The Saeima has adopted and the President promulgated the following laws: For the 1974 International Convention for the safety of life at sea, 1988 Protocol to article 1. 1 November 1974 in London signed the International Convention for the safety of life at sea Protocol 1988, its annex and Appendix (hereinafter referred to as the Protocol) with this law is adopted and approved. 2. article. The law shall enter into force on the date of its promulgation. With the law put the Protocol in English, and its translation into Latvian language. 3. article. The Ministry of transport shall coordinate the fulfilment of the obligations provided for in the Protocol. 4. article. The responsible institution that supports the implementation of the measures referred to in the protection of human life at sea is a non-profit organisation State joint stock company "Latvian maritime administration". 5. article. The Ministry of Foreign Affairs shall inform the Secretary-General of the International Maritime Organization in accordance with article III of the Protocol. Ministry of transportation provides the necessary information to the above requirements. 6. article. Protocol shall enter into force for the period specified in article V and in order, and shall notify the Ministry of Foreign Affairs Gazette "journal". The Parliament adopted the law of 4 March 1999. The President g. Ulmanis in Riga on 24 March 1999, the Protocol of 1988 Relating to the International Convention for the Safety of life at sea, 1974 the parties TO the present PROTOCOL, BEING parties to the International Convention for the Safety of life at sea, done at London on 1 November 1974, RECOGNIZING the need for the introduction into the above-mentioned Convention of provision for survey and certification harmonized with òàæó provision in other international instruments , CONSIDERING that this need may best be met by the conclusion of a Protocol Relating to the International Convention for the Safety of life at sea, 1974, have AGREED as follows: article i. General obligations 1. The parties to the present Protocol undertak to give effect to the provision of the present Protocol and to the Annex, which shall heret constitut an integral part of the present Protocol. Every reference to the present Protocol constitut-at the same time a reference to the Annex of the heret. 2. As between the parties to the present Protocol, the provision of the International Convention for the Safety of life at sea, 1974, as amended, (hereinafter referred to as "the Convention") shall apply subject to the modifications and additions set out in the present Protocol. 3. With respect to ships entitled to fly the flag of a State which is not a Party to the Convention and the present Protocol, the parties to the present Protocol shall apply the requirements of the Convention and the present Protocol as may be not the cessary ensur that from more favorable treatment is given to such ships. Article II Prior to the axis 1. treats between the parties to the present protocol, the present Protocol and the abrogat replace the Protocol of 1978 relating to the Convention. 2. Notwithstanding any other provision of the present Protocol, any certificate issued under, and in accordanc with, the provision of the Convention and any supplement to such certificate issued under, and in accordanc with, the provision of the Protocol of 1978 relating to the Convention which is current when the present Protocol enter into force in respect of the Party by which the certificate or supplement was issued , shall remain valid until it expires under the terms of the Convention or the Protocol of 1978 relating to the Convention, as the case may be. 3. A Party to the present Protocol shall not issue certificates under, and in accordanc with, the provision of the International Convention for the Safety of life at sea, 1974, as adopted on 1 November 1974 article III. Communication of information the parties to the present Protocol to communicate the undertak and deposit with the Secretary-General of the International Maritime Organization (hereinafter referred to as "the Organization") : (a) the text of the law, Decree, orders and regulations and other instruments which have been promulgated on the various matters within the scope of the present Protocol; (b) a list of the nominated surveyors or recognized organizations which act on them with authorized their behalf in the administration of the measure for safety of life at sea for circulation to the parties for information of their officers, and a notification of the specific responsibilities and conditions of the authority delegated to nominated surveyors or recognized those organizations; and (c) a sufficient number of specimen certificates issued under their "of the provision of the present Protocol. Article IV signature, ratification, acceptance, approval and accession 1. The present Protocol shall be open for signature at the headquarters of the Organization from 1 March 1989 to 28 February 1990 and shall thereafter remain open for accession. Subject to the provision of paragraph 3, States may express their consent to be bound by the present Protocol by: (a) signature without reservation as to ratification, acceptance or approval; or (b) signature subject to ratification, acceptance or approval, followed by ratification, acceptance or approval; or (c) accession. 2. Ratification, acceptance, approval or accession shall be effected by the deposit of an instrument to that effect with the Secretary-General of the Organization. 3. The present Protocol may be signed without reservation, ratified, accepted, approved or acceded to only by States which have signed, ratified, without reservations accepted, approved or acceded to the Convention. Article v. Entry into force 1. The present Protocol shall enter into force twelve months after the date on which both the following conditions have been met: (a) not less than fifteen States, the combined merchant fleet of which not less than fifty constitut per cent of the gross tonnage of the world's merchant shipping, have expressed their consent to be bound by it in accordanc with article IV , and (b) the conditions for the entry into force of the Protocol of 1988 relating to the International Convention on Load lines, 1966, have been met, provided that the present Protocol shall not enter into force before 1 February 1992 2. For States which have deposited an instrument of ratification, acceptance, approval or accession in respect of the present Protocol after the conditions for entry into force thereof have been met but prior to the date of entry into force , the ratification, acceptance, approval or accession shall take effect on the date of entry into force of the present Protocol or three months after the date of deposit of the instrument, whichever is the later date. 3. Any instrument of ratification, acceptance, approval or accession deposited after the date on which the present Protocol enter into force shall take effect three months after the date of deposit. 4. After the date on which an amendment to the present Protocol is deemed to have been accepted under article VI, any instrument of ratification, acceptance, approval or accession deposited shall apply to the present Protocol as amended. Article VI. Amendments to the procedures set out in article VIII of the Convention shall apply to amendments to the present Protocol, provided that: (a) the reference in that article to the Convention and it will be taken the Contracting Governments shall mean a reference to the present Protocol and to the parties to the present Protocol respectively: (b) amendments to the articles of the present Protocol and to the Annex shall be adopted and the theret brough into the force in accordanc with the procedure applicable to amendments to the articles of the Convention or the Chapter I of the Annex theret; and (c) amendments to the appendix to the Annex to the present Protocol may be adopted into the UN force in the brough accordanc with the procedure applicable to amendments to the Annex to the Convention other than Chapter I article VII Denunciation 1. The present Protocol may be denounced by any Party at any time after the expiry of five years from the date on which the present Protocol enter into force for that Party. 2. Denunciation shall be effected by the deposit of an instrument of denunciation with the Secretary-General of the Organization. 3. A denunciation shall take effect one year, or such longer period as may be specified in the instrument of denunciation, after its receipt by the Secretary-General of the Organization. 4. A denunciation of the Convention by a Party shall be deemed to be a denunciation of the present Protocol by that Party. Such denunciation shall take effect on the same day a sharp denunciation of the Convention takes effect according to paragraph (c) of article XI of the Convention. Article VIII. Depositary 1. The present Protocol shall be deposited with the Secretary-General of the Organization (hereinafter referred to as "the depositary"). 2. The depositary shall: (a) shall notify the Governments of all States which have signed the present Protocol or acceded the theret of: (i) each new signature or deposit of an instrument of ratification, acceptance, approval or accession, together with the date thereof; (ii) the date of entry into force of the present Protocol; (iii) the deposit of any instrument of denunciation of the present Protocol together with the date on which it was received and the date on which the denunciation takes effect; (b) transmit certified true cop out of the present Protocol to the Governments of all States which have signed the present Protocol or acceded theret. 3. As soon as the present Protocol enter into force, a certified true copy thereof shall be transmitted by the depositary to the Secretariat of the United Nations for registration and publication in accordanc with article 102 of the Charter of the United Nations. Article IX. Languages the present Protocol is established in a single original in the Arabic, Chinese, English, French, Russian and Spanish languages, each text being equally authentic. An official translation into the Italian language shall be prepared and deposited with the signed original. Done AT LONDON this eleventh day of November one thousand nine hundred and eighty-eight. In WITNESS WHEREOF the undersigned, being duly authorized by their * respectiv of Governments for that purpose, have signed the present Protocol.
Annex modifications and additions to the Annex to the International Convention for the Safety of life, 1974 the Se Chapter 1. GENERAL PROVISION for the A — APPLICATION, DEFINITION, ETC. Regulations 2. Definition of the existing text of paragraph (k) is replaced by the following: "(k) New ship means a ship the keel of which is let or which is at a similar stage of construction on or after 25 May 1980" the following paragraph is added to the existing text : "(n) Anniversary date means the day and month of each year the which will correspond to the date of expiry of the relevant certificate." About the B — surveys AND certificates Regulations 6. Inspection and survey the existing text is replaced by the following: "(a) the inspection and survey of ships, so far as regards the enforcement of the provision of the present regulations and the granting of an exemption therefrom shall be carried out, by officers of the Administration. The Administration may, however, entrust the surveys either their inspection and surveyors nominated for the purpose or to organizations recognized by it. (b) An Administration nominating surveyors or recognizing organizations to conduct inspection and surveys as set forth in paragraph (a) shall as a minimum empower any nominated or recognized organization to: (i) require repair to a ship; (ii) carry out inspection and surveys if requested by the appropriate authorities of a port State. The Administration shall notify the Organization of the specific responsibilities and conditions of the authority delegated to nominated surveyors or recognized organizations. (c) When a nominated surveyor or recognized organization that the condition of determin of the ship or its equipment does not correspond substantially with the particular of the certificate or is such that the ship is not fit to proceed to sea without danger to the ship or persons on board, such surveyor or organization shall immediately ensur that correctiv action is taken and shall in due course notify the Administration. If such correctiv actions is not taken the relevant certificate should be withdrawn and the Administration shall be notified immediately; and, if the ship is in the port of another Party, to the appropriate authorities of the port State shall also be notified immediately. When an officer of the Administration, a nominated surveyor or recognized organization has notified a to the appropriate authorities of the port State, the Government of the port State concerned shall give such officer, surveyor or organization any assistance the cessary not carry out their obligations under this regulation. When applicable, the Government of the port State concerned shall ensur that the ship shall not sail until it can proceed to sea or leave the port, for the purpose of proceedings to the appropriate repair yard, without danger to the ship or persons on board. (d) In every case, the Administration shall fully guarantee the completenes and efficiency of the inspection and survey, and IR to undertak ensur the cessary to satisfy not subject this obligation. '' Regulation 7. Survey of passenger ships the existing text is replaced by the following: "(a) (A) passenger ships shall be subjected to the surveys specified below: (i) an initial survey before the ship is put in service; (ii) a renewal survey once every 12 months, except where regulation 14 (b), (e), (f) and (g) is applicable; (iii) additional surveys, as the occasion «arise. (b) the surveys referred to above shall be carried out as follows: (i) the initial survey shall include a complete inspection of the ship's structures machinery and equipment, including the outside of the ship's bottom and the inside and outside of the boiler. This survey shall be such as to ensur it that the arrangements, materials and scantling of the structure, boiler pressure vessel and others and their appurtenanc, change and auxiliary machinery, electrical installation, radio installation for including those used in life-saving appliances, fire protection, fire safety systems and appliances, life-saving appliances and arrangements, the navigational equipment, shipborn nautical publications, means of embarkation for pilots and others equipment fully comply with the requirements of the present regulations , and of the law, Decree, orders and regulations promulgated as a result thereof by the Administration for ships of the service for which it is intended. The survey shall also be such as to ensur that the workmanship of all parts of the ship and its equipment is in all respect is satisfactory, and that the ship is provided with the lights, shapes, means of making sound signals and distress signals as required by the provision of the present regulations and the International regulations for Preventing Collision at sea in force; (ii) the renewal survey shall include an inspection of the structure, boiler pressure vessel and others, machinery and equipment, including the outside of the ship's bottom. The survey shall be such as to ensur that the ship, as regards the structure of the boiler, pressure vessel and others and their appurtenanc, change and auxiliary machinery, electrical installation, radio installation for including those used in life-saving appliances, fire protection, fire safety systems and appliances, life-saving appliances and arrangements, the navigational equipment, shipborn nautical publications, means of embarkation for pilots and other equipment is in satisfactory condition and is fit for the service for which it is intended , and that it stay with the compl requirements of the present regulations and of the law, Decree No. ' orders and regulations promulgated as a result thereof by the Administration. The lights, shapes, means of making sound signals and distress signals carried by the ship shall also be subject to the above-mentioned survey for the purpose of ensuring that they comply with the requirements of the present regulations and of the International regulations for Preventing Collision at sea in force, (ii) an additional survey, either general or partial according to the of circumstanc , shall be made after a repair resulting from investigations prescribed in regulation 11, or whenever any important repairs or renewal with made. The surveys shall be such as to ensur that the repair or renewal of cessary have been effectively made, that the materials and workmanship of such repairs or renewal with respect to satisfactory in all, and that the ship is in all respect to compl with the provision of the present regulations and of the International regulations for Preventing Collision at sea in force, and of the laws the Decree, orders, and regulations promulgated as a result thereof by the Administration; (c) (i) the law, Decree, orders and regulations referred to in paragraph (b) of this regulation shall be in all respect is such as to ensur that, from the point of view of safety of life, the ship is fit for the service for which it is intended; (ii) they shall among others things the prescrib requirements to be observed as to the initial and subsequent hydraulic or other alternative test their acceptabl which the change and auxiliary boilers, connection, steam pipes, high pressure receivers and fuel tanks for internal combustion engines with to be submitted including the test procedures to be followed and the interval between two consecutive tests. " Regulation 8. Surveys of life-saving appliances and other equipment of cargo ships the existing text is replaced by the following: "(a) the life-saving appliances and other equipment of cargo ships of 500 tons gross tonnage and upward as referred to in paragraph (b) (i) shall be subject to the surveys specified below: (i) an initial survey before the ship is put in service; (ii) a renewal survey at intervals specified by the Administration but not exceeding five years, except where regulation 14 (b), (e), (f) and (g) is applicable; (iii) a periodical survey within three months before or after the second anniversary date or within three months before or after the third anniversary date of the Cargo Ship Safety equipment certificate which shall take the place of one of the annual surveys specified in paragraph (a) (iv); (iv) an annual survey within 3 months before or after each anniversary date of the Cargo Ship Safety equipment certificate; (v) an additional survey as prescribed for passenger ships in regulation 7 (b) (iii). (b) the surveys referred to in paragraph (a) shall be carried out as follows: (i) the initial survey shall include a complete inspection of the fire safety systems and appliances, life-saving appliances and arrangements by using the radio installation, the navigational equipment of shipborn, means of embarkation for pilots and other equipment to which chapter II-1, II-2, III and V apply to ensur that they comply with the requirements of the present regulations with satisfactory condition in and fit for the service for which the ship is intended. The fire control plans, nautical publications, lights, shapes, means of making sound signals and distress signals shall also be subject to the above-mentioned survey for the purpose of ensuring that they comply with the requirements of the present regulations and, where applicable, the International regulations for Preventing Collision at sea in force; (ii) the renewal and periodical surveys shall include an inspection of the equipment referred to in paragraph (b) (i) to ensur that it stay with the relevant compl requirements of the present regulations and the International regulations for Preventing Collision at sea in force, is in satisfactory condition and is fit for the service for which the ship is intended; (iii) the annual survey shall include (a) a general inspection of the equipment referred to in paragraph (b) (i) to ensur that it has been maintained in accordanc with regulation 11 (a) and that it remains satisfactory for the service for which the ship is intended. (c) the periodical and annual surveys referred to in paragraph (a) (ii) and (a) (iv) shall be endorsed on the Cargo Ship Safety equipment certificate. " Regulation 9. Surveys of radio and radar installation of cargo ships the existing heading is replaced by the following: "Survey of the radio installation of cargo ship" the existing text is replaced by the following: "(a) the radio installation, including those used in life-saving appliances, of cargo ships to which chapter III and IV apply shall be subject to the surveys specified below : (i) an initial survey before the ship is put in service; (ii) a renewal survey at intervals specified by the Administration but not exceeding five years, except where regulation 14 (b), (e), (f) and (g) is applicable; (iii) a periodical survey within three months before or after each anniversary date of the Cargo Ship Safety radio certificate; (iv) an additional survey as prescribed for passenger ships in regulation 7 (b) (iii). (b) the surveys referred to in paragraph (a) shall be carried out as follows: (i) the initial survey shall include a complete inspection of the radio installation of cargo ships, including those used in life-saving appliances, ensur that they comply with the requirements of the present regulations; (ii) the renewal and periodical surveys shall include an inspection of the radio installation of cargo ships, including those used in life-saving appliances, ensur that they comply with the requirements of the present regulations. (c) the periodical surveys referred to in paragraph (a) (iii) shall be endorsed on the Cargo Ship Safety radio certificate. " Regulation 10. Surveys of hull, machinery and equipment of cargo ships the existing heading is replaced by the following: "surveys of the structure, machinery equipment of the cargo ship" the existing text is replaced by the: (a) the structure, machinery and equipment (other than items in respect of which a Cargo Ship Safety equipment certificate and Cargo Ship Safety radio a certificate with the issued) of a cargo ship as referred to in paragraph (b) (i) shall be subject to the survey and inspection of specified below: (i) an initial survey including an inspection of the outside of the ship's bottom before the ship is put in service; (ii) a renewal survey at intervals specified by the Administration but not exceeding 5 years, except where regulation 14 (b), (e), (f) and (g) is applicable; (iii) an intermediate survey within three months before or after the second anniversary date or within three months before or after the third anniversary date of the Cargo Ship Safety Construction certificate, which shall take the place of one of the annual surveys specified in paragraph (a), (iv) an annual survey within 3 months before or after each anniversary date of the Cargo Ship Safety Construction certificate; (v) a minimum of two inspection of the outside of the ship's bottom during any five year period, except where regulation 14 (e) or (f) is applicable. Where regulation 14 (e) or (f) is applicable, this five year period may be extended, it is with the extended period coincid of validity of the certificate. In all cases the interval between any two such inspection shall be 36 months: 12 notes (via) an additional survey as prescribed for passenger ships in regulation 7 (b) (iii). (b) the surveys referred to in their inspection and paragraph (a) shall be carried out as follows: (i) the initial survey shall include a complete inspection of the structure, machinery and equipment. This survey shall be such as to ensur that the arrangements, materials, and workmanship of the scantling structure, boiler pressure vessel and others, their appurtenanc, and auxiliary machinery including main steering gear and associated control systems, electrical installation and other equipment comply with the requirements of the present regulations, with satisfactory condition in and fit for the service for which the ship is intended and that the required information is provided stability. In the case of tankers in such a survey shall also include an inspection of the pump-room, cargo, bunker and ventilation piping systems and associated safety devices, (ii) the renewal survey shall include an inspection of the structure, machinery and equipment as referred to in paragraph (b) (i) to ensur that they comply with the requirements of the present regulations, with satisfactory condition in and fit for the service for which the ship is intended; (iii) the intermediate survey shall include an inspection of the structure, boiler pressure vessel and others, machinery and equipment, the steering gear and the associated control systems and electrical installation to ensur that they remain satisfactory for the service for which the ship is intended. In the case of a tanker, the survey shall also include an inspection of the pump-room, cargo, bunker and ventilation pipingsystem and associated safety devices and the testing of insulation resistance of electrical installation in dangerous zones; (iv) the annual survey shall include (a) a general inspection of the structure, machinery and equipment referred to in paragraph (b) (i), to ensur that they have been maintained in accordanc with regulation 11 (a) and that they remain satisfactory for the service for which the ship is intended, (v) the inspection of the outside of the ship's bottom and the survey of related items inspected at the same time shall be such as to ensur that they remain satisfactory for the service for which the ship is intended. (c) the intermediate and annual surveys and the inspection of the outside of the ship's bottom in referred to paragraph (a) (iv) and (a) (v) shall be endorsed on the Cargo Ship Safety Construction certificate. " Regulations 11. Maintenance of condition after survey the existing text is replaced by the following: "(a)) the condition of the ship and its equipment shall be maintained to conform with the provision of the present regulations to ensur that the ship in all respect will remain fit to proceed to sea without danger to the ship or persons on board. (b) After any survey of the ship under regulation 7, 8, 9 or 10 has been completed, shall be made of the change in the structural arrangements, machinery, equipment and other items covered by the survey, without the sanction of the Administration. (c) Whenever an accident occure to a ship or a defect is discovered, either of which Lady is the safety of the ship or the efficiency or completenes of its lifesaving appliances or other equipment, the master or owner of the ship shall report at the earlies opportunity to the Administration, a nominated surveyor or recognized the organization responsible for issuing the relevant certificate , who shall cause investigations to be initiated to determin the whethers a survey as required by regulation 7, 8, 9 or 10, is not cessary. If the ship is in a port of another Contracting Government, the master or owner shall also report immediately to the appropriate authorities of the port State and the nominated surveyor or recognized organization shall ascertain that such a report has been made. " Regulation 12. Issue of certificates the existing heading is replaced by the following: "the issue or endorsement of certificate" of the existing text is replaced by the following: "(a) (i) a certificate called a Safety certificate shall be passenger ships issued after an initial or renewal survey to a passenger ships which compl to with the relevant requirements of chapter II-1, II-2, III, IV and V and any other relevant requirements of the present regulations; (ii) a certificate called a Cargo Ship Safety Construction certificate shall be issued after an initial or renewal survey to a cargo ship which compl to with the relevant requirements of chapter II-1 and II-2 (other than those relating to fire safety systems and appliances and fire control plans) and any other relevant requirements of the present regulations; (iii) a certificate called a Cargo Ship Safety equipment certificate shall be issued after an initial or renewal survey to a cargo ship which compl to with the relevant requirements of chapter II-1, II-2, III and V and any other relevant requirements of the present regulations; (iv) a certificate called a Cargo Ship Safety radio certificate shall be issued after an initial or renewal survey to a cargo ship which compl to with the relevant requirements of chapter IV and any other relevant requirements of the present regulations; (g) (1) (a) a certificate called a Cargo Ship Safety certificate may be issued after an initial or renewal survey to a cargo ship which compl to with the relevant requirements of chapter II-1, II-2, III, IV and V and any other relevant requirements of the present regulations, as an alternative to the certificates referred to in paragraph (a) (ii), (a) (ii) and (a) (iv); (2) whenever in this chapter reference is made to (a) a Cargo Ship Safety Construction certificate, Cargo Ship Safety equipment certificate or cargo Ship Safety radio certificate, it shall apply to (a) a Cargo Ship Safety Certificate, if it is used as an alternative to these certificates. (vi) the passenger Ship Safety Certificate, Cargo Ship Safety the equipment certificate, Cargo Ship Safety of the radio certificate and the Cargo Ship Safety Certificate, referred to in sub-paragraph (i), (ii), (iii) and (v), shall be supplemented by a Record of equipment; (VII) when an exemption is granted under a ship and in accordanc with the provision of the present regulations, a certificate called an Exemption Certificate shall be issued in addition to the certificate prescribed in this paragraph; (VIII) the certificates referred to in this regulation shall be issued or endorsed either by the Administration or by any person or organization authorized by it. In every case, you assume full responsibility of the Administration for the certificates. (b) A Contracting Government shall not issue certificates under, and in accordanc with, the provision of the International Convention for the Safety of life at sea, 1960, 1948 or in 1929, after the date on which acceptance of the present Convention by the Government takes effect. " Regulation 13. Issue of a certificate by another Government Til existing heading is replaced by the following: "the issue or endorsement of certificate by another Government" the existing text is replaced by the following: "(A) A Contracting Government may, at the request of the Administration, cause a ship to be surveyed and, if satisfied that the requirements of the present regulations are complied with , shall issue or authoriz the issue of certificates to the ship and, where appropriate, or authoriz endors the endorsement of certificates on the ship in accordanc with the present regulations. Any certificate so issued shall contain a statement to the effect that it has been issued at the request of the Government of the State the flag of which the ship is entitled to fly, and it shall have the same force and receive the same recognition as a certificate issued under regulation 12. 14. Duration of certificates regulations the existing heading is replaced by the following: "the Duration of validity of the certificate at" the existing text is replaced by the following: "(a) A Safety certificate shall be Passenger ships issued for a period not exceeding 12 months. (A) a Cargo Ship Safety Construction certificate, Cargo Ship Safety equipment certificate and Cargo Ship Safety radio certificate shall be issued for a period specified by the Administration which shall note the five year exceeds 100. An Exemption Certificate shall not be valid for longer than the period of the certificate to which it will refer. (b) (i) notwithstanding the requirements of paragraph (a), when the renewal survey is completed within three months before the expiry date of the existing certificate, the new certificate shall be valid from the date of completion of the renewal survey to: (1) for (a) passenger ships, a date not exceeding 12 months from the date of expiry of the existing certificate; (2) for a cargo ship, a date not exceeding five years from the date of expiry of the existing certificate; (ii) when the renewal survey is completed after the expiry date of the existing certificate, the new certificate shall be valid from the date of completion of the renewal survey to: (1) for (a) passenger ships, a date not exceeding 12 months from the date of expiry of the existing certificate; (2) for a cargo ship, a date not exceeding five years from the date of expiry of the existing certificate; (iii) when the renewal survey is completed more than three months before the expiry date of the existing certificate, the new certificate shall be valid from the date of completion of the renewal survey to: (1) for (a) passenger ships, a date not exceeding 12 months from the date of completion of the renewal survey; (2) for a cargo ship, a date not exceeding five years from the date of completion of the renewal survey. (c) If a certificate other than a Passenger Ship Safety certificate is issued for a period of less than five years, the Administration may extend the validity of the certificate beyond the expiry date to the maximum period specified in paragraph (a), provided that the surveys referred to in regulations 8, 9 and 10 applicable when a certificate is issued for a period of 5 years is carried out with as appropriate. (d) If a renewal survey has been completed and a new certificate cannot be issued or placed on board the ship before the expiry date of the existing certificate, the person or organization authorized by the Administration may endors the existing certificate and such a certificate shall be accepted as valid for a further period which shall not exceeds 100 5 months from the expiry date. (e) If (a) the ship at the time when a certificate expires is not in a port in which it is to be surveyed, the Administration may extend the period of validity of the certificate but this extension shall be granted only for the purpose of allowing the ship to complete its voyage to the port in which it is to be surveyed , and then only in cases where it would appear proper and reasonable to do so. Of the certificate shall be extended for a period longer than three months, and a ship to which an extension is granted shall not, on its arrival in the port in which it is to be surveyed, be entitled by virtue of such extension to leave that port without having a new certificate. When the renewal survey is completed, the new certificate shall be valid to: (i) for (a) passenger ships, a date not exceeding 12 months from the date of expiry of the existing certificate before the extension was granted; (ii) for a cargo ship, a date not exceeding 5 years from the date of expiry of the existing certificate before the extension was granted. (f) A certificate issued to a ship engaged on short voyages which has not been extended under the foregoing provision of this regulation may be extended by the Administration for a period of grace of up to one month from the date of expiry stated on it. When the renewal survey is completed, the new certificate shall be valid to: (i) for (a) passenger ships data not exceeding a 12 months from the date of expiry of the existing certificate before the extension was granted; (ii) for a cargo ship, a date not exceeding 5 years from the date of expiry of the existing certificate before the extension was granted. (g) In special circumstanc, as determined by the Administration, a new certificate need not be dated from the date of expiry of the existing certificate as required by paragraph (b) (ii), (e) or (f). In these special circumstanc, the new certificate shall be valid to: (i) for (a) passenger ships, a date not exceeding 12 months from the date of completion of the renewal survey; (ii) for a cargo ship, a date not exceeding five years from the date of completion of the renewal survey. (h) If an annual, intermediate or periodical survey is completed before the period specified in the relevant regulations then: (i) the anniversary date shown on the certificate shall be the relevant amended by endorsement to a date which shall not be more than three months later than the date on which the survey was completed; (ii) the subsequent annual, intermediate or periodical survey required by the relevant regulations shall be completed at the intervals prescribed by these regulations using the new anniversary date; (iii) the expiry date may remain unchanged provided one or more annual, intermediate or periodical survey, as appropriate, are carried out so that the maximum intervals between the surveys prescribed by the relevant regulations are not exceeded. (i) A certificate issued under regulation 12 or 13 shall cease to be valid in any of the following cases: (i) if the relevant surveys and inspection with 9 (a) and 10 (a); (ii) if the certificate is not endorsed in accordanc with the present regulations; (iii) upon transfer of the ship to the flag of another State. A new certificate shall only be issued when the Government issuing the new certificate is fully satisfied that the ship is in compliance with the requirements of regulation 11 (a) and (b). In the case of a transfer between Contracting Governments if requested within three months after the transfer has taken place, the Government of the State whose flag the ship was formerly entitled to fly shall, as soon as possible, transmit to the Administration of the cop to the certificate carried by the ship before the transfer and, if available, to the cop of the relevant survey reports. " 15. Form of certificates regulations the existing heading is replaced by the following: "in the Form of certificates and records of equipment '' the existing text is replaced by the following:" certificate and record of equipment shall be drawn up on the form òàæó to the models given in the appendix to the Annex to the present Convention. If the language used is not English nor French ither, the text shall include a translation into one of these languages. " Regulation 16. Posting up of certificates the existing heading is replaced by the following: "Availability of certificates" the existing text is replaced by the following: "the certificates issued under regulations 12 and 13 shall be readily available on board for examination at all times." Regulation 19. Control the existing text is replaced by the following: "(a) in Every ship when in a port of another Contracting Government is subject to control by officers duly authorized by such Government in so far as this control is directed towards verifying that the certificates issued under regulation 12 or 13 with the valid regulations. (b) Such certificate if valid, shall be, unless there is accepted clear grounds for believing that the condition of the ship or of its equipment does not correspond substantially with the particular of any of the certificates or that the ship and its equipment are not in compliance with the provision of regulation 11 (a) and (b). (c) In the paragraph of the givens in circumstanc (b) or where a certificate has expired or ceased to be valid, the officer carrying out the control shall take steps to ensur that the ship shall not sail until it can proceed to sea or leave the port for the purpose of proceedings to the appropriate repair yard without danger to the ship or persons on board. (d) In the event of the control by giving rise to an intervention of any kind, the officer carrying out the control shall forthwith inform, in writing, the Consul or, in his absence, the ares not a diplomatic representative of the State whose flag the ship is entitled to fly of all the in which the intervention was deemed circumstanc not cessary. In addition, nominated surveyors or recognized organizations responsible for the issue of the certificates shall also be notified. The facts concerning the intervention shall be reported to the Organization. (e) the port State authority concerned shall notify all relevant information about the ship to the authorities of the next port of call, in addition to parties mentioned in paragraph (d), if it is unable to take action as specified in paragraph (c) and (d) or if the ship has been allowed to proceed to the next port of call. (f) When exercising control under this regulation all possible efforts shall be made to avoid a ship being unduly detained or delayed. If a ship is unduly detained or delayed it thereby shall be entitled to compensation for any loss or damage suffered. "
Appendix Modification and additions to the Appendix to the Annex to the International Convention for the Safety of life at sea, 1974 the existing forms of the Passenger Ship Safety Certificate, Cargo Ship Safety Construction certificate, Cargo Ship Safety equipment certificate, Cargo Ship Safety Radiotelegraphy certificate. Cargo Ship Safety Radiotelephony certificate and Exemption Certificate in the Appendix of Led tile tile of the Convention by the Appendix replaced by the form of the following certificate and records of equipment.
FORM OF SAFETY certificate FOR PASSENGER ships PASSENGER SHIPS SAFETY certificate this certificate shall be supplemented by a Record of equipment (Form P) (Official seal) (State) For an a short international voyage 1 Issued under the provision of the INTERNATIONAL CONVENTION FOR the SAFETY OF life AT sea, l974, as modified by the Protocol of 1988 relating to the authority of the theret under the Government of............................................................................................................................... " (name of the State) ............................................................................................................................... (person or organization authorized) Particular of name of ship ship2............................................................................ " Distinctive number or letters … … …. …. …. …. …. …. …. …. …. …. …. …. …. …. …. Port of registry ................................................................................ Gross tonnage ................................................................................ Sea area in which the ship is certified to operate (regulation IV/2) … … … … … … … … … … … … … … … … … …. IMO Number3 ................................................................................ Date on which keel was let go or ship was at a similar stage of construction or, where applicable, the date on which work for a conversion or an alteration or modification of a major character was commenced................................... " This IS TO CERTIFY: 1. That the ship has been surveyed in accordanc with the requirements of regulation 1/7 of the Convention. 2. That the survey showed that: 2.1 the ship complied with the requirements of the Convention as regards: 2.1.1 the structure, main and auxiliary machinery, boilers and other pressure vessel of the subdivision be subject 2.1.2 watertigh and details; 2.1.3 the following subdivision load lines: load lines assigned and marked Subdivisions on the ship's side at amidship (regulation II-1/13) the Freeboard To apply when the spaces in which the passenger is carried to include the following alternative spaces C. 1...................................................... " C.2 ........................ .............................. C.3 ........................ .............................. 2.2 the ship complied with the requirements of the Convention as regards structural fire protection, fire safety systems and appliances and fire control plans; 2.3 the life-saving appliances and the equipment of the liferaft, lifeboat and rescue boats were provided in accordanc with the requirements of the Convention; 2.4 the ship was provided with a line-throwing appliance and radio installation is used in life-saving appliances in accordanc with the requirements of the Convention; 2.5 the ship complied with the requirements of the Convention as regards the radio installation; 2.6 the functioning of the radio installation is used in life-saving appliances complied with the requirements of the Convention; 2.7 the ship complied with the requirements of the Convention as regards the shipborn navigational equipment, means of embarkation for pilots and nautical publications; 2.8 the ship was provided with lights, shapes, means of making sound signals and distress signals in accordanc with the requirements of the Convention and the International regulations for preventing Collision at sea in force; 2.9 in all others respect the ship complied with the relevant requirements of the Convention. 3. That an Exemption Certificate has/has been issued not4. This certificate is valid until...................................................................... " Issued at ................................................................................ (Place of issue of certificate) …. …. …. …. …. …. …. …. …. …. …. …. …. …. …. …. …. …. …. (Date of issue) (Signature of authorized official issuing the certificate) (Seal or stamp of the issuing authority, as appropriate) Endorsement where the renewal survey has been completed and regulations I/4 (d) Apple to the ship to the relevant compl with requirements of the Convention, and this certificate shall, in accordanc with regulation l/14 (d) of the Convention, be accepted as valid until....................................................... "


Signed: ....................................................


(Signature of authorized official)


Place: ....................................................... Date: ....................................


(Seal or stamp of the authority, as appropriate) Endorsement to extend the validity of the certificate until reaching the port of survey or for a period of grace where regulation I/14 (e) or (f) the Apple I/14 to this certificate shall, in accordanc with regulation I/14 (e)/I/14 (f) 5 of the Convention, be accepted as valid until....................................................... "


Signed: ....................................................


(Signature of authorized official)


Place: ....................................................... Date: ........................................................


(Seal or stamp of the authority, as appropriate)
RECORD OF equipment FOR the PASSENGER SHIP SAFETY certificate (FORM P) this shall be permanently attached to the Record the Safety Certificate passenger ships RECORD OF equipment FOR compliance WITH the INTERNATIONAL CONVENTION FOR the SAFETY OF life AT sea, 1974, AS MODIFIED BY the PROTOCOL OF the Particular 1 l988 RELATING THERET of ship name of ship................................................................................ " Distinctive number or letters … … … … … … … … … … … … … … … … … … …. Number of passenger for which certified … … … … … … … … … … … … …. Minimum number of persons required to operate with qualifications the radio installation........................................................................ "
2. Details of life-saving appliances 1. Total number of persons for which the life-saving appliances are provided. … … … … … … … … … … … … … … … … … … … … … … … … … …. Port side Starboard side 2. Total number of lifeboat..................... " 2.1 Total number of persons accommodated by them..................... " 2.2 Number of partially enclosed lifeboat (regulation III/42) … … … … … …. 2.3 Number of self-righting partially enclosed lifeboat (regulation III/43) … … … … … …. 2.4 Number of totally enclosed lifeboat (regulation II/44) … … … … … …. 2.5 Other lifeboat..................... " 2.5.1. the Number … … … … … …. 2.5.2. Type..................... " 3. the Number of lifeboat engine (included in the total shown above lifeboat)..................... " 3.1 Number of lifeboat is fitted with searchlight..................... " 4. the Number of rescue boats … … … … … …. 4.1 Number of boats which are included in the total shown above lifeboat..................... " 5. Liferaft..................... " 5.1 those for which approved launching appliances are required..................... " 5.1.1 Number of liferaft 5.1.2 Number of persons accommodated by them..................... " 5.2 those for which approved launching appliances are not required..................... " 5.2.1 Number of liferaft..................... " 5.2.2 Number of persons accommodated by them..................... " 6. Buoyan apparatus to..................... " 6.1 Number of apparatus..................... " 6.2 Number of persons capable of being supported..................... " 7. Number of lifebuoy..................... " 8. Number of lifejacket..................... " 9. The Immersion suits … … … … … …. 9.1 Total number..................... " 9.2 Number of suits complying with the requirements for lifejacket..................... " 10. the Number of thermal protective aids6 radio installation in the 11 used in life-saving appliances … … … … … …. 11.1 Number of radar transponders..................... " 11.2 Number of two-way VHF apparatus of radiotelephon..................... "
3. Details of radio facilities items Actual provision 1. Primary systems..................... " 1.1 the VHF radio installation..................... " 1.1.1. DSC encoder.................... " 1.1.2. DSC watch receiver.................... " 1.1.3 Radiotelephony. …. …. …. …. …. 1.2 MF radio installation..................... " 1.2.1 DSC encoder ..................... 1.2.2. DSC watch receiver.................... " 1.2.3 Radiotelephony. …. …. …. …. …. 1.3 the MF/HF radio installation..................... " 1.3.1. DSC encoder.................... " 1.3.2. DSC watch receiver.................... " 1.3.3 Radiotelephony. …. …. …. …. …. 1.4 Inmarsat ship earth station..................... " 2. Secondary means of alerting..................... " 3. Facilities for reception of maritime safety information..................... " 3.1. NAVTEX receiver.................... " 3.2. EGC receiver.................... " 3.3. HF direct-printig radiotelegraph receivers..................... " 4. Satellite EPIRB..................... " 4.1-SARSAT COSP..................... " 4.2 Inmarsat ... ... ... ... ... ... ... 5. VHF EPIRB..................... " 6. the Ship's radar treasponder..................... " 7. Radiotelephon of distress frequency watch receiver on 2.182 kHz7 … … … … … …. 8. Device for generating the radiotelephon alarm signal on 2.182 kHz8 … … … … … ….
4. Methods used to ensur the availability of radio facilities (regulation IV/9.7 and 9.8) Duplication of equipment 4.1........................................................... " shore-based maintenance 4.2.......................................................... " 4.3 the At-Sea maintenance capability................................................... "
5. Ships constructed before February 1995 which do not comply with all the applicable requirements of chapter IV of the Convention as amended in 19889 requirements of regulations Actual provision of listening hours by operator … … …. …. …. …. …. …. …. …. …. Number of operator … … …. …. …. …. …. …. …. …. …. Whethers car alarm fitted.......................................... " Whethers change installation fitted … … …. …. …. …. …. …. …. …. …. Whethers reserve installation fitted … … …. …. …. …. …. …. …. …. …. Change and whethers reserve transmitters electrically separated or combined.......................................... "
6. Ships constructed before 1 February 1992 which do not fully comply with the applicable requirements of chapter III of the Convention as amended in Actual lifeboat Radiotelegraph installation for 198810 provision..................... " Portable radio apparatus for survival craft of..................... " Survival craft EPIRB (121.5 MHz and 243.0 MHz)..................... " Two-way radiotelephon the apparatus ….................. " This IS TO CERTIFY that this Record is correct in all respect. Issued at ................................................................................ (Place of issue of the Record).............................................................................. " (Date of issue) (Signature of duly authorized official issuing the Record) (Seal or stamp of the issuing authority, as appropriate)
FORM OF SAFETY CONSTRUCTION certificate FOR cargo ships cargo SHIP SAFETY CONSTRUCTION certificate (Official seal) (State) Issued under the provision of the INTERNATIONAL CONVENTION FOR the SAFETY OF life AT sea, 1974, as modified by the Protocol of 1988 relating to the authority of the theret under the Government of............................................................................................................................... " (name of the State) by ................................................................................................................ (person or organization authorized) Particular of ships11 name of ship … … … … … … … … … … … … … … … … … … … … … … … … … …. Distinctive number or letters … … … … … … … … … … … … … … … … … … … … … …. Port of registry ................................................................................ Gross tonnage ................................................................................ Deadweigh of ship (metric ton) 12 IMO Number13................................................................................ " Type of ship14 Oil tanker Chemical tanker Gas carrier cargo ship other than any of the above date on which keel was let go or ship was at a similar stage of construction or, where applicable, the date on which work for a conversion or an alteration or modification of a major character was commenced................................... " This IS TO CERTIFY: 1. That the ship has been surveyed in accordanc with the requirements of regulation 1/10 of the Convention. 2. That the survey showed that the condition of the structure, machinery and equipment as defined in the above regulation was satisfactory and the ship complied with the relevant requirements of chapter II-1 and II-2 of the Convention (other than those relating to fire safety systems and appliances and fire control plans). 3. That the last two inspection of the outside of the ship bottom took place on..................................................... and........................................... " (data) 4. That an Exemption Certificate has/has not15 been issued. This certificate is valid until................................................... " 16 subject to the annual and intermediate surveys and inspection of the outside of the ship's bottom in accordanc with regulation 1/10 of the Convention. Issued at ................................................................................ (Place of issue of certificate) …. …. …. …. …. …. …. …. …. …. …. …. …. …. …. …. …. … … …. (Date of issue) (Signature of duly authorized official issuing the Record) (Seal or stamp of issuing authority, as appropriate)
Endorsement FOR ANNUAL AND intermediate surveys this IS TO CERTIFY that at a survey required by regulation I/10 of the Convention, the ship was found to comply with the relevant requirements of the Convention. Annual survey: Signed:.................................................. " (Signature of authorized official) Place: .................................................... Date: ..................................................... (Seal or stamp of the authority, as appropriate) Annual/Intermediate17 Signed:.................................................. " (Signature of authorized official) Place: .................................................... Date: ..................................................... (Seal or stamp of the authority, as appropriate) Annual/Intermediate18 Signed:.................................................. " (Signature of authorized official) Place: .................................................... Date: ..................................................... (Seal or stamp of the authority, as appropriate) Annual survey: Signed:.................................................. " (Signature of authorized official) Place: .................................................... Date: ..................................................... (Seal or stamp of the authority, as appropriate)
ANNUAL/intermediate SURVEY IN ACCORDANC WITH REGULATION I/14 (h) (iii) this IS TO CERTIFY that, at an annual/intermediate19 survey in accordanc with regulation I/14 (h) (iii) of the Convention, the ship was found to comply with the relevant requirements of the Convention. Signed: .................................................. (Signature of authorized official) Place: .................................................... Date: ..................................................... (Seal or stamp of the authority, as appropriate)
Endorsement FOR INSPECTION OF the outside OF the SHIP BOTTOMS20 this IS TO CERTIFY that, at an inspection required by regulation I/10 of the Convention, the ship was found to comply with the relevant requirements of the Convention. First inspection: Signed:.................................................. " (Signature of authorized official) Place: .................................................... Date: ..................................................... (Seal or stamp of the authority, as appropriate) Second inspection: Signed:.................................................. " (Signature of authorized official) Place: .................................................... Date: ..................................................... (Seal or stamp of the authority, as appropriate) Endorsement to extend the certificate if valid for less than 5 years where regulation I/14 (c) Apple to the ship to the relevant compl with requirements of the Convention, and this certificate shall, in accordanc with regulation I/I 4 (c) of the Convention, be accepted as valid until................................................ " Signed: .................................................. (Signature of authorized official) Place: .................................................... Date: ..................................................... (Seal or stamp of the authority, as appropriate) Endorsement where the renewal survey has been completed and regulations I/4 (d) Apple to the ship to the relevant compl with requirements of the Convention, and this certificate shall in accordanc with regulation I/14 (d) of the Convention, be accepted as valid until...................................................... " Signed: .................................................. (Signature of authorized official)




Place: .................................................... Date: .....................................................




(Seal or stamp of the authority, as appropriate) Endorsement to extend the validity of the certificate until reaching the port of survey or a period of grace where regulation I/14 (e) or (f) the Apple I/14 to this certificate shall, in accordanc with regulation I/14 (e) (f) I/14-21 of the Convention, be accepted as valid until.................................................... "




Signed: .................................................. (Signature of authorized official) Place: .................................................... Date: .....................................................




(Seal or stamp of the authority, as appropriate) Endorsement for advancement of anniversary date where regulation I/14 (h) applies In accordanc with regulation I/14 (h) of the Convention, the new anniversary date is.................................................. "




Signed: .................................................. (Signature of authorized official) Place: .................................................... Date: .....................................................




(Seal or stamp of the authority, as appropriate) In accordanc with regulation I/14 (h) of the Convention, the new anniversary date is............................................... "




Signed: .................................................. (Signature of authorized official) Place: .................................................... Date: .....................................................




(Seal or stamp of the authority, as appropriate)
FORM OF SAFETY equipment certificate FOR cargo ships cargo SHIP SAFETY equipment certificate this certificate shall be supplemented by a Record of equipment (Form E) (Official seal) (State) Issued under the provision of the INTERNATIONAL CONVENTION FOR the SAFETY OF life AT sea, 1974, as modified by the Protocol of 1988 relating to the authority of the theret under the Government of............................................................. " (name of State) by ............................................................. (person or organization authorized) Particular of ship22 name of ship............................................................................ " Distinctive number or letters...................................................................... " Port of registry ................................................................................ Gross tonnage ................................................................................ Deadweigh of ship (metric ton) 23....................................................... " Length of ship (regulation III/3.10)............................................................. " IMO Number24 ................................................................................ Type of Oil tanker, Chemical tanker, Gas carrier ship25 cargo ship other than any of the above date on which keel was let go or ship was at a similar stage of construction or, where applicable, the date on which work for a conversion or an alteration or modification of a major character was commenced...................................................... " This IS TO CERTIFY: 1. That the ship has been surveyed in accordanc with the requirements of regulation 1/8 of the Convention. 2. That the survey showed that: 2.1 the ship complied with the requirements of the Convention as regards fire safety systems and appliances and fire control plans; 2.2 the life-saving appliances and the equipment of the liferaft, lifeboat and rescue boats were provided in accordanc with the requirements of the Convention; 2.3 the ship was provided with a line-throwing appliance and radio installation is used in life-saving appliances in accordanc with the requirements of the Convention; 2.4 the ship complied with the requirements of the Convention as regards the shipborn navigational equipment, means of embarkation for pilots and nautical publications; 2.5 the ship was provided with lights, shapes, means of making sound signals and distress signals in accordanc with the requirements of the Convention and the International regulations for Preventing Collision at sea in force; 2.6 in all others respect the ship complied with the relevant requirements of the Convention. 3. That the ship operate in accordanc with regulation III/26.1.1.1 within the................................. limits of the trade area.................................... " 4. That an Exemption Certificate has/has not26 been issued. This certificate is valid until............................ " 27 subject to the annual and periodical surveys in accordanc with regulation I/8 of the Convention. Issued at ................................................................................ (Place of issue of certificate) … … … … … … … … … … … … … … … … … … … … … … … … … … … … …. (Date of issue) (Signature of authorized official issuing the certificate) (Seal or stamp of the issuing authority, as appropriate)
Endorsement FOR ANNUAL AND PERIODICAL surveys this IS TO CERTIFY that, at a survey required by regulation I/8 of the Convention, the ship was found to comply with the relevant requirements of the Convention. Annual survey: Signed:.................................................. "


(Signature of authorized official) Place: .................................................... Date: .....................................................


(Seal or stamp of the authority, as appropriate) Annual/Periodical28 survey: Signed:.................................................. " (Signature of authorized official) Place: .................................................... Date: .....................................................


(Seal or stamp of the authority, as appropriate) Annual/Periodical29 survey: Signed:.................................................. " (Signature of authorized official) Place: .................................................... Date: .....................................................


(Seal or stamp of the authority, as appropriate) Annual survey: Signed:.................................................. " (Signature of authorized official) Place: .................................................... Date: .....................................................


(Seal or stamp of the authority, as appropriate)
ANNUAL/PERIODICAL SURVEY IN ACCORDANC WITH REGULATION I/14 (h) (iii) this IS TO CERTIFY that, at an annual/periodical30 survey in accordanc with regulation I/14 (h) (iii) of the Convention the ship was found to comply with the relevant requirements of the Convention.


Signed: .................................................. (Signature of authorized official) Place: .................................................... Date: .....................................................


(Seal or stamp of the authority, as appropriate) Endorsement to extend the certificate if valid for less than 5 years where regulation I/14 (c) Apple to the ship to the relevant compl with requirements of the Convention, and this certificate shall, in accordanc with regulation I/1 4 (c) of the Convention, be accepted as valid until...................................................... "


Signed: .................................................. (Signature of authorized official) Place: .................................................... Date: .....................................................


(Seal or stamp of the authority, as appropriate) Endorsement where the renewal survey has been completed and regulations I/14 (d) Apple to the ship to the relevant compl with requirements of the Convention, and this certificate shall, in accordanc with regulation I/14 (d) of the Convention, be accepted as valid until.................................................... "


Signed: .................................................. (Signature of authorized official) Place: .................................................... Date: .....................................................


(Seal or stamp of the authority, as appropriate) Endorsement to extend the validity of the certificate until reaching the port of survey or for a period of grace where regulation I/14 (e) or (f) the Apple I/14 to this certificate shall. in accordanc with regulation I/14 (e) (f) I/14 31 of the Convention, be accepted as valid until.................................................... "


Signed: .................................................. (Signature of authorized official) Place: .................................................... Date: .....................................................


(Seal or stamp of the authority, as appropriate) Endorsement for advanceme of anniversary dare where regulation I/14 (h) applies In accordanc with regulation I/14 (h) of the Convention, the new anniversary date is.................................... "


Signed: .................................................. (Signature of authorized official) Place: .................................................... Date: .....................................................


(Seal or stamp of the authority, as appropriate) In accordanc with regulation I/14 (h) of the Convention, the new anniversary date is...................................... "


Signed: .................................................. (Signature of authorized official) Place: .................................................... Date: .....................................................


(Seal or stamp of the authority, as appropriate)
RECORD OF equipment FOR the cargo SHIP SAFETY equipment certificate (FORM E) this Record shall be permanently attached to the Cargo Ship Safely equipment certificate RECORD OF equipment FOR compliance WITH the INTERNATIONAL CONVENTION FOR the SAFETY OF life AT sea. in 1974, BY the PROTOCOL OF 1988 MOIDIFIED RELATING THERET 1. Particular of ship name of ship............................................................................ " Distinctive number or letters … … … … … … … … … … … … … … … … … … … … … …. 2. Details of life-saving appliances 1. Total number of persons for which the life-saving appliances provided with the port side Starboard side 2. Total number of persons accommodated by them.................................... " 2.1 Total number of persons accommodated by them.................................... " 2.2 Number of self-righting partially enclosed lifeboat (regulation 111/43) …. …. …. …. …. …. …. …. …. Number of totally enclosed lifeboat for 2.3 (regulation II/44) … … … … … … … … … …. 2.4 Number of lifeboat with a self-led air support system (regulation III/45) …. …. …. …. …. …. …. …. …. 2.5 the Number of fire-protected lifeboat (regulation III/46)................................. " 2.6 Other lifeboat................................. " 2.6.1 Number .................. ............... 2.6.2 type … … … … …. 2.7 the Number off the freefall lifeboat.................. " 2.7.1 Totally enclosed (regulation II/44) …. …. … … …. 2.7.2 Self-led (regulation III/45) …. …. … … …. 2.7.3 fire-protected (regulation III/46).................. " 3. the Number of lifeboat engine (included in the total shown above lifeboat) 3.1 Number of lifeboat fitted with a searchlight … … …. …. …. 4. the Number of rescue boats....................................... " 4.1 Number of boats which are included in the total shown above lifeboat....................................... " 5. Liferafts ....................................... 5.1 those for which approved launching appliances are required....................................... " 5.1. Number of liferaft 1....................................... " 5.1.2 Number of persons accommodated by them....................................... " 5.2 those for which approved launching appliances are not required....................................... " 5.2.1 Number of liferaft....................................... " 5.2.2 Number of persons accommodated by them....................................... " 5.3 Number of liferaft required by regulation III/26.1.4....................................... " 6. Number of lifebuoy................................. " 7. Number of lifejacket....................................... " 8. The Immersion suits....................................... " 8.1 Total number … … … … … … … … … … … …. 8.2 Number of suits complying with the requirements for lifejacket....................................... " 9. the Number of thermal protective installation of aids32 10. Radio used in life-saving appliances................................. " Number of radar transponders 10.1................................. " 10.2 Number of two-way VHF apparatus of radiotelephon................................. " 3. in ships constructed before 1 February 1992 which do not fully comply with the applicable requirements of chapter III of the Convention as amended 198833 Actual lifeboat Radiotelegraph installation for a provision........................ " Portable radio apparatus for survival craft of........................ " Survival craft EPIRB (121.5 MHz and 243.0 MHz)........................ " Two-way radiotelephon the apparatus …..................... " This IS TO CERTIFY that this Record is correct in all respect to Issued at................................................................................ " (Place of issue of the record) ................................... ....................................................... (Date of issue) (Signature of duly authorized official issuing the Record) (Seal or stamp of the issuing authority, as appropriate)
FORM OF SAFETY radio certificate FOR cargo ships cargo SHIP SAFETY radio certificate this certificate shall be supplemented by a Record of equipment of radio facilities (Form R) (Official seal) (State) Issued under the provision of the INTERNATIONAL CONVENTION FOR the SAFETY OF life AT sea, 1974, as modified by the Protocol of 1988 relating to the authority of the theret under the Government of............................................................. " (name of the State) by ............................................................. (person or organization authorized) Particular of ship34 name of ship … … … … … … … … … … … … … … … … … … … … … … … … … …. Distinctive number or letters … … … … … … … … … … … … … … … … … … … … … …. Port of registry ................................................................................ Gross tonnage ................................................................................ Sea area in which the ship is certified to operate (regulation IV/2) … … … …. IMO Number35........................................................................ Date on which keel was let go or ship was at a similar stage of construction or, where applicable, the date on which work for a conversion or an alteration or modification of a major character was commenced.................................. " This IS TO CERTIFY: 1. That the ship has been surveyed in accordanc with the requirements of regulation 1/9 of the Convention. 2. That the survey showed that: 2.1 the ship complied with the requirements of the Convention as regards the radio installation; 2.2 the functioning of the radio installation is used in life-saving appliances complied with the requirements of the Convention; 3. That an Exemption Certificate has/has not36 been issued. This certificate is valid until............................................. " 37 subject to the periodical surveys in accordanc with regulation 1/9 of the Convention Issued at................................................................................ " (Place of issue of certificate) … … … … … … … … … … … … … … … … … … … … … … … … … … … … …. (Date of issue) (Signature of authorized official issuing the certificate) (Seal or stamp of the issuing authority, as appropriate)
Endorsement FOR PERIODICAL surveys this IS TO CERTIFY that, at a survey required by regulation I/8 of the Convention, the ship was found to comply with the relevant requirements of the Convention. Periodical survey: Signed:.................................................. " (Signature of authorized official) Place: .................................................... Date: .....................................................


(Seal or stamp of the authority, as appropriate) Periodical survey: Signed:.................................................. " (Signature of authorized official) Place: .................................................... Date: .....................................................


(Seal or stamp of the authority, as appropriate) Periodical survey: Signed:.................................................. " (Signature of authorized official) Place: .................................................... Date: .....................................................


(Seal or stamp of the authority, as appropriate) Periodical survey: Signed:.................................................. " (Signature of authorized official) Place: .................................................... Date: .....................................................


(Seal or stamp of the authority, as appropriate)

PERIODICAL SURVEYS IN ACCORDANC WITH REGULATION I/14 (h) (iii) this IS TO CERTIFY that, at a periodical survey in accordanc with regulation I/14 (h) (iii) of the Convention, the ship was found to comply with the relevant requirements of the Convention.


Signed: .................................................. (Signature of authorized official) Place: .................................................... Date: .....................................................


(Seal or stamp of the authority, as appropriate) Endorsement to extend the certificate if valid for less than 5 years where regulation I/14 (c) Apple to the ship to the relevant compl with requirements of the Convention, and this certificate shall, in accordanc with regulation I/I 4 (c) of the Convention, be accepted as valid until................................................... "


Signed: .................................................. (Signature of authorized official) Place: .................................................... Date: .....................................................


(Seal or stamp of the authority, as appropriate) Endorsement where the renewal survey has been completed and regulations I/l4 (d) Apple to the ship to the relevant compl with requirements of the Convention, and this certificate shall, in accordanc with regulation I/14 (d) of the Convention, be accepted as valid until....................................................... "


Signed: .................................................. (Signature of authorized official) Place: .................................................... Date: .....................................................


(Seal or stamp of the authority, as appropriate) Endorsement to extend the validity of the certificate until reaching the port of survey or for a period of grace where regulation I/14 (e) or (f) 14/Apple to this certificate shall, in accordanc with regulation I/14 (e)/I/14 (f) 37 of the Convention, be accepted as valid until....................................................... "


Signed: .................................................. (Signature of authorized official) Place: .................................................... Date: .....................................................


(Seal or stamp of the authority, as appropriate) Endorsement for advancement of anniversary date where regulation I/14 (h) applies In accordanc with regulation I/14 (h) of the Convention, the new anniversary date is.................................................. "


Signed: .................................................. (Signature of authorized official) Place: .................................................... Date: .....................................................


(Seal or stamp of the authority, as appropriate) In which the regulation I/accordanc 14 (h) of the Convention, the new anniversary date is................................................ "


Signed: .................................................. (Signature of authorized official) Place: .................................................... Date: .....................................................


(Seal or stamp of the authority, as appropriate)
RECORD OF EQUIPMENT For the cargo SHIP SAFETY radio certificate (FORM R) this shall be permanently attached to the records ' Cargo Ship Safety radio certificate RECORDS OF equipment OF radio facilities FOR compliance WITH the INTERNATIONAL CONVENTION (F) OR the SAFETY OF life AT sea, 1974, AS MODIFIED BY the PROTOCOL OF 1988 RELATING to the Particular 1 THERET of ship name of ship................................................................................ " Distinctive number or letters...................................................................... " Minimum number of persons required to operate with qualifications the radio installation................................................................................ " 2. Details of radio facilities item Actual provision 1. Primary systems........................ " 1.1 the VHF radio installation........................ " 1.1.1. DSC encoder....................... " 1.1.2. DSC watch receiver....................... " 1.1.3 Radiotelephony........................ " 1.2 MF radio installation........................ " 1.2.1. DSC encoder....................... " 1.2.2. DSC watch receiver....................... " 1.2.3 Radiotelephony........................ " 1.3 the MF/HF radio installation........................ " 1.3.1. DSC encoder....................... " 1.3.2. DSC watch receiver....................... " 1.3.3 Radiotelephony........................ " direct-printing telegraphy 1.3.4........................ " 1.4 Inmarsat ship earth station........................ " 2. Secondary means of alerting........................ " 3. Facilities for reception of maritime safety information........................ " 3.1. NAVTEX receiver....................... " 3.2. EGC receiver....................... " 3.3. HF direct-printing radiotelegraph receivers........................ " 4. Satellite EPIRB........................ " 4.1-SARSAT COSP........................ " 4.2 Inmarsat …. …. …. …. …. …. 5. VHF EPIRB........................ " 6. the Ship's radar transponder........................ " 7. Radiotelephon of distress frequency watch receiver on 2.182 kHz39........................ " 8. Device for generating the radiotelephon alarm signal on 2.182 kHz40........................ " 3. the methods used to ensur the availability of radio facilities (regulation IV/15.6 and 15.7) 3.1 the Duplication of equipment.................................................................. " 3.2 shore-based maintenance................................................................. " 3.3 the At-Sea maintenance capability.......................................................... " 4. for ships constructed before 1 January 1995 which do not comply with all the applicable requirements of chapter IV of the Convention as amended in198841 4.1 For ships required to be fitted with radiotelegraphy in accordanc with the Convention in force prior to 1 February 1992. Requirements of regulations Actual provision of listening by operator hours................................. " Number of operator … … … … … … … … … …. Whethers car alarm fitted................................. " Whethers change installation fitted … … … … … … … … … …. Whethers reserve installation fitted ….............................. " Change and whethers reserve transmitters electrically separated or combined................................. " 4.2 For ships required to be fitted with radiotelephony in accordanc with the Convention in force prior to 1 February 1992. Requirements of regulations Actual provision hours of listening … … … … … … … … … …. Number of operator … … … … … … … … … …. This IS TO CERTIFY that this Record is correct in all respect to Issued at................................................................................ " (Place of issue of the Record).............................................................................. " (Date of issue) (Signature of duly authorized official issuing the Record) (Seal or stamp of the issuing authority, as appropriate)
FORM OF SAFETY certificate FOR cargo ships cargo SHIP SAFETY certificate this certificate shall be supplemented by a Record of equipment (Form C) (Official seal) (State) Issued under the provision of the INTERNATIONAL CONVENTION FOR the SAFETY OF life AT sea, 1974, as modified by the Protocol of 1988 relating to the authority of the theret under the Government of............................................................. " (name of State) by ............................................................. (person or organization authorized) Particular of ship42 name of ship … … … … … … … … … … … … … … … … … … … … … … … … … …. Distinctive number or letters … … … … … … … … … … … … … … … … … … … … … …. Port of registry........................................................................ Gross tonnage ................................................................................ Deadweigh of ship (metric ton) 43........................................................... Length of ship (regulation III/3.10).......................................................... " Sea area in which the ship is certified to operate (regulation IV/2) … … … … …. IMO Number44 ................................................................................ Type of ship45 Oil tanker Chemical tanker Gas carrier cargo ship other than any of the above date on which keel was let go or ship was at a similar stage of construction or, where applicable, the date on which the work for an alteration or modification of a major character was commenced........................................... " This IS TO CERTIFY: 1. That the ship has been surveyed in accordanc with the requirements of the regulations, I/I/8 and 9/10 (I) of the Convention. 2. That the survey showed that: 2.1 the condition of the structure, machinery and equipment as defined in regulation I/10 was satisfactory and the ship complied with the relevant requirements of chapter II-1 and chapter II-2 of the Convention (other than those relating to fire safety systems and appliances and fire control plans); 2.2 that the last two inspection of the outside of the ship's bottom took place on............................ and.......................... " (data) 2.3 the ship complied with the requirements of the Convention as regards fire safety systems and appliances and fire control plans; 2.4 the life-saving appliances and the equipment of the liferaft, lifeboat and rescue boats were provided in accordanc with the requirements of the Convention; 2.5 the ship was provided with a line-throwing appliance and radio installation is used in life-saving appliances in accordanc with the requirements of the Convention; 2.6 the ship complied with the requirements of the Convention as regards the radio installation; 2.7 the functioning of the radio installation used in life-saving appliances complied with the requirements of the Convention; 2.8 the ship complied with the requirements of the Convention as regards the shipborn navigational equipment, means of embarkation for pilots and nautical publications; 2.9 the ship was provided with lights, shapes, means of making sound signals and distress signals in accordanc with the requirements of the Convention and the International regulations for Preventing Collision at sea in force; 2.10 in all others, respect the ship compiled with the relevant requirements of the Convention. 3. That the ship operate in accordanc with regulation III/26.1.1.1. within the limits of the trade area........................................ " 4. That an Exemption Certificate has/has not45 been issued. This certificate is valid until....................................... " 46 subject to the annual, intermediate and periodical survey and inspection of the outside of the ship's bottom in accordanc with regulation I/8, 9 and 10 I//I of the Convention Issued at................................................................................ " (Place of issue of certificate) …. …. …. …. …. …. …. …. …. …. …. …. …. …. …. …. …. … … …. (Date of issue) (Signature of authorized official issuing the certificate) (Seal or stamp of the issuing authority, as appropriate)
Endorsement FOR ANNUAL AND intermediate surveys RELATING TO structure, MACHINERY AND equipment REFERRED TO IN PARAGRAPH 2.1 OF this certificate this IS TO CERTIFY that, at a survey required by regulation I/10 of the Convention, the ship was found to comply with the relevant requirements of the Convention. Annual survey: Signed:.................................................. " (Signature of authorized official) Place: .................................................... Date: .....................................................




(Seal or stamp of the authority, as appropriate) Annual/Intermediate48 Signed:.................................................. " (Signature of authorized official) Place: .................................................... Date: .....................................................




(Seal or stamp of the authority, as appropriate) Annual/Intermediate49 Signed:.................................................. " (Signature of authorized official) Place: .................................................... Date: .....................................................




(Seal or stamp of the authority, as appropriate) Annual survey: Signed:.................................................. " (Signature of authorized official) Place: .................................................... Date: .....................................................




(Seal or stamp of the authority, as appropriate)
ANNUAL/intermediate SURVEY IN ACCORDANC WITH REGULATION I/14 (h) (iii) this IS TO CERTIFY that, at an annual/intermediate50 survey in accordanc with regulation I/10 and I/14 (h) (iii) of the Convention, the ship was found to comply with the relevant requirements of the Convention.




Signed: .................................................. (Signature of authorized official) Place: .................................................... Date: .....................................................




(Seal or stamp of the authority, as appropriate)
Endorsement FOR INSPECTION OF the outside OF the SHIP's BOTTOM50 this IS TO CERTIFY that, at an inspection required by regulation I/10 of the Convention, the ship was found to comply with the relevant requirements of the Convention. First inspection: Signed:.................................................. " (Signature of authorized official) Place: .................................................... Date: .....................................................




(Seal or stamp of the authority, as appropriate) Second inspection: Signed:.................................................. " (Signature of authorized official) Place: .................................................... Date: .....................................................




(Seal or stamp of the authority, as appropriate)
Endorsement FOR ANNUAL AND PERIODICAL surveys RELATING TO LIFE-SAVING APPLIANCES AND OTHER equipment REFERRED TO IN paragraphs 2.3, 2.4, 2.5, 2.8 AND 2.9 OF this certificate this IS TO CERTIFY that, at a survey required by regulation I/8 of the Convention, the ship was found to comply with the relevant requirements of the Convention. Annual survey: Signed:.................................................. " (Signature of authorized official) Place: .................................................... Date: .....................................................



(Seal or stamp of the authority, as appropriate) Annual/Periodical52 Signed:.................................................. " (Signature of authorized official) Place: .................................................... Date: .....................................................



(Seal or stamp of the authority, as appropriate) Annual/Periodical53 Signed:.................................................. " (Signature of authorized official) Place: .................................................... Date: .....................................................



(Seal or stamp of the authority, as appropriate) Annual survey: Signed:.................................................. " (Signature of authorized official) Place: .................................................... Date: .....................................................



(Seal or stamp of the authority, as appropriate)
ANNUAL/PERIODICAL SURVEY IN ACCORDANC WITH REGULATION I/14 (h) (iii) this IS TO CERTIFY that, at an annual/periodical54 survey in accordanc with regulation I/8 and I/14 (h) (iii) of the Convention, the ship was found to comply with the relevant requirements of the Convention.



Signed: .................................................. (Signature of authorized official) Place: .................................................... Date: .....................................................



(Seal or stamp of the authority, as appropriate)
Endorsement FOR PERIODICAL surveys RELATING TO the INSTALLATION of the radio REFERRED TO IN paragraphs 2.6 AND 2.7 OF this certificate this IS TO CERTIFY that, at a survey required by regulation I/8 of the Convention, the ship was found to comply with the relevant requirements of the Convention. Periodical survey: Signed:.................................................. " (Signature of authorized official) Place: .................................................... Date: .....................................................



(Seal or stamp of the authority, as appropriate) Periodical survey: Signed:.................................................. " (Signature of authorized official) Place: .................................................... Date: .....................................................



(Seal or stamp of the authority, as appropriate) Periodical survey: Signed:.................................................. " (Signature of authorized official) Place: .................................................... Date: .....................................................



(Seal or stamp of the authority, as appropriate) Periodical survey: Signed:.................................................. " (Signature of authorized official) Place: .................................................... Date: .....................................................



(Seal or stamp of the authority, as appropriate)
PERIODICAL SURVEYS IN ACCORDANC WITH REGULATION I/14 (h) (iii) this IS TO CERTIFY that, at a periodical survey in accordanc with regulation I/11 and I/14 (h) (iii) of the Convention the ship was found to comply with the relevant requirements of the Convention.



Signed: .................................................. (Signature of authorized official) Place: .................................................... Date: .....................................................



(Seal or stamp of the authority, as appropriate) Endorsement to extend the certificate if valid for less than 5 years regulation I/14 (c) Apple to the ship to the relevant compl with requirements of the Convention, and this certificate shall, in accordanc with regulation I/14 (c) of the Convention, be accepted as valid until................................................... " Signed: .................................................. (Signature of authorized official) Place: .................................................... Date: ..................................................... (Seal or stamp of the authority, as appropriate) Endorsement where the renewal survey has been completed and regulations I/14 (d) Apple to the ship to the relevant compl with requirements of the Convention, and this certificate shall in accordanc with regulation I/14 (d) of the Convention, be accepted as valid until....................................................... " Signed: .................................................. (Signature of authorized official) Place: .................................................... Date: ..................................................... (Seal or stamp of the authority, as appropriate) Endorsement to extend file validity of the certificate until reaching the port of survey or for a period of grace where regulation I/14 (e) or (f) the Apple I/14 to this certificate shall, in accordanc with regulation I/14 (e)/I/14 (f) 55 of the Convention, be accepted as valid until................................................... " Signed: .................................................. (Signature of authorized official) Place: .................................................... Date: ..................................................... (Seal or stamp of the authority, as appropriate) Endorsement for advancement of anniversary date where regulation I/14 (h) applies In accordanc with regulation I/14 (h) of the Convention, the new anniversary date is............................................... " Signed: .................................................. (Signature of authorized official) Place: .................................................... Date: ..................................................... (Seal or stamp of the authority, as appropriate) In accordanc with regulation I/14 (h) of the Convention, the new anniversary date is.................................................... " Signed: .................................................. (Signature of authorized official) Place: .................................................... Date: ..................................................... (Seal or stamp of the authority, as appropriate)
RECORD OF equipment FOR the cargo SHIP SAFETY certificate (FORM C) this Record shall be permanently attached to the Cargo Ship Safety Certificate RECORD OF equipment FOR compliance WITH the INTERNATIONAL CONVENTION FOR the SAFETY OF life AT sea, 1974, AS MODIFIED BY the PROTOCOL OF 1988 RELATING to the Particular 1 THERET of ship name of ship................................................................................ " Distinctive number or letters … … …. …. …. …. …. …. …. …. …. …. …. …. …. …. …. Minimum number of persons required to operate with qualifications the radio installation................................................................................ " 2. Details of life-saving appliances 1. Total number of persons for which the life-saving appliances are provided............................................................................. " Port side Starboard side 2. Total number of lifeboat........................ " 2.1 Total number of persons accommodated by them........................ " 2.2 Number of self-righting partially enclosed lifeboat (regulation III/43) …. …. …. …. …. …. 2.3 Number of totally enclosed lifeboat (regulation II/44) …. …. …. …. …. …. 2.4 Number of lifeboat with a self-led air support system (regulation III/45) …. …. …. …. …. …. 2.5 the Number of fire-protected lifeboat (regulation III/46)........................ " 2.6 Other lifeboat........................ " 2.6.1 Number........................ " 2.6.2 Type ............ ............ 2.7 Number of freefall lifeboat........................ " 2.7.1 Totally enclosed (regulation II/44) …. …. …. …. …. …. 2.7.2 Self-led (regulation III/45) …. …. …. …. …. …. 2.7.3 fire-protected (regulation III/46)........................ " 3. the Number of lifeboat engine is included in the total shown above lifeboat..................... " 3.1 Number of lifeboat is fitted with searchlight..................... " 4. the Number of rescue boats … … … … … …. 4.1 Number of boats which are included in the total shown above lifeboat..................... " 5. Liferaft..................... " 5.1 those for which approved launching appliances are required..................... " 5.1.1 Number of liferaft..................... " 5.1.2 Number of persons accommodated by them..................... " 5.2 those for which approved launching appliances are not required..................... " 5.2.1 Number of liferaft..................... " 5.2.2 Number of persons accommodated by them..................... " 5.3 Number of liferaft required by regulation III/26.1.4..................... " 6. Number of lifebuoy..................... " 7. Number of lifejacket..................... " 8. The Immersion suits … … … … … …. 8.1 Total number … … … … … …. 8.2 Number of suits complying with the requirements for lifejacket..................... " 9. the Number of thermal protective aids55..................... " 1. Radio installation is used in life-saving appliances … … … … … …. Number of radar transponders 10.1..................... " 10.2 Number of two-way VHF apparatus of radiotelephon..................... " 3. Details of radio facilities item Actual provision 1. Primary systems..................... " 1.1 the VHF radio installation..................... " 1.1.1. DSC encoder.................... " 1.1.2. DSC watch receiver.................... " 1.1.3 Radiotelephony. …. …. …. …. …. 1.2 MF radio installation..................... " 1.2.1. DSC encoder.................... " 1.2.2. DSC watch receiver.................... " 1.2.3 Radiotelephony. …. …. …. …. …. 1.3 the MF/HF radio installation..................... " 1.3.1. DSC encoder.................... " 1.3.2. DSC watch receiver.................... " 1.3.3 Radiotelephony. …. …. …. …. …. 1.4 Inmarsat ship earth station..................... " 2. Secondary means of alerting..................... " 3. Facilities for reception of maritime safety information..................... " 3.1. NAVTEX receiver.................... " 3.2. EGC receiver.................... " 3.3. HF direct-printing radiotelegraph receivers..................... " 4. Satellite EPIRB..................... " 4.1 COSP/SARSAT..................... " 4.2 Inmarsat ... ... ... ... ... ... ... 5. VHF EPIRB..................... " 6. the Ship's radar transponder. …. …. …. …. …. 7. Radiotelephon of distress frequency watch receiver on 2.182 kHz57 … … … … … …. 8. Device for generating the radiotelephon alarm signal on 2.182 kHz58 … … … … … …. 4. Methods used to ensur the availability of radio facilities (regulation IV/15.6 and 15.7) 4.1 Duplication equipment........................................ " shore-based maintenance 4.2................................................................ " 4.3 the At-Sea maintenance capability.......................................................... " 5. Ships constructed before 1 January 1995 which do not comply with all the applicable requirements of chapter IV of the Convention as amended in 198859 5.1 For ships required to be fined with radiotelegraphy in accordanc with the Convention in force prior to 1 February 1992 requirements of regulations Actual provision of listening hours by operator … … …. …. …. …. …. …. Number of operator … … …. …. …. …. …. …. Whethers car alarm fitted.............................. " Whethers change installation fitted … … …. …. …. …. …. …. Whethers reserve installation fitted … … …. …. …. …. …. …. Change and whethers reserve transmitters electrically separated or combined.............................. " 5.2 For ship required to be fitted with radiotelephony in accordanc with the Convention in force prior to 1 February 1992 requirements of regulations Actual provision hours of listening … … …. …. …. …. …. …. Number of operator … … …. …. …. …. …. …. 6. Ships constructed before 1 February 1992 which do not fully comply with the applicable requirements of chapter III of the Convention as amended in Actual lifeboat Radiotelegraph installation for 198860 provision..................... " Portable radio apparatus for survival craft of..................... " Survival craft EPIRB (121.5 MHz and 243.0 MHz)..................... " Two-way radiotelephon the apparatus ….................. " This IS TO CERTIFY that this Record is correct in all respect to Issued at................................................................................ " (Place of issue of the Record).............................................................................. " (Date of issue) (Signature of duly authorized official issuing the Record) (Seal or stamp of the issuing authority, as appropriate)
FORM OF EXEMPTION certificate EXEMPTION certificate (Official seal) (State) Issued under the provision of the INTERNATIONAL CONVENTION FOR the SAFETY OF life AT sea, 1974, as modified by the Protocol of 1988 relating to the authority of the theret under the Government of.......................................................................................................................... " (name of State) by ............................................................. (person or organization authorized) Particular of ship61 name of ship … … … … … … … … … … … … … … … … … … … … … … … … … …. Distinctive number of letters … … … … … … … … … … … … … … … … … … … … … … …. Port of registry ................................................................................ Gross tonnage ................................................................................ IMO Number62 ................................................................................ This IS TO CERTIFY: that the ship is, under the authority conferred by regulation..................... "of the Convention, exempted from the requirements of......................................................................................................................." of the Convention. Conditions, if any, on which the Exemption Certificate is granted:................................................................................................................................................................ " Voyages, if any, on which the certificate is granted: Extemption................................................................................ " This certificate is valid until ....................................................................... subject to the ................................................................................ Certificate, to which this certificate is attached, remaining valid. Issued at ................................................................................ (Place of issue of the Record).............................................................................. " (Date of issue) (Signature of duly authorized official issuing the certificate) (Seal or stamp of the issuing authority, as appropriate) Endorsement to extend the certificate if valid for less than 5 years where regulation I/14 (c) applies for this certificate shall, in accordanc with regulation I/14 (c) of the Convention, be accepted as valid until....................... subject to the … … … … … … … … … … …. Certificate, to which this certificate is attached, remaining valid.



Signed: .................................................. (Signature of authorized official) Place: ........................................... Date: .............................................



(Seal or stamp of the authority, as appropriate) Endorsement to the certificate if valid exten for less than 5 years where regulation I/14 (d) applies for this certificate shall, in accordanc with regulation I/14 (d) of the Convention, be accepted as valid until.............................................. subject to the......................... " Certificate, to which this certificate is attached, remaining valid.



Signed: .................................................. (Signature of authorized official) Place: .................................................... Date: .....................................................



(Seal or stamp of the authority, as appropriate) Endorsement to exten the validity of the certificate until reaching the port of survey or for a period of grace where regulation I/14 (e) or (f) the Apple I/14 to this certificate shall, in accordanc with regulation I/14 (e) or (f) I/14 63 of the Convention, be accepted as valid until................................................................................. subject to the.......................................................... " Certificate, to which this certificate is attached, remaining valid.




Signed: .................................................. (Signature of authorized official) Place: .................................................... Date: .....................................................




(Seal or stamp of the authority, as appropriate) ____ ____ ____ ____ _____ * signatures omitted. 1 delete as appropriate. 2 Altenatively, the particular of the ship may be placed in boxes horizontaly. 3 In accordanc with resolution A. 600 (15) IMO Ship Identification Number scheme, this information may be included voluntarily. 4 delete as appropriate. 5 delete as appropriate. 6 Excluding those required by regulation III/38.5. l. 24, 41.8.31 and III/III/47.2.2.13.7 to another Unless the data is determined by the Maritime Safety Committee, this item need not be reproduced on the record attached to certificates issued after 1 February 1999.8 this item need not be reproduced on the record attached to certificates issued after 1 February 1999.9 this section need not be reproduced on the record attached to certificates issued after 1 February 1999.10 this section need not be reproduced on the record attached to certificates issued after 1 February 1995 11 Alternatively, the particular of the ship may be placed horizontally in boxes. 12 For oil tankers, chemical tankers and gas carrier only. 13 In accordanc with resolution A. 600 (15) IMO Ship Identification Number scheme, this information may be included voluntarily. 14 delete as appropriate. 15 delete as appropriate. 16 insert the date of expiry as specified by the Administration in accordanc with regulation I/14 (a) of the Convention. The day and the month of this date correspond to the anniversary date as defined in regulation I/2 (n) of the Convention, unless amended in accordanc with a regulation I/14 (h). 17 delete as appropriate. 18 delete as appropriate. 19 delete as appropriate. 20 Provision may be made for additional inspection. 21 delete as appropriate. Alternatively, the 22 of the particular ship may be placed horizontally in boxes. 23 For oil tankers, chemical tankers and gas carrier only. 24 In accordanc with resolution A. 600 (15) IMO Ship Identification Number scheme, this information may be included voluntarily 25 delete as appropriate. 26 delete as appropriate. 27 insert the date of expiry as specified by the Administration in accordanc with regulation I/14 (a) of the Convention. The day and the month of this date correspond to the anniversary date as defined in regulation I/2 (n) of the Convention, unless amended in accordanc with a regulation I/14 (h). 28 delete as appropriate. 29 delete as appropriate. 30 delete as appropriate. 31 delete as appropriate. 32 Excluding those required by regulation III/38.5.1.24 III/41.8.31 III/47.2.2.13. and 33 this section need not be reproduced on the record attached to certificates issued after 1 February 1995. Alternatively, the particular 34 of the ship may be placed horizontally in boxes. 35 In accordanc with resolution A. 600 (15) IMO Ship Identification Number scheme, this information may be included voluntarily. 36 delete as appropriate. 37 insert the date of expiry as specified by the Administration in accordanc with regulation I/14 (a) of the Convention. The day and the month of this date correspond to the anniversary date as defined in regulation I/2 (n) of the Convention, unless amended in accordanc with a regulation I/14 (h). 38 delete as appropriate. Unless another date is 39 is determined by the Maritime Safety Committee, this item need not be reproduced on the record attached to certificates issued after 1 February 1999.40 this item need not be reproduced on the record attached to certificates issued after 1 February 1999.41 this section need not be reproduced on the record attached to certificates issued after 1 February 1999.42 Alternatively the particular of the ship may be placed horizontally in boxes. 43 For oil tankers, chemical tankers and gas carrier only. 44 In accordanc with resolution A. 600 (15) IMO Ship Identification Number scheme, this information may be included voluntarily. 45 delete as appropriate. 46 delete as appropriate. 47 insert the date of expiry as specified by the Administration in accordanc with regulation I/14 (a) of the Convention. The day and the month of this date correspond to the anniversary date as defined in regulation I/2 (n) of the Convention, unless amended in accordanc with a regulation I/14 (h). 48 delete as appropriate. 49 delete as appropriate. 50 delete as appropriate. 51 Provision may be made for additional inspection. 52 delete as appropriate. 53 delete as appropriate. 54 delete as appropriate. 55 delete as appropriate. 56 Excluding those required by regulation III/38.5.1.24 III/4 l. 8.31 and III/57 in another 47.2.2.13. Unless the data is determined by the Maritime Safety Committee, this item need not be reproduced on the record attached to certificates issued after 1 February 1999.58 this item need not be reproduced on the record attached to certificates issued after 1 February 1999.59 this section need not be reproduced on the record attached to certificates issued after 1 February 1999.60 this section need not be reproduced on the record attached to certificates issued after 1 February 1995, the particular in 61 Alternatively otth ship may be placed horizontally in boxes. 62 In accordanc with resolution A. 600 (H) (15)-IMO Ship ldentification Number scheme, this information may be included voluntarily. 63 delete as appropriate.

the 1974 International Convention for the safety of life at sea, 1988 Protocol this Protocol, being parties to the International Convention for the safety of life at sea, adopted in London on 1 November 1974, the parties, recognizing the need for inspections and certification of the implementation of the provisions of the above Convention, which harmonised with other appropriate international instruments, taking into account that this need can best be achieved the conclusion of a Protocol relating to the 1974 International Convention for the safety of life at sea, have agreed as follows: article I General obligations 1. Parties to this Protocol undertake to implement this Protocol and the Annex, which is an integral part of this Protocol, the provisions. Any reference to this Protocol at the same time extended as a reference to the attachment. 2. The parties to this Protocol as amended the 1974 International Convention for the safety of life at sea ("the Convention") the rules apply, subject to the changes and additions that set out in this Protocol. 3. with respect to ships entitled to fly the flag of a State which is not Party to the Convention and to this Protocol, the parties to this Protocol shall be applied in the Convention and this Protocol the extent necessary to ensure that these vessels will not be given more favourable treatment. Article II the previous contract Between 1 the parties to this Protocol this Protocol replaces and cancels the 1978 Protocol to the Convention. 2. Notwithstanding any other provisions of this Protocol, any certificate issued under and in accordance with the provisions of the Convention and any annex to this certificate issued pursuant to and in accordance with the provisions of the Protocol of 1978 relating to the Convention, which is in force at the time of entry into force of this Protocol with respect to a party, which issued the certificate or of the annex, shall remain in force until it expires in accordance with the Convention or Convention of 1978 Protocol rules Depending on the circumstances. 3. A party to this Protocol not to issue certificates under the 1974 1 November 1974 adopted the International Convention for the safety of life at sea regulations and in accordance with them. Article III of this Protocol the communication of information the parties undertake to communicate to and deposit the International Maritime Organization (hereinafter referred to as "the Organization"): (a) the Secretary-General) law, Decree, order, rules, and other texts adopted on the various issues covered by this Protocol; (b)) or of the inspectors a list of recognized organizations which are authorized to act on behalf of the protection of human life at sea in the management of measures to inform the responsible persons of the parties, as well as notice of the specific duties and powers delegated to these conditions that inspectors appointed or recognised organisations; and (c)) a sufficient number of specimen certificates issued pursuant to the provisions of this Protocol. Article IV signature, ratification, acceptance, approval and accession 1 this Protocol shall be open for signature at the headquarters of the organisation from 1 March 1989 to 1990 on 28 February and then remain open for the purposes of accession in accordance with the provisions of paragraph 3. States may express their consent to recognize this Protocol of: (a) the signing of binding), not discouraged by the deposit of an instrument of ratification, acceptance or approval; or (b)), the signature of said instruments of ratification, acceptance or approval with the following ratification, acceptance or accession; or (c)) by joining. 2. Ratification, acceptance, approval or accession shall be effected by depositing with the Secretary-General the instrument. 3. this Protocol shall be without reservation, to sign, ratify, accept, approve or accede to it only States that have signed, ratified, without reservations, accepted, approved or acceded to the Convention. Article v 1. Entry into force this Protocol shall enter into force twelve months from the date when both the following conditions are fulfilled: (a) not less than fifteen) countries whose merchant fleet total gross tonnage is not less than fifty per cent of the world merchant fleet total gross tonnage, have expressed a proposal to discharge its obligations under article IV, and (b)) are met by Protocol 1988 entry into force conditions concerning the 1966 International Convention on load lines provided that this Protocol will enter into force not earlier than February 1, 1992. 2. the States which have deposited their instruments of ratification, of acceptance, approval or accession to this Protocol after the conditions for entry into force of the executor, but before the date of entry into force, the ratification, acceptance, approval or accession shall take effect as of the date of entry into force of this Protocol or after three months from the date of the deposit of this instrument are, depending on which of the actions later. 3. any instrument of ratification, acceptance, approval or accession deposited after the entry into force of this Protocol, shall enter into force on the date after three months from the date of deposit. 4. After the date of the amendment to this Protocol shall be deemed to have been accepted in accordance with article 6, any deposited the instrument of ratification, acceptance, approval or accession shall apply to the amended Protocol. Article vi article VIII of the Convention, the amendment procedures set out in this Protocol is applicable to amendments, provided that: (a) a reference in this article to) Convention and the Contracting Governments be construed as references respectively to this Protocol and the parties to this Protocol; (b) of this Protocol and article) amendments to the annex are adopted and shall enter into force in accordance with the procedure applicable to an article of the Convention or its annexes, Chapter 1 of the amendment; and (c)) the appendix to annex this Protocol amendments can be adopted and enter into force in accordance with the procedure relating to the Convention, with the exception of amendments to Chapter 1. Article VII denunciation 1 Any party may denounce this Protocol at any time after five years from the date on which this Protocol enters into force for that party. 2. the denunciation shall be effected by depositing with the Secretary-General of the instrument of denunciation. 3. The denunciation shall take effect one year from the date of receipt by the Secretary-General of the instrument of denunciation, or the longer period of time as may be specified in that instrument. 4. The party who denounced the Convention, be considered as a denonsējuš of this Protocol. Such denunciation shall take effect on the same date, in accordance with article XI of the Convention, (c) the entry into force of the Convention, the denunciation. Article VIII the depositary 1. this Protocol shall be deposited with the Secretary-General (hereinafter referred to as "the depositary"). 2. The depositary shall: (a) inform all Governments) that have signed or acceded to this Protocol of: (i) each new signature or deposit of an instrument of ratification, acceptance approval or accession and the date of filing; (ii) the date of entry into force of the present Protocol; (iii) any denunciation of this Protocol, deposit of an instrument, the date on which it was received, and the date on which the denunciation takes effect; b) sends all Governments that have signed or acceded to this Protocol, approved this Protocol. 3. As soon as this Protocol enters into force, the depositary shall send a certified copy of the United Nations Secretariat for registration and publication in accordance with the Charter of the United Nations in article 102. Article IX the language protocol is drawn up in a single copy in the Arabic, Chinese, English, French, Russian and Spanish languages, each text being equally authentic. Together with the signed original is prepared and deposited it in the official translation into Italian. Signed in London one thousand nine hundred and eighty-eighth year of the eleventh of November. In witness whereof, the undersigned [*] Government to duly authorized representatives have signed this Protocol.
Annex to the 1974 International Convention for the safety of life at sea amendments and additions to annex Chapter 1 General provisions part A — APPLICATION, definitions, etc. 2. the rule. The definition of the existing text of paragraph (k) replace by the following text: "(k) a new ship means a ship wedge inserted into 25 May 1980 and later, or who is in any analogous construction." The existing text with the following: "(n) means the annual date of each specified day of the month corresponding to the certificate's expiration date." Part b — the view and the certificate rule 6. Inspection and view existing text replaced by the following: "(a) the inspection and inspection of vessels in so far as it relates to the enforcement of rules and exceptions shall be made administration officials. However, the Administration may entrust inspections and inspections make either approved inspectors for this purpose, or they recognised organisations. (b) approving or recognizing organizations inspectors for the inspection and inspection, as specified in point (a), the Administration certainly empowered each approved or recognized organizations: (i) to request the repair of the ship; (ii) to carry out inspections and inspections by the relevant authorities of the port State. The administration shall notify the Organization of the specific responsibilities and conditions of the authority delegated to the inspectors approved or recognised organisations. (c) If the approved inspector or the recognised organisation discovered that a ship or its equipment situation significantly different from specified in the certificate or is such that the ship is not suitable for navigation without threat to the ship or persons located on it, then this officer or organization shall immediately ensure that corrective measures and a specific time to be notified to the administration. If corrective measures are not taken, the appropriate licence to be cancelled, immediately notifying administration; and, if the ship is in a port of another party, it shall immediately notify the relevant national administrations this port authorities. When administration officials, the approved inspector or recognized organization has notified the appropriate authorities of the port State, the Government of the port State shall deliver the official, officer or organisation all necessary assistance to carry out its duties, as set out in these rules. When it is possible, the Government of the port State shall ensure that the ship does not fly until it will be able to proceed to sea or leave the port for the purpose of going to the appropriate ship repair plant, without endangering the ship itself or the person who sits on it. (d) the administration of the case to fully guarantee the inspection and examination and efficiency, and shall undertake to ensure the necessary measures to comply with this obligation. " 7. rule. Passenger ships of the existing text is replaced by the following: "(a) a passenger ship shall be subjected to the following inspections: (i) the initial inspection before the ship is put into service; (ii) inspection once in 12 months, except where applicable, rule 14 (b), (e), (f) and (g) above; (iii) in addition, if the need arises. (b) the above inspections as follows: (i) the initial inspection includes full structure, mechanism of the vessel and equipment, including the bottom of the outside, and the inside and outside of the boiler inspection. This view must be such as to ensure that the size of the construction system, boilers and other pressure vessels and their accessories, main and auxiliary machinery, electrical equipment, radio installations, including those used in life saving equipment, fire protection, fire safety systems and devices, life-saving devices and systems, the ship's navigation equipment, maritime literature, pilot decision-making tools and other equipment is in full compliance with the requirements of this regulation, and the resulting law , Decree, order, and the requirements of the rules, which, in respect of the service for which the ship is intended, issued by the administration. During the Preview time, to make sure that all parts of the ship and its equipment operation in all respects satisfactory and that the ship is equipped with lights, signs, sounds an alarm and distress signal feeding devices, as defined in these regulations and the international ship collision avoidance rules at sea; (ii) examination include construction, boilers and other pressure vessels, gear and equipment, including the bottom of the outside inspections. Viewing must be such as to ensure that the ship's construction, boilers and other pressure vessels and their accessories, main and papildmehānism, electrical equipment, radio installations, including those used in life saving equipment, fire protection, fire safety systems and devices, life-saving devices and systems, the ship's navigation equipment, maritime literature, pilot decision-making tools and other equipment is in satisfactory condition and fit for the planned operation and that they comply with the requirements of this regulation and the resulting laws, decrees, orders and rules issued by the administration. Lights, signs, sounds an alarm and distress signal feeding devices on board, just obey the following inspections to ensure that they comply with these rules and the international vessel collision avoidance rules at sea in force; (iii) in addition to the reviews, General or partial according to the circumstances, be carried out after a repair resulting from investigations prescribed in rule 11, or when one has done any major repairs or renovation. Viewing must be such as to ensure that the necessary repairs or renovations are effectively done that this repair and reconstruction materials and work quality in all respects satisfactory and that the ship fully complies with the Rules and the international prevention of collisions at sea in force and the requirements of the rules and the resulting laws, decrees, orders and regulations issued by the administration. (c) (i) of this provision (b) referred to in laws, decrees, orders and regulations in all respects must be such as to ensure that, from the point of view of the protection of life, the ship is valid for the type of operation for which it is intended; (ii) including, they shall determine the conditions to be met for the initial and subsequent hydraulic or other acceptable alternative in the tests to be carried out on the main and palīgkatl, connections, steam pipes, high pressure and internal combustion engine fuel tanks, including the procedure to be followed and the interval between two consecutive tests. ". 8. rule. Cargo ship life-saving appliances and other equipment inspection, existing text replaced by the following: "(a) The cargo ship, which the tonnage of 500 gross tons and over, as specified in point (b) (i), life-saving means and other equipment is subject to the inspections specified below: (i) the initial inspection before the ship is put into service; (ii) repeated the Administration's view, at intervals not exceeding 5 years, except when applicable, rule 14 (b), (e), (f) and (g) above; (iii) periodic inspection three months before or after the second cargo ship safety equipment certificates annual date, or within three months before or after the third annual cargo ship safety equipment certificate, which is one of the annual inspection, as specified in point (a) (iv); (iv) annual examination, within three months before or after each of the cargo ship safety equipment certificates annual date; (v) in addition to the view, as set out in the passenger vessel provision 7 (b) (iii) below. (b) (a) the inspections referred to in paragraph shall undertake the following: (i) the initial inspection includes fire safety systems and appliances, life-saving devices and systems, with the exception of radio equipment, navigation equipment, pilot reception and other equipment subject to II-1, II-2, III and chapter V, complete the inspection, to ensure that they comply with the requirements of this regulation, are in satisfactory condition and are valid for the type of operation for which the ship is intended. Fire control plans, maritime literature, lights, signs, sounds and distress signal means surrender like that at higher viewing with the aim of ensuring that they comply with the requirements of this regulation and when applicable-the international vessel collision prevention regulations; (ii) periodic inspections and includes (b) (i) the equipment referred to in point inspection to make sure it complies with the applicable requirements of these regulations and the international ship collision prevention rules in force are in satisfactory condition and fit for the type of operation for which the ship is intended; (iii) annual survey includes General (b) (i) above, the inspection of the equipment to ensure that they are maintained under rule 11 (a), and they still are appropriate for the type of operation for which the ship is intended. (c) (a) (ii) and (a) (iv) referred to in the periodic and annual inspections of the cargo ship safety equipment certificate. ". 9. rule. Cargo ship radio and radar equipment inspections in the title shall be replaced by the following: "cargo ship radio equipment inspection". The existing text is replaced by the following: "(a) the cargo ship radio equipment, including those that are used for life-saving appliances, covered in chapters III and IV, is subject to the following inspections: (i) the initial inspection before the ship is put into service; (ii) inspection at intervals set by the Administration, which shall not exceed five years, except where applicable, rule 14 (b), (e), (f) and (g) above; (iii) periodic inspection three months before or after each of the cargo ship safety radio certificate annual date; (iv) in addition to the view, as defined in the passenger vessel provision 7 (b) (iii) below. (b) (a) the inspections referred to in paragraph shall undertake the following: (i) the initial inspection includes the cargo ship radio equipment, including those that are used in life saving equipment, complete inspection to make sure that they comply with the requirements of this regulation; (ii) periodic inspection and include the cargo ship radio equipment, including those that are used in life-saving devices, inspection to make sure that they comply with the requirements of this regulation. (c) (a) (iii) referred to in the periodic inspection is marked cargo ship safety radio certificate. ". 10. rule. Cargo ship hull, machinery and equipment inspections in the title shall be replaced by the following: "cargo ship construction, machinery and equipment inspections". The existing text is replaced by the following: "(a) the cargo ship construction, machinery and equipment (with the exception of those entities for which it has issued a cargo ship safety equipment certificate and cargo ship safety radio certificate) specified in (b) (i) above, the following inspections are subject to: (i) the initial inspection, including the outside bottom of the inspection before the ship is put into service; (ii) repeated the Administration's view, at intervals not exceeding 5 years, except when applicable, rule 14 (b), (e), (f) and (g) above; (iii) the mid-term review within three months before or after the second cargo ship safety construction certificates annual date, or within three months before or after the third cargo ship safety construction certificates annual date occurring in any part of the annual inspection, as specified in point (a) (iv); (iv) annual inspection three months before or after each of the cargo ship safety construction certificates annual date; (v) at least two outside bottom inspections within five years, except where applicable, rule 14 (e) or (f) point. Where applicable, rule 14 (e) or (f) point, the five-year period can be extended to coincide with the extension of the certificate validity period. In all cases, the interval between any two such inspections shall not exceed 36 months; (vi) in addition, as indicated in the passenger vessel 7. provision (b) (iii) below. (b) specified in paragraph (a) inspections and inspections are made as follows: (i) the initial inspection includes full structure, mechanism and inspection of the equipment. This view must be such as to ensure that the construction of the system, the materials, the size and quality of manufacture, boilers and other pressure vessels, accessories, main and auxiliary machinery, including steering and related control systems, electrical equipment and other equipment meeting the requirements of this regulation, are in satisfactory condition and are valid for the type of operation for which the ship is intended, and that the required stability is ensured. In the case of a tanker, then it also includes pump rooms, cargo, bunkering and vent piping and related safety equipment inspection; (ii) examination include (b) (i) under section construction, machinery and equipment inspections to make sure that they comply with the requirements of this regulation, are in satisfactory condition and are valid for the type of operation for which the ship is intended; (iii) involves the construction of starpapskat, pots and other pressure vessel, machinery and equipment, the steering equipment and the related control system, electrical equipment inspections to make sure they are still valid for the type of operation for which the ship is intended. In the case of a tanker, the inspection also includes a pump room, cargo, bunkering and vent piping and associated safety equipment inspection and electrical equipment insulation resistance check dangerous areas; (iv) annual examination includes general construction, and (b) (i) the equipment specified in point inspection to ensure that they are maintained in accordance with rule 11 (a) below, and they are still valid for the type of operation for which the ship is intended; (v) the bottom of the outside inspection and inspection of units carried out at the same time, to make sure they are still valid for the type of operation for which the ship is intended; (c) (a) (iii) (a) (iv) and (a) (v) in point of interim and annual inspections and the bottom of the outside inspection of the cargo ship is selected the design of the security certificate. ". 11. rule. Maintenance after inspection of the situation existing text replaced by the following: "(a) the condition of the ship and its equipment is maintained in the order, to comply with the requirements of this regulation and to ensure that the ship remains in all respects suitable for navigation in the sea without danger to the ship and the persons themselves, lying on it. (b) After completion of the inspection of any vessel that made based on 7, 8, 9 or 10. rules, without the approval of the Administration not to make any changes to the Board structure, the constructive mechanisms, equipment and other things which are included in the examination. (c) if the accident happened by ship or a defect is discovered which affects the safety of the ship or its equipment, or other rescue equipment effectiveness or completeness, the master or owner at the earliest opportunity notify the Inspector has approved the administration or the recognised organisation responsible for issuing the relevant certificate, which launched the investigation to determine whether an inspection is required, laid down 7, 8, 9 or 10. rule. If the ship is in a port of another Contracting Government, the master or owner shall immediately notify also the port State, the institutions concerned and the approved inspector or by a recognised organisation shall ensure that this report is made. ". 12. the rule. The issue of the licence, the title shall be replaced by the following: "the issue of the certificate or approval". The existing text is replaced by the following: "(a) (i) a passenger ship safety certificate is issued after the passenger ship initial or repeat screening if it complies with the relevant, II-1 II-2, III, IV and V requirements and any other relevant requirements of this regulation; (ii) a cargo ship safety construction certificate, cargo ship is issued after the initial or repetitive inspections, if it satisfies the relevant II-1 and II-2 chapters (all except those that relate to fire safety systems and appliances and fire control plans) and any other relevant requirements of this regulation; (iii) a cargo ship safety equipment certificate, cargo ship is issued after the initial or repetitive inspections, if it satisfies the relevant II-1, II-2, III, and chapters V and any other relevant requirements of this regulation; (iv) a cargo ship safety radio certificate is issued after the initial or repeat screening of the cargo ship, which complies with the relevant requirements of chapter IV and any other relevant requirements of this regulation; (g) (1) a cargo ship safety certificate is issued after the initial or repeat screening of the cargo vessel, if it satisfies the relevant II-1, II-2, III, IV and V requirements and any other relevant requirements of this Regulation as an alternative to (a) (ii), (a) (iii) and (iv) in paragraph (a) are specified in the certificate; (2) where this section reference is made to the cargo ship safety construction certificate, cargo ship safety equipment certificate, cargo ship safety radio certificate, it refers to the cargo ship safety certificate if it is used as an alternative to these licences. (vi) the passenger ship safety certificate, cargo ship safety equipment certificate, cargo ship safety radio certificate and cargo ship safety certificate as defined in (i), (iii) and (v), supplemented by a list of the equipment; (VII) if the vessel is a derogation in accordance with the requirements of this regulation, a certificate as this exception specified in point addition of certificate; (VIII) the certificate provided for in these provisions shall be issued or certified by the administration or any of its authorized person or organization. In any case, the Administration assumes full responsibility for the certificate. (b) the Contracting Governments after the date of entry into force of this Convention in respect of the acceptance of this country does not issue certificates according to the 1960, 1948., or the 1929 International Convention for the safety of life at sea. ". 13. the rule. The issue of the licence by the Government of the other title is replaced by the following: "the issue of the certificate or approval by any other Government." The existing text is replaced by the following: "Contracting Government may, at the request of the Administration, ship inspection and, if it considers that the requirements of this regulation have been met, to issue or authorise the issue of the certificate to the ship and, when applicable, approve or authorize the vessel's certificate of approval in accordance with these rules. Each certificate issued in this way shall contain a statement certifying that it has been issued at the request of the Government of the State whose flag the ship is entitled to fly, and shall have the same effect and recognised in the same way as a certificate issued in accordance with rule 12. ". 14. the rule. The period of validity of the existing certificate, the title shall be replaced by the following: "licence limitation and expiry date". The existing text is replaced by the following: "(a) passenger ship safety certificate shall be issued with a validity period not exceeding 12 months. Cargo ship safety construction certificate, cargo ship safety equipment certificate, cargo ship safety radio certificate issued by the Administration, the deadline which shall not exceed five years. Exemption certificate shall be valid for a period not longer than the period of validity of the licence to which it relates. (b) (i) Notwithstanding the requirements of paragraph (a), if the repeated inspection completed three months before the expiry date of the existing certificate, the new certificate of completion valid from the date of the repeated inspection completed: (1) a passenger ship to date, not exceeding 12 months from the date of expiry of the existing certificate expiration date; (2) a cargo vessel to date not exceeding 5 years from the date of expiry of the existing certificate expiration date; (ii) if inspection completed after the expiry date of the existing certificate expiration date, the new licence valid from the date of the repeated inspection is completed: (1) a passenger ship to date, not exceeding 12 months from the date of expiry of the existing certificate expiration date; (2) a cargo vessel to date not exceeding 5 years from the date of expiry of the existing certificate expiration date; (iii) if inspection completed more than three months before the expiry date of the existing certificate expiration date, the new licence valid from the date of the repeated inspection completed: (1) a passenger ship to date, not exceeding 12 months from the date of completion of the repeating inspections; (2) a cargo vessel to date not exceeding 5 years from the date of the completion of the inspection again. (c) if the licence, except for the passenger ship safety certificate is issued with a validity period of less than five years, the Administration may extend the validity period of the licence after the specified expiry date to the maximum period, as referred to in points (a) to ensure that the 8, 9 and 10 in the tests laid down rules applicable in cases where the certificate is issued for a period of five years is appropriate. (d) if the inspection has been completed and a new certificate cannot be issued or delivered to the ship before the expiry date of the existing certificate, the Administration authorized person or organization can confirm the existing certificate and such a certificate is considered valid for a period not exceeding 5 months from the expiry date of the period of validity. (e) if the vessel certificate shall be valid for a period of time, the point is not in a port in which it is carried out, the Administration may extend the period of validity of the certificate but this extension only, to allow the vessel to complete the voyage to the port in which the ship's inspection, and then only in cases where it is considered correct and reasonable. The licence may be extended for a period not exceeding three months, and the ship, which has allowed an extension, entering the port, which is not the right of inspection, using this extension, leave the port without the new certificates. Upon completion of re-examination, the new certificate shall be valid for: (i) a passenger ship to date, not exceeding 12 months from the date of expiry of the existing certificate before the expiration date, the extension was allowed; (ii) a cargo vessel to date not exceeding 5 years from the date of expiry of the existing certificate before the extension of the expiry date was accepted; (f) the certificate issued to a ship engaged on short voyages which has not been extended and in accordance with the above provisions, the Administration may be extended for up to one month from the date of expiry stated expiration date. Upon completion of re-examination, the new certificate shall be valid for: (i) a passenger ship to date, not exceeding 12 months from the date of expiry of the existing certificate before the expiration date, the extension was allowed; (ii) a cargo vessel to date not exceeding 5 years from the date of expiry of the existing certificate before the expiration date, the extension was allowed. (g) special, the Administration may, in certain cases, a new certificate need not be dated from the expiry date of the existing certificate expiration date, as defined in (b) (ii), (e) or (f) point. In these special cases, the new certificate shall be valid for: (i) a passenger ship to date, not exceeding 12 months from the date of completion of the repeating inspections; (ii) a cargo vessel to date not exceeding 5 years from the date of completion of the repeating inspections; (h) If the annual or periodic reviews by starpapskat is completed before the period specified in the relevant provisions, then: (i) the annual date indicated on the certificate, must be the right to confirm a date, which shall not exceed three months from the date when the inspection was completed; (ii) next annual, starpapskat or periodic inspection required by the relevant provisions are completed following the interval that determines these rules using the new annual date. (ii) expiration expiration date may remain unchanged, ensuring as appropriate, one or more annual or periodic examinations, starpapskaš pursuit so as not to exceed the maximum interval between inspections, which specify the rules in question. (i) a certificate issued in accordance with the provisions of 12 or 13, validity is terminated in the following cases: (i) if the examination or inspection is not completed in time, which is determined by the provisions of (a) 7, 8. the provisions of paragraph (a), point (a) of rule 9 and 10 (a) of the rules; (ii) if the certificate is not approved in accordance with these rules; (iii) to re-register the ship to the flag of another State. A new certificate shall only be issued when the Government issuing the new certificate is fully satisfied that the ship complies with rule 11 (a) and (b) the requirements of paragraph 1. If the renewal is taking place between the Government and the contractors if requested within three months after the renewal of the Government whose flag the ship previously drove as quickly as possible, transmit to the Administration Board, copies of the certificates that ship was before renewal, and, if possible, the screening copy of messages. ". 15. the rule. Certificate form the title shall be replaced by the following: "licence forms and description of equipment". The existing text is replaced by the following: "licence and equipment descriptions are developed in a manner consistent with the Convention's Appendix dot patterns. If the language used is neither English nor French, the text must include a translation into one of those languages. ". 16. the rule. Access to licence the title shall be replaced by the following: "the availability of the certificate". The existing text is replaced by the following: "licence, issued in accordance with rule 12 and 13 must be permanent and easily accessible for inspection on the ship at any time.". 19. rule. Control the existing text replaced by the following: "(a) each ship which is in the port of another Contracting Government, obey the control carried out by the officials, which is duly authorized in such a Government the extent to control confirm that certificate, issued in accordance with the provisions of 12 or 13, is valid. (b) such certificate, if it is valid, recognised, unless there are clear grounds for believing that the condition of a ship or its equipment does not correspond to the essence of a message or provided in the certificate that the vessel and its equipment does not comply with rule 11 (a) and (b) the provisions of paragraph 1. (c) (b) in the cases referred to in paragraph 1 or, if the certificate has expired, or it has lost validity, the CSO control, measures must be taken to ensure that the ship shall not sail until it can proceed to sea or leave the port with the aim to go to the ship repair yard without endangering the ship itself or the person who sits on it. (d) if the control causes any type of intervention, the officer carrying out the control, in writing, immediately inform the Consul, or in his absence the nearest of the State whose flag the ship is entitled to fly, the diplomatic representative of all factors why intervention was deemed necessary. In addition inform the inspectors approved or recognised organisations responsible for the issue of the certificate. On the intervention of the facts reported to the organization. (e) in addition to (d) the persons referred to in paragraph 1 the authorities of the port State shall notify the next entry into the port authority bodies all relevant information about vessels, if the Government fails to take action, as defined in (c) and (d), or if a ship to go to the next entry into the port. (f) carrying out controls in accordance with this provision, to make all possible efforts to avoid a ship being unduly detained or delayed. If a ship is unduly detained or delayed, it is entitled to compensation for any loss or damage. "
Addition to the 1974 International Convention for the safety of life at sea Appendix amended and supplemented the passenger ship safety certificate, cargo ship safety construction certificates, cargo ship safety equipment certificates, cargo ship safety certificate, telegraphy cargo ship safety radiotelephony certificate and certificate of exceptions in the current form in the appendix to the Convention replaced with such certificates and equipment description of shapes.
Passenger ship safety CERTIFICATE FORM of passenger ship safety certificate This certificate supplement description of equipment (form P) (official seal) (country) jebkuram1 — — — — — international flight brief issued in accordance with the 1974 International Convention for the safety of life at sea requirements, as amended by the Protocol of 1988............................................................. "on behalf of the Government of (name of country) … … … … … … … … … … … … … … … … … … … …. (authorized officer or organization) News on kuģi2 name............................................................. " Identification number or letters … … … … … … … … … … … … … … … … … … … …. Pieraksta osta ............................................................. Bruto tonnāža ............................................................. The shipping area to which the ship is entitled to use (IV/2) … … … … … … … … … … … … … … … … … … … …. IMO numurs3............................................................. Wedge fitting date or when the vessel was similar in construction stage or when applicable,-the date on which the relevant conversion or start reconstruction or modification … … … … … … … … … … … … … … … … … … … …. This is to certify that: 1. the ship is tested according to the provisions of the Convention I/7 requirements. 2. the inspection found that: 2.1 the ship complies with the requirements of the Convention with regard to: 2.1.1. the structure, main and auxiliary machinery, boilers and other pressure vessels; 2.1.2. the subdivision of the impervious systems and components; 2.1.3. the following subdivision load lines assigned and marked: subdivision load line on the side of the ship to mideļ (II-1/13) above applies, if the side rooms that carry passengers, includes the following alternative spaces C. 1.................................... " C.2 .................. .................. C.3 .................. .................. 2.2. the ship complies with the requirements of the Convention, relating to structural fire protection, fire safety systems and appliances and fire control plans; 2.3. the life saving appliances and the equipment of lifeboats, rafts and rescue boats have been provided in accordance with the requirements of the Convention; 2.4. the ship is equipped with a cableway into the devices and radio installations used in life-saving products in accordance with the requirements of the Convention; 2.5. the ship complies with the requirements of the Convention regarding radio equipment; 2.6. life-saving devices functioning radio equipment used meets the requirements of the Convention; 2.7. the ship complies with the requirements of the Convention regarding the ship's navigation equipment, pilot acceptance equipment and maritime literature; 2.8. the ship is equipped with lights, signs, sounds and distress signal notification devices in accordance with the requirements of the Convention and existing international vessel collision prevention regulations; 2.9. in all other respects the ship complies with the relevant requirements of the Convention. 3. no izsniegta4 Issued/exception certificate. This certificate is valid until … … … … … … … … … … … … … … … … … … … … … … … … ….
Izdota.......................................................................... (Place of issue of the licence).............................................................................. " Issue date signature of authorized official issuing the licence (Izdevējinstitūcij-seal or stamp, if necessary) approval that the examination has been completed and applicable I/14 (d) rule the ship complies with the relevant requirements of the Convention and this licence in accordance with the provisions of the Convention (I)/14 (d) of the rules, shall be deemed valid until................................. "


Paraksts................................................. (Signature of authorized official)
Vieta.......................................................
Datums...................................................


(Seal or stamp of Izdevējinstitūcij, as needed) Endorsement to extend the validity period of the certificate to the inspection port to achieve or to time according to the I/14 (e) and (I)/14 (f) the provisions of this licence in accordance with the provisions of the Convention (I)/14 (e) and (f) I/14 5 rules deemed valid until............................................................... "


Paraksts:................................................ (Signature of authorized official)
Vieta:......................................................
Datums:..................................................


(Seal or stamp of Izdevējinstitūcij, as needed)
Equipment description the passenger ship safety certificate (FORM P) this description should be permanently connected to a passenger ship safety certificate in compliance with the description of the EQUIPMENT to the 1974 International Convention for the safety of life at sea, as amended by the Protocol of 1988 1. Details of the vessel vessel name........................................................................... " Identification number or letters … … …. …. …. …. …. …. …. …. …. …. …. …. …. …. …. …. …. The number of passengers allowed........................................................................... " The minimum number of persons necessary qualifications radio facilities … … … … … …. 2. details of life-saving appliances 1. total number of persons which are provided with life-saving devices. Left side right side 2. Lifeboat the total number … … … … … … … … … …. 2.1. total number of persons which they can pick up … … … … … … … … … …. 2.2. partially closed lifeboat (III/42 rule) … … … … … … … … … …. 2.3. the Self-righting partially enclosed lifeboats (regulation III/43) … … … … … … … … … …. 2.4. Totally enclosed lifeboats (regulation III/44) … … … … … … … … … …. 2.5. other lifeboats............... " .................. 2.5.1. Skaits ............... .................. 2.5.2. Tips ............... .................. 3. With the engine fitted to the rescue boat (included in the above total number of lifeboats)........................ " 3.1. the search lights equipped lifeboat........................ " 4. Rescue boat........................ " 4.1. number of Boats which are included in the above survival........................ " 5. Life-raft …. …. …. …. …. …. 5.1. The number, which is required for approved launching appliances........................ " 5.1.1. Liferaft........................ " 5.1.2. the number of persons, that they can admit it........................ " 5.2. The numbers, which do not require approved launching appliances........................ " 5.2.1. Liferaft........................ " 5.2.2. the number of persons, that they can admit it........................ " 6. Floating AIDS........................ " 6.1. the apparatus number........................ " 6.2. The number of persons, that they are able to keep …. …. …. …. …. …. 7. number of lifebuoys........................ " 8. Life jacket........................ " 9. Hidrokostīm........................ " 9.1. Total number........................ " 9.2. number of Costumes, which correspond to the lifejacket requirements........................ " 10. Heat-capable assistants6 features … … … … … … …. 11. the life-saving devices using radio equipment........................ " 11.1. Radar the defendant........................ " 11.2. VHF radio telephone bilateral communication apparatus........................ " 3. details of radio equipment Subject to actual security 1. Primary system … … … … … …. 1.1. VHF radio equipment..................... " 1.1.1. The digital selective calling (DSC) decryptor..................... " 1.1.2. Digital selective calling (DSC) officer on the tray … … … … … …. 1.1.3. Radiotelefoniekārt..................... " 1.2. VV radio equipment..................... " 1.2.1. Digital selective calling (DSC) decryptor..................... " 1.2.2. Digital selective calling (DSC) officer on the tray … … … … … …. 1.2.3. Radiotelefoniekārt..................... " 1.3. VV/ARRAY radio equipment..................... " 1.3.1. Digital selective calling (DSC) decryptor..................... " 1.3.2. Digital selective calling (DSC) officer on the tray … … … … … …. 1.3.3. Radiotelefoniekārt..................... " 1.3.4. Direct print radiotelegraph. …. …. …. …. …. 1.4. Inmarsat ship sauzem station … … … … … …. 2. Secondary alarm notification features..................... " 3. Maritime safety information service iekāt … … … … … …. 3.1. NAVTEX receiver..................... " 3.2. The enhanced group call (EGC) receiver..................... " 3.3. ARRAY direct-print radioteleks..................... " 4. Or moon … … … … … …. 4.1.-SARSAT COSP..................... " 4.2. Inmarsat ... ... ... ... ... ... ... 5. VHF or..................... " 6. The ship's radar, the defendant … … … … … …. 7. radiotelephone distress 2.182 kHz fekvenc officer of the uztvērējs7 … … … … … …. 8. the device's radio telephone alarm signal rejection of 2.182 kHz frekvencē8..................... " 4. The methods used to ensure availability of radio equipment (IV/15.6 and 15.7) 4.1 backup Equipment … … … … … … … … … … … … … … … … … … … … … … …. 4.2. maintenance....................................................................... " 4.3. Engineering options............................................... " 5. before 1 February 1995 built vessels which do not comply with all applicable to the 1988 Convention as amended by the Protocol of its notification (9) the provisions of chapter IV of the actual security requirements Operator guard hours................................. " Operator number … … … … … … … … … …. Is or is not equipped with an automatic alarm signal … … … … … … … … … …. The actual provisions of security is or is not equipped with main equipment … … … … … … … … … …. is or is not equipped with a spare equipment … … … … … … … …. …. …. or the main and backup transmitter are electrically separated or combined. …. …. …. …. …. …. …. …. 6. Ships which are built up to February 1, 1992, and which do not fully comply with the 1988 Protocol III of the Convention, as amended by chapter. 10 actual support lifeboat radiotelegraph installation........................ " Survival means a portable radio........................ " Survival means EPIRB (121.5 MHz and 243.0 MHz) …. …. …. …. …. …. Bilateral communications radiotelephone apparatus........................ " This is to certify that this description is completely accurate.
Izsniegts....................................................................... ............................................................. (Description of place of issue) (Date of issue) (Signature of duly authorized official issuing the description) (Seal or stamp of Izdevējinstitūcij, as needed)
Cargo ship safety construction CERTIFICATE in the FORM of the cargo ship safety construction certificate (official seal) (country) issued in accordance with the 1974 International Convention for the safety of life at sea, as amended by the Protocol of 1988 rules............................................................. "on behalf of the Government of (name of country) … … … … … … … … … … … … … … … … … … … …. (authorized person or organization) News on kuģi11 name............................................................. " Identification number or letters … … … … … … … … … … … … … … … … … … … …. Pieraksta osta ............................................................. Bruto tilpība ............................................................. The ship dedveit (metric tonnes) 12............................................................. " IMO numurs13 ............................................................. Ship tips14 oil tanker chemical tanker freight Gāzvedēj any other cargo ship except above the wedge fitting date or the date on which the ship was similar in construction, or when applicable,-the date on which the relevant conversion or start reconstruction or modification … … … … … … … … … … … … … … … … … … … …. This is to certify: 1. that the ship has been inspected according to the provisions of the Convention I/10. 2. The results of the inspection found that the construction, machinery and equipment, as defined in the provisions mentioned above, is satisfactory and that the ship complies with the Convention II-1 and II-2 of the relevant requirements of chapter (except those requirements pertaining to fire safety systems and tools, and fire control plans). 3. The two last external vessel bottom inspections took place. .......................................................un....................... (date) 4. That no derogation issued/izsniegta15 certificate. This certificate is valid until … … … … … … … … … …. 16 provided that the annual external bottom part of ship inspection, starpapskat and verification in accordance with regulation I/10 of the Convention.
Izsniegta....................................................................... (Place of issue of the licence).............................................................................. " (Date of issue) (Authorised officials, issuing certificates, signature) (Institutions that issued the certificate, seal or stamp, if needed)
ANNUAL inspections and approval of STARPAPSKAT this is to certify that the inspection carried out as laid down in the provisions of the Convention (I)/10, found that the ship complies with the relevant requirements of the Convention. Annual inspection: signature … … … … … … … … … … … … … … … … … …. (Signature of authorized official)
Vieta...............................................
Datums...............................................



(Seal or stamp of the Authority, as necessary) Annual/Starpapskate17 Signature … … … … … … … … … … … … … … … … … …. (Signature of authorized official)
Vieta...............................................
Datums............................................... (Seal or stamp of the Authority, as necessary)



Annual/Starpapskate18 Signature … … … … … … … … … … … … … … … … … …. (Signature of authorized official)
Vieta...............................................
Datums............................................... (Seal or stamp of the Authority, as necessary) Annual inspection signature … … … … … … … … … … … … … … … … … …. (Signature of authorized official)
Vieta...................................................
Datums...............................................



(Seal or stamp of the Authority, as necessary)
ANNUAL inspection/STARPAPSKAT under (I)/14 (h) (iii) of the REGULATIONS is hereby certified that the annual reviews/starpapskati19 according to the Convention I/14 (h) (iii) the rules, found that the ship complies with the relevant requirements of the Convention.




Paraksts....................................................... (Signature of authorized official)
Vieta...................................................
Datums...............................................




(Seal or stamp of the Authority, as necessary) The outer VESSEL bottom inspections APSTIPRINĀJUMS20 this is to certify that I/10 rules of the Convention required inspection found that the ship complies with the relevant requirements of the Convention. First test: signature … … … … … … … … … … … … … … …. (Signature of authorized official)
Vieta...................................................
Datums...............................................




(Seal or stamp of the Authority, as necessary) Second test: signature … … … … … … … … … … … … … … … … … …. (Signature of authorized official)
Vieta...................................................
Datums...............................................



(Seal or stamp of the Authority, as necessary) Approval to extend the period of validity of the certificate, if it is less than 5 years if not applicable I/14 (c). Craft comply with the essential requirements of the Convention and this licence in accordance with the provisions of the Convention (I)/14 (c), the provisions are valid until...................................... "




Paraksts....................................................... (Signature of authorized official)
Vieta...................................................
Datums...............................................




(Seal or stamp of the Authority, as necessary) Confirmation if you have repeated inspection and is applicable I/14 (d) rule. Craft comply with the essential requirements of the Convention and this licence in accordance with the provisions of the Convention (I)/14 (d) rule is valid until......................................... "




Paraksts....................................................... (Signature of authorized official)
Vieta...................................................
Datums...............................................




(Seal or stamp of the Authority, as necessary) Approval to extend the period of validity of the certificate to the port where the viewing is carried out, or on the relief period where applicable I/14 (e) or (f) I/14. This certificate shall, in accordance with the provisions of the Convention (I)/14 (e)/(I)/14 (f) 21 provisions are valid until............................................................................ "




Paraksts....................................................... (Signature of authorized official)
Vieta...................................................
Datums...............................................




(Seal or stamp of the Authority, as necessary) Approval of the annual date changes when applicable I/14 (h) rules. In accordance with the provisions of the Convention (I)/14 (h) of the rules, the new annual date is................... "




Paraksts....................................................... (Signature of authorized official)
Vieta...................................................
Datums...............................................




(Seal or stamp of the Authority, as necessary) In accordance with the provisions of the Convention (I)/14 (h) of the rules of the new annual date is.......... "




Paraksts....................................................... (Signature of authorized official)
Vieta...................................................
Datums...............................................




(Seal or stamp of the Authority, as necessary)
Cargo ship safety equipment certificate FORM a cargo ship safety equipment certificate the certificate must be accompanied by a list of equipment (form E) (official seal) (country) issued in accordance with the 1974 International Convention for the safety of life at sea requirements, as amended by the Protocol of 1988............................................................. "on behalf of the Government of (name of country) …. …. …. …. …. …. …. …. …. …. …. …. …. …. …. …. …. …. …. …. …. …. …. …. …. …. …. …. … … …. (authorized person or organization) Details of the Ship's name is kuģi22............................................................. " Identification number or letters … … … … … … … … … … … … … … … … … … … …. Pieraksta osta ............................................................. Bruto tilpība ............................................................. The ship dedveit (metric tonnes) 23............................................................. " The length of the vessel (III/3.10)............................................................. " IMO numurs24 ............................................................. The ship's tips25 oil tanker chemical tanker freight Gāzvedēj any other cargo ship except above the wedge fitting date or the date on which the ship was similar in construction stage or when applicable-the date on which the relevant conversion or start reconstruction or modification … … … … … … … … … … … … … … … … … … … …. This is to certify: 1. The ship is tested according to the provisions of the Convention I/8. 2. Viewing results found that: 2.1 the ship complies with the requirements of the Convention regarding fire safety systems and appliances and fire control plans; 2.2. the life-saving devices and life-saving boat, raft and rescue boat equipment provided in accordance with the requirements of the Convention; 2.3. the ship is equipped with a cable into the device and radio equipment used rescue products in accordance with the requirements of the Convention; 2.4. the ship complies with the requirements of the Convention regarding the ship's navigation equipment, pilot reception and navigation publications; 2.5. the ship is equipped with lights, signs, sound signals and distress signals passing products in accordance with the requirements of the Convention and existing international regulations for prevention of collisions at sea; 2.6. It follows from all of the other aspects of the ship complies with the essential requirements of the Convention. 3. Ship operating under the rules of certain lll/26.1.1.1. marketing area. 4. Was/is not the exclusive licence tika26 issued. This certificate is valid until … … … … … … … … …. 27 provided that annual inspections are made and starpapskat, in accordance with the provisions of the Convention I/8.
Izsniegta....................................................................... (Place of issue of the licence).............................................................................. " (Date of issue) (Signature of Authorised official issuing the certificate) (Seal or stamp of the Authority, as necessary) Annual and PERIODIC inspection approval this is to certify that, in the examination, as required by regulation I/8 of the Convention, found that the ship complies with the relevant requirements of the Convention. Annual inspection: signature … … … … … … … … … … … … … … … … … …. (Signature of authorized official)
Vieta...................................................
Datums...............................................



(Seal or stamp of the Authority, as necessary) Annual/periodic inspection: signature 28....................................................... " (Signature of authorized official)
Vieta...................................................
Datums...............................................



(Seal or stamp of the Authority, as necessary) Annual/Periodiskā29 viewing: signature … … … … … … … … … … … … … … … … … …. (Signature of authorized official)
Vieta...................................................
Datums...............................................



(Seal or stamp of the Authority, as necessary) Annual inspection: signature … … … … … … … … … … … … … … … … … …. (Signature of authorized official)
Vieta...................................................
Datums...............................................



(Seal or stamp of the Authority, as necessary) Annual/PERIODIC inspection in accordance with (I)/14 (h) (iii) of the REGULATIONS is hereby certified that the annual/periodisko30 examination in accordance with the provisions of the Convention (I)/14 (h) (iii) the rules, found that the ship complies with the relevant requirements of the Convention.




Paraksts....................................................... (Signature of authorized official)
Vieta...................................................
Datums...............................................



(Seal or stamp of the Authority, as necessary) Approval to extend the period of validity of the certificate, which is less than 5 years, if applicable (I)/14 (c). Craft comply with the essential requirements of the Convention, and this certificate shall, in accordance with the Convention (I)/14 (c) of the regulations is valid until … … … … … … … … … … … … … ….




Paraksts....................................................... (Signature of authorized official)
Vieta...................................................
Datums...............................................



(Seal or stamp of the Authority, as necessary) Confirmation that has made repeated inspection, if applicable (I)/14 (d) rule. Craft comply with the essential requirements of the Convention, and this certificate shall, in accordance with the Convention (I)/14 (d) of the regulations is valid until … … … … … … … … … … … … … ….




Paraksts....................................................... (The officials authorised paraksts)
Vieta...................................................
Datums...............................................



(Seal or stamp of the Authority, as necessary) Approval to extend the period of validity of the licence until you reach port, you need to review, or to the period of grace, if applicable (I)/14 (e) or (f) I/14. This certificate shall, in accordance with the Convention's annex I/14 (e)/(I)/14 (f) of the rules of 31 is valid until … … … … … … … … … … … … … … … … … … … … … … … … ….




Paraksts....................................................... (Signature of authorized official)
Vieta...................................................
Datums...............................................



(Seal or stamp of the Authority, as necessary) Approval of the annual date changes, if applicable (I)/14 (h) rules. In accordance with the provisions of the Convention (I)/14 (h) of the rules of the new annual date is............................................................. "




Paraksts....................................................... (Signature of authorized official)
Vieta...................................................
Datums...............................................



(Seal or stamp of the Authority, as necessary) In accordance with the provisions of the Convention (I)/14 (h) of the rules of the new annual date is............................................................. "




Paraksts....................................................... (Signature of authorized official)
Vieta...................................................
Datums...............................................



(Seal or stamp of the Authority, as necessary)
LIST of equipment of the cargo ship safety EQUIPMENT certificate (E FORM) this list is constantly added to the cargo ship safety equipment certificate. List of the equipment according to the 1974 International Convention for the safety of life at sea, as amended by the Protocol of 1988 1. details of the ships name.............................................................................................................................. " Identification number or letters … … … … … … … … … … … … … … … … … … … …. 2. a description of the life-saving appliances 1. the total number of people provided with rescue devices................ " Left side right side 2. total number of lifeboat 2.1. the total number of people provided with them partially closed 2.2, pašiztaisnojošo in the lifeboat (III/43 rule). 2.3. Totally enclosed lifeboats (regulation III/44). 2.4. number of lifeboat with self-contained air supply system (III/45 rules). 2.5. Fire rescue boat (rule III/46). 2.6. other lifeboat number 2.6.2 2.6.1. Type 2.7. number of lifeboat, which is lowered to the free fall method 2.7.1. Completely closed (lll/44 rule) 2.7.2. With a separate air supply (lll/45 rules) 2.7.3. Fire (lll/46 rule) 3. Rescue boat (includes the above mentioned number of lifeboat) 3.1 With projectors equipped lifeboat number 4. Savior boat number 4.1 number of Boat that is part of the above total number of rescue boats rescue rafts 5.5.1. Liferaft that require approved launching appliances for survival craft number 5.1.1 5.1.2 number of persons with them are provided 5.2. Rescue rafts, which do not require the approved launching appliance 5.2.1. number of liferaft 5.2.2 number of persons that are provided with the 5.3 number of liferaft, which requires lll/rule No 6 26.1.4. number of lifebuoys 7. Lifejacket number 8. Hidrotermokostīm total number of 8.1 8.2. number of Costumes that meet the requirements put rescue jackets 9. skaits32 10. Siltumsaglabājoš means Saving products used radio equipment 10.1. number of defendants radar VHF duplex communication 10.2. radio telephone apparatus number 3. ships which are built up to February 1, 1992, and which do not fully comply with the 1988 Convention, as amended by chapter III of the actual security prasībām33 Telegraphy equipment, survival craft portable radio apparatus means survival of the ship's emergency radio buoys, survival means (121.5 MHz and 243 MHz) two-way radiotelephone communications apparatus is hereby certified that this list from all of the opinions is correct.
Izsniegts....................................................................... (Saraksta izsniegšanas vieta) ....................................... ................................................................. (Date of issue) (Signature of the official Authorized to issue list) (Seal or stamp of Izdevējinstitūcij, as needed)
Cargo ship safety radio certificate FORM a cargo ship safety radio certificate this certificate must be added to the list of equipment (form R) (official seal) (country) issued in accordance with the 1974 International Convention for the safety of life at sea requirements, as amended by the Protocol of 1988............................................................. "on behalf of the Government of (name of country) …. …. …. …. …. …. …. …. …. …. …. …. …. …. …. …. …. …. …. …. …. …. …. …. …. …. …. …. … … …. (authorized person or organization) Details of the Ship's name is kuģi34............................................................. " Identification number or letters … … … … … … … … … … … … … … … … … … … …. Pieraksta osta ............................................................. Bruto tilpība ............................................................. The shipping area in which the ship is entitled to take action (IV/2) … … … … … … … … … … … … … … … … … … … …. IMO numurs35............................................................. Wedge fitting date or the date on which the ship was similar in construction or when it is applicable, the date on which the relevant conversion or start reconstruction or modification … … … … … … … … … … … … … … … … … … … …. This is to certify: 1. The ship is tested according to the provisions of the Convention I/9. 2. The inspection found that: 2.1 the ship complies with the requirements of the Convention regarding radio equipment; 2.2. the rescue operation of radio equipment to be used in the media meets the requirements of the Convention; 3. no izsniegta36 Issued/exception certificate. This certificate is valid until … … … … … … … … …. 37 on the condition that you will make periodic inspections in accordance with the provisions of the Convention I/9.
Izsniegta....................................................................... (Apliecības izsniegšanas vieta) ............................................ ................................................................. (Date of issue) (Authorized Officer issuing a certificate signature) (Institutions that issued the certificate, seal or stamp, if needed) PERIODIC inspection approval this is to certify that in accordance with the provisions of the Convention I/9, found that the ship complies with the relevant requirements of the Convention. Periodic inspection: signature … … … … … … … … … … … … … … … … … …. (Signature of authorized official)
Vieta...................................................
Datums...............................................



(Seal or stamp of the Authority, as necessary) Periodic inspection: signature … … … … … … … … … … … … … … … … … …. (Signature of authorized official)
Vieta...................................................
Datums...............................................



(Seal or stamp of the Authority, as necessary) Periodic inspection: signature … … … … … … … … … … … … … … … … … …. (Signature of authorized official)
Vieta...................................................
Datums...............................................



(Seal or stamp of the Authority, as necessary) Periodic inspection: signature … … … … … … … … … … … … … … … … … …. (Signature of authorized official)
Vieta...................................................
Datums...............................................



(Seal or stamp of the Authority, as necessary) The periodic inspection in accordance with (I)/14 (h) (iii) the provisions of this is to certify that, through periodic inspection in accordance with Annex I of the Convention/14 (h) (iii) the rules, found that the ship complies with the relevant requirements of the Convention.




Paraksts....................................................... (Signature of authorized official)
Vieta...................................................
Datums...............................................



(Seal or stamp of the Authority, as necessary) Approval to extend the term of the licence, the period of validity of less than 5 years, if applicable (I)/14 (c). Craft comply with the essential requirements of the Convention and this licence in accordance with the provisions of the Convention (I)/14 (c) of the regulations is valid until … … … … … … … … … … … … … ….




Paraksts....................................................... (Signature of authorized official)
Vieta...................................................
Datums...............................................



(Seal or stamp of the Authority, as necessary) If the approval is made to view and apply I/14 (d) rule. Craft comply with the essential requirements of the Convention and this licence in accordance with the provisions of the Convention (I)/14 (d) of the regulations is valid until......................................... "




Paraksts....................................................... (Signature of authorized official)
Vieta...................................................
Datums...............................................



(Seal or stamp of the Authority, as necessary) Approval to extend the period of validity of the licence until you reach port, you need to review, or to a period of grace where I/14 (e) or (f) I/14. This certificate shall, in accordance with the Convention's annex I/14 (e)/(I)/14 (f) of the rules are valid until 38............................................................................ "




Paraksts....................................................... (Signature of authorized official)
Vieta...................................................
Datums...............................................



(Seal or stamp of the Authority, as necessary) Approval of the annual date changes, if applicable (I)/14 (h) rules. In accordance with the provisions of the Convention (I)/14 (h) of the rules of the new annual date is............................................................. "




Paraksts....................................................... (Signature of authorized official)
Vieta...................................................
Datums...............................................



(Seal or stamp of the Authority, as necessary) In accordance with the provisions of the Convention (I)/14 (h) of the rules of the new annual date is............................................................. "




Paraksts....................................................... (Signature of authorized official)
Vieta...................................................
Datums...............................................



(Seal or stamp of the Authority, as necessary)
Cargo ship safety radio certificate equipment list (FORM R) this list is permanently attached to the cargo ship safety radio certificate. Radio equipment list according to the 1974 International Convention for the safety of life at sea, as amended by the Protocol of 1988 1. details of the ships name............................................................. " Identification number or letters … … … … … … … … … … … … … … … … … … … …. The minimum number of persons having the qualifications needed to work with radio equipment … … … … … … … … … … … … … … … … … … … …. 2. Radio equipment description the name of the actual security system 1 primary 1.1. VHF radio station 1.1.1. selective use of Digital decoder 1.1.2. Digital dežūruztvērēj is a selective use of Radiotelephony equipment 1.1.3.1.2. VV Radio 1.2.1. Digital selective use decryptor 1.2.2. Digital dežūruztvērēj is a selective use of Radiotelephony equipment 1.3 1.2.3. VV/ARRAY Radio 1.3.1. Digital selective use decryptor 1.3.2. Digital dežūruztvērēj is a selective use of Radiotelephony equipment 1.3.3 1.3.4. Direct print radiotelegraph equipment 1.4. Inmarsat ship earth station equipment 2 alarm signal device 3 rejection of maritime safety information reception of NAVTEX Receiver 3.1 3.2 PG (enhanced group call) receiver 3.3. direct ARRAY output tray 4 or radiotelegraph attendant COSP-SARSAT 4.1 4.2. Inmarsat 5. VHF or radar vessel 6. defendant 7. Radiotelephone alarm the dežūruztvērēj kHz39 frequency 2.182 8. Equipment radiotelephone alarm signal of rejection of the 2.182 kHz frekvencē40 3. Radioaprīkojum access methods (IV/15.6 and 15.7): 3.1 equipment backup 3.2 maintenance 3.3 ashore for maintenance support of 4 ships at sea. built before 1 February 1995, which does not meet all of the 1988 Protocol to the Convention, part IV, as amended by the applicable prasībām41 4.1. Vessels shall be fitted with a radiotelegraph equipment according to 1992. February 1, the existing Convention. The actual provisions of security guard hours Operator the Operator is or is not equipped with an automatic alarm notification device Is or is not equipped with the main equipment Is or is not equipped with a spare and replacement of equipment or the main electrical characteristics are separated or combined 4.2 vessels must be equipped with a radiotelephone installation in accordance with the 1992 until February 1, the existing Convention. The actual provisions of security guard hours a number of Operator it is hereby certified that this description is completely accurate.
Izsniegta....................................................................... (Apliecības izsniegšanas vieta) ......................................... ................................................................. (Date of issue) (Duly authorized official issuing the certificate signature) (Seal or stamp of Izdevējinstitūcij, as needed) Cargo ship safety certificate FORM a cargo ship safety certificate This Certificate shall be supplemented by a list of equipment (form C) (official seal) (country) issued in accordance with the 1974 International Convention for the safety of life at sea, as amended by the Protocol of 1988............................................................. "on behalf of the Government of (name of country) … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … …. (authorized person or organization) Details of the Ship's name is kuģi42............................................................. " Identification number or letters … … … … … … … … … … … … … … … … … … … …. Pieraksta osta ............................................................. Bruto tilpība ............................................................. The ship dedveit (metric tonnes) 43............................................................. " The length of the vessel (III/3.10 rule)............................................................. " The shipping area to which the ship is entitled to use (IV/2noteikum) … … … … … … … … … … … … … … … … … … … …. IMO numurs44............................................................. Ķuģ a tips45 oil tanker chemical tanker freight Gāzvedēj any other cargo ship except above the wedge fitting date or the date on which the ship was similar in construction stage or when applicable,-the date on which the relevant conversion or start reconstruction or modification … … … … … … … … … … … … … … … … … … … …. This is to certify: 1. The vessel is inspected in accordance with Convention, I/I/8 and 9/10 rules I. 2. Viewing results found that: 2.1 the construction, machinery and equipment, as defined in the regulations, I/10 is satisfactory and meets the Convention II-1 and II-2 of the essential requirements of chapter (except those requirements pertaining to fire safety systems and appliances and fire control plans); 2.2. the last two vessels in the lower portion of the outer check happened.............................................................................. " (date) 2.3. ship complies with the requirements of the Convention regarding fire safety systems and appliances and fire control plans; 2.4. rescue equipment and rescue boat, raft and rescue boat equipment is secured in accordance with the requirements of the Convention; 2.5. the ship is secured with rope and throw radio equipment used rescue equipment in accordance with the requirements of the Convention; 2.6. the ship complies with the requirements of the Convention regarding radio equipment; 2.7. the rescue operation of radio equipment to be used in the media meets the requirements of the Convention; 2.8. the ship complies with the requirements of the Convention regarding the ship's navigation equipment, pilot reception and navigation publications; 2.9. the ship is equipped with lights, signs, sound signals and distress signals passing products in accordance with the requirements of the Convention and the existing Starptaautisk rules for the prevention of collisions at sea; 2.10. the vessel fully complies with the relevant requirements of the Convention. 3. Ship operating under the rules of certain 26.1.1.1. lll/commercial district. 4. Was/is not the exclusive licence tika46 issued. This certificate is valid until … … … … … … … … …. 47 on condition that you will make annual inspections, and periodic starpapskat external vessel bottom inspections and checks in accordance with Annex I of the Convention/8, 9 and 10 I/I/.
Izsniegta....................................................................... (Apliecības izsniegšanas vieta) ......................................... .............................................................. (Date of issue) (Authorised officials issuing the certificate signature) (Seal or stamp of Izdevējinstitūcij, as needed) the certificate referred to in paragraph 2.1 of the construction, machinery and equipment, ANNUAL inspections and approval of STARPAPSKAT this is to certify that, in the examination, as required by regulation I/10 of the Convention, found that the ship complies with the relevant requirements of the Convention. Annual inspection signature … … … … … … … … … … … … … … … … … …. (The officials authorised paraksts)
Vieta...................................................
Datums...............................................



(Seal or stamp of the Authority, as necessary) Annual inspection/Starpapskate48 signature … … … … … … … … … … … … … … … … … …. (Signature of authorized official)
Vieta...................................................
Datums...............................................



(Seal or stamp of the Authority, as necessary) Annual inspection/Starpapskate49 signature … … … … … … … … … … … … … … … … … …. (Signature of authorized official)
Vieta...................................................
Datums...............................................



(Seal or stamp of the Authority, as necessary) Annual inspection signature … … … … … … … … … … … … … … … … … …. (Signature of authorized official)
Vieta...................................................
Datums...............................................



(Seal or stamp of the Authority, as necessary) ANNUAL inspection/STARPAPSKAT under (I)/14 (h) (iii) of the REGULATIONS is hereby certified that the annual reviews/starpapskati50 according to the Convention and I/I/10 14 (h) (iii) the rules, found that the ship complies with the relevant requirements of the Convention.



Paraksts....................................................... (Signature of authorized official)
Vieta...................................................
Datums...............................................



(Seal or stamp of the Authority, as necessary) The outer VESSEL bottom inspections APSTIPRINĀJUMS51 this is to certify that, when carrying out an inspection under the provisions of the Convention (I)/10, found that the ship complies with the relevant requirements of the Convention. First test: signature … … … … … … … … … … … … … … … … … …. (Signature of authorized official)
Vieta...................................................
Datums...............................................



(Seal or stamp of the Authority, as necessary) Second test: signature … … … … … … … … … … … … … … … … … …. (Signature of authorized official)
Vieta...................................................
Datums...............................................



(Seal or stamp of the Authority, as necessary) this card 2.3., 2.4., 2.5., 2.8 and 2.9, paragraph rescue devices and other equipment to the annual and PERIODIC inspection approval this is to certify that, in the view according to the provisions of the Convention I/8, found that the ship complies with the relevant requirements of the Convention. Annual inspection: signature … … … … … … … … … … … … … … … … … …. (Signature of authorized official)
Vieta...................................................
Datums...............................................


(Seal or stamp of the Authority, as necessary) Annual/Periodiskā52 viewing: signature … … … … … … … … … … … … … … … … … …. (Signature of authorized official)
Vieta...................................................
Datums...............................................


(Seal or stamp of the Authority, as necessary) Annual/Periodiskā53 viewing: signature … … … … … … … … … … … … … … … … … …. (Signature of authorized official)
Vieta...................................................
Datums...............................................


(Seal or stamp of the Authority, as necessary) Annual inspection: signature … … … … … … … … … … … … … … … … … …. (Signature of authorized official)
Vieta...................................................
Datums...............................................


(Seal or stamp of the Authority, as necessary) Annual/PERIODIC inspection according to 1/14 (h) (iii) of the REGULATIONS is hereby certified that the annual/periodisko54 view matching conventions I/8 and I/14 (h) (iii) the rules, found that the ship complies with the relevant requirements of the Convention.



Paraksts....................................................... (Signature of authorized official)
Vieta...................................................
Datums...............................................


(Seal or stamp of the Authority, as necessary) these cards 2.6 and 2.7 above radio EQUIPMENT in periodic inspection approval this is to certify that, in the view according to the provisions of the Convention I/9, found that the ship complies with the relevant requirements of the Convention. Periodic inspection: signature … … … … … … … … … … … … … … … … … …. (Signature of authorized official)
Vieta...................................................
Datums...............................................


(Seal or stamp of the Authority, as necessary) Periodic inspection: signature … … … … … … … … … … … … … … … … … …. (Signature of authorized official)
Vieta...................................................
Datums...............................................


(Seal or stamp of the Authority, as necessary) Periodic inspection: signature … … … … … … … … … … … … … … … … … …. (Signature of authorized official)
Vieta...................................................
Datums...............................................


(Seal or stamp of the Authority, as necessary) Periodic inspection: signature … … … … … … … … … … … … … … … … … …. (Signature of authorized official)
Vieta...................................................
Datums...............................................


(Seal or stamp of the Authority, as necessary) The periodic inspection in accordance with the 1/14 (h) (iii) the provisions of this is to certify that, through periodic inspection in accordance with Annex I of the Convention/9 and annex I/14 (h) (iii) the rules, found that the ship complies with the relevant requirements of the Convention.



Paraksts....................................................... (Signature of authorized official)
Vieta...................................................
Datums...............................................


(Seal or stamp of the Authority, as necessary) Approval to extend the term of the licence, the period of validity of less than 5 years, if applicable (I)/14 (c). Craft comply with the essential requirements of the Convention, and this certificate shall, in accordance with the Convention (I)/14 (c) of the regulations is valid until … … … … … … … … … … … … … ….



Paraksts....................................................... (Signature of authorized official)
Vieta...................................................
Datums...............................................


(Seal or stamp of the Authority, as necessary) Confirmation if the certificate carried out repeated inspection and applicable I/14 (d) rule. Craft comply with the essential requirements of the Convention, and this certificate shall, in accordance with the Convention (I)/14 (d) of the regulations is valid until....................................................... "



Paraksts....................................................... (Signature of authorized official)
Vieta...................................................
Datums...............................................


(Seal or stamp of the Authority, as necessary) Approval to extend the period of validity of the licence until you reach the port of inspection, to be carried out or to the period of grace, if applicable 1/14 (e) or (f) 1/14. This certificate shall, in accordance with the Convention's annex I/14 (e)/(I)/14 (f) of the rules are valid until 55............................................................................ "



Paraksts....................................................... (Signature of authorized official)
Vieta...................................................
Datums...............................................


(Seal or stamp of the Authority, as necessary) Approval of the annual date changes, if applicable (I)/14 (h) rules. In accordance with the provisions of the Convention (I)/14 (h) of the rules of the new annual date is................... "



Paraksts....................................................... (Signature of authorized official)
Vieta...................................................
Datums...............................................


(Seal or stamp of the Authority, as necessary) In accordance with the provisions of the Convention (I)/14 (h) of the rules, the new annual date is.......................... "



Paraksts....................................................... (Signature of authorized official)
Vieta...................................................
Datums...............................................


(Seal or stamp of the Authority, as necessary)
List of equipment of the cargo ship safety certificate (C) this list must be permanently attached to the cargo ship safety certificate. List of the equipment according to the 1974 International Convention for the safety of life at sea, as amended by the Protocol of 1988 1. details of the ships name............................................................. " Identification number or letters … … … … … … … … … … … … … … … … … … … …. The minimum number of persons having the qualifications needed to work with radio equipment … … … … … … … … … … … … … … … … … … … …. 2. a description of the life-saving appliances 1. total number of persons which are served by lifesaving devices..................... " Left side right side 2. total lifeboat number 2.1. Total number of persons which they can measure 2.2. glābšn partially closed the self-righting boat (rule III/43) 2.3. Totally enclosed lifeboat (III/44 rule) 2.4. number of lifeboat equipped with autonomous air supply system (III/45 rules) 2.5. Fire rescue boat (rule III/46) 2.6 other lifeboat number 2.6.2 2.6.1. Type 2.7. number of lifeboat which is lowered to the free fall method 2.7.1. Completely closed (lll/44 rule) 2.7.2. With a separate air supply (lll/45 rules) 2.7.3. Fire (lll/46 rule) 3. Rescue boat number, (which includes the above mentioned number of lifeboat) 3.1 With projectors equipped lifeboat number 4. Savior boat number 4.1 number of Boats that are part of the above total number of lifeboat 5. Life-raft, life-rafts 5.1 that require an approved launching appliances 5.1.1. number of liferaft 5.1.2. Number of people that they can pick up 5.2. Rescue rafts, which do not require an approved launching appliance 5.2.1. number of liferaft 5.2.2. The number of people that they can pick up the 5.3 number of liferaft, which requires lll/rule 6 26.1.4. number of lifebuoys 7. Lifejacket number 8. Hidrotermokostīm total number of 8.1 8.2. number of Costumes that meet the requirements put rescue jackets 9. Siltumsaglabājoš skaits56 of funds 10. Rescue devices used radio equipment 10.1. number of defendants radar 10.2. VHF radio telephone apparatus of bilateral communication number 3. Radio equipment description the name of the actual security system 1 primary 1.1. VHF radio 1.1.1. Digital selective (DSC) using decoder 1.1.2. Digital selective (DSC) dežūruztvērēj the use of Radiotelephony equipment 1.1.3.1.2. VV Radio 1.2.1. Digital selective (DSC) using decryptor 1.2.2. Digital selective (DSC) using dežūruztvērēj 1.2.3. Radio telephone equipment 1.3. VV/ARRAY Radio 1.3.1. Digital selective use decryptor (DSC) 1.3.2. Digital selective (DSC) using dežūruztvērēj to 1.3.3 1.3.4. Direct Radiotelephone equipment in the printing Telegraph machine 1.4. Inmarsat ship earth station 2. Secondary alarm notification features 3. maritime safety information device reception 3.1. NAVTEX receiver 3.2. Enhanced group call (EGC) receiver 3.3. direct ARRAY output tray 4 or radiotelegraph attendant COSP-SARSAT 4.1 4.2. Inmarsat 5. VHF or radar ship 6, defendant 7.2219 radiotelephony frequency kHz57 8. dežūruztvērēj device for radio telephone alarm signal rejection of 2219 kHz frekvencē58 4. Radioaprīkojum availability practices (IV/15.6 and 15.7 rule) 4.1 installation backup 4.2. maintenance ashore 4.3 maintenance assurance Sea 5. Ships built prior to 1 February 1995, and which does not meet all of the 1988 Protocol to the Convention, part IV, as amended by the applicable prasībām59 5.1 vessels shall be provided with a radiotelegraph installation in accordance with the 1992 to February 1, the existing Convention. The name of the actual provisions of security guard hours Operator the Operator is or is not equipped with an automatic alarm signal or not equipped with main equipment Is or is not equipped with a spare machine Or the main and backup transmitter are electrically separated or combined 5.2 vessels must be equipped with a radiotelephone installation in accordance with the 1992 until February 1, the existing Convention. The actual provisions of security guard hours Operator number 6. Ships which are built before 1992. February 1 and which do not fully comply with the 1988 Convention, as amended by chapter III. 60 actual support lifeboat radiotelegraph installation survival means portable radio apparatus means survival of the EPIRB (121.5 MHz and 243 MHz) two-way radiotelephone apparatus for communications it is hereby certified that this list is entirely correct.
Izsniegts....................................................................... (saraksta izsniegšanas vieta) .......................................... ................................................................. (Date of issue) (Signature of the duly authorized officials, which issue list) (Seal or stamp of Izdevējinstitūcij, as needed)
Exclusive licence FORM exception certificate This certificate shall be supplemented by a list of equipment (form P) (official seal) (country) issued in accordance with the 1974 International Convention for the safety of life at sea requirements, as amended by the Protocol of 1988............................................................. "on behalf of the Government of (name of country) … … … … … … … … … … … … … … … … … … … …. (authorized person or organization) Details of the Ship's name is kuģi61............................................................. " Identification number or letters … … … … … … … … … … … … … … … … … … … …. Pieraksta osta ............................................................. Bruto tilpība ............................................................. IMO numurs62 ............................................................. This is to certify: the ship in accordance with the provisions of the Convention................. rules for authorisation is released from the Convention … … … … … … … … … … … … … … … …. Conditions, if any, on the basis of which a certificate has been issued in exceptional:.............................................................................. " Trips, if any, on the basis of which a certificate has been issued in exceptional:.............................................................................. This certificate is valid for līdz......................ar that............................ " Certificate, which is attached to this certificate is still valid.
Izsniegta....................................................................... (Apliecības izsniegšanas vieta) ......................................... ................................................................. (Date of issue) (Signature of Authorised official issuing the certificate) (Seal or stamp of Izdevējinstitūcij, as needed) Approval to extend the term of the licence, the period of validity of less than 5 years and applicable I/14 (c). This certificate shall, in accordance with the Convention (I)/14 (c) of the regulations is valid until … … … … … … provided that.............................................. " Certificate, which is attached to this certificate is still valid.
Paraksts....................................................... (Signature of authorized official)
Vieta...................................................
Datums............................................... (Seal or stamp of the Authority, as necessary) Approval, if made to the inspection and applicable I/14 (d) rule. This certificate shall, in accordance with the Convention (I)/14 (d) of the regulations is valid until … … … … … … provided that............................................... " Certificate, which is attached to this certificate is still valid.
Paraksts....................................................... (Signature of authorized official)
Vieta...................................................
Datums.............................................. (Seal or stamp of the Authority, as necessary) Approval to extend the period of validity of the licence until you reach port, you need to review, or to the period of grace, if applicable (I)/14 (e) or (f) I/14. This certificate shall, in accordance with the Convention (I)/14 (e)/I/14 (f) rule 63 is valid until..................................., provided that … … … … … … … … … … … … … … …. Certificate, which is attached to this certificate is still valid.
Paraksts....................................................... (Signature of authorized official)
Vieta...................................................
Datums............................................... (Seal or stamp of the Authority, as necessary) ____ ____ ____ ____ ___ [*] signatures are not added to 1 not applicable 2 Optional details of ships can be placed horizontally in the table. 3. In accordance with resolution 600 (15)-International Maritime Organization (IMO) ship identification number system, this information can be included on a voluntary basis. 4 not applicable not applicable 6 5 except those that require the 41.8.31 III/47.2.2.13 38.5.1.24, and.. 7 if the maritime safety Committee has not adopted a different date, these items do not need to reflect the description attached after February 1, 1999, for certificates issued. 8 This item is not required the description attached to atspuguļ by February 1, 1999, for certificates issued. 9 this chapter need not reflect the description attached after February 1, 1999, for certificates issued. 10 this part does not need to reflect the schedule that is connected by 1 February 1999, the certificates issued. 11 optional details of ships can be placed horizontally in the table. 12 only for oil tankers, chemical tankers and freight gāzvedēj. 13. In accordance with resolution A-600 (15) IMO ship identification number system-this information can be included on a voluntary basis. 14 not applicable. 15 not applicable. 16 record expiration expiration date, which is determined by the Administration, in accordance with the provisions of the Convention (I)/14 (a) of the rules. This date, day and month matches the annual date, as set out in the Convention's annex I/2 (n) rules, if not amended according to the annex I/14 (h). 17 not applicable. 18 not applicable. 19 not applicable. 20 can record details of extra check. 21 not applicable. 22 optional details of ships can be placed horizontally in the table. 23 only for oil tankers, chemical tankers and freight gāzvedēj. 24. In accordance with resolution A-600 (15) IMO ship identification number scheme-this information can be included on a voluntary basis. 25 not applicable. 26 not applicable. 27 record the expiration date established by the Administration, in accordance with the provisions of the Convention (I)/14 (a) of the rules. This day and month matches the annual date as defined in rule 1 (n) of the Convention, if not amended according to the annex I/14 (h). not applicable 28. 29 not applicable. 30 delete where inapplicable. 31 not applicable. 32 except as required under III/38.5.1.24, 41.8.31 and 47.2.2.13. 33 this part need not be reflected in the attached list after 1 February 1995 the issued certificate. 34 After the check, the details of ships can be placed horizontally in the table. 35. In accordance with resolution A-600 (15) IMO ship identification number scheme-this information can be included on a voluntary basis. not applicable 36. 37 record expiration date, as determined by the Administration in accordance with the provisions of the Convention (I)/14 (a) of the rules. This day and month matches the annual date as defined in rule 1 (n) of the Convention, if you do not make edits according to I/14 (h). 38 not applicable. 39 If the maritime safety Committee has not laid down another date, this point need not be reflected in the list annexed to the certificate issued after 1 February 1999. 40 this paragraph need not be reflected in the list annexed to the certificate issued after 1 February 1999. 41 this chapter need not reflect the Description accompanying the certificate issued after 1 February 1999. 42 After the check details of ships can be placed horizontally in the table. Only 43 oil tankers, chemical tankers and freight gāzvedēj. 44. In accordance with resolution A-600 (15) IMO ship identification number scheme-this information can be included on a voluntary basis. 45 not applicable. 46 not applicable. 47 record expiration date fixed by the Administration in accordance with the provisions of the Convention 1/14 (a) of the rules. This day and month matches the annual date as defined in rule 1 (n) of the Convention, if there are no corrections have been made according to 1/14 (h). 48 not applicable. 49 50 not applicable not applicable. 51 can write news about extra check. not applicable 52. 53 not applicable. 54 not applicable. 55 not applicable. 56 except those that require the lll/38.5.1.24.41.8.31.47.2.2.13., and rules 57 If the maritime safety Committee is established by the new date, this paragraph does not take in the list to reflect the added after February 1, 1999, for Certificates issued. 58 this point need not be reflected in the attached List after February 1, 1999, for Certificates issued. 59 this chapter need not be reflected in the attached List after February 1, 1999, for Certificates issued. 60 this part need not be reflected in the attached list after 1 February 1995 issued certificates. 61 After the check details of ships can be placed horizontally in the table. 62. In accordance with resolution A-600 (15) IMO ship identification number scheme-this information can be included on a voluntary basis. 63 not applicable.