account the ratio of revenue to receive support; (B) + C-applicant's income from agricultural production and processing in the past two years concluded (B – C – in the first year, second year). For new business, if no revenue in the last two years, closed last year entered into use, divided by 1; D – the applicant paid public funds. If the criteria is a negative result, the award criterion the maximum number of points-20.3 criterion is calculated using the following formula: A = B/C, where A 100-number of points, calculated in the light of the applicant's (in the on-farm also farms owner for a self made contributions) last year concluded the State social insurance contributions on average per year in the last conclusion employed (including self-employed); B – the last year concluded the applicant made to the State social insurance contributions; C – average last year concluded the number of employees (including self-employed). The criteria used in the calculation of the data in the database ENVIRONMENT. 4 criterion is calculated using the following formula: A = B x (-10), which is the A-number of points, which is calculated taking into account the territorial development index; (B) the development of the territory of a municipality in which the index will take the implementation of the project (construction, installation of equipment in an existing building).
B. 18.2. selection criteria the Sub-measure "aid for investment in the processing of" No. " PO box A group of Criteria criteria score criteria the maximum number of points in support of the applicant Group score criteria 1. Readiness for the implementation of the project (number of points multiplied by the proportion of the expenditure on construction of the total eligible expenditure of the project) with a construction permit in 1 make a mark on the design conditions or explanatory note/receipt card with a būvvald mark on acceptance of the construction plan filed with the application of the draft 10 10 2. The received public funding supports the applicant's average revenue the past two years concluded from the production of agricultural products and processing against paid public funding 2007-2013 PAGE under "agricultural added value" and the Cabinet of Ministers on 30 September 2014 rule no. 600 "procedures for granting state aid in the European Union and an open design competition for the measure in the form of" investment in tangible assets "" 1.2. Sub referred to in subparagraph 2 (if the last two years has been concluded, the turnover but support has not been received, the applicant is granted the maximum number of points for criteria) according to the calculated factor 20 3. Tax contributions made to support applicants last year concluded the State social insurance contributions on average per year in the last conclusion employed (including self-employed persons), divided by the estimated coefficient according 1003 15 4. The aim of the project (in accordance with the Cabinet of Ministers on 30 September 2014 rule no. 600 "procedures for granting state aid in the European Union and an open design competition for the measure in the form of" investment in tangible assets "" 11 ") is implemented in one Project the objective of the project is being implemented in 20 25 two or more objectives 25 5. Support is a food quality scheme operator supports the applicant's national food quality schemes, organic schemes, protection of geographical indications, designations of origin, traditional specialities guaranteed scheme operator 10 10 6. Project to the application project application submitted to the rural support service Electronic login system in 5 5 7. Area development index support the construction of the applicant (including equipment installation in existing construction) implementing area development index country or city to the meaning of the Republic (if it is negative) 4 according to the calculated factor 15 total 100 the minimum number of points to qualify for the aid, has 35 points in the notes. 1 criterion is calculated using the following formula: A = B x C where A D-number of points, calculated, taking into account the proportion of construction against the total eligible project costs; B-number of points, following criteria documents submitted; C-project in construction costs (euro); D – total eligible project costs (euro). Points are awarded on a single criteria group. 2 criterion is calculated using the following formula: A = (B + C)/2 x 10 where A D-number of points, calculated, taking into account the ratio of revenue to receive support; (B) + C-applicant's income from agricultural production and processing in the past two years concluded (B – C – in the first year, second year); D – the applicant paid public funds. 3 criterion is calculated using the following formula: A = B/C, where A 100-number of points, calculated in the light of the applicant's (in the on-farm also farms owner for a self made contributions) last year concluded the State social insurance contributions on average per year in the last conclusion employed (including self-employed); B – the last year concluded the applicant made to the State social insurance contributions; C – average last year concluded the number of employees (including self-employed). The criteria used in the calculation of the data in the database ENVIRONMENT. 4 criterion is calculated using the following formula: A = B x (-10), which is the A-number of points, which is calculated taking into account the territorial development index; (B) the development of the territory of a country or Republic of index meaning city in which the implementation of the project (construction, installation in an existing builds).
B. 18.3. selection criteria under "investment in tangible assets" cooperatives No. PO box A group of Criteria criteria score criteria the maximum number of points in support of the applicant Group score criteria 1. Readiness for the implementation of the project (number of points multiplied by the proportion of the expenditure on construction of the total eligible costs of the project) with a construction permit in 1 make a mark on the design conditions or explanatory note/receipt card with a būvvald mark on acceptance of the construction plan filed with the application of the draft 10 10 2. The received public funding supports the applicant's average revenue the past two years from a closed agricultural turnover of goods and services to members to paid public funding 2007-2013 PAGE under "farm modernization" and "agricultural added value" and the Cabinet of Ministers on 30 September 2014 rule no. 600 "procedures for granting state aid in the European Union and an open design competition for the measure in the form of" investment in tangible assets "" 1.1. and 1.2. Sub-measure 2 referred to in subparagraph (if the last two years has been concluded, but the support has not been received, the applicant is granted the maximum number of points for criteria) according to the calculated factor 20 3. Agricultural turnover turnover of goods and services between the cooperative societies and its members as a percentage of the cooperative society of agricultural goods and services total turnover according to the calculated ratio – for each full percentage in excess of 75% of the total turnover of about 1 point 20 4. The aim of the project (in accordance with the Cabinet of Ministers on 30 September 2014 rule no. 600 "procedures for granting state aid in the European Union and an open design competition for the measure in the form of" investment in tangible assets "" 11 ") is implemented in one Project the objective of the project is being implemented in 20 25 two or more objectives 25 5. Support the applicant included in the organic farming control system organically certified cooperative 5 5 6. Project to the application project application submitted to the rural support service Electronic login system in 5 5 7. Area development index support the construction of the applicant (including equipment installation in existing construction) implementing area development index country (if it is negative) 3 according to the calculated factor 15 total 100 the minimum number of points to qualify for the aid, has 35 points in the notes. 1 criterion is calculated using the following formula: A = B x C where A D-number of points, calculated, taking into account the proportion of construction against the total eligible project costs; B-number of points, following criteria documents submitted; C-project in construction costs (euro); D – total eligible project costs (euro). Points are awarded on a single criteria group. 2 criterion is calculated using the following formula: A = (B + C)/2 x 10 where A D-number of points, calculated, taking into account the ratio of revenue to receive support; (B) + C-applicant's income from agricultural turnover of goods and services with members in the past two years concluded; D – the applicant paid public funds 2007-2013 PAGE under "agricultural added value" and "modernisation of agricultural holdings". 3 criterion is calculated using the following formula: A = B x (-10), which is the A-number of points, which is calculated taking into account the territorial development index; (B) the development of the territory of a municipality in which the index will take the implementation of the project (construction, installation of equipment in an existing building).
B. 18.4. selection criteria the Sub-measure "aid for investment in agricultural and forestry infrastructure ' no. PO box A group of Criteria criteria score criteria the maximum number of points in support of the applicant Group score criteria 1. The project provides for the construction Projects with planning permission for design conditions or the explanatory memorandum and the road construction and conversion is filed together with the application of the project 30 30 2. Implementation of joint projects, in which the alteration or renovation of a reclamation project concerns more than five owners of the drainage systems 20 20 project concerns five owners of the drainage systems 10 3. The project used eco-friendly drainage system elements in the project phase, the settling pond with meandr, drainage ditches or two pile of rocks, the controlled drainage and artificial wetlands 30 30 4. The project applied for the amount of the eligible project submission round Sub "aid for investment in agricultural and forestry infrastructure development" (sums all the relevant sub-measure projects submitted in the corresponding round) to EUR 50 000 to EUR 150 000 EUR 10 15 15 50 001 – more than 150 001 EUR 5 5. Project to the application project application submitted to the rural support service Electronic login system in total 5 5 100 the minimum number of points to qualify for the aid, have 35 points c. financial information (C). 1. Production (information points, starting with the most recent closed year, years and years, two or three years after the implementation of) the last closed year year year after project implementation (C) 1.1. No PO box production Pro form of information Purpose the Duke childhood (in physical units) 0 year 1 year per Item at the beginning of the ODE area (ha) Sara wrapped consumed Syme realized the item at the end of the period you are peri od in Stock at the beginning of the area (ha) Produce consumed in the saimn. Realized the items per Ode bei Da price of August, allocated EUR value quantity value EUR CenaEUR EUR crop production crop X X 1 2 3 4 total total revenue of crop product sales total revenue from sales of plant products, livestock, livestock 5 X X X X 7 X 6               8 x X X X X X X-total-total revenue from livestock product sales total revenue from marketing livestock production-recycling recycling 9 X 10 X 11 X 12 X X X X X X X X X total total revenue from the processing product sales total revenue from p ārstrād-product sales revenue from other products and from other sectors 0 income from other products and from other sectors 1 13 14 15 16 total revenue from other products and from other sectors total revenue from other products and other industries net turnover net turnover the rest support the applicant's operating income 0 other support applicant's economic operating revenues 1 17 deferred income (EU finance) deferred income (EU finance) 18 19 20 other operating income total other operating income total No PO box Pro form of information Purpose the Duke childhood (fiz a dope at one farm) 2 year 3 year Kr, you smell the beginning per surface area (ha) in the scar even wrapped Sara sa we realized the item at the end of the period you are peri od in Stock at the beginning of the area (ha) Sara consumed wrapped in saimn. Realized the items per Ode bei Da price of August, allocated EUR value quantity price EUR EUR EUR crop production crop production Value 1 2 3 4 total X X total revenue of crop product sales total revenue from sales of plant products, livestock, livestock 5 X X X X 7 X 6               8 x X X X X X X-total-total revenue from livestock product sales total revenue from marketing livestock production-recycling recycling 9 X 10 X 11 X 12 X X X X X X X X X total total revenue from the processing product sales total revenue from processing product sales revenue from other products from other sectors and 2 income from other products and from other sectors total revenue 3 13 14 15 16 from other products and from other sectors total revenue from other products and other industries net turnover net turnover the rest support the applicant's operating income 2 rest support the applicant's operating income 3 17 deferred income (EU finance) deferred income (EU finance) 18 19 20 other total operating revenue other operating income total No PO box Pro form of information Purpose the Duke childhood (in physical units) 4 year 5 year stock per the beginning of Ode area (ha) Sara wrapped consumed Syme realized the item at the end of the period you are peri od in Stock at the beginning of the area (ha) Sara consumed wrapped in saimn. Realized the items per Ode bei Da price of August, allocated EUR Into the external value of the EURO amount CenaEUR EUR crop production crop X X 1 2 3 4 total total revenue of crop product sales total revenue from sales of plant products, livestock, livestock 5 X X X X 7 X 6               8 x X X X X X X-total-total revenue from livestock product sales total revenue from marketing livestock production-recycling recycling 9 X 10 X 11 X 12 X X X X X X X X X total total revenue from the processing product sales total revenue n o processing product sales revenue from other products and from other sectors 4 income from other products and from other sectors 5 13 14 15 16 total revenue from other products and from other sectors total revenue from other products and other industries net turnover net turnover the rest support the applicant's operating income 4 other support the applicant's operating income 5 17 deferred income (EU finance) deferred income (EU finance) 18 19 20 rest operating income total other operating income total C. 1.2. Net sales by the agricultural sector (summary of table 1.1) unit: 0 1 total revenue of crop product sales total revenue of crop product sales total revenue from livestock product sales total revenue from livestock product sales total revenue from the processing product sales total revenue from the processing product sales total revenue from other products (other sectors) total revenue from other products (other sectors) net turnover Net turnover, other operating income other operating income measurement : EUR 2 3 total income from crop production sales total revenue of crop product sales total revenue from livestock product sales total revenue from livestock product sales total revenue from the processing product sales total revenue from the processing product sales total revenue from other products (other sectors) total revenue from other products (other sectors) net turnover Net turnover, other operating income other operating income measurement : EUR       4     5 total revenue of crop product sales total revenue of crop product sales total revenue from livestock product sales total revenue from livestock product sales total revenue from the processing product sales total revenue from the processing product sales total revenue from other products (other sectors) total revenue from other products (other sectors) net turnover Net turnover, other operating income other operating income (C). 1.3. Marketed production (euro) unit: EUR no PO box Nature of produce a year 0. 1. 2. 3. 4. 5. Crop products 1 2 3 processing livestock production production other production 4 (other sectors) total (C). 2. (Information points, starting with the most recent closed year, years and years, two or three years after the implementation of) the last closed year year year after project implementation c. 2.1. Variable and fixed costs, marketed production production costs unit: EUR 0. year 1. year 2. year 3. year 4. year 5. year costs consumed amount consumed amount consumed amount consumed amount consumed amount consumed the amount of variable costs for crop seeds in 1 2 3 4 5 pesticides fertilizer variable costs together, crop production livestock fodder Purchased 6 7 8 9 10 of Veterinary variable costs together, 11 food processors in animal husbandry dē                           12                           8                           9                           10 Mainīgās izmaksas kopā, pārstrādē                       16 Pārējās nozarēs                           17                           18                           19                           20 Mainīgās izmaksas kopā, pārējās nozarēs                       21 Mainīgās izmaksas kopā                      

Fiksētās izmaksas 0   1   2   3   4   5 22 Darba alga                       23 Sociālās apdrošināšanas maksājum (I) 24 fuel and lubricant (in addition to the variable costs contained in part) 26 27 25 electricity fuel production facilities to service and repair work 28 rental 29 30 31 32 33 34 other costs fixed costs total costs total 35 36 t. see marketed production production cost (C). 2.2. Variable and fixed costs, marketed production cost of production in the Year 0. 1. 2. 3. 4. 5. Variable costs for crop husbandry processing other sectors total variable costs fixed costs total cost including. marketed production production cost (C). 3. Cash-flow statements by year year Project year after year 3 of the project after project implementation (C) 3.1. Cash-flow statements over the years (starting with the year and subsequent years, and years, two or three years after implementation) in 0 1 2 3 4 5 1 Year cash balance at beginning of period 2 incoming cash flow together 3 i. operating cash flow 4 income from crop production (specify type) 5 income from crop production (specify type) 6 income from crop production (specify) 7 income from livestock production (specify) 8 revenue from livestock production (specify) 9 revenue from livestock production (specify type) 10 revenue of the processing (specify) 11 revenue from processing (specify) 12 income from processing (specify) 13 revenue from other product sales TAX received from the sale of 14 15 the rest of the company's operating revenue 16 II.-operating cash flow from the asset and revenue 20 intangible investment sales TAX received from 21-22 cash flow interest received 23 dividends received other revenue from 25-26 of action III. Financing activities cash flow 27 Sa take loans (credits) 28 the European agricultural fund for rural development (EAFRD) for the financing of the European Union and 29 State support (specify type): 30 31 outgoing cash flow along 32. Operating cash flow 33 payments to suppliers of raw materials costs 34 (specify) 35 the costs of raw materials (specify) 36 editions of raw materials (specify) 37 expenditure on land, building and machinery rentals 38 expenditure on utilities costs for 39 fuel and lubricants costs for electricity and 40 fuel expenditure on services 41 of 42 pay expenses for repair expenses on transport 44 43 expenditure on insurance and certification 45 paid VAT (input tax) on goods/services purchases in the current period expenditure 46 on wage payments 47 expenditure on social security payments 48 administration expenses 49 paid corporate income tax             50 paid real estate taxes paid 51 other taxes and fees 52 other operating expenses of the enterprise project cost 55 position: the position of the VAT Costs 56 57 VAT (input tax) of project activities along the extraordinary expenses 57 II.-operating cash flow expenditure 1 real estate, equipment, intangible and other long-term investments 2 paid input tax on intangible fixed assets and funds the purchase of loans in 3 others 4 cost position : 5 cost position Excl. VAT VAT (input tax) on the 6 project costs total 7 8 other expenditure on investments 9 III. Financing activities cash flow loan repayment expenses 10 11 Paid loans on the loans of the leased fixed assets 12 expenditure of expenditure 13 lease purchase interest dividends paid 14 15 VAT payment budget 16 cash balance at the end of period C. 3.2. Support the candidate's number of employees over the years (the year of the project and the planned future years) 0 1 2 3 4 5 c. 3.3. If the planned financial information provides for significant changes (more than 20% compared to the previous year), explain their reasons (on the financial positions of items) (C). 4. Profit and loss statement and balance sheet for the last year entered into projects with total eligible costs above EUR 150 000 the last year concluded C. 4.1. Income statement Net turnover 1 2 cost of sales gross profit or loss 3 4 5 cost of sales administration expenses 6 income from participation in Group subsidiaries and associates in the capital of 7 other operating income 8 t. see prepaid revenue share (EU finance) 9 other operating costs 10 other interest and similar income 11 interest payable and similar charges 12 profit or loss before extraordinary items and taxes 13 extraordinary income extraordinary expenses 14 15 profit or loss before tax 16 corporate income tax for the year under review 17 other taxes 18 profit or loss for the financial year (C). 4.2. Balance sheet (at the end of the year) assets 1 Assets 2 intangible assets 3 long-term financial investments long-term investments 4 total (1 + 2 + 3) 5 Item 6 of 7 Customers trade receivables deferred costs 8 9 10 debtors other debtors total 11 funds 12 total current assets total (5 + 10 + 11) 13 total (4 + 12) assets liabilities equity share capital at 14 15 16 17 previous-year reserve retained earnings 18 year retained earnings total equity 19 (15 + 16 + 17 + 18) 20 21 long-term creditors accruals long-term loans 22 part 23 long-term trade payables deferred revenue 24 25 t. see get financial assistance (EU finance) 26 Not paid prior year dividend 27 other long-term liabilities total long-term debt 28 29 30 short-term debt short-term borrowings (including short-term portion of long-term loan) 31 trade payables deferred income 32 33 t. see get financial assistance (EU finance) dividend the year 34 35 36 other Payables total short-term debt to total 37 creditors (28 + 36) 38 total liabilities (19 + 20 + 30) depreciation c. 39 4.3. Calculation of economic viability 1 equity/total assets current assets 2/3 short-term creditors pure profit + depreciation * (50%)  
(D) (D). 1. Accompanying documents. Documents to be submitted documents to be submitted (if the form is submitted in accordance with the law on electronic document processing requirements, including accompanying documents to be submitted under this legislation) support the applicant fills in the notes to the corresponding X answer yes no not applicable 1. Project application full set (2 copies) and with the electronic version of the business plan in accordance with the submission of the project C. 1., c. 2., C. 3. and (C). 4. the original section 2. Support the Declaration of the applicant in accordance with the laws of the State of the European Union and the granting of aid, administration and monitoring of the development of the rural and fisheries-2014 – 2020 programming period the original 3. Credit decision on the provision of credit, if the project will take credit, projects eligible costs above EUR 500 0001 original 4. If the project supports the tenderer intends to invest private (except credit) money, submit documents to prove the availability of funds, the project for which the eligible costs above EUR 500 0001 original 5. Long-term rental contract copy (the original show), which is incorporated in the land for at least 7 years from the date of the application, of the real estate in which, through a project designed to set up fixed assets copy 6. National Environment Service regional environmental management technical regulations or the technical regulations for the implementation of the project are not original pieciešami1 7. Environmental monitoring National Bureau decision on environmental impact assessment, if the project has undergone an environmental impact assessment, or an initial opinion on the final report, if made environmental impact novērtējums1 original information if the project submitted under 4.1 and 4.2 8. Certified professional building energy audit report issued by the energy efficiency calculation (rule 16.) or blanket and/or calculation of ammonia emissions (in accordance with the provisions of annex 13, 14) 9. In accordance with the requirements of the legislation on food quality schemes, the implementation, operation, monitoring and control procedures-accredited institutions or integrated agricultural products growing, storage and labelling requirements, and procedures for the control of authorities issued a document that certifies the company's compliance with the food quality schemes or organic or integrated production requirements a copy (the original show), if the information submitted by the project 4.1 sub 10. Sketch project-if the planned installation of outdoor plantings original 11 national environmental service statement of minimum environmental requirements of the livestock farms in the original 12. Certificate of domestic cargo operations, if you planned to buy a copy of the transport puspiekabes2 13. Information on Agriculture and forestry the turnover of goods and services between the public and the members of the public for the past two years concluded (submit cooperative society) the original 14. If the project young farmer – formal education or certificate from the school's copy       The information submitted by the project 4.2. Sub 15. The Declaration of conformity of the small companies (the little) or the average of the company according to the laws on commercial companies reporting procedures under the small (tiny), or the average company original 16. National Environment Service regional environmental management issued a statement about the action to happen, polluting the project, and which permits A or B category contaminating-authorized or polluting activities of category C proof-supports the applicant is required to obtain, if this requirement applies to the applicant in accordance with the laws and regulations on polluting activities of the original 17. Technological process description, sketches and the final inventory file and the location of the machine scheme of the original or a copy of the 18. Documents proving that the basic security (legal person who intends to initiate the processing of products, presented in the original) 19. The cooperation agreement on the basic of the local origin of buying a copy (the original show) 20. Labelling of food products that meet the recommended food selection criteria, the original 21. Opinion on the conformity of the proposed innovation project of the original information, if the project is submitted by 4.3 sub 22. Drainage system and the waterworks structures technical examination opinion (if the application is not added to the project, technical project) 23. The decision on the environmental impact assessment or impact on Natura 2000 sites assessment procedures-application projects, not having made an initial environmental impact assessment and environmental impact assessment or impact on Natura 2000 sites assessment procedure should not apply a copy 24. Environmental monitoring national Office opinion on the environmental impact assessment of the final report or the impact on Natura 2000 sites evaluation report and the final evaluation report or, if the project is carried out an environmental impact assessment of 25 copies. Environmental Protection Administration issued proof of the envisaged operations with the specially protected natural areas conservation plan, where the drainage system alteration or renewal is especially protected natural areas in the original 26. Legal proof of possession of the land on which the project will be carried out, if the land is not owned by the applicant of the original 27. Local Government Council decision on participation in the project and all project-related commitments implementation of CC 28. Proof of ownership or possession to the pārbūvējam or drainage system to restore the original 29. Notarized contract between the joint venture participants (if is implemented in joint ventures) in cases where a procurement procedure should be applied in accordance with the public procurement likumu3 30. Bidding documents in accordance with the public procurement law of original or copies, where the Republic of Latvia to apply laws on procurement procedures the customer funded projects, procurement procedures of formal dokumenti3 31. Procurement technical specification of the subject of the original 32. Procurement monitoring Bureau (hereinafter referred to as the IUB) published the invitation printed 33. Receive offers from potential suppliers copy 34. Amendments published in the IUB print 35. The final decision is published in the IUB print 36. Evaluation report of the original 37. Support the applicant's description of the comparison of tenders for the purchase, the information on the business operators surveyed, confirming the original objektivitāti4 prices of new construction, renovation and construction of housing renewal projects, 38. Long-term rental contracts registered in the land register at least 7 years from the date of application for the real estate, which, by implementing the project, the construction of the new construction, shipbuilding, construction work to restore or installation of plantations, if the property is leased to the copy (the original show) 39. Building permits by Mark būvvald for the construction of the acceptance of the idea, if the date is not confirmed in the technical project (the original show) 3 copies of 40. Explanatory memorandum (receipt card) with the būvvald mark for the construction of the acceptance of the idea, developed according to the construction of laws and regulations governing the municipal noteikumiem3 the copy (the original show) 41. Prepare the construction cost estimate, if according to the intention of the planned construction būvvald issued by the applicant's reasons (receipt card) 3 original 42. The purchase of building materials, construction and town planning with būvvald marks on the design conditions, if the planned construction būvvald in accordance with the intention of not issuing the explanatory memorandum (receipt card) 1 copy of 43. A construction with the mark on the building design condition copy of izpildi3 44. Updated permit or updated explanatory note (receipt card) with the būvvald mark for the commencement of the construction works of izpildi5 conditions copy (the original show) other documents submitted 45.          
1 may be submitted within 6 months after the entry into force of the rural support service of the decision on the approval of the project application. You can submit up to 2 of the payment request submission. 3 6 months may be submitted (in conjunction with the national drainage systems – 9 months) after the entry into force of the rural support service of the decision on the approval of the project application, i.e. the purchase documents for the costs associated with the construction, as architects, engineers, consultants, etc. fees forming part of the overall costs. 4 in accordance with the laws of the State of the European Union and the granting of aid in support of fields and fisheries. You can submit 5 9 months after the entry into force of the rural support service of the decision on the approval of the project application.
        date applicant's signature supports (printed name) Note. Document properties "date" and "supports the applicant's signature" does not fill in, if the electronic document was made according to the design of the electronic documents regulations the requirements set out in the documents. "
Agriculture Minister John Dūklav in annex 2 of the Cabinet of Ministers on 27 September 2016. Regulations No 646 "annex 2 Cabinet 30 September 2014 regulations no 600 project selection criteria of the measure" investment in tangible assets "Sub" aid for investment in agricultural holdings "Nr. PO box A group of Criteria criteria score criteria maximum points in Group 1. Readiness for the implementation of the project (number of points multiplied by the proportion of the expenditure on construction of the total eligible costs of the project) 1 with the project application is filed with the building of a construction tag on the design conditions or planned permanent cultivation crop plantation sketch project, or explanatory note/receipt card with a būvvald mark on the acceptance of the idea of construction 15 15 2. The received public funding supports the applicant's average revenue the past two years concluded from agricultural production and processing in comparison with the public funding 2007-2013 PAGE under "farm modernization" and the Cabinet of Ministers on 30 September 2014 rule no. 600 "procedures for granting state aid in the European Union and an open design competition for the measure in the form of" investment in tangible assets "" 1.1. referred to in subparagraph (apakšpasākumā2 if the past two years has been concluded, the turnover but aid is received, even if he had no turnover, no support, the applicant received the maximum number of points assigned criteria) according to the calculated factor 20 3. The aim of the project (in accordance with the Cabinet of Ministers on 30 September 2014 rule no. 600 "procedures for granting state aid in the European Union and an open design competition for the measure in the form of" investment in tangible assets "" 11 ") is implemented in one Project the objective of the project is being implemented in 20 25 two or more objectives 25 4. Tax contributions made to support applicants last year concluded the State social insurance contributions on average per employee (including self-employed persons), divided by the estimated coefficient according 1003 15 5. Support the applicant meets one of the following schemes of organic farming scheme operator 15 15 integrated production of horticultural products and the covered areas – participation in food quality schemes 10 6. Project to the application project application submitted to the rural support service Electronic login system in 5 5 7. Area development index aid applicant's construction (also installation in existing construction) implementing area development index country (if it is negative) 4 according to the calculated factor 15 8. Support the applicant owner or holding a person in a company owned by shareholders not less than 51 percent and the company register individual power, not older than 40 years 10 10 9. The project applied for the amount of the eligible project submission round Sub "aid for investment in agricultural holdings" (sums all the relevant sub-measure projects submitted in the corresponding round) to 150 000 EUR EUR 500 000 to EUR 10 15 15 150 001 – more than 500 001 € 5 in total 135 minimum number of points to qualify for the aid, has 40 points in the notes. 1 criterion is calculated using the following formula: A = B x C where A D-number of points, calculated, taking into account the proportion of construction against the total eligible project costs; B-number of points, following criteria documents submitted; C-project in construction costs (euro); D – total eligible project costs (euro). Points are awarded on a single criteria group. 2 criterion is calculated using the following formula: A = (B + C)/2 x 10, where D – 70 000 A-score calculated taking into account the ratio of revenue to receive support; (B) + C-applicant's income from agricultural production and processing in the past two years concluded (B – C – in the first year, second year). For new business, if no revenue in the last two years, closed last year entered into use, divided by 1; D – the applicant paid public funds. If the criteria is a negative result, the award criterion the maximum number of points-20.3 criterion is calculated using the following formula: A = B/C, where A 100-number of points, calculated in the light of the applicant's (in the on-farm also farms owner for a self made contributions) last year concluded the State social insurance contributions on average per year in the last conclusion employed (including self-employed); B – the last year concluded the applicant made to the State social insurance contributions; C – average last year concluded the number of employees (including self-employed). The criteria used in the calculation of the data in the database ENVIRONMENT. 4 criterion is calculated using the following formula: A = B x (-10), which is the A-number of points, which is calculated taking into account the territorial development index; (B) the development of the territory of a municipality in which the index will take the implementation of the project (construction, installation of equipment in an existing building). "
Agriculture Minister John Dūklav in annex 3 of the Cabinet of Ministers on 27 September 2016. Regulations No 646 "annex 3 Cabinet 30 September 2014 regulations no 600 project selection criteria of the measure" investment in tangible assets "under the" investment aid "No processing. PO box A group of Criteria criteria score criteria maximum points in Group 1. Readiness for the implementation of the project (number of points multiplied by the proportion of the expenditure on construction of the total eligible expenditure of the project) 1 with the project application is filed with the building of a construction tag on the design conditions or explanatory note/receipt card with a būvvald mark on the construction plans of 10 10 2 accepted. The received public funding supports the applicant's average revenue the past two years concluded from the production of agricultural products and processing against paid public funding 2007-2013 PAGE under "agricultural added value" and the Cabinet of Ministers on 30 September 2014 rule no. 600 "procedures for granting state aid in the European Union and an open design competition for the measure in the form of" investment in tangible assets "" 1.2. referred to in subparagraph (apakšpasākumā2 if the past two years has been concluded, the turnover but support has not been received, the applicant is granted the maximum number of points for criteria) according to the calculated factor 20 3. Tax contributions made to support applicants last year concluded the State social insurance contributions on average per employee (including self-employed persons), divided by the estimated coefficient according 1003 15 4. The aim of the project (in accordance with the Cabinet of Ministers on 30 September 2014 rule no. 600 "procedures for granting state aid in the European Union and an open design competition for the measure in the form of" investment in tangible assets "" 11 ") is implemented in one Project the objective of the project is being implemented in 20 25 two or more objectives 25 5. Support is a food quality scheme operator supports the applicant's national food quality schemes, organic schemes, protection of geographical indications, designations of origin, traditional specialities guaranteed scheme operator 10 10 6. Project to the application project application submitted to the rural support service Electronic login system in 5 5 7. Area development index aid applicant's construction (also installation in existing construction) implementing area development index country or city to the meaning of the Republic (if it is negative) 4 according to the calculated factor 15 total 100 the minimum number of points to qualify for the aid, has 35 points in the notes. 1 criterion is calculated using the following formula: A = B x C where A D-number of points, calculated, taking into account the proportion of construction against the total eligible project costs; B-number of points, following criteria documents submitted; C-project in construction costs (euro); D – total eligible project costs (euro). Points are awarded on a single criteria group. 2 criterion is calculated using the following formula: A = (B + C)/2 x 10 where A D-number of points, calculated, taking into account the ratio of revenue to receive support; (B) + C-applicant's income from agricultural production and processing in the past two years concluded (B – C – in the first year, second year); D – the applicant paid public funds. 3 criterion is calculated using the following formula: A = B/C, where A 100-number of points, calculated in the light of the applicant's (in the on-farm also farms owner for a self made contributions) last year concluded the State social insurance contributions on average per year in the last conclusion employed (including self-employed); B – the last year concluded the applicant made to the State social insurance contributions; C – average last year concluded the number of employees (including self-employed). The criteria used in the calculation of the data in the database ENVIRONMENT. 4 criterion is calculated using the following formula: A = B x (-10), which is the A-number of points, which is calculated taking into account the territorial development index; (B) the development of the territory of a country or Republic of index meaning city in which the implementation of the project (construction, installation of equipment in an existing building). "
Agriculture Minister John Dūklav in annex 4 of the Cabinet of Ministers on 27 September 2016. Regulations No 646 "annex 4 Cabinet 30 September 2014 regulations no 600 project selection criteria for cooperatives under" investment in tangible assets ", Nr. PO box A group of Criteria criteria score criteria maximum points in Group 1. Readiness for the implementation of the project (number of points multiplied by the proportion of the expenditure on construction of the total eligible costs of the project) 1 with the project application is filed with the building of a construction tag on the design conditions or explanatory note/receipt card with a būvvald mark on the construction plans of 10 10 2 accepted. The received public financing about the applicant's average supports revenue the past two years from a closed agricultural turnover of goods and services to members to paid public funding 2007-2013 PAGE under "modernisation of agricultural holdings", "agricultural added value" and the Cabinet of Ministers on 30 September 2014 rule No. 600 "procedures for granting state aid in the European Union and an open design competition for the measure in the form of" investment in tangible assets "" 1.1. and 1.2. referred to in subparagraph (apakšpasākumā2 if the past two years has been concluded, the turnover but support has not been received, the applicant is granted the maximum number of points for criteria) according to the calculated factor 20 3. Agricultural turnover turnover of goods and services between the cooperative societies and its members as a percentage of the cooperative society of agricultural goods and services total turnover according to the calculated ratio – for each full percentage in excess of 75% of the total turnover of about 1 point 20 4. The aim of the project (in accordance with the Cabinet of Ministers on 30 September 2014 rule no. 600 "procedures for granting state aid in the European Union and an open design competition for the measure in the form of" investment in tangible assets "" 11 ") is implemented in one Project the objective of the project is being implemented in 20 25 two or more objectives 25 5. Support the applicant included in the organic farming control system organically certified cooperative 5 5 6. Project to the application project application submitted to the rural support service Electronic login system in 5 5 7. Area development index aid applicant's construction (also installation in existing construction) implementing area development index country (if it is negative) 3 according to the calculated factor 15 total 100 the minimum number of points to qualify for the aid, has 35 points in the notes. 1 criterion is calculated using the following formula: A = B x C where A D-number of points, calculated, taking into account the proportion of construction against the total eligible project costs; B-number of points, following criteria documents submitted; C-project in construction costs (euro); D – total eligible project costs (euro). Points are awarded on a single criteria group. 2 criterion is calculated using the following formula: A = (B + C)/2 x 10 where A D-number of points, calculated, taking into account the ratio of revenue to receive support; (B) + C-applicant's income from agricultural turnover of goods and services with members in the past two years concluded; D – the applicant paid public funds 2007-2013 PAGE under "agricultural added value" and "modernisation of agricultural holdings". 3 criterion is calculated using the following formula: A = B x (-10), which is the A-number of points, which is calculated taking into account the territorial development index; (B) the development of the territory of a municipality in which the index will take the implementation of the project (construction, installation of equipment in an existing building). "
Agriculture Minister John Dūklav in annex 5 of the Cabinet of Ministers on 27 September 2016. Regulations No 646 "annex 5 cabinet 30 September 2014 regulations no 600 project selection criteria of the measure" investment in tangible assets "Sub" aid for investment in agricultural and forestry infrastructure ' no. PO box A group of Criteria criteria score criteria maximum points in Group 1. The project provides for the construction with the project application is filed with a construction permit for design conditions or the explanatory memorandum and the road construction and conversion of 30 30 2. Implementation of joint projects, in which the alteration or renovation of a reclamation project concerns more than five owners of the drainage systems 20 20 project concerns five owners of the drainage systems 10 3. The project used eco-friendly drainage system elements in the project phase, the settling pond with meandr, drainage ditches or two pile of rocks, the controlled drainage and artificial wetlands 30 30 4. The project applied for the amount of the eligible project submission round Sub "aid for investment in agricultural and forestry infrastructure development" (sums all the relevant sub-measure projects submitted in the corresponding round) to EUR 50 000 to EUR 150 000 EUR 10 15 15 50 001 – more than 150 001 EUR 5 5. Project to the application project application submitted to the rural support service Electronic login system in total 5 5 100 the minimum number of points to qualify for the aid, have 35 points, "Agriculture Minister John Dūklav in annex 6 of the Cabinet of Ministers on 27 September 2016. Regulations No 646" annex 6 Cabinet 30 September 2014 regulations no 600 one programming period available to the applicant the maximum amount of eligible costs N. PO box Sub-measures and their activities the applicant eligible cost about (euro) i. Sub-measure "aid for investment in agricultural holdings" 1. Acquisition of premises construction and pārbūve1 of the farm including 2 000 000 asset iegāde2 700 000 2. Acquisition of fixed assets, construction and alteration of buildings, acquisition of new holdings and young farmers, which plans to take over, to establish a farm or acquire merchant status 150 000 3. Acquisition of fixed assets, construction and alteration of buildings, asset iegāde3 young farmers 400 000 4. Acquisition of fixed assets, construction and alteration of buildings (including primary agricultural products and machinery) 4 II 8 000 000 cooperative societies under "investment aid for processing" 5. Acquisition of premises construction and recycling company, pārbūve5 t. see 3 000 000 Producers cooperative society, which produced 100 000 home manufacturer, producing in the home, if the project company become the herbal product registered companies or products of animal origin recognized 300 000 new companies processing plants to create 200 000 farm new processing company izveidošanai6 2 000 000 III. Sub "aid for investment in agricultural and forestry infrastructure development" 6. Drainage system rebuilding and restoring (and one owner and sharing), drainage of the road adjacent to the conversion object and restoring farms, natural person – economic performer, which is in the possession of the forest, a legal person, which is more than 50% of the share capital in private equity, municipal (municipal corporation, which also will take the role of municipal drainage system of sharing conversion or restoration) 300 000 national reclamation system operator shall, without limitation, 7. Agricultural infrastructure (area at the production facilities, links) – construction, alteration, farmers cooperative society 50 000 300 000 notes. 1 with respect to construction or construction and the acquisition of fixed assets – up to the tenderer's average revenue from agricultural production and processing in the last two years before the project was concluded in the application or if the holding founded last year concluded before the submission of the project, up to the last closed year revenues from agricultural production more than five times, and the acquisition of fixed assets does not exceed more than three times (this condition does not apply to the applicant If the total amount of eligible costs supported programming period is less than 150 000 euros). 2 If the project purchased the only fixed assets – up to the tenderer's average revenue from agricultural production and processing in the last two years before the project was concluded in the application or if the holding founded last year concluded before the submission of the project, up to the last closed year revenues from agricultural production more than three times (this condition does not apply to the applicant, if the total amount of eligible costs supported programming period is less than 150 000 euros). 3 the maximum funding Available, including this annex, paragraph 7. With respect to construction or construction and the acquisition of fixed assets – up to the tenderer's average revenue from agricultural production and processing in the last two years before the project was concluded the application or, if the holding founded last year concluded before the submission of the project, up to the last closed year revenues from agricultural production more than five times, and the acquisition of fixed assets does not exceed more than three times (this condition does not apply to the applicant, if the total amount of eligible costs supported programming period is less than 150 000 euros). With regard to the acquisition of fixed assets – up to the tenderer's average revenue from agricultural production and processing in the last two years before the project was concluded in the application or if the holding founded last year concluded before the submission of the project, up to the last closed year revenues from agricultural production more than three times (this condition does not apply to the applicant, if the total amount of eligible costs supported programming period is less than 150 000 euros). The applicant has the opportunity to apply for the funding referred to in paragraph 1 (the maximum funding available, including this annex, paragraph 3), not applying the annex 7 additional support effort for young farmers. 4 the maximum funding Available, including 5 and 7 of this annex, paragraph. 5 do not exceed the applicant's net sales of agricultural products processing and production last year concluded before the application of the project more than five times (this condition does not apply to the applicant, the purpose of which is to create a new processing plant). 6 eligible costs to the holding, if the new processing plant processing capacity is not greater than the aid the applicant's primary agricultural products produced in the amount planned to be processed, and if the processing plant are processed at least 70% of the aid the applicant's primary agricultural products produced. "
Agriculture Minister John Dūklav in annex 7 of the Cabinet of Ministers on 27 September 2016. Regulations No 646 "Annex 7 Cabinet 30 September 2014 regulations no 600 aid intensity (as a percentage of the eligible expenditure of the project). PO box Type of eligible costs aid applicants (including cooperatives) the total turnover (euro) 70 000 70 001 – 50 000 000 1 000 000 1 000 001-01 to more than 50 000 001 i. Sub-measure "aid for investment in agricultural holdings" 2 1. Structure construction, alteration, renovation, purchase of fixed installations with construction or conversion of permanent installation under 40% 40% 40% 40% aid intensity, the additional young farmers through construction, modification or acquisition of fixed installations with construction or alterations or installing outdoor gardens 20% 20% 10% – – additional aid intensity, if the project is implemented in the livestock sector in which cultivated herbivores – 10% 10% 10%-additional aid intensity for the construction and equipment providing 11.2.1. objective, if the project is implemented this provision in paragraph 11.2.1. this objective (as a result of the project will increase energy efficiency by at least 20%) – 10% 10% 10% 2. Further, the intensity of the aid for young farmers, if invested in an investment project for the purchase of fixed assets without construction or rebuilding 10% 10% 10% – – 3. Agricultural tractors (the first farm purchased, if everyone else is older than 10 years) 40% 40% 40% 40% 4. Agricultural tractors (each subsequent) 30% 30% 20% 20% – 5. Trailers, implements, implements (excluding agricultural tractors), equipment 40% 40% 40% 30% 6. Structure construction, conversion, acquisition of fixed installations with construction or conversion and specialised transportation cooperatives – 40% 40% 40% 40% 7. Trailers, implements, implements (excluding agricultural tractors) and equipment for cooperatives-25% 25% 25% 25% II. the Sub-measure "aid for investment in the processing of" 3 8. Building and equipment 30% 30% 30% 20% 20% 9. Additional aid intensity the processing undertaking which manufactures food quality scheme products-10% 10% 10% 10% 10. Additional aid intensity, if an applicant produces at least five foods that meet recommended food selection criteria (under this provision 10. Annex) – 10% 10% 10% 10% 11. Additional support for the restructuring of the company, the intensity if it affected other countries imposed import restrictions (export to the country made by at least 10%) – 10% 10% 10% 10% 12. Additional aid intensity, if the project is implemented this provision in paragraph 11.2.1. this objective (as a result of the implementation of the project will increase energy efficiency by at least 20%) 4-10% 10% 10% 10% 13. Additional aid intensity, if as a result of the implementation of the project is implemented in inovācija4-10% 10% 10% 10% 14. Manufacturers who produce home apstākļos5-40% 30% 6 – – (II). The Sub-measure "aid for investment in agricultural and forestry infrastructure development" 15. Drainage system rebuilding and restoring 60% 60% 60% 60% 60% 16. Environmentally friendly drainage system (12. Annex) 80% 80% vegetable 80% 80% 80% 17. Drainage system rebuilding or renovation activities 70% 70% 70% 70% 70% 18. Municipal drainage system and the construction of waterworks and municipal interest sharing drainage system 90% 90% 90% 90% 90% 19. Drainage system rebuilding and restoring national 100% 100% systems 100% 100% 100% 20. Area, siding, etc. infrastructure cooperatives 40% 40% 40% 40% 40% 21. Area, siding, etc. infrastructure holdings, young farmers 40% 40% 40% 40% 40% notes. 1 new processing plant or farm. 2 the maximum aid intensity will not exceed 50% of the Sub, except support for young farmers. Young farmers additional aid intensity is applied up to 400 000 euro eligible costs. The intensity of the aid the agricultural sector national scientific institutions is 50%. 3 the maximum aid intensity does not exceed 40% of the Sub. The great merchants, a project which the finished product is not included in the Treaty on the functioning of the European Union annex I, it shall not exceed 35%. 4 higher aid intensity cannot get aid applicants, which the project implementation, the resulting final product is mentioned in these rules 27.2. 5 are not subject to the higher aid intensity. 6 companies with turnover of up to eur 200 000. "
Agriculture Minister John Dūklav of Annex 8 of the Cabinet of Ministers 27 September 2016. Regulations No 646 "Annex 8 Cabinet 30 September 2014 regulations no 600 drainage system construction, conversion and restoration works to the maximum eligible costs N. PO box The nature of the measure of per-unit costs (excluding VAT) * 1. Drainage system work to restore: 1.1. ūdensnotek, novadgrāvj, and ditch the rebuilding, reconstruction works the way the cost applied to the izrokam of the soil volume 1 m3 costs (agricultural land) 4.00 euro/m3 1 1.2. ūdensnotek, novadgrāvj, and ditch the rebuilding, reconstruction works the way the cost applied to the izrokam of the soil volume 1 m3 costs (woodland) 5.00 Euro/1 m3 1.3. drain system with FILE conversion and restoration works the way the cost applied to the drain one meter costs 8.00 Euro/m 1.4. culverts up to 0.6 m in diameter (including) the construction works (including the old culverts dismantling work) costs allocated to the culverts built one meter costs 1.5 Euro/m 430.50. culverts in diameter over 0.6 to 1 m (including) the construction works (including the old culverts dismantling), applied to the culverts built one meter costs €/750.00 1.6 m. culverts in diameter above 1 m construction costs of the works of nature, applied to the culverts built one meter costs 1000.00 Euro/m 2. National ūdensnotek the bottom of the slope and shore construction costs. Compressed form of the large diameter culverts (with cross-sectional area, from 2.00 m2 and larger) construction construction types of costs allocated to the culverts built one meter costs, according to the procurement procedure (assessment of grounds) 3. Drain well (kontrolak, uncovered wells, uztvērējak) construction (see old Oh dismantling) and manifold connection construction costs Euro/piece. 750.00 4. Drain spout (Ø up to 250 mm) recovery and rebuilding costs Euro/piece. 100.00 5. Drain spout (Ø 300 mm above) recovery and rebuilding costs Euro/piece. 200.00 note. * Including environmental friendly drainage system construction of elements. "
Agriculture Minister John Dūklav 9. attachment Cabinet 27 September 2016. Regulations No 646 "9. attachment Cabinet 30 September 2014 regulations no 600 maximum eligible costs public financing of new construction for the calculation and conversion projects, the main structure types, and the types of works No. PO box The type of construction new construction and conversion of the unit of measure for the total building area (without VAT) in building materials 1. Agriculture and processing industry sheds (excluding the wall cladding, gates and Windows) 163.00 98.00 euro/m2 2. Agricultural sheds, machinery and technical 182.00 109.00 euro/m2 shed 3. Warehouse and storage: 3.1. warehouse and storage facilities for agriculture (grain towers and cellars) 70.00 42.00 euro/m3 3.2. grain storage structures with horizontal load of host wall structures (hangars) 225.00 94.00 euro/m2 3.3. vegetables and fruit the primary shipbuilding 512.00 307.00 euro/m2 4. Agricultural and processing enterprises of the freezer (0 to + 8 ° C) 130.00 78.00 euro/m3 5. Agricultural and processing enterprises of the freezer (0 to-8 ° C) 150.00 90.00 euro/m3 6. Processing plant chillers (from-8 to-25 ° C) 175.00 105.00 euro/m3 7. Animal housing: 7.1. housing of sows euro/m2 437.00 262.00 7.2. beef cattle housing 274.00 105.00 euro/m2 7.3. Milk House 412.00 220.00 euro/m2 7.4. dairy cattle and other animal housing Euro 392.00 141.00 m2/8. Concrete manure storage 50.00 30.00 euro/m3 9. The type of manure lagoon storage 30.00 18.00 euro/m3 10. Surface metal construction of manure storage 40.00 23.00 euro/m3 11. Greenhouse: 11.1. summer and 50.00 30.00 euro/m2 under 11.2. heated 285.00 145.00 euro/m2 12. Slaughterhouse 515.00 309.00 euro/m2 13. Animal product processing building foods 14 640.00 384.00 euro/m2. Herbal product processing building foods 570.00 342.00 euro/m2 15. Non-food and feed products manufacturing construction/16 euro 500.00 300.00 m2. Warehouse and utilities construction manufacturing needs (such as boilers, pump station) (applies to separately deployed structures) 17 334.00 200.00 euro/m2. Earthworks water reservoir and adjacent infrastructures (excavation and Earth align) 2.00 euro/m3 18. Home improvement cost: 13.00 18.1. concrete areas 32.00 19.00 euro/m2 18.2. asphalted, paved areas 38.00 23.00 euro/m2 18.3. gravel Plaza euro/m2 15.00 9.00 18.4. Dolomite splinter 18.00 11.00 euro/m2 area 18.5. lawn installation of 1.00 euro/m2 19. Silage tanks 65.00 39.00 euro/m3 20. Heated garage and repair shop in euro/m2 269.78 148.60 21. Executive rooms 22 euro/m2 354.85 204.40. Concrete slab pavement path euro/m2 56.17 41.69 "Agriculture Minister John Dūklav 10. attachment Cabinet 27 September 2016. Regulations No 646" 12. attachment Cabinet 30 September 2014 regulations no 600 environmental drainage system elements and their criteria No. PO box Environmentally friendly drainage system elements the measurable criteria 1. Sedimentary basin: agricultural and forest land drainage system ūdensnotek (water courses, novadgrāvj) bearing extensions and rinse well with water and sedimentation of the products for biological accumulation (nostādinātājbasein) • Pārtīrām novadgrāvj or ūdensnotek stage of the length must be at least 300 m • construction sites-as close as possible to natural or regulated flow into the watercourse or body of water • sedimentation pool to be built 30-50 m long section, you create a 0.5 – 1.0 m recesses (agricultural high Moss in bogs in peat bog or developed 0.5-4 m) • sedimentation basin bottom width is at least 2 m pārtīrām in ietekoš in wider than the ūdensnotek or novadgrāvj the width of the bottom of the 2. Two drainage ditches – two-stage compound ūdensnotek seabed šķērsprofil when you create or save a developed artificial floodplains with or without shore a • Put the šķērsprofil shelf width: not less than 1.0 m • two-stage compound šķērsprofil-stage project, the overall length of not less than 10% of renewable (pārbūvējam) ūdensnotek or novadgrāvj length 3. Pile of rocks – designing renewable or pārbūvējam ūdensnotek or novadgrāvj of the route, the garenslīpum and šķērsprofil, the bottom left small stones or pile of stones krācīt • bottom diameter of stones left – not less than 30 cm • pile of stones-volume not less than 1 m3 rock diameter of not less than 0.2 m • pile of stones less than average summer water level 4. Meandrēšan-sīklīkumainīb-ūdensnotek-bed building, restoring the old floor stages or creating new twists • restored the old floor stages – more than 3 • create new elbows with no less than 3 m large radius of curvature from the existing ūdensnotek (novadgrāvj) axis a line and no less than 6 elbows during the stage (one place) • construction sites-as close as possible to the regulated flow into ūdensnotek and (or) natural watercourse (water) 5. Controlled drainage, moisture regulating bilateral construction of drainage channels to drain the kontrolak or collector sources verifying the existence and functionality of design (summer mazūden period) 6. Artificial wetlands-artificially created wetlands for water pollution in fundraising with the surface or subsurface flow wetlands were created artificially • who created the project, and which have not previously been • construction sites-as close as possible to the regulated flow into ūdensnotek and (or) natural watercourse • water flow filtration using natural plant filters (cane u. (c) wood, in chips), gravel, sand • surface flow Wetlands with wetland basin depth of Base: not more than 1.5 m "Minister of agriculture John Dūklav