Cabinet of Ministers Regulations No. 315 Riga 6 June 2017 (pr. No 29 31) operational programmes for the "growth and jobs" 1.1.1. aid specific objective "to increase scientific research institutions of Latvia and the innovative capacity and the ability to attract external funding, investing in human capital and infrastructure" measure "support 1.1.1.5. international cooperation projects in research and innovation" first, second and third application round project for implementing provisions Issued under the European Union's structural funds and the cohesion fund the 2014 – 2020 programming period management law of 6 and article 20 paragraph 13 i. General questions 1. determines the : 1.1 the procedures for implementing the action programme "growth and employment" priority axis "research, technological development and innovation" specific support 1.1.1. objective "to increase Latvian scientific research institutions and innovative capacity and the ability to attract external funding, investing in human capital and infrastructure" (hereinafter referred to as the specific objective) "action aid 1.1.1.5 international cooperation projects in research and innovation" (hereinafter measure) the first, second and third round of project submissions; 1.2. the objectives of the measure; 1.3. measures and the selection rounds of funding available; 1.4. the requirements of the European regional development fund project (hereinafter the project) to the applicant and project partners; 1.5. the eligible cost of the operation and the conditions of the question; 1.6. the simplified conditions of application costs and order; 1.7. an agreement or contract for the implementation of a project of unilateral notice conditions. 2. The terms used in the following terms: 2.1 with economic activities related project – a project that meets the following criteria: 2.1.1. the first phase of the project within this provision, paragraph 12 of the draft, the second round – scientific institution that complies with the provisions referred to in paragraph 2.19. research definition but third row – scientific institution that complies with the provisions referred to in paragraph 2.19. research organisations, or regulatory authority; 2.1.2. the project feasible actions comply with this rule 2.5. conditions referred to; 2.2. economic activity-related project – a project that meets one or both of the following criteria: 2.2.1. project scientific authority or the commercial register of the Republic of Latvia registered trader; 2.2.2. project activities, which are economic in nature; 2.3. Baltic bonus program-financial aid program, which is financed from the State budget funds and whose purpose is to promote international cooperation in science and innovation, including support to cooperation among the Baltic countries, scientific employees, including programs "Horizon 2020" subprogramme contests, in EURATOM, EUROSTAR-2, Eureka, the Joint Baltic Sea Research and development programme bonus, joint technology initiatives and the era-NET project COFUND competitions; 2.4. work start – obligations of European Commission 2014 17. Regulation No 651/2014 of June, by which certain categories of aid compatible with the internal market, the application of the Treaty and article 107.108 (hereinafter referred to as Commission Regulation No 651/2014), article 2 the definition laid down in paragraph 23; 2.5. the transaction, which is not economic in nature, the research organisation, which does not include the Treaty on the functioning of the European Union article 107 the scope defined in paragraph 1, including: 2.5.1. training to bring staff numbers and qualifications; 2.5.2. "independent research and development, in order to gain more knowledge and better understanding, including joint research and development, a research organization engaging in effective cooperation; 2.5.3. the dissemination of research results, without exclusivity and discrimination, including through teaching, open access, open the database of publications or open source software; 2.5.4. the transfer of knowledge and technology, where knowledge and technology: 2.5.4.1. transfer operations research department or research organisations, which is a subsidiary of the company, in which the participation of the parent company's share exceeds 50 percent, or in which the parent company has a majority and which complies with the definition of research organisations, research organisations, together with other research organizations or research organisation with a third party, an open competition contracts for certain services; 2.5.4.2. all profits from such operations are again invested in the research organization's core business; 2.6. effective cooperation — cooperation that comply with Commission Regulation No 651/2014 2 paragraph of article 90; 2.7. the European strategic forum on research infrastructures (European Strategy Forum on Research Infrastructure (esfri)) – the Council of Europe in 2002, created a strategic tool to promote scientific integration in Europe, providing open access to high-quality research infrastructure; 2.8. the experimental development-research category, corresponding to Commission Regulation No 651/2014 2 paragraph of article 86; 2.9. Era-NET (European Research area network) COFUND project-European research collaboration network (public administration institutions that finance scientific operations, including administering national research programmes) developed projects which aim to support the European research area and the closer integration of its members, by supporting cooperation between researchers, knowledge and technology circulate freely, and encouraging it for national research program coordination of the implementation of the transnational level. The era-NET projects COFUND is organized in several research and technology development project contest, and the first of them, the European Commission co-financed; 2.10. ERIC Consortium – a European research infrastructure consortium – European Research Infrastructure Consortium (ERIC), which was established in accordance with the Council of 25 June 2009. Regulation (EC) No 723/2009 on the community legal framework for a European research infrastructure consortium (ERIC) (Official Journal of the European Union, 2009. on 8 august, no L 206); 2.11. the euraxess portal-the European portal (https://euraxess.ec.europa.eu/), which is designed to ensure modern and comfortable environment for the exchange of information and scientific sector of international mobility in the framework of the European research area; 2.12. fundamental research — research that corresponds to the category of Commission Regulation No 651/2014 2 paragraphs of article 84; 2.13. a company in difficulty – merchant who comply with Commission Regulation No 651/2014 2 article 18 definition laid down; 2.14. joint programming initiatives (Joint Programming Initiative)-the European Commission's initiatives to, combining the resources of the Member States of the European Union, the implementation of the research areas relevant to the public. Within the Member States of the European Union is developing strategic research agendas (Strategic Research agenda), based on a common vision of the way in which the unsolved problems of the important public, including through the "Horizon 2020" instruments, as well as providing a financial contribution of the Member States; 2.15 joint venture ECSEL (Electronic components and systems for European Leadership (ECSEL)) – public private partnership joint technology initiatives joint venture "electronic components and systems of Europe's leading role in the consolidation of" created by the Council in 2014 may 6 Regulation (EU) No 561/2014 setting up the ECSEL (Official Journal of the European Union, 7 June 2014, no L 169), combining the joint ventures in the field of nanoelectronics and embedded systems that added to the technology platform for integrating intelligent systems; 2.16. the big merchant-a merchant that correspond to Commission Regulation No 651/2014 2 of article 24 the definition laid down in point; 2.17. The national focal points, national development agencies of Education Department programs "Horizon 2020" Latvian National point of contact for the implementation of the function; 2.18. research – activities that involve one or more of the research categories and are intended to fulfill the exact economic, scientific or technical nature indivisible task with clear goals. Research projects can create more work packages and includes clear objectives, actions to be taken to achieve these objectives (including the estimated cost), as well as specific results to determine the outcome of this action, and compare them with the relevant objectives. If two or more research projects are not clearly distinguishable from one another, particularly if they do not have the technological success of independent probabilities, considered the same project; 2.19. the research organisation – an institution that complies with Commission Regulation No 83 of Article 651/2014 2 the definition laid down in point; 2.20. "full time equivalent staff employed in science – the total research work the number of hours worked (including annual paid leave), what is doable in the normal working hours within the calendar year concerned; 2.21. "Horizon 2020" programme, the European Union's research and innovation framework programme "Horizon 2020"; 2.22. the intensity of public funding – the total European Regional Development Fund funding as a percentage of the project total eligible costs; 2.23. industrial research — research that corresponds to the category of Commission Regulation No 85 of Article 651/2014 2 the definition laid down in point; 2.24. the economic activity-any activity that involves the offering of goods or services on the market, including the leasing of research infrastructure, implementation tasks of traders services or contract research; 2.25. the tiny (micro), small and average business person – trader that complies with Commission Regulation No 651/2014 2. in paragraph 2 of article definition laid down; 2.26. the technical-economic feasibility studies – actions that correspond to Commission Regulation No 87 of Article 651/2014 2 the definition laid down in point; 2.27. the technology law – know-how and other rights or their combination, including the applications or registrations that meet the European Commission's 2014 March 21 Regulation (EU) No 316/2014 concerning the Treaty on the functioning of the European Union Article 101, paragraph 3, of the application of the technology transfer agreement categories (Official Journal of the European Union, 28 March 2014, no L 93) (hereinafter referred to as Commission Regulation No 316/2014) in article 1, "b" the definition laid down in point; 2.28. knowledge and technology transfer: any process which seeks to obtain, collect and distribute explicit and tacit knowledge, including skills and competencies of both business and operations that are not economic in nature, such as research collaboration, consulting, licensing, new business creation, publication, and the researchers and other staff involved in these activities in mobility. In addition to the scientific and technical knowledge, it also includes other types of knowledge, such as knowledge of how to apply the standards and regulations that they included, and on the real-life environmental conditions of operation, organizational innovation methods, as well as knowledge management, related to the identification of intangible assets, acquisition, protection, defence and use; 2.29. the scientific personnel, according to the scientific activities of the laws governing elected leading researchers, researchers and research assistants, as well as the persons within the company that performs the leading researcher, investigator and Research Assistant; 2.30. the scientific institutions, scientific institutions of the Republic of Latvia register of registered scientific Institute (public agency, derived public person, public school Department, private-law legal person or body) or graduate school. 3. objective of the measure is to promote the European research area, bilateral and multilateral cooperation projects, and participation in international research, networking and twinning activities and the European strategic forum on research infrastructures infrastructure installations, including providing support for capacity building of the national point of contact. 4. in the event the target group are scientific institutions, scientific personnel, the Republic of Latvia Enterprise register registered merchants and national focal points. 5. the following Measures are achievable in monitoring indicators: outcome indicator: 5.1 5.1.1 until 2018 December 31 over the quality threshold estimated and the European regional development fund-supported programs "Horizon 2020" project, the number of applications, including Baltic bonus programme, -154; 5.1.2. to 2023 December 31 over the quality threshold estimated and the European regional development fund-supported programs "Horizon 2020" and European Union framework programme 9 of the project the number of applications, including Baltic bonus programme-1029; 5.2. financial performance – up to 2018 December 31 certified expenditure of eur 4 809 228; 5.3. results indicators – up to 2023 December 31 operational programmes for the "growth and employment" priority axis "research, technological development and innovation" specific support 1.1.1. objective "to increase Latvian scientific research institutions and innovative capacity and the ability to attract external funding, investing in human capital and infrastructure" koprezultāt: 5.3.1. the average number of scientific publications per scientific staff full time equivalent year-0.48; 5.3.2. the public and the higher education sector is linked to external financing for the research activity – 160 600 000 euro. 6. Measure the responsible authority for the Ministry of education and Science (hereinafter referred to as the responsible authority). 7. the planned Measures the total attributable funds is eur 32 552 786, including the European regional development fund-eur 27 669 868 and Government co-financing – 4 882 918 euros. 8. The first, second and third round of economic activities implemented with an unrelated project the maximum eligible European regional development fund shall not exceed 85 per cent of the total eligible project funding. The required national co-funding is provided from the State budget funds, and that does not exceed 15 percent of the total eligible project funding. 9. to close an agreement or contract for the project implementation until 2018 31 December selection rounds total eligible funding available is eur 23 537 360, including the European regional development fund – Euro 20 006 756 and Government co-financing, eur 3 530 604. By January 1, 2019, a responsible authority under the European Commission's decision on the priority axis "research, technological development and innovation" of the European regional development fund in the framework of the implementation of specific performance may propose to increase available funding to apply the provisions referred to in paragraph 7 of the planned maximum funding, subject to this provision, paragraph 39. 10. This provision 12, paragraph 35 and 54 in the selection round of the project applicant, which by agreement or contract concluded for the implementation of a project is the European regional development fund, the beneficiary (beneficiaries), and in accordance with the project application selection round of the Charter, the requirements of the project submission deadline shall be submitted to the liaison body of the cohesion policy fund management information system in 2014-2020.
II. The first phase of project implementation conditions for the first round of 11 implemented limited project application selection. 12. project applicants in the first round are: 12.1. The Ministry of education and science; 12.2. The national education development agency. 13. The first round of each applicant shall submit one project with economic activity unrelated to the project application and implemented individually. 14. the first round of the scheduled total attributable funds is eur 16 635 686, including the European regional development fund – 14 140 333 euro and national co-financing budget – eur 2 495 353. 15. the project applicant total planned funding that does not exceed the applicable: 15.1. the Ministry of education and science – 10 806 632 euro (European regional development fund-eur 9 185 637 and Government co-financing-1 620 995 eur); 15.2. the National Agency for education development-5 829 054 euro (European Regional Development Fund – 4 954 696 euro and national budget co-financing – 874 358 euros). 16. the project applicant total eligible funding available until 2018. December 31, to close a deal on the implementation of the project, shall not exceed the following: 16.1. the Ministry of education and science – 6 688 082 euro (European regional development fund-eur 5 684 870 and Government co-financing-1 003 212 euro); 16.2. National Education Development Agency – eur 5 776 894 (European regional development fund and the funding of eur 4 910 360 State budget co-funding of eur 866 534). 17. The first round until 2023 December 31, you can leverage the following indicators: 17.1. this rule 12.1. project referred to in the applicant's project: monitoring indicators 17.1.1. – European regional development fund and supported by the above quality threshold rated programs "Horizon 2020" and European Union Framework Programme 9 applications, including at least 10 of the European regional development fund supported and funded projects common programming initiatives; 17.1.2. the specific outcome indicators: ensure participation five 17.1.2.1. joint programming initiatives; 17.1.2.2. ensure World Congress of Latvian scientists in Latvia; 17.2. these rules prescribed in paragraph 12.2., the project applicant: 17.2.1. monitoring indicator – European regional development fund and supported by the above quality threshold rated programs "Horizon 2020" and European Union Framework Programme 9 applications, including: 17.2.1.1. no fewer than 10 of the European Regional Development Fund funded projects supported and the era-NET projects COFUND; 17.2.1.2. supported no less than 65 programs "Horizon 2020" and European Union framework programme of subprogramme 9 contests submitted and above quality threshold assessment of project preparation financing during the period from 2014 to 2023, for which they have not received aid for preparing the second round; 17.2.2. specified output pointer to complete a project to implement a national focal point for the expansion and efficiency plan for aid for participation in "Horizon 2020" and European Union framework programme 9; 17.3. in implementing this provision and 19.2.3 20.4. eligible activities referred to in the following specific outcomes indicators: 17.3.1. original scientific articles published in: 17.3.1.1. journals or Conference article, that citation index reaches at least 50 percent of the industry average citation index; 17.3.1.2. Web of science or Scopus (A or B) databases included in journals or Conference article in the inventory. 17.3.2. technology: 17.3.2.1. patents; 17.3.2.2. other intangible assets; 17.3.3. intellectual property license agreements; 17.3.4. new product or technology prototype. 17.3.5. new treatments and diagnostic techniques (including non-komercializējam method), which complements this provision, 17.3.2 17.3.3 17.3.1..,. and 17.3.4. referred to indicators; 17.3.6. other research or project-specific appropriate indicators (including the data), which complements this provision, 17.3.2 17.3.3 17.3.1..,. and 17.3.4. referred to. 18. the project the applicant shall prepare and submit to the liaison body of the submission of the project application selection round of the requirements laid down in the Statute. In the annex, add at least the following documents: 18.1. The Ministry of education and science project: 18.1.1. action plan common programming initiatives that aligned with the relevant sectoral ministries and implemented until the project is finished. 18.1.2. strengthening of international cooperation in the communications plan, which is implemented through the project's completion and ensure complementarity with the activities of the "growth and jobs" 1.2.1. specific objective "to increase private sector investment in the" P& "action aid 1.2.1.2 technology transfer system development" (hereinafter 1.2.1.2) eligible activities implemented in the investment and development agency of Latvia; 18.2. The national education development agency project: 18.2.1. The national contact point in the expansion and efficiency of the implementation plan, which is aligned with the Latvian Academy of Sciences, the National Institute of the Latvian Association of young scientists, the Association Council of Rectors, the Latvian Chamber of Commerce and industry and the Ministry of education and science and defined activities, which are financed from the State budget and from the project eligible activities, ensuring their complementarity and non-duplication. This plan is being implemented to the completion of the project; 18.2.2. participation in the indicative plan for era-NET activities, COFUND taking into account the priority directions of science, smart specialisation strategy, implemented national research programmes and scientific institutions in the proposals being implemented until the project is finished. 18.2.3. the regulations governing the procedure for the granting of the aid programs "Horizon 2020" subprogramme contests submitted and above the threshold of quality assessment of projects for financing. 19. The beneficiary-Ministry of education and science in implementing such projects eligible: 19.1. research and development in the interests of strengthening programs "Horizon 2020" programmkomitej and other international programs, including ensuring the smart specialisation strategies and within the defined area of specialisation in-depth analysis;
19.2. national level activities in international cooperation networks, including: 19.2.1. targeted relationship building and cooperation with the Latvian diaspora abroad joint research and development activities and for the implementation of cooperation, including identification of Latvian scientists abroad and its network of mutual cooperation and communication analysis; 19.2.2. targeted cooperation with Latvian and foreign economic and diplomatic missions to expand contacts and cooperation, including the deepening of appropriate information and communication material preparation, while defining the activities which are financed from the State budget and from the project eligible activities, ensuring complementarity and not duplication with the Latvian investment and development agency of the implementation activities; 19.2.3. the membership of the international research and development cooperation initiatives, priority – common programming initiatives, including giving them the appropriate funding for participation and ensuring the framework supported by economic activity unrelated to the project financing of part of the Latvian partners according to the relevant common programming initiative in eligible activities and eligible costs; 19.2.4. communication campaigns, including target group research, if necessary; 19.2.5. World Congress of Latvian scientists organizing in 2018; 19.3. the activities of the national scientific information system functionality and data integration options with other information systems or databases, including ensuring the complementarity with the measures eligible 1.2.1.2. the work of the investment and development agency of Latvia; 19.4. the project publicity and communication activities of the European Parliament and of the Council of 17 December 2013 Regulation (EU) No 1303/2013 laying down common provisions on the European regional development fund, the European Social Fund, the Cohesion Fund, the European agricultural fund for rural development and the European Fund for Maritime Affairs and fisheries and general provisions on the European regional development fund, the European Social Fund, the Cohesion Fund and the European Fund for Maritime Affairs and fisheries, and repealing Council Regulation (EC) No 1083/2006 (Official Journal of the European Union 2013, 20 December, no L 347) (hereinafter referred to as the Council Regulation No 1303/2013), and the regulations on the procedures for European Union structural funds and the Cohesion Fund in the implementation of the 2014-2020 programming period provide a communications and visual identity requirements; 19.5. project management. 20. The beneficiary – national education development agency-project implemented in the following eligible activities: 20.1 National point of contact operational. expansion and efficiency improvement measures: 20.1.1. National point of contact information and providing advisory expertise and competencies, including: appropriate qualifications expert 20.1.1.1. additional attraction; 20.1.1.2. National focal points for the participation of experts in thematic events organised in the framework of the "Horizon 2020" and specialized in training; 20.1.1.3. National point of contact to customer – programs "horizon" of potential project applicants, database development, including integration with the activities of the national scientific information system; 20.1.1.4. advice and training support programs "Horizon 2020" potential project applicants; 20.1.2. Euraxess Portal activity in Latvia by promoting international and inter-sectoral task forces of researchers ' mobility and the provision of information on the scientific career opportunities in Latvia; 20.1.3. Latvia's participation in the program "Horizon 2020" evaluation of its implementation in the mid term and final; 20.2. the provision of expertise in the operational programmes for the "growth and employment" priority axis "research, technological development and innovation" specific support 1.1.1. objective "to increase Latvian scientific research institutions and innovative capacity and the ability to attract external funding, investing in human capital and infrastructure" measure "1.1.1.2. Postdoctoral Research support" (hereinafter 1.1.1.2) selection of research applications, starting with the second measure 1.1.1.2. project application selection round; 20.3. the "Horizon 2020" and European Union framework programme of subprogramme 9 contests submitted and above quality threshold assessed project preparation financing (providing an overlap with the second round of the eligible projects and activities eligible costs), if on the preparation of the draft had not previously received the European structural and investment fund or the national budget funds within the Programme Baltic bonus period from 2014 to 2016; 20.4. the membership of the era-NET project consortia and the COFUND the project within the open competitions and the support provided by the economic activities related to the research project, part of the Latvian partners, financing and monitoring under the era-NET project the COFUND eligible activities set out in and eligible costs in selection rounds, which are not assigned to the co-funding from the European Commission programme "Horizon 2020"; 20.5. project management; 20.6. the project publicity and communication measures in accordance with Council Regulation No 1303/2013. 21. The first round of the following costs apply position: 21.1.  Project direct eligible costs these regulations 19 and 20 of the operations: 21.1.1. direct eligible personnel costs: 21.1.1.1. the project management personnel remuneration costs (excluding overtime), taking into account that: 21.1.1.1.1. they have up to five percent of the total eligible project costs and do not exceed 56 580 euros per year to the applicant of the project – Ministry of education and science – 19.5. This provision referred to the implementation of the action; 21.1.1.1.2. it is up to five percent of the total eligible project costs and do not exceed 56 580 euros per year to the applicant of the project – national education development agency – this rule 20.5. transactions referred to in implementation; 21.1.1.2. project implementation staff remuneration costs (excluding overtime) that rule 19.1, 19.2, 19.3, 20.1, 20.2, 20.3. and 20.4. the implementation of the activities referred to in (a); 21.1.2. the health insurance costs and mandatory health checks costs the beneficiaries of project management and implementation staff. If health insurance is for the beneficiary's institution and the personnel are employed in a normal working time, health insurance costs are eligible for 100 percent. If the staff is employed full time or part time, health insurance costs be determined in proportion to the percentage of workload distribution. Health insurance costs apply only to the period when the staff is employed in the project; 21.1.3. the newly created job equipment (Office furniture and equipment, computer software and licenses) acquisition cost not more than 3 000 euro for a single work throughout the project implementation period. Newly created jobs in equipment acquisition cost, including equipment maintenance and repair costs, apply no more than eur 3000 per job site throughout the project implementation period, if the management or implementation of the project staff are employed in the project, at least 30 percent of their normal working time on a contract basis. If the management or implementation of the project staff are employed full time or part time, the newly created jobs in equipment acquisition cost is attributed in proportion to the percentage of workload distribution; 21.1.4. travel (domestic and foreign) and travel costs for project management and implementation staff according to laws and regulations about the order in which the recoverable costs associated with business travel, if they are reasonable and related to the implementation of the project; 21.1.5. transport costs (fuel, vehicle hire, purchase of transport services, charges for the use of public transport); 21.1.6. costs that rule 19.1, 19.2, 19.3, 19.4, 20.1. and 20.6. the implementation of the activities referred to in point. If the service provider is a natural person and is not registered to the State revenue service as a self-employed person, is also applicable to national employers ' compulsory social insurance contributions; 21.1.7. informative and educational materials development and publication costs these rules 19.2 and 20.1. implementation of activities referred to in subparagraph; 21.1.8. seminars, discussions, conferences and the Organization and implementation of training-related costs, including room rental, if necessary for the implementation of activities to rent space outside of the legal beneficiaries of funding to address, and the cost of the handout 19.1. these provisions, 19.2 20.1, 20.3 and 20.4.. the implementation of the activities referred to in point; 21.1.9. value added tax project direct eligible costs, if the beneficiary cannot recover from the State budget in accordance with the laws of the Republic of Latvia of tax policy; 21.1.10. project information and publicity costs according to the regulations on the procedures for European Union structural funds and the Cohesion Fund in the implementation of the 2014-2020 programming period provide a communications and visual identity requirements of these rules 19 and 20 of the activities supported in this implementation; 21.1.11. this rule 20.3. referred to one of the "Horizon 2020" project application preparation costs to the Ministry of education and science developed by the unit cost methodology for reconciliation with the managing authority not more than 9 000 euro, if the applicant is a "Horizon 2020" project coordinator, and not more than 6 000 euro, if the applicant is a project partner in the application, subject to the following restrictions: actual costs of foreign travel 21.1.11.1. to plan the project application preparation, up to four days, and the cost does not exceed 1500 euro; 21.1.11.2. the cost of this remuneration rule 20.3. projects referred to are determined in accordance with the funding recipient and internal remuneration policy: scientific personnel 21.1.11.2.1. not exceeding 400 working hours, if the programs "Horizon 2020" project application log on as Coordinator; 21.1.11.2.2. not exceeding 200 scientific staff working hours, if the programs "Horizon 2020" project application to log on as a partner; 21.1.11.2.3. the administrative manager shall not exceed 35 working hours; COFUND 21.1.12. Era-NET projects in open competitions and submitted the project supported research project partners of Latvia; 21.2. the project's indirect eligible costs these regulations 19 and 20 of the operations. Its plan as one cost position by applying indirect costs a flat rate of 15 per cent of the amount of this provision in paragraph 21.1.1 direct eligible personnel costs. Indirect cost flat rate applied staff costs incurred on the basis of the contract of employment (or appointment to the order of, if applicable). 22. In planning the rule referred to in 21.1.1. direct eligible personnel costs, the beneficiary shall ensure that project management and implementation staff is employed on a full time or part time no less than 30 percent of their normal working time, respectively, through project management and implementation staff working time records of all the functions and time worked. 23. This rule 20.3. eligible activities referred to in the provision of support is provided by: 23.1. "Horizon 2020" with economic activity unrelated to the project for the preparation of the application if it complies with this provision in subparagraph 2.1; 23.2. the "Horizon 2020" with economic activity projects for the preparation of the application if it complies with the provisions of paragraph 2.2. 24. Support for this rule 23.2. the activity referred in accordance with the European Commission on 18 December 2013 Regulation (EU) No 1407/2013 concerning the Treaty on the functioning of the European Union and article 107.108. application of the de minimis aid (Official Journal of the European Union, 2013 December 24, no. L 352) (hereinafter referred to as Commission Regulation No 1407/2013) and regulations on de minimis aid tracking and allocation procedure and de minimis aid form samples and it is considered a commercial support. The order in which these rules prescribed in paragraph 12.2 project applicant granted support with economic activities related to the project preparation funding, determines the implementation of a programme of support for the Charter. 25. This rule 12.2. referred to the project before the grant of de minimis aid checks the aid shall, together with the fiscal year concerned and the two previous fiscal years of de minimis aid granted does not exceed the Commission Regulation No 1407/2013 3 in paragraph 2 of article the maximum total amount of de minimis aid. De minimis aid is estimated at one single company level. 26. One single company is an enterprise that satisfies the Commission Regulation No 1407/2013 2 of article. 27. This rule 12.2. draft referred to the applicant and this rule 23.2. beneficiary referred to ensure the accessibility of information on de minimis aid for 10 years from the date of granting the aid, according to the Commission Regulation No 1407/2013 6 point 4 of article. 28. This rule 12.2. project referred to by the applicant does not grant de minimis aid, unless the de minimis aid is linked to one of Commission Regulation No 1407/2013 1. laid down in paragraph 1 of article industries and activities. 29. If this rule 23.2. beneficiary referred to while working in one or more of the ineligible sectors and carry out non-assisted activities, laid down in Commission Regulation No 1407/2013 1 in point 1 of article, de minimis aid recipients supports this sectoral activity or cost segregation in accordance with Commission Regulation No 1407/2013 1 (2) of the article. 30. This provision giving the aid referred to in paragraph 23, that rule 12.2. draft referred the applicant to check whether the beneficiary of aid under the administration of the State revenue service tax (duty) the debtor of the information available in the database is not a tax or fee debt, including State social security payment for debt, which totals more than eur 150. 31. This provision and 20.4 19.2.3. Common referred programming initiatives and the era-NET project funded by COFUND the project monitoring procedures of the beneficiary with the responsible institution and liaison body. 32. The beneficiary with an economic activity unrelated to the project from the date of an agreement on the first phase of the project, but no longer than up to 2023 of 30 November. The first round of projects is eligible: 32.1. in paragraph 19 of these rules and 20.1, 20.2, 20.4, 20.5 and 20.6..., referred to if they are not financed from other public financial instruments and made, starting with January 1, 2017; 32.2. this rule 20.3. activities referred to in point, if they are not financed from other public financial instruments and performed: 32.2.1. starting with 1 January 2014 and to the conclusion of the agreement, if the programs "Horizon 2020" contest and submitted over the threshold of quality assessed project developer with funding request submitted in the sustainability of the activities envisaged; 32.2.2. after the conclusion of the agreement. 33. If any of these provisions 19.1., 19.2, 19.3, 19.4, 20.1, 20.3, 20.4, and referred to in paragraph 20.6. eligible activities in point 12 of these rules the applicant shall implement the project outsourcing, it ensure that outsourcing is carried out subject to the laws and regulations in the area of public procurement in certain procurement procedures.
III. Second round of project implementation conditions 34. Second round of project submissions a limited exercise selection. 35. project applicants in the second round of scientific institutions are the following: 35.1. Daugavpils University with the cooperation partners in the implementation of the project – Hidroekoloģij Institute of Latvia; 35.2. Institute of electronics and computer science; 35.3. Music Academy of Latvia; 35.4. The Latvian biomedical research and study center; 35.5. The Latvian cultural Academy; 35.6. The Latvian Agricultural University with its partners in the implementation of the project and the Economic Institute Agroresurs and horticultural Institute; 35.7. Latvian Academy of Arts; 35.8. Latvian Institute of organic synthesis; 35.9. University of Latvia with the partners in the project-the University of Latvia, Institute of solid state physics, University of Latvia, Institute of mathematics and Informatics of the University of Latvia and of literature, folklore and Art Institute; 35.10. Wood Chemistry Institute; 35.11. mežzinātn Institute "silava"; 35.12. University of Baltimore; 35.13. food safety, animal health and Environmental Research Institute "BIOR"; 35.14. Rezekne Technology Academy; 35.15. Riga stradiņš University; 35.16. Riga Technical University; 35.17. Ventspils University College; Vidzeme University. 35.18. 36. in the second round, each applicant shall submit one project with economic activity unrelated to the project application, which comply with the provisions referred to in point 2.5. conditions and implemented individually or in cooperation with these rules, and 35.9 35.1.35.6. referred to cooperation partners. 37. The second round of the scheduled total attributable funds is the 6 617 100 euro, comprising the European regional development fund – 5 624 535 euro and national budget co-financing-992 565 euros. 38. to close deal on the project implementation until 2018 31 December in the second round, the total eligible funding available is eur 6 272 384, comprising the European regional development fund – Euro 5 331 526 and Government co-financing, eur 940 858.
39. the project, the applicant shall submit to the institution of cooperation projects with the cooperation of the application and shall conclude an agreement on the implementation of the project. The second round of the project the applicant plans to project implementation in phases, subject to the following conditions: 39.1. the first phase of this rule 44.1 and 44.2.. implementation of activities referred to in the financing available to 93.9% of project total to the applicant pursuant to this provision in annex 2 to this public funding allocation methodology for the estimated the related public financing; 39.2. the performance reserve funding 6.1 percent of second-round funding to apply the framework provided in this rule and 44.2 44.1. the implementation of the activities referred to in point until 2018 31 December include a second round of project performance Fund, the project applicant is available in addition to in accordance with the provisions of section 39.3.; 39.3. the decision on the performance of the Fund's funding reallocation second round recipients of funding from the European Commission's decision on the execution of performance framework adopted by the Ministry of education and science after 1 April 2020 according to the Ministry of education and Science approved the granting of performance fund procedures, on the basis of the beneficiary of the financing international cooperation achieved during a period for which the information is taken from the documents that are submitted each year to the Ministry of education and science for the calculation of the reference amount. In this case, the applicant of the project increases the total eligible funding available, according to the amendment to the agreement for the implementation of the project. 40. the second round of project applicants total eligible funding available until 2018. December 31, to close a deal on the implementation of the project, shall not exceed the following: 40.1. Daugavpils University – 219 867 euro (European regional development fund – euro and 186 887 State budget co-financing – 32 980 euro); 40.2. the Institute of electronics and computer science-219 867 euro (European regional development fund – euro and 186 887 State budget co-financing – 32 980 euro); 40.3. Should the Latvia Academy of music – 86 764 euro (European regional development fund – 73 750 euro and Government co-financing, eur 13 014); 40.4. The Latvian biomedical research and study center-447 614 euro (European regional development fund – euro 380 472 and State budget co-funding-67 142 euros), of which 200 000 euro that rule 44.3. eligible activities referred to in (a);
40.5. The Latvian cultural Academy – 86 764 euro (European regional development fund – 73 750 euro and Government co-financing, eur 13 014); 40.6. Latvian Agricultural University – 344 097 euro (European regional development fund – 292 482 euro and national budget co-financing – 51 615 euro); 40.7. Latvian Art Academy – 86 764 euro (European regional development fund – 73 750 euro and Government co-financing, eur 13 014); 40.8. The Latvian Institute of organic synthesis-555 579 € (European regional development fund – 472 242 euro and Government co-financing – 83 337 euros), of which 100 000 euro that rule 44.3. eligible activities referred to in (a); 40.9. University of Latvia – 1 778 050 euro (European regional development fund – Euro 1 511 342 and State budget co-funding-266 708 euros), of which 360 000 euro that rule 44.3. and 44.5. referred to the implementation of the activities supported; 40.10. Wood Chemistry Institute – 246 487 euro (European regional development fund – 209 514 euro, and Government co-financing, eur 36 973); 40.11. mežzinātn Institute "silava" – 210 993 euro (European regional development fund – 179 344 euro and Government co-financing, eur 31 649); 40.12. Liepaja University – 104 511 euro (European regional development fund-€ 88 834 and Government co-financing, eur 15 677); 40.13. food safety, animal health and environmental scientific Institute "BIOR" – 122 258 euro (European regional development fund – euro 103 919 and Government co-financing, eur 18 339); 40.14. Technology Academy of Rezekne-113 384 euro (European regional development fund – Euro 96 376 and Government co-financing, eur 17 008;) 40.15. Riga stradiņš University – 371 602 euro (European regional development fund – euro 315 862 and Government co-financing – 55 740 euros), of which 60 000 euro that rule 44.3. eligible activities referred to in (a); No 40.16. Riga Technical University – 883 900 euro (European regional development fund-eur 751 315 and State budget co-financing – 132 585 euros), of which 100 000 eur 44.4. This provision referred to the implementation of the activities supported; 40.17. Ventspils University College-262 752 euro (European regional development fund – euro 223 339 and State budget co-financing – 39 413 euro) of which 100 000 euro that rule 44.3. eligible activities referred to in (a); Vidzeme University, 40.18.131 131 euro (European regional development fund – euro and 111 461 State budget co-funding-19 670 euros). 41. The second round until 2023 December 31, you can leverage the following indicators: outcome indicator-41.1. European regional development fund and supported by the above quality threshold appreciated no less than the 458 programs "Horizon 2020" and European Union Framework Programme 9 application breakdown by project applicants are as follows: Daugavpils University 41.1.1. – at least 17; 41.1.2. Institute of electronics and computer science – at least 17; 41.1.3. Music Academy of Latvia, at least 2; 41.1.4. Biomedical research and study center, at least 19; 41.1.5. The Latvian cultural Academy – at least 2; 41.1.6. Latvian University of Agriculture-at least 31; 41.1.7. The Latvian Academy of Arts – at least 2; 41.1.8. The Latvian Institute of organic synthesis, at least 43; 41.1.9. University of Latvia – at least 150; 41.1.10. Wood Chemistry Institute, at least 20; 41.1.11. the mežzinātn Institute "silava", at least 16; 41.1.12. the University of Liepaja – at least 4; 41.1.13. food safety, animal health and Environmental Research Institute "BIOR", at least 6; 41.1.14. Technology Academy of Rezekne – at least 5; 41.1.15., Riga stradiņš University – at least 27; 41.1.16. Technical University of Riga – at least 80; 41.1.17. Ventspils University College – at least 10; Vidzeme University College-41.1.18. at least 7; 41.2. a specific outcome indicators-implementation of the Latvian national partnership plan for membership in eight consortia: 41.2.1. ERIC Biobank and Biomolecular resources research infrastructure consortium (ERIC BBMR-) National Coordinator is 35.4. This provision referred to the project the applicant – the Latvian biomedical research and study center; 41.2.2. Common language resources and technology infrastructure consortium (CLARIN-ERIC), which is the national coordinator of 35.9. these provisions referred to by the applicant of the project partner-the University of Latvia, Institute of mathematics and Informatics; 41.2.3. European social research infrastructure consortium (EU-ERIC), which is the national coordinator of 35.9. This provision referred to the project the applicant – the University of Latvia; 41.2.4. European high level infrastructure research discovery to practical use in medicine Consortium (EATR – ERIC), which is the national coordinator of this provision the project referred to in paragraph 35.15. applicant – Riga stradiņš University; 41.2.5. Very long base interferometry Consortium in the United Institute (JIVA-ERIC), which is the national coordinator of this provision the project referred to 35.17. applicant – Ventspils University College; 41.2.6. Microbiological resources research infrastructure platform Consortium (MIRR), which is the national coordinator of 35.9. This provision referred to the project the applicant – the University of Latvia; 41.2.7. the European structural biology integrated infrastructure consortium (INSCTRUC), which is the national coordinator of this provision the project referred to in paragraph 35.4. applicant – the Latvian biomedical research and study center; 41.2.8. the European infrastructure open screening platform for chemical biology Consortium (EU-OPENSCREEN) National Coordinator is 35.8. This provision referred to the project the applicant – the Latvian Institute of organic synthesis; 41.3. specific outcome indicators, a European Organization for nuclear research (CERN), the Latvian national contact points in the action plan; 41.4. specific outcome indicators-implementation of the action plan for cooperation in the field of quantum computing between 35.9. these provisions referred to in the project applicant, quantum Software Research Centre (Netherlands) and Quantum Computing Centre of Paris (France). 42. This provision, and 35.9 35.1.35.6. projects referred to in the applicant's application for a project implemented together with cooperation partners, subject to the following conditions: 42.1. the project application submitted by the applicant for the project, which is responsible for the implementation of the project; 42.2. the applicant in the project with partners prior to the application of the cooperation projects shall conclude cooperation agreements on the joint execution of projects, about duty and responsibility sharing results and results of use (hereinafter referred to as the agreement). Cooperation agreement in addition to the information laid down in the regulations on the procedures for European Union structural and cohesion funds in the participating institutions provide the planning document preparation and implementation of these funds in 2014 – 2020 programming period, including at least the following: 42.2.1. objectives and principles of cooperation; 42.2.2. total cooperation project financing; 42.2.3. project application assurance of financial flows; 42.2.4. partner of the indicators and results to be achieved according to the project application to be implemented within the eligible actions; 42.2.5. penalties, failure to comply with the cooperation the obligations referred to in the contract. 43. the project the applicant shall prepare and submit to the authority of the cooperation project, the application according to the project application selection round of the requirements laid down in the Statute. In the annex, shall be accompanied by the following documents: 43.1. plan programs "Horizon 2020" competitions and other research and innovation support programs and technology initiatives, defining international cooperation projects with a high degree of maturity; 43.2. scientific institutions internal arrangements for international cooperation, including research mobility and participation in programs "Horizon 2020" competitions and other research and innovation support programs and technology initiatives, supports the financing of measures that include the activities to be supported, the implementation of which may be eligible for financial support, determine the application procedures and the criteria for receiving the aid, as well as in the framework of the activities supported in the results achieved and their quality control and surveillance; 43.3. This provision, 35.8, 35.4..., 35.15.35.9 and 35.17. project referred to by the applicant-ERIC Consortium Latvian national partnership plan, the National Consortium for the establishment and functioning, including national level achieved results that meet the requirements of the international consortium, and ERIC plan in coordination with the national plan and the Ministry of education and science; 43.4. This provision of the project referred to in paragraph 35.16. applicant – the European Organisation for nuclear research (CERN) in the Latvian national contact points action plan agreed with the Ministry of education and science; 43.5. This provision of the project referred to in paragraph 35.9. applicant – an action plan for collaboration in the field of quantum computing with quantum Software Research Centre (Netherlands) and Quantum Computing Centre of Paris (France) agreed with the Ministry of education and science; 43.6. this rule 42.2. the cooperation referred to in the contract (if applicable). 44. The second round of the following eligible activities: 44.1. measures programs "Horizon 2020" and European Union framework programme 9 in international cooperation projects in the field of research and development to increase performance, including providing an overlap with the first round of the eligible projects and activities eligible costs: 44.1.1. networking, training and mobility, including mobility, research activities, to engage in international consortia and programs "Horizon 2020" and the European Union 9. Framework Programme projects including: 44.1.1.1. participation in programs "Horizon 2020" and European Union framework programme 9 organized in partnership exchanges and information day. 44.1.1.2. participation in the European Commission's Joint Research Centre organized in support measures; 44.1.1.3. participation in international scientific conferences; 44.1.2. "Horizon 2020" programme and the European Union framework programme 9 of the project application preparation, including missions and visits to potential project partners for project planning meetings, the working seminars in Latvia and support of external experts; 44.2. international scientific conferences in Latvia; 44.3. the provision for participation ERIC consortia – refers to this provision, 35.8, 35.4..., 35.15.35.9 and 35.17. project referred to the applicants; 44.4. European nuclear research (CERN) of the Organization the national contact point for the implementation of the action plan – these rules apply to 35.16. projects referred to the applicant; 44.5. the implementation of cooperation activities in the field of quantum computing between 35.9. these provisions referred to project applicants and quantum Software Research Centre (Netherlands) and Quantum Computing Centre of Paris (France); 44.6. project management; 44.7. the project publicity and communication measures under the regulation of the European Parliament and of the Council No. 1303/2013.45. The second round of the following costs apply position: 45.1.  Project direct eligible costs this rule 44, paragraph activities: direct eligible 45.1.1. personnel costs: 45.1.1.1. project management personnel remuneration costs (excluding overtime) 44.6. these provisions referred to in the implementation of the action is up to five percent of the total eligible project costs and do not exceed 56 580 euros per year for projects with the direct eligible costs above eur 5 000 000 or 24 426 per year plus a percentage of the project's direct 0.64 eligible costs, but not including direct project management staff costs, projects with the direct eligible costs, less than eur 5 000 000; 45.1.1.2. project staff involved in the implementation of the remuneration costs (excluding overtime) that rule 44.1 44.2 44.3.,.,., and 44.4 44.5. the implementation of the activities referred to under this provision in paragraph 47 above cost constraints. If the company is closed, the national employers ' compulsory social insurance contributions is attributable, if involved in the implementation of project activities, the person is not registered in the State revenue service as a self-employed person; 45.1.2. health insurance and mandatory health checks costs the beneficiaries of project management and implementation staff. If health insurance is for the beneficiary's institution and the personnel are employed in a normal working time, health insurance costs are eligible for 100 percent. If the staff is employed full time or part time, health insurance costs be determined in proportion to the percentage of workload distribution. Health insurance costs apply only to the period when the staff is employed in the project; 45.1.3. newly work equipment (Office furniture and equipment, computer software and licenses) the acquisition or rental costs up to € 3 000; one work throughout the project implementation period this provision, 44.3 44.4 44.1.2..,.,., and 44.5 44.6. the implementation of the activities referred to in point. Newly created jobs for the acquisition or rental of equipment, including equipment maintenance and repair costs, apply no more than eur 3000 per job site throughout the project implementation period, if the management or implementation of the project staff are employed in the project, at least 30 percent of their normal working time on the basis of the employment contract or appointed to the order. If project management or implementation staff is employed full time or part time, the newly created jobs in equipment purchase or rental costs are attributable proportion of workload percentage allocations, including respecting the principle of economic benefit; 45.1.4. mission expenses, travel expenses of project personnel under the legislation on the order in which the recoverable costs associated with business travel, if they are reasonable and related to the implementation of the project; 45.1.5. distribution and informational materials about the beneficiary of the financing (brochures, labels, business cards, posters, presentations, videos), if it is justified by this production rule 44.1., 44.3 44.4 and 44.5..., referred to the implementation of activities and the achievement of the project objectives; 45.1.6. membership fee that 44.1.1. measures referred to in (a); 45.1.7. This provision 44.1.2. projects referred to in the application for the preparatory work for the organisation of workshops in Latvia, the players Association, handout, technical equipment and communication services (including teleconference system license purchase) costs, subject to the principle of proportionality and rationality; 45.1.8. This provision referred to 44.2. International Scientific Conference and this rule 44.3 44.4 and 44.5..., referred to actions for the necessary workshops (including space and booth rental, technical equipment, Conference materials, and handouts for the publication costs, communication costs, the players Association and representation costs), subject to the principle of proportionality and rationality; 45.1.9. Conference participation and publication of handouts, Billboard rental, production, transportation, operation of technical equipment, the cost of this provision in the said operation 44.1.1; 45.1.10. the cost of the service (including access to research infrastructure) that rule 44.1 44.2 44.3.,.,., and 44.4 44.5. the implementation of the activities referred to in point. If the service provider is a natural person and is not registered to the State revenue service as a self-employed person, is also applicable to national employers ' compulsory social insurance contributions; 45.1.11. non-recoverable projects of direct eligible costs of the value added tax payments; 45.1.12. project information and publicity costs according to the regulations on the procedures for European Union structural funds and the Cohesion Fund in the implementation of the 2014-2020 programming period provide a communications and visual identity requirements, these provisions referred to in paragraph 44 of eligible actions; 45.2. the project's indirect eligible costs these rules referred to in paragraph 44 operations. Its plan as one cost position by applying indirect costs a flat rate of 15 per cent of the amount of the provision referred to in subparagraph direct 45.1.1. eligible staff costs. Indirect cost flat rate applied staff costs incurred on the basis of the contract of employment (or appointment to the order of, if applicable). 46. This provision 45.1.1. Planning referred to direct eligible personnel costs, the beneficiary shall keep records of working time on project management and staff in the implementation of project activities and functions of time worked and shall ensure that: where a project employee 46.1. is employed on a full time or part time no less than 30 percent of their normal working time, the eligible personnel costs included in the employee's payroll the legislation, allowances and social security costs; 46.2. If the employee is employed on the project in less than 30 percent of their normal working time, remuneration, costs must be done in accordance with scientific institutions in determining remuneration policy remuneration rate hours, taking into account the number of hours worked on the project. In the related staff remuneration costs shall include only the employee's salary without premium laid down in legislation and social security costs. 47. This rule 44.1. eligible referred to actions implemented under the following conditions and restrictions: the cost incidence 47.1. eligible actions implemented under developed and the beneficiaries approved for internal arrangements to fund the international support measures, including participation in the mobility and participation in research programs "Horizon 2020" and European Union framework programmes 9. competitions and other research and innovation support programs and technology initiatives; 47.2. the provisions referred to in paragraph one 44.1.2. programs "Horizon 2020" and European Union framework programme 9 project preparation costs of the application to the Ministry of education and science developed by the unit cost methodology for reconciliation with the managing authority not more than 9 000 euro, if the applicant is a "Horizon 2020" and European Union framework programme 9 of the project coordinator, and the application does not exceed eur 6000, where the applicant is a project partner and for the preparation of the project has not received the European structural and investment fund or the national budget funds within the Programme Baltic bonus period from 2014 to 2016, including subject to the following restrictions: actual costs 47.2.1. foreign trips to plan programs "Horizon 2020" and European Union framework programme 9 of the project application preparation, up to four days, and the cost does not exceed 1500 euro; 47.2.2. pay the cost of this provision 44.1.2. referred to the preparation of the project are determined in accordance with the funding recipient and internal remuneration policy: scientific personnel 47.2.2.1. not exceeding 400 working hours, if the programs "Horizon 2020" and European Union framework programme 9 of the application filed as the project coordinator; 47.2.2.2. not exceeding 200 scientific staff working hours, if the programs "Horizon 2020" and European Union framework programme 9 in the application log on the project as a partner; 47.2.2.3. the administrative manager shall not exceed 35 working hours; 47.3.44.1.1.1. these provisions are referred to foreign trips on the stock exchange is a partnership up to four days, and the cost does not exceed 1500 euro.
48. If the rules referred to in paragraph 36 during project implementation funding is paid out to the beneficiary, the advance may be paid in instalments. Payment in advance not more than 30 percent of public funding granted to the project totals. After an agreement on the implementation of the project, the cooperation body based on the beneficiary's written request, provide advance funding for the requested advance payments according to legislation on the State budget planning the European Union's structural and cohesion funds for the implementation of the project and execution of payments in 2014 – 2020 programming period. 49. The beneficiary with the economic activities of related projects not implemented from the day of conclusion of the agreement, but not longer than until 2022 31 December.
50. the economic activities related to the project are not eligible for the following: 50.1. this rule 44.1. the activities referred to in point, if they are not financed from other public financial instruments and performed: 50.1.1. starting with 1 January 2014 and to the conclusion of the agreement, if the beneficiary shall submit the application for action for sustainability; 50.1.2. after the conclusion of the agreement; 50.2. this rule 44.2 44.3 44.4.,.,.,., 44.5 44.6 and 44.7. the activities referred to in point, if they are not financed from other public financial instruments and made, starting with January 1, 2017. 51. If any of these rules, 44.2 44.1.,.,., 44.3 44.4 and 44.5 44.7. the eligible activities referred to in paragraph 35 of these regulations that the applicant implemented the project outsourcing, it ensure that outsourcing is carried out subject to the laws and regulations in the area of public procurement in certain procurement procedures.
IV. the third round of the project implementation conditions 52. Third round of open projects implemented in the application selection. 53. the third round of aid programs "Horizon 2020" above the threshold measure the quality, but not received project funding or part of the financing, which, beginning with the January 1, 2015, is presented in the following sub-programmes: 53.1. Excellence in distribution and membership expansion (Spreading excellence and Widening Participation) sub-programme era Chair; Marie Curie-53.2. Curie fellowships sub-programme: 53.2.1. European grants (Fellowships); 53.2.2. Global grants (Global Fellowship); 53.2.3. European researchers night (European night, Researcher '); 53.3. the European Scientific Council (European Research Council) Frontier Research grant: 53.3.1. Starting grant (ERC-SG); 53.3.2. Consolidator grant (ERC-CG); 53.3.3. Advanced grant (ERC-AG); 53.3.4. Proof of concept (PoC-HEARTS); 53.4. the joint venture within the approved project ECSEL from the European structural and investment funds financed jobs package. 54. the project applicant is a scientific institution, but this rule 53.2. programme referred to also direct regulatory authority that the third round presented one or more project submissions. 55. the project applicant project application is submitted and the project individually or in collaboration with other scientific institutions, including foreign, if a partner is for this rule 53.4. the sub-programme referred to the implementation of the project. If the partner is a scientific authority of the foreign State or foreign merchant, partner for the implementation of the project requires funding support from partners in the possession of the funds. 56. the third round of the project the applicant can implement: 56.1. with economic activities not related to the project; 56.2. the economic activities related to the project. 57. the third round of the scheduled total public eligible funding is eur 9 300 000, comprising the European regional development fund – 7 905 000 euro and national co-financing budget – eur 1 395 000. 58. to close an agreement or contract for the project implementation until 2018 31 December the third round the total available funding is attributable to the public 4 800 000 euros, the European Regional Development Fund – 4 080 000 euro and Government co-financing, eur 720 000. 59. The third round until 2023 31 December is achievable the following monitoring indicators: 59.1.  outcome indicator – European regional development fund and supported by the above quality threshold rated no less than 15 programs "Horizon 2020" project applications; 59.2. the specific outcome indicators: 59.2.1. original scientific articles published in journals or conferences 59.2.1.1.: article inventory that citation index reaches at least 50 percent of the industry average citation index: 59.2.1.2. the Web of science or Scopus (A or B) databases included in journals or Conference article in the inventory. 59.2.2. technology: 59.2.2.1. patents; 59.2.2.2. other intangible assets; 59.2.3. intellectual property license agreements; 59.2.4. a new product or new technology prototype. 59.2.5. new treatments and diagnostic techniques (including non-komercializējam method), which complements this provision. 59.2.2.59.2.3 59.2.1, 59.2.4, and. referred to indicators; 59.2.6. other research or project-specific appropriate indicators (including the data), which complements this provision. 59.2.2.59.2.3 59.2.1, 59.2.4, and. referred to. 60. the project applicant third round shall prepare and submit to the liaison body of the submission of the project application selection round of the requirements laid down in the Statute. In the annex, shall be accompanied by the following documents: 60.1.  "Horizon 2020" within this provision in paragraph 53 above submitted project applications sub-programmes of the certified copies; 60.2. documentation showing that the application is made to the quality assessment of the project and it has risen above a certain quality threshold programs "Horizon 2020" project applications are assessed: 60.2.1. the European Commission issued stamp certificate of excellence (Seal of excellence), where specific programs "Horizon 2020" to give the European Commission a sub-programme excellence seal certificate; 60.2.2. the printing of the information systems Research Participant a Portal containing information on project evaluation and assessment of the quality of the set threshold (Evaluation Summary report); 60.3. If given this provision referred to in paragraph 53 of the sub-programme, the European Commission has granted a certificate or seal of excellence project filed before the European Commission launched a stamp certificate of Excellence Award, in addition to this rule 60.2. the documents referred to in the European Commission's information on the responsible authority the rejection of the project as a result of insufficient funding or project into the reserve list; 60.4. the printing of the information systems Research Participant Portal, which contains information on the date of the application, if the information is not specified in this rule 60.2. or in the documents referred to in paragraph 60.3; 60.5. assurance that the project will not be implemented in "Horizon 2020" – refers to this provision, and 53.1 53.2 53.3... "in these sub-programmes; 60.6. ECSEL joint national States representative group of certified copy of the decision on the implementation of the project approval, apply to this rule 53.4. the sub-programme referred to; 60.7. scientific institutions of financial management and accounting policy description and return for the last three fiscal year concluded, prepared in accordance with the provisions of annex 1; 60.8. "Horizon 2020" within this provision in paragraph 53 sub project submitted to clarify the application of the financing plan, the budget and other related projects section of the application according to the project application selection round of the Statute, if under the business support of legislation governing the project application for funding under this measure classified as an economic activity associated with the project. This project allowed the intensity of public funding in the third round calculated in accordance with the provisions of paragraph 63 and 64 (if applicable). 61. The third round of direct eligible project implementation is the cost of this provision, paragraph 53 supported subprogramme for the implementation of the project and the project's indirect eligible costs corresponding to the relevant paragraph 53 of these rules laid down in the European Commission's subprogrammes in the programme of work (Work programme) and corresponds to the European Parliament and of the Council on 11 December 2013 to Regulation (EU) No 1291/2013 establishing the research and innovation framework programme "Horizon 2020" (2014-2020) and repealing Decision No 1982/2006/EC (Official Journal of the European Union 2013, 20 December, no L 347), the European Parliament and of the Council of 11 December 2013 to Regulation (EU) No 1290/2013 laying down the framework programme research and innovation "Horizon 2020" (2014-2020) membership and the dissemination of the provisions and repealing Regulation (EC) No 1906/2006 (Official Journal of the European Union, 20 December 2013, no L 347), including the application of the per-unit cost If these rules are defined in the referred to in paragraph 53 of the subprogramme, as far as the financing of the programme of work (Work programme) fixed costs do not conflict with the structural funds of the European Union legislative framework, while respecting this rule 62.1. paragraph 63 and paragraph. 62. If the rules referred to in paragraph 53 sub project is classified as an economic activity associated with the project, the project applicant project application's compliance with the following conditions: 62.1. the project's eligible costs application comply with Commission Regulation No 651/2014 25. paragraph 3 of article "a", "b", "d" and "e" in subparagraph research costs and compliance with this provision in paragraph 63 and 64 maximum allowable intensity of public funding; 62.2. the project for the implementation of the necessary application to the national co-financing of projects from the applicant's private funding (project applicant means, savings or other financial resources that do not receive any public support, including funding, which has received no State or municipal guarantee, or a State or local government credit with preferential conditions). 63. The permitted intensity of public funding in the third round, with economic activity related projects is the following: 63.1.   85 percent of fundamental research; 63.2. technical-economic feasibility studies: 63.2.1.70 per cent of the project to the applicant corresponding to the small (micro) or small business person definition; 63.2.2.60 percent project applicant, which complies with the definition of the average trader; 63.2.3.50 percent project applicant that meets the definition of a great merchant; 63.3. industrial research: 63.3.1.70 per cent of the project to the applicant corresponding to the small (micro) or small business person definition; 63.3.2.60 percent project applicant, which complies with the definition of the average trader; 63.3.3.50 percent project applicant that meets the definition of a great merchant; 63.4. experimental design: 63.4.1.45 percent of the project to the applicant corresponding to the small (micro) or small business person definition; 63.4.2.35 percent of the project to the applicant corresponding to the average business person definition; 63.4.3.25 percent in the project applicant that meets the definition of a great merchant. 64. This provision and 63.4 63.3. public funding referred to in intensity may be increased by 15 percent, up to a maximum of 80% of the project total eligible costs, if at least one of Commission Regulation No 651/2014 25. paragraph 6 of article "b" section. 65. the implementation of the project in time for the third round is from the date of the agreement or the agreement on the implementation of the project, up to 2023 of 30 November. 53. These provisions referred to programs "Horizon 2020" subprogramme supported projects activities are supported: 65.1. with economic activity unrelated to the project – starting with January 1, 2017; 65.2. economic activities associated with project after project to the application shall, subject to the cooperation of Commission Regulation No 651/2014 6 to article. 66. If this rule 56.1. or 56.2. project referred to beneficiaries during the implementation of the advance is paid, it may be paid in instalments. The advance payment shall not exceed 30 percent of the project, the total amount of public funding granted. Then when an agreement or contract for the project implementation, cooperation, on the basis of the beneficiary's written request, provide advance funding for the requested advance payments according to legislation on the State budget planning the European Union's structural and cohesion funds for the implementation of the project and execution of payments in 2014 – 2020 programming period. 67. the monitoring of the implementation of the project by the Ministry of education and science, or its delegated authority, in cooperation with the cooperation shall ensure that rule 53.1 53.2 53.3., and the programmes referred to in the draft submitted in the framework of the mid-term and final evaluations of the quality of the results, subject to the following conditions: 67.1. an assessment of the European Commission expert experts included in the database that meets the following criteria: 67.1.1. the expert has a doctoral degree; 67.1.2. the experts scientific qualification corresponds to the specific project submission Science sub-sectors; 67.1.3. the experts shall have appropriate professional experience and competence; 67.2. The Ministry of education and science or by the delegated authority and the development of cooperation under the authority of the assessment, including the standard including requirement for mid-term evaluation of the results the expert in how progress of implementation of the project in accordance with the plan, and to make recommendations for the adjustment of the working plan, if required, but the end result-based evaluation of the extent to which the expected results of the project have been achieved (assessment expressed as a percentage); 67.3. taking into account the results of the mid-term evaluation of the conclusions and recommendations, the Ministry of education and science, the liaison body, the responsible authority and the beneficiary will, where necessary, agree on the amendments to the project work plan; 67.4. the end result of the evaluation of the cooperation body used in the taking of a decision on the project objectives and expected results. Based on the final evaluation of the project results in the planned level, the liaison body shall take a decision on the application of financial corrections under the managing authority guidelines on the application of financial corrections, the European Union's structural funds, cohesion fund, European economic area financial instrument, the financial instrument of Norway, Latvia and Switzerland's cooperation programmes funded projects. For that decision, the cooperation shall inform the responsible authority. 68. If any of the provisions referred to in paragraph 56 of the project transaction this provision, paragraph 54 the applicant implemented the project outsourcing, it ensure that outsourcing is carried out subject to the laws and regulations in the area of public procurement in certain procurement procedures.
V. implementation of the project and funding conditions 69. Measure does not apply to the following costs: 69.1.  scientific apparatus and equipment acquisition cost 12 and 35 of these regulations, paragraph requesting the project project implementation; EB 69.2. costs related to building civil design, construction, reconstruction and adaptation of the premises; 69.3. payment for loan processing, presentation, and service, the reservation fee on financial transactions, interest on arrears, penalties and expenses of litigation; 69.4. costs not specified in this provision 21.45, 61, and 62.;. 69.5. costs that exceed this provision 21, 45 and 47, paragraph cost limits; 69.6. costs that are not directly related to the funding recipient project activities does not meet the reasonable financial management, in particular value for money and cost-effectiveness; 69.7. costs for which payments are made later than one month after the expiry of the implementation of the project; 69.8. costs not justified by supporting documents or the costs incurred by the law of the non-compliance; 69.9. project beneficiaries requires account opening and maintenance costs; 69.10. value added tax (except when the beneficiary is unable to recover it from the State budget in accordance with the laws of the Republic of Latvia in the field of tax), customs duties, fees and penalty payments. 70. Where expenditure actually incurred exceed the total eligible cost of the project or project planning or implementation occurs during non-eligible expenditures or costs, the fact that the beneficiary of the said cost shall be borne by the funds at its disposal, the European Union funds and the State budget financing, the redistribution of savings or from other funding recipient project funding positions. 71. This provision 12, paragraphs 35 and 54 applicants for this project and this provision in paragraph 35 that the cooperation partner (if applicable) to the following requirements: 71.1. it is not the merchant difficulty according to Commission Regulation No 651/2014 2 of article 18 definition laid down in point (if applicable); 71.2. the tax debt, the State social insurance compulsory contribution and other State specific minimum charges an amount not exceeding eur 150; 71.3. this cooperation body, the responsible authority or any other competent institution does not knowingly provided false information in connection with European Union structural funds co-financed projects implementation; 71.4. He has received and don't plan to get funding from national or European Union funds or other financial resources for the same eligible costs or research results; 71.5. where this provision in paragraph 54 above, the applicant is assigned to the project business support in accordance with Commission Regulation No 651/2014, body checks, or not subject to recovery orders referred to in Commission Regulation No 651/2014 1. paragraph 4 of point "a"; If the project applicant 71.6. implemented by economic activity-related project and one of the sectors in which the applicant is not eligible for the project, but the project applicant qualifies for project implementation, project sector eligible applicant clearly distinguish between activities eligible sectors and implementing related financial flows from the activities of other sectors and financial flows during project implementation and five years after the final payment is made, apply to this provision the project referred to in paragraph 54 of the applicant; If the project applicant 71.7. take both economic activities and activities which are not economic in nature, it differentiates the kinds of activities and their costs, funding and revenue so as to effectively prevent cross-subsidisation of economic activity, – to apply to this rule 35 and projects referred to in paragraph 54 of the applicant; 71.8. these provisions, paragraph 35, the applicant received the project of cooperation between the authorities call for project submissions, the applicant of the project 20 working days after the date of entry into force of the cooperation body, provide to the applicant's financial management and accounting policy description and turnover report (annex 1) for the last three years, the report concluded that justify the project met the definition of research organisations; 71.9. the applicant that the project meets the definition of a research organization: 71.9.1. to separate the economic activity related activity (and related financial flows) from the economic key activities; 71.9.2. operating activities and related financial flows from other scientific institutions activities and related financial flows. 72. The project is not eligible activities and sectors that correspond to Commission Regulation No 651/2014 1. and in paragraph 2 of article 3, point "c" and "d" in the subparagraph. 73. Project aid shall not be granted if there's someone of Commission Regulation No 651/2014 1. in paragraph 5 of article specific cases. 74. The implementation of the project in the first place, the second and third rounds within the territory of the Republic of Latvia. 75. The beneficiary not less frequently than once every three months on its tīmekļvietn the current information on the progress of the implementation of the project. 76. The beneficiary provides project information and publicity measures pursuant to Council Regulation No 1303/2013 and regulations, arrangements for the European Union's structural and cohesion funds in 2014 introduction – 2020 programming period provide a communications and visual identity requirements. 77. measures in support of integration of environmental requirements in the procurement of goods and services (green procurement). 78.12 and 35 of these regulations, paragraph beneficiary: 78.1. data on the horizontal principles to accumulate "equal opportunities" horizontal indicator – number of projects in which the European regional development fund investment has resulted in gender equity, disability, age and ethnic principles (if applicable); 78.2. accumulate data on the horizontal principle, "sustainable development" horizontal indicators – project green procurement used (if applicable) to ensure that the conditions of paragraph 77. 79. The beneficiary shall ensure the sustainability of the expected results on the project for at least five years after the final payment is made. 80. cooperation authority have the right to unilaterally withdraw from the agreement or contract for the implementation of a project in any of the following cases: 80.1. the beneficiary does not comply with the agreement or contract, including non-compliance with the time limits set out in the project or have other circumstances occurred which negatively affects or may affect the purpose or objective of the event, the monitoring indicators; 80.2. the beneficiary during project implementation deliberately gives a cooperation body of false information, and it negatively affects or may affect the event target or target specific support measures monitoring indicators; 80.3. in other cases determined by the agreement or contract. 81. If, through economic activity related projects, liaison body or during the project implementation period of five years after the final payment, finds that these rules have not been observed, in point 2.4., 63.62.1, 64 and paragraph 65.2. the conditions referred to in the implementation of the project allocated public funds to be considered unfounded and granted the requested funding repayable from private funding in the State budget in the following order: 81.1. If the project is launched before the project application not following this rule 2.4 and 65.2. above, the beneficiary of the cooperation body fully reimburse all the public funding received; 81.2. failure to comply with any of these terms or in 63 62.1.64 or conditions listed in, but the other conditions are met for State aid in the commercial, the beneficiary shall repay public funds, the difference between the original application and the actual situation appropriate. 82. If, through economic activity unrelated projects, liaison body or during the project implementation period of five years after the final payment, finds that the project does not match this rule and 2.5 2.1. criterion, referred the project to the allocated public funding is considered to be unfounded and the beneficiary received the full repayment of the private funding. 83. On this rule 20.3. aid referred to in the programme "Horizon 2020" and submitted over the threshold of quality draft evaluated the development of the application of this provision, paragraph 35, the applicant and its project partner (if applicable) will not be eligible if the project application development costs are covered from the second round of funding. 84. in order to ensure the dubultfinansējum control, measure the liaison body and the national education development agency implemented a bilateral cooperation through interdepartmental agreement on Exchange of information and data and for a coherent and complementary activities implemented by laying down procedures for the exchange of information on the programme "Horizon 2020" and submitted over the threshold of quality assessed the application. 85. Public funding of economic activities linked to the implementation of projects awarded in accordance with Commission Regulation No 651/2014 25. article. 86. in support of the measure (including de minimis aid) can be combined with support for the same eligible costs provided in another State aid program and project (including the can not be combined with other State aid programme or project in de minimis support). 87. The beneficiary shall supply and liaison body accumulating data for this rule 17, 41 and monitoring referred to in paragraph 59. Data for this rule, 17.2.1.17.1.1., and 41.1. in paragraph 17.3. and 59 the indicators referred to in paragraph liaison body accumulates according to statistical classification of economic activities NACE Rev. 2 and the Organization for economic cooperation and development, Frascati manual, developed "guidelines for the development of research and experimental development data collection and notification" field and a two-digit subsectors. 88. cooperation authority supports 651/2014 9 of Commission Regulation No 1 and 4 of article specified in paragraph publicity measures. 89. cooperation authority and 56.2. these provisions in the implementing of the project referred to in the Commission Regulation provides no 651/2014 12 monitoring laid down in the article. 90. The decisions on the granting of aid, in accordance with Commission Regulation No 651/2014 59. Article or of Commission Regulation No 1407/2013 8. article does not accept the application of the said regulation the end date of the period. Prime Minister Māris kučinskis education and Science Minister Karlis Šadursk by the Ministry of education and science presented in annex 1 of the Cabinet of Ministers on 6 June 2017 regulations No 315 scientific institutions < name > turnover report for 20 years _.: 1. expenditure by economic classification codes (CEC) and dimensions: the nature of the operations and activities of CEC N S together in an activity which is not economic in nature of a total economic activities operating activities other activities a total of other operating activities of a total education research technology transfer education Research technology transfer F R E F R E fundamental research industrial research experimental development fundamental research industrial research experimental development revenue 0 0 0 0 0 0 0 0 0 2 by economic classification codes (CEC) and dimensions: the nature of the operations and activities of CEC N S together in an activity which is not economic in nature of a total economic activities operating activities other activities do not direct action together operating other action of a total education research technology transfer education research technology transfer F R E F R E fundamental research industrial research experimental development fundamental research industrial research experimental development 0 0 0 0 0 0 0 0 0 Minister of education and science Charles Šadursk by Annex 2 of the Cabinet of Ministers on 6 June 2017 regulations No 315 of the operational programme "growth and employment" specific support 1.1.1. St's target to increase "scientific research institutions of Latvia and the innovative capacity and the ability to attract external funding, investing in human capital and infrastructure" measure "support 1.1.1.5. international cooperation projects in research and innovation" project submission within one round of public funding available for allocation to the scientific methodology of the calculation of the institutions 1.  Operational programme ' growth and employment ' specific support 1.1.1. objective "to increase scientific research institutions of Latvia and the innovative capacity and the ability to attract external funding, investing in human capital and infrastructure" measure "support 1.1.1.5. international cooperation projects in research and innovation" (hereinafter referred to as 1.1.1.5) in public funding available for the Fi distribution by scientific institutions is calculated using the following formula:, where Fi-project ' i ' to the applicant, the total available public funds (euro);
I – applicant of the project options (i = 1, 2, ...);
FSI-project applicant available initial public funds for the promotion of international cooperation to eur 70 000;
FP-project available to the applicant for additional public funding for the promotion of international cooperation (in euro); -funding for European research infrastructure consortium (ERIC Consortium) national partnerships for the implementation of the plan, as determined in the amount of eur 20 000 for one year and available in this provision, 35.10.35.4, 35.11 35.15.35.17., and referred to the applicant on the project three years ago, when ERIC Consortium Latvia has observer status, or for a period of five years, if ERIC is a member of the Latvia Consortium status or funding the European nuclear research organisation in Latvia's national point of contact to function for five years available in 35.16. these provisions in the applicant for this project, or funding for the implementation of cooperation activities between 35.9. these provisions referred to in the project applicant, quantum Software Research Centre (Netherlands) and Quantum Computing Centre of Paris (France) for a period of five years; – the project for the applicant the minimum available funding for the promotion of international cooperation in the amount of eur 18 000, which is determined when the FP in accordance with this annex, 2., 3., 4., 5 and 6 point of calculation laid down in not more than 18 000 eur; -project funding available to the applicant, provided that the provisions referred to in paragraph 44.6 project management. 2. additional public funding for the promotion of international cooperation is calculated using the following formula:, where FP-total available additional public funding for the promotion of international cooperation (in euro);  – the project for the applicant the additional public funding for international cooperation for the implementation of the measures laid down in the light of the applicant's project institutional capacity (euro);  – the project for the applicant the additional public funding for international cooperation for the implementation of the measures laid down in the light of the success of the applicant in the project of European Union research and innovation framework programme "Horizon 2020" during the period from 2014 to 2016 (euro). 3. the project for the applicant calculated the additional public funding for international cooperation for the implementation of the measures laid down in the light of the applicant's project institutional capacity, calculated using the following formula: where: the applicant's project institutional capacities for the promotion of international cooperation is established, pursuant to this rule 47.2. maximum limit referred to;  1.1.1.5. the second measure — the project application selection round of project applicants available initial additional public funding for the promotion of international cooperation. 4. the applicant's Project institutional capacity for international cooperation for the implementation of the measures is calculated using the following formula:, where Ki-(i) by the applicant of the project institutional capacity coefficient of performance;  -project of the capacity factor of the institutional characteristics.
Ki = (I2016 + P2016) × AT2016 + (I2017 + P2017) × AT2017, which – financial resources for the maintenance of the scientific institutions in 2016, established under the Cabinet of Ministers on 12 November 2013 rules no 1316 "order in which calculations and assign the base funding for scientific institutions," said the statement.  -financial resources employed in scientific institutions, research staff principal investigator, researchers and scientific assistant – remuneration of 2016, established under the Cabinet of Ministers on 12 November 2013 rules no 1316 "order in which calculations and assign the base funding for scientific institutions," said the statement.  -scientific institutions development factor 2016. year determined in accordance with the Cabinet's 12 November 2013 rules no 1316 "order in which calculations and assign the base funding for scientific institutions," said the statement.  -financial resources for the maintenance of the scientific institutions in the year 2017, determined in accordance with the Cabinet's 12 November 2013 rules no 1316 "order in which calculations and assign the base funding for scientific institutions," said the statement.  -financial resources employed in scientific institutions, research staff principal investigator, researchers and scientific assistant – reimbursement in the year 2017, determined in accordance with the Cabinet's 12 November 2013 rules no 1316 "order in which calculations and assign the base funding for scientific institutions," said the statement.  -development of scientific institutions in the year 2017, the factor determined in accordance with the Cabinet's 12 November 2013 rules no 1316 "order in which calculations and assign the base funding for scientific institutions" that calculation. 5. Project funding available to the applicant, the international cooperation for the implementation of the measures laid down in the light of the success of the applicant in the project of European Union research and innovation framework programme "Horizon 2020" during the period from 2014 to 2016, is calculated using the following formula: where: project applicant characteristics of international cooperation;  – These rules specified in the second action project 1.1.1.5 application selection round of the original total outcome indicator; F-measure 1115.2 k 1.1.1.5. the second project application selection round of project applicants available initial additional public funding for the promotion of international cooperation. 6. the project applicant characteristics of international cooperation factor RH2020 is determined using the following formula:-project human resources the applicant's individual margin of one European Union research and innovation framework programme "Horizon 2020" and submitted over the threshold of quality assessment project for the preparation of the application, which is calculated using the following formula: where: the applicant's project the average number of research staff (full time equivalent terms) during the period from 2013 to 2015, which is not less than the number of research staff (full time equivalent terms) in 2015;  – the project submitted by the applicant and above quality threshold estimated project applications in the European Union's research and innovation framework programme "Horizon 2020" (contained in a fixed in accordance with the European Parliament and of the Council on 11 December 2013 Regulation (EU) No 1291/2013 (11 December 2013) establishing research and innovation framework programme "Horizon 2020" (2014-2020) and repealing Decision No 1982/2006/EC , article 5 and 36 in the preamble). 7. Project funding available to the applicant for this rule stated in 44.6 project management, calculated using the following formula: education and Science Minister Karlis Šadursk a