STATE NEWS

REPUBLIC OF INDONESIA No. 304, 2017 KEMEN-ESDM. EXCESS POWER. UTILIZATION

COAL.

REGULATION OF ENERGY MINISTER AND MINERAL RESOURCES

REPUBLIC OF INDONESIA

NUMBER 19 YEAR 2017

ABOUT

COAL UTILIZATION FOR POWER GENERATION

AND THE PURCHASE OF EXCESS POWER GENERATION (EXCESS POWER)

WITH THE GRACE OF THE GOD ALMIGHTY

MINISTER OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA,

DRAWS: A. that in order to increase utilization

coal optimally in the development

power plant, as well as improving the role

power plant of the operating permit holder to

keep the availability of electrical power on the system

local notorials, need to set the provisions

regarding the coal utilization for plant

electricity and the purchase of excess power (excess

power);

b. that based on consideration as

referred to in letter a, it needs to set the Regulation

Minister of Energy and Mineral Resources on

Coal utilization for Power Plants and

Purchase of Excess Power Electricity (Excess Power);

www.peraturan.go.id

2017, No. 304 -2-

Given: 1. Law No. 30 Year 2007 on Energy

(sheet Of State Of The Republic Of Indonesia In 2007

Number 96, Additional Gazette Republic Of The Republic

Indonesia Number 4746);

2. Law No. 4 of 2009 on

Mineral Mining and Coal (State Sheet

Republic of Indonesia 2009 No. 4, Supplement

sheet of state of the Republic of Indonesia Number 4959);

3. Law No. 30 Year 2009 on

Fame of the Republic of Indonesia

in 2009 Number 133, Additional Sheet Country

Republic of Indonesia Number 5052);

4. Government Regulation No. 23 of 2010 on

Implementation Of Mineral Mining Efforts and

Coal (State Of The Republic Of Indonesia Year

2010 Number 29, Additional Gazette Republic

Indonesia Number 5111) as it has been several times

amended last with Government Regulation No.

1 Year 2017 on the Fourth Change of the Year

Government Regulation No. 23 of 2010 on

Implementation of the Undertaking Activities Mineral Mining and

Coal (State Sheet of the Republic of Indonesia Year

2017 Number 4, Additional State Sheet Republic

Indonesia Number 6012);

5. Government Regulation No. 14 of 2012 on

The Activities of Supplying Electric Power (Sheets

State Republic Of Indonesia In 2012 Number 28,

Additional Sheet Republic Of Indonesia Number

5281) As has been amended by Regulation

Government Number 23 Year 2014 on Change

over Government Regulation No. 14 Year 2012

on the Activities of the Electrical Energy Provision

(State Sheet of the Republic of Indonesia Year 2014

Number 75, Additional State Sheet Republic

Indonesia Number 5530);

www.peraturan.go.id

2017, No. 304 -3-

6. Government Regulation No. 79 of 2014 on

National Energy Policy (Republican Gazette

Indonesia Year 2014 Number 300, Extra Sheet

State of the Republic of Indonesia Number 5609);

7. President Regulation No. 68 of 2015 on

Ministry of Energy and Mineral Resources (Sheet

State of the Republic of Indonesia 2015 Number 132)

as amended by the Presidential Regulation

Number 105 of the Year 2016 on the Change of

Presidential Regulation No. 68 of 2015 on

Ministry of Energy and Mineral Resources (Sheet

State of the Republic of Indonesia 2016 Number 289);

8. Regulations Minister of Energy and Mineral Resources

Number 09 of 2016 on the Tata Way of Supplies and

Coal pricing for Power Plants

Mouth Mouth (Republic of Indonesia State News

2016 Number 512) as amended with

The Regulation of the Minister of Energy and Mineral Resources

Number 24 of 2016 on Change of Regulation

Minister of Energy and Mineral Resources Number

09 Year 2016 on Tata Cara Provision and

Coal pricing for Power Plants

Mine Mouth (State News of the Republic of Indonesia of the Year

2016 Number 1367);

9. Regulation of the Minister of Energy and Mineral Resources

Number 13 of 2016 on Organization and Work

Ministry of Energy and Mineral Resources (News

State of the Republic of Indonesia 2016 Number 782);

DECIDED:

SET: REGULATION OF MINISTER OF ENERGY AND RESOURCES

MINERALS ON THE UTILIZATION OF COAL FOR

POWER GENERATION AND EXCESS PURCHASE

ELECTRICAL POWER (EXCESS POWER).

www.peraturan.go.id

2017, No. 304 -4-

BAB I

provisions of UMUM

Article 1

In this Ministerial Regulation referred to:

1. Coal is the precipitate of carbonan organic compounds

that is formed naturally from the remainder growing-

plants.

2. The next power-selling agreement

referred to as the PJBL is a power-buying agreement

electricity between PT Companies Electric Negara (Persero)

as a buyer with the seller as the seller.

3. The Price of Coal For Mouth Power Plant

Mine is a specially designated price for

Batubara used as fuel

mine mouth power plant.

4. The mine-mouth power plant is the plant

electric power plant and gas power plant

Batubara, which uses Batubara fuel,

which is guaranteed the availability of Batubara by the company

mine On the sale deal for the coal.

5. Mine company is a company that

carried out the activities of its Batubara mining business.

6. The Mine Mouth Power Plant is the

holder of an electric power supply venture that

operates the Mine Mouth Power Plant.

7. The next PT Corporate Electricity Company (Persero)

called PT PLN (Persero) is the state-owned enterprise

state established under Government Regulation

No. 23 of 1994 on Disposition of Forms

The Company General (Perum) Power Of State To

Company Of Perseroan (Persero).

8. The underlying cost of the next generation of Regenerating

called the Dissenters ' BPP is the provision of the provision

electric power by PT PLN (Persero) in the generation

electric power, excluding the power supply charge

electricity.

www.peraturan.go.id

2017, No. 304 -5-

9. Power Systems Network Rules (Grid Code) are

a set of rules, requirements, and standards for

guarantees the safety, reliability and operation and

efficient system development in the meet

An increase in the need for electrical power in the power system

electricity.

10. Commercial Operation Date later abbreviated

COD is the start date of the plant's operation

electric power to channel electrical energy into

the electric power grid of PT PLN (Persero).

11. Capacity Factor further abbreviated to CF was

capacity factor, comparison between flat-capacity-

flat in megawatt (MW) of production during the period

specified for the installed capacity.

12. The Electric Power Dissenters ' Agency is

an electric power producer company other than PT PLN

(Persero) which conducts a power-buying agreement

electricity with PT PLN (Persero).

13. The Minister is the minister who organizes affairs

governments in the field of energy and mineral resources.

Article 2

The Regulation of the Minister governs the provisions regarding

utilization of Batubara to the plant electric and

purchase of excess power (excess power) from

operating permit holder.

BAB II

Coal-fueled power plant

Part Kesatu

General

Article 3

(1) In order to meet the power provision obligations

electricity, holder power supply permit

which has an enterprise area can do

www.peraturan.go.id

2017, No. 304 -6-

The purchase of electric power from power generation

bakar Batubara.

(2) The purchase of electric power as referred to

paragraph (1) is executed on the venture plan

The provision of electric power.

(3) Coal-based power plants

as referred to in paragraph (1) may be:

a. The Mine Mouth Power Plant; or

b. mining nonmouth power plant.

(4) Purchase of electric power from the Mulut Power Plant

Mine as referred to in paragraph (3) the letter a

can be done through the direct designation.

(5) Purchase of the power power from nonmouth power plant

mine as referred to in paragraph (3) letter b

is done in accordance with regulatory provisions

laws.

Second Quarter

Mine Mouth Power Plant

Article 4

(1) In the framework of the construction of the Mulut Power Plant

Mine, PT PLN (Persero) and the Effort

Dissenters of Electric Power required to ensure that

alokasi/supply of Batubara corresponds to the PJBL.

(2) Coal supply as referred to

paragraph (1) is conducted under the purchase agreement

Batubara between the Mine Company with

The Company of the Mine Mouth Power Plant.

(3) the Company The Mine Mouth Power Plant

as referred to in paragraph (2) may be:

a.

integrate with the following: electric power supply authorization holder

generation.

www.peraturan.go.id

2017, No. 304 -7-

(4) Coal provision for Plant development

Mine Mouth power may be supplied by more than 1 (one)

Mine Company.

Section 5

(1) Purchase of electrical power from Mouth Power Plant

Mine as referred to in Article 3 of the paragraph (3)

the letter a is exercised under the PJBL.

(2) The PJBL as referred to in paragraph (1) is exercised

for a period of 30 (thirty) years since

COD.

(3) The purchase price of electric power from the Power Plant

The Mine Mouth as referred to in paragraph (1)

is specified with the following conditions:

a. in terms of Dissenitan BPP in the system

local composure is the same or below

average national Disobedience BPP, price

highest benchmark of 75% (seventy-five

percent) of BPP Dissenters in the system

local notoriality; or

b. in terms of Dissenters BPP in the system

local notoriality above average BPP

National Dissenters, the highest benchmark price

by 75% (seventy-five percent) of the average

BPP Dissenters nationwide.

(4) The terms of the purchase of electric power purchase price as

referred to in paragraph (3) are designated as CF's assumption

a plant of 80% (eighty percent).

(5) Dissenters in the local system of composure

and the average national Disseness BPP as

referred to in paragraph (3) is the Dissenters ' BPP at

the local system of composure and the average BPP

The national disobedience of the previous year that

has been established by the Minister based on the proposal of PT PLN

(Persero).

www.peraturan.go.id

2017, No. 304 -8-

Section 6

In order for the implementation of power grid development

electricity for the power evacuation of the Mulut Power Plant

Mine to the dial point of PT PLN (Persero),

construction The network can be done by the Business Agency

Disobedience of Electric Power based on the mechanism that

mutually beneficial (business to business).

Third Part

Non-Mulut Electric Power Plant

Article 7

(1) Purchase of electrical power from nonmouth power plants

mine as referred to in Article 3 of the paragraph (3)

letter b is performed under the PJBL.

(2) The PJBL as referred to in paragraph (1) is exercised

for a period of 30 (thirty) years since

COD.

(3) The purchase price of electric power from the power plant

nonmouth of the mine as referred to in paragraph (1)

is set for the following capacity:

a. larger than 100 MW (one hundred megawatts); and

b. up to 100 MW (hundred megawatts).

Article 8

(1) The purchase price of electric power from power generation

nonmouth mine with greater capacity than

100 MW (hundred megawatts) as intended

in Section 7 of the paragraph (3) letter a, set to

terms as follows:

a. in terms of Dissenitan BPP in the system

local composure is the same or below

average BPP National Plant, benchmark price

highest of BPP Dissenters in the system

local notoriality; or

www.peraturan.go.id

2017, No. 304 -9-

b. in terms of Dissenitan BPP in the system

local composure above average BPP

National Disobedience, highest benchmark price

of the national Dissenters BPP.

(2) The purchase price of the power plant from the plant electric

nonmouth mine with capacity up to 100

MW (hundred megawatts) as intended in

Section 7 of the paragraph (3) letter b, specified with the provisions

as follows:

a. in the case of the Dissenters BPP in the system

local composure is the same or below

average national Disseness BPP, price

The highest benchmark of BPP Dissenters at

local notoriality system; or

b. in terms of Dissenitan BPP in the system

Local composure above average BPP

National Dissenters, power purchase prices

electricity set based on auction or

mutually beneficial mechanisms (business to

business).

(3) The provisions of the purchase price of electric power as

are referred to in paragraph (1) letter a and paragraph (2) letter a,

using the price of Batubara for the power plant

mine nonmouth corresponds to the principle passthrough

based on the assumptions of Batubara prices at the time

using the BPP in the local notoriagalism system.

(4) The terms of the purchase of electric power purchase as

are referred to in paragraph (1) and paragraph (2) is set with

assumption of generating plant by 80% (eighty

percent).

(5) Dissenters in the local system of composure

and the average national Disseness BPP as

referred to in paragraph (1) and paragraph (2) are BPP

Dissenters in the local system of composure and

average national Dissenters BPP in the year

previously specified by the Minister

based on the proposed PT PLN (Persero).

www.peraturan.go.id

2017, No. 304 -10-

Article 9

In order to perform the construction of the power grid

electricity for the power evacuation of the nonmouth power plant

mine to the dial point of PT PLN (Persero),

network development may be performed by the Enterprise

Disobedience of Electric Power based on the mechanism that

mutually beneficial (business to business).

Article 10

(1) Purchase of electric power from Mouth Power Plant

Mine and mine nonmouth power plant

as referred to in Section 5 and Section 8

using a co-building pattern to build, have,

operate, and assign (build, own, operate,

and transfer/BOOT).

(2) Further provisions regarding the same pattern of cooperation

as referred to in paragraph (1) are set in PJBL.

Fourth Quarter

The Lyric Energy Purchase From Expansion Plant

Article 11

(1) In terms of the purchase of electric power from the plant

expansion electricity at the same location, it can be performed

through direct appointment with the purchase price

electrical power must be below the benchmark price

as referred to in Section 5 and Section 8.

(2) In terms of the purchase of electric power from the plant

the expansion electricity at different locations on the system that

same, can be done through direct elections

with the purchase price of an electric power must be below

the benchmark price as referred to in Section 5 and

Article 8.

www.peraturan.go.id

2017, No. 304 -11-

BAB III

PURCHASE OF ELECTRIC EXCESS OF

OPERATING PERMIT (EXCESS POWER)

Article 12

(1) Licensee's business permit provision of which is

has an area of effort to purchase excess power

electricity (excess power) of the operating permit holder to

strengthen the local electric power supply system.

(2) Purchase of excess electrical power (excess power)

as referred to a paragraph (1) can be greater

of the electrical power used to be alone and in accordance with

the conditions or needs of the local system of notorialism

.

(3) Power plant operations of the plant

operating permit holders must refer to the Rules

Network Power Systems (Grid Code) on the system

local or electrical power distribution rules.

Article 13

(1) The purchase price of excess power (excess power)

at the highest of 90% (ninety percent) of

BPP Dissenters in the local system of notoriality.

(2) Dissenters in the local notorialization system

as referred to in paragraph (1) is BPP

Dissenters in the local system of notoriality at

the previous year that has been set by the Minister

based on the proposal of PT PLN (Persero).

(3) Purchase of excess power (excess power)

as referred to in Section 12 of the paragraph (1) can

be done through an overpowered purchasing agreement

the power of futures.

(4) the sale Agreement purchase excess power power futures

as referred to in paragraph (3) may be less or

more than 1 (one) years based on the conditions and

local system needs.

www.peraturan.go.id

2017, No. 304 -12-

Article 14

(1) PT PLN (Persero) performs a purchase price evaluation

excess power (excess power) as

is referred to in Article 13 of the paragraph (1) every year

based on Disobedience BPP changes in the system

local notoriality.

(2) Dissenters in the local system of composure

as referred to in paragraph (1) are BPP

Dissenters in the system of notoriality local that

has been set by the Minister based on the proposal of PT PLN

(Persero).

BAB IV

TRANSITIONAL provisions

Section 15

At the time the Minister's Ordinance came into effect, against

The Board of Dissenters of Power Power:

a. has done the auction process and already offers

price;

b. set as an auction winner;

c. has signed a letter of appointment (letter of intent);

or

d. has signed the PJBL,

process of implementation of its purchase and power price

in accordance with the provisions set out in the regulations

laws before this Minister Regulation

promulgled.

Article 16

The purchase agreement of excess power (excess power)

before the signing of this Ministerial Regulation

remains in effect until the end of the agreement

sell the buy excess power power (excess power).

www.peraturan.go.id

2017, No. 304 -13-

BAB V

PROVISIONS

Article 17

At the time the Minister's Ordinance came into effect:

1. The provisions of the excess power (excess

power) as referred to in Article 13 and Section

14 Regulation of the Minister of Energy and Mineral Resources

Number 01 2015 of the Cooperation of the Supplies

Electric Power and Mutual Benefit Network

Electric Power (Indonesian Republic News Of The Year

2015 Number 3);

2. Regulation of the Minister of Energy and Mineral Resources

Number 03 of 2015 on the Purchasing Procedures

Electric Power and Power Purchase Risk

Electricity from PLTU Mulut Mine, PLTU Batubara,

PLTG/PLTMG, and PLTA by PT PLN (Persero) Through

Direct election and Direct Show (News

State of the Republic of Indonesia Year 2015 No. 49); and

3. the provisions of the excess power (excess

power) as referred to in Article 16 and Section

17 Regulation of the Minister of Energy and Mineral Resources

No. 21 Year 2016 on the Purchase of Electric Power

of the Biomassa Power Plant and Plant

Biogas Electricity by PT Companies Power Negara

(Persero) (Republic of Indonesia State News 2016

No. 1129),

revoked and declared no apply.

Article 18

The Minister ' s Regulation is beginning to apply on the date

Put it down.

www.peraturan.go.id

2017, No. 304 -14-

For everyone to know, ordered

the invitational of the Minister's Regulation with its placement

in the Republic of Indonesia News.

Specified in the Jakarta

on February 14, 2017

MINISTER OF ENERGY AND MINERAL RESOURCES

REPUBLIC OF INDONESIA,

ttd

IGNASIUS JONAN

It was promulded in Jakarta

on the 17th February 2017

DIRECTOR GENERAL

REGULATION

MINISTRY OF LAW AND HUMAN RIGHTS

REPUBLIC OF INDONESIA,

ttd

WIDODO EKATJAHJANA

www.peraturan.go.id